FORMWORK FOR SLABS,BEAMS AND STAIRS
PRESENTED BY:
RAKHI DEVRASHMI. RSUNIDHI MADHAVSWATHE
![Page 2: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/2.jpg)
INTRODUCTION
Formwork for concrete structures has a significant impact on the cost, time, and quality of a completed construction project.
Formwork is the term given to either temporary or permanent moulds into which concrete or similar materials are poured
![Page 3: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/3.jpg)
WoodPlywoodSteelAluminium PlasticPlasterSynthetics
materials
MATERIALS USED OBJECTTIVES
QUALITY
SAFETY
ECONOMY
![Page 4: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/4.jpg)
REQUIREMENTS AND STAGES
Assembly and erection
Concrete placement
Stripping and dismantling
![Page 5: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/5.jpg)
SLABS AND BEAMS
In a typical reinforced concrete building frame, the slabs are the primary load carrying element. They transfer their load tosecondary elements such as walls or beams.
![Page 6: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/6.jpg)
![Page 7: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/7.jpg)
![Page 8: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/8.jpg)
![Page 9: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/9.jpg)
TIMBER FORMWORK
![Page 10: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/10.jpg)
![Page 11: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/11.jpg)
BEAM FORM
![Page 12: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/12.jpg)
![Page 13: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/13.jpg)
![Page 14: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/14.jpg)
Installation of formwork for first floor slab and beams progressing all around the building
![Page 15: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/15.jpg)
DISADVANTAGES
Easy Handling – LightweightEasy assemblingFlexibleEasy to produceRepaired parts can be easily replacedEasily available
Speed reduced for larger structures not many reusesMay asorb moisture from concreteShrinkage and warping
ADVANTAGES
![Page 16: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/16.jpg)
CONVETION STYLE
![Page 17: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/17.jpg)
INCORRECT BEHAVIOUR
![Page 18: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/18.jpg)
SHUTTERING FOR SLABS WITH TIMBER BEAMS
![Page 19: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/19.jpg)
![Page 20: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/20.jpg)
FIXING THE FORMWORK
SUPPORT OF FORMWORK
Use of 18mm plywood sheets.In the construction of the slab and beam formwork, it is need to give a proper attention to the levels, shape and the alignment of the particular structural element. It is need to check the level at the initial state of erecting the formwork and before the concreting is done. Otherwise the level of the slab can change after the cast .So also, the stop boards at drops should be well positioned and fixed correctly before the concreting. Diesel should be applied inside of the formwork which is touched the concrete surface to easy removal of formwork.
![Page 21: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/21.jpg)
STEEL FORMWORK
Consists of panelsUsage of clamps, bolts and nutsPanels fabricated In large numberUsed I large projects ad where there are high number of reusesSuitable for circular ad curved structures.Limited size ad shape. Excessive heat lossLimited fixingUniform surfaceLarger spans ad more durale. Does not absorb water from concrete
![Page 22: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/22.jpg)
LIGHT METAL SHUTTERING
![Page 23: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/23.jpg)
COMBINED
SHUTTERING
![Page 24: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/24.jpg)
![Page 25: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/25.jpg)
![Page 26: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/26.jpg)
![Page 27: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/27.jpg)
PERMANENT FORM WORK
![Page 28: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/28.jpg)
USING PLASTICS
![Page 29: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/29.jpg)
Combination of main beam and sliding wedge, this new and innovative system makes set-up and stripping faster, and reduces the turn-around time of the equipment.
20x60 cm panels (weighing each max. 11 kg) and by 3 plastic beams placed upon traditional wooden trusses.
This system allows to advance the stripping operation.
This the ideal solution to build any kind of slab: bidirectional, full or lightened.
The panels can be carried by hand by a single person without the aid of a crane or of heavy lifting equipment.
Resistance to chemicals, termites ad fungi
Use of electric power not required
![Page 30: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/30.jpg)
STAIRSWeight of throat of stairs to e supportedFormwork should e tied together to prevent sideways movement.Sideways movement is mainly because of the slope of stairsA basic principle of stair formwork is that the treads are not formed, but left open. A normal good quality concrete mix with a standard slump, (that is not too wet) will swell up slightly under vibration, but it should not pour out of the bottom in a flood.
![Page 31: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/31.jpg)
![Page 32: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/32.jpg)
![Page 33: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/33.jpg)
CONCRETE STAIRS WITH HALF SPACE LANDING
A mixture of steel props and maybe steel "h" frames under the landing, and good old form ply and timber struts and braces.
![Page 34: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/34.jpg)
The soffit (underneath side) ply and supports of the landing run through wider than necessary for just the concrete, to support the timbers for the upper flight of the stair.You can see that all the smaller supports are cut out of timber.The formwork will stay in place at least a week.
![Page 35: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/35.jpg)
WIDER STAIRS SHOWING MORE STRONG BACKS
When the stairs are wider, using more than one Strongback.There are two strong backs supporting the riser timbers. There is no limit as to how many and how wide the stair can go.
![Page 36: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/36.jpg)
SOFFIT FORMWORK FOR A FLIGHT OF CONCRETE STAIRS
![Page 37: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/37.jpg)
STEEL STAIRSReduced construction times – achieved
because manufacture and site preparation can occur simultaneously with quick and straight forward installation, ensuring faster enclosure of the structure, minimal delay to work being carried out by other trades, and limited site congestion with no delays resulting from external weather conditions.
Substantial cost savings over conventional formwork methods.
Permanent steel handrails may be fitted immediately eliminating the need for temporary safety rails.
No topping of stairs to repair damage which occurs during construction.
The riser profile provides a ledge at the bottom for the concreter to trowel to.
![Page 38: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/38.jpg)
![Page 39: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/39.jpg)
![Page 40: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/40.jpg)
they contain the fill at the center of the pour with a metal mesh box This way they could use much less concrete than if the landing and stairs had been solid.
![Page 41: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/41.jpg)
Formwork is essential in the success of any construction project involving concrete. If designed and set-up correctly, it will function as planned. If not, any of a number of costly problems can occurReusable – panel formnon reusable – stationary form
STRIKING
MAINTENANCE
STORAGE OF FORMS
![Page 42: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/42.jpg)
Metal beam slab formwork
The stringers and joist are replaced with aluminium forming systems or steel beams and supports are replaced with metal props.This also makes this method more systematic and reusable
![Page 43: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/43.jpg)
Modular slab formwork
These systems consist of prefabricated timber, steel or aluminium beams and formwork modules.does not require a crane to place the formwork, speed of construction with unskilled labour, formwork modules can be removed after concrete sets leaving only beams in place prior to achieving design strength.
![Page 44: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/44.jpg)
![Page 45: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/45.jpg)
![Page 46: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/46.jpg)
![Page 47: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/47.jpg)
![Page 48: Costruction ppt](https://reader036.vdocuments.mx/reader036/viewer/2022062320/55b1f97fbb61eb1a2a8b4777/html5/thumbnails/48.jpg)