country estates final report paragon. project team mike reeves – project manager cole marr –...

23
Country Estates Final Report PARAGON

Post on 21-Dec-2015

220 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda

Country EstatesFinal Report

PARAGON

Page 2: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda

Project Team Mike Reeves – Project Manager

Cole Marr – Project Engineer

Bryce Beckstrom – Project Engineer

Amanda Sheehe – Project Editor

Page 3: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda

Project DescriptionDesign RequirementsProject ApproachWork Completed Projected Work

Page 4: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda

Project Description

Page 5: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda
Page 6: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda

Project Description 66 Acres 22 Estate Size Homes 1-2 Acre Lots ± 33 Acre Community

Space High Efficiency Low Environmental

Impact

Page 7: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda

Existing Site

Proposed Development

Page 8: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda

Design Requirements

Objectives Develop 3 Wastewater Treatment Options Develop Stormwater Management Plan Incorporate Greywater Treatment and Reuse Wetland Habitat Area Community Recycling Program Design Trail Around Site

Page 9: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda

Preliminary Feasibility Study Location Zoning Utilities Transportation Site Characteristics

Page 10: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda

Environmental Site Assessment Site Reconnaissance

Current and Past Use Tax Information Other Concerns

Interviews Josh Reed – Property Owner Hancock County Assessor’s Office

Page 11: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda

Codes & Regulations

Regulation Entities Hancock County Conservation Subdivision IDNR LEED 10 State Standards AASHTO

Page 12: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda

LID Design Options

Page 13: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda

Preliminary Site Plan Designed According

to Hancock County

Will Meet R-1 Zoning

1-2 Acre Lots for

Adequate Septic

Page 14: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda

In Contact with Mike Dale - Planning Dept

Use Natural Lay of

Land to Reduce Cut and Fill in Roadway

Roundabout Designed to Standards (TFHDC)

Preliminary Site Plan

Page 15: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda

Geotechnical Analysis

Wildcat Dynamic Cone Penatrometer

Tube Samples (6” &3’)

Page 16: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda

Laboratory Analysis of Samples Unconfined Compression Test (ASTM D2166)

Atterberg Limits (ASTM D4318)

Particle Size Analysis (ASTM D422)

Page 17: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda

Assessment of Wastewater Options 3 Options Considered

Conventional Septic System

Presby Treatment System

Wetlands Treatment

Page 18: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda

Assessment of Wastewater Options Decision Matrix Criteria

Decision Matrix Results

Alternative Percentage Weighting

Environmental Impact 30%

Cost 30%

Feasibility 20%

Creativity 20%

AlternativeEnvironmental

ImpactCost Feasibility Creativity Total

Conventional Septic 0.9 0.6 0.3 0.45 2.25

Presby System 0.3 0.3 0.15 0.3 1.05

Wetlands Treatment 0.6 0.6 0.45 0.3 1.95

Page 19: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda

Hydraulics and Hydrology

Design for 100-yr flood Route stormwater

through wetlands Size pipes to control

flooding Design water quality

trenches Promote natural

overland flow

Existing vs Proposed 100-year Storm Routing

Page 20: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda

Wetlands Treat 170 acres Design wet pond to

allow for sediment settling/quality volume

Research vegetation for the wetlands

Design outlet structure that controls 100-year flood

Page 21: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda

Erosion Control Plan

Minimize sediment runoff into Miller Ditch

Minimize cut and fill on-site: 680cy cut

Reduce soil that leave site via truck tires

Page 22: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda

LID/Conservation Highlights 50% Community

Space 20 Lots front

community space Enviro-Septic

Wastewater Treatment

Density meets maximum requirement

Page 23: Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda

Highlights

22 Lots, 1-2 Acres Each Site Layout/Roadway Design Sustainable LID Designs for:

Wastewater

Greywater

Stormwater

$440,000 Cost Estimates for Design/Construction/Lifecycle