Page 1: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

Country Presentation. Ukraine

24th Meeting of the IAEA Technical Working Group on Nuclear

Power Plant Instrumеntation and Control (TWG -NPPIC)

May 22-24, 2013, Vienna, Austria

Vladimir Sklyar, RPC Radiy

Page 2: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

2

TOP5 of Europe

TOP10 of the World

About 50% of national power

generation

One utility:

national company NAEC

“Energoatom”

http://www.energoatom.kiev.ua/

Regulatory Authority: State Nuclear

Regulatory Inspectorate of Ukraine

http://www.snrc.gov.ua/nuclear

Ukrainian NPPs. Fast facts Total Gross Capacity: 13,835 MW

4 sites

15 units

2 units under construction

South-Ukrainian NPP

3×VVER-1000

Khmelnitsky NPP 2×VVER-1000

2×VVER-1000

under construction

Rivne NPP

2×VVER-1000

2×VVER-440

Kyiv

Zaporizhzhya NPP –

The biggest NPP in Europe

6×VVER-1000

May 22-24, 2013 | 24th Meeting of IAEA TWG -NPPIC,

Vienna

Page 3: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

Ukrainian NPPs. Fleet details

Site, Unit Capacity, MW Unit type Commissioning year Decommissioning year

Zaporizhzhya NPP

1

2

3

4

5

6

1000

1000

1000

1000

1000

1000

V-320

V-320

V-320

V-320

V-320

V-320

1984

1985

1986

1987

1989

1995

2014

2015

2016

2017

2019

2025

South-Ukrainian NPP

1

2

3

1000

1000

1000

V-302

V-338

V-320

1982

1985

1989

2012 2032

2015

2019

Rivne NPP

1

2

3

4

420

415

1000

1000

V-213

V-213

V-320

V-320

1980

1981

1986

2004

2010 2030

2011 2031

2016

2034

Khmelnitsky NPP

1

2

3

4

1000

1000

1000

1000

V-320

V-320

V-392

V-392

1987

2004

2018

2020

2017

2034

2068

2070

May 22-24, 2013 | 24th Meeting of IAEA TWG -NPPIC,

Vienna

3

Page 4: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

Running of Consolidated program of increased safety of Ukrainian NPP units

(December 2010) in compliance with Energy strategy of Ukraine till 2030 (was officially

approved in 2006).

Life extension project for Unit 1, South-Ukraine NPP (commissioned in 1982) is

running; a goal is to extended an operation from 30 to 50 years (2013).

The same decision for the oldest Units 1 and 2, Rivne NPP (commissioned in 1980,

1981) was done in 2010.

Actions for life extension for Unit 1 and 2, Zaporizhzhya NPP (commissioned in 1984,

1985) has been implemented since 2012.

Building of Ukrainian-Russian nuclear fuel production site was started in Ukraine in

October 2012. Production start is expected in 2015.

Ukrainian NPPs. What has been new since 2011?

May 22-24, 2013 | 24th Meeting of IAEA TWG -NPPIC,

Vienna

4

Page 5: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

1. I&C modernization projects in operating NPPs.

2. I&C systems being installed in NPPs under

construction.

3. Country's plan to build new NPPs.

I&C technologies in new NPP designs.

4. I&C research and development projects.

New I&C technologies.

5. Recommendation to the IAEA regarding the

content and format of future I&C activities.

Presentation Agenda

May 22-24, 2013 | 24th Meeting of IAEA TWG -NPPIC,

Vienna

5

Page 6: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

I&C modernization projects in operating NPPs

May 22-24, 2013 | 24th Meeting of IAEA TWG -NPPIC,

Vienna

6

Page 7: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

Life cycle extension (from 30

to 50 years).

NPP safety improvement.

Consolidated program of

increased safety of Ukrainian

NPP units was approved in

December 2010.

NPP I&C systems modernization reasons

May 22-24, 2013 | 24th Meeting of IAEA TWG -NPPIC,

Vienna

7

Page 8: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

Systems modernization (in accordance with

Consolidated program of increased safety of Ukrainian NPP units) (1)

#14201. Prevention of Safety Control Systems and Reactor Trip

System Common Cause Failure due to absence of physical

separation of impulse lines.

#14202. Modernization of Neutron Flux Monitoring Systems.

#14203. Modernization of Reactor Trip Systems.

#14204. Modernization of Reactor Power Control and Limitation

System.

#14205. Modernization of Rod Control Systems, including

Electric Power Supply System of Rod Drives.

#14206. Modernization of Rod Drives including electromagnet

modules and position detectors.

#14301. Modernization of ESFAS.

May 22-24, 2013 | 24th Meeting of IAEA TWG -NPPIC,

Vienna

8

Page 9: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

#14101. Instrumentation assurance during accidents.

#14102. Implementation of systems for pipe position monitoring

in the primary loop.

#14103. Modernization Process Information Systems (PIS) and

their integration with Radiation Monitoring System and SPDS.

#14104. Modernization of systems for hydrogen cooling

monitoring of generator.

#14105. Modernization of Reactor Island Control System of

Normal Operation.

#14106. Modernization of Conventional Island Control System of

Normal Operation.

May 22-24, 2013 | 24th Meeting of IAEA TWG -NPPIC,

Vienna

9

Systems modernization (in accordance with

Consolidated program of increased safety of Ukrainian NPP units) (2)

Page 10: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

#14401. Modernization of Radiation Monitoring Systems.

#14402. Modernization of In-Core Monitoring Systems with

implemented reactor simulator and extended core monitoring

and diagnostics.

#14403. PAMS implementation.

#14404. Modernization of Diesel Generators Control Systems.

#14405. Modernization of Control System for Refueling Machine.

#14406. Modernization of Chemical Monitoring System.

#14407. Modernization of turbine control systems.

May 22-24, 2013 | 24th Meeting of IAEA TWG -NPPIC,

Vienna

10

Systems modernization (in accordance with

Consolidated program of increased safety of Ukrainian NPP units) (3)

Page 11: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

Reason for modernization: to extend

life cycle of units for additional 20

years (2030 and 2031

decommissioning instead 2010 and

2011).

Involved vendors: Impuls (Ukraine)

and Radiy (Ukraine).

Safety I&C systems was modernized

by 2011, non-safety I&C systems was

modernized during 2012-2013.

Regulatory decision was made in

2010; units life time was extended from

30 to 50 years .

May 22-24, 2013 | 24th Meeting of IAEA TWG -NPPIC,

Vienna

11

Large I&C modernization project

NPP Rivne-1,2 (VVER-440) life extension

Page 12: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

Reason for modernization: to extend life

cycle of units for additional 20 years

(2032 decommissioning instead 2012).

Outage was started in March 2013,

expected date of the outage end is

October 2013.

Involved vendors: Radiy (Ukraine) and

Westron (Ukraine).

Safety I&C systems was modernized by

2011, non-safety I&C systems was

modernized during 2012-2013.

Regulatory decision is expected in

October 2013.

May 22-24, 2013 | 24th Meeting of IAEA TWG -NPPIC,

Vienna

12

Large I&C modernization project:

NPP South-Ukrainian-1 (VVER-1000) life extension (1)

Page 13: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

Modernization scope (1):

Reactor Trip System,

Neutron Flux Monitoring System,

Rod Control System,

Reactor Power Control and

Limitation System,

Engineered Safety Features

Actuation System,

Sensors and transmitters

replacement,

Cables replacement.

May 22-24, 2013 | 24th Meeting of IAEA TWG -NPPIC,

Vienna

13

Large I&C modernization project:

NPP South-Ukrainian-1 (VVER-1000) life extension (2)

Page 14: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

Modernization scope (2):

MCR & ECR,

Electric Power Supply Systems

replacement,

Reactor Island System of Normal

Operation,

Conventional Island System of

Normal Operation,

Diesel Generator Control System,

Radiation Monitoring System,

Post Accident Monitoring System.

May 22-24, 2013 | 24th Meeting of IAEA TWG -NPPIC,

Vienna

14

Large I&C modernization project:

NPP South-Ukrainian-1 (VVER-1000) life extension (3)

Page 15: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

Switchgears modernization

May 22-24, 2013 | 24th Meeting of IAEA TWG -NPPIC,

Vienna

15

Large I&C modernization project:

NPP South-Ukrainian-1 (VVER-1000) life extension (4)

Page 16: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

Country's plan to build new

NPPs.

I&C technologies in new NPP

designs

Khmelnitsky NPP, Units 3

Khmelnitsky NPP, Units 4

May 22-24, 2013 | 24th Meeting of IAEA TWG -NPPIC,

Vienna

16

Page 17: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

Originally there was a plan to build four VVER-1000 units at

Khmelnitsky NPP site.

Units 3 and 4 building was stopped in 1990 in accordance with

Ukrainian Moratorium to build new NPPs.

Construction of units was in 1990: Unit 3 – 75%, Unit 4 – 28%.

June 2005 – Government Regulation on preparation to build

new units.

2006-2007 – technical analysis of Units 3,4 was performed by

KIEP (Ukrainian design company).

Khmelnitsky NPP, Units 3,4. History

May 22-24, 2013 | 24th Meeting of IAEA TWG -NPPIC,

Vienna

17

Page 18: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

Reactor choice – VVER-1000 (V-392), permits to improve NPP

safety and to extend NPP life time for at least 50 years.

January 2011 – Ukraine with Russia signed an agreement for

cooperation to build Units 3 and 4.

May 2011 – public hearings took place in Khmelnitsky region and

in Kyiv. As a result, some upgrades for safety improvement of

design will be agreed with reactor designer.

September 2012 – Ukrainian Law concerning site, design and

construction of Units 3 and 4 at Khmelnitsky NPP was approved.

Negotiation with Russia is in progress.

Khmelnitsky NPP, Units 3,4. Current status

May 22-24, 2013 | 24th Meeting of IAEA TWG -NPPIC,

Vienna

18

Page 19: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

May 22-24, 2013 | 24th Meeting of IAEA TWG -NPPIC,

Vienna

MCR ECR

ES

FA

S 1

RT

S 1

ES

FA

S 2

PC

LS

ES

FA

S 3

RT

S 2

Control

Gate

Infor-

mation

Gate

RCS NFMS ICFMS

RICS TICSPAMS

19

Khmelnitsky NPP, Units 3,4. General design of I&C systems (2012)

Page 20: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

I&C research and development projects.

New I&C technologies

May 22-24, 2013 | 24th Meeting of IAEA TWG -NPPIC,

Vienna

20

Page 21: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

FPGA Technology issues (1)

About 50 FPGA-based Applications have been

installed at Ukrainian NPPs since 2004 (Reactor

Trip Systems, Neutron Flex Monitoring System,

Rector Power Control and Limitation Systems,

Reactor Control Systems, ESFAS, Reactor and

Conventional Island Control Systems of Normal

Operation).

6 FPGA-based ESFASs have been commissioned

at Kozloduy-5,6 (Bulgaria) during 2008-2010 by

Ukrainian vendor.

Two FPGA-based products for Embalse (Argentina)

will be deliver by Ukrainian vendor in cooperation

with Candu Enegy Inc. in 2013-2014.

May 22-24, 2013 | 24th Meeting of IAEA TWG -NPPIC,

Vienna

21

Page 22: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

FPGA Technology issues (2)

Operation experience learning.

Experience transfer for CANDU and another types of reactors (not only

PWR).

Improvement of regulations and procedures concerning FPGA-based

platforms and applications development, V&V, operation and licensing.

Implementation of SIL (IEC 61508:2010) and IEC 62566:2011 based

approach to qualification of FPGA-based platforms and applications.

Participation in development of IAEA technical document related to

application of FPGAs in NPP I&C systems.

Learning cybersecurity issues of FPGA-based systems.

May 22-24, 2013 | 24th Meeting of IAEA TWG -NPPIC,

Vienna

22

Page 23: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

Diversity issues (1)

Ukrainian regulations

requires to implement

diversity for Reactor Trip

System.

Original VVER-1000

design included two

redundant RTS trains

with three channels in

each train.

Original VVER-440

design included one RTS

train with three channels.

RPC Radiy is the sole

national vendor of RTS.

Control

Logic

Cabinet 1

2oo3

Voting Logic

Cabinet

L,F

,P,T

,

L,F

,P,T

,

L,F

,P,T

,

L,F

,P,T

,

Control

Logic

Cabinet 2

L,F

,P,T

,

L,F

,P,T

,

Operator’s Control Panel of Main

Control Room

(Emergency Protection Control Keys)

Diverse

Control Logic

Cabinet 1

Diverse

Control Logic

Cabinet 3

2oo3

Diverse Voting

Logic Cabinet

L,F

,P,T

,

L,F

,P,T

,

L,F

,P,T

,

L,F

,P,T

,

Diverse

Control Logic

Cabinet 2

L,F

,P,T

,

L,F

,P,T

,

Operator’s Control Panel of Main

Control Room

(Emergency Protection Control Keys)

Output Control Signals

Main RTS Diverse

RTS

or or or

Control

Logic

Cabinet 2

May 22-24, 2013 | 24th Meeting of IAEA TWG -NPPIC,

Vienna

23

Page 24: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

Diversity issues (2)

A regulatory decision was

made to implement the main

RTS and the diverse RTS

from the same vendor

(FPGAs vs FPGAs+CPUs).

Since 2004 RTSs have been

modernized for 15 Ukrainian

NPP units (for both VVER-

1000 and VVER-440).

No Common Cause Failure

in modernized RTS.

May 22-24, 2013 | 24th Meeting of IAEA TWG -NPPIC,

Vienna

24

Page 25: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

Cybersecurity issues

State Nuclear Regulatory Inspectorate of Ukraine

includes both:

Department of safety regulation of nuclear

installations (responsibilities for I&C systems

safety regulation),

Department of security regulation.

New Ukrainian safety and security regulations were

approved in 2008 and 2010.

Ukrainian cybersecurity regulations have not been

developed yet.

Cybersecurity regulation adoption is possible only in

cooperation between the above two departments.

May 22-24, 2013 | 24th Meeting of IAEA TWG -NPPIC,

Vienna

25

Page 26: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

New Ukrainian Regulation

for I&C systems important to NPP safety

The first edition of Ukrainian

Regulatory Requirements to I&C

systems important to NPP safety was

approved in 2000.

2009-2012: the second edition of the

above document was developed.

2012: the final version of the second

edition of Ukrainian Regulatory

Requirements to I&C systems

important to NPP safety was supplied

for approval.

May 22-24, 2013 | 24th Meeting of IAEA TWG -NPPIC,

Vienna

26

Page 27: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

Chernobyl issues

Shelter-1 has been under different

increased risks.

State program of Chernobyl NPP

decommissioning was approved

(January 2010).

Regulatory permission for start of

Shelter-2 building was signed (April

2013).

Shelter-2 building fulfillment is expected

in 2015.

After that demounting of unstable parts

of Shelter-1 can be started

May 22-24, 2013 | 24th Meeting of IAEA TWG -NPPIC,

Vienna

27

Page 28: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

28

5th International Conference “NPP I&C Systems Safety

Aspects”:

• October 1-2, 2013

• Kharkiv, Ukraine

• Will be hosted by State Scientific and Technical Center for Nuclear

and Radiation Safety, State Nuclear Inspectorate of Ukraine

ics-conference.org.ua

May 22-24, 2013 | 24th Meeting of IAEA TWG -NPPIC,

Vienna

Page 29: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

29

6th International Workshop on the Application of FPGAs in NPPs:

• October 8-11, 2013

• Kirovograd, Ukraine

• Will be hosted by Research and Production Corporation Radiy

The workshop builds on the success of the previous meetings, which were held in:

•2008 Chatou, France, hosted by EdF

•2009 Kirovograd, Ukraine, hosted by Radiy

•2010 Hamilton, Ontario, Canada, hosted by AECL/McMaster University

•2011 Chatou, France, hosted by EdF

•2012 Beijing, China, hosted by CNNC/CNCS

conference.radiy.com/over.php

May 22-24, 2013 | 24th Meeting of IAEA TWG -NPPIC,

Vienna

Page 30: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

May 22-24, 2013 | 24th Meeting of IAEA TWG -NPPIC,

Vienna

Recommendation to the IAEA regarding the content and

format of future I&C activities

“Peopleware” support and development:

Knowledge management for safety culture supporting,

Key Performance Indicators (KPIs) for knowledge management assessment.

Harmonization of standards requirements and regulations, safety classifications,

definitions.

Information management and sharing:

Experts communications development and improvement,

Awareness about best practices and success stories in new I&C

technologies implementations (FPGAs, wireless etc.).

Cybersecurity:

Safety – Security relations,

Cybersecurity defensive measures.

30

Page 31: Country Presentation. Ukraine Presentation. Ukraine 24th Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumеntation and Control (TWG -NPPIC)

Thank you for your attention!

Research & Production Corporation Radiy

29, Geroyiv Stalingrada Street, Kirovograd 25006, Ukraine

e-mail: [email protected]

http://www.radiy.com

State Scientific Technical Center

on Nuclear and Radiation Safety

53, Chernishevskaya Street, Kharkov 61002, Ukraine

e-mail: [email protected]