CREDIBLE COST ESTIMATES
CE CLASSIFICATION
COST ESTIMATING PROCESS
12 STEPS
CE CHALLENGES
-
8/12/2019 Cost Estimating Advice Manual
2/287
CE UNCERTAINTY
FUNDING PROFILES
COST ANALYSIS CONCEPTS
ASSESS TEAM CHECKLIST
BASELINE ELEMENTS
BASELINE DESCRIPTION
COMMON ELEMENTS IN A
WBS
WBS CHECKLIST
-
8/12/2019 Cost Estimating Advice Manual
3/287
GROUND RULES & ASSUMP.
CHECKLIST
DATA SOURCES
DATA BEST PRACTICES
CE METHODS COMPARED
CE METHODS SAMPLES
LEARNING CURVE
POINT ESTIMATED CHECKLIST
SENSITIVITY ANALYSIS
-
8/12/2019 Cost Estimating Advice Manual
4/287
SENSITIVITY ANALYSIS
SAMPLE
UNCERTAINTY
ELECTRICAL SERVICES
COST, RISK & UNCERTAINTY
POTENTIAL UNCERTAINTY
RISK SCORING MATRIX
ROLLING DICE PROBABILITY
HIGH CLASS CE MAPPED
-
8/12/2019 Cost Estimating Advice Manual
5/287
CE ACCURACY CHECK
8 TYPES OF CE REVIEWS
CE VALIDATION CHECKLIST
COST ESTIMATING
DOCUMENTATION
WHAT TO INCLUDE IN CE DOC
CE PRESENTATION
CE INTEGRATION WITH
SYSTEMS & RISK
INTEGRATING EVM & RISK
MANAGEMENT
-
8/12/2019 Cost Estimating Advice Manual
6/287
TRACKING EARNED VALUE
KEY BENEFITS OF EVM
CONCERNS ABOUT EVM
ANSI GUIDELINE FOR EVM
WBS COST, SCHEDULE, TI
INTEGRATION
ID RESPONSIBILITY @
CONTROL ACCOUNT
EV METRICS
EV & % COMPLETION METHOD
GENESIS OF PERFORMANCE
METRICS
-
8/12/2019 Cost Estimating Advice Manual
7/287
STRUCTURED CONTRACT
PAYMENTS
EVM ACCEPTANCE PROCESS
MANAGING COSTS BEST
PRACTICE
IBR DISCUSSION TEMPLATE
EVM OVERALL VIEW
CONTRACT PERFORMANCE
REPORT ELEMENTS
EVM PERFORMANCE INDEXES
EXECUTION OF PROGRAMCOST
ANSI ON CHANGES TO EVM
SURVEILLANCE SELECTION
MATRIX
COMMON INDICATORS OF
POOR PERFORMANCE
-
8/12/2019 Cost Estimating Advice Manual
8/287
STEPS ASSOCIATED WITH
OVERTARGET BUDGETS
TAKE OFF FORM
OVERHEAD RECAP FORM
PAINTING CE FORM
RESIDENTIAL COST
ESTIMATING
STANDARD SUBCONTRACT
JOB SCHEDULE FORM
WBS FORM
MASTER COST CODE SYSTEM
MATERIAL CONTROL
-
8/12/2019 Cost Estimating Advice Manual
9/287
COMMUNICATIONS PLAN
-
8/12/2019 Cost Estimating Advice Manual
10/287
Credible Cost Estimates Characteristics
Cost Engineers Association Cost Estimates Classification
Cost Estimating Process
12 Steps to High Quality Cost Estimates
Cost Estimating Challenges
COST ESTIMATING ADVICE MANUAL
SPREADSHEETS DESCRIPTION
-
8/12/2019 Cost Estimating Advice Manual
11/287
Cost Estimate Uncertainty Cone
Typical Acquisition Capital Funding Profiles
Cost Analysis Concepts
Cost Assessment Team Checklist
Typical Technical Baseline Elements
Technical Baseline Description Checklist
Common Elements in a Work Breakdown Structure
WBS Checklist Best Practice
-
8/12/2019 Cost Estimating Advice Manual
12/287
Ground Rules and Assumptions Checklist Best Practice
Data Sources
Data Best Practices Checklist
Cost Estimating Methods Compared
Cost Estimating Methods Samples
Learning Curve
Point Estimate Checklist
Sensitivity Analysis Checklist
-
8/12/2019 Cost Estimating Advice Manual
13/287
Sensitivity Analysis Sample
Cost Estimates Uncertainty during the Project Life Cycle
Cumulative Probability
Cost, Risk and Uncertainty Checklist
Potential Sources of Cost Estimate Uncertainties
Risk Scoring Matrix
Rolling Dice Probability Distribution
High Class Cost Estimates Mapped Against Characteristics
-
8/12/2019 Cost Estimating Advice Manual
14/287
Cost Estimates Accuracy Check
Eight Types of Cost Estimates Reviews
Cost Estimate Validation Checklist
Cost Estimating Documentation
What is included in the Cost Estimate Documentation
Presenting the Cost Estimate to Management
Integrating Cost Estimates with Systems and Risk
Integrating EVM and Risk Management
-
8/12/2019 Cost Estimating Advice Manual
15/287
Tracking Earned Value
Key Benefits of EVM
Concerns about EVM
ANSI Guidelines for EVM
WBS Integration of Cost, Schedule and Technical Information
Identifying Responsibility for Managing Work at the Control Account
Typical Methods for Measuring EV Performance
Earned Value Using the Percentage Completion Method
The Genesis of Performance Measurement Baseline
-
8/12/2019 Cost Estimating Advice Manual
16/287
-
8/12/2019 Cost Estimating Advice Manual
17/287
Steps Typically Associated with Implementing an Over target Budget
Estimate Quantities Take off Sheet Form
Overhead Recap Form
Painting Cost Estimate Form
Residential Cost Estimating Form
Standard Subcontract Form
Job Schedule form
Work Breakdown Structure Form
Master Cost Code System
Material Requisition Control Form
-
8/12/2019 Cost Estimating Advice Manual
18/287
Communication Plan Form
-
8/12/2019 Cost Estimating Advice Manual
19/287
1
2
3
4
5
-
8/12/2019 Cost Estimating Advice Manual
20/287
6
7
8
9
10
11
12
13
-
8/12/2019 Cost Estimating Advice Manual
21/287
14
15
16
17
18
19
20
21
-
8/12/2019 Cost Estimating Advice Manual
22/287
22
23
24
25
26
27
28
29
-
8/12/2019 Cost Estimating Advice Manual
23/287
30
31
32
33
34
35
36
37
-
8/12/2019 Cost Estimating Advice Manual
24/287
38
39
40
41
42
43
44
45
46
-
8/12/2019 Cost Estimating Advice Manual
25/287
47
48
49
50
51
52
53
54
55
56
57
-
8/12/2019 Cost Estimating Advice Manual
26/287
58
59
60
61
62
63
64
65
66
67
-
8/12/2019 Cost Estimating Advice Manual
27/287
68
-
8/12/2019 Cost Estimating Advice Manual
28/287
TO GO
TO THIS
SPREADS
HEET
cred
ceclas
cepr
12st
cecha
TO GO TO THIS
SPREADSHEET
-
8/12/2019 Cost Estimating Advice Manual
29/287
unctru
funpro
coanc
catcl
ttble
tbldc
cewbs
wbscpb
-
8/12/2019 Cost Estimating Advice Manual
30/287
graclbp
dsour
dbpc
cemc
cems
learcur
pechl
ssacl
-
8/12/2019 Cost Estimating Advice Manual
31/287
ssasam
ceunlc
cumpro
crucl
psceu
rsmat
rdpd
hcemach
-
8/12/2019 Cost Estimating Advice Manual
32/287
-
8/12/2019 Cost Estimating Advice Manual
33/287
tev
kbevm
caevm
ansi
wbsicsti
irmwca
evmetr
ev%cm
gopm
-
8/12/2019 Cost Estimating Advice Manual
34/287
scpay
evmap
mcbp
ibramdt
evmov
cprdele
evmpind
epcclbp
ansichgev
m
pssm
cippp
-
8/12/2019 Cost Estimating Advice Manual
35/287
stpaiob
tkoff
ohrec
pcef
rcef
sscf
jsf
wbsf
mccs
mrcf
-
8/12/2019 Cost Estimating Advice Manual
36/287
cpf
-
8/12/2019 Cost Estimating Advice Manual
37/287
BASIC CHARACTERISTICS OF CREDIBLE COST ESTIMATES
-
8/12/2019 Cost Estimating Advice Manual
38/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
39/287
-
8/12/2019 Cost Estimating Advice Manual
40/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
41/287
-
8/12/2019 Cost Estimating Advice Manual
42/287
-
8/12/2019 Cost Estimating Advice Manual
43/287
-
8/12/2019 Cost Estimating Advice Manual
44/287
TWELVE STEPS OF A HIGH-QUALITY COST ESTIMATING
-
8/12/2019 Cost Estimating Advice Manual
45/287
-
8/12/2019 Cost Estimating Advice Manual
46/287
-
8/12/2019 Cost Estimating Advice Manual
47/287
PROCESSRETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
48/287
-
8/12/2019 Cost Estimating Advice Manual
49/287
-
8/12/2019 Cost Estimating Advice Manual
50/287
-
8/12/2019 Cost Estimating Advice Manual
51/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
52/287
-
8/12/2019 Cost Estimating Advice Manual
53/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
54/287
-
8/12/2019 Cost Estimating Advice Manual
55/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
56/287
-
8/12/2019 Cost Estimating Advice Manual
57/287
-
8/12/2019 Cost Estimating Advice Manual
58/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
59/287
COST ASSESSMENT TEAM BEST PRACTICE
-
8/12/2019 Cost Estimating Advice Manual
60/287
CHECKLIST RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
61/287
-
8/12/2019 Cost Estimating Advice Manual
62/287
-
8/12/2019 Cost Estimating Advice Manual
63/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
64/287
-
8/12/2019 Cost Estimating Advice Manual
65/287
TECHNICAL BASELINE DESCRIPTION CHECKLIS
-
8/12/2019 Cost Estimating Advice Manual
66/287
T BEST PRACTICE RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
67/287
-
8/12/2019 Cost Estimating Advice Manual
68/287
-
8/12/2019 Cost Estimating Advice Manual
69/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
70/287
-
8/12/2019 Cost Estimating Advice Manual
71/287
WBS CHECKLIST BEST PRACTICE
-
8/12/2019 Cost Estimating Advice Manual
72/287
-
8/12/2019 Cost Estimating Advice Manual
73/287
GROUND RULES AND ASSUMPTIONS BEST PRACT
-
8/12/2019 Cost Estimating Advice Manual
74/287
-
8/12/2019 Cost Estimating Advice Manual
75/287
CES CHECKLIST RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
76/287
-
8/12/2019 Cost Estimating Advice Manual
77/287
-
8/12/2019 Cost Estimating Advice Manual
78/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
79/287
DATA BEST PRACTICE CHECKLIST
-
8/12/2019 Cost Estimating Advice Manual
80/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
81/287
-
8/12/2019 Cost Estimating Advice Manual
82/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
83/287
-
8/12/2019 Cost Estimating Advice Manual
84/287
-
8/12/2019 Cost Estimating Advice Manual
85/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
86/287
-
8/12/2019 Cost Estimating Advice Manual
87/287
-
8/12/2019 Cost Estimating Advice Manual
88/287
-
8/12/2019 Cost Estimating Advice Manual
89/287
-
8/12/2019 Cost Estimating Advice Manual
90/287
-
8/12/2019 Cost Estimating Advice Manual
91/287
-
8/12/2019 Cost Estimating Advice Manual
92/287
-
8/12/2019 Cost Estimating Advice Manual
93/287
-
8/12/2019 Cost Estimating Advice Manual
94/287
-
8/12/2019 Cost Estimating Advice Manual
95/287
LEARNING CURVE
-
8/12/2019 Cost Estimating Advice Manual
96/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
97/287
DEVELOPING A POINT ESTIMATE CHECKLI
-
8/12/2019 Cost Estimating Advice Manual
98/287
-
8/12/2019 Cost Estimating Advice Manual
99/287
STRETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
100/287
-
8/12/2019 Cost Estimating Advice Manual
101/287
SENSITIVITY ANALYSIS CHECKLIST BEST P
-
8/12/2019 Cost Estimating Advice Manual
102/287
ACTICE RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
103/287
-
8/12/2019 Cost Estimating Advice Manual
104/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
105/287
-
8/12/2019 Cost Estimating Advice Manual
106/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
107/287
-
8/12/2019 Cost Estimating Advice Manual
108/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
109/287
COST RISK AND UNCERTAINTY CHECKLIS
-
8/12/2019 Cost Estimating Advice Manual
110/287
-
8/12/2019 Cost Estimating Advice Manual
111/287
-
8/12/2019 Cost Estimating Advice Manual
112/287
BEST PRACTICE RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
113/287
-
8/12/2019 Cost Estimating Advice Manual
114/287
-
8/12/2019 Cost Estimating Advice Manual
115/287
-
8/12/2019 Cost Estimating Advice Manual
116/287
-
8/12/2019 Cost Estimating Advice Manual
117/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
118/287
-
8/12/2019 Cost Estimating Advice Manual
119/287
-
8/12/2019 Cost Estimating Advice Manual
120/287
-
8/12/2019 Cost Estimating Advice Manual
121/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
122/287
-
8/12/2019 Cost Estimating Advice Manual
123/287
-
8/12/2019 Cost Estimating Advice Manual
124/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
125/287
-
8/12/2019 Cost Estimating Advice Manual
126/287
-
8/12/2019 Cost Estimating Advice Manual
127/287
-
8/12/2019 Cost Estimating Advice Manual
128/287
-
8/12/2019 Cost Estimating Advice Manual
129/287
-
8/12/2019 Cost Estimating Advice Manual
130/287
-
8/12/2019 Cost Estimating Advice Manual
131/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
132/287
-
8/12/2019 Cost Estimating Advice Manual
133/287
-
8/12/2019 Cost Estimating Advice Manual
134/287
-
8/12/2019 Cost Estimating Advice Manual
135/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
136/287
-
8/12/2019 Cost Estimating Advice Manual
137/287
VALIDATE COST ESTIMATE CHECKLIST BEST PRACTICE
-
8/12/2019 Cost Estimating Advice Manual
138/287
-
8/12/2019 Cost Estimating Advice Manual
139/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
140/287
-
8/12/2019 Cost Estimating Advice Manual
141/287
COST ESTIMATE DOCUMENTATION
-
8/12/2019 Cost Estimating Advice Manual
142/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
143/287
-
8/12/2019 Cost Estimating Advice Manual
144/287
-
8/12/2019 Cost Estimating Advice Manual
145/287
-
8/12/2019 Cost Estimating Advice Manual
146/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
147/287
-
8/12/2019 Cost Estimating Advice Manual
148/287
-
8/12/2019 Cost Estimating Advice Manual
149/287
PRESENTING A COST ESTIMATE TO M
-
8/12/2019 Cost Estimating Advice Manual
150/287
NAGEMENT - BEST PRACTICE
-
8/12/2019 Cost Estimating Advice Manual
151/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
152/287
-
8/12/2019 Cost Estimating Advice Manual
153/287
-
8/12/2019 Cost Estimating Advice Manual
154/287
-
8/12/2019 Cost Estimating Advice Manual
155/287
-
8/12/2019 Cost Estimating Advice Manual
156/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
157/287
-
8/12/2019 Cost Estimating Advice Manual
158/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
159/287
-
8/12/2019 Cost Estimating Advice Manual
160/287
-
8/12/2019 Cost Estimating Advice Manual
161/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
162/287
-
8/12/2019 Cost Estimating Advice Manual
163/287
-
8/12/2019 Cost Estimating Advice Manual
164/287
-
8/12/2019 Cost Estimating Advice Manual
165/287
-
8/12/2019 Cost Estimating Advice Manual
166/287
-
8/12/2019 Cost Estimating Advice Manual
167/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
168/287
-
8/12/2019 Cost Estimating Advice Manual
169/287
-
8/12/2019 Cost Estimating Advice Manual
170/287
-
8/12/2019 Cost Estimating Advice Manual
171/287
-
8/12/2019 Cost Estimating Advice Manual
172/287
-
8/12/2019 Cost Estimating Advice Manual
173/287
-
8/12/2019 Cost Estimating Advice Manual
174/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
175/287
-
8/12/2019 Cost Estimating Advice Manual
176/287
-
8/12/2019 Cost Estimating Advice Manual
177/287
-
8/12/2019 Cost Estimating Advice Manual
178/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
179/287
-
8/12/2019 Cost Estimating Advice Manual
180/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
181/287
-
8/12/2019 Cost Estimating Advice Manual
182/287
-
8/12/2019 Cost Estimating Advice Manual
183/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
184/287
-
8/12/2019 Cost Estimating Advice Manual
185/287
-
8/12/2019 Cost Estimating Advice Manual
186/287
-
8/12/2019 Cost Estimating Advice Manual
187/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
188/287
-
8/12/2019 Cost Estimating Advice Manual
189/287
-
8/12/2019 Cost Estimating Advice Manual
190/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
191/287
-
8/12/2019 Cost Estimating Advice Manual
192/287
-
8/12/2019 Cost Estimating Advice Manual
193/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
194/287
-
8/12/2019 Cost Estimating Advice Manual
195/287
-
8/12/2019 Cost Estimating Advice Manual
196/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
197/287
-
8/12/2019 Cost Estimating Advice Manual
198/287
-
8/12/2019 Cost Estimating Advice Manual
199/287
-
8/12/2019 Cost Estimating Advice Manual
200/287
ICE RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
201/287
-
8/12/2019 Cost Estimating Advice Manual
202/287
-
8/12/2019 Cost Estimating Advice Manual
203/287
-
8/12/2019 Cost Estimating Advice Manual
204/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
205/287
-
8/12/2019 Cost Estimating Advice Manual
206/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
207/287
-
8/12/2019 Cost Estimating Advice Manual
208/287
-
8/12/2019 Cost Estimating Advice Manual
209/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
210/287
-
8/12/2019 Cost Estimating Advice Manual
211/287
-
8/12/2019 Cost Estimating Advice Manual
212/287
-
8/12/2019 Cost Estimating Advice Manual
213/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
214/287
EXECUTION OF PROGRAM COSTS C
-
8/12/2019 Cost Estimating Advice Manual
215/287
-
8/12/2019 Cost Estimating Advice Manual
216/287
ECKLIST BEST PRACTICE
-
8/12/2019 Cost Estimating Advice Manual
217/287
-
8/12/2019 Cost Estimating Advice Manual
218/287
-
8/12/2019 Cost Estimating Advice Manual
219/287
-
8/12/2019 Cost Estimating Advice Manual
220/287
-
8/12/2019 Cost Estimating Advice Manual
221/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
222/287
-
8/12/2019 Cost Estimating Advice Manual
223/287
-
8/12/2019 Cost Estimating Advice Manual
224/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
225/287
-
8/12/2019 Cost Estimating Advice Manual
226/287
-
8/12/2019 Cost Estimating Advice Manual
227/287
-
8/12/2019 Cost Estimating Advice Manual
228/287
-
8/12/2019 Cost Estimating Advice Manual
229/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
230/287
-
8/12/2019 Cost Estimating Advice Manual
231/287
RETURN
Info!A1
-
8/12/2019 Cost Estimating Advice Manual
232/287
Tak
Customer: Job #:
Dimension
L H W Qty.
Totals
Description Qty. Unit
-
8/12/2019 Cost Estimating Advice Manual
233/287
RETURN
Info!A1
-off Sheet
Date:
Total Labor Man- Total Equip. Total
matl. rate hours labor cost equip.SUBCost Total
-
8/12/2019 Cost Estimating Advice Manual
234/287
-
8/12/2019 Cost Estimating Advice Manual
235/287
RETURN
Info!A1
p Form
Last Chg
Description 12 mo. + or - ProjectedOffice expenses
Building maintenance
Equipment repairs
Postage
Printing
Rent
Security Supplies
Telephone
Utilities
Personnel (indirect)
Payroll
Pensions
Profit sharing
Union dues
Taxes
Payroll (indirect) Property
Travel
Vehicles
Fuel
Insurance
Registration
Repair and maintenance
Totals
-
8/12/2019 Cost Estimating Advice Manual
236/287
DateCustomer
AddressCity/State/Zip
PhoneEstimated by
Operation Material
1
2
3
4
5
67
8
9
10
11
12
13
14
15
1617
18
-
8/12/2019 Cost Estimating Advice Manual
237/287
Operation Material
1
2
3
4
56
7
8
9
10
11
12
13
14
1516
17
18
Operation1
2
3
4
5
6
7
8
9
10
Operation Descriptio
-
8/12/2019 Cost Estimating Advice Manual
238/287
SetUp
Remove/Replace
Protection
TouchUp is applied as a percentage of the total costs.
CleanUp
Equipment
Equipment Rental
description days
Subcontractor Costs
TradePavement marking $
Sandblasting $
Scaffolding $
Wallcovering $
Waterblasting $
Other -- $
Other -- $
Other -- $
Total Subcontractor Costs $
-
8/12/2019 Cost Estimating Advice Manual
239/287
-
8/12/2019 Cost Estimating Advice Manual
240/287
Application Dimensions Quantity
method SF/LF/Each
x
x
x
x
xx
x
x
x
x
x
x
x
x
xx
x
x
Total Exterior Costs (includes overhe
Preparation CostsQuantity
Dimensions SF/LF/Eachx
x
x
x
x
x
x
x
x
x
Total Preparation Costs (includes overhe
SURRPTUCU Costs
Labor Labor cost
n hours (AT $_____)
-
8/12/2019 Cost Estimating Advice Manual
241/287
osts
Daily Total Supervisi
cost cost Setup
$ Remove/
$ Protectio
$ Cleanup $ Equipme
$ Subcontr
$ Commiss
Total Equipment Costs $ Other co
Overhea
Profit (__
Preparati
Bid amount Interior toExterior t
Touchup
Continge
Total bas
Adjustme
Final bid
Price per
Price per
-
8/12/2019 Cost Estimating Advice Manual
242/287
RETURN
Info!A1
Unit cost Total
cost
= $
= $
= $
= $
= $
= $= $
= $
= $
= $
= $
= $
= $
= $
= $
= $= $
= $
d and profit) = $
-
8/12/2019 Cost Estimating Advice Manual
243/287
Unit cost Total
cost
= $
= $
= $
= $
= $= $
= $
= $
= $
= $
= $
= $
= $
= $
= $= $
= $
= $
d and profit) = $
Unit Total
cost cost= $
= $
= $
= $
= $
= $
= $
= $
= $
= $
d and profit) = $
Material
cost Totals
-
8/12/2019 Cost Estimating Advice Manual
244/287
= $
= $
= $
= $
Extensions
on ____
eplace
t
ats
ions
ts
Subtotal
(__%)
%)
Subtotal
on
tal tal
Subtotal
(__%)
cy (__%)
e bid
nt (__%)
otal
SF
room
-
8/12/2019 Cost Estimating Advice Manual
245/287
Residential Estimat
Owner Contractor
Property address Address
Estimate by Telephone num
Legal description Net Bldg. Fund
No. Item Qty Unit Material1 Excavation
2 Trenching
3 Concrete rough4 Concrete finish
5 Asphalt paving
6 Rough lumber
7 Finish lumber
8 Door frames
9 Windows and glass
10 Fireplace
11 Masonry
12 Roof
13 Plumbing14 Heating
15 Electric wiring
16 Electric fixtures
17 Rough carpentry
18 Finish carpentry
19 Lath and plaster
20 Drywall
21 Garage door
22 Doors
23 Painting24 Cabinets
25 Hardwood floors
26 Ceramic tile
27 Formica
28 Hardware
29 Linoleum
30 Asphalt tile
31 Range and oven
-
8/12/2019 Cost Estimating Advice Manual
246/287
32 Insulation
33 Shower door
34 Temperature facilities
35 Miscellaneous
36 Cleanup
37 Carpet
38 Gutters and downspouts39 Septic tank
40 Sewer connection
41 Overhead
42 Supervision
43 Water meter
44 Building permit
45 Plan and specifications
4647 Total cost
-
8/12/2019 Cost Estimating Advice Manual
247/287
RETURN
Info!A1
Summary
er
Loan Number
Labor Subcontract Total Actual cost
-
8/12/2019 Cost Estimating Advice Manual
248/287
-
8/12/2019 Cost Estimating Advice Manual
249/287
Standard Form Subcontract
Subcontract No. _____
This Agreement, made and entered into at ___________ this __________ day of ______
___________________________ hereinafter called Contractor, with principal office at __
___________________ and ____________________________________________ herei
Recitals
On or about the ________________ day of _______________, 19 _____, Contractor ente
____________________________________________________________ hereinafter ca
_______________________________________________________________________
the following construction work: _____________________________________________
. Said work t
be performed in accordance with the prime contract and the plans and specifications. Said
have been prepared by or on behalf of ________________________________________
Section 1 - Entire Contract
Subcontractor certifies and agrees that he is fully familiar with all of the terms, conditions a
tract Documents, as hereinafter defined, the location of the job site, and the conditions un
performed, and that he enters into this Agreement based upon his investigation of all such
lying upon any opinions or representations of Contractor. It is agreed that this Agreement r
ment. It is further agreed that the Contract Documents are incorporated in this Agreementsame force and effect as if the same were set forth at length therein, and that Subcontract
be and are bound by any and all of said Contract Documents insofar as they relate in any
directly to the work covered by this Agreement. Subcontractor agrees to be bound to Cont
and to the same extent as Contractor is bound to Owner under the Contract Documents, t
vided for this Agreement, and that where, in the Contract Documents, reference is made t
or specification therein pertains to Subcontractor's trade, craft, type of work, then such wor
interpreted to apply to Subcontractor instead of Contractor. The phrase "Contract Docume
mean and include:
Section 2 - Scope
Subcontractor agrees to furnish all labor, services, materials, installation, cartage, hoisting
equipment, scaffolding, tools and other facilities of every kind and description required for
execution of the work described herein and to perform the work necessary or incidental to
for the project in strict accordance with the Contract Documents and as more particularly, t
specified in:
-
8/12/2019 Cost Estimating Advice Manual
250/287
Section 3 - Contract Price
Contractor agrees to pay Subcontractor for the strict performance of his work, the sum of:
_____________________________________________________________ ( _________
additions and deductions for changes in the work as may be agreed upon, and to make paPayment Schedule, Section 4.
Section 4 - Payment Schedule
Contractor agrees to pay Subcontractor in monthly payments of ________________ % of
been placed in position and for which payment has been made by Owner to Contractor. T
shall be retained by Contractor until he receives final payment from Owner, but not less th
entire work required by the prime contract has been fully completed in conformity with the
been delivered and accepted by the Owner, Architect and Contractor. Subject to the provi
Page 1 of 2
the retained percentage shall be paid Subcontractor promptly after Contractor receives his
from Owner. Subcontractor agrees to furnish, if and when required by Contractor, payroll a
release of claims for labor, material and subcontractors performing work or furnishing mat
all in form satisfactory to Contractor, and it is agreed that no payment hereunder shall be
option, until and unless such payroll affidavits, receipts, vouchers or releases; or any or all
And payment made hereunder prior to completion and acceptance of the work, as referred
construed as evidence of acceptance of any part of Subcontractor's work.
Section 5 - General Provisions
1. Subcontractor agrees to begin work as soon as instructed by the Contractor, and shall c
efficiently and at a speed that will not cause delay in the progress of the Contractor's work
tractors. If, in the opinion of the Contractor, the Subcontractor falls behind in the progress
may direct the Subcontractor to take such steps as the Contractor deems necessary to im
including, without limitation, requiring the Subcontractor to increase the number of shifts, p
days of work, equipment, or other remedies and to submit to Contractor for Contractor's a
demonstrating the manner in which the required rate of progress will be regained, without
Contractor may require Subcontractor to prosecute, in preference to other parts of the wor
such part or parts of the work as Contractor may specify.
The Subcontractor shall complete the work as required by the progress schedule prepared
be amended from time to time. The progress schedule may be reviewed in the office of the
construction will be as directed by the Contractor.
The Subcontractor agrees to have an acceptable representative (an officer of Subcontract
Contractor) present at all job meetings and to submit weekly progress reports in writing if r
Any job progress schedules are hereby made part of and incorporated herein by reference
2. Reserved Gate Usage
-
8/12/2019 Cost Estimating Advice Manual
251/287
Subcontractor shall notify in writing, and assign its employees, material men and suppliers
as may be established for their use by Contractor and in accordance with such conditions
posed by Contractor. Strict compliance with Contractor's gate usage procedures shall be r
who shall be responsible for such gate usage by its employees, material men, suppliers, s
men and suppliers.
3. Staggered Days and Hours of Work and for Deliveries
Subcontractor shall schedule the work and the presence of its employees at the jobsite an
materials by its material men and suppliers to the jobsite on such days, and at such times
directed by Contractor. Subcontractor shall assume responsibility for such schedule compl
but for all its material men, suppliers and subcontractors, and their material men and suppl
Section 6 - Special Provisions
Contractors are required by law to be licensed and regulated by the Contractors' State Lic
concerning a contractor may be referred to the registrar of the board.
In Witness Whereof: The parties hereto have executed this Agreement fo
cessors, administrators, and assignees on the day and year first above written.
Subcontractor Contractor
By ByName Title Name
Corporation Partnership Proprietorship
Contractor's State License No._________ Contractor's State Lice
Page 2 of 2
-
8/12/2019 Cost Estimating Advice Manual
252/287
RETURN
Info!A1
_______
__ 19 ______ by and between
_______________________,
nafter called a Subcontractor.
red into a prime contract with
lled Owner, whose address is
____________to perform
___________________
o
plans and specifications
______________, Architect.
nd obligations of the Con-
er which the work is to be
matters and is in no way re-
epresents the entire agree-
by this reference, with theor and his subcontractors will
part or in any way, directly or in-
actor in the same manner
the extent of the work pro-
Contractor and the work
k or specification shall be
nts" is defined to
, supplies, insurance,
he prompt and efficient
complete
hough not exclusively,
-
8/12/2019 Cost Estimating Advice Manual
253/287
_______________), subject to
yment in accordance with the
labor and materials which have
e remaining __________ %
n thirty-five days after the
Contract Documents and has
ions of the next sentence,
final payment
ffidavits, receipts, vouchers,
rials under this Agreement,
ade, except at Contractor's
of them, have been furnished.
to above, shall not be
arry on said work promptly,
or work of other subcon-
of the work, the Contractor
prove the rate of progress,
ersonnel, overtime operations,
proval an outline schedule
additional cost to the Contractor.
k,
by the Contractor, which may
Contractor and sequence of
or if requested by the
equested by the Contractor.
.
-
8/12/2019 Cost Estimating Advice Manual
254/287
, to such gates or entrances
and at such times as may be im-
equired by the Subcontractor
ubcontractors, and their material
d any deliveries of supplies or
and during such hours, as may be
liance not only for its employees
liers.
nse Board. Any questions
r themselves, their heirs, executors, suc-
Title
se No._________
-
8/12/2019 Cost Estimating Advice Manual
255/287
Job Sche
Contract number:
Event 1 2 3 4 5 6
-
8/12/2019 Cost Estimating Advice Manual
256/287
RETURN
Info!A1
ule
Job foreman:
Production date (Elapsed time by w
7 8 9 10 11 12 13 14 15
-
8/12/2019 Cost Estimating Advice Manual
257/287
Customer name:
ek)
16 17 18 19 20 21 22 23 24
-
8/12/2019 Cost Estimating Advice Manual
258/287
25 26 27 28 29 30
-
8/12/2019 Cost Estimating Advice Manual
259/287
ID Task
Dependencies
StatusEffort
HoursCost
1
ID # oftask
23
4
5
6
7
8
9
10
11
1213
14
15
Project artifacts
Work BreakdoProject
Project manager
-
8/12/2019 Cost Estimating Advice Manual
260/287
Project # RETURN
Sponsor
Updated Info!A1
Start DatePlanned
Completion
Estimate to
Completion
Actual
CompletionResource
n Structure
-
8/12/2019 Cost Estimating Advice Manual
261/287
CLASS LIST STATUS
100 Land/Property Acquisition None
110 Acquisition Expenses None150 Development Costs None160 Lot Mowing/Maintenance None170 Carrying Costs - Loan Interest None180 Carrying Costs - Property Taxes None190 Carrying Costs - HOA Fees None
CLASS LIST STATUS200 Site Surveys L-M-S-R201 Property Inspections L-M-S-R202 Soils Exploration L-M-S-R205 Design Costs L-M-S-R206 Engineering Fees L-M-S-R207 Estimating Costs L-M-S-R210 Construction Financing None220 Project Insurance None221 Builders Risk Insurance None230 Building Permits/Fees None231 Radon Gas Fee None232 Arborist Fee None233 Inspector Training Fee None238 Other Permit Fees None
239 Reinspections None240 Utility Deposits None241 Water Connection Fee None242 Sewer Connection Fee None245 Utility Service Fee None250 Impact Fees None251 City Impact Fee None252 Road Impact Fee None253 Sewer Impact Fee None
DIVISION 200 PRE-CONSTRUCTION
MASTERCODE COST CODEGENERAL NOTES
1. L-M-S-R Labor - Material - Subcontract - Rental. (Category II)
2. Labor = Payroll Labor and Subcontract Labor (optional). (Category I)
3. Materials = Material only, including delivery and taxes. (Category I)
4. Subcontract = Labor & Material Subcontracts and Subcontract Labor (optional). (Category I)
5. Rental = Rental only, including delivery and taxes. (Category I)
6. None = Not Classified / Unclassified / No Class Assigned
7. N/A = Not Applicable
8. List Status = Account status in the Template File when 1st installed. (may be changed by user)
DIVISION 100 LAND & PROPERTY
-
8/12/2019 Cost Estimating Advice Manual
262/287
-
8/12/2019 Cost Estimating Advice Manual
263/287
316 Concrete Reinforcing Materials* Material317 Concrete Reinforcing Labor* Labor 320 Concrete Work Contract321 Concrete TruckMix Material322 Concrete Labor* Labor 323 Concrete Equip Rental* Rental
324 Concrete Crane Rental L-M-S-R325 Concrete Pumping L-M-S-R326 Concrete Precast L-M-S-R327 Concrete Special Finishes L-M-S-R329 Concrete Testing L-M-S-R330 Concrete Structures L-M-S-R331 Concrete Footers L-M-S-R332 Concrete Foundations L-M-S-R333 Concrete Columns334 Concrete Decks L-M-S-R335 Concrete Monolithic Slabs L-M-S-R
336 Concrete Floor Slabs L-M-S-R337 Concrete Walls L-M-S-R338 Concrete Tilt Up L-M-S-R340 Masonry Contract341 Masonry Materials* Material342 Masonry Labor* Labor 343 Masonry Equip Rental* Rental344 Masonry Scaffolding L-M-S-R345 Parging L-M-S-R348 Foundation Waterproofing L-M-S-R
349 Foundation Drainage/Sump L-M-S-R350 Masonry Structures L-M-S-R351 Masonry Foundation Walls L-M-S-R352 Masonry Retaining Walls L-M-S-R353 Masonry Walls L-M-S-R354 Masonry Columns L-M-S-R355 Masonry Chimney L-M-S-R356 Masonry Modifications L-M-S-R360 Structural Steel L-M-S-R361 Structural Steel Materials* Material362 Structural Steel Labor* Labor
364 Structural Steel Crane L-M-S-R365 Steel - Shop Fabrications L-M-S-R366 Steel - Field Welding L-M-S-R370 Steel Structures L-M-S-R377 Steel/Metal Stairs L-M-S-R380 Rough Carpentry Contract381 Rough Carpentry Materials* Material382 Rough Carpentry Labor* Labor 383 Rough Carpentry Tool Rental* Rental
-
8/12/2019 Cost Estimating Advice Manual
264/287
384 Rough Carpentry Crane L-M-S-R385 Special Wood Beams Material386 Structural Hardware Material387 Floor Trusses Material388 Roof Trusses Material390 Rough Carpentry Structures L-M-S-R
391 Wood Beams & Girders L-M-S-R392 Floor Framing L-M-S-R393 Exterior Wall Framing L-M-S-R394 Roof Framing L-M-S-R395 Interior Partitions & Blocking L-M-S-R396 Wall Furring L-M-S-R397 Stair/Landing Framing L-M-S-R
CLASS LIST STATUS400 Roofing L-M-S-R401 Roofing Materials* Material402 Roofing Labor* Labor
403 Roofing Equip Rental* Rental404 Asphalt Shingle Roofing L-M-S-R405 Concrete/Clay Tile L-M-S-R406 Slate Roofing L-M-S-R407 Cedar Shake Roofing L-M-S-R408 Metal Roofing L-M-S-R409 Membrane/Built-up Roofing L-M-S-R410 Exterior Swing Doors L-M-S-R411 Sliding Glass Doors L-M-S-R413 Basement Doors L-M-S-R
414 Special Doors L-M-S-R415 Garage Doors L-M-S-R416 Garage Door Opener L-M-S-R419 Access Panels L-M-S-R420 Windows L-M-S-R421 Greenhouse Windows L-M-S-R422 Glazing L-M-S-R423 Stained/Etched Glass L-M-S-R424 Entrances/Storefront L-M-S-R425 Glass Block Windows L-M-S-R429 Skylights/Roof Windows L-M-S-R
430 Building Wrap L-M-S-R431 Exterior Millwork L-M-S-R432 Molded Foam Trim L-M-S-R435 Wood Siding & Trim L-M-S-R436 Wood Siding & Trim Materials* Material437 Wood Siding & Trim Labor* Labor 440 Face Brick L-M-S-R441 Face Brick Materials* Material442 Face Brick Labor* Labor
DIVISION 400 EXTERIOR FINISHES
-
8/12/2019 Cost Estimating Advice Manual
265/287
444 Brick Tuckpointing L-M-S-R445 Stonework L-M-S-R446 Stonework Materials* Material447 Stonework Labor* Labor 449 Precast Ornamental Concrete L-M-S-R450 Stucco L-M-S-R
451 Stucco Materials* Material452 Stucco Labor* Labor 455 Textured Coatings L-M-S-R456 Water & Damproofing L-M-S-R457 Special Caulking L-M-S-R460 Exterior Painting L-M-S-R461 Exterior Painting Materials* Material462 Exterior Painting Labor* Labor 465 Spraytech Coatings L-M-S-R470 Aluminum Siding L-M-S-R471 Alum Soffit & Fascia L-M-S-R
475 Aluminum Railings L-M-S-R476 Aluminum Screen Doors L-M-S-R479 Gutters & Downspouts L-M-S-R480 Vinyl Siding L-M-S-R481 Vinyl Soffit & Fascia L-M-S-R485 Shutters L-M-S-R489 Awnings L-M-S-R490 Ornamental Iron L-M-S-R491 Chimney Cap L-M-S-R
CLASS LIST STATUS
500 Insulation L-M-S-R504 Fireproofing L-M-S-R505 Metal Stud L-M-S-R506 Metal Stud Materials* Material507 Metal Stud Labor* Labor 509 Soundproofing L-M-S-R510 Drywall L-M-S-R511 Drywall Materials* Material512 Drywall Labor* Labor 515 Fiberglass Panels L-M-S-R516 Lath & Plastering L-M-S-R
517 Ornamental Plaster L-M-S-R520 Finish Carpentry L-M-S-R521 Finish Carpentry Materials* Material522 Finish Carpentry Labor* Labor 525 Interior Doors L-M-S-R526 Fire Doors L-M-S-R530 Wood Mouldings L-M-S-R531 Wood Shelving L-M-S-R535 Wood Stairs & Rails L-M-S-R
DIVISION 500 INTERIOR FINISHES
-
8/12/2019 Cost Estimating Advice Manual
266/287
536 Attic Stairs L-M-S-R537 Paneling/Planking L-M-S-R539 Fireplace Mantle/Trim L-M-S-R540 Cabinets & Vanities L-M-S-R541 Cabinetry Materials* L-M-S-R542 Cabinetry Labor* L-M-S-R
544 Special Millwork L-M-S-R545 Formica Countertops L-M-S-R546 Solid Surface Countertops L-M-S-R547 Stone Countertops L-M-S-R548 Cultured Marble Tops L-M-S-R549 Cultured Marble Work L-M-S-R550 Painting L-M-S-R551 Painting Materials* Material552 Painting Labor* Labor 554 Faux Finishes L-M-S-R555 Wallpaper L-M-S-R
556 Wallpaper Materials* Material557 Wallpaper Labor* Labor 560 Suspended Ceilings L-M-S-R561 Suspended Ceiling Materials* Material562 Suspended Ceiling Labor* Labor 565 Acoustical Ceilings L-M-S-R566 Metal Ceilings L-M-S-R569 Illuminated Ceilings L-M-S-R570 Ceramic Tile L-M-S-R571 Ceramic Tile Materials* Material
572 Ceramic Tile Labor* Labor 574 Tile Counters L-M-S-R575 Glass Block L-M-S-R578 Tile/Marble Window Sills L-M-S-R579 Ceramic Fireplace Finishes L-M-S-R580 Tile Flooring L-M-S-R581 Vinyl Flooring L-M-S-R582 Wood Flooring L-M-S-R583 Wood Floor Refinishing L-M-S-R584 Marble Flooring L-M-S-R585 Stone/Slate Flooring L-M-S-R
586 Terrazzo Flooring L-M-S-R587 Brick/Paver Flooring L-M-S-R588 Concrete Floor Refinishing L-M-S-R589 Carpeting L-M-S-R590 Door Hardware L-M-S-R591 Mirrors L-M-S-R592 Medicine Cabinets L-M-S-R593 Shower Enclosures L-M-S-R594 Bath Accessories L-M-S-R
-
8/12/2019 Cost Estimating Advice Manual
267/287
595 Wire Shelving L-M-S-R596 Metal Shelving L-M-S-R597 Closet Systems L-M-S-R598 Fabricated Plastics L-M-S-R599 Finish Metals L-M-S-R
CLASS LIST STATUS
600 Plumbing System L-M-S-R601 Plumbing Fixtures Material602 Special Tubs Material603 Water Heater Material604 Plumbing Utility Connections Material605 Solar Water Heating Sys L-M-S-R606 Gas Transmission System L-M-S-R607 Boiler/HW Heating System L-M-S-R610 HVAC System L-M-S-R611 Oven/Dryer/Bath Venting L-M-S-R612 Attic/Whole House Fans L-M-S-R
614 Electrostatic Filter System L-M-S-R615 Sheet Metal Work L-M-S-R616 Duct Cleaning L-M-S-R619 Prefab Fireplaces L-M-S-R620 Electrical System L-M-S-R621 Lighting Fixtures Material622 Ceiling Fans Material624 Electrical Utility Connections Material625 Door Chime System Material626 CATV/Antenna System L-M-S-R
627 Telephone/PBX System L-M-S-R628 Computer Wiring L-M-S-R629 Low Voltage Lighting L-M-S-R630 Security System L-M-S-R631 Safes & Vaults L-M-S-R632 Intercom/Sound System L-M-S-R634 Lightning Protection System L-M-S-R635 Smoke Detection System L-M-S-R636 Fire Extinguishers L-M-S-R637 Fire Alarm System L-M-S-R638 Fire Sprinkler System L-M-S-R
639 Central Vacuum System L-M-S-R640 Appliances L-M-S-R641 Refrigerator/Freezer L-M-S-R642 Stove/Range L-M-S-R643 Range Hood L-M-S-R644 Garbage Disposal L-M-S-R645 Dishwasher L-M-S-R646 Microwave Oven L-M-S-R648 Clothes Washer L-M-S-R
DIVISION 600 MECHANICAL & CSI
-
8/12/2019 Cost Estimating Advice Manual
268/287
649 Clothes Dryer L-M-S-R650 SPECIALTIES (Div 10) L-M-S-R660 EQUIPMENT (Div 11) L-M-S-R670 FURNISHINGS (Div 12) L-M-S-R671 Window Treatments L-M-S-R672 Manufactured Casework L-M-S-R
673 Rugs & Mats L-M-S-R680 SPECIAL CONST (Div 13) L-M-S-R681 Greenhouses L-M-S-R682 Gazebos L-M-S-R690 CONVEYING SYSTEMS (Div 14) L-M-S-R691 Residential Elevator L-M-S-R692 Dumb Waiter L-M-S-R693 Wheelchair Lifts L-M-S-R
CLASS LIST STATUS700 Septic System L-M-S-R701 Well & Pump L-M-S-R
702 Water Meter L-M-S-R705 Drainage System L-M-S-R710 Concrete Curb/Gutter L-M-S-R715 Asphalt Paving L-M-S-R716 Pavement Marking L-M-S-R720 Final Grading L-M-S-R730 Concrete Flatwork L-M-S-R731 Concrete Flatwork Materials* L-M-S-R732 Concrete Flatwork Labor* L-M-S-R735 Driveways/Aprons L-M-S-R
736 Patios/Sidewalks L-M-S-R737 Special Concrete Finishes L-M-S-R738 Brick Pavers L-M-S-R739 Flagstone L-M-S-R740 Exterior Wood Structures L-M-S-R741 Ext. Wood Structure Materials* L-M-S-R742 Ext. Wood Structure Labor* L-M-S-R750 Exterior Sundeck L-M-S-R751 Exterior Wood Stairs L-M-S-R752 Exterior Wood Railings L-M-S-R753 Wood Patios/Walkways L-M-S-R
759 Dune Crossovers L-M-S-R760 Fencing L-M-S-R765 Mailboxes L-M-S-R766 Signage / House Numbers L-M-S-R770 Landscaping L-M-S-R771 Landscaping Materials* L-M-S-R772 Landscaping Labor* L-M-S-R775 Irrigation System L-M-S-R776 Landscape Plantings L-M-S-R
DIVISION 700 SITE IMPROVEMENTS
-
8/12/2019 Cost Estimating Advice Manual
269/287
777 Sod & Seeding L-M-S-R779 Landscape Lighting L-M-S-R780 Pool/Spa Construction L-M-S-R783 Pool/Spa Re-Decking L-M-S-R784 Pool/Sap Re-Marcite L-M-S-R785 Pool/Spa Deck Coatings L-M-S-R
786 Chattahoochee/River Rock L-M-S-R790 Screening / Screen Rooms L-M-S-R
CLASS LIST STATUS800 Site Supervision L-M-S-R801 Supervision Bonus L-M-S-R802 Associate Bonus L-M-S-R805 Project Management L-M-S-R810 Rough Cleanup L-M-S-R811 Trash Removal/Dumpster L-M-S-R812 Dump Fees L-M-S-R815 Final Cleaning L-M-S-R
816 Material Protection L-M-S-R817 Special Testing L-M-S-R819 General Purpose Scaffolding L-M-S-R820 Builders Risk Insurance None821 Liability Insurance Impact None822 Worker's Comp Impact None823 Licensing Cost Impact None830 Bonding Costs None831 Warranty Program None832 Legal Expenses (project only) None
833 Accounting Costs (project only) None834 Administration & Clerical None835 Blueprints / Copies None836 Photography None840 Travel Expenses None845 Vehicle Expenses None850 Materials Acquisition & Dist. L-M-S-R855 Off Site Storage (project only) L-M-S-R860 Minor Medical None865 Refreshments / Ice None870 Consumable Tools None
880 Final Punchout L-M-S-R885 Final Move-in & Set-up L-M-S-R890 Warranty Service L-M-S-R891 Warranty-Materials* Material892 Warranty-Labor* Labor 893 Warranty-Rental* Rental
CLASS LIST STATUS900 Marketing / Advertising L-M-S-R901 Promotional Signage L-M-S-R
DIVISION 900 SALES & MARKETING
DIVISION 800 PROJECT OVERHEAD
-
8/12/2019 Cost Estimating Advice Manual
270/287
902 Decorating L-M-S-R905 Buyers Incentives None906 Permanent Utilities (for buyer) None910 Closing Costs None911 Title Insurance None912 Final Appraisal None
913 Foundation Check L-M-S-R914 Final Inspections L-M-S-R915 Final Surveys L-M-S-R916 Bank Inspections None918 Permanent Loan Points None919 Other Closing Costs None920 Sales Commissions - In House None921 Sales Commissions - Outside None930 Construction Loan Points None931 Construction Loan Interest None932 Post Construction Interest None
935 Investor Profit Share None940 Maintenance L-M-S-R950 Late Completion Costs None960 General Stock Materials None970 Small Job Costs L-M-S-R971 Small Jobs - Materials* Material972 Small Jobs - Labor* Labor 973 Small Jobs - Rentals* Rental974 Small Jobs - Overhead None980 Miscellaneous Job Cost L-M-S-R
981 Miscellaneous Materials* Material982 Miscellaneous Labor* Labor 983 Miscellaneous Rental* Rental984 Miscellaneous Job Overhead None990 Perm Uncategorized Costs L-M-S-R991 Perm Uncategorized Materials* Material992 Perm Uncategorized Labor* Labor 993 Perm Uncategorized Rentals* Rental994 Perm Uncategorized Job Overhead None999 Temp Unidentified Job Costs L-M-S-R
-
8/12/2019 Cost Estimating Advice Manual
271/287
RETURN
Info!A1
NOTES
NOTES
YSTEM
-
8/12/2019 Cost Estimating Advice Manual
272/287
NOTES
-
8/12/2019 Cost Estimating Advice Manual
273/287
-
8/12/2019 Cost Estimating Advice Manual
274/287
NOTES
-
8/12/2019 Cost Estimating Advice Manual
275/287
NOTES
-
8/12/2019 Cost Estimating Advice Manual
276/287
-
8/12/2019 Cost Estimating Advice Manual
277/287
NOTES
-
8/12/2019 Cost Estimating Advice Manual
278/287
NOTES
-
8/12/2019 Cost Estimating Advice Manual
279/287
NOTES
NOTES
-
8/12/2019 Cost Estimating Advice Manual
280/287
-
8/12/2019 Cost Estimating Advice Manual
281/287
Material Requisitio
Proj
Project
Unit Qty.
Date Description price ordered
-
8/12/2019 Cost Estimating Advice Manual
282/287
-
8/12/2019 Cost Estimating Advice Manual
283/287
n Control
Date: RETURN
ct name:
number: Info!A1
Cost Supplier Date Back
($) contact order received
-
8/12/2019 Cost Estimating Advice Manual
284/287
-
8/12/2019 Cost Estimating Advice Manual
285/287
Project #
Sponsor
Updated
ID Communication Description Frequency
1 What type of communication is this?What is the description
of the contents/purpose
of this communication?
2
34
56
7891011
1213
1415
1617
Communication PlProject
Project manager
Project artifacts
-
8/12/2019 Cost Estimating Advice Manual
286/287
TO GET BACK TO MAI
Info!A1
Format Owner Recipient/
Attendees
Who sends? Who gets?
n
-
8/12/2019 Cost Estimating Advice Manual
287/287