COSTING FOR CIVIL ENGINEERING PROJECTS
Cost
RateCost Estimating
Methods
Quantity
![Page 3: Costing for-civil-engineering-project](https://reader034.vdocuments.mx/reader034/viewer/2022051516/55a6bc021a28abf1088b48cb/html5/thumbnails/3.jpg)
Cost
![Page 4: Costing for-civil-engineering-project](https://reader034.vdocuments.mx/reader034/viewer/2022051516/55a6bc021a28abf1088b48cb/html5/thumbnails/4.jpg)
What is Cost ?
An estimate how much money will be neededor price to be charged for something.
(Oxford Advanced Learner’s Dictionary)
![Page 5: Costing for-civil-engineering-project](https://reader034.vdocuments.mx/reader034/viewer/2022051516/55a6bc021a28abf1088b48cb/html5/thumbnails/5.jpg)
Why Cost (Control) Is Important?
Inception Design
Preliminary cost
estimate
Comparative cost estimate
Alternative materials
Form of construction
Tender Construction
Planned profits achieved ?
Feedback for future cost estimating available ?
What corrective action to be
taken ? Within economic limit of expenditure ?
Pre-contract Stage Post contract Stage
![Page 6: Costing for-civil-engineering-project](https://reader034.vdocuments.mx/reader034/viewer/2022051516/55a6bc021a28abf1088b48cb/html5/thumbnails/6.jpg)
Quantity Rate AmountX
How Costing Is Done?
=
![Page 7: Costing for-civil-engineering-project](https://reader034.vdocuments.mx/reader034/viewer/2022051516/55a6bc021a28abf1088b48cb/html5/thumbnails/7.jpg)
Quantity?
![Page 8: Costing for-civil-engineering-project](https://reader034.vdocuments.mx/reader034/viewer/2022051516/55a6bc021a28abf1088b48cb/html5/thumbnails/8.jpg)
What is Quantity ?
The measurement of something by statinghow much of it there is.
(Oxford Advanced Learner’s Dictionary)
![Page 9: Costing for-civil-engineering-project](https://reader034.vdocuments.mx/reader034/viewer/2022051516/55a6bc021a28abf1088b48cb/html5/thumbnails/9.jpg)
How quantity is read?
Quantity is shown as a figure and a unit of measurement behind it.
800 M
Unit of measurementQuantity
![Page 10: Costing for-civil-engineering-project](https://reader034.vdocuments.mx/reader034/viewer/2022051516/55a6bc021a28abf1088b48cb/html5/thumbnails/10.jpg)
Quantity
Area (M2)
Weight (Kg or Ton)
Length (M)Volume
(M3)
OthersHours or
Day
Unit of measurement
![Page 11: Costing for-civil-engineering-project](https://reader034.vdocuments.mx/reader034/viewer/2022051516/55a6bc021a28abf1088b48cb/html5/thumbnails/11.jpg)
Rate
![Page 12: Costing for-civil-engineering-project](https://reader034.vdocuments.mx/reader034/viewer/2022051516/55a6bc021a28abf1088b48cb/html5/thumbnails/12.jpg)
What is Rate?
A fixed charge, payment or value.
(Oxford Advanced Learner’s Dictionary)
![Page 13: Costing for-civil-engineering-project](https://reader034.vdocuments.mx/reader034/viewer/2022051516/55a6bc021a28abf1088b48cb/html5/thumbnails/13.jpg)
What is Rate?
Price per unit of measurement.
![Page 14: Costing for-civil-engineering-project](https://reader034.vdocuments.mx/reader034/viewer/2022051516/55a6bc021a28abf1088b48cb/html5/thumbnails/14.jpg)
RM 250.00/M3
Per unit of measurement
Currency
How rate is read?
Price of item
![Page 15: Costing for-civil-engineering-project](https://reader034.vdocuments.mx/reader034/viewer/2022051516/55a6bc021a28abf1088b48cb/html5/thumbnails/15.jpg)
Material CostWastagesPlant Cost
Labour CostProfit & Overheads
Rate Build Up
![Page 16: Costing for-civil-engineering-project](https://reader034.vdocuments.mx/reader034/viewer/2022051516/55a6bc021a28abf1088b48cb/html5/thumbnails/16.jpg)
Example Of Market Rate
Description Unit Rate (RM)
Excavation (pit) M3 10.00
Concrete Grade 15 M3 240.00
Concrete Grade 20 M3 255.00
Concrete Grade 25 M3 270.00
Formwork M2 28.00
Reinforcement Kg 3.20
Rate will differ from one project to another due to various factors such as size, nature of work, location, market conditions, etc.
![Page 17: Costing for-civil-engineering-project](https://reader034.vdocuments.mx/reader034/viewer/2022051516/55a6bc021a28abf1088b48cb/html5/thumbnails/17.jpg)
Cost Estimating Methods
![Page 18: Costing for-civil-engineering-project](https://reader034.vdocuments.mx/reader034/viewer/2022051516/55a6bc021a28abf1088b48cb/html5/thumbnails/18.jpg)
Notes On Costing For Civil Engineering Projects
Involve large amount of uncertainty owing to
nature of ground conditions, temporary works, etc.
![Page 19: Costing for-civil-engineering-project](https://reader034.vdocuments.mx/reader034/viewer/2022051516/55a6bc021a28abf1088b48cb/html5/thumbnails/19.jpg)
Notes On Costing For Civil Engineering Projects
Bill of quantities comprise large quantities of comparatively few items.
Quantities usually approximate and
remeasurement required when work is actually carried out.
Different method of measurement is used for civil engineering works (CESMM).
![Page 20: Costing for-civil-engineering-project](https://reader034.vdocuments.mx/reader034/viewer/2022051516/55a6bc021a28abf1088b48cb/html5/thumbnails/20.jpg)
Notes On Costing For Civil Engineering Projects
Costing can be carried out by breaking
down works into smaller cost items and price the quantities against a rate.
![Page 21: Costing for-civil-engineering-project](https://reader034.vdocuments.mx/reader034/viewer/2022051516/55a6bc021a28abf1088b48cb/html5/thumbnails/21.jpg)
Notes On Costing For Civil Engineering Projects
Costing similar to building works but more
towards method of construction rather than material cost.
![Page 22: Costing for-civil-engineering-project](https://reader034.vdocuments.mx/reader034/viewer/2022051516/55a6bc021a28abf1088b48cb/html5/thumbnails/22.jpg)
Cost Estimating Methods
Unit Method
Standard Unit Of Accommodation
Appropriate Cost Per UnitXEstimated
Cost=
MidLow High
![Page 23: Costing for-civil-engineering-project](https://reader034.vdocuments.mx/reader034/viewer/2022051516/55a6bc021a28abf1088b48cb/html5/thumbnails/23.jpg)
Cost Estimating Methods
Superficial Method
Area Of FloorsCost Per
Square MetreXEstimated Cost
=
MidLow High
![Page 24: Costing for-civil-engineering-project](https://reader034.vdocuments.mx/reader034/viewer/2022051516/55a6bc021a28abf1088b48cb/html5/thumbnails/24.jpg)
Cost Estimating Methods
Approximate Quantities
Items Of Major Cost Importance Measured Only
Unit RateXEstimated Cost
=
MidLow High
Build up on basis from cost database price book or priced BQ
from previous project
![Page 25: Costing for-civil-engineering-project](https://reader034.vdocuments.mx/reader034/viewer/2022051516/55a6bc021a28abf1088b48cb/html5/thumbnails/25.jpg)
Cost Estimating Methods
Bill Of Quantities
Measured Quantities
Unit RateXEstimated Cost
=
MidLow High
Build up on basis from cost database price book or priced BQ
from previous project
Pre-Tender Estimate to include other items like
Preliminaries, Provisional Sums, Prime Cost Sums,
Contingency, etc.
![Page 26: Costing for-civil-engineering-project](https://reader034.vdocuments.mx/reader034/viewer/2022051516/55a6bc021a28abf1088b48cb/html5/thumbnails/26.jpg)
Cost Estimating Methods
Type of information provided
Quality of relevant available pricing information
Experience
Skills
Degree Of Accuracy