Covenant Mayor's Investment Forum Brussels, Belgium | 19th February 2019
Creating renewable future
GOLEA – GOriska Local Energy Agency
Covenant Mayor's Investment Forum Brussels, Belgium | 19th February 2019
• Founded in 2006 by Nova Gorica municipality.
Co-financed by EU-Intelligent Energy Europe – IEE programme.
• Mission of GOLEA: promotion of Renewable Energy Source - RES
and Energy Efficiency – EE
with focus to the energy self-handling region,
focus to the sustainable region within Primorska region
• Our motto: creating renewable and sustainable future.
• Energy Manager in 21 Primorska Municipalities in 3 statistic regions
EMS in 21 municipalities enables us to make data available – base line (marked blue)
Creating renewable future
LEC, SEAP, SECAP in Primorska Municipalities
Covenant Mayor's Investment Forum Brussels, Belgium | 19th February 2019
Creating renewable future
7 accessed municipalities of covenant of Mayor‘s
Covenant Mayor's Investment Forum Brussels, Belgium | 19th February 2019
ENERGY MANAGEMENT SYSTEM AT MUNICIPALTY• Implementation energy management system.
• Based on data from monthly energy bills.
• Energy supervisory system data integration.
• Setting first energy performance indicators.
• Evaluation on energy efficiency.
• Encouraging first steps for improving energy
efficiency, based on systematic energy
efficiency evaluation.
Setting strong base for long-term energy
savings.
Knowledge and experience are essential for the
successful application of ELENA TA.
Creating renewable future
plan – do – check – act circle
ENERGY REFURBISHMENT OF PUBLIC BUILDINGS LS-1 LS-2 2007-2014
Covenant Mayor's Investment Forum Brussels, Belgium | 19th February 2019
LS-1: 12.448.319 € investment 9.368.850 € EU Cohesion found
507.363 €/a energy savings, 1.346 t/a reduction CO2
LS-2: 7.579.457 € investment 4.276.890 € EU Cohesion found
za 332.172 €/a energy savings, 881 t/a reduction CO2
Together: 20 m€ investment, 13,5 m€ subsidy
8 GWh, 800,000 € savings, 2,000 t CO2 per year is saved
Creating renewable futureknowledge and experience
Renovation Street Lighting and Biomass DH
Covenant Mayor's Investment Forum Brussels, Belgium | 19th February 2019
UJR tender for renovation Street Lighting:
883.511,51 € EU found, 2.895 MWh/a savings
1.620 t/a reduced CO2 emissions
Novo mesto, 435.492,84 €, 1.522 MWh/a savings
Ajdovščina, 142.628,82 €, 686 MWh/a savings
Kanal, 83.629,25 €, 262 MWh/a savings
Brda, 175,249 €, 292 MWh/a savings + ESCO EPC
Miren – Kostanjevica 46,511 €, 133 MWh/a + ESCO EPC
DOLB tender – Biomass District Heating
DOLB Miren – Kostanjevica, 678,210 €, 339,105 € EU, 500 kW
ELENA TA:
DOLB Bovec, 1,116,863 €, 581,091 € EU, 1,000 kW
micro DOLB Kobarid, 267,316 €, 139,453 € EU, 300 kW
in progress: micro DOLB OŠ Hrpelje
micro DOLB OŠ Rovte
micro DOLB OŠ Črni vrh nad Idrijo
micro DOLB ŠC Tolmin
Creating renewable future
The first EPC project.
knowledge and experience
GOLEA – EPC – energy renovation of municipal buildings in Brda
SCHOOL DOBROVO SCHOOL KOJSKO MUPICIPALITY BUILDING TOTAL
MUNICIPALITY 266.747,00 € 2.879,04 € 0,00 € 269.626,04 €
SUBSIDY 504.088,00 € 128.394,74 € 0,00 € 632.482,74 €
ESCO 9.430,00 € 37.500,00 € 316.783,00 € 363.713,00 €
TOTAL 780.265,00 € 168.773,78 € 316.783,00 € 1.265.821,78 €
ANUAL SAVINGS MWh/a 187,38 42,28 25,49 255,15
ANUAL SAVINGS €/a 36.521,00 € 5.061,00 € 8.059,37 € 49.641,37 €
?
• Preparation of ESCO tender: March 2014
• Opening session: 30.6.2014
• Signing of Contract: till 30.8.2014
• Beginning of works: 1.10.2014
• Completion of works 30.11.2014
EPC + = EPC + ESC
Energy Performance Contracting
Energy Supply Contracting
Creating renewable future
The pilot EPC project – guidelines for EPC in SI.
knowledge and experience
GOLEA – EPC – energy renovation of municipal buildings in Brda
Contractor under the contract guarantees that its actions to save energy since the beginning of the obligation to
implement the main service until the end of the contract to reduce the reference quantity of energy consumption for the
amount of the guaranteed energy savings.
Guaranteed savings the contractor and the municipality shared 90: 10, the excess savings shared 50 : 50If the contractor does not meet the guaranteed savings, it is determined negative difference is charged to the contractor. Contract duration: 15 years.
SUM = (RP x C + RV ) x F F < 1 !!!
annual payment for client (Municipality) should be reduced
Creating renewable futureFrom 2016 to 2018 EPC project are growing in SI.
Number Flor area Investment
The pilot EPC project – guidelines for EPC in SI.
EPC has a future in Slovenia
“Preparation and Mobilisation of Financing for Sustainable Energy Investments in Primorska Region Municipalities (PM4PM)”
ELENA TECHNICAL ASSISTANCE
Covenant Mayor's Investment Forum Brussels, Belgium | 19th February 2019
Creating renewable future
MUNICIPALITIES
OTHER PUBLIC BODIES
WIDE PUBLIC SECTOR
Covenant Mayor's Investment Forum Brussels, Belgium | 19th February 2019
Creating renewable futureCreating renewable future
Long-Term Strategy of Slovenia for Mobilising Investments in the Energy Renovation of Buildings:• annual renovation of 3% of public buildings owned by the narrow public sector,
• renovation of 1.8 million m2 of floor area in buildings in the wider public sector in the period 2014–2023
• improvement of the ratio between the invested public funds and the investment incentives in the public sector to 1:3
€115 million € in grants and €50 million € in repayable cohesion funds provided in the period 2016 - 2023
GOLEA: Energy manager for Municipalities in Primorska region• information about municipalities buildings energy efficiency state
• draft of investment for ELENA TA
Expected results: • renovation of 9.1 million m2 of floor area, which includes: 6 million m2 of floor area in residential buildings, 1.8 million m2 of
floor area in public buildings,
• renovation of 1.3 million m2 of floor area in public buildings in the wider public sector
Covenant Mayor's Investment Forum Brussels, Belgium | 19th February 2019
Creating renewable future
Coordination withMunicipalities
Submission of Pre-application – EIB
Submission ofapplication form -EIB
EIB review
EIB approval
Contract signed
October 2015 January 2016
January 2016
March 17, 2016
March 2016 June 2016
July 31, 2016
September 30, 2016
Covenant Mayor's Investment Forum Brussels, Belgium | 19th February 2019
Creating renewable future
“Preparation and Mobilisation of Financing for Sustainable Energy Investments in Primorska Region Municipalities (PM4PM)”
Project duration: 3 YEARS October 1, 2016 September
30, 2019
Total Eligible Costs EUR 2,250,000 €
The EIB contribute a maximum 90 % of the total
Eligible Costs with a maximum of EUR 2,025,000 €
FINANCING:
1.pre-payment 810,000 €
2.pre-paymet 607,500 €
Final payment 607,500 €
LEVERAGE FACTOR: 20
Investment Programme to be prepared under the Project Development Services must
represent at least 20 times the amount of the total
contribution
MINIMUM OF INVESTMENTS
45 MIO €
Covenant Mayor's Investment Forum Brussels, Belgium | 19th February 2019
Creating renewable future
Project Implementation Unit PIU:
7 employees
Energy performance contracting: key model for investment implementation.
Covenant Mayor's Investment Forum Brussels, Belgium | 19th February 2019
Creating renewable future
The PIU is assisted by various subcontracted external experts and several municipalities and utilities departments to:
Covenant Mayor's Investment Forum Brussels, Belgium | 19th February 2019
Creating renewable future
TOTAL: 380 various documents and activities
1/3 PIU, 2/3 External experts
Covenant Mayor's Investment Forum Brussels, Belgium | 19th February 2019
Creating renewable future
54 IMO €INVESTMENT PROGRAMME
OVER 350 VARIOUS DOCUMENTS,
PREPARED BY PIU
130 EXTERNAL EXPERTS
CONTRACTS
73INVESTMENT
PROJECTS
32PROJECT
PARTNERS:
Covenant Mayor's Investment Forum Brussels, Belgium | 19th February 2019
PROJECT PARTNER ENERGY EFFICIENCY IN PUBLIC BUILDINGS
DISTRICT HEATING STREET LIGHTING
CLEAR TRANSPORT
LOCAL ENERGY EFFICIENT UTILITIES
PROJECTS TOTAL
1 MUNICIPALITY AJDOVŠČINA 1.645.546 32.899 1.678.446
2 MUNICIPALITY BOVEC 586.000 2.246.945 122.000 0 2.954.945
3 MUNICIPALITY BRDA 0 60.000 2.782 62.782
4 MUNICIPALITY CERKNO 1.250.942 296.800 1.547.742
5 MUNICIPALITY DIVAČA 479.114 44.026 523.139
6 MUNICIPALITY HRPELJE-KOZINA 494.984 511.921 1.006.905
7 MUNICIPALITY IDRIJA 3.051.209 357.575 4.076.015 7.487.527
8 MUNICIPALITY ILIRSKA BISTRICA 1.607.000 1.292.036 5.563 2.904.599
9 MUNICIPALITY IZOLA 914.451 860.000 13.908 1.788.359
10 MUNICIPALITY KANAL OB SOČI 270.000 38.463 308.463
11 MUNICIPALITY KOBARID 500.000 317.977 118.020 935.996
12 MUNICIPALITY KOPER 2.636.418 598.982 1.800.000 212.280 5.247.680
13 MUNICIPALITY LOGATEC 1.143.623 1.143.623
14 LOG- DRAGOMER 1.089.259 1.089.259
15 MUNICIPALITY MIREN-KOSTANJEVICA 110.000 33.417 36.401 179.818
16 MUNICIPALITY NOVA GORICA 4.801.565 371.582 1.000.000 38.463 6.211.609
17 MUNICIPALITY POSTOJNA 3.709.324 389.574 4.098.898
18 MUNICIPALITY PIVKA 243.118 335.955 579.073
19 MUNICIPALITY RENČE-VOGRSKO 225.228 50.000 5.563 280.792
20 MUNICIPALITY SEŽANA 1.300.000 1.300.000
21 MUNICIPALITY ZAGORJE 1.700.000 112.019 1.812.019
22 KOVOD 341.727 341.727
23 HOUSING FUND NOVA GORICA 0
24 HOUSING FUND KOPER 180.000 180.000
25 MUNICIPALITY METLIKA 1.141.562 481.900 1.623.462
26 MUNICIPALITY TOLMIN 455.631 500.000 955.631
27 STUDENT HOME NOVA GORICA 1.000.000 1.000.000
28 MUNICIPALITY ŽUŽEMBEK 1.212.449 1.212.449
29 MUNICIPALITY JEZERSKO 351.920 351.920
30 RETIREMENT HOME GRADIŠČE 1.317.600 1.317.600
31 UNIVERSITY OF NOVA GORICA 500.000 500.000
32 HIGH SCHOOL CENTRE NOVA GORICA 3.500.000 3.500.000TOTAL 37.406.749 6.874.090 3.534.531 2.018.067 4.288.295 54.124.460
Creating renewable future
32 PROJECT PARTNERS:
MUNICIPALITIES
PUBLIC BODIES
ELENA
INVESTMENT PROGRAMME 54 MIO €
BULDING RETROFIT:
OVER 60 BUILDINGS
37.491.313 €
PP MODEL
33 PROJECTS
26.437.064 €
EPC MODEL:
3 PROJECTS
7.211.130,72 €
DISTRICT HEATING:
13 DH SYSTEMS
7.262.509 €
STREET LIGHTING
3.534.531 €
PP MODEL
3 PROJECTS
390.020 €
EPC MODEL:
6 PROJECTS
3.244.511 €
CLEAN TRANSPORT
2.020.849 €
LOCAL ENERGY EFFICIENT UTILITIES
4.288.295 €
Covenant Mayor's Investment Forum Brussels, Belgium | 19th February 2019
Creating renewable future
39 BUILDING RETROFIT PROJECTS supported with ELENA TA
37,4 mio € 65 BUILDINGS
Projects with tenders announced: 20,3 mio € 45 BUILDINGS
EPC projects:
Contracts signed 7,2 mio EUR
MUNICIPALITY POSTOJNA: joint project EPC – building
retrofit (11 buildings) and street lighting
MUNICIPALITY METLIKA (2 buildings)
MUNICIPALITY IDRIJA (2 buildings)
Plan: 4,5 mio EUR
STUDENTS HOME NOVA GORICA
HIGH SCHOOL CENTRE NOVA GORICA – 5 buildings
Covenant Mayor's Investment Forum Brussels, Belgium | 19th February 2019
Creating renewable future
Expected final energy savings: 30% - 40%
Covenant Mayor's Investment Forum Brussels, Belgium | 19th February 2019
15 projects of district heating supported with ELENA TA 7,3 mio €
10 PROJECTS: tenders already announced5,6 mio €
5 CONTRACTS SIGNED: Municipalities Kobarid, Bovec, Miren-Kostanjevica, Zagorje, Nova Gorica
This component includes the renovation of existing and the installation of new small-scale and building integrated district heating systems
Creating renewable future
Expected primary energy savings: 10% - 20%
Estimated total annual RES production: 7,620 MWh
EPC: 3,2 mio EUR
• PIVKA
• POSTOJNA
• IZOLA
• NOVA GORICA
• BRDA
• KOPER
9 projects supported with ELENA TA 3,5 mio €
5 contracts signed: 2,1 mio €
Municipalities Kobarid, Brda, Koper, Postojna in Pivka
Covenant Mayor's Investment Forum Brussels, Belgium | 19th February 2019
Old lamp new lamps
Creating renewable future
Expected final energy savings: 40% - 50%
Electric cars for 5 municipalities
Joint tender 8 municipalities for 19 electric vehicle charging stations
Covenant Mayor's Investment Forum Brussels, Belgium | 19th February 2019
Creating renewable future
This component involves the introduction of electric vehicle
charging stations, electrical vehicles for public services, and
compressed natural gas stations.
MUNICIPALITY IDRIJA WITH PUBLIC UTILITY COMPANYImprovement plan for energy efficiency of water and waste water system in municipality of Idrija 4,4 MIO EUR
This component includes installation of IT technology for energy management
and optimisation of infrastructure system operation. It aims at improving the
EE of systems through the power reduction from pumps and subsequently the
electric energy consumption.
The annual energy savings from the local utilities projects are estimated to be
at least 10% and estimated at 17 MWh, which equate to 4t CO2 reduction.
PLANNED INVESTMENT PROGRAMME 54,1 mio €
REALISATION ON 31.12.2018 (TENDER PROCEDURES) 30,9 mio €
EPC/WORK CONTRACTS SIGNED: 26,2 mio €
PROJECTS IN PROCUREMENT PROCESS: 4,7 mio €
PROJECTS IN PROGRESS WITH ELENA TA: 19,2 mio €
Creating renewable future
Covenant Mayor's Investment Forum Brussels, Belgium | 19th February 2019
MODEL: WORK CONTRACT / PUBLIC PROCUREMENT
Investment cost………………………………………………………..………744.276 EUR
Cohesion funds……………………………………………………………….. 242.585 EUR
Net floor area of buildings………………………………...………………..…4.343,00 m2
Annual energy savings………………………………………………..… 322.600,00 kWh
CO2 reduction………………………………………………………………..……… 43,92 t
Finished in august 2018.
MEASURES:
• Thermal insulation of the external envelope
• Thermal insulation of roof
• Replacing windows and doors
• Replacement of the existing lighting system with energy-saving lighting solutions.
• Replacing the light domes
• Setting up an electrical charging station
The project was not interesting for ESCO because of long term return of investment.
Creating renewable future
Covenant Mayor's Investment Forum Brussels, Belgium | 19th February 2019
Creating renewable future
Covenant Mayor's Investment Forum Brussels, Belgium | 19th February 2019
MODEL: WORK CONTRACT / PUBLIC PROCUREMENT
Investment cost…………………………..……………1.158.515 EUR
Cohesion funds…………………………………………. 155.609 EUR
Net floor area of buildings……………………………...…. 873,83 m2
Annual energy savings…………………………….... 50.249,00 kWh
Annual Increase of RES production ……………… 31.251,00 kWh
CO2 reduction……………………………..…………………. 6,84 t
Finished in November 2018.
Cultural heritage building
Covenant Mayor's Investment Forum Brussels, Belgium | 19th February 2019
Cultural heritage building
Creating renewable future
Creating renewable future
Covenant Mayor's Investment Forum Brussels, Belgium | 19th February 2019
CULTURAL CENTRE LOGATEC OLD SCHOOL ROVTE PUBLIC BUILDING TRŽAŠKA CESTA OLD SCHOOL LAZE PRIMARY SCHOOL HOTEDRŠČICA
MODEL: WORK CONTRACT / PUBLIC PROCUREMENT
Investment cost…………………………………..………1.123.139 EUR
Cohesion funds…………………………………………… 399.210 EUR
Net floor area of buildings……………………………… 2.950,50 m2
Annual energy savings……………………………….. 213.529,68 kWh
Annual Increase of RES production ……………….. 107.497,98 kWh
CO2 reduction……………………………………………….… 43,92 t
Finished in October 2018.
Creating renewable future
Covenant Mayor's Investment Forum Brussels, Belgium | 19th February 2019
EPC MODEL: Public-private partnership through energy agreements
Investment cost…………………………………..………410.000 EUR
FINANCING: ……………………………………………. ESCO 100%
DURATION OF CONTRACT…………………………….…10 years
Annual energy savings…………………………… 555.000 kWh (75%)
Number of lightbulbs replaced: 1,251
Guaranteed savings to the Municipality through PPP: 320,000 €
Finished in October 2018.
The Municipality of Pivka did not invest any money from its own budget, since the private partner will have the investment entirely repaid from the savings achieved with lower consumption of electricity and reduced maintenance of lamps.
In the 10-year period of the public-private partnership, the Municipality of Pivka will save a further €320,000, while considering the 12-year guarantee for the lamps, the savings from public lighting will exceed 500,000 €.
• Bringing the municipalities together is certainly the right way to go, as they have a greater chance of applying for grants and
receiving more favourable bids this way.
• The key to successful implementation of projects is the participation of an independent organisation representing the interests of
public partners, which is professionally qualified and adequately staffed to roll out and manage projects. Municipalities need to be
supported in all phases of the investment process.
• It is important to set the project in a flexible way, because municipalities often change the priority projects or do not fulfil their plans
and the investment plan could not be achieved. Adding projects and new project partners helps to overcome these situations.
• Rules must be put down in the beginning of the project: - protocol on technical assistance funds delivery and payback of exceeded
technical assistance funds.
• For such a complex project it is vital to set up a relationship of co-responsability among all the partners for the whole duration of the
project. In this way all the relationship and responsibilities between parties are clearly defined. For all the contracts with external
experts three-part contracts are signed – PIU GOLEA, the participating Municipality and external contractor,
• In Slovenia, the ESCO market is underdeveloped, which is why more projects were not carried out using the EPC model. Adequate
financial mechanisms need to be put in place to encourage the development of new ESCOs.
• In the following financial perspective, grants will no longer be available, which means the municipalities will need to provide their
own funds or use financial mechanisms to implement the investment projects. Appropriate financial mechanisms replacing the
grants will thus need to be developed in cooperation with competent ministries and banks.
• Our project is considered a pilot case for further cooperation of municipalities in Slovenia.
Covenant Mayor's Investment Forum Brussels, Belgium | 19th February 2019
Creating renewable future
Covenant Mayor's Investment Forum Brussels, Belgium | 19th February 2019
Creating renewable future
Creating renewable future
Covenant Mayor's Investment Forum Brussels, Belgium | 19th February 2019