cost action e24 helsinki meeting 27-28 november, 2003

9
COST Action E24 Helsinki meeting 27-28 november, 2003 -4 -3 -2 -1 0 1 2 3 4 -4 -3 -2 -1 0 1 2 3 4 UR UA

Upload: silas-holmes

Post on 03-Jan-2016

218 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: COST Action E24 Helsinki meeting 27-28 november, 2003

COST Action E24

Helsinki meeting

27-28 november, 2003

-4

-3

-2

-1

0

1

2

3

4

-4 -3 -2 -1 0 1 2 3 4

UR

UA

Page 2: COST Action E24 Helsinki meeting 27-28 november, 2003

COST Action E24

Helsinki meeting27-28 november, 2003

Agenda

2, 3 or 4 sessions in parallel

Session 1: short term properties

Session 2: Creep, DOL, moisture effects

Session 3: Size effects, system effects

Session 4: Design of timber joints

Components

Systems

-4

-3

-2

-1

0

1

2

3

4

-4 -3 -2 -1 0 1 2 3 4

UR

UA

Page 3: COST Action E24 Helsinki meeting 27-28 november, 2003

COST Action E24

Objectives:

General: specifications for a level 1 PMC, including methods and case studies

For each topic:

• Organisation into sub-chapters

•Justification of assumptions

• Description of methods

• Proposal of case studies

•Distribution of tasks

Dissemination: book, CD, Demonstration tools …

-4

-3

-2

-1

0

1

2

3

4

-4 -3 -2 -1 0 1 2 3 4

UR

UA

Page 4: COST Action E24 Helsinki meeting 27-28 november, 2003

COST Action E24

-4

-3

-2

-1

0

1

2

3

4

-4 -3 -2 -1 0 1 2 3 4

UR

UA

Level 1 probabilistic model code

Summary of Zürich conclusions

•Level of sophistication: RV discretisation, time invariant models

•Short term strength: LN tail fitting for timber and EWP, correlation models (other properties than bending strength)

•DOL: time invariant probabilistic formulation

•Size effects: parametric equation based height/length effects on material strength and stiffness

•System effects: discretisation into components arranged in logical systems (e.g. serial /parallel). Linearisation and iterative processes.

Page 5: COST Action E24 Helsinki meeting 27-28 november, 2003

COST Action E24

Agenda

27/11

09:00 – 10:00 Introduction

10:15 – 16:00 Working sessions

16:15 – 17:00 Plenary session

28/11

09:00 – 10:00 Working sessions (Ctd)

10:15 – 12:30 Reporting

14:00 – 15:30 Future work and meetings

16:00 – 17:00 Steering Committee Meeting

-4

-3

-2

-1

0

1

2

3

4

-4 -3 -2 -1 0 1 2 3 4

UR

UA

Page 6: COST Action E24 Helsinki meeting 27-28 november, 2003

COST Action E24

Working plan

For each session:

• 4/5 delegates (with possibility of participating to several sessions)

• A chairman for each session

Defining bounds of « level 1 » approach

(Research and application)

Interactions with national codes/eurocode5

Defining key subjects (e.g. refering to materials, type of actions, diagnostic…)

Proposing case studies

Links with other topics

-4

-3

-2

-1

0

1

2

3

4

-4 -3 -2 -1 0 1 2 3 4

UR

UA

Page 7: COST Action E24 Helsinki meeting 27-28 november, 2003

COST Action E24

Relevant documents (web site):

• STSM reports from:

J. Koehler

G. Turk

J.W. Van de Kuilen

• Papers from:

H.J. Larsen

Model code for reliability based design of timber structures (draft not available on the web site)

T. Toratti and A. Ranta Maunus

A discussion on the introduction of wood to the JCSS probabilistic model code (Zürich workshop)

-4

-3

-2

-1

0

1

2

3

4

-4 -3 -2 -1 0 1 2 3 4

UR

UA

Page 8: COST Action E24 Helsinki meeting 27-28 november, 2003

COST Action E24

Plenary session 28/11

Future work and meetings

Report of activities:

- A general introduction to the activity of COST Action E24 (P. Castéra, F. Casciati, M. Faber, H.J. Larsen)

- Contents of workshops

-Thematic state of the art reports (to be discussed)

-Individual reports of activities

Dissemination of results (WCTE, CIB,..)

An international conference in 2004?

Implementation of the « level 2 » approach

-4

-3

-2

-1

0

1

2

3

4

-4 -3 -2 -1 0 1 2 3 4

UR

UA

Page 9: COST Action E24 Helsinki meeting 27-28 november, 2003

COST Action E24

Steering comittee meeting

28, november 2003

1. Opening of the meeting and attendance 2. Adoption of the agenda

3. Short report from the COST Secretariat 4. Report from the Working Groups 5. Revision of the Work Program 6. Preparation of the Program for the fourth COST E24 Workshop/Working

Group meetings

7. Preparing the items of the agenda for the next MC meeting 8. Information to and communication with participants 9. Other matters 10. Closing

-4

-3

-2

-1

0

1

2

3

4

-4 -3 -2 -1 0 1 2 3 4

UR

UA