corte madera lake mrd-30 · corte madera lake cleveland national forest dulzura barette lake...

1
Cleveland National Forest Dulzura Barette Lake Loveland Reservoir Barrette Substation AFS-8 Dulzura Fireshed AFS-8 Dulzura Fireshed AFS-8 Dulzura Fireshed Morena Reservoir 94 MRD-30 MRD-25 MRD-20 MRD-15 0 0 2 2 1 1 Miles Miles N Forester's Co-Op Professional Forestry F C O & GIS Services (530) 273-8326 www.forco-op.com Modified Route D Alternative AFS-8 Dulzura Fireshed Alternative Route Milepost Existing Substation (69/12kV) State Park Land U.S. Forest Service Land Tribal Land Bureau of Land Management Land State Land Sunrise Powerlink Project E.4 MODIFIED ROUTE D ALTERNATIVE Draft EIR/EIS Sunrise Powerlink Project Figure E.4.15-16 Dulzura Fireshed Modified Route D Alternative Wildfire Containment Conflict Model January 2008 Existing 69kV Transmission Line Existing 500kV Transmission Line Wildfire Containment Conflict Model Low Moderate Very High High Dulzura Fireshed - Modified Route D Alt. Percentage of Wildfire Containment Conflicts Low 3% Very High 36% Moderate 32% High 29%

Upload: others

Post on 30-Jan-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Corte Madera Lake MRD-30 · Corte Madera Lake Cleveland National Forest Dulzura Barette Lake Loveland Reservoir Barrette Substation AFS-8 Dulzura Fireshed AFS-8 Dulzura Fireshed AFS-8

Corte MaderaLake

ClevelandNational

Forest

Dulzura

Barette Lake

LovelandReservoir

BarretteSubstation

AFS-8 Dulzura Fireshed

AFS-8 Dulzura Fireshed

AFS-8 Dulzura Fireshed

MorenaReservoir

94

MRD-30

MRD-25

MRD-20 MRD-15

00 2211MilesMiles

N

Forester's Co-OpProfessional ForestryF

C O& GIS Services

(530) 273-8326

www.forco-op.com

Modified Route D Alternative

AFS-8 Dulzura Fireshed

Alternative Route MilepostExisting Substation (69/12kV)

State Park Land

U.S. ForestService Land

Tribal Land

Bureau of Land Management Land

State Land

Sunrise Powerlink ProjectE.4 MODIFIED ROUTE D ALTERNATIVE

Draft EIR/EIS

Sunrise Powerlink ProjectFigure E.4.15-16

Dulzura Fireshed ModifiedRoute D Alternative Wildfire Containment Conflict Model

January 2008

Existing 69kV Transmission LineExisting 500kV Transmission Line

Wildfire Containment Conflict ModelLowModerate

Very HighHigh

Dulzura Fireshed - Modified Route D Alt. Percentage of Wildfire Containment Conflicts

Low3%

Very High36%

Moderate32%

High29%