Department of Public Works and Environmental Services Planning & Design Division 12000 Government Center Parkway, Suite 449 Fairfax, VA 22035-0052 Phone: 703-324-5800, TTY: 1-800-828-1120, Fax: 703-324-4365 www.fairfaxcounty.gov/dpwes County of Fairfax, Virginia M E M O R A N D U M DATE: November 23, 2009 TO: Jimmie D. Jenkins, Director Department of Public Works and Environmental Services FROM: Ronald N. Kirkpatrick Planning and Design Division SUBJECT: Planning and Design Division Monthly Projects Status Report Attached is a copy of the October 2009 Monthly Projects Status Report. This report provides a status summary for capital projects managed within the Planning and Design Division (P&DD). A separate report will be issued by the Stormwater Planning Division for drainage related capital projects. If you have any questions, please call at 703-324-5800. RNK/ml/1257m Attachment: As Stated PUBLIC WORKS AND ENVIRONMENTAL SERVICES DISTRIBUTION Howard J. Guba, Deputy Director, Department of Public Works and Environmental Services Shahram Mohsenin, Director, Wastewater Planning and Monitoring Division Gilbert Osei-Kwadwo, Branch Chief, Wastewater Planning and Monitoring Division Edgar R. Jones, Chief, Financial Management & Financial Planning Branch, Wastewater Planning & Monitoring Division Mark M. Leonard, Wastewater Planning & Monitoring Division Randy Bartlett, Deputy Director, DPWES Steve Aitcheson, Director, Maintenance and Stormwater Management Division Craig Carinci, Director, Stormwater Planning Division (SWPD) Don Demetrius, Chief, Watershed Projects Evaluation Branch (WPEB), SWPD Chad Crawford, Chief, Watershed Projects Implementation Branch (WPIB), SWPD Scott Ramsey, MA III, SWPD, DPWES Dale Glines, Engineering Technician III, MSMD, DPWES Nat Atapoor, Director, Construction Management Division Vickie McEntire, County Surveyor, CMD Bruce Goudarzi, Chief, Utilities Construction Branch, CMD Robin W. Patton, Director, Land Acquisition Division James Ratliff, Project Manager, Land Acquisition Division John Honnick, Senior Right-of-Way Agent, Land Acquisition Division Keith Wilson, Senior Right-of-Way Agent, Land Acquisition Division Walter T. Wozniak, Chief, Planning Support Branch, P&DD Larry Ichter, Deputy Director, Transportation Design, P&DD Carey F. Needham, Deputy Director, Building Design, P&DD Ahmed Rayyan, Chief, Wastewater Design Branch, P&DD Jeff Kent, Chief, Administrative Support Branch, CAP Randall Flowers, Engineer, Wastewater Design Branch, P&DD Michael Guarino, Engineer, TDB, P&DD Shahla Zahirieh, Engineer, TDB, P&DD Jennifer Gilbert, Consultant, TDB, P&DD Erik Shively, Consultant, TDB, P&DD Brian Utterback, Consultant, TDB, P&DD Natalie Colley, Engineering Technician III, TDB, P&DD Anna Carlen, Administrative Support Branch, CAP Richard Aamodt, Electoral Board, REG Rona Courtney, Admin V, Directors Office

Upload: trinhthuan

Post on 04-May-2018

216 views

Category:

Documents


1 download

TRANSCRIPT

Department of Public Works and Environmental ServicesPlanning & Design Division

12000 Government Center Parkway, Suite 449Fairfax, VA 22035-0052

Phone: 703-324-5800, TTY: 1-800-828-1120, Fax: 703-324-4365www.fairfaxcounty.gov/dpwes

C o u n t y o f F a i r f a x , V i r g i n i a

M E M O R A N D U M

DATE: November 23, 2009 TO: Jimmie D. Jenkins, Director

Department of Public Works and Environmental Services

FROM: Ronald N. Kirkpatrick Planning and Design Division SUBJECT: Planning and Design Division Monthly Projects Status Report Attached is a copy of the October 2009 Monthly Projects Status Report. This report provides a status summary for capital projects managed within the Planning and Design Division (P&DD). A separate report will be issued by the Stormwater Planning Division for drainage related capital projects. If you have any questions, please call at 703-324-5800. RNK/ml/1257m Attachment: As Stated PUBLIC WORKS AND ENVIRONMENTAL SERVICES DISTRIBUTION Howard J. Guba, Deputy Director, Department of Public Works and Environmental Services Shahram Mohsenin, Director, Wastewater Planning and Monitoring Division Gilbert Osei-Kwadwo, Branch Chief, Wastewater Planning and Monitoring Division Edgar R. Jones, Chief, Financial Management & Financial Planning Branch, Wastewater Planning & Monitoring Division Mark M. Leonard, Wastewater Planning & Monitoring Division Randy Bartlett, Deputy Director, DPWES Steve Aitcheson, Director, Maintenance and Stormwater Management Division Craig Carinci, Director, Stormwater Planning Division (SWPD) Don Demetrius, Chief, Watershed Projects Evaluation Branch (WPEB), SWPD Chad Crawford, Chief, Watershed Projects Implementation Branch (WPIB), SWPD Scott Ramsey, MA III, SWPD, DPWES Dale Glines, Engineering Technician III, MSMD, DPWES Nat Atapoor, Director, Construction Management Division Vickie McEntire, County Surveyor, CMD Bruce Goudarzi, Chief, Utilities Construction Branch, CMD Robin W. Patton, Director, Land Acquisition Division James Ratliff, Project Manager, Land Acquisition Division John Honnick, Senior Right-of-Way Agent, Land Acquisition Division Keith Wilson, Senior Right-of-Way Agent, Land Acquisition Division Walter T. Wozniak, Chief, Planning Support Branch, P&DD Larry Ichter, Deputy Director, Transportation Design, P&DD Carey F. Needham, Deputy Director, Building Design, P&DD Ahmed Rayyan, Chief, Wastewater Design Branch, P&DD Jeff Kent, Chief, Administrative Support Branch, CAP Randall Flowers, Engineer, Wastewater Design Branch, P&DD Michael Guarino, Engineer, TDB, P&DD Shahla Zahirieh, Engineer, TDB, P&DD Jennifer Gilbert, Consultant, TDB, P&DD Erik Shively, Consultant, TDB, P&DD Brian Utterback, Consultant, TDB, P&DD Natalie Colley, Engineering Technician III, TDB, P&DD Anna Carlen, Administrative Support Branch, CAP Richard Aamodt, Electoral Board, REG Rona Courtney, Admin V, Directors Office

Jimmie D. Jenkins Planning and Design Division Monthly Projects Status Report Page 2 of 2

OUTSIDE AGENCY DISTRIBUTION Carol Bondurant, VDOT, 14685 Avion Parkway, Chantilly, VA 20151 w/attachment Fund 304, 314, 315, HCD, & Misc.; [email protected] Dorothy Purvis, VDOT, 14685 Avion Parkway, Chantilly, VA 20151; [email protected] Rick A. Miller, VDOT, [email protected] Jan Vaughan, VDOT, [email protected] Charlene Whitfield, DVP, Manager Regional Projects, 171 Elden St., Herndon, Va. 20170; [email protected] John W. Dargle, Director, Fairfax County Park Authority Mike Lake, Department of Transportation w/attachment Fund 304, 305, & Misc. Katharine Ichter, Director, Department of Transportation James Chandler, Department of Transportation Charlie Strunk, Department of Transportation Ellen Gallagher, Department of Transportation Karyn Moreland, Department of Transportation Chris Wells, Department of Transportation Tom Biesiadny, Department of Transportation Paul Mounier, Bus Stop Coordinator, Department of Transportation Jeffrey Hermann, Department of Transportation Otto Clemente, Department of Transportation Dranesville District Supervisors Office David B. Marshall, Assistant Director, Planning Division, Department of Planning and Zoning Paula C. Sampson, Director, Housing and Community Development (HCD), w/attachment 314 and 315 Barbara Byron, Director, Zoning Evaluation Division, Department of Planning and Zoning Sheng-Jieh Leu, Department of Planning and Zoning Dave Guerra, Fairfax County Water Authority; [email protected] Jeannie Swim, Fairfax County Water Authority; [email protected] Jerry Scott, Fairfax County Water Authority; [email protected] John Milgrim, Environmental Health Supervisor, Fairfax County Health Department Mark Canale, Department of Transportation Bill Harrell, Department of Transportation, [email protected] Todd Lawson, Verizon, 2980 Fairview Park Dr., 7th Floor, Falls Church, VA. 22042; [email protected] David A. Guillaudeu, Engineering Assistant, Verizon Communications, david.a.guillaudeu@verizon,com [email protected] Jo Anne Sorenson, VDOT, 14685 Avion Parkway, Chantilly VA 20151, w/attachment Fund 308, 304, 305, 314, 315, HCD & Misc.; [email protected] Mark Comer, VDOT, [email protected] Peter Gerner, VDOT, [email protected] Richard Burke, VDOT, [email protected] Charlotte E. Miller, VDOT, [email protected] Donald Ostrander, Traffic Engineering Section, VDOT Northern Va. District, [email protected] Allan Melliza, Washington Gas; [email protected] Ronald Seale, VDOT, [email protected] Javier Baldivieso, [email protected] Verna Love, [email protected]

PD 1 of 1CAP WDB - Monthly Status Report10/31/2009

MONTHLY STATUS REPORTPre-Design

PROJECT: Noman M. Cole Pollution Control Plant RenovationsProject Number X00911 408/

PROJECT MANAGER: Roberts, Frank

LAND ACQ. AGENT:PROJECT ENGINEER:

USER AGENCY: Capital FacilitiesSarah Motsch

DistrictMount Vernon

Study of the existing condition and future rehabilitation/replacement options of the solids incinerator and related processes.

Parsons has been selected to provide engineering services for this project. Negotiations are in progress with Parsons and are expected to be concluded by the end of the Winter 2010.

PROJECT STATUS

PROJECT DESCRIPTION

Engineer: Parsons

Phase

Kailash GuptaMike McGrath

CURRENT FISCAL YEAR APPROPRIATION:CURRENT TOTAL PROJECT ESTIMATE:APPROVED TOTAL PROJECT ESTIMATE:

FUNDING INFORMATION:

Solids Stabilization and Disposal System Study

developed by, Robert Hockersmith

D 1 of 12CAP WDB - Monthly Status Report10/31/2009

MONTHLY STATUS REPORTPlanning and Design

PROJECT: Extension ProjectProject Number X00828 402/

PROJECT MANAGER: Schmidt, Natasha

LAND ACQ. AGENT: Preston, ClintonPROJECT ENGINEER: Steele, Terrence

USER AGENCY: Wastewater Management

DistrictSully

115 LF 8" sanitary sewer, 10 grinder pumps, & 1,565 LF and 1-1/2" force main.

LAD authorized 2/9/09 to acquire easements (acquisition complete for 5 of 16 properties); citizens meeting conducted 10/28/09 to present the new DPWES guidelines for grinder pump lots; since three out of ten property owners attended, a letter was sent to all ten property owners summarizing the meeting and the new guidelines; property owners who have not signed and returned their easement agreements by 12/15/09 will be issued revised plats and easement documents per the new guidelines.

PROJECT STATUS

PROJECT DESCRIPTION

Engineer: Natasha Schmidt (in-house)

Phase

CURRENT FISCAL YEAR APPROPRIATION $250,000

APPROVED TOTAL PROJECT ESTIMATE: $250,000

SCHEDULE APPROVED CURRENT

DESIGN:

CONSTRUCTION:

Schematics: NADesign Dev: NA

Const.Drawings: 03/09Site Permit: NA

Bldg. Permit: NA

Bid Advertisement: 11/09Contract Award: 02/10

Substantial Completion: 04/10

NANA

03/09NANA

01/10 04/10 09/10

A

EEE

ESTIMATED /ACTUAL

CURRENT TOTAL PROJECT ESTIMATE: $250,000

FUNDING INFORMATION:

Occupancy: NA NA

Colewood Street

developed by, Robert Hockersmith

D 2 of 12CAP WDB - Monthly Status Report10/31/2009

MONTHLY STATUS REPORTPlanning and Design

PROJECT: Extension ProjectProject Number X00826 402/

PROJECT MANAGER: Royse, Andy

LAND ACQ. AGENT: Finnell, RichardPROJECT ENGINEER: TBD, To be Determined

USER AGENCY: Wastewater Management

DistrictDranesville

3,600 LF 8" gravity sanitary sewer and 200 LF 1.5" force main; 25 lots served by gravity, 4 lots served by grinder pumps.

Gravity only outfall alternative rejected because of property owner objection over amount of tree loss; directed by Supervisor Foust's office to consider other outfall alternatives; agreement in principal arrived at with 1322 Darnall Drive for alternative outfall easement; 2nd citizen's meeting held 8/19/09; additional survey and utility designation received 9/17/09, and 9/24/09 respectively; 3rd citizen's meeting with preliminary design held October 21, 2009. Preliminary design in progress.

PROJECT STATUS

PROJECT DESCRIPTION

Engineer: Andy Royse (in-house)

Phase

CURRENT FISCAL YEAR APPROPRIATION $2,000,000

APPROVED TOTAL PROJECT ESTIMATE: $2,000,000

SCHEDULE APPROVED CURRENT

DESIGN:

CONSTRUCTION:

Schematics: NADesign Dev: 11/09

Const.Drawings: 04/10Site Permit: NA

Bldg. Permit: NA

Bid Advertisement: 12/10Contract Award: 02/11

Substantial Completion: 10/11

NA 11/09 04/10

NANA

12/10 02/11 10/11

EE

EEE

ESTIMATED /ACTUAL

CURRENT TOTAL PROJECT ESTIMATE: $2,000,000

FUNDING INFORMATION:

Occupancy: NA NA

Salona Village E&I

developed by, Robert Hockersmith

D 3 of 12CAP WDB - Monthly Status Report10/31/2009

MONTHLY STATUS REPORTPlanning and Design

PROJECT: Extension ProjectProject Number X00828 402/

PROJECT MANAGER: Royse, Andy

LAND ACQ. AGENT: Barnes, DiannePROJECT ENGINEER: Steele, Terrence

USER AGENCY: Wastewater Management

DistrictProvidence

950 LF 8-inch sanitary sewer.

Project was on hold for approximately 5-years pending the receipt of an additional prepayment of availability fee which was received 8/07 (5 properties with 3 payments received from locations with non-failing systems); major design update required; site survey complete and FCPA concurrence received on proposed sewer alignment; design in progress; LAD authorized December 2008 to proceed with the acquisition of the required easements; final easement (FCPA) recorded 8/26/09; Received letter from FCPA requesting/stating that no construction on their property be done 2/15/10-07/01/10 to allow for bird breeding. RNK approved start date of 7/2/10.

PROJECT STATUS

PROJECT DESCRIPTION

Engineer: Andy Royse (in-house)

Phase

CURRENT FISCAL YEAR APPROPRIATION $375,000

APPROVED TOTAL PROJECT ESTIMATE: $375,000

SCHEDULE APPROVED CURRENT

DESIGN:

CONSTRUCTION:

Schematics: NADesign Dev: NA

Const.Drawings: 11/08Site Permit: NA

Bldg. Permit: NA

Bid Advertisement: 03/10Contract Award: 05/10

Substantial Completion: 11/10

NANA

11/08NANA

03/10 05/10 11/10

A

EEE

ESTIMATED /ACTUAL

CURRENT TOTAL PROJECT ESTIMATE: $375,000

FUNDING INFORMATION:

Occupancy: NA NA

Pine Ridge E&I

developed by, Robert Hockersmith

D 4 of 12CAP WDB - Monthly Status Report10/31/2009

MONTHLY STATUS REPORTPlanning and Design

PROJECT: Extension ProjectProject Number X00826 402/

PROJECT MANAGER: Gallo, Michael

LAND ACQ. AGENT: Barnes, DiannePROJECT ENGINEER: Knizner, Anthony

USER AGENCY: Wastewater Management

DistrictHunter Mill

550 LF of 8-inch sanitary sewer to serve 6 dwellings.

Project scope and alignment issues resolved; site survey and design complete, including alignment changes requested by the property owners during easement acquisition; initial land acquisition complete (4 of 7 easements and 0 of 1 letters of permission acquired); partial LAD completion memorandum sent 7/27/09 (LAD has obtained an updated compensation estimate and is continuing to pursue the negotiations (difficult) to acquire the remaining land rights at a crossing of a pipe stem driveway concurrently with the remaining project being prepared for construction bid advertisement).

PROJECT STATUS

PROJECT DESCRIPTION

Engineer: Michael Gallo (in-house)

Phase

CURRENT FISCAL YEAR APPROPRIATION $175,000

APPROVED TOTAL PROJECT ESTIMATE: $175,000

SCHEDULE APPROVED CURRENT

DESIGN:

CONSTRUCTION:

Schematics: NADesign Dev: NA

Const.Drawings: 06/08Site Permit: NA

Bldg. Permit: NA

Bid Advertisement: 02/10Contract Award: 10/09

Substantial Completion: 04/10

NANA

08/08NANA

02/10 03/10 09/10

A

EEE

ESTIMATED /ACTUAL

CURRENT TOTAL PROJECT ESTIMATE: $175,000

FUNDING INFORMATION:

Occupancy: NA NA

Old Courthouse/Besley Road

developed by, Robert Hockersmith

D 5 of 12CAP WDB - Monthly Status Report10/31/2009

MONTHLY STATUS REPORTPlanning and Design

PROJECT: Extension ProjectProject Number X00826 402/

PROJECT MANAGER: Gallo, Michael

LAND ACQ. AGENT: Barnes, DiannePROJECT ENGINEER: TBD, To be Determined

USER AGENCY: Wastewater Management

DistrictDranesville

1,000 LF 8-inch sanitary sewer and 6 grinder pumps.

BOS approved expansion of Sewer Service Area on February 27, 2006, to include additional properties with potentially failing septic systems; Phase I serves properties with potentially failing systems (including those in expansion area); scope of work revised to include the use of grinder pumps to address constructability issues associated with deep excavations (grinder pump easements will be required); design by A/E (Dewberry) 60% complete; preliminary plans submitted and under review; geotechnical report and boring complete; coordination on-going with property owners on proposed grinder pump locations; LAD authorized 11/9/09 to review easement plats and obtain title reports; project schedule adjustment approved 9/14/09).

PROJECT STATUS

PROJECT DESCRIPTION

Engineer: Dewberry & Davis LLC

Phase

CURRENT FISCAL YEAR APPROPRIATION $350,000

APPROVED TOTAL PROJECT ESTIMATE: $350,000

SCHEDULE APPROVED CURRENT

DESIGN:

CONSTRUCTION:

Schematics: NADesign Dev: NA

Const.Drawings: 10/08Site Permit: NA

Bldg. Permit: NA

Bid Advertisement: 04/10Contract Award: 05/10

Substantial Completion: 06/10

NANA

11/09NANA

04/10 05/10 12/10

E

EEE

ESTIMATED /ACTUAL

CURRENT TOTAL PROJECT ESTIMATE: $350,000

FUNDING INFORMATION:

Occupancy: NA NA

Portland Place E & I, Phase I

developed by, Robert Hockersmith

D 6 of 12CAP WDB - Monthly Status Report10/31/2009

MONTHLY STATUS REPORTPlanning and Design

PROJECT: Extension ProjectProject Number X00828 402/

PROJECT MANAGER: Royse, Andy

LAND ACQ. AGENT: Buckley, BethPROJECT ENGINEER: Knizner, Anthony

USER AGENCY: Wastewater Management

DistrictDranesville

3,100 LF 8-inch sanitary sewer, 20 grinder pumps, and 1,800 LF force main; 38 properties in project.

LAD authorized 6/21/06 to proceed with acquisition of easements (34 total plats including 20 grinder pump easements and 4 offsite easements); 1 critical easement remains outstanding; land acquisition negotiations continuing concurrently with attempts to get 7 more pre-payments. Will need to go to BOS for one "owner unknown" easement. Supervisor Foust and Cheryl Patten to meet with key homeowner, Mr. Gregg, the first week of December 2009 regarding granting critical easement.

PROJECT STATUS

PROJECT DESCRIPTION

Engineer: Patton Harris Rust & Associates

Phase

CURRENT FISCAL YEAR APPROPRIATION $2,530,000

APPROVED TOTAL PROJECT ESTIMATE: $2,530,000

SCHEDULE APPROVED CURRENT

DESIGN:

CONSTRUCTION:

Schematics: NADesign Dev: NA

Const.Drawings: 05/06Site Permit: NA

Bldg. Permit: NA

Bid Advertisement: 11/07Contract Award: NA

Substantial Completion: 12/08

NANA

05/07NANA

05/10 07/10 10/11

A

EEE

ESTIMATED /ACTUAL

CURRENT TOTAL PROJECT ESTIMATE: $2,530,000

FUNDING INFORMATION:

Occupancy: NA NA

Saigon Subdivision E & I

developed by, Robert Hockersmith

D 7 of 12CAP WDB - Monthly Status Report10/31/2009

MONTHLY STATUS REPORTPlanning and Design

PROJECT: Extension ProjectProject Number X00826 402/

PROJECT MANAGER: Roberts, Frank

LAND ACQ. AGENT: TBD, To be DeterminedPROJECT ENGINEER: TBD, To be Determined

USER AGENCY: Wastewater Management

DistrictLee

1,450 LF of 8'' sanitary sewer.

Project to provide sanitary sewer service to 11 houses; coordination with DPZ completed to require an adjacent land development project to provide an alternate sanitary sewer outfall (possibly in late 2009) via a proffered development condition; project schedule to be prepared once adjacent development begins construction; looking into alternate routings/alignments to provide service.

PROJECT STATUS

PROJECT DESCRIPTION

Engineer: Frank Roberts (in-house)

Phase

CURRENT FISCAL YEAR APPROPRIATION $381,000

APPROVED TOTAL PROJECT ESTIMATE: $381,000

SCHEDULE APPROVED CURRENT

DESIGN:

CONSTRUCTION:

Schematics: NADesign Dev: NA

Const.Drawings: NASite Permit: NA

Bldg. Permit: NA

Bid Advertisement: NAContract Award: NA

Substantial Completion: NA

NANANANANA

NANANA

TBDTBDTBDNANA

TBDTBDTBD

ESTIMATED /ACTUAL

CURRENT TOTAL PROJECT ESTIMATE: $381,000

FUNDING INFORMATION:

Occupancy: NA NA NA

Piney Run Drive

developed by, Robert Hockersmith

D 8 of 12CAP WDB - Monthly Status Report10/31/2009

MONTHLY STATUS REPORTPlanning and Design

PROJECT: Extension ProjectProject Number X00826 402/

PROJECT MANAGER: Gallo, Michael

LAND ACQ. AGENT: Kresge, CarolPROJECT ENGINEER: Knizner, Anthony

USER AGENCY: Wastewater Management

DistrictProvidence

1,000 LF of 8-inch sanitary sewer.

Survey and utility designation complete; LAD coordinated with County Attorney on the use of a combined sanitary sewer/storm sewer easement as requested by property owners; sanitary and storm drainage design to be completed by Dewberry via a task order; first submission design plans for sanitary sewer (includes directional drilling) have been reviewed (revised preliminary design submission scheduled for mid-November 2009); addressing property owner concerns with the impact of construction; wetlands delineation complete; updated project completion schedule to be prepared after property owner concerns addressed.

PROJECT STATUS

PROJECT DESCRIPTION

Engineer: Dewberry & Davis

Phase

CURRENT FISCAL YEAR APPROPRIATION $315,000

APPROVED TOTAL PROJECT ESTIMATE: $315,000

SCHEDULE APPROVED CURRENT

DESIGN:

CONSTRUCTION:

Schematics: NADesign Dev: NA

Const.Drawings: 03/09Site Permit: NA

Bldg. Permit: NA

Bid Advertisement: 03/10Contract Award: 04/10

Substantial Completion: 02/11

NANA

01/10NANA

03/10 04/10 02/11

E

EEE

ESTIMATED /ACTUAL

CURRENT TOTAL PROJECT ESTIMATE: $315,000

FUNDING INFORMATION:

Occupancy: NA NA

Glenbrook Road E & I

developed by, Robert Hockersmith

D 9 of 12CAP WDB - Monthly Status Report10/31/2009

MONTHLY STATUS REPORTPlanning and Design

PROJECT: Extension ProjectProject Number X00826 402/

PROJECT MANAGER: Royse, Andy

LAND ACQ. AGENT: Buckley, BethPROJECT ENGINEER: TBD, To be Determined

USER AGENCY: Wastewater Management

DistrictDranesville

2,700 LF 1.5" force main sanitary sewer with grinder pumps serving 16 lots.

Project will serve 16 lots with pressure sewer; citizens opposed gravity solution presented because of tree loss; feasibility study done in July 2009 in response to Supervisor Foust's 2/9/09 Board Matter requesting staff look into alternative approaches which would save trees. Presented force main with grinder pump solution at 7/30/09 citizens' meeting. NIP item authorizing grinder pump alternative signed in August 2009. Additional survey obtained 11/04/09. Design in progress.

PROJECT STATUS

PROJECT DESCRIPTION

Engineer: Andy Royse (in-house)

Phase

CURRENT FISCAL YEAR APPROPRIATION $650,000

APPROVED TOTAL PROJECT ESTIMATE: $650,000

SCHEDULE APPROVED CURRENT

DESIGN:

CONSTRUCTION:

Schematics: NADesign Dev: NA

Const.Drawings: 06/10Site Permit: NA

Bldg. Permit: NA

Bid Advertisement: 01/11Contract Award: 03/11

Substantial Completion: 11/11

NANA

06/10NANA

01/11 03/11 11/11

E

EEE

ESTIMATED /ACTUAL

CURRENT TOTAL PROJECT ESTIMATE: $650,000

FUNDING INFORMATION:

Occupancy: NA NA

Turkey Run Road Sewer E&I

developed by, Robert Hockersmith

D 10 of 12CAP WDB - Monthly Status Report10/31/2009

MONTHLY STATUS REPORTPlanning and Design

PROJECT: Extension ProjectProject Number X00828 402/

PROJECT MANAGER: Roberts, Frank

LAND ACQ. AGENT: Finnell, RichardPROJECT ENGINEER: Knizner, Anthony

USER AGENCY: Wastewater Management

DistrictProvidence

6,450 LF of 8-inch sanitary sewer.

Three (3) pre-payments of availability fees outstanding to satisfy 50% requirement (30 of 33 payments received); project on-hold pending receipt of the required pre-payments at which time an updated completion schedule will be presented; VDOT comments received 6/8/09, partial redesign in progress to address VDOT comments. Anticipate resubmission to VDOT by December 2009.

PROJECT STATUS

PROJECT DESCRIPTION

Engineer: Frank Roberts (in-house)

Phase

CURRENT FISCAL YEAR APPROPRIATION $2,500,000

APPROVED TOTAL PROJECT ESTIMATE: $2,500,000

SCHEDULE APPROVED CURRENT

DESIGN:

CONSTRUCTION:

Schematics: NADesign Dev: NA

Const.Drawings: 12/07Site Permit: NA

Bldg. Permit: NA

Bid Advertisement: NAContract Award: NA

Substantial Completion: 04/10

NANA

03/08NANA

02/10 04/10 04/11

A

EEE

ESTIMATED /ACTUAL

CURRENT TOTAL PROJECT ESTIMATE: $2,500,000

FUNDING INFORMATION:

Occupancy: NA NA

Fairfax Acres Subivision

developed by, Robert Hockersmith

D 11 of 12CAP WDB - Monthly Status Report10/31/2009

MONTHLY STATUS REPORTPlanning and Design

PROJECT: Extension ProjectProject Number X00826 402/

PROJECT MANAGER: Zahirieh, Shahla

LAND ACQ. AGENT: Finnell, RichardPROJECT ENGINEER: TBD, To be Determined

USER AGENCY: Wastewater Management

DistrictDranesville

700 LF 8-inch sanitary sewer.

Survey and utility designation complete; LAD has acquired all easements; stream crossing permits (Army Corps of Engineers and Virginia DEQ) obtained; letter to property owners 12/22/08 requesting the prepayment of the availability fee (3 of 4 required payments received); geotechnical proposal approved; updating VSMP permit application and preparing to submit; finalizing plans and preparing construction package.

PROJECT STATUS

PROJECT DESCRIPTION

Engineer: Shahla Zahirieh (in-house)

Phase

CURRENT FISCAL YEAR APPROPRIATION $200,000

APPROVED TOTAL PROJECT ESTIMATE: $200,000

SCHEDULE APPROVED CURRENT

DESIGN:

CONSTRUCTION:

Schematics: NADesign Dev: NA

Const.Drawings: 10/06Site Permit: NA

Bldg. Permit: NA

Bid Advertisement: NAContract Award: NA

Substantial Completion: 04/08

NANA

12/07NANA

12/09 03/10 06/10

A

EEE

ESTIMATED /ACTUAL

CURRENT TOTAL PROJECT ESTIMATE: $200,000

FUNDING INFORMATION:

Occupancy: NA NA

Langley Forest E&I Phase II

developed by, Robert Hockersmith

D 12 of 12CAP WDB - Monthly Status Report10/31/2009

MONTHLY STATUS REPORTPlanning and Design

PROJECT: Extension ProjectProject Number X00826 402/

PROJECT MANAGER: Gallo, Michael

LAND ACQ. AGENT: Barnes, DiannePROJECT ENGINEER: TBD, To be Determined

USER AGENCY: Wastewater Management

DistrictDranesville

525 LF 8-inch sanitary sewer.

Phase II serves section of neighborhood south of Portland Place and requires easements; survey complete; design by A/E (Dewberry) 50% complete; preliminary plans submitted and under review; geotechnical report and boring complete; follow up citizen's meeting with critical property owners conducted 8/24/09 to discuss alignment and construction methods; evaluation of possible directional drilling alternative being pursued to minimimize impact to an existing property; completion schedule to be adjusted upon a final determination of the overall project scope. .

PROJECT STATUS

PROJECT DESCRIPTION

Engineer: Dewberry & Davis

Phase

CURRENT FISCAL YEAR APPROPRIATION $200,000

APPROVED TOTAL PROJECT ESTIMATE: $200,000

SCHEDULE APPROVED CURRENT

DESIGN:

CONSTRUCTION:

Schematics: NADesign Dev: NA

Const.Drawings: 10/08Site Permit: NA

Bldg. Permit: NA

Bid Advertisement: 04/10Contract Award: 05/10

Substantial Completion: 06/10

NANA

12/09NANA

04/10 05/10 12/10

E

EEE

ESTIMATED /ACTUAL

CURRENT TOTAL PROJECT ESTIMATE: $200,000

FUNDING INFORMATION:

Occupancy: NA NA

Portland Place - Phase II

developed by, Robert Hockersmith

PC 1 of 2CAP WDB - Monthly Status Report10/31/2009

MONTHLY STATUS REPORTPost-Construction

PROJECT: Extension ProjectProject Number X00826 402/

PROJECT MANAGER: Royse, Andy

LAND ACQ. AGENT: Buckley, BethPROJECT ENGINEER: Knizner, Anthony

USER AGENCY: Capital Facilities

DistrictDranesville

Installation of 3,266 LF 8-inch sanitary sewer, 69 grinder pumps, and 18,570 LF force main.

Project substantially complete (VDOT permit release obtained 8/28/08); LAD completed vacation/ abandonment of grinder pump easements on 10/28/09.

PROJECT STATUS

PROJECT DESCRIPTION

Engineer: Dewberry & Davis (consultant)

Phase

CURRENT FISCAL YEAR APPROPRIATION: $7,300,000CURRENT TOTAL PROJECT ESTIMATE: $7,300,000APPROVED TOTAL PROJECT ESTIMATE: $7,300,000

PROJECT LOCATION: 729 Lawton Street, McLean, VA, 22101-

PROJECT COMPLETE: 100

Contractor: Anchor

Project Substantial Complete Date: 8/31/2008

FUNDING INFORMATION:

%

River Oaks

developed by, Robert Hockersmith

PC 2 of 2CAP WDB - Monthly Status Report10/31/2009

MONTHLY STATUS REPORTPost-Construction

PROJECT: Extension ProjectProject Number X00826 402/

PROJECT MANAGER: Royse, Andy

LAND ACQ. AGENT: Barnes, DiannePROJECT ENGINEER: Steele, Terrence

USER AGENCY: Wastewater ManagementJonathan Okafor

DistrictDranesville

2,400 LF 8-inch sanitary sewer.

Construction NTP given 2/20/09. Construction substantially complete 10/29/2009.PROJECT STATUS

PROJECT DESCRIPTION

Engineer: Andy Royse (in-house)

Phase

Sam Shaikh

CURRENT FISCAL YEAR APPROPRIATION: $914,000CURRENT TOTAL PROJECT ESTIMATE: $914,000APPROVED TOTAL PROJECT ESTIMATE: $914,000

PROJECT LOCATION: 9247 Vernon Drive, Great Falls, VA,

PROJECT COMPLETE: 100

Contractor: Willam A Hazel

Project Substantial Complete Date: 10/29/2009

FUNDING INFORMATION:

%

Kenmore Subdivision

developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

26002G

Bus Shelters-CMAQ02407

South Van Dorn St @Crown Royal Dr NB

$19,000$0

Installation of bus shelter Shelter installed by developer. County project has been cancelled.

Lee Guarino, MichaelGlass, Lisa

PM PDD:PM LAD:PM CMDE:PM CMDS:

TBDTBD TBD TBD TBD TBD

Project Description Monthly Remarks

TBD TBD TBD TBDTBDTBD 04/04102Fund

26002G

Bus Shelters-CMAQ02409

Franconia Rd @ Westchester St EB

$15,000$0

Installation of bench Land acquisition required. Property owner refused to grant easements. Memo to DOT 9/26/06, recommending deletion of project. DOT coordinating with Supervisor's office (email sent 11/3/09, recommending deletion).

Lee Guarino, MichaelKresge, Carol

PM PDD:PM LAD:PM CMDE:PM CMDS:

NANA NA TBD TBD TBD

Project Description Monthly Remarks

NA01/06

TBD TBD TBDTBD 04/06102Fund

26002G

Bus Shelters-CMAQ02501

Rt 7 @ South George Mason Dr EB

$19,000$0

Installation of bus shelter Construction package being prepared. State building permit application submitted and comments received. County building permit obtained. Application for construction stage environmental clearance submitted 7/14/09.

Mason Moreland, KenBarnes, Dianne

PM PDD:PM LAD:PM CMDE:PM CMDS:

10/09 09/08NA NA NA NA

Project Description Monthly Remarks

08/09 11/09 11/09 01/1011/0911/09102Fund

26002G

Bus Shelters-CMAQ02602

Ft Hunt Rd @ Belle View Blvd WB (N Side)

$19,000$0

Installation of bus shelter Construction package being prepared. State building permit application submitted and comments received. County building permit obtained. Application for construction stage environmental clearance submitted 7/14/09.

Mount Vernon Moreland, KenHonnick, John

PM PDD:PM LAD:PM CMDE:PM CMDS:

10/09 11/03 05/09NA NA NA

Project Description Monthly Remarks

08/09 11/09 11/09 01/1011/1011/09102Fund

Friday, November 20, 2009 Page 1 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

26002G

Bus Shelter-CMAQ07001

BS#01730 Alban Road EB @ Springfield Oaks Drive

$30,000$0

Installation of bus shelter and storm drainage improvements

Project funded with federal (CMAQ) dollars. Intermediate design is in progress. Scope increased to include drainage improvements. NEPA environmental clearance work is in progress by consultant.

Lee Zahirieh, Shahla

McEntire, Vickie

PM PDD:PM LAD:PM CMDE:PM CMDS:

09/1001/10 03/10 08/10TBD TBD

Project Description Monthly Remarks

01/10 11/10 11/10 02/1105/1011/10102Fund

26002G

Bus Shelter-CMAQ07002

BS#01248 Hinson Farm WB @ Tiswell Drivel

$30,000$0

Installation of bus shelter Project funded with federal (CMAQ) dollars. Intermediate design in progress. NEPA environmental clearance work in progress by consultant.

Mount Vernon Zahirieh, ShahlaPM PDD:PM LAD:PM CMDE:PM CMDS:

09/1001/10 03/10 08/10NA TBD

Project Description Monthly Remarks

01/10 11/10 11/10 02/1105/1011/10102Fund

26002G

Bus Shelter-CMAQ07003

BS#03020 Leesburg Pike EB @ Nevius Street

$35,000$0

Installation of bus shelter Project funded with federal (CMAQ) dollars. Intermediate design in progress. NEPA environmental clearance work in progress by consultant.

Mason Zahirieh, ShahlaPM PDD:PM LAD:PM CMDE:PM CMDS:

09/1001/10 03/10 08/10NA TBD

Project Description Monthly Remarks

01/10 11/10 11/10 02/1105/1011/10102Fund

26002G

Bus Shelter-CMAQ07004

BS#03129 Old Keene Mill EB @ Ainsworth Avenue

$30,000$0

Installation of bus shelter Project funded with federal (CMAQ) dollars. Coordinating with DOT on overall project scope and location - project on-hold until resolved.

Springfield Zahirieh, Shahla

Harper, Greg

PM PDD:PM LAD:PM CMDE:PM CMDS:

TBDTBD TBD TBD TBD TBD

Project Description Monthly Remarks

TBD TBD TBD TBDTBDTBD 08/08102Fund

Friday, November 20, 2009 Page 2 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

26002G

Bus Shelter-CMAQ07005

BS#04042 Braddock Road EB @ Carriagepark Drive

$35,000$0

Installation of bus shelter Project funded with federal (CMAQ) dollars. Intermediate design in progress. NEPA environmental clearance work in progress by consultant.

Braddock Zahirieh, Shahla

Harper, Greg

PM PDD:PM LAD:PM CMDE:PM CMDS:

09/1001/10 03/10 08/10NA TBD

Project Description Monthly Remarks

01/10 11/10 11/10 02/1105/1011/10102Fund

26002G

Bus Shelter-CMAQ07006

BS#04050 Braddock Road EB @ Nash Drive

$35,000$0

Installation of bus shelter Project funded with federal (CMAQ) dollars. Intermediate design in progress. NEPA environmental clearance work in progress by consultant.

Braddock Zahirieh, Shahla

Harper, Greg

PM PDD:PM LAD:PM CMDE:PM CMDS:

09/1001/10 03/10 08/10NA TBD

Project Description Monthly Remarks

01/10 11/10 11/10 02/1105/1011/10102Fund

26002G

Bus Shelter-CMAQ07007

BS#05343 McClearen Road EB @ Towerview Road

$30,000$0

Installation of bus shelter Project funded with federal (CMAQ) dollars. Intermediate design in progress. NEPA environmental clearance work in progress by consultant.

Sully Zahirieh, ShahlaPM PDD:PM LAD:PM CMDE:PM CMDS:

09/1001/10 03/10 08/10NA TBD

Project Description Monthly Remarks

01/10 11/10 11/10 02/1105/1011/10102Fund

26006G

Richmond Highway Intersection Improvement Phase 4D

06001

Intersection Design - Sacramento Drive, Southgate Drive, Lockheed Boulevard and Arlington Drive

$1,200,000$1,200,000

Engineering and construction of intersection improvements for express bus service stops at Sacremento Dr., Southgate Dr., Lockheed Blvd. and Arlington Dr.

Project is part of the Four-Year Transportation Program endorsed by the Board on 2/9/04. This project will be completed in phases. Schedule for this phase will be determined following completion of other phases.

Mount Vernon Madhusudhan, GPM PDD:PM LAD:PM CMDE:PM CMDS:

TBDTBD TBD TBD TBD TBD

Project Description Monthly Remarks

TBD TBD TBD TBDTBDTBD 07/06Lee102Fund

Friday, November 20, 2009 Page 3 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

26006G

Richmond Highway Intersection Improvement Phase 4B2

06002

Intersection Design - Lukens Lane and Frye Road (Phase2)

$600,000$600,000

Engineering and construction of intersection improvements for express bus service stops at Lukens Lane and Frye Road.

Project is part of the Four-Year Transportation Program endorsed by the BOS on 2/9/04. This project will be completed in phases. Design waiver package submitted to VDOT 8/31/09. Intermediate design in progress.

Mount Vernon Madhusudhan, GBarnes, DianneFarsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

05/1102/10 07/10 07/11NA TBD

Project Description Monthly Remarks

05/11 10/11 11/11 06/1206/1209/11

Lee102Fund

26006G

Richmond Highway Intersection Improvement Phase 4C

06002

Intersection Design - Ladson Lane

$400,000$400,000

Engineering and construction of intersection improvements for an express bus service stop at Ladson Ln.

Project is part of the Four-Year Transportation Program endorsed by the BOS on 2/9/04. This project will be completed in phases. Intermediate design in progress. Design waiver package submitted to VDOT 8/31/09. Consultant is coordinating with VDOT on revised scope of work.

Mount Vernon Madhusudhan, G

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

03/1102/10 05/10 05/11NA TBD

Project Description Monthly Remarks

03/11 08/11 09/11 12/1112/1107/11

Lee102Fund

26006G

Richmond Highway Intersection Improvement Phase 4B1

06002

Intersection Design Frye Road (Phase I)

$200,000$0

Engineering and construction of intersection improvements for express bus service stop at Frye Road.

Project is part of the Four-Year Transportation Program endorsed by the Board on 2/9/04. This project will be completed in phases. Fairfax Water utility relocation plans were received and are under review.

Mount Vernon Madhusudhan, GBarnes, DianneFarsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

11/0905/06NA NA NA NA

Project Description Monthly Remarks

07/06 02/10 03/10 07/1007/1001/10

Lee102Fund

26006G

Richmond Highway Intersection Improvement Phase 4C1

06002

Intersection Design Kings Highway

$400,000$0

Engineering and construction of intersection improvements for express bus service stop at Kings Highway.

Project is part of the Four-Year Transportation Program endorsed by the Board on 2/9/04. This project will be completed in phases. Draft construction package being prepared. VDOT permit application submitted 9/30/09.

Mount Vernon Madhusudhan, G

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

09/0905/06NA NA NA NA

Project Description Monthly Remarks

07/06 01/10 02/10 06/1004/1012/09

Lee102Fund

Friday, November 20, 2009 Page 4 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

26006G

Richmond Hwy Public Transport Initiative: Intersections Phase 4

06004

Route 1 SB: Sacramento Drive: Southbound REX Bus Stop

$65,000$65,000

Installation of REX Bus Shelter and Bus Stop Improvements

Part of a multi-phased project along the Route 1 Corridor (Fort Belvoir to Huntington Metro) with an overall TPE of $55 million; construction 100% complete except for solar lighted sign pole installation. CMD authorized to install lighted sign poles 5/17/09.

Mount Vernon Zahirieh, Shahla

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

12/06NA NA NA NA NA

Project Description Monthly Remarks

12/06 12/06 12/06 01/0702/0712/06102Fund

26007G

Seven Corners Transit Center06000

$1,000,000$0

Design and construction of a transit center on the Seven Corners Shopping Center parking lot site

Project is part of the Second Four-Year Transportation Program; CMAQ funds approved for project. Final plans to be submitted to LDS once VDOT approves new entrance layout. A public hearing is scheduled for 11/18/09.

Mason Hojatzadeh, Max

Farsad, NahidHousley, Gregg

PM PDD:PM LAD:PM CMDE:PM CMDS:

05/08NA NA TBD TBD TBD

Project Description Monthly Remarks

05/08 02/10 03/10 11/1006/0901/10102Fund

26008G

Countywide Trails07001

Soapstone Drive Walkway

$1,500,000$0

3,300 LF of walkway, curb and gutter, drainage improvements along east side of Soapstone Drive, 4 bus pad sites

Contract addendum for design services is being revised by consultant based on comments received from the County. A citizen's meeting was held 10/27/09 to go over selected alignment for the project. Fee proposal for addendum one is being processed.

Hunter Mill El Kaissi, Moham

Gharavi, MoMcEntire, Vickie

PM PDD:PM LAD:PM CMDE:PM CMDS:

TBDTBD TBD TBD TBD TBD

Project Description Monthly Remarks

TBD TBD TBD TBDTBDTBD102Fund

26008G

Countywide Trails07002

Columbia Pike Phase II Walkway

$500,000$0

600 LF of 8-foot wide walkway, retaining wall and installation of a bus shelter, eastbound lane Columbia Pike at Powell Lane

Project is part of the Second Four-Year Transportation Program Project will include the construction of the proposed bus shelter. Additional CMAQ funds approved for construction of Phase II section. Pre-final plans have been submitted and are under review. Comments due back from MSMD and CMD by 11/25/09. County is pursuing necessary environmental approvals.

Mason Schmidt, NatashaBuckley, Beth

Harper, Greg

PM PDD:PM LAD:PM CMDE:PM CMDS:

10/09 11/06

Project Description Monthly Remarks

09/09 03/10 05/10 09/1004/1002/10102Fund

Friday, November 20, 2009 Page 5 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

PPTF01

Pedestrian Task Force Recommendations

00400

Leesburg Pike / Glen Carlyn Road

$150,000$0

Pedestrian improvements at the intersection of Leesburg Pike and Glen Carlyn Road.

Notice to proceed issued 10/12/09. Construction is 60% complete.

Mason Hojatzadeh, Max

Lim, SamJensen, Chris

PM PDD:PM LAD:PM CMDE:PM CMDS:

08/0906/07NA NA NA NA

Project Description Monthly Remarks

09/07 10/09 10/09 02/1012/0910/09124Fund

PPTF01

Pedestrian Task Force Recommendations

00500

Leesburg Pike / Magarity Road

$150,000$0

Pedestrian improvements at the intersection of Leesburg Pike and Magarity Road.

Notice to proceed issued 10/12/09. Construction is 60% complete.

Dranesville Hojatzadeh, Max

Lim, Sam

PM PDD:PM LAD:PM CMDE:PM CMDS:

08/0909/07NA NA NA NA

Project Description Monthly Remarks

04/08 10/09 10/09 02/1012/0910/09

Providence124Fund

PPTF01

Pedestrian Task Force Recommendations

00600

Leesburg Pike / Dranesville Road

$150,000$0

Pedestrian improvements at the intersection of Leesburg Pike and Dranesville Road.

Construction is 60% complete.

Dranesville Hojatzadeh, Max

Lim, Sam

PM PDD:PM LAD:PM CMDE:PM CMDS:

08/0909/07NA NA NA NA

Project Description Monthly Remarks

04/08 11/09 11/09 02/1012/0911/09124Fund

PPTF01

Pedestrian Task Force Recommendations

00700

Dolley Madison Boulevard / Great Falls Street - Lewinsville Road

$150,000$0

Pedestrian improvements at the intersection of Dolley Madison Boulevard/Great Falls Street and Lewinsville Road.

Construction is 60% complete.

Dranesville Hojatzadeh, Max

Lim, Sam

PM PDD:PM LAD:PM CMDE:PM CMDS:

08/0909/07NA NA NA NA

Project Description Monthly Remarks

04/08 11/09 11/09 02/1012/0911/09124Fund

Friday, November 20, 2009 Page 6 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

PPTF01

Pedestrian Task Force Recommendations

00800

Lewinsville Road / Balls Hill Road

$150,000$0

Pedestrian improvements at the intersection of Lewinsville Road and Balls Hill Road.

Construction is 60% complete.

Dranesville Hojatzadeh, MaxZore, TasneemLim, SamMcEntire, Vickie

PM PDD:PM LAD:PM CMDE:PM CMDS:

08/0909/07 02/08 04/08NA NA

Project Description Monthly Remarks

04/08 11/09 11/09 02/1012/0911/09124Fund

PPTF01

Pedestrian Task Force Recommendations

00900

Little River Turnpike / Backlick Road

$150,000$0

Pedestrian improvements at the intersection of Little River Turnpike and Backlick Road.

Construction package submitted 10/1/09. Notice to proceed issued 10/12/09. Construction is 0% complete.

Mason Hojatzadeh, Max

Lim, Sam

PM PDD:PM LAD:PM CMDE:PM CMDS:

08/0909/07NA NA NA NA

Project Description Monthly Remarks

04/08 10/09 10/09 02/1012/0910/09124Fund

PPTF01

Pedestrian Task Force Recommendations

01000

Arlington Blvd - Olin Drive

$150,000$0

Pedestrian improvements on Arlington Boulevard near Olin Drive.

Construction package submitted to 10/1/09. Notice to proceed issued 10/12/09. Construction is 0% complete.

Mason Hojatzadeh, Max

Lim, SamMurdoch, Guy

PM PDD:PM LAD:PM CMDE:PM CMDS:

08/0908/08NA NA NA NA

Project Description Monthly Remarks

09/08 10/09 10/09 02/1012/0910/09124Fund

PPTF01

Pedestrian Task Force Recommendations

01200

Vale Rd and Flint Hill Rd Pedestrian Concrete Projects

$20,000$0

Three new crosswalks, sidewalk, curb and gutter, curb ramps, and concrete island

Notice to proceed with survey and design issued 10/8/09. Survey notification letters sent 10/8/09.

Hunter Mill Ayodeji, OlawalePM PDD:PM LAD:PM CMDE:PM CMDS:

12/1001/10 07/10 02/11NA TBD

Project Description Monthly Remarks

12/10 04/11 04/11 07/1107/1104/11124Fund

Friday, November 20, 2009 Page 7 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

PPTF01

Pedestrian Task Force Recommendations

01300

Arlington Boulevard / Graham Road

$200,000$0

Pedestrian improvements at the intersection of Arlington Boulevard and Graham Road.

Final design is in progress. Preparing VDOT permit package. Plat being revised.

Providence Hojatzadeh, MaxFinnell, RichardLim, Sam

PM PDD:PM LAD:PM CMDE:PM CMDS:

04/1008/08 08/09 03/10NA NA

Project Description Monthly Remarks

02/09 07/10 08/10 11/1011/1006/10124Fund

PPTF01

Pedestrian Task Force Recommendations

01400

Braddock Road / Guinea Road

$150,000$0

Pedestrian improvements at the intersection of Braddock Road and Guinea Road.

Pre-final plans submitted to VDOT for review 5/5/09. Final comments received. Preparing VDOT permit application. Plat being revised.

Braddock Hojatzadeh, MaxFinnell, RichardLim, SamMcEntire, Vickie

PM PDD:PM LAD:PM CMDE:PM CMDS:

09/1012/08 10/09 04/10NA NA

Project Description Monthly Remarks

05/09 06/10 06/10 12/1004/1106/10124Fund

PPTF01

Pedestrian Task Force Recommendations

01500

Braddock Road / Wakefield Chapel Road

$150,000$0

Pedestrian improvements at the intersection of Braddock Road and Wakefield Chapel Road.

Final plans submitted to VDOT for review on 8/26/09.

Braddock Hojatzadeh, MaxFinnell, RichardLim, SamJensen, Chris

PM PDD:PM LAD:PM CMDE:PM CMDS:

08/1003/08 10/09 04/10NA NA

Project Description Monthly Remarks

08/08 06/10 06/10 12/1003/1106/10124Fund

PPTF01

Pedestrian Task Force Recommendations

01600

Leesburg Pike / Baron Cameron Avenue - Springvale Road

$200,000$0

Pedestrian improvements at the intersection of Leesburg Pike/Baron Cameron Avenue and Springvale Road.

Pre-final plans submitted to VDOT for review 9/16/09. Request for plat made 9/28/09. Plat being revised.

Dranesville Hojatzadeh, MaxKresge, CarolLim, SamMcEntire, Vickie

PM PDD:PM LAD:PM CMDE:PM CMDS:

09/0901/09 10/09 04/10NA NA

Project Description Monthly Remarks

05/09 06/10 06/10 12/1004/1106/10

Hunter Mill124Fund

Friday, November 20, 2009 Page 8 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

PPTF01

Pedestrian Task Force Recommendations

01700

Leesburg Pike / Patrick Henry Drive

$500,000$0

Pedestrian improvements at the intersection of Leesburg Pike and Patrick Henry Drive.

Second final design submitted to VDOT for review 6/23/09. Awaiting final comments. Request for plats submitted 10/7/09. Preparing VDOT permit package.

Mason Hojatzadeh, MaxZore, TasneemLim, SamMcEntire, Vickie

PM PDD:PM LAD:PM CMDE:PM CMDS:

07/1006/08 11/09 06/10NA NA

Project Description Monthly Remarks

05/09 10/10 11/10 02/1102/1109/10124Fund

R19301

Georgetown Pike/Walker Road RTL00009

Georgetown Pike/Walker Road RTL

$500,000$0

Construction of right turn lane and sidewalk from southbound Walker Rd. to westbound Georgetown Pk. and signal modifications.

Construction package submitted 10/1/09. Notice to proceed issued 10/26/09.

Dranesville Hojatzadeh, MaxFinnell, RichardFarsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

08/0910/08 12/08 04/09NA NA

Project Description Monthly Remarks

08/09 10/09 10/09 03/1003/1010/09124Fund

007701

Route 50 Interchange/Waples Mill Road

00000

$4,584,000$0

Design and construction of at-grade improvements.

Project is part of the Four-Year Transportation Program endorsed by the Board on 2/9/04. Construction substantially complete 12/18/06. Punch list items for overhead sign completed. Awaiting permit release.

Springfield Gharavi, MoFinnell, RichardMinnix, W. ToddHarper, Greg

PM PDD:PM LAD:PM CMDE:PM CMDS:

10/0410/02 07/03 04/04 10/04NA

Project Description Monthly Remarks

10/04 05/05 06/05 12/0610/0604/05

Providence301Fund

007702

Tall Timbers Drive00000

$1,450,000$0

Construction of 700 linear feet of roadway connecting existing portions of Tall Timbers Drive.

Construction substantially complete 10/10/07. Post-construction street acceptance package submitted to VDOT 7/21/09.

Springfield McCorkle, LisaBuckley, BethMinnix, W. ToddHarper, Greg

PM PDD:PM LAD:PM CMDE:PM CMDS:

01/0706/06 12/05 02/07NA NA

Project Description Monthly Remarks

08/06 02/07 03/07 10/0701/0801/07301Fund

Friday, November 20, 2009 Page 9 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

008803

Route 29 Widening00000

$4,400,000$985,000

Phase II: Trail improvements from Stevenson Street to Holly Avenue.

VDOT completed widening of westbound lane between Dixie Hill Road and Holly Avenue. TPE includes future phases to be identified. Phase II final design comments are being addressed. Design approval package submitted to VDOT for review 8/24/09. Preparing right of way authorization package for VDOT approval.

Springfield Madhusudhan, GFinnell, RichardMinnix, Todd

PM PDD:PM LAD:PM CMDE:PM CMDS:

11/06 04/07TBD TBD TBD TBD

Project Description Monthly Remarks

11/07TBD TBD TBDTBDTBD

301Fund

009906

Signal Installation00100

Pedestrian Signals at Prosperity and Hilltop

$80,000$0

Pedestrian improvements at the intersection of Prosperity Avenue and Hilltop Road.

Pre-final design in progress. Project plats are in progress.

Providence Ayodeji, OlawaleFinnell, RichardMinnix, W. Todd

PM PDD:PM LAD:PM CMDE:PM CMDS:

01/1005/09 01/10 07/10NA TBD

Project Description Monthly Remarks

11/09 08/10 08/10 12/1009/1008/10301Fund

009913

Dolley Madison Blvd. (Rt. 123)00000

$8,946,000$0

Widening Dolley Madison Blvd. to six lanes from I-495 to Dulles Toll Road.

Construction is complete. Initial street acceptance package approved by VDOT on 10/2/09.

Providence

Goudarzi, BehrooStrecker, Mathias

PM PDD:PM LAD:PM CMDE:PM CMDS:

11/0002/00 11/00 11/00 03/01NA

Project Description Monthly Remarks

11/00 03/01 04/01 07/0207/0212/00301Fund

009471

Lee District Capital ProjectsWT002

Governor's Hill Drive Walkway

$240,000$126,000

750 LF of 5-foot wide concrete walkway along the south side of Franconia Road between Governor's Hill Road and Telegraph Road

Fairfax Water submitted updated waterline relocation proposal 11/10/09. Construction schedule being developed.

Lee Royse, AndyBarnes, Dianne

Housley, Gregg

PM PDD:PM LAD:PM CMDE:PM CMDS:

08/07 08/08 01/09NA

Project Description Monthly Remarks

06/07 04/10 05/10 11/1008/0903/10303Fund

Friday, November 20, 2009 Page 10 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

009472

Mason District Capital ProjectsWT002

Columbia Pike: Govnmnt Ctr to Downing St

$570,000$0

500 LF of 5-foot wide concrete sidewalk

Project is part of the Second Four-Year Transportation Program Construction substantially complete 5/18/09. VDOT permit release 6/30/09.

Mason Schmidt, NatashaBuckley, BethMinnix, W. ToddHarper, Greg

PM PDD:PM LAD:PM CMDE:PM CMDS:

11/07 11/06NA NA

Project Description Monthly Remarks

02/07 09/08 05/0912/08NA

303Fund

009473

Mt. Vernon District Capital ProjectsWT002

David Site Wayside Signage

$10,000$0

Installation of signage at historic site along Mason Neck Trail, segment 3

FCPA to follow up with consultant on 11/10/09 to finalize graphics design for historic signage panels. Construction schedule to be developed after panel design is complete.

Mount Vernon Royse, AndyPM PDD:PM LAD:PM CMDE:PM CMDS:

TBDTBD TBD NA NA NA

Project Description Monthly Remarks

TBD TBD TBD TBDTBDTBD303Fund

009475

Springfield District Capital ProjectsWT002

Tuttle Road

$441,200$0

2,935 LF of 8-foot wide asphalt walkway.

Construction notice to proceed issued 6/29/09. Construction is 90% complete.

Springfield Roberts, FrankZore, TasneemMinnix, W. Todd

PM PDD:PM LAD:PM CMDE:PM CMDS:

04/06 02/07NA NA

Project Description Monthly Remarks

03/06 05/09 05/09 12/0909/0905/09303Fund

V00003

Road Viewer ProjectsRVP34

I-Street

$36,000$36,000

180 LF road improvements Preliminary punch list developed with VDOT. Updated property line and topographic survey requested 11/18/09. Coordination meeting with VDOT to be scheduled 11/2009 to discuss the outstanding scope of work. Project completion schedule to be prepared after updated site survey is completed.

Mount Vernon Gallo, MichaelPM PDD:PM LAD:PM CMDE:PM CMDS:

01/10NA NA NA

Project Description Monthly Remarks

12/06TBD TBD TBDTBDTBD

303Fund

Friday, November 20, 2009 Page 11 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

V00003

Road Viewer ProjectsRVP35

Woodburn Access Rd

$250,300$250,300

850 LF road improvements Negotiations between County and INOVA in progress on Woodburn Center for Community Mental Health site which may delete the need to proceed with the access road project; Building Design Branch included access road issue with briefing of County Executive (deletion of road improvements deferred ~ project to remain on hold unitl possible BOS action currently scheduled for the spring 2010).

Providence Wozniak, WalterColeman, MichaelFarsad, NahidMcMillen, Barry

PM PDD:PM LAD:PM CMDE:PM CMDS:

TBDNA NA NA NA NA

Project Description Monthly Remarks

TBD TBD TBD TBDTBDTBD 04/03303Fund

V00004

Road Maintenance ProgramRM188

Abbott Lane

$65,000$0

380 LF road improvements Design in progress. Updated survey in progress. Coordination with VDOT in progress to conduct a joint site inspection to define scope. Construction contingent upon availability of possible BORV funds that may be approved during FY 2010. Project completion schedule to be approved after a funding source for construction is identified.

Providence Gallo, MichaelPM PDD:PM LAD:PM CMDE:PM CMDS:

TBDNA NA NA NA NA

Project Description Monthly Remarks

02/06TBD TBD TBDTBDTBD

303Fund

V00004

Road Maintenance ProgramRM190

Silverleaf Drive

$75,000$0

700 LF road improvements Coordinatng with VDOT in progress to conduct a joint site inspection to re-define scope of corrective work. Land acquisition may be required. Construction contingent upon availability of possible BORV funds that may be approved during FY 2010. Project completion schedule to be approved after a funding source for construction is identified.

Springfield Wozniak, WalterPM PDD:PM LAD:PM CMDE:PM CMDS:

TBDNA NA TBD TBD TBD

Project Description Monthly Remarks

04/06TBD TBD TBDTBDTBD

303Fund

Z00032

Safety Improvements at Bus Shelters/Stops

05120

NB Soapstone & Hearthstone Ct

$20,200$0

20' concrete sidewalk, loading pad, and drainage culvert

Group 1: Project to be completed with Soapstone Drive Walkway, Project No. 26008G (07001).

Hunter Mill Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

NANA NA NA NA NA

Project Description Monthly Remarks

TBD NA NA NANANA303Fund

Friday, November 20, 2009 Page 12 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

Z00032

Safety Improvements at Bus Shelters/Stops

05144

WB Glade Drive & Breton Court

$15,000$0

Loading pad Group 3: Bus stop improvements to be completed with walkway project - see Glade Drive Walkway, Project No. 4YP201 (PB012).

Hunter Mill Lauretti, FrancescFinnell, Richard

McEntire, Vickie

PM PDD:PM LAD:PM CMDE:PM CMDS:

NANA NA NA NA NA

Project Description Monthly Remarks

NA NA NA NANANA303Fund

006495

Wiehle Avenue Phase III00000

$7,399,000$0

Four lane road from Dranesville Road to Fairfax County Parkway.

Construction is complete. AT&T quitclaim has been received. As-built package re-submitted to VDOT 8/13/09. A follow up email was sent to VDOT 11/9/09.

Dranesville Gharavi, Mo

Farsad, NahidStrecker, Mathias

PM PDD:PM LAD:PM CMDE:PM CMDS:

08/0003/89 07/90 11/99 11/99 06/00

Project Description Monthly Remarks

08/00 03/01 04/01 08/0208/0202/01304Fund

006495

Wiehle Avenue, Phase II00000

$7,933,000$0

Four lane road from Fairfax County Parkway to Reston Avenue.

Construction is complete. Colonial Pipeline quitclaim has been received. As-built package re-submitted to VDOT 7/16/09. A follow up email was sent to VDOT 11/9/09.

Hunter Mill Gharavi, Mo

Farsad, NahidStrecker, Mathias

PM PDD:PM LAD:PM CMDE:PM CMDS:

10/9803/89 01/90 03/98 03/98 10/98

Project Description Monthly Remarks

10/98 05/99 06/99 04/0004/0001/99

Dranesville304Fund

064103

South Van Dorn/I-95, Phase II00000

$11,300,000$0

Design and construct a ramp from northbound South Van Dorn Street to eastbound I-95.

Construction is complete. Street Acceptance Package being prepared for submission to VDOT. Vacation of a Portion of Oakwood Road and a Dedication of a Temporary Drainage Easement and a Sanitary Sewer Easement was forwarded to DOT at the end of August 2006. PDD is working to secure the easements with the property owners.

Lee Gharavi, Mo

Strecker, Mathias

PM PDD:PM LAD:PM CMDE:PM CMDS:

09/9707/94 01/96NA NA NA

Project Description Monthly Remarks

09/97 01/98 02/98 01/9901/9901/98304Fund

Friday, November 20, 2009 Page 13 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

064233

Spring Hill Road00000

$10,900,000$0

Widening Spring Hill Road between Route 7 and International Drive.

Funding provided by VDOT in accordance with its 6-year plan. Construction is 50% complete.

Providence Gharavi, MoKresge, CarolGharavi, MoHarper, Greg

PM PDD:PM LAD:PM CMDE:PM CMDS:

09/0307/02 12/03 05/05 10/05NA

Project Description Monthly Remarks

09/03 02/09 03/09 10/1006/0812/08304Fund

064246

South Van Dorn/Franconia Interchange

00000

$7,574,399$0

Design of grade-separated interchange.

Project is funded for design only in the VDOT Six-Year Improvement Program. Preliminary design in progress. VDOT approved the VE recommendations on 10/26/09. Meeting with consultant, DOT and PDD scheduled on 11/6/09.

Lee Salahuddin, KhaliFinnell, Richard

PM PDD:PM LAD:PM CMDE:PM CMDS:

07/1001/10 03/10TBD TBD TBD

Project Description Monthly Remarks

10/07TBD TBD TBDTBDTBD

304Fund

064248

Fairfax County Parkway Widening00000

$3,325,000$0

Widening of Fairfax County Parkway to six lanes from Rugby Road to Dulles Toll Road for a total of 6.5 miles. Additional lane to be HOV lane.

Funding for preliminary engineering and environmental studies only. Further evaluation is necessary to determine any operational issues that may arise due to HOV designation of the additional through lane. Revised draft report summarizing VISSIM results submitted for review 8/17/09. Project is on hold.

Sully Salahuddin, KhaliPreston, ClintonMinnix, ToddHarper, Greg

PM PDD:PM LAD:PM CMDE:PM CMDS:

TBDTBD TBD TBD TBD TBD

Project Description Monthly Remarks

TBD TBD TBD TBDTBDTBD 02/09Hunter Mill304Fund

064251

Guinea Road/Falmead Road00000

$150,000$0

Extend sidewalk, drop inlet, drainage improvements, and install a crosswalk at Guinea Road and Falmead Road.

Construction to be completed by annual contractor. VDOT permit application package submitted 9/29/09. Draft construction package is being prepared.

Braddock Madhusudhan, GPreston, ClintonGharavi, Mo

PM PDD:PM LAD:PM CMDE:PM CMDS:

09/0906/05NA NA NA NA

Project Description Monthly Remarks

02/06 01/10 02/10 04/1007/0712/09304Fund

Friday, November 20, 2009 Page 14 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

064257

Centreville Road Trail at Dulles Toll Road Phase II

00000

$290,000$0

Provide pedestrian improvements and traffic signal modifications to cross Centreville Rd. @ Dulles Toll Rd. Interchange.

Final design is in progress. Traffic Management Plan is being prepared.

Hunter Mill Madhusudhan, G

Harper, Greg

PM PDD:PM LAD:PM CMDE:PM CMDS:

12/0905/09NA NA NA NA

Project Description Monthly Remarks

01/09 03/10 03/10 07/1008/0903/10304Fund

064258

Colts Neck Road Trail/Sidewalk00000

$366,000$0

Construct trail/sidewalk on Colts Neck Road/South Lakes Drive to Hunter Wood Shopping Center (west side).

A field meeting with CMD was held 4/15/09 to resolve utility conflicts. Design options are being evaluated.

Hunter Mill Madhusudhan, GZore, TasneemMinnix, W. Todd

PM PDD:PM LAD:PM CMDE:PM CMDS:

01/1007/05 06/06 09/06NA NA

Project Description Monthly Remarks

03/06 03/10 03/10 07/1009/0703/10

Mason304Fund

064267

Pedestrian Improvements - VDOT Funded

PI005

Chain Bridge Road / International Drive

$0$0

Pedestrian improvements at the intersection of Chain Bridge Road and International Drive.

Project on hold due to potential conflict with Metro Project.

Providence Hojatzadeh, Max

Lim, Sam

PM PDD:PM LAD:PM CMDE:PM CMDS:

TBDTBD TBD TBD TBD TBD

Project Description Monthly Remarks

TBD TBD TBD TBDTBDTBD 08/07304Fund

064267

Pedestrian Improvements - VDOT Funded

PI026

Fairfax County Parkway / Hooes Road - Seabrook Lane

$500,000$350,000

Pedestrian improvements at the intersection of Fairfax County Parkway/Hooes Road and Seabrook Lane.

Due to the impact of project to existing bridge, a feasibility study was prepared. VDOT has approved the feasibility study. Due to high construction costs, DOT has requested project be put on hold until additional funds are available.

Springfield Hojatzadeh, Max

Lim, Sam

PM PDD:PM LAD:PM CMDE:PM CMDS:

TBDTBD TBD TBD TBD TBD

Project Description Monthly Remarks

TBD TBD TBD TBDTBDTBD 02/09304Fund

Friday, November 20, 2009 Page 15 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

064270

Beverly Rd/Fleetwood Rd00000

$120,000$0

Provide raised concrete median on northbound and southbound approach of Beverly Road.

Construction substantially complete 8/31/09. Permit released 10/27/09.

Dranesville Ayers, RobertZore, TasneemMcCorkle, LisaHousley, Gregg

PM PDD:PM LAD:PM CMDE:PM CMDS:

02/0903/08 01/08 03/08NA NA

Project Description Monthly Remarks

02/08 04/09 06/09 08/0903/0904/09304Fund

064271

Annandale Rd/Kerns Rd00000

$225,000$150,000

Intersection improvements including left and right-turn lanes.

Intermediate design is in progress. Design waiver for sub-standard turn lane and reduced lane width was submitted with intermediate submission 10/30/09.

Mason Khorashadi, BrooKresge, CarolGharavi, MoHarper, Greg

PM PDD:PM LAD:PM CMDE:PM CMDS:

07/1005/09 12/09 02/10 09/10TBD

Project Description Monthly Remarks

04/08 12/10 01/11 06/1112/1011/10304Fund

064273

Silverbrook Rd/Hooes Rd Intersection Imp.

00000

$350,000$0

Intersection improvement to configure turn lanes at Silverbrook Road and Hooes Road intersection.

Final design in progress. Notice to proceed issued 10/13/09 for additional traffic signal design services.

Mount Vernon Madhusudhan, G

McCorkle, LisaMcEntire, Vickie

PM PDD:PM LAD:PM CMDE:PM CMDS:

04/1012/07NA NA NA NA

Project Description Monthly Remarks

10/08 07/10 08/10 12/1007/0906/10304Fund

064274

Route 29 Walkway00000

$250,000$0

Provide 10' wide asphalt trail on south side of Route 29 between Shreve Road and Fairview Park Drive.

Pre-final design was submitted to VDOT for review 8/12/08. Comments have been received. VDOT's HOT Lane project at this location is under construction and is in conflict with project's current design. This project on hold pending scope revision.

Providence Ayers, RobertFinnell, Richard

Housley, Gregg

PM PDD:PM LAD:PM CMDE:PM CMDS:

03/08TBDNA TBD TBD TBD

Project Description Monthly Remarks

08/08TBD TBD TBDTBDTBD 10/08

304Fund

Friday, November 20, 2009 Page 16 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

064276

West Ox Rd/Fairfax County Parkway00000

$500,000$0

Extend right turn lane on southbound Fairfax County Parkway. Add dual left turn lanes on northbound Fairfax County Parkway.

Second final design submitted 11/9/09.

Sully El Kaissi, MohamPreston, ClintonGharavi, Mo

PM PDD:PM LAD:PM CMDE:PM CMDS:

01/1009/07 11/08 04/09NA NA

Project Description Monthly Remarks

04/08 04/10 05/10 03/1103/1103/10

Hunter Mill304Fund

064288

Fairfax County Parkway/Sunrise Valley Drive

00000

Fairfax County Parkway/Sunrise Valley Drive

$1,160,000$0

Addition of dual left-turn lane on northbound Fairfax County Parkway.

VDOT permit received 10/7/09. Construction package forwarded to CMD 10/29/09.

Hunter Mill Salahuddin, KhaliPreston, ClintonMinnix, W. ToddStrecker, Mathias

PM PDD:PM LAD:PM CMDE:PM CMDS:

08/0909/05 10/07 12/08NA NA

Project Description Monthly Remarks

10/07 12/09 01/10 10/1012/0811/09304Fund

4YP012

South Kings Highway/Harrison Lane00000

$3,000,000$0

Addition of left-turn lane from South Kings Highway to Harrison Lane.

Project is part of the Four-Year Transportation Program. Construction is 20% complete.

Lee Salahuddin, KhaliBarnes, DianneMinnix, ToddHarper, Greg

PM PDD:PM LAD:PM CMDE:PM CMDS:

11/0803/06 08/06 03/07 07/07 09/08

Project Description Monthly Remarks

03/07 05/09 06/09 06/1006/1004/09304Fund

4YP013

Route 236/Beauregard Street00000

$2,180,000$0

Add a second left-turn lane from eastbound Route 236 to northbound Beauregard Street.

Project is part of the Four-Year Transportation Program. Construction substantially complete 1/16/09. Awaiting permit release.

Mason Ayers, RobertZore, TasneemGharavi, MoHarper, Greg

PM PDD:PM LAD:PM CMDE:PM CMDS:

12/0707/05 04/06 05/06 11/06NA

Project Description Monthly Remarks

01/07 03/08 03/08 01/0905/0802/08304Fund

Friday, November 20, 2009 Page 17 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP020

Hunter Mill Road Walkway00000

$840,000$0

Walkway along Hunter Mill Road from Chain Bridge Road to Corbalis Park for a total distance of approximately 1900 LF.

Project is part of the Four-Year Transportation Program. Construction substantially complete 8/17/09. Final inspection has been requested. Awaiting permit release.

Providence El Kaissi, MohamKresge, CarolMinnix, W. ToddStrecker, Mathias

PM PDD:PM LAD:PM CMDE:PM CMDS:

06/0801/06 05/06 03/08NA NA

Project Description Monthly Remarks

09/06 11/08 12/08 08/0908/0810/08304Fund

4YP201

Pedestrian Improvements - Bond Funded

PB003

Lewinsville Rd Median

$150,000$0

Installation of a pedestrian safety median on Lewinsville Rd at Spring Hill Elementary School. Project is approx. 975 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design is in progress. A citizens meeting is scheduled for 11/19/09.

Dranesville Marsh, DennisFinnell, RichardMcCorkle, LisaStrecker, Mathias

PM PDD:PM LAD:PM CMDE:PM CMDS:

12/0910/08NA NA NA NA

Project Description Monthly Remarks

12/09 04/10 05/10 10/1010/1003/10304Fund

4YP201

Pedestrian Improvements - Bond Funded

PB004

Spring Hill Rd - Old Dominion to Pettit Ct

$480,000$0

Pedestrian improvements along east side of Spring Hill Rd from Old Dominion Dr to Pettit Ct. Project is approx. 1,550 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design in progress. Design alternatives are being evaluated. Additional survey received and forwarded to consultant.

Dranesville Marsh, DennisKresge, CarolGharavi, MoMcEntire, Vickie

PM PDD:PM LAD:PM CMDE:PM CMDS:

12/0909/08 12/09 01/10 08/10NA

Project Description Monthly Remarks

10/09 11/10 12/10 06/1103/1110/10304Fund

4YP201

Pedestrian Improvements - Bond Funded

PB005

Turner Ave Walkway - Williamsburg Pond to Haycock

$50,000$0

Pedestrian improvements along east side of Turner Ave from Williamsburg Pond Ct to Haycock Rd. Project is approx. 200 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Final design is underway. Project plats are in progress.

Dranesville Marsh, DennisBarnes, DianneMcCorkle, LisaStrecker, Mathias

PM PDD:PM LAD:PM CMDE:PM CMDS:

02/1012/08 11/09 12/09 06/10NA

Project Description Monthly Remarks

02/10 09/10 10/10 02/1111/1008/10304Fund

Friday, November 20, 2009 Page 18 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP201

Pedestrian Improvements - Bond Funded

PB006

Westmoreland St Walkway - Chain Bridge to Dillion

$230,000$0

Pedestrian improvements along east side of Westmoreland St from Chain Bridge Rd to Dillon Ave. Project is approx. 700 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Two preliminary design alternatives are being developed. Additional survey received and forwarded to consultant. Schedule to be developed after design alternative is developed.

Dranesville Marsh, Dennis

Housley, Gregg

PM PDD:PM LAD:PM CMDE:PM CMDS:

TBDTBD TBD TBD TBD TBD

Project Description Monthly Remarks

TBD TBD TBD TBDTBDTBD304Fund

4YP201

Pedestrian Improvements - Bond Funded

PB007

Westmoreland St Walkway - Haycock to Temple

$230,000$0

Pedestrian improvements along west side of Westmoreland St from Haycock Rd to Temple Rodef Shalom. Project is approx. 845 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Scope being revised to add right-turn lane from southbound Westmoreland to Haycock Road. Project to be combined with Project No. RSPI01/1200 -Westmoreland Street/Haycock Road.

Dranesville Marsh, DennisPreston, ClintonMcCorkle, Lisa

PM PDD:PM LAD:PM CMDE:PM CMDS:

05/1012/08 10/09 11/09 06/10NA

Project Description Monthly Remarks

05/10 09/10 10/10 08/1108/1108/10304Fund

4YP201

Pedestrian Improvements - Bond Funded

PB008

Westmoreland St Walkway - Temple to Chesterbrook

$150,000$0

Walkway on west side Westmoreland St from Temple Rodef Shalom to Chesterbrook Presbyterian Church. Project is approx. 550 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design submitted to VDOT for review 8/20/09. Project plats are being revised. Plats were sent to LAD for review 10/28/09.

Dranesville Marsh, DennisPreston, ClintonMcCorkle, Lisa

PM PDD:PM LAD:PM CMDE:PM CMDS:

03/1012/08 11/09 07/10NA NA

Project Description Monthly Remarks

03/10 10/10 11/10 02/1102/1109/10304Fund

4YP201

Pedestrian Improvements - Bond Funded

PB009

Beulah Rd Walkway - Abbotsford to Clarks Crossing

$1,000,000$0

Pedestrian improvements along Beulah Rd from Abbotsford Dr to Coral Crest Ln and along Clarks Crossing Rd. Project is approx. 4,700 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Intermediate design in progress. Citizen's information meeting is being planned for the fall 09. Coordination with Supervisors office is ongoing in preparation for meeting.

Hunter Mill Conley, TimKresge, Carol

PM PDD:PM LAD:PM CMDE:PM CMDS:

04/1002/09 11/09 01/10 08/10TBD

Project Description Monthly Remarks

03/10 04/11 05/11 10/1109/1102/11304Fund

Friday, November 20, 2009 Page 19 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP201

Pedestrian Improvements - Bond Funded

PB010

Colts Neck Rd Walkway - Lakes to Winterthur

$130,000$0

Pedestrian improvements along east side of Colts Neck Rd from South Lakes Dr to Winterthur Ln. Project is approx. 850 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. VDOT permit received 10/12/09. Draft construction package is being prepared. Land Acquisition is complete 11/6/09.

Hunter Mill Conley, TimFinnell, RichardMcCorkle, Lisa

PM PDD:PM LAD:PM CMDE:PM CMDS:

09/0908/08 05/09 11/09NA NA

Project Description Monthly Remarks

09/09 02/10 03/10 07/1003/1001/10304Fund

4YP201

Pedestrian Improvements - Bond Funded

PB011

Fox Mill Rd Walkway - Pkwy to Mill Heights

$100,000$0

Pedestrian improvements along south side of Fox Mill Rd from Mill Heights Dr across Fairfax County Pw. Project is approx. 800 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Final design in progress. 0 of 3 easements have been acquired.

Hunter Mill Conley, TimBuckley, BethFarsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

02/1008/08 06/09 01/10NA NA

Project Description Monthly Remarks

02/10 04/10 05/10 08/1008/1003/10304Fund

4YP201

Pedestrian Improvements - Bond Funded

PB012

Glade Dr Walkway - Colts Neck to Shire Ct

$110,000$0

Pedestrian improvements along north side of Glade Dr from Colts Neck Rd to Shire Ct. Project is approx. 800 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Final design is in progress. Land acquisition package submitted 8/24/09. 0 of 3 easements have been acquired.

Hunter Mill Conley, TimFinnell, RichardFarsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

12/0908/08 08/09 03/10NA NA

Project Description Monthly Remarks

07/09 09/10 10/10 02/1108/1008/10304Fund

4YP201

Pedestrian Improvements - Bond Funded

PB013

McLearen Rd Walkway - Quincy Adams to Reston Pkwy

$150,000$0

Concrete sidewalk on north side of McLearen Rd from Fox Mill Shopping Ctr east across Transcontinental Pipeline. Project is approx. 250 LF.

Concrete sidewalk on the north side of McLearen Rd. from the Fox Mill Shopping Ctr. east across the Transcontinental Pipeline. Project length is approximately 250 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. VDOT permit received 9/9/09. Construction package sent to CMD 10/26/09. Task order being developed for annual contractor.

Hunter Mill Conley, TimFinnell, RichardGharavi, Mo

PM PDD:PM LAD:PM CMDE:PM CMDS:

06/0908/08 12/08 08/09NA NA

Project Description Monthly Remarks

02/09 11/09 11/09 02/1012/0911/09304Fund

Friday, November 20, 2009 Page 20 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP201

Pedestrian Improvements - Bond Funded

PB015

Reston Ave Walkway - Southington to Shaker Dr

$110,000$0

Pedestrian improvements along west side of Reston Ave from Southington Ln to Shaker Dr. Project is approx. 700 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Final design in progress. 0 of 2 easements have been acquired.

Hunter Mill Conley, TimPreston, ClintonGharavi, Mo

PM PDD:PM LAD:PM CMDE:PM CMDS:

12/0909/08 06/09 01/10NA NA

Project Description Monthly Remarks

06/09 03/10 04/10 07/1004/1002/10304Fund

4YP201

Pedestrian Improvements - Bond Funded

PB017

Sunset Hills Rd Walkway - W&OD to Michael Faraday

$240,000$0

Pedestrian improvements along north side of Sunset Hills Rd from W&OD Trail to Michael Faraday Ct. Project is approx. 1,500 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design submitted on 10/13/09.

Hunter Mill Conley, TimBuckley, Beth

PM PDD:PM LAD:PM CMDE:PM CMDS:

12/0902/09 01/10 02/10 09/10NA

Project Description Monthly Remarks

10/09 12/10 01/11 04/1112/1011/10304Fund

4YP201

Pedestrian Improvements - Bond Funded

PB018

Silverbrook Rd Walkway - Southrun to Monacan

$60,000$0

Pedestrian improvements along north side of Silverbrook Rd from Southrun Rd to Monacan Rd. Project is approx. 820 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Final design in progress.

Mount Vernon Conley, TimPreston, ClintonMcCorkle, Lisa

PM PDD:PM LAD:PM CMDE:PM CMDS:

12/0909/08 11/09 06/10NA NA

Project Description Monthly Remarks

10/09 08/10 09/10 12/1004/1007/10304Fund

4YP201

Pedestrian Improvements - Bond Funded

PB019

Lee Jackson Hwy Walkway - Fair Ridge to Fire Station

$100,000$0

Pedestrian improvements along south side of Lee Jackson Hy from Fair Ridge Dr East to the police/fire station. Project is approx. 675 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Final construction package submitted to CMD on 5/15/09. Walkway construction is 30% complete. Work is being completed with adjoining County stormwater pond project.

Springfield Ayodeji, OlawalePreston, ClintonLim, Sam

PM PDD:PM LAD:PM CMDE:PM CMDS:

02/0906/08 01/09 01/09NA NA

Project Description Monthly Remarks

07/09 05/09 05/09 01/1006/1005/09304Fund

Friday, November 20, 2009 Page 21 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP201

Pedestrian Improvements - Bond Funded

PB020

Silverbrook Rd Walkway - Silverthorn to Bayberry Ridge

$220,000$0

Pedestrian improvements along north side of Silverbrook Rd from Silverthorn Rd to Bayberry Ridge Rd. Project is approx. 650 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Final design is complete. 4 of 6 easements have been acquired. LAD is following up with property owner.

Springfield Conley, TimPreston, ClintonMcCorkle, Lisa

PM PDD:PM LAD:PM CMDE:PM CMDS:

11/0909/08 02/09 11/09NA NA

Project Description Monthly Remarks

10/09 02/10 03/10 06/1004/1001/10304Fund

4YP201

Pedestrian Improvements - Bond Funded

PB021

Sydenstricker Rd Walkway - Briarcliff to Galgate

$180,000$0

Pedestrian improvements along north side of Sydenstricker Rd from Briarcliff Dr to Galgate Dr. Project is approx. 1,350 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design in progress.

Springfield Conley, TimBuckley, Beth

PM PDD:PM LAD:PM CMDE:PM CMDS:

02/1005/09 11/09 06/10NA TBD

Project Description Monthly Remarks

02/10 09/10 10/10 04/1108/1008/10304Fund

4YP201

Pedestrian Improvements - Bond Funded

PB022

Ashburton Ave Walkway - at Cedar Run

$476,000$0

Pedestrian improvements along west side of Ashburton Ave at Cedar Run. Project is approx. 250 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design submitted to VDOT for review 8/14/09. Partial comments received 10/13/09. Environmental permitting in progress.

Sully Conley, TimBuckley, BethMcCorkle, Lisa

PM PDD:PM LAD:PM CMDE:PM CMDS:

01/1001/09 01/10 08/10NA TBD

Project Description Monthly Remarks

01/10 11/10 12/10 06/1107/1010/10304Fund

4YP201

Pedestrian Improvements - Bond Funded

PB023

Telegraph Rd Walkway - South Kings Hy to Lee District Park

$800,000$0

Pedestrian improvements along alternate sides of Telegraph Rd. from South Kings Hy to Lee District Park. Project is approx. 3,500 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design is in progress. Signal design is underway. Scope may change based on Telegraph Rd. Widening project. Coordination is on-going with VDOT.

Lee Marsh, DennisBarnes, Dianne

McEntire, Vickie

PM PDD:PM LAD:PM CMDE:PM CMDS:

05/1004/09 01/10 02/10 09/10NA

Project Description Monthly Remarks

05/10 12/10 01/11 02/1210/1111/10304Fund

Friday, November 20, 2009 Page 22 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP201

Pedestrian Improvements - Bond Funded

PB024

Backlick Rd Walkway - Wilburdale Comm to Braddock

$150,000$0

Pedestrian improvements along west side of Backlick Rd from Wilburdale community to Braddock Rd. Project is approx. 1,100 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Final design in progress. Project plats are being revised to minimize land acquisition cost.

Mason Marsh, DennisKresge, Carol

McEntire, Vickie

PM PDD:PM LAD:PM CMDE:PM CMDS:

02/1008/08 01/10 02/10 08/10NA

Project Description Monthly Remarks

08/09 11/10 12/10 05/1106/1010/10304Fund

4YP201

Pedestrian Improvements - Bond Funded

PB025

Backlick Rd Walkway - Opposite Wilburdale Comm

$150,000$0

Pedestrian improvements along east side of Backlick Rd opposite the Wilburdale community. Project is approx. 360 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Final design submitted 10/2/09. Land acquisition is in progress.

Mason Marsh, DennisBuckley, BethMinnix, W. ToddMcEntire, Vickie

PM PDD:PM LAD:PM CMDE:PM CMDS:

12/0908/08 07/09 03/10NA NA

Project Description Monthly Remarks

08/09 06/10 07/10 11/1005/1005/10304Fund

4YP201

Pedestrian Improvements - Bond Funded

PB026

Columbia Pike Walkway - Downing St to Lincolnia

$430,000$0

Pedestrian improvements along south side of Columbia Pk from Downing St to Lincolnia Rd. Project is approx. 900 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design in progress. Additional survey received and forwarded to consultant.

Mason Marsh, DennisPreston, ClintonMinnix, W. ToddHarper, Greg

PM PDD:PM LAD:PM CMDE:PM CMDS:

04/1012/08 12/09 01/10 08/10NA

Project Description Monthly Remarks

01/10 11/10 12/10 03/1112/1010/10304Fund

4YP201

Pedestrian Improvements - Bond Funded

PB027

Columbia Pike Walkway - Maple Ct to Blair

$200,000$0

Pedestrian improvements along north side of Columbia Pk from Maple Ct to Blair Rd. Project is approx. 1,000 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design in progress. Additional survey received and forwarded to consultant. Project plats are being revised.

Mason Marsh, DennisPreston, ClintonMinnix, W. ToddMcEntire, Vickie

PM PDD:PM LAD:PM CMDE:PM CMDS:

01/1005/09 11/09 06/10NA TBD

Project Description Monthly Remarks

06/09 12/10 01/11 07/1109/1011/10304Fund

Friday, November 20, 2009 Page 23 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP201

Pedestrian Improvements - Bond Funded

PB028

Columbia Pike Walkway - Gallows to Annandale Church

$190,000$0

Pedestrian improvements along south side of Columbia Pk from Gallows Rd at the Annandale Methodist Church. Project is approx. 450 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Intermediate design in progress. Additional survey received and forwarded to consultant.

Mason Marsh, Dennis

McEntire, Vickie

PM PDD:PM LAD:PM CMDE:PM CMDS:

04/1102/10 12/10 02/11 08/11NA

Project Description Monthly Remarks

04/11 11/11 12/11 06/1206/1210/11304Fund

4YP201

Pedestrian Improvements - Bond Funded

PB029

Leesburg Pike Walkway - Falls Church to Alexandria

$4,000,000$0

Rt 7 Pedestrian Initiative: Construct missing segments of walkway along Leesburg Pk from Falls Church to Alexandria. Project is approx. 13,200 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Preliminary design submitted to VDOT for review 5/11/09. It is anticipated project to be divided into individual segments at intermediate design. Schedule will be set at that time.

Mason Marsh, DennisBuckley, Beth

McEntire, Vickie

PM PDD:PM LAD:PM CMDE:PM CMDS:

05/09TBDTBD TBD TBD TBD

Project Description Monthly Remarks

TBD TBD TBD TBDTBDTBD304Fund

4YP201

Pedestrian Improvements - Bond Funded

PB030

Lincolnia Rd Walkway - Deming Ave to N Chambliss

$50,000$0

Pedestrian improvements along north side of Lincolnia Rd from Deming Ave to North Chambliss St. Project is approx. 240 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Final design submitted 11/7/09. Project plats in progress.

Mason Marsh, DennisKresge, CarolFarsad, NahidMcEntire, Vickie

PM PDD:PM LAD:PM CMDE:PM CMDS:

03/1010/08 12/09 01/10 08/10NA

Project Description Monthly Remarks

09/09 11/10 12/10 04/1106/1010/10304Fund

4YP201

Pedestrian Improvements - Bond Funded

PB031

Montrose St Walkway - Braddock to Grafton

$90,000$0

Pedestrian improvements along west side of Montrose St from Braddock Rd to Grafton St. Project is approx. 520 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design submitted 11/7/09. Scope adjusted to minimize land acquisition cost.

Mason Marsh, DennisBuckley, BethMcCorkle, LisaStrecker, Mathias

PM PDD:PM LAD:PM CMDE:PM CMDS:

03/1010/08 07/09 08/09 03/10NA

Project Description Monthly Remarks

09/09 06/10 07/10 12/1007/1005/10304Fund

Friday, November 20, 2009 Page 24 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP201

Pedestrian Improvements - Bond Funded

PB032

Tyler St Walkway - Columbia Pike to Lake St

$140,000$0

Pedestrian improvements along east side of Tyler St from Columbia Pk to Lake St. Project is approx. 1,000 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design in progress. Project plats submitted to LAD for review.

Mason Marsh, DennisPreston, Clinton

Perry, Michael

PM PDD:PM LAD:PM CMDE:PM CMDS:

02/1002/09 11/09 11/09 06/10NA

Project Description Monthly Remarks

02/10 09/10 10/10 03/1112/1008/10304Fund

4YP201

Pedestrian Improvements - Bond Funded

PB033

Annandale Rd Walkway - Brice to Falls Church City Line

$80,000$0

Pedestrian improvements along the east side of Annandale Rd from Brice St to Falls Church City line. Project is approx. 190 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design in progress. Project plats in progress.

Providence Marsh, DennisPreston, Clinton

Jensen, Chris

PM PDD:PM LAD:PM CMDE:PM CMDS:

02/1002/09 12/09 01/10 08/10NA

Project Description Monthly Remarks

02/10 11/10 12/10 05/1111/1010/10304Fund

4YP201

Pedestrian Improvements - Bond Funded

PB034

Courthouse Rd Walkway - Chain Br to Plantation Ln

$140,000$0

Pedestrian improvements along north side of Courthouse Rd from Chain Bridge Rd to Oakton Plantation Ln. Project is approx. 410 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Revised final design and signal modification design plans distributed for review. Partial comments received. 0 of 2 easements have been acquired. Utility coordination in progress. VSMP permit application submitted 6/29/09.

Providence Shively, ErikBuckley, BethGharavi, MoMcEntire, Vickie

PM PDD:PM LAD:PM CMDE:PM CMDS:

11/0907/08 02/09 11/09NA NA

Project Description Monthly Remarks

04/09 01/10 02/10 07/1003/1012/09304Fund

4YP201

Pedestrian Improvements - Bond Funded

PB035

Edgelea Rd Walkway - Oleander to Courthouse

$120,000$0

Pedestrian improvements along the east side of Edgelea Rd from Oleander Ave to Courthouse Rd. Project is approx. 350 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Final design submitted to VDOT for review 7/14/09. Partial comments received. 0 of 2 easements have been acquired.

Providence Shively, ErikBuckley, BethMinnix, W. ToddMcEntire, Vickie

PM PDD:PM LAD:PM CMDE:PM CMDS:

11/0906/08 01/09 11/09NA NA

Project Description Monthly Remarks

04/09 01/10 02/10 07/1003/1012/09304Fund

Friday, November 20, 2009 Page 25 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP201

Pedestrian Improvements - Bond Funded

PB036

Jefferson Ave Walkway - Summerfield to Marshall St

$250,000$0

Pedestrian improvements along south side of Jefferson Av from Summerfield Rd to Marshall St. Project is approx. 1,300 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Construction package submitted to CMD 10/30/09.

Providence Shively, ErikBuckley, BethMinnix, W. ToddJensen, Chris

PM PDD:PM LAD:PM CMDE:PM CMDS:

11/0905/08NA NA NA NA

Project Description Monthly Remarks

07/09 12/09 01/10 06/1005/1011/09304Fund

4YP201

Pedestrian Improvements - Bond Funded

PB037

Lee Highway Walkway - at Blake Ln

$100,000$0

Construction of missing segment of pedestrian walkway along Lee Hwy at Blake Ln. Project is approx. 170 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Project on hold pending determination of feasibility of project. Coordination on-going with DOT.

Providence Marsh, Dennis

Strecker, Mathias

PM PDD:PM LAD:PM CMDE:PM CMDS:

TBDNA TBD TBD TBD TBD

Project Description Monthly Remarks

TBD TBD TBD TBDTBDTBD 01/09304Fund

4YP201

Pedestrian Improvements - Bond Funded

PB038

Oak St Walkway - Sandburg to W Morgan Ln

$120,000$0

Pedestrian improvements along south side of Oak St from Sandburg St to west of Morgan Ln. Project is approx. 410 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design in progress. Revisions have been made to the project plats and they have forwarded to LAD. The schedule has been adjusted accordingly. Coordinating with DOT about this project becoming part of Hot Lanes Enhancement Grant Project.

Providence Marsh, DennisPreston, ClintonMcCorkle, LisaStrecker, Mathias

PM PDD:PM LAD:PM CMDE:PM CMDS:

12/0911/08 07/09 03/10NA TBD

Project Description Monthly Remarks

12/09 06/10 07/10 12/1009/1005/10304Fund

4YP201

Pedestrian Improvements - Bond Funded

PB039

Sutton Rd Walkway - at Marywood Rd

$50,000$0

Construction of missing segment of pedestrian walkway along Sutton Rd at Marywood Rd. Project is approx. 50 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Second intermediate design submitted for review 9/08/09. Comments received and are being addressed. Project plats in progress.

Providence Marsh, DennisBuckley, BethGharavi, MoHousley, Gregg

PM PDD:PM LAD:PM CMDE:PM CMDS:

04/1009/09 12/09 01/10 08/10NA

Project Description Monthly Remarks

01/10 11/10 12/10 04/1110/1010/10304Fund

Friday, November 20, 2009 Page 26 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP201

Pedestrian Improvements - Bond Funded

PB041

Franconia Rd Walkway - N side Governor's Hill Dr to Telegraph

$100,000$0

Pedestrian improvements along north side of Franconia Rd from Governor's Hill Dr to Telegraph Rd. Project is approx. 350 LF.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Second intermediate design submitted for review 9/08/09. Comments received and are being addressed. Project plats in progress.

Lee Marsh, DennisBarnes, Dianne

Jensen, Chris

PM PDD:PM LAD:PM CMDE:PM CMDS:

02/1002/09 02/10 03/10 10/10NA

Project Description Monthly Remarks

02/10 12/10 01/11 04/1111/1011/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

01063

WB Little River Tpk & Pinecrest Vista Dr

$24,000$0

Loading pad and 130 LF of sidewalk Group 5: Final design in progress. Land rights required. Project plat in progress.

Mason Lauretti, FrancescPreston, Clinton

PM PDD:PM LAD:PM CMDE:PM CMDS:

07/1001/09 01/10 06/10NA TBD

Project Description Monthly Remarks

04/09 08/10 08/10 10/1007/0908/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

01125

SB Fort Hunt Rd near Gahant Rd

$21,200$0

Loading pad Group 1: Land acquisition complete. Construction package submitted to CMD 10/16/09.

Mount Vernon Lauretti, FrancescBuckley, BethFarsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

10/0901/08 01/09 09/09NA NA

Project Description Monthly Remarks

09/09 11/09 11/09 01/1012/0911/09304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

01128

SB Fort Hunt Rd & Wellington Rd

$22,000$0

Concrete loading pad, sidewalk connection, and ditch regrading

Group 6: Final design is in progress. Land rights required.

Mount Vernon Lauretti, FrancescBarnes, Dianne

PM PDD:PM LAD:PM CMDE:PM CMDS:

06/1001/09 12/09 05/10NA TBD

Project Description Monthly Remarks

08/09 07/10 07/10 09/1011/0907/10304Fund

Friday, November 20, 2009 Page 27 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

01130

SB Fort Hunt Rd & Oakbrooke Ave

$16,000$0

Concrete loading pad Group 6: Construction complete 10/23/09.

Mount Vernon Lauretti, Francesc

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

08/0901/09NA NA NA NA

Project Description Monthly Remarks

12/08 09/09 09/09 10/0904/0909/09304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

01180

Fort Hunt Rd NB @ Oakbrooke Ave EB

$19,500$0

Loading pad, curb ramp, and crosswalk

Group 6: Construction complete 10/23/09.

Mount Vernon Lauretti, Francesc

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

07/0912/08NA NA NA NA

Project Description Monthly Remarks

12/08 08/09 08/09 10/0904/0908/09304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

01181

NB Fort Hunt Rd & Gladstone Pl

$23,000$0

Concrete loading pad, 4-foot wide asphalt sidewalk, and ditch regrading

Group 6: Final design is in progress. Construction package is being prepared.

Mount Vernon Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

10/0901/09NA NA NA NA

Project Description Monthly Remarks

12/08 11/09 11/09 01/1004/0911/09304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

01182

NB Fort Hunt Rd & Wellington Rd

$20,000$0

Concrete loading pad, concrete sidewalk, and re-install shelter

Group 6: Final design in progress. Land rights required.

Mount Vernon Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

06/1003/09 12/09 05/10NA NA

Project Description Monthly Remarks

08/09 07/10 07/10 09/1011/0907/10304Fund

Friday, November 20, 2009 Page 28 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

01184

NB Fort Hunt Rd & Shenandoah Rd

$17,000$0

Concrete loading pad and 4-foot wide concrete sidewalk

Group 6: Final design in progress. Construction package submitted to CMD 10/21/09.

Mount Vernon Lacquement, Don

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

09/0901/09NA NA NA NA

Project Description Monthly Remarks

12/08 10/09 10/09 12/0904/0910/09304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

01371

Burke Rd WB @ Shana Pl NB

$19,700$0

Loading pad and update pedestrian ramps

Group 11: Intermediate design in progress.

Springfield Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

03/1012/09NA TBD TBD TBD

Project Description Monthly Remarks

03/10 04/10 04/10 06/1006/1004/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

01372

Burke Rd WB @ Shanna Pl SB

$15,400$0

Loading Pad Group 10A: Utility coordination underway. Authorized for construction 10/15/09. Notice to proceed issued 11/9/09.

Springfield Schmidt, Natasha

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

09/09NA NA NA

Project Description Monthly Remarks

08/09 11/09 11/09 01/1012/0910/09304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

01376

Burke Rd WB @ Old Burke Lake RD NB

$20,400$0

Loading pad, Sidewalk and culvert Group 11: Intermediate design in progress.

Springfield Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

03/1012/09NA TBD TBD TBD

Project Description Monthly Remarks

03/10 04/10 04/10 06/1006/1004/10304Fund

Friday, November 20, 2009 Page 29 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

01377

Burke Rd WB @ Old Burke Lake Rd SB

$45,400$0

Loading pad Group 10A: Utility coordination underway. Authorized for construction 10/15/09. Notice to proceed issued 11/9/09.

Springfield Schmidt, Natasha

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

09/09NA NA NA

Project Description Monthly Remarks

08/09 11/09 11/09 01/1012/0910/09304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

01383

Burke Rd EB @ Burke Lake Rd NB

$17,300$0

Loading pad and sidewalk. Group 11: Intermediate design in progress.

Springfield Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

03/1012/09NA TBD TBD TBD

Project Description Monthly Remarks

03/10 04/10 04/10 06/1006/1004/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

01387

Burke Rd EB @ Ridge Ford Dr SB

$16,800$0

Loading pad. Group 11: Intermediate design in progress.

Springfield Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

03/1012/09NA TBD TBD TBD

Project Description Monthly Remarks

03/10 04/10 04/10 06/1006/1004/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

01388

Burke Rd EB @ Ridge Ford Dr NB

$23,100$0

Loading pad, retaining wall, sidewalk and pedestrian ramp.

Group 11: Intermediate design in progress.

Springfield Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

03/1012/09NA TBD TBD TBD

Project Description Monthly Remarks

03/10 04/10 04/10 06/1006/1004/10304Fund

Friday, November 20, 2009 Page 30 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

01467

Field Master DR SB @ Blarney Stone Dr EB

$16,100$0

Loading Pad Group 11: Pre-final design in progress. Land rights are required.

Springfield Lauretti, FrancescBarnes, Dianne

PM PDD:PM LAD:PM CMDE:PM CMDS:

10/1008/09 04/10 09/10NA NA

Project Description Monthly Remarks

03/10 11/10 11/10 01/1101/1111/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

01468

Field Master Dr SB @ Park Forest Dr EB

$18,000$0

Loading pad, update walkway and sidewalk.

Group 11: Intermediate design in progress.

Springfield Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

03/1012/09NA TBD TBD TBD

Project Description Monthly Remarks

03/10 04/10 04/10 06/1006/1004/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

01497

Field Master Dr NB @ Old Keene Mill Rd WB

$16,300$0

Loading pad Group 11: Pre-final design in progress.

Springfield Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

03/1008/09NA TBD TBD TBD

Project Description Monthly Remarks

03/10 04/10 04/10 06/1006/1004/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

01498

Field Mater Dr NB @ Blarney Stone Dr EB

$15,500$0

Loading pad Group 11: Pre-final design in progress. Land rights required.

Springfield Lauretti, FrancescBarnes, Dianne

PM PDD:PM LAD:PM CMDE:PM CMDS:

10/1010/09 04/10 09/10NA NA

Project Description Monthly Remarks

03/10 11/10 11/10 01/1101/1111/10304Fund

Friday, November 20, 2009 Page 31 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

01543

Burke Lake Rd WB @ Gooding Pond Ct SB

$17,300$0

Loading pad Group 11: Pre-final design in progress.

Braddock Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

03/1010/09NA NA NA NA

Project Description Monthly Remarks

03/10 04/10 04/10 06/1006/1004/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

01544

Wilmington Dr NB @ Wolcott Dr EB

$14,600$0

Loading pad Group 10A: Design 95% complete. Land rights are required. Land acquisition work request submitted to LAD on 9/3/09. Property owner has expressed opposition to proposed pad and is refusing to sign the easement agreement.

Braddock Schmidt, NatashaBarnes, DianneFarsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

09/09 10/09 02/10NA

Project Description Monthly Remarks

08/09 03/10 03/10 05/1012/0903/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

01551

Wilmington Dr SB @ Wolcott Dr WB

$18,500$0

Loading pad, sidewalk and pedestrian ramp

Group 11: Intermediate design in progress.

Braddock Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

03/1012/09NA TBD TBD TBD

Project Description Monthly Remarks

03/10 04/10 04/10 06/1006/1004/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

01552

Burke Lake Rd EB @ Timarron Cove Lane SB

$15,400$0

Loading pad Group 10A: Authorized for construction 10/15/09. Notice to proceed issued 11/9/09.

Springfield Schmidt, Natasha

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

09/09NA NA NA

Project Description Monthly Remarks

08/09 11/09 11/09 01/0912/0910/09304Fund

Friday, November 20, 2009 Page 32 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

01600

WB Arlington Dr near Windbreak Dr

$15,700$0

Loading pad, bench, and concrete sidewalk

Group 4: Final design in progress. Land acquisition authorized 9/23/09.

Mount Vernon Lauretti, FrancescKresge, Carol

PM PDD:PM LAD:PM CMDE:PM CMDS:

03/1010/08 09/09 02/10NA NA

Project Description Monthly Remarks

03/09 04/10 04/10 06/1006/0904/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

01752

Alban Rd WB @ Alban Station Rlvd NB

$17,800$0

Loading Pad Group 9: Pre-final design in progress. Land rights required.

Mount Vernon Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

09/1009/09 03/10 08/10NA NA

Project Description Monthly Remarks

02/10 10/10 10/10 12/1012/1010/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

01753

Alban Rd WB @ Alban Station Bld SB

$17,800$0

Loading pad Group 9: Intermediate design in progress.

Mount Vernon Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

02/1012/09NA TBD TBD TBD

Project Description Monthly Remarks

02/10 03/10 03/10 05/1005/1003/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

01754

Alban Rd WB @ Entrance to Alban Business Center NB

$18,300$0

Loading pad, sidewalk and pedestrian ramp

Group 9: Pre-final design in progress. Land rights are required.

Mount Vernon Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

09/1009/09 03/10 08/10NA TBD

Project Description Monthly Remarks

02/10 10/10 10/10 12/1012/1010/10304Fund

Friday, November 20, 2009 Page 33 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

01904

SB Colts Neck Road & Hunter Square Court

$29,000$0

Loading pad, sidewalk, and pedestrian ramp

Group 3: Final design is complete. Land acquisition complete 5/29/09. Coordination with Reston HOA Association is ongoing.

Hunter Mill Lauretti, FrancescBuckley, Beth

McEntire, Vickie

PM PDD:PM LAD:PM CMDE:PM CMDS:

10/0907/08 01/09 05/09NA NA

Project Description Monthly Remarks

03/09 11/09 11/09 01/1006/0911/09304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

01906

NB Reston Parkway & S Lakes Dr

$19,900$0

Loading pad and curb and gutter extension

Group 4: Final design in progress. Land acquisition in progress. 0 of 2 easements have been acquired.

Hunter Mill Lauretti, FrancescBuckley, Beth

PM PDD:PM LAD:PM CMDE:PM CMDS:

12/0907/08 06/09 11/09NA NA

Project Description Monthly Remarks

06/09 01/10 01/10 03/1009/0901/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

01907

Reston Pkwy NB @ Sunrise Valley Dr WB

$20,600$0

Loading pad and 5' sidewalk connection

Group 8: Intermediate design in progress.

Hunter Mill Lauretti, Francesc

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

01/1012/09NA TBD TBD TBD

Project Description Monthly Remarks

07/09 12/09 12/09 02/1010/0912/09304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

02022

SB Telegraph Road and Highland Meadows Ct

$29,200$0

Loading pad, 100' curb and gutter, concrete sidewalk, curb inlet and storm sewer

Group 1: Preliminary construction package submitted to CMD 7/2/09. VDOT permit application package re-submitted 9/15/09.

Lee Lauretti, FrancescBuckley, BethFarsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

10/0911/07 01/09 04/09NA NA

Project Description Monthly Remarks

01/09 11/09 11/09 01/1010/0911/09304Fund

Friday, November 20, 2009 Page 34 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

02023

Telegraph Rd SB @ Dunsmore Rd EB

$23,100$0

Loading pad, culvert and sidewalk Group 9: Intermediate design in progress.

Lee Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

02/1012/09NA TBD TBD TBD

Project Description Monthly Remarks

02/10 03/10 03/10 05/1005/1003/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

02024

Telegraph Rd SB @ Glenwood Mews Dr WB

$16,300$0

Loading pad Group 9: Pre-final design in progress.

Lee Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

02/1009/09NA NA NA NA

Project Description Monthly Remarks

02/10 03/10 03/10 05/1005/1003/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

02025

Telegraph Rd SB @ Belleau Woods La EB

$16,300$0

Loading pad Group 9: Pre-final design in progress.

Lee Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

02/1009/09NA NA NA NA

Project Description Monthly Remarks

02/10 03/10 03/10 03/1005/1003/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

02026

Telegraph Rd SB @ Helmsdale La WB

$16,600$0

Loading pad Group 9: Pre-final design in progress. Project plats in progress.

Lee Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

09/1009/09 03/10 08/10NA TBD

Project Description Monthly Remarks

02/10 10/10 10/10 12/1012/1010/10304Fund

Friday, November 20, 2009 Page 35 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

02041

Telegraph Rd NB @ Dunsmore Rd EB

$16,600$0

Loading pad Group 9: Pre-final design in progress. Land rights are required. LAD pursuing letter of permission.

Lee Lauretti, FrancescBuckley, Beth

PM PDD:PM LAD:PM CMDE:PM CMDS:

09/1009/09 03/10 08/10NA TBD

Project Description Monthly Remarks

02/10 08/10 08/10 12/1012/1008/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

02042

Telegraph Rd NB @ Wickford Dr EB

$17,100$0

Loading pad Group 9: Pre-final design in progress.

Lee Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

02/1009/09NA NA NA NA

Project Description Monthly Remarks

02/10 03/10 03/10 05/1005/1003/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

02043

Telegraph Rd NB @ Devereux Circle Dr EB

$16,500$0

Loading pad Group 9: Pre-final design in progress.

Lee Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

02/1009/09NA NA NA NA

Project Description Monthly Remarks

02/10 03/10 03/10 05/1005/1003/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

02123

Helmsdale La WB @ Telegraph Rd NB

$16,600$0

Loading pad Group 9: Pre-final design in progress.

Lee Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

02/1009/09NA NA NA NA

Project Description Monthly Remarks

02/10 03/10 03/10 05/1005/1003/10304Fund

Friday, November 20, 2009 Page 36 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

02212

Columbia Pike EB @ Ashwood Pl SB

$18,600$0

Loading pad, sidewalk connection, and handicap ramp

Group 10A: Design 90% complete. Preparing to submit plan to CMD & MSMD for review.

Mason Schmidt, Natasha

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

11/09NA NA NA

Project Description Monthly Remarks

08/09 12/09 12/09 03/1012/0912/09304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

02226

Columbia Pike WB @ Ashwood Pl SB

$18,600$0

Loading pad, sidewalk connection, and handicap ramp

Group 10A: Design 90% complete. Preparing to submit plan to CMD & MSMD for review.

Mason Schmidt, Natasha

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

11/09NA NA NA

Project Description Monthly Remarks

08/09 12/09 12/09 03/0912/0912/09304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

02229

Columbia Pike WB @ Downing St SB

$14,600$0

Loading pad & Crosswalk Group 10A: Design 90% complete. Preparing to submit for review. Land rights are required.

Mason Schmidt, Natasha

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

11/09 10/09 03/10NA

Project Description Monthly Remarks

08/09 04/10 04/10 06/1012/0904/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

02287

Annandale Rd NB at Franklin Rd EB

$17,100$0

Concrete loading pad and reconstruct existing curb cut ramp

Group 7: Pre-final design in progress.

Mason Lauretti, FrancescPreston, Clinton

PM PDD:PM LAD:PM CMDE:PM CMDS:

07/1005/09 01/10 06/10NA NA

Project Description Monthly Remarks

02/09 08/10 08/10 10/1001/1008/10304Fund

Friday, November 20, 2009 Page 37 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

02292

Annandale Rd EB at Hockett St SB

$18,500$0

Concrete loading pad, curb cut ramp, and sidewalk connection

Group 7: Pre-final design in progress. Project plats in progress. Site being combined with 4YP202 - 02292.

Mason Lauretti, FrancescFinnell, Richard

PM PDD:PM LAD:PM CMDE:PM CMDS:

08/1003/09 02/10 07/10NA NA

Project Description Monthly Remarks

09/09 09/10 09/10 11/1001/1009/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

02329

Annandale Rd WB at Hockett St SB

$18,700$0

Concrete loading pad, curb cut ramp, and painted crosswalk

Group 7: Pre-final design in progress. Project plats in progress. Site being combined with 4YP202 - 02292.

Providence Lauretti, FrancescFinnell, Richard

PM PDD:PM LAD:PM CMDE:PM CMDS:

08/1003/09 02/10 07/10NA NA

Project Description Monthly Remarks

09/09 09/10 09/10 11/1001/1009/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

02330

Annandale Rd WB at Sheffield Ct SB

$19,000$0

Concrete loading pad, curb cut ramp, and sidewalk connection

Group 7: Pre-final design in progress. Land rights required.

Providence Lauretti, FrancescPreston, Clinton

PM PDD:PM LAD:PM CMDE:PM CMDS:

07/1004/09 01/10 06/10NA NA

Project Description Monthly Remarks

09/09 08/10 08/10 10/1001/1008/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

02331

Annadale Rd WB at Statecrest Dr SB

$23,600$0

Concrete loading pad and sidewalk connection

Group 7: Final design in progress.

Providence Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

11/0904/09NA NA NA NA

Project Description Monthly Remarks

02/09 12/09 12/09 02/1006/0912/09304Fund

Friday, November 20, 2009 Page 38 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

02334

Annandale Rd SB at Franklin Rd EB

$16,400$0

Concrete loading pad Group 7: Pre-final design in progress. Land acquisition package submitted 9/23/09.

Mason Lauretti, FrancescPreston, Clinton

PM PDD:PM LAD:PM CMDE:PM CMDS:

03/1003/09 09/09 02/10NA TBD

Project Description Monthly Remarks

09/09 04/10 04/10 06/1001/1004/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

02416

Arlington Blvd WB @ Greenway Blvd NB

$17,800$0

Loading pad, 5' wide concrete walk connection to EP

Group 10A. Design 90% complete. Preparing to submit plans for initial review.

Providence Schmidt, Natasha

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

11/09NA NA NA

Project Description Monthly Remarks

08/09 12/09 12/09 03/1012/0912/09304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

02420

WB Arlington Boulevard Near Graham Rd

$28,700$0

Loading pad, bus shelter, 20 LF of sidewalk, and grate inlet

Group 1: Redesign submitted 5/09. Intermediate design submitted to VDOT on 7/30/09. Due to comments received dates have been revised "To Be Determined".

Providence Lauretti, Francesc

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

TBDNA NA NA NA NA

Project Description Monthly Remarks

TBD TBD TBD TBDTBDTBD 09/08304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

02421

WB Arlington Blvd & Allen St

$28,700$0

Loading pad, improved access, pedestrian ramp from frontage road, and drainage improvements

Group 4: Pre-final design in progress. VDOT review required. Design delayed due to complicated drainage issues. Pre-design submitted to VDOT on 7/30/09. Schedule to be determined once drainage issues are resolved.

Providence Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

01/09TBDNA TBD TBD TBD

Project Description Monthly Remarks

TBD TBD TBD TBDTBDTBD 11/09304Fund

Friday, November 20, 2009 Page 39 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

02428

Arlington Blvd WB @ Chichester Lane NB

$16,200$0

Loading pad Group 10A: Design 90% complete. Preparing to submit plans for initial review.

Providence Schmidt, Natasha

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

11/09NA NA NA

Project Description Monthly Remarks

08/09 12/09 12/09 03/1012/0912/09304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

02438

Hummer Rd NB at Marshall Dr EB

$16,000$0

Concrete loading pad Group 7: Final design complete. Construction package being prepared.

Mason Lauretti, Francesc

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

11/0903/09NA NA NA NA

Project Description Monthly Remarks

02/09 12/09 12/09 02/1006/0912/09304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

02463

Gallows Rd SB at Dolce Dr EB

$18,500$0

Concrete loading pad and trash receptacle

Group 7: Final design in progress. Construction package submitted to CMD 10/21/09.

Mason Lauretti, Francesc

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

09/0904/09NA TBD TBD TBD

Project Description Monthly Remarks

02/09 10/09 10/09 12/0906/0910/09304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

02465

SB Fairview Park Dr & Yancey Dr

$15,700$0

Loading pad Group 4: Construction complete 10/30/09.

Providence Lauretti, FrancescBuckley, BethFarsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

09/0908/08 06/09 09/09NA NA

Project Description Monthly Remarks

03/09 09/09 09/09 10/0906/0909/09304Fund

Friday, November 20, 2009 Page 40 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

02471

NB Fairfview Park Dr & New Providence Dr

$20,000$0

Loading pad and bench Group 4: Construction complete 10/30/09.

Providence Lauretti, FrancescBuckley, BethFarsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

09/0907/08 03/09 09/09NA NA

Project Description Monthly Remarks

05/09 09/09 09/09 10/0908/0909/09304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

02482

Chain Bridge Rd NB @ Glengyle Dr WB

$16,200$0

Loading pad Group 10A: Authorized for construction 11/3/09.

Providence Schmidt, Natasha

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

09/09NA NA NA

Project Description Monthly Remarks

08/09 11/09 11/09 01/1012/0911/09304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

02487

Chain Bridge Rd SB @ Glengyle Dr WB

$16,200$0

Loading pad Group 10A: Authorized for construction 11/3/09.

Hunter Mill Schmidt, Natasha

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

09/09NA NA NA

Project Description Monthly Remarks

08/09 11/09 11/09 01/1012/0911/09304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

03066

Patrick Henry Dr SB @ Brook Dr EB

$15,400$0

Loading pad Group 10A: Design 85% complete.

Mason Schmidt, Natasha

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

11/09NA NA NA

Project Description Monthly Remarks

08/09 12/10 12/10 02/1012/0912/10304Fund

Friday, November 20, 2009 Page 41 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

03074

Old Keene Mill Rd WB @ Byron Ave SB

$23,000$0

Loading pad, curb & gutter, asphalt trail and pedestrian ramp

Group 9: Intermediate design in progress.

Lee Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

02/1012/09NA TBD TBD TBD

Project Description Monthly Remarks

02/10 03/10 03/10 05/1005/1003/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

03077

Old Keene Mill Rd EB @ Westmore Dr SB

$22,000$0

Loading pad, curb & gutter, sidewalk and pedestrian ramp

Group 9: Pre-final design in progress.

Lee Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

02/1009/09NA TBD TBD TBD

Project Description Monthly Remarks

02/10 03/10 03/10 05/1005/1003/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

03082

WB Old Keene Mill Road & Ainsworth Ave

$33,000$0

Loading pad, sidewalk, curb ramps, and curb & gutter improvements

Group 3: Final design in progress. Land acquisition package submitted 6/8/09. 1 of 2 easements have been acquired.

Springfield Lauretti, FrancescPreston, Clinton

Harper, Greg

PM PDD:PM LAD:PM CMDE:PM CMDS:

12/0911/08 06/09 11/09NA NA

Project Description Monthly Remarks

12/09 01/10 01/10 03/1003/1001/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

03083

WB Old Keene Mill Rd and Carrleigh Pkwy

$95,000$0

Loading pad, concrete sidewalk, curb & gutter extension, median cut, 2 pedestrian ramps, 2 crosswalks, and 4 pedestrian signals

Group 1 (design in conjunction with Stop No. 03128): Traffic signal design is in progress. Investigating adding shelter to scope. Project plats are in progress. Additional survey being ordered. Scope may expand. Schedule to be determined once scope is finalized.

Springfield Lauretti, FrancescBarnes, Dianne

PM PDD:PM LAD:PM CMDE:PM CMDS:

06/08TBDNA TBD TBD TBD

Project Description Monthly Remarks

TBD TBD TBD TBDTBDTBD 11/09304Fund

Friday, November 20, 2009 Page 42 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

03091

Old Keene Mill Rd WB @ Keene Dr NB

$20,400$0

loading pad, sidewalk and pedestrian ramp

Group 11: Intermediate design in progress.

Springfield Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

03/1012/09NA TBD TBD TBD

Project Description Monthly Remarks

03/10 04/10 04/10 06/1006/1004/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

03108

Leesburg Pike WB @ Patrick Henry Dr SB

$16,200$0

Loading pad Group 10A: Design 99% complete. Land acquisition required.

Mason Schmidt, NatashaPreston, ClintonFarsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

09/09 09/09 02/10NA

Project Description Monthly Remarks

08/09 03/10 03/10 05/1012/1003/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

03115

Leesburg Pike WB @ Rio Dr SB

$16,200$0

Loading pad Group 10A: Design 85% complete. Land acquisition required.

Mason Schmidt, Natasha

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

11/09TBD TBD TBD

Project Description Monthly Remarks

08/09 04/10 04/10 06/1012/0904/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

03120

Old Keene Mill Rd EB @ Keene Dr NB

$20,700$0

Loading pad, sidewalk and regrading ditch

Group 11: Intermediate design in progress.

Springfield Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

03/1012/09NA TBD TBD TBD

Project Description Monthly Remarks

03/10 04/10 04/10 06/1006/1004/10304Fund

Friday, November 20, 2009 Page 43 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

03125

EB Old Keene Mill Rd @ Millwood Dr

$16,500$0

Loading pad Group 4: Final design in progress. Land acquisition complete on 10/20/09. Construction package being prepared.

Springfield Lauretti, FrancescZore, TasneemFarsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

12/0910/08 06/09 11/09NA NA

Project Description Monthly Remarks

03/09 01/10 01/10 03/1006/0901/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

03128

EB Old Keene Mill Rd and Carrleigh Pkwy

$85,000$0

Bus shelter, sidewalk, pedestrian signals, crosswalk, and median cut

Group 1 (design in conjunction with Stop No. 03128): Traffic signal design is in progress. Investigating adding shelter to scope. Project plats are in progress. Additional survey being ordered. Scope may expand. Schedule to be determined once it is finalized.

Springfield Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

06/08TBDNA TBD TBD TBD

Project Description Monthly Remarks

TBD TBD TBD TBDTBDTBD 11/09304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

03131

EB Old Keene Mill Road and Jansen Drive

$33,000$0

Loading pad, sidewalk, curb and gutter, and 2 pedestrian ramps

Group 3: Consultant coordinating with VDOT to resolve outstanding comments. Land acquisition required. VDOT comments addressed 7/16/09. Project plats are being revised.

Springfield Lauretti, FrancescJohnson, Vicki

McEntire, Vickie

PM PDD:PM LAD:PM CMDE:PM CMDS:

06/1007/08 12/09 05/10NA TBD

Project Description Monthly Remarks

07/09 07/10 07/10 09/1010/0907/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

03168

NB Frontier Dr near Franconia Rd

$39,400$0

Bus shelter and small retaining wall Group 4: Pre-final design in progress. Building permits required. Land rights required.

Lee Lauretti, FrancescBuckley, Beth

PM PDD:PM LAD:PM CMDE:PM CMDS:

05/1001/09 11/09 04/10NA TBD

Project Description Monthly Remarks

03/09 06/10 06/10 08/1006/0906/10304Fund

Friday, November 20, 2009 Page 44 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

03265

EB Edsall Rd & Industrial Dr

$86,500$0

Bus shelter, sidewalk, 4 pedestrian ramps, 2 crosswalks, pedestrian signals, and drainage culvert

Group 3: Intermediate design submitted to VDOT for review 4/27/09. Comments received 7/14/09. Project plats in progress.

Mason Lauretti, FrancescKresge, Carol

McEntire, Vickie

PM PDD:PM LAD:PM CMDE:PM CMDS:

09/1004/09 03/10 08/10NA TBD

Project Description Monthly Remarks

12/09 10/10 10/10 01/1104/1010/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

03490

Backlick Rd SB @ Calamo St WB

$18,300$0

Loading pad and pedestrian ramp Group 9: Pre-final design in progress. Land rights required.

Lee Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

09/1009/09 03/10 08/10NA NA

Project Description Monthly Remarks

02/10 10/10 10/10 12/1012/1010/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

03491

Backlick Rd SB @ Springfield Blvd EB

$19,800$0

Loading pad Group 9: Pre-final design in progress. Land rights required.

Lee Lauretti, FrancescPreston, Clinton

PM PDD:PM LAD:PM CMDE:PM CMDS:

09/1009/09 03/10 08/10NA NA

Project Description Monthly Remarks

02/10 10/10 10/10 12/1012/1010/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

03496

Backlick Rd SB @ Barta Rd EB

$16,200$0

Loading pad Group 10A: Construction authorization on-hold due to possibility that DOT may request plan revision to include a bus shelter.

Lee Schmidt, Natasha

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

09/09NA NA NA

Project Description Monthly Remarks

08/09 11/09 11/09 01/1012/0911/0911/09

304Fund

Friday, November 20, 2009 Page 45 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

03668

Olley Lane NB @ Nester Rd WB

$15,400$0

Loading pad Group 10A: Authorized for construction 11/3/09.

Braddock Schmidt, NatashaPreston, ClintonFarsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

09/09 04/09 09/09NA

Project Description Monthly Remarks

08/09 11/09 11/09 01/1012/0911/09304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

03671

Olley Lane NB @ Little River Tpk EB

$16,200$0

Loading pad, small 1.5-foot high retaining wall

Group 10A: Design 90% complete. Preparing to plans for initial review. Land rights are required.

Braddock Schmidt, Natasha

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

11/09 12/08 04/10NA

Project Description Monthly Remarks

08/09 05/10 05/10 07/1012/0905/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

03690

Little River Trnpk EB at Morning Wind Ct SB

$37,500$0

Bus shelter, curb cut ramp, sidewalk connection, and curb & gutter extension

Group 7: Intermediate design in progress. Land rights required. LAD is coordinating with home owner regarding issue with mail box.

Mason Lauretti, FrancescHonnick, John

PM PDD:PM LAD:PM CMDE:PM CMDS:

10/1012/09 03/10 10/10NA TBD

Project Description Monthly Remarks

03/09 11/10 11/10 11/1001/1011/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

03691

EB Little River Tpk & Logsdon Dr

$20,900$0

Loading pad, curb ramp, and sidewalk connection

Group 5: Final design in progress.

Mason Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

03/1001/09NA NA NA NA

Project Description Monthly Remarks

04/09 04/10 04/10 06/1007/0904/10304Fund

Friday, November 20, 2009 Page 46 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

03693

EB Little River Turnpike and Columbia Pike

$21,900$0

Loading pad and sidewalk connection Group 5: Final design in progress. Land rights required. Project plat in progress.

Mason Lauretti, FrancescPreston, Clinton

PM PDD:PM LAD:PM CMDE:PM CMDS:

07/1003/09 11/10 06/10NA TBD

Project Description Monthly Remarks

04/09 08/10 08/10 10/1007/0908/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

03719

Lee Jackson Memorial Hwy WB @ Stringfellow Rd SB

$19,000$0

Loading pad and ashpalt sidewalk connection

Group 8: Pre-final design in progress.

Sully Lauretti, Francesc

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

01/1006/09NA NA NA NA

Project Description Monthly Remarks

07/09 02/10 02/10 04/1010/0902/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

04077

WB Little River Tpk & Old Columbia Pike

$24,900$0

Loading pad and sidewalk connection Group 5: Final design in progress. Land rights required.

Mason Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

07/1003/09 01/10 06/10NA TBD

Project Description Monthly Remarks

04/09 08/10 08/10 10/1007/0908/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

04127

NB Pimmit Dr & Leesburg Pike

$25,600$0

Loading pad and trash receptacle Group 4: Final design is in progress. Plat is being finalized. LAD authorized on 10/15/09.

Dranesville Lauretti, FrancescBarnes, Dianne

PM PDD:PM LAD:PM CMDE:PM CMDS:

04/1007/08 10/09 03/10NA TBD

Project Description Monthly Remarks

01/09 05/10 05/10 07/1004/0905/10304Fund

Friday, November 20, 2009 Page 47 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

04328

NB Magarity Rd & Ware Rd

$30,500$0

Loading pad, curb & gutter, drainage inlet, and pedestrian ramp

Group 6: Final design is in progress. VDOT comments received 9/8/09. Land rights required.

Dranesville Lauretti, FrancescKresge, CarolFarsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

04/1001/09 10/09 03/10NA NA

Project Description Monthly Remarks

10/09 05/10 05/10 07/1001/1005/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

04330

NB Magarity Rd & Griffith Rd

$18,000$0

Loading pad and sidewalk connection Group 6: Final design complete. Construction package being prepared.

Dranesville Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

11/0901/09NA NA NA NA

Project Description Monthly Remarks

12/08 12/09 12/09 02/1004/0912/09304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvementss

04331

NB Magarity Rd & Peabody Dr

$17,500$0

Loading pad and sidewalk connection Group 6: Final design in progress. Project plat in progress. LAD pursuing letter of permission.

Dranesville Lauretti, FrancescBarnes, Dianne

PM PDD:PM LAD:PM CMDE:PM CMDS:

06/1003/09 12/09 05/10NA NA

Project Description Monthly Remarks

08/09 07/10 07/10 09/1011/0907/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

04380

Chain Bridge Rd EB @ Hunting Avenue NB

$18,500$0

Loading pad, asphalt walkway, and ditch regrading

Group 5: Final design in progress. Project plat is under review.

Dranesville Lauretti, FrancescKresge, Carol

PM PDD:PM LAD:PM CMDE:PM CMDS:

04/1012/08 11/09 04/10NA TBD

Project Description Monthly Remarks

04/09 05/10 05/10 07/1007/0905/10304Fund

Friday, November 20, 2009 Page 48 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

04389

Old Dominion Dr EB @ Valley Ave SB

$21,400$0

Loading pad, drainage culvert, & sidewalk connection

Group 8: Pre-final design in progress.

Dranesville Lauretti, Francesc

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

03/1011/09NA TBD TBD TBD

Project Description Monthly Remarks

07/09 04/10 04/10 06/1010/0904/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

04396

Old Dominion Dr WB @ Cloverlawn Ct NB

$17,900$0

Loading pad & sidewalk connection Group 8: Pre-final design in progress.

Dranesville Lauretti, Francesc

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

01/1006/09NA TBD TBD TBD

Project Description Monthly Remarks

07/09 02/10 02/10 04/1010/0902/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

04399

Old Dominion Dr WB @ Kirby Rd NB

$15,300$0

Loading pad Group 8: Final design in progress.

Dranesville Lauretti, Francesc

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

01/1006/09NA TBD TBD TBD

Project Description Monthly Remarks

07/09 02/10 02/10 04/1010/0902/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

04400

Old Dominion Dr WB @ Kirby Rd SB

$26,800$0

Loading pad Group 8: Final design in progress.

Dranesville Lauretti, Francesc

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

01/1006/09NA TBD TBD TBD

Project Description Monthly Remarks

07/09 02/10 02/10 04/1010/0902/10304Fund

Friday, November 20, 2009 Page 49 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

04401

Old Dominion Dr WB @ Valley Ave NB

$24,200$0

Loading pad and sidewalk connection Group 8: Pre-final design in progress.

Dranesville Lauretti, Francesc

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

12/0906/09NA TBD TBD TBD

Project Description Monthly Remarks

07/09 01/10 01/10 03/1010/0901/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

04402

Old Dominion Dr WB @ Valley Ave SB

$27,200$0

Loading pad and regrading drainage ditch

Group 8: Pre-final design in progress.

Dranesville Lauretti, Francesc

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

01/1006/09NA TBD TBD TBD

Project Description Monthly Remarks

07/09 02/10 02/10 04/1010/0902/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

04403

Old Dominion Dr @ Birch Rd NB

$19,900$0

Loading pad, sidewalk connection & curb and gutter

Group 8: Pre-final design in progress.

Dranesville Lauretti, Francesc

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

02/1011/09NA TBD TBD TBD

Project Description Monthly Remarks

07/09 03/10 03/10 05/1010/0903/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

04554

Flint Hill Rd NB @ Rambling Rd EB

$17,800$0

Loading pad and sidewalk Group 11: Intermediate design in progress.

Hunter Mill Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

03/1012/09NA TBD TBD TBD

Project Description Monthly Remarks

03/10 04/10 04/10 06/1006/1004/10304Fund

Friday, November 20, 2009 Page 50 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

04572

Flint Hill Rd SB @ Rambling Rd WB

$19,000$0

Loading pad, sidewalk and regrading ditch

Group 11: Intermediate design in progress.

Hunter Mill Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

03/1012/09NA TBD TBD TBD

Project Description Monthly Remarks

03/10 04/10 04/10 06/1006/1004/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

05073

WB Sunrise Valley Dr & Glade Dr

$21,800$0

Loading pad and bench Group 4: Final design in progress.

Hunter Mill Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

12/0908/08NA NA NA NA

Project Description Monthly Remarks

09/08 01/10 01/10 03/1006/0901/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

05078

Sunset Hills Rd EB @ Town Center Pkwy SB

$19,900$0

Loading pad and bench Group 4: Pre-final design in progress. Project plat being revised. Land acquisition authorized 10/26/09.

Hunter Mill Lauretti, FrancescBuckley, Beth

PM PDD:PM LAD:PM CMDE:PM CMDS:

05/1010/08 10/09 04/10NA TBD

Project Description Monthly Remarks

03/09 06/10 06/10 08/1006/0906/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

05087

Glade Drive EB @ Soapstone Drive SB

$19,500$0

Loading pad, upgrade existing handicap ramp, & sidewalk connection

Group 10B: Design 80% complete.

Hunter Mill Schmidt, Natasha

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

12/09NA NA NA

Project Description Monthly Remarks

12/09 02/10 02/10 05/1005/1002/10304Fund

Friday, November 20, 2009 Page 51 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

05123

Soapstone Dr NB @ Rolling Green Ct EB

$17,000$0

Loading pad, sidewalk connection, and handicap ramp

Group 10B: Design 80% complete.

Hunter Mill Schmidt, Natasha

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

12/09NA NA NA

Project Description Monthly Remarks

12/09 02/10 02/10 05/1005/1002/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

05124

Soapstone Dr NB @ Glencourse Lane EB

$17,000$0

Loading pad, sidewalk connection, and handicap ramp

Group 10B: Design 80% complete.

Hunter Mill Schmidt, Natasha

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

12/09NA NA NA

Project Description Monthly Remarks

12/09 02/10 02/10 05/1005/1002/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

05133

Soapstone Dr SB @ Glencourse Lane EB

$16,200$0

Loading pad and trail connection Group 10B: Design 50% complete.

Hunter Mill Schmidt, Natasha

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

12/09NA NA NA

Project Description Monthly Remarks

12/09 02/10 02/10 05/1005/1002/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

05136

Soapstone Dr SB @ Underoak Ct EB

$17,000$0

Loading pad and sidewalk connection Group 10B: Design 80% complete.

Hunter Mill Schmidt, Natasha

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

12/09NA NA NA

Project Description Monthly Remarks

12/09 02/10 02/10 05/1005/1002/10304Fund

Friday, November 20, 2009 Page 52 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

05137

SB Soapstone Dr near Hearthstone Ct

$15,400$0

Loading pad, drainage inlet and pipe Group 1: Pre-final design in progress. 1 of 1 easement has been acquired. Preparing to submit to Reston DRB.

Hunter Mill Lauretti, FrancescPreston, Clinton

PM PDD:PM LAD:PM CMDE:PM CMDS:

01/1001/08 03/09 09/09NA NA

Project Description Monthly Remarks

09/09 02/10 02/10 04/1012/0902/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

05138

Soapstone Dr SB @ Woodhollow Ct EB

$14,600$0

Loading pad Group 10B: Design 20% complete.

Hunter Mill Schmidt, Natasha

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

12/09NA NA NA

Project Description Monthly Remarks

12/09 02/10 02/10 05/1005/1002/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

05139

Glade Dr WB @ Soapstone Dr SB

$15,400$0

Loading pad Group 10B: Design 75% complete.

Hunter Mill Schmidt, Natasha

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

12/09 02/10NA NA

Project Description Monthly Remarks

12/09 02/10 02/10 05/1005/1002/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

05168

EB South Lakes Dr & Chestnut Burr Ct

$16,900$0

Loading pad and curb ramp Group 2: Pre-final design in progress. 1 of 1 easement has been acquired. Preparing to submit to Reston DRB.

Hunter Mill Lauretti, FrancescFinnell, Richard

PM PDD:PM LAD:PM CMDE:PM CMDS:

01/10 08/08 09/09NA NA NA

Project Description Monthly Remarks

06/09 02/10 02/10 04/1009/0902/10304Fund

Friday, November 20, 2009 Page 53 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

05217

SB Glade Dr & Cocquina Dr

$16,200$0

Loading pad Group 5: Final design in progress. Construction package submitted to CMD 10/19/09.

Hunter Mill Lauretti, FrancescFinnell, RichardFarsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

02/1008/08 02/10NA NA NA

Project Description Monthly Remarks

04/09 03/10 03/10 05/1007/0903/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

05226

EB Sunrise Valley Dr near Glade Dr

$16,400$0

Loading pad Group 5: Final design in progress. Land rights required.

Hunter Mill Lauretti, FrancescFinnell, Richard

PM PDD:PM LAD:PM CMDE:PM CMDS:

08/1001/09 02/10 07/10NA TBD

Project Description Monthly Remarks

04/09 09/10 09/10 11/1007/0909/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

05227

Sunrise Valley Dr EB @ South Lakes Dr SB

$18,300$0

Loading pad and curb ramp Group 5: Final design in progress. Project plat is being revised. LAD authorized 10/15/09.

Hunter Mill Lauretti, FrancescBuckley, Beth

PM PDD:PM LAD:PM CMDE:PM CMDS:

04/1001/09 10/09 03/10NA TBD

Project Description Monthly Remarks

04/09 05/10 05/10 07/1007/0905/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

05525

Stringfellow Rd SB @ Brandy Station Rd WB

$19,200$0

Loading pad, 6-asphalt walkway, & curb and gutter

Group 8: Intermediate design in progress.

Sully Lauretti, Francesc

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

01/1009/09NA TBD TBD TBD

Project Description Monthly Remarks

07/09 02/10 02/10 04/1010/0902/10304Fund

Friday, November 20, 2009 Page 54 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

05526

Stringfellow Rd SB @ Jasper Rd WB

$17,300$0

Load pad, curb & gutter, & curb cut ramp

Group 8: Pre-final design in progress. Land rights required.

Sully Lauretti, Francesc

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

07/1006/09 01/10 06/10NA TBD

Project Description Monthly Remarks

07/09 08/10 08/10 10/1005/1008/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

05527

Stringfellow Rd NB @ Jasper Rd EB

$16,500$0

Loading pad and curb ramp Group 8: Pre-final design in progress.

Sully Lauretti, Francesc

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

12/0906/09NA TBD TBD TBD

Project Description Monthly Remarks

07/09 01/10 01/10 03/1010/0901/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

05528

Stringfellow Rd NB @ Cross Keys Ct WB

$24,300$0

Loading pad, sidewalk connection, drainage culvert, & curb cut ramp

Group 8: Pre-final design in progress. Land rights required.

Sully Lauretti, Francesc

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

07/1006/09 01/10 06/10NA TBD

Project Description Monthly Remarks

07/09 08/10 03/10 10/1005/1008/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

05534

Lawyers Rd NB @ McLearen Rd EB

$20,300$0

Loading pad, sidewalk and upgrade an existing handicap ramp

Group 10A: Design 90% complete. Addressing comments from CMD.

Hunter Mill Schmidt, Natasha

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

11/09NA NA NA

Project Description Monthly Remarks

08/09 12/09 12/09 02/1012/09304Fund

Friday, November 20, 2009 Page 55 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

05536

NB Reston Parkway & Glade Drive

$30,000$0

Loading pad, sidewalk, and curb and gutter

Group 3: Pre-final design in progress. Land acquisition complete 6/30/09. Coordination with Reston HOA is on-going.

Hunter Mill Lauretti, FrancescBuckley, Beth

McEntire, Vickie

PM PDD:PM LAD:PM CMDE:PM CMDS:

01/1007/08 01/09 06/09NA NA

Project Description Monthly Remarks

05/09 02/10 02/10 04/1008/0902/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

05567

Galesbury Ln SB @ Lee Jackson Memorial Hwy EB

$17,100$0

Loading pad Group 8: Construction package submitted to CMD 10/21/09.

Sully Lauretti, Francesc

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

10/0906/09NA TBD TBD TBD

Project Description Monthly Remarks

07/09 11/09 11/09 01/1010/0911/09304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

05615

Helmsdale La WB @ Duddington Dr NB

$15,500$0

Loading pad Group 9: Pre-final design in progress. Land rights required.

Lee Lauretti, FrancescBuckley, Beth

PM PDD:PM LAD:PM CMDE:PM CMDS:

09/1009/09 03/10 08/10NA NA

Project Description Monthly Remarks

02/10 10/10 10/10 12/1012/1010/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

05618

Helmsdale La EB @ Amesbury Ct NB

$15,500$0

Loading pad Group 9: Intermediate design in progress.

Lee Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

02/1012/09NA TBD TBD TBD

Project Description Monthly Remarks

02/10 03/10 03/10 05/1005/1003/10304Fund

Friday, November 20, 2009 Page 56 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

05631

EB Great Falls Street and Aynsley Ln

$16,000$0

Loading pad Group 5: Final design in progress. Project plat is being revised.

Dranesville Lauretti, FrancescKresge, Carol

PM PDD:PM LAD:PM CMDE:PM CMDS:

07/1009/08 01/10 06/10NA TBD

Project Description Monthly Remarks

04/09 08/10 08/10 10/1007/0908/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

05632

WB Great Falls Street and Eldorado Ct

$16,200$0

Loading pad Group 5: Final design in progress. Project plat is under review.

Dranesville Lauretti, FrancescBuckley, Beth

PM PDD:PM LAD:PM CMDE:PM CMDS:

07/1009/08 01/10 06/10NA TBD

Project Description Monthly Remarks

04/09 08/10 08/10 10/1007/0908/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

05716

Burke Rd EB @ Old Burke Lake Rd NB

$15,400$0

Loading pad Group 10A: Design 90% complete. Preparing to submit for review. Land rights will be required.

Springfield Schmidt, Natasha

Farsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

11/09 12/09 04/10TBD

Project Description Monthly Remarks

08/09 05/10 05/10 07/1012/1005/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

06119

Blake Ln SB at Kingsbridge Dr EB

$25,100$0

Concrete loading pad, curb cut ramps, and sidewalk connection

Group 7: Pre-final design in progress. Project plat is in progress.

Providence Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

07/1005/09 01/10 06/10NA NA

Project Description Monthly Remarks

10/09 08/10 08/10 10/1001/1008/10304Fund

Friday, November 20, 2009 Page 57 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP202

Bus Stop Inventory, Safety & Access Improvements

06253

Field Master Dr SB @ Rosewall Ct EB

$16,300$0

Loading Pad Group 11: Intermediate design in progress.

Springfield Lauretti, FrancescPM PDD:PM LAD:PM CMDE:PM CMDS:

03/1012/09NA TBD TBD TBD

Project Description Monthly Remarks

03/10 04/10 04/10 06/1006/1004/10304Fund

4YP202

Bus Stop Inventory, Safety & Access Improvements

10101

Amherst Ave SB @ Springfield Blvd EB

$17,100$0

Loading pad Group 9: Pre-final design in progress. Land rights required.

Lee Lauretti, FrancescPreston, Clinton

PM PDD:PM LAD:PM CMDE:PM CMDS:

09/1009/09 03/10 08/10NA NA

Project Description Monthly Remarks

02/10 10/10 10/10 12/1012/1010/10304Fund

4YP203

Spot Improvements - Braddock Road/Backlick Road

00000

$500,000$0

Install an additional left-turn lane on westbound Braddock Road to southbound Backlick Road

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design is in progress. Traffic signal proposal being revised to address comments from County. Design waiver package being revised to address comments from County.

Mason Madhusudhan, GBuckley, BethFarsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

03/1009/08 04/09 01/10 02/10 09/10

Project Description Monthly Remarks

12/09 12/10 01/11 06/1110/1011/10304Fund

4YP204

Spot Improvements - Shirley Gate Rd/Route 29

00000

$1,000,000$0

Intersection improvements at Route 29 to add additional thru lanes

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Scope has been revised to converting existing right turn lanes on Route 29 to shared thru and right turn lanes. A meeting has been scheduled with DOT and VHB to review intersection study and analysis for revised scope. Schedule to be revised after further review and agreement on intersection analysis.

Springfield Khorashadi, BrooBarnes, DianneMinnix, W. Todd

PM PDD:PM LAD:PM CMDE:PM CMDS:

06/08 09/08TBD TBD TBD TBD

Project Description Monthly Remarks

TBD TBD TBD TBDTBDTBDBraddock304Fund

Friday, November 20, 2009 Page 58 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP205

Spot Improvements - Zion Drive00000

$1,000,000$0

Reconstruct horizontal curve on Zion Drive east of Windsor Hill Drive.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Pre-final design is in progress.

Braddock Ayodeji, OlawaleBuckley, BethMcCorkle, Lisa

PM PDD:PM LAD:PM CMDE:PM CMDS:

05/1011/08 02/10 03/10 10/10NA

Project Description Monthly Remarks

11/09 12/10 01/11 12/1112/1111/10304Fund

4YP206

Spot Improvements - Rte 7/Towlston Road

00000

$750,000$0

Add left turn lane on north bound Towlston Road to west bound Route 7.

Preliminary design in progress.

Dranesville Conley, TimPM PDD:PM LAD:PM CMDE:PM CMDS:

07/1012/09 01/10 04/10 06/10 01/11

Project Description Monthly Remarks

07/10 04/11 05/11 12/1112/1103/11304Fund

4YP210

Poplar Tree Road Improvements00000

$5,500,000$2,500,000

Widening Poplar Tree Road to four lane divided section from Sully Station Drive to Braddock Ridge Drive.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Final design is in progress. Flood plain analysis is under review to determine impacts on adjoining properties. Addressing comments from VDOT to revise existing pavement section. Consultant will submit an addendum for new design work. Schedule to be revised once addendum is received.

Sully Khorashadi, BrooFinnell, RichardMinnix, W. ToddMcEntire, Vickie

PM PDD:PM LAD:PM CMDE:PM CMDS:

05/1010/07 02/09 12/09 10/09 07/10

Project Description Monthly Remarks

06/09 10/10 11/10 08/1110/1009/10304Fund

4YP212

Route 29 Widening00000

$4,000,000$0

Phase III: Widen northbound Route 29 to 3 lanes on from Legato Road to Shirley Gate Road.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Preliminary design submitted to VDOT for review 9/22/09. Utility designation update in progress.

Springfield Madhusudhan, GPreston, ClintonMinnix, W. Todd

PM PDD:PM LAD:PM CMDE:PM CMDS:

03/1109/09 04/10 05/10 12/10TBD

Project Description Monthly Remarks

03/11 06/11 07/11 07/1207/1205/11304Fund

Friday, November 20, 2009 Page 59 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

4YP213

Lorton Road00000

$40,000,000$20,000,000

Widen Lorton Rd. to 4 lanes from Rte. 123/Furnace Rd. to Silverbrook Rd. and from Rte. 123/Lorton Rd. to Furnace Rd.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Intermediate plans submitted for review on 10/14/09. VDOT Design Field Inspection scheduled for 12/09/09. An alignment study, signal warrant study, and documentation of cultural resources are being prepared to address concerns raised at the community meetings held in September and October 2009.

Mount Vernon Roberson , JeanKresge, CarolMinnix, W. Todd

PM PDD:PM LAD:PM CMDE:PM CMDS:

01/1109/08 10/09 01/10 02/10 09/10

Project Description Monthly Remarks

01/11 04/11 05/11 12/1212/1203/11304Fund

4YP214

Cinder Bed Road Improvements00000

$5,000,000$0

Improvements to the intersection of Cinder Bed Road and Newington Road. Relocate entrance to County vehicle maintenance facility.

Project is part of the Second Four-Year Transportation Plan endorsed by the BOS on 10/15/07. Final hydrologic and hydraulic analysis report submitted for review 7/16/09. Consultant submitted proposal for final design 11/12/09 and it is under review. Schedule to be developed once proposal is approved.

Mount Vernon Ayodeji, OlawalePM PDD:PM LAD:PM CMDE:PM CMDS:

06/09TBDTBD TBD TBD TBD

Project Description Monthly Remarks

TBD TBD TBD TBDTBDTBD304Fund

D00448

Plaza America Pedestrian Improvements

PA02B

Sunset Hills Road: Reston Center to Town Center Parkway

$170,000$0

600 LF 8' wide asphalt trail100 LF 6' wide concrete walkway

Funding provided by Plaza America cash proffer contribution. Coordinating with Comcast to lower section of cable. Evaluating scope and cost of additional walkway that owner requested, land acquisition on hold.

Hunter Mill Zahirieh, ShahlaBarnes, DianneGharavi, MoHarper, Greg

PM PDD:PM LAD:PM CMDE:PM CMDS:

03/09TBDNA NA NA TBD

Project Description Monthly Remarks

02/09TBD TBD TBDTBDTBD 05/09

307Fund

D00448

Plaza America Pedestrian Improvements

PA050

Sunset Hills Rd Trail: Rstn Pkwy-Wiehle

$195,000$0

350 LF 8' asphalt trail from Sunset Hills Road to W&OD Trail

Partial funding provided by Plaza America proffer contribution and funds from the Old Reston Avenue roadway improvement project. Resolving issues with Dominion Virginia Power. Evaluated alternate alignments, but determined not feasible. Schedule to be determined once issues with Dominion Virginia Power are resolved. Cost estimate is being prepared.

Hunter Mill Zahirieh, ShahlaBuckley, BethTBD, To be DeterHarper, Greg

PM PDD:PM LAD:PM CMDE:PM CMDS:

04/06 04/08NA NA NA TBD

Project Description Monthly Remarks

04/06 10/09TBD TBD TBDTBD 04/09

307Fund

Friday, November 20, 2009 Page 60 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

D00448

Plaza America Pedestrian Improvements

PA060J

Sunset Hills Road @ Target EB Bus Stop Improvements

$30,000

Installation of a bus shelter Funding provided by Plaza America proffer contribution. Land acquisition required. Negotiations have been unsuccessful (memorandum to DOT 1/11/07 recommending deletion ~ follow up memorandum 4/9/08 and email 9/15/08 to DOT for status update). Proposed development may provide bus stop improvements and relocation of stop - DOT is following up.

Hunter Mill Guarino, MichaelBuckley, BethFarsad, NahidMcMillen, Barry

PM PDD:PM LAD:PM CMDE:PM CMDS:

10/05NA NA TBD TBD TBD

Project Description Monthly Remarks

10/05 10/06TBD TBD TBDTBD 01/07

307Fund

D00448

Plaza America Pedestrian Improvements

PA060O

Sunset Hills Road @ WO&D Trail WB Bus Stop Improvements

$30,000$0

Installation of a bus shelter Partial funding provided by Plaza America proffer contribution. Loading pad is proposed at stop with walkway project - see Sunset Hills Road Walkway - W&OD to Michael Faraday, Project No. 4YP201 (PB017).

Hunter Mill Guarino, MichaelBuckley, BethFarsad, NahidHarper, Greg

PM PDD:PM LAD:PM CMDE:PM CMDS:

01/08NA NA TBD TBD TBD

Project Description Monthly Remarks

01/08 12/08TBD TBD TBDTBD 05/08

307Fund

K00447

Richmond Hwy Public Transport Initiative Phase 4A

RS102

Intersection Design - Belford Drive Old Mill Road, and Mohawk Lane

$357,000$0

Engineering and construction of intersection improvements at express bus service stops for Belford Drive, Old Mill Road, and Mohawk Lane.

Project is part of the Four-Year Transportation Program endorsed by the BOS on 2/9/04. This project will be completed in phases. Meeting held on 8/26/09 with the consultant to check on the status of the project and to plan the next course of action to expedite the submission process to VDOT. Design waiver package submitted to VDOT 8/31/09.

Mount Vernon Madhusudhan, GPreston, ClintonFarsad, Nahid

PM PDD:PM LAD:PM CMDE:PM CMDS:

03/1102/10 05/10 05/11NA TBD

Project Description Monthly Remarks

03/11 08/11 09/11 01/1201/1207/11

Lee307Fund

K00447

Richmond Hwy Public Transport Initiative: Walkways Phase 4D

RS211

Route 1 SB: South of Dogue Creek to Mobile Home Sales Park

$350,000$0

300 LF 8' Asphalt Trail and Pedestrian Bridge over Dogue Creek

Project is part of the Four-Year Transportation Program endorsed by the BOS on 2/8/04. Developing design scope for project. Design to be performed by consultant. Schedule to be determined once contract executed with design consultant. Land acquisition required.

Mount Vernon Zahirieh, ShahlaPM PDD:PM LAD:PM CMDE:PM CMDS:

TBDTBD TBD TBD TBD TBD

Project Description Monthly Remarks

TBD TBD TBD TBDTBDTBD307Fund

Friday, November 20, 2009 Page 61 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

K00447

Richmond Hwy Public Transport Initiative: Walkways Phase 4D

RS213

Route 1 SB: Sacramento Drive to Engleside Plaza (North of Woodlawn Court)

$350,000$0

1400 LF of 5-foot wide concrete sidewalk

Project is part of Four-Year Transportation Program endorsed by the BOS on 2/9/04. Plans submitted to VDOT 7/16/09. Preparing request to VDOT for right-of-way authorization to start land acquisition, including necessary environmental documentation. Schedule to be determined once VDOT authorizes initiation of land acquisition.

Mount Vernon Zahirieh, ShahlaKresge, Carol

Housley, Gregg

PM PDD:PM LAD:PM CMDE:PM CMDS:

TBDTBD TBD TBD TBD TBD

Project Description Monthly Remarks

TBD TBD TBD TBDTBDTBD307Fund

K00447

Richmond Hwy Public Transport Initiative: Walkways Phase 4D

RS214

Route 1 SB: South of Sky View Drive

$42,500$0

170 LF 5-foot wide concrete sidewalk and bus stop pad

Project is part of Four-Year Transportation Program endorsed by the BOS on 2/9/04. Plans submitted to VDOT 7/16/09. Preparing request to VDOT for right-of-way authorization to start land acquisition, including necessary environmental documentation. Schedule to be determined once VDOT authorizes initiation of land acquisition.

Mount Vernon Zahirieh, ShahlaKresge, Carol

PM PDD:PM LAD:PM CMDE:PM CMDS:

TBDTBD TBD TBD TBD TBD

Project Description Monthly Remarks

TBD TBD TBD TBDTBDTBD307Fund

K00447

Richmond Hwy Public Transport Initiative: Walkways Phase 4E

RS221

Route 1 NB: North of Reddick Avenue/Russell Road (towards Janna Lee Avenue)

$125,000$0

500 LF of 5-foot wide concrete sidewalk

Project is part of Four-Year Transportation Program endorsed by the BOS on 2/9/04. Plans submitted to VDOT 7/16/09l. Preparing request to VDOT for right-of-way authorization to start land acquisition, including necessary environmental documentation. Schedule to be determined once VDOT authorizes initiation of land acquisition.

Mount Vernon Zahirieh, ShahlaKresge, Carol

Housley, Gregg

PM PDD:PM LAD:PM CMDE:PM CMDS:

TBDTBD TBD TBD TBD TBD

Project Description Monthly Remarks

TBD TBD TBD TBDTBDTBD307Fund

K00447

Richmond Hwy Public Transport Initiative: Walkways Phase 4E

RS222

Route 1 NB: South of Janna Lee Avenue to Buckman Road/Mt. Vernon Highway

$303,000$0

1210 LF of 5-foot wide concrete sidewalk

Project is part of Four-Year Transportation Program endorsed by the BOS on 2/9/04. Utility coordination in progress. VDOT is requiring additional public involvement due to additional easements. Land acquisition is required. Drainage issues on site impacting walkway design - coordinating with DOT, SWPD, and VDOT. Project on hold until final scope regarding drainage issues resolved.

Mount Vernon Zahirieh, ShahlaKresge, Carol

PM PDD:PM LAD:PM CMDE:PM CMDS:

TBDTBD TBD TBD TBD TBD

Project Description Monthly Remarks

TBD TBD TBD TBDTBDTBD 02/09307Fund

Friday, November 20, 2009 Page 62 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

K00447

Richmond Hwy Public Transport Initiative: Walkways Phase 4E

RS223

Route 1 NB: Mt. Vernon Hwy/Buckman Rd to Napper Rd

$125,000$0

Pedestrian crossing and signal at Mt. Vernon Hwy. and 500 LF 5-foot wide concrete sidewalk

Project is part of Four-Year Transportation Program endorsed by the BOS on 2/9/04. Land acquisition is required. Utility coordination in progress. Obtaining signal design proposal. Additional survey and drainage calculations required. Schedule to be determined once additional public involvement finished and approved by VDOT.

Mount Vernon Zahirieh, ShahlaKresge, Carol

PM PDD:PM LAD:PM CMDE:PM CMDS:

TBDTBD TBD TBD TBD TBD

Project Description Monthly Remarks

TBD TBD TBD TBDTBDTBD307Fund

K00447

Richmond Hwy Public Transport Initiative: Walkways Phase 4F

RS232

Route 1 NB: South of Kings Village Road

$37,500$0

150 LF of 5-foot wide concrete sidewalk

Project is part of Four-Year Transportation Program. Utility coordination in progress. Plans submitted to VDOT on 7/16/09. Land acquisition is required. Preparing request to VDOT for right-of-way authorization to start land acquisition, including necessary environmental documentation. Schedule to be determined once additional public involvement finished and approved by VDOT.

Mount Vernon Zahirieh, ShahlaBuckley, Beth

Housley, Gregg

PM PDD:PM LAD:PM CMDE:PM CMDS:

TBDTBD TBD TBD TBD TBD

Project Description Monthly Remarks

TBD TBD TBD TBDTBDTBD307Fund

K00447

Richmond Hwy Public Transport Initiative: Walkways Phase 4F

RS233

Route 1 NB: South of Fordson Road to Woodlawn Trail

$410,000$0

1640 LF of 5-foot wide concrete sidewalk

Project is part of Four-Year Transportation Program. Utility coordination in progress. Plans submitted to VDOT on 7/16/09. Land acquisition is required. Preparing request to VDOT for right-of-way authorization to start land acquisition, including necessary environmental documentation. Schedule to be determined once additional public involvement finished and approved by VDOT.

Mount Vernon Zahirieh, ShahlaBuckley, Beth

PM PDD:PM LAD:PM CMDE:PM CMDS:

TBDTBD TBD TBD TBD TBD

Project Description Monthly Remarks

TBD TBD TBD TBDTBDTBD307Fund

K00447

Richmond Hwy Public Transport Initiative: Walkways Phase 4H

RS252

Route 1 NB: Quander Road - Phase 2

$112,500$0

450 LF of 5-foot wide concrete sidewalk south of Quander

Project is part of Four-Year Transportation Program. Utility coordination in progress. Plans submitted to VDOT on 7/16/09. Land acquisition is required. Preparing request to VDOT for right-of-way authorization to start land acquisition, including necessary environmental documentation. Schedule to be determined once additional public involvement finished and approved by VDOT.

Mount Vernon Zahirieh, ShahlaBuckley, Beth

Housley, Gregg

PM PDD:PM LAD:PM CMDE:PM CMDS:

TBDTBD TBD TBD TBD TBD

Project Description Monthly Remarks

TBD TBD TBD TBDTBDTBD307Fund

Friday, November 20, 2009 Page 63 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

K00447

Richmond Hwy Public Transport Initiative: Walkways Phase 4H

RS254

Route 1 SB: Belle Haven Towers - Phase 2

$137,500$0

550 LF of 5-foot wide concrete sidewalk and service drive crossing

Project is part of Four-Year Transportation Program. Utility coordination in progress. Plans submitted to VDOT on 7/16/09. Land acquisition is required. Preparing request to VDOT for right-of-way authorization to start land acquisition, including necessary environmental documentation. Schedule to be determined once additional public involvement finished and approved by VDOT.

Mount Vernon Zahirieh, ShahlaBuckley, Beth

PM PDD:PM LAD:PM CMDE:PM CMDS:

TBDTBD TBD TBD TBD TBD

Project Description Monthly Remarks

TBD TBD TBD TBDTBDTBD307Fund

W00100

Braddock District WalkwaysW109

Roberts Road @ GMU

$570,000$0

700 LF 6' asphalt trail Project is part of the Second Four-Year Transportation Program. Walkway construction 90% complete. Completion of the remaining 80 LF transition to Roberts Road contingent upon an on-going utility adjustment. LAD negotiating to reduce the easement limits due to the reduced project scope.

Braddock Popoola, LarryBarnes, DianneSteele, TerrenceMcEntire, Vickie

PM PDD:PM LAD:PM CMDE:PM CMDS:

09/08 02/09NANA NA NA

Project Description Monthly Remarks

NA08/09 08/09 12/0910/0908/09307Fund

W00200

Dranesville District WalkwaysW202A

Georgetown Pike Phase I

$500,000$0

Phase I: 1,260 LF of stonedust trail from Applewood Lane to the Village Center

Project scope reduced to trail section west of the village center due to citizen opposition east of the village center. VDOT authorized project for construction bid advertisement 11/10/09.

Dranesville Schmidt, NatashaKresge, CarolFarsad, NahidHarper, Greg

PM PDD:PM LAD:PM CMDE:PM CMDS:

03/09 08/09NANA NA TBD

Project Description Monthly Remarks

NA12/09 12/09 07/1005/0811/09307Fund

W00200

Dranesville District WalkwaysW202B

Georgetown Pike Phase II

$400,000$0

Trail align. study & design of 1,800 LF walkway. from Utterback Store Rd to Falls Manor Ct.

Preliminary design submitted to VDOT 11/10/09 for review.

Dranesville Popoola, LarryKresge, Carol

PM PDD:PM LAD:PM CMDE:PM CMDS:

05/10 05/10 10/10TBD

Project Description Monthly Remarks

05/10 02/11 02/11 08/1108/1102/11307Fund

Friday, November 20, 2009 Page 64 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

W00200

Dranesville Distict WalkwaysW202C

Georgetown Pike Environmental Certification

$60,000$0

Environmental Analysis along Georgetown Pike from Seneca Road to River Bend Road (approximately 4.2 miles)

Environmental analysis currently in progress. Phase I Enviromnental Site Assessment received. Received completed wetlands delineation report dated 7/9/09. Awaiting the 4(f) determination/exemption from VDOT.

Dranesville Schmidt, NatashaPM PDD:PM LAD:PM CMDE:PM CMDS:

11/09NA NA NA

Project Description Monthly Remarks

03/09NA NA NANANA

307Fund

W00200

Dranesville District WalkwaysW212

Walker Road Phase I

$350,000$0

5-foot wide concrete sidewalk (Phase I: 1200 LF of walkway north of Village Center to north end of Great Falls Elementary School property)

Project scope reduced due to citizens opposition. VDOT authorized project for construction bid advertisement on 11/10/09.

Dranesville Schmidt, NatashaKresge, CarolFarsad, NahidJensen, Chris

PM PDD:PM LAD:PM CMDE:PM CMDS:

10/05 03/09 08/09NA NA NA

Project Description Monthly Remarks

NA12/09 12/09 07/1005/0811/09307Fund

W00300

Hunter Mill District WalkwaysW304

Wiehle Avenue Walkway

$480,000$0

1200 LF 6-foot wide asphalt walkway with retaining walls and drainage improvements

Reston Design Review Board(RDRB) approval received. RDRB requested additional details be provided. VDOT and County agencies comments received. Plans are being revised. Coordinating with property owner on updates to plans and preparing to go back to RDRB with additional details and plan updates.

Hunter Mill Guarino, MichaelZore, TasneemGharavi, Mo

PM PDD:PM LAD:PM CMDE:PM CMDS:

01/10 01/02 09/08NA NA NA

Project Description Monthly Remarks

11/09 03/10 04/10 10/1008/1002/10307Fund

W00300

Hunter Mill District WalkwaysW308

Clarks Crossing Road Walkway

$139,000$0

250' 8-foot wide asphalt trail Construction complete 7/10/09. Awaiting permit release.

Hunter Mill Wozniak, WalterZore, TasneemGharavi, Mo

PM PDD:PM LAD:PM CMDE:PM CMDS:

05/06 09/07 02/07NA NA NA

Project Description Monthly Remarks

05/06 05/09 05/09 07/0908/0905/09307Fund

Friday, November 20, 2009 Page 65 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

W00300

Hunter Mill District WalkwaysW311

Beulah Road Trail

$165,000$0

500' 10-foot wide trail (Section D) Enhancement grant funds approved to prepare a trail feasibility study (complete) and design Section D (500 LF 10-foot wide trail) in progress. Final design in progress. Pre-final submission submitted to VDOT 11/9/09. Citizen meeting held 9/23/09.

Hunter Mill Popoola, LarryKresge, Carol

Murdoch, Guy

PM PDD:PM LAD:PM CMDE:PM CMDS:

03/10 02/10 08/10NA TBD

Project Description Monthly Remarks

03/10 09/10 11/10 05/1105/1109/10307Fund

W00400

Lee District WalkwaysW413

Florence Lane Walkway

$287,000$0

550 LF of 5-foot wide concrete sidewalk along the east side of Florence Lane between Candle Light Court and Beech Tree Drive

Project implementation was on-hold due to property owner opposition. Pre-final design submitted 10/13/09 for review.

Lee Popoola, Larry

Minnix, W. Todd

PM PDD:PM LAD:PM CMDE:PM CMDS:

02/10 02/10 07/10TBD

Project Description Monthly Remarks

02/10 09/10 09/10 12/1012/1009/10307Fund

W00500

Mason District WalkwaysW505

Old Col Pike-Elmdale

$290,000$272,000

700 LF of 6-foot wide walkway Funding for design only. Additional funding required. Project on hold pending approval of additional funding.

Mason Guarino, MichaelPM PDD:PM LAD:PM CMDE:PM CMDS:

TBDTBD TBD TBD TBD TBD

Project Description Monthly Remarks

TBD TBD TBD TBDTBDTBD 08/03307Fund

W00600

Mt. Vernon District WalkwaysW611

West Potomac High School Walkway

$576,969$0

500 LF of 5-foot wide concrete sidewalk with curb and gutter and storm drainage improvements

Project is part of the Second Four-Year Transportation Program. Construction NTP issued 3/2/09. Construction substantially complete 8/17/09. Permit released 10/19/09.

Mount Vernon Royse, AndyBarnes, DianneFarsad, NahidHousley, Gregg

PM PDD:PM LAD:PM CMDE:PM CMDS:

06/07 01/08 06/08NA NA NA

Project Description Monthly Remarks

06/07 12/08 03/09 08/0902/0911/08307Fund

Friday, November 20, 2009 Page 66 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

W00600

Mt. Vernon District WalkwaysW613

Mason Neck Trail Segment II

$1,906,000$1,163,718

First portion, Segment 2A is 1,500 LF of 8-foot wide asphalt trail

ROW certification obtained from VDOT for Segment 2A on 8/26/09. ECS provided updated geotechnical report on 9/18/09. Final plans and bid documents being reviewed by VDOT. Contract addendum negotiations to finish Segment 2B plans in progress.

Mount Vernon Royse, AndyKresge, CarolNolan, BillMurdoch, Guy

PM PDD:PM LAD:PM CMDE:PM CMDS:

08/09 02/09 08/09NA NA TBD

Project Description Monthly Remarks

04/06 03/10 05/10 10/1010/1002/10307Fund

W00700

Providence District WalkwaysW705

Woodford Rd @ Wolftrap

$110,000$75,000

270 LF of 6-foot wide walkway replacement including extensive site grading and drainage facilities

Funding approved for replacement of an existing walkway. HOA 9/29/06 withdrew support for the project. Project on-hold pending resolution of HOA issues; coordinating with District Supervisor's office.

Providence Guarino, MichaelKresge, Carol

PM PDD:PM LAD:PM CMDE:PM CMDS:

10/05 01/06NA NA

Project Description Monthly Remarks

10/05 09/06TBD TBD TBDTBD 09/06

307Fund

W00700

Providence District WalkwaysW719

Lido Place Walkway

$194,500$0

600 LF of 4-foot wide sidewalk with drainage ditch, two 15" RCP culverts, and crosswalk

CMD authorized construction 7/15/09. Construction substantially complete 8/31/09. VDOT permit release 10/27/09.

Providence Gallo, MichaelBarnes, DianneMinnix, W. ToddHarper, Greg

PM PDD:PM LAD:PM CMDE:PM CMDS:

04/07 01/08 05/08NA NA NA

Project Description Monthly Remarks

04/07 08/09 08/09 08/0905/0908/09307Fund

009217

Stonecroft Boulevard Widening00000

$500,000$150,000

Widen Stonecroft Boulevard to a six-lane section from Conference Ctr. Dr.to Westfields Blvd. Project is 800 LF.

Construction to be managed by developer. Additional funding required. A meeting with WBOA was held on 7/30/09 to discuss the four bids received, construction schedule, and other construction issues. Marriott recorded the dedication deed on 8/21/09. Revised package submitted to LDS by the developer 9/1/09.

Sully Salahuddin, KhaliKresge, Carol

PM PDD:PM LAD:PM CMDE:PM CMDS:

08/05 04/07 10/07 01/08TBDNA

Project Description Monthly Remarks

03/06NA NA NANANA

312Fund

Friday, November 20, 2009 Page 67 of 68developed by, Robert Hockersmith

Project #

Project NameSubProject #

Sub Project Name

TPE ($)

FUT ($)On Hold

Design Dates

Estimated Completion

District CAP Assignments

Project ManagersLand Acquisition Dates

Construction Award

IntermediatePreliminary Utility Plats

Project Plats

Bid OpenApproved Completion

Estimated Completion

Bid Advertisement

CurrentFinal

Approved Completion

Construction Dates

Summary Status ReportTransportation Design Branch

Oct 2009

008909

Annandale Streetscape Columbia Pike - Annandale Fire Station

00000

$1,600,000$369,000

Streetscape improvements on north side of Columbia Pike from Backlick Road to Annandale Fire Station

VDOT Transportation Enhancement Grant approved and received 9/1/09. Final design in progress. NTP issued 10/8/09 for Maintenance of Traffic Plan. Due Diligence and NEPA documentation are complete.

Mason Ayers, RobertPreston, ClintonLim, Sam

PM PDD:PM LAD:PM CMDE:PM CMDS:

03/1002/98 01/99 10/99 12/00 12/02

Project Description Monthly Remarks

09/06 08/10 09/10 04/1110/1007/10315Fund

008912

McLean CRP00001

McLean Streetscape Demonstration Project

$1,700,000$0

Streetscape improvements to Chain Bridge Road from Westmoreland Street to Cedar Avenue.

This project is funded with VDOT Transportation Enhancement Grants. Construction substantially complete on 11/12/08. Punch-list items are being addressed. Permit released 10/28/09.

Dranesville Roberson , JeanBarnes, DianneFarsad, NahidHarper, Greg

PM PDD:PM LAD:PM CMDE:PM CMDS:

12/0501/04 06/04 08/04 03/06NA

Project Description Monthly Remarks

12/05 11/07 02/08 11/0807/0810/07315Fund

008912

McLean CRP00002

McLean Utilities

$1,800,000$0

Underground utilities along Chain Bridge Road from Corner Lane to Laughlin Avenue.

Additional funding may be required due to increased material and utilities costs. Additional funding available through Mclean Revitalization Corp. Awaiting land acquisition rights before proceeding with redesign. Staff working with property owners and Supervisor's office to resolve issues to expedite acquisition of land rights. 2 of 13 easements have been acquired by McLean Revitalization Corp. and forwarded to LAD. DVP working on revision to duct bank.

Dranesville Ayers, RobertFinnell, RichardMinnix, Todd

PM PDD:PM LAD:PM CMDE:PM CMDS:

03/04 12/05 09/06TBD TBD TBD

Project Description Monthly Remarks

06/06TBD TBD TBDTBDTBD

315Fund

Friday, November 20, 2009 Page 68 of 68developed by, Robert Hockersmith