ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
1 of 126
MINUTES OF PRE-BID CONFERENCE
Minutes of Pre-bid conference held on: 14-08-2013
Description of Goods/Name of the Work: Supply of New Infrastructure, Upgradation, Redeployment, of Existing Infrastructure, Data
Migration, Integrate and Roll out the Integrated Architecture, Commissioning,
Maintenance and Support with On-site & Off-site resources through a Single Point Service
Provider and JV Model
Tender/Package No. : ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
Names of those Present:
Chairman of the meeting: Mr. Pankaj Kumar Bansal, IAS, Project Director, TNHSP
From Purchaser (ELCOT):
1. Mr. R.Madhavan – Deputy Manager (TNHSP), ELCOT
From Customer (TNHSP):
1. Dr. P. Sunil Gavaskar – Medical Officer HMIS, TNHSP
2. Mr. K. Saravana Kumar, TCS, HMIS Application Development & Support Team
From Prospective Bidders:
1. Mr. J. Mohan Babu, HCL Infosystems
2. Mr. Michael Anandh, HCL Technologies Limited
3. Mr. S. Venkat, PCS Technology Limited
4. Mr. S. Rajagopalan, Accel Frontline
5. Mr. Rohit Bapat, Enterprise DB
6. Mrs. Bhuvaneshwari, Enterprise DB
7. Mr. Marshal, Hitachi Data Systems
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
2 of 126
8. Mr. Satish, Hitachi Data Systems
9. Mr. Himanshu Gupta, Oracle India
10. Mr. Sanjeev Chauhan, Oracle India
11. Mr. R. Ramasubramanian, Oracle India
12. Mrs. Renuka sushil, Red Hat India Private Limited
Opening Remarks
The Manager (TNHSP), Electronics Corporation of Tamil Nadu Limited, Chennai, Tamil Nadu had conducted the Pre-Bid meeting. At the
outset the Manager (TNHSP) welcomed everybody attending the Pre-Bid meeting for the ICB No. ELCOT / TNHSP Phase III / ICB /
AG68-P3H5 / Server / 2013-14 for Supply of New Infrastructure, Upgradation, Redeployment, of Existing Infrastructure, Data Migration,
Integrate and Roll out the Integrated Architecture, Commissioning, Maintenance and Support with On-site & Off-site resources through a
Single Point Service Provider and JV Model. A brief status about the project was presented before the audience.
The members representing the bidders were asked to furnish their queries in written format so that the replies to the same can be
provided by the Purchaser. The members representing the bidders submitted their queries in written format. The meeting ended with a vote
of thanks to the chair.
Replies to the queries are presented in Table 1 and Amendment / Addendum to the bid document in Table 2 and they become part of
the tender document.
Managing Director
Electronics Corporation of Tamil Nadu Limited
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
3 of 126
Table 1- Replies to Queries Raised during the pre-bid meeting
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
1 Section – III Evaluation
and Qualification
Criteria (4) Post
Qualification
Requirements (ITB
38.2)
Experience and
Technical capability
As this is a complex bid, it
may be asked that the lead
bidder to be an ISO 20000,
ISO 27001 certified
company
No Change As per existing
tender clause
only
2 Section – III Evaluation
and Qualification
Criteria (4) Post
Qualification
Requirements (ITB
38.2)
Experience and
Technical capability
The lead bidder should be a
CMMi Level 5 as
experience in Cross
platform application is
needed and lot of services
for to be rendered in
collaboration with the
application vendor and
Data Migration activities
Already the tender
requires the bidder need
to have required
experience in running of
datacenter with cross
platform application and
data migration
experience. Anyhow this
can be again clarified
clearly.
As per existing
tender clause
only
3 Section – III Evaluation
and Qualification
Criteria (4) Post
Study, Analysis of
total infrastructure,
design of Integrated
The bidder should provide
relevant experience for
design of Integrated Server
The bidder / JV member
should submit
Documentary proof for
Refer S.no 3 of
the Amendment /
Addendum table
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
4 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
Qualification
Requirements (ITB
38.2) (A) Manufacturer
Bidders
Server Architecture
plan, team
formulation, Data
Migration and
Submission of
Integrated
Architecture Rollout
plan
Architecture, Data
migration etc.
having undertaken and
successfully completed
atleast one similar
assignment in the country
during the last five years.
2
4 Section – III Evaluation
and Qualification
Criteria (4) Post
Qualification
Requirements (ITB
38.2) (A) Manufacturer
Bidders
Deployment of
Managed Services &
tools for monitoring
elements like server,
desktops, routers,
switches etc
The bidder should provide
relevant experience in a
government environment
for deployment of
Managed services, relevant
proofs to be produced.
The bidder / JV member
should submit
documentary proof for
having undertaken and
successfully completed
atleast one similar
assignment in the country
during the last five years.
Refer S.no 4 of
the Amendment /
Addendum table
2
5 Section – III Evaluation
and Qualification
Criteria (4) Post
Qualification
Requirements (ITB
Joint Venture Bidding
– Eligibility Criteria
of Bidder for JV
Model
The lead bidder should
have experience in
Integrated Infrastructure
with cross platform
application environment as
No Change As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
5 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
38.2) asked in 4.A for JV model
also
6 Section IV – Bidding
Forms: Price and
Completion Schedule –
Important Requirements
– S.No (3) Page No (76)
The vendor should
include 90 days for
Critical Services to
provide on-site
measurable support
by OEMs for
Application Layer,
Web Layer, Database
Layer etc., during the
entire project period
of five years. This
need not be utilized
based on requirement
of sorting out any
issue among the
critical service layers.
The reason for on-site
support should be
justified and
approved for availing
This specification seems
contradictory for on-site
support days from OEM,
with clause no. 14 “All
services (On site consulting
-30 days) and support
(RDBA) should be
provided directly by OEM”
and 15. “All open source
software should be
individually supported by
30 days onsite OEM
Support (Post production
support) which will be
availed as & when required
during contract period”
Requesting you to clarify
and mention the exact no.
of on-site support required
from Database OEM over a
A total of 90 man-days
are planned during the
contract period of five
years for any OEM's on-
site direct support as and
when required. Any
additional requirement
will be decided on case to
case basis.
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
6 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
the on-site support by
TNHSP. The cost for
the support is payable
based on the
measurable services
rendered and
certification that the
issues resolved
satisfactorily.
period of 5 years.
7 Section IV Bidding
Forms: Price and
Completion Schedule –
Important Requirement
– S.No (2) Page No (75)
Training of five
personnel identified
by TNHSP and
selected after pre-
assessment of skill set
every quarterly for (a
total of 40 days)
during the project
period of five years.
The training
documentation should
include pre-training
Hope the training to be
provided at TNHSP DMS
campus only and Infra etc
will be provided by
TNHSP, only training
material to be provided by
the service provider.
Training material and
trainer resource to be
provided by bidder. The
training venue is Chennai
and training
infrastructure will be
provided by customer.
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
7 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
assessment report and
post training
assessment report to
justify impartment of
training and skill
Upgradation
programme.
8 Section IV Bidding
Forms: Price and
Completion Schedule –
Important Requirement
– S.No (7) Page No (78)
Deployment of one
on-site Service Desk
Assistant at TNHSP
for monitoring,
reporting and
management of Tool
based System for
Integrated
Architecture and the
other IT assets.
SLA: The resource
support should be
available at TNHSP
from 9 AM to 5 PM
for 6 days in a week
Job description of this man
power to be specified.
Already provided in bid.
This is for Tool Based
Asset Management, SLA
management etc. The job
will be assigned by
customer in relevant area.
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
8 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
during the entire
project period of five
years, except Sundays
and National
holidays. In the event
of critical
requirement, the
resource should
complete the assigned
task irrespective of
working hours,
Sundays or holidays.
Penalty can be levied
at Rs.100/- per hour
of default and a
default of 10 hours in
a month will qualify
for replacement of
equivalent or higher
quality resource with
a penalty of forfeiting
one month (particular
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
9 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
month of default)
professional cost of
the resource.
9 Section IV Bidding
Forms: Price and
Completion Schedule –
Important Requirement
– S.No (7) Page No (78)
Deployment of one
on-site Service Desk
Assistant at TNHSP
for monitoring,
reporting and
management of Tool
based System for
Integrated
Architecture and the
other IT assets.
SLA: The resource
support should be
available at TNHSP
from 9 AM to 5 PM
for 6 days in a week
during the entire
project period of five
years, except Sundays
and National
For providing RIM
support, Incident
management, SLA
Management, Vendor
management etc one
service desk man power
will not be sufficient and
common man power
strength to be arrived and
provision for quoting the
same to be provided
One resource is enough at
present. If additional
resources required, then
the strength of the team
can be increased at the
same cost on case to case
basis and from time to
time during the contract
period.
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
10 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
holidays. In the event
of critical
requirement, the
resource should
complete the assigned
task irrespective of
working hours,
Sundays or holidays.
Penalty can be levied
at Rs.100/- per hour
of default and a
default of 10 hours in
a month will qualify
for replacement of
equivalent or higher
quality resource with
a penalty of forfeiting
one month (particular
month of default)
professional cost of
the resource.
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
11 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
10 Section IV Bidding
Forms: Price and
Completion Schedule –
Important Requirement
– S.No (15) Page No
(79)
Tool based asset
management for 5
years Desktop
Are these desktops snmp
enabled and what is the
level of monitoring
expected to be provided
Already provided in the
bid. The assets are
compatible. The other
requirements should be
specified by the bidder in
the SRS and Project
Rollout Plan document
after analysis of existing
infrastructure / assets.
As per existing
tender clause
only
11 Section IV Bidding
Forms: Price and
Completion Schedule –
Important Requirement
– S.No (14) Page No
(79)
Tool based asset
management for 5
years for Servers
given in Section VI
Schedule of
Requirement -
Requirement
Specification
What is the level of
monitoring expected to be
provided
Already provided in the
bid. The assets are
compatible. The other
requirements should be
specified by the bidder in
the SRS and Project
Rollout Plan document
after analysis of existing
infrastructure / assets.
As per existing
tender clause
only
12 Section IV Bidding
Forms: Price and
Completion Schedule –
Tool based asset
management for 5
years Printer
Are these printer snmp
enabled and what is the
level of monitoring
Already provided in the
bid. The assets are
compatible. The other
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
12 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
Important Requirement
– S.No (16) Page No
(80)
expected to be provided requirements should be
specified by the bidder in
the SRS and Project
Rollout Plan document
after analysis of existing
infrastructure / assets.
13 Section IV Bidding
Forms: Price and
Completion Schedule –
Important Requirement
– S.No (17) Page No
(80)
Tool based asset
management for 5
years UPS
Are these UPS snmp
enabled and connected to a
LAN port and what is the
level of monitoring
expected to be provided
Already provided in the
bid. The assets are
compatible. The other
requirements should be
specified by the bidder in
the SRS and Project
Rollout Plan document
after analysis of existing
infrastructure / assets.
As per existing
tender clause
only
14 Section IV Bidding
Forms: Price and
Completion Schedule –
Important Requirement
– S.No (18) Page No
(80)
Tool based asset
management for 5
years Switches and
Jack panels
What is the level of
monitoring expected to be
provided like port level
monitoring etc
Already provided in the
bid. The assets are
compatible. The other
requirements should be
specified by the bidder in
the SRS and Project
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
13 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
Rollout Plan document
after analysis of existing
infrastructure / assets.
15 Section IV Bidding
Forms: Price and
Completion Schedule –
Important Requirement
– S.No (19) Page No
(80)
Tool based asset
management for 5
years Routers
What is the level of
monitoring expected to be
provided
Already provided in the
bid. The assets are
compatible. The other
requirements should be
specified by the bidder in
the SRS and Project
Rollout Plan document
after analysis of existing
infrastructure / assets.
As per existing
tender clause
only
16 Section IV Bidding
Forms: Price and
Completion Schedule –
Important Requirement
– S.No (20) Page No
(80)
Tool based asset
management for 5
years Modems
What is the level of
monitoring expected to be
provided
Already provided in the
bid. The assets are
compatible. The other
requirements should be
specified by the bidder in
the SRS and Project
Rollout Plan document
after analysis of existing
infrastructure / assets.
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
14 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
17 Section IV Bidding
Forms: Price and
Completion Schedule –
Important Requirement
– S.No (21) Page No
(80)
Tool based asset
management for 5
years SAN Storage
Requirement 17 (1
No) + Requirement
18 (1 No) +
Requirement 19(1
No)given in Section
VI Schedule of
Requirement -
Requirement
Specification
What is the level of
monitoring expected to be
provided
Already provided in the
bid. The assets are
compatible. The other
requirements should be
specified by the bidder in
the SRS and Project
Rollout Plan document
after analysis of existing
infrastructure / assets.
As per existing
tender clause
only
18 Section IV Bidding
Forms: Price and
Completion Schedule –
Important Requirement
– S.No (22) Page No
(81)
Tool based asset
management for 5
years Tape Library
Requirement 20 given
in Section VI
Schedule of
Requirement -
Requirement
Specification
What is the level of
monitoring expected to be
provided
Already provided in the
bid. The assets are
compatible. The other
requirements should be
specified by the bidder in
the SRS and Project
Rollout Plan document
after analysis of existing
infrastructure / assets.
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
15 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
19 Section IV Bidding
Forms: Price and
Completion Schedule –
Important Requirement
– S.No (23) Page No
(81)
Tool based asset
management for 5
years SAN Switch
Requirement 22 +
Requirement 23 given
in Section VI
Schedule of
Requirement -
Requirement
Specification
What is the level of
monitoring expected to be
provided
Already provided in the
bid. The assets are
compatible. The other
requirements should be
specified by the bidder in
the SRS and Project
Rollout Plan document
after analysis of existing
infrastructure / assets.
As per existing
tender clause
only
20 Section IV Bidding
Forms: Price Schedule –
Optional Items – Page
No (74)
Additional optional
items like RAM,
CPU(Processor),
Hard Disk, etc are to
be quoted by the
bidder as optional
items will also be
added for evaluation
but will be used for
ordering in case of
scaling activity
It is not clear whether
virtualization is needed or
not and any licenses for
virtualization or any other
solution will be costed and
hence provision for quoting
should be provided in the
Optional Price schedule.
It is clarified that the
requirement of
architecture has been
envisaged based on the
current and anticipated
load during the project
period / contract period
of six (5 + 1) years
during this period no
additional infrastructure
will be provided except
the items required for
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
16 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
during this contract
period only on case to
case basis. However
the vendor service
provider has to
manage and utilize
the integrated
architecture to the
fullest capacity by
virtualization / other
solutions without any
extra cost. Additional
resources can be
added only on
confirmation and
acceptance of the
purchaser / customer
on the full utilization
of the integrated
architecture.
upgradation through rate
contract prices.
Otherwise the selected
service providers need to
manage the infrastructure
to the optimum level of
utilization through
virtualization / other
solution at no extra cost
separately.
21 Section VIII Special Payment Terms For supply of materials, we (1) Instead of 20% Refer S.no 5 of
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
17 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
Conditions of Contract -
GCC 16.1 – Payment
Terms
request the payment terms
as 90% on delivery and
balance 10% against BG
against successful
delivery, installation,
commissioning in all
respects and submission
of acceptance certificate
from customer, 50% is
acceptable.
(2) Balance 50% will be
divided into 20 equal
quarterly installments and
paid on quarterly basis on
successful rendering of
services against QPC.
(3) Last quarter will be
paid only after entering to
CAMC period and
payment of 5% amount
for performance security
during the CAMC /
support transfer period.
(4) The professional
charges for on-site
the Amendment /
Addendum table
2
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
18 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
resources will be paid on
successful rendering of
services every month
within 15 days of the
successive month from
the date of claim along
with required documents.
(5) The OEM's direct on-
site support charges will
be paid within 15 days
from the date of claim
along with documents
certifying the successful
rendering of services.
22 Section VIII Special
Conditions of Contract -
GCC 16.1 – Payment
Terms
Payment Terms CAPEX: 90% payment on
installation & 10% against
BG, OPEX: Quarterly
payment terms are ok for
us.
(1) Instead of 20% against
successful delivery,
installation,
commissioning in all
respects and submission
of acceptance certificate
from customer, 50% is
Refer S.no 5 of
the Amendment /
Addendum table
2
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
19 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
acceptable.
(2) Balance 50% will be
divided into 20 equal
quarterly installments
and paid on quarterly
basis on successful
rendering of services
against QPC.
(3) Last quarter will be
paid only after entering
to CAMC period and
payment of 5% amount
for performance security
during the CAMC /
support transfer period.
(4) The professional
charges for on-site
resources will be paid on
successful rendering of
services every month
within 15 days of the
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
20 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
successive month from
the date of claim along
with required
documents.
(5) The OEM's direct on-
site support charges will
be paid within 15 days
from the date of claim
along with documents
certifying the successful
rendering of services.
23 Section VIII Special
Conditions of Contract –
GCC 16.1 Payment
Terms - point (e) – Page
No. (175)
The CAMC to be
entered and the
CAMC services to be
rendered continuously
without any
discontinuance of
support for 3 years
from the date of
completion of
What will be the payment
terms of CAMC
The total contract period
is six years (5+1) and the
payment terms are same
i.e quarterly against QPC.
Bidders to quote as
required in the Bid
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
21 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
warranty period. For
this the performance
guarantee will be 5%
of the CAMC value.
24 Section VIII Special
Conditions of Contract –
GCC 16.1 Payment
Terms – Point (e) Page
(175)
The CAMC to be
entered and the
CAMC services to be
rendered continuously
without any
discontinuance of
support for 3 years
from the date of
completion of
warranty period. For
this the performance
guarantee will be 5%
of the CAMC value.
Since everywhere in the
requirements, it is
mentioned that 5 Years
further maintenance
support has been requested,
the above clause is
contradictory. Request to
amend the clause to 5 Years
or please elaborate why the
difference?
The CAMC to be entered
and the CAMC services
to be rendered
continuously without any
discontinuance of support
for one year from the date
of completion of project
period of five years. For
this the performance
guarantee will be 5% of
the CAMC value
Refer S.no 5 of
the Amendment /
Addendum table
2
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
22 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
25 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others – Database
Layer From
Requirement 7 to
Requirement 15 Page
no: (109 to 119)
Refer Tender Our Subscription Licensing
policy is based on number
of Physical CPUs in a
database server. However
in the RFP, at several
places the no. of Physical
CPUs are not mentioned
for database servers for
new or upgraded database
servers. Requesting you to
kindly share the details of
Physical CPUs on the
database servers.
No of Physical CPUs = 4
per database server. for
more details.
– Please refer the
document for more
details.
As per existing
tender clause
only
26 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others - Page No:
100
TNSHP has plans for
a Disaster Recovery
Site at the earliest.
The vendor need to
ensure the data
management in the
absence of DR and
Is DR site's hardware and
software provisioning, a
part of current RFP? If yes,
could you please elaborate
on the database server
needs in the DR
environment?
There is no Disaster
Recovery site at the
moment. However, there
should be a data
protection mechanism to
prevent data loss in case
of a disaster in the SDC
through the available
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
23 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
provide trouble free
environment for
smooth operation of
the project with the
existing integrated
architecture.
infrastructure within
scope of the tender and
contract.
27 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –Page no
(100)
TNSHP has plans for
a Disaster Recovery
Site at the earliest.
The vendor need to
ensure the data
management in the
absence of DR and
provide trouble free
environment for
smooth operation of
the project with the
existing integrated
DR site creation - Road
map plan to be provided for
planning the data
management period and
costing.
DR creation is in the
planning stage of
Government / Customer.
Other requirements or
data management has
already been provided in
the bid.
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
24 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
architecture.
28 Section IV Schedule of
Requirements (3)
Requirement
Specification for Servers
and Storage for
HMIS/HMS/MIS, CMS
and others – Page (100)
TNSHP has plans for
a Disaster Recovery
Site at the earliest.
The vendor need to
ensure the data
management in the
absence of DR and
provide trouble free
environment for
smooth operation of
the project with the
existing integrated
architecture.
Requirement is not really
clear. Request to elaborate
the clause and explain the
detailed requirement of this
clause.
No change.
The bidders are advised
to take note of the
situation and ensure
provide efforts according
to the defined
requirement.
As per existing
tender clause
only
29 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Refer Tender Is the CMS and Student
Database going to reside on
same HMIS/HMS/MIS
database Server or separate
This should be part of
SRS and project rollout
plan which should be
approved by
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
25 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others - Starting
from Page No: 100
database server?
SMT/TNHSP and
implemented by the
successful bidder during
the contract period.
30 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others - Starting
from Page No: 100
Refer Tender As Reporting is a critical
module of the whole
application, how the High-
Availability of Reporting
Server is ensured? We
would like to propose a Hot
Standby database server as
a High-availability solution
for the Reporting database.
Kindly provision a
database server to ensure
High-Availability of
Reporting server in the
Phase III roll out.
The DB Servers will be
partitioned logically for
high availability for
OLTP systems and one
partition will be used as a
report server.
Implementation plans
may change based on
Phase III roll out and
stabilization activities.
As per existing
tender clause
only
31 Section VI -Schedule of
Requirements (3)
Requirement
The HMIS/
HMS/MIS and CMS
software application
Current Application –
running with complete
details of Platform,
Already provided in the
bid. The bidders have
been given opportunity to
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
26 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –Page no
(100)
modules have been
developed,
implemented and
being supported by
M/s.TCS and to run
the Application
successfully the
necessary
infrastructure with the
24/7 supports for
infrastructure
management is
required, which are
procured adopting
WB guidelines.
modules, Current database
size, Daily Archive log
generation size, Proposed
Database details to be
provided.
study the existing
environment before
bidding and hence they
should be aware of.
The bidders can visit the
TNHSP infrastructure at
TNSDC and get details
from the Server
Administrators with one
day prior notice before
submission of bid. The
bidders should not use
this as an excuse.
32 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others – Operation
As a project rollout
plan, the support
transfer of reusable
assets (servers and
other components)
from HCL at the
already agreed rates
What is the rate already
agreed and the OEM
should agree to those rates
otherwise the bidder should
be allowed to quote the
rates separately.
The bidders can quote the
rates in the respective
price schedule. This will
be utilized in price
comparison. However the
successful bidder will be
requested to explore the
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
27 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
Methodology - Page no
(102)
of CAMC should be
transferred to the new
team from January
2014 and from
M/s.Accel Frontline
Ltd from September
2014, when the
warranty period is
completed and
CAMC starts.
option of matching the
already agreed CAMC
rates and will be decided
mutually between
successful bidder and
customer TNHSP.
33 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others – Operation
Methodology - Page no
(102)
As a project rollout
plan, the support
transfer of reusable
assets (servers and
other components)
from HCL at the
already agreed rates
of CAMC should be
transferred to the new
team from January
2014 and from
M/s.Accel Frontline
In case the OEM declares
end of support for those
assets, ELCOT will have to
procure new assets and the
same may be confirmed
please.
OEM may declare "End
of sale" i.e the old model
infrastructure will not be
available for new
procurement as a total
unit or spares for the End
Of Sale product by
official declaration after a
reasonable period from
the date of release of
product but there is no
"End of support" as such
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
28 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
Ltd from September
2014, when the
warranty period is
completed and
CAMC starts.
at present by OEMs i.e
support will be available
for the entire life time of
the asset. OEM's
declaration of End of
Support for any existing
or new assets during
contract period is not
acceptable.
34 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others – Operation
Methodology - Page no
(102)
As a project rollout
plan, the support
transfer of reusable
assets (servers and
other components)
from HCL at the
already agreed rates
of CAMC should be
transferred to the new
team from January
2014 and from
M/s.Accel Frontline
Ltd from September
Will the other elements like
desktops, printers, routers
and switches also be
transferred to the Service
provide or it will continue
with the supplier itself. In
case, how the service
provider can take
ownership of SLA for the
items maintained by other
vendors.
The assets procured
under Pilot, Phase-1 and
Phase-2 for server
architecture is covered
under this bid. The
desktops, DMPs etc
procured for end
locations will not come
under this scope of bid
except under tool based
asset and SLA
monitoring, reporting and
management.
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
29 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
2014, when the
warranty period is
completed and
CAMC starts.
35 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others – Operation
Methodology - Page no
(102)
As a project rollout
plan, the support
transfer of reusable
assets (servers and
other components)
from HCL at the
already agreed rates
of CAMC should be
transferred to the new
team from January
2014 and from
M/s.Accel Frontline
Ltd from September
2014, when the
warranty period is
completed and
CAMC starts.
In case AMC cost to be
quoted for other vendor
products, there is no
provision given in the price
schedule.
Quote for the assets
which have been asked in
the bid.
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
30 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
36 Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 5 – Page
no (106)
Upgradations of
RAM from 128 GB to
256 GB RAM.
The Existing servers
supplied to TNHSP cannot
be upgraded as the parts for
upgrade such as CPU and
Memory can NO longer be
supplied by the
OEM/Vendor (Oracle/Sun),
Hence request you to
remove/amend this clause.
End of Sale Life is
meaning that we cannot
buy this Application
Server Model anymore, if
these models are declared
by OEM as End Of Sale..
The Application Servers
are in Warranty
Maintenance Support by
the Service Provider M/s.
Accel with the support
commitment by OEM till
the contract period of 6
years i.e 2017. Hence
there should not be any
issue to supply spares as
part of support to rectify
defects in the available
server. But why the same
spares cannot be supplied
afresh to upgrade to
increase the capacity is
As per existing
tender clause
only
The
Prospective
bidder to quote
for either
upgradation or
replacement of
the existing
server to the
required
configuration.
The
prospective
bidder will be
allowed to take
the existing
servers if he
quotes for
replacement.
The upgrading
cost / the
replacement
cost will be
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
31 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
the issue to be jointly
replied by the existing
Service Provider and the
OEM as MFA has been
given by the OEM.
Alternatively TNHSP
through M/s.TCS can
explore the following
options: (1) Option-1: To
continue the present
server with upgradation
as required (or) (2)
Option-2: Replace these
servers with the required
configuration if the
upgradation is not
feasible by the bidder but
without compromising
the performance of the
integrated infrastructure
and project deliverables
during the contract
considered as
Upgradation
cost and will
be treated
equal for
evaluation.
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
32 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
period.
37 Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 6 – Point
(5) - Page no (107)
Optical Drive - DVD-
ROM/RW
Suggest to modify the
clause as "Internal /
External (USB Based)
DVDROM/RW.
If the DVD ROM/RW is
mentioned as part of
specification of the
Application Server then it
is Internal. If separately
asked, then it is external.
Bidders to quote as
required In the bid.
As per existing
tender clause
only
38 Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 6 – Point
(10) - Page no (108)
Necessary Installation
and implementation
services should be
provided along with
24x7 supports for
hardware for 3 years
by the vendor.
Necessary Installation and
implementation services
should be provided along
with 24x7 supports for
hardware.
Necessary Installation
and implementation
services should be
provided along with 24x7
supports for hardware
for the entire project
period of six (5 +1) years.
Refer S.no 6 of
the Amendment /
Addendum table
2
39 Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
Necessary Installation
and implementation
services should be
Necessary Installation and
implementation services
should be provided along
Necessary Installation
and implementation
services should be
Refer S.no 7 of
the Amendment /
Addendum table
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
33 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
and others –
Requirement 6a – Point
(11) - Page no (109)
provided along with
24x7 supports for
hardware for 3 years
by the vendor.
with 24x7 supports for
hardware. provided along with 24x7
supports for hardware
for the entire project
period of six (5 +1) years.
2
40 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 6a – Page
no (109) –
Operating System
should be Unix Based
64 Bit with binary
compatibility for
32bit application. The
Operating system
should be 64 bit
enterprise Unix
environment with
unlimited user
license. Such of those
operating system
components required
for running Open
Source Webserver /
Glassfish Application
should be provided
Jboss is the only enterprise
class Open Source Web
server available in the
industry. We request you to
mention the following in
the tender as : Jboss
Enterprise web Server be
mentioned as Unix//Red
Hat enterprise Linux based
server
It is clarified that the OS
should be 64 bit
enterprise Unix
environment with
unlimited user license
with the components
required to run
successfully the
"Opensource and Open
standard Applications
such as Webserver /
Glassfish Application
Server" which should be
certified by the Server
OEM.
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
34 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
along with the
Operating system.
System should be
certified for the
Operating system, by
the OEM
41 Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 7 – Page
no (110)
Upgradation required
is (1) 4 SPARC VII
Quad Core CPU to be
upgraded to 64
SPARC VII Quad
Core CPU and (2)
128 GB DDR ECC
RAM to be upgraded
to 1 TB DDR ECC
RAM.
The available M5000
Server has gone End of
Sale Life (EOL) and the
spares for upgrade is not
available from Oracle.
Spares are available only
for Service /Support ONLY.
Also, the available server
M5000 cannot be upgraded
to 64 CPUs and 1 TB
RAM. We have to go for
SPARC M9000 Server or
its equivalent latest
generation servers. Based
upon the performance
requirements of TNHSP,
End of Sale Life is
meaning that we cannot
buy this M5000 Server
anymore.
Bidder has indicated that
spares are available for
Service / Support only.
The M5000 servers were
procured in 2011 only
and are in Warranty
Maintenance Support by
the Service Provider M/s.
Accel with the support
commitment by OEM till
the contract period of 6
years i.e 2017. Hence
As per existing
tender clause
only
The
Prospective
bidder to quote
for either
upgradation or
replacement of
the existing
server to the
required
configuration.
The
prospective
bidder will be
allowed to take
the existing
servers if he
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
35 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
the server has to be
properly selected and sized
along with the help of
Oracle Systems LoB Team.
Please share us the clear
performance and
availability requirements
for the same or Can we
propose a equivalent latest
generation Servers
delivering the equivalent or
better performance in a
lesser number of cores.
there should not be any
issue to supply the spares
as part of support to
rectify defects in the
available server. But why
the same spares cannot be
supplied afresh to
upgrade to increase the
capacity is the issue to be
jointly replied by the
existing Service Provider
and the OEM as MFA has
been given by the OEM.
Alternatively TNHSP
through M/s.TCS can
explore the following
options: (1) Option-1: To
continue the present
server with upgradation
as required (or) (2)
Option-2: Replace these
servers with the required
quotes for
replacement.
The upgrading
cost / the
replacement
cost will be
considered as
Upgradation
cost and will
be treated
equal for
evaluation.
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
36 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
configuration if the
upgradation is not
feasible by the bidder but
without compromising
the performance of the
integrated infrastructure
and project deliverables
during the contract
period..
42 Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 8 – Point
(10) - Page no (111)
Partitioning - Server
should support
electrically isolated
Hard partitions and
OS level logical
partitioning.
Server should support
hardware logical partitions
with independent OS
instances and OS level
logical partitioning.
No change. Anyhow this
can be decided as per the
SRS and Project Rollout
Plan document approved
by SMT/TNHSP
As per existing
tender clause
only
43 Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 8 – Point
(5) - Page no (111)
Optical Drive - DVD-
ROM/RW
Suggest to modify the
clause as "Internal /
External (USB Based)
DVDROM/RW.
If the DVD ROM/RW is
mentioned as part of
specification of the
Application Server then it
is Internal. If separately
asked, then it is external.
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
37 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
Bidders to quote as
required In the bid.
44 Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 8a – Point
(11) - Page no (113)
Necessary Installation
and implementation
services should be
provided along with
24x7 supports for
hardware for 3 years
by the vendor.
Necessary Installation and
implementation services
should be provided along
with 24x7 supports for
hardware.
Necessary Installation
and implementation
services should be
provided along with 24x7
supports for hardware for
the entire project period
of six (5 +1) years.
Refer S.no 8 of
the Amendment /
Addendum table
2
45 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 10 – Page
no (114) –
Operating System
should be Open
Source Based 64 Bit
with binary
compatibility for
32bit application. The
Operating system
should be 64 bit
enterprise Linux
environment with
unlimited user
license. Such of those
Since the earlier two
phases, the servers are all
Red Hat Enterprise servers,
the same should be
mentioned as this will ease
the
consolidation/maintenance/
support of the server
No change in the tender
clause. We need not
specify a product name.
The bidder in JV
association has to supply
the suitable OS.
Refer the appropriate
document given by us.
Cross platform
Application integration
should be ensured by the
successful bidder.
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
38 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
operating system
components required
for running Database
Load balancing
software for
PostgreSQL server
should be provided.
System should be
certified for the
Operating system, by
the OEM.
46 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 10 – Page
no (115) –
The Server should be
supplied with
industry standard
Virtualization
software and should
be supported by the
OEM. The Server
Operating system
should support
industry standard
cluster software for
Since the above servers are
Linux servers, we would
request you to mention the
same as Open Source Red
Hat Enterprise
Virtualization.
"The industry standard
virtualization software
should be supported by
the OEM like Vmware,
HyperV, Oracle VM etc"
and compliance
certificate from OEM for
the support to be
supported"
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
39 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
high availability. The
Systems need to be
integrated with
existing Shared
storage / new storage.
47 Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 10 – Point
(1) - Page no (114)
Must be latest
generation model.
Must have min. of 12
Cores, Must be Intel
Xeon processor E5-
2600 product family
CPUs; Processor
offered should be
minimum of 2.8 GHZ
or above clock speed
with the latest chipset
as applicable to the
quoted processor
technology.
Must be latest generation
model. Must have min. of
12 Cores, Must be Intel
Xeon processor E5-2600
product family CPUs;
Processor offered should be
minimum of 2.5 GHZ or
above clock speed with the
latest chipset as applicable
to the quoted processor
technology.
No Change As per existing
tender clause
only
48 Specifications for
Servers and Storage for
Cache capacity -
4MB L3 cache or
Upto 15 MB L3 shared
cache or above
No Change As per existing
tender clause
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
40 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
HMIS/HMS/MIS, CMS,
and others –
Requirement 10 – Point
(2) - Page no (114)
above only
49 Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 10 – Point
(3) - Page no (114)
RAM - 64 GB DDR2
ECC–expandable to
512 GB.
64 GB DDR3 ECC–
expandable to 512 GB.
RAM - 64 GB DDR2
ECC–expandable to 512
GB or higher
Refer S.no 9 of
the Amendment /
Addendum table
2
50 Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 11 – Point
(1) - Page no (115)
Must be latest
generation model.
Must have min. of 12
Cores, Must be Intel
Xeon processor E5-
2600 product family
CPUs; Processor
offered should be
minimum of 2.8 GHZ
or above clock speed
with the latest chipset
Must be latest generation
model. Must have min. of
12 Cores, Must be Intel
Xeon processor E5-2600
product family CPUs;
Processor offered should be
minimum of 2.5 GHZ or
above clock speed with the
latest chipset as applicable
to the quoted processor
technology.
No Change As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
41 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
as applicable to the
quoted processor
technology.
51 Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 11 – Point
(2) - Page no (115)
Cache capacity -
4MB L3 cache or
above
Upto 15 MB L3 shared
cache or above
No Change As per existing
tender clause
only
52 Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 11 – Point
(3) - Page no (115)
RAM - 64 GB DDR2
ECC–expandable to
512 GB.
64 GB DDR3 ECC–
expandable to 512 GB.
64 GB DDR2 ECC-
expandable to 512 GB or
higher.
Refer S.no 9 of
the Amendment /
Addendum table
2
53 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
Operating System
should be Open
Source Based 64 Bit
with binary
compatibility for
32bit application. The
Since the earlier two
phases, the servers are all
Red Hat Enterprise servers,
the same should be
mentioned as this will ease
the
No change in the tender
clause. We need not
specify a product name.
The bidder in JV
association has to supply
the suitable OS, which
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
42 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
and others –
Requirement 11 – Page
no (115) –
Operating system
should be 64 bit
enterprise Linux
environment with
unlimited user
license. Such of those
operating system
components required
for running Database
Load balancing
software for
PostgreSQL server
should be provided.
System should be
certified for the
Operating system, by
the OEM.
consolidation/maintenance/
support of the server should be comply with
cross platform
application integration.
Also refer the
appropriate documents
given by us..
54 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
Technical Support
Assistance to the
existing vendor M/s.
Broadline Computers
who have supplied
What is the level of support
expected and based on the
same service cost to be
allowed.
Any professional
assistance required by the
present service provider
without cost involvement
to be provided.
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
43 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
HMIS/HMS/MIS, CMS,
and others –
Requirement 16 – Page
no (119)
and maintaining the
SMS &e-Mail Server
– Procured directly by
TNHSP. No cost to
be quoted by the
present bidder.
(S21SMS)
55 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 18 – Page
no (119)
Reuse of the SAN
storage sub system
procured in Phase-1
Usable capacity of existing
storage
Usable capacity of
existing storages
TNHSP-6140
Storage(HCL) Total
Capacity 4.464TB
Available Capacity
31.275GB
TNHSP-6580
Storage(Accel) Total
Capacity 42.206TB
Available Capacity
12.991TB
Refer S.no 10 of
the Amendment /
Addendum table
2
56 Section VI -Schedule of
Requirements (3)
Reuse of the SAN
storage sub system
Number of hosts connected
to existing storage
Number of hosts
connected to existing Refer S.no 11 of
the Amendment /
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
44 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 18 – Page
no (119)
procured in Phase-1 storage
TNHSP-6140
Storage(HCL)
4Hosts(DB1,DB2,Report,
PGPool)
TNHSP-6580
Storage(Accel)
4Hosts(DB1,DB2,Report,
PGPool)
Number of host to be
connected to the new
storage 6 (DB1, DB2,
DB3, Report, PGPOOL
(1&2), Backup)
Implementation plans
may change based on
Phase III roll out and
stabilization activities.
Addendum table
2
57 Section VI -Schedule of
Requirements (3)
Reuse of the SAN
storage sub system
Applications running on
existing storage
HMS and MIS
applications As per existing
tender clause
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
45 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 18 – Page
no (119)
procured in Phase-1 only
58 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 18 – Page
no (119)
Reuse of the SAN
storage sub system
procured in Phase-1
Performance in IOPS of
existing storage and
requirement for new
storage
TNHSP-6580
Storage(Accel) -115K
throughput 3000 MB per
sec. IOPS requires for
Phase-3 is 3 times of the
Max capability of the
Phase-2 setup. Bidders
should collect the
existing systems IOP
during site survey.
Refer S.no 12 of
the Amendment /
Addendum table
2
59 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Phase III Storage Sub
System: SAN – 1 No.
– 12 TB RAW (One
new)
Number of hosts to be
connected in new storage
No change.
Successful bidder can
find out during SRS and
project rollout plan and
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
46 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 19 – Page
no (120)
implement accordingly.
60 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 19 – Page
no (120)
Phase III Storage Sub
System: SAN – 1 No.
– 12 TB RAW (One
new)
12TB Raw requirement,
what is the usable
requirement and any
desired Raid level
The storage should meet
the minimum technical
specifications. RAID
Level (Level -5) anyhow,
this will be decided
during implementation.
Further all the equipment
(servers, storage,
switches, etc,) offered for
supply under this bid
shall be new and of the
most recent series models
incorporating the latest
improvements in design’
(ref. Page 48 of the bid
document). The new
technology should be
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
47 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
compatible with the
existing architecture /
Hardware. It should not
affect the current
functioning of the
architecture. The
successful bidder shall
not claim that he has
provided what was asked
in the spec. He should
analyze the current
architecture and
implement suitable
products and solutions.
61 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 19 – Page
Phase III Storage Sub
System: SAN – 1 No.
– 12 TB RAW (One
new)
Application to be hosted HMS , HMIS , CMS &
website As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
48 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
no (120)
62 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 19 – Page
no (120)
Phase III Storage Sub
System: SAN – 1 No.
– 12 TB RAW (One
new)
Type of data to be ported
on the storage
Glassfish, PostgreSQL
Data and Image files. As per existing
tender clause
only
63 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 19 – Page
no (120) – Point (5) –
Protocol Support
Network protocol
Support: FC, iSCSI,
CIFS, TCP/IP, NFS
Version 3,4 over UDP
and TCP, SNMP,
Telnet, Network time
protocol (NTP),
HTTP,FTP &
Infiniband. All the
Protocols should be
managed by single
Why is the need for both
SAN and NAS. Protocols?
Database & Images are
stored in SAN.
Off-site DB backup,
Sever logs are stored in
NAS
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
49 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
operating system.
64 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 19 – Page
no (120) – Point (7) –
Ports
Each storage array
should have been
configured with
atleast 4 nos. of
onboard 1 GbE ports,
& minimum 4 nos. of
onboard/add on
8Gbps Fiber Channel
ports.
Why FC and iSCSI ports
required, what is the
interface from host end?
The storage should meet
the minimum technical
specifications. If the
given specification is
higher than the minimum
requirement for
successful operation of
the project, then the
higher specification is
required.
Further the equipment
offered for supply shall
be new and of the most
recent series models
incorporating the latest
improvements in design’
(ref. Page 48 of the bid
document). The new
technology should be
compatible with the
existing architecture /
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
50 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
Hardware. It should not
affect the current
functioning of the
architecture. The
successful bidder shall
not claim that he has
provided what was asked
in the spec. He should
analyze the current
architecture and work out
the requirements.
65 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 19 – Page
no (120) – Point (8) –
Disk Type
The Storage should
be configured with
600 GB 15 K RPM
FC/SAS II with
6Gbps backend loop
support. Storage
should support
separate read flash &
write flash (SSD's) to
enhance
performance.
As discussed, the OEM has
the choice to configure
latest disk types and not
only 600GB 15k which is
LFF drive
The storage should meet
the minimum technical
specifications. If the
given specification is
higher than the minimum
requirement for
successful operation of
the project, then the
higher specification is
required. Further the
bidders should ensure
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
51 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
that configuring the disk
types should not
compromise the
performance.
Further the equipment
offered for supply shall
be new and of the most
recent series models
incorporating the latest
improvements in design’
(ref. Page 48 of the bid
document). The new
technology should be
compatible with the
existing architecture /
Hardware. It should not
affect the current
functioning of the
architecture. The
successful bidder shall
not claim that he has
provided what was asked
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
52 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
in the spec. He should
analyze the current
architecture and work out
the requirements.
66 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 19 – Page
no (122) – Standard
Features – Point (6)
Hard disk interface
must be FC or SATA.
Each hard disk must
have a capacity of at
least 600Gbyte. The
rotation speed must
not be less than
15,000 rpm. The
storage sub-system
should also support
Solid state disks.
Disk types will be SAS and
NL-SAS
The storage should meet
the minimum technical
specifications. The latest
disk types are agreeable,
which is compatible and
uncompromising on the
performance of the
infrastructure. Bidders
need to submit
documentary proof on the
claim
Further the equipment
offered for supply shall
be new and of the most
recent series models
incorporating the latest
improvements in design’
(ref. Page 48 of the bid
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
53 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
document). The new
technology should be
compatible with the
existing architecture /
Hardware. It should not
affect the current
functioning of the
architecture. The
successful bidder shall
not claim that he has
provided what was asked
in the spec. He should
analyze the current
architecture and work out
the requirements.
67 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
The storage systems
must have at least 8
disk back-end FC
loops (4Gb/s speed)
FC back end loops to be
replaced by SAS back end
The storage should meet
the minimum technical
specifications. The latest
disk types are agreeable,
which is compatible and
uncompromising on the
performance of the
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
54 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
Requirement 19 – Page
no (123) – Storage
Capability – Point (11)
infrastructure. Bidders
need to submit
documentary proof on the
claim.
Further the equipment
offered for supply shall
be new and of the most
recent series models
incorporating the latest
improvements in design’
(ref. Page 48 of the bid
document). The new
technology should be
compatible with the
existing architecture /
Hardware. It should not
affect the current
functioning of the
architecture. The
successful bidder shall
not claim that he has
provided what was asked
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
55 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
in the spec. He should
analyze the current
architecture and work out
the requirements.
68 Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 19 –
Storage Scalability –
Point (9) Page no (123)
The Storage sub-
system should be
populated with 48
spindles of 600 GB
FC 15K RPM and 32
spindles of 1 TB 7.2
RPM SATA disks for
snapshots and clones.
The Tender specifications
are contradictory, wherein
the actual requirement
being 12 TB is mentioned
as the requirement, the
specifications also mention
that it has to be supplied
with 60 TB. Please
elaborate.
12 TB Raw Disk capacity
using 20 x 600 GB @ 15K
RPM
As per existing
tender clause
only
69 Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 19 – Point
(11) - Page no (121)
Disk Capacity
Upgrade /
Performance upgrade
- There should not be
any downtime or
migration required in
the event NTPC
needs to add
There should not be any
downtime or migration
required in the event
TNHSP needs to add
additional capacity or
needs additional
performance to the storage
system.
There should not be any
downtime or migration
required in
the event of necessity to
add additional capacity or
additional performance to
the storage system.
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
56 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
additional capacity or
needs additional
performance to the
storage system.
70 Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 19 – Point
(12) - Page no (121)
Storage should
support all RAID
Levels like Raid 6
Double Parity, Raid
Triple Parity Raid 5,
Raid 1+0 & Raid
Triple Mirroring.
Storage Should
support protection
against double disk
failures & triple disk
failures in same
RAID group. Should
be capable to protect
data
against simultaneous
two disk failures in a
RAID6 group which
Storage should support all
RAID Levels like Striping,
mirroring, triple-mirroring
single-parity RAID,
double-parity RAID, triple-
parity RAID, wide stripes.
Storage Should support
protection against double
disk failures & triple disk
failures in same RAID
group. Should be capable
to protect data against
simultaneous two disk
failures in a RAID group
which needs to be
demonstrated at the time of
installation. File system
should support Data
No change as of now. The
successful bidder needs
to configure and
implement as required by
SMT / TNHSP during the
contract period.
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
57 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
needs to be
demonstrated at the
time of installation.
File system should
support Data
Checksum to avoid
silent data
corruption.
Checksum to avoid silent
data corruption.
71 Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 19 –
Standard Features - Page
no (122)
Standard Features –
Point (1) to (6)
As the very detailed
configuration is already
shared by the customer, the
below standard features are
repetitive and contradictory
to the requirements as
detailed in the SAN
Storage requirements.
Suggest TNHSP to remove
this entire section to avoid
confusions in product
positioning by bidders, as
both the specifications
points to completely
Please refer the detailed
configuration is given by
us.
The standard features are
to be considered.
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
58 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
different series / range of
products.
72 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 20 – Page
no (125)
Data Management -
Archival And
Retrieval Of Data
Through Tape Library
Media to be provided by
the customer as and when
needed.
Any consumables which
are not covered in the
scope of the present bid
will be provided by the
customer.
As per existing
tender clause
only
73 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 21 – Page
no (126) –
SAN Switch (Re-Use
of the existing SAN
Switch and integrate
and support the
Integrated
Architecture)
Number of free ports in the
existing switches is
required
Server Administrators to
provide data during site
visit otherwise the
successful bidder can find
out during SRS and
project rollout plan.
As per existing
tender clause
only
74 Section VI -Schedule of Additional Switching San switches need to be The Bidder has to reuse As per existing
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
59 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 22 – Page
no (126) –
components required:
(In the event of
analysis and decision
on this new
requirement)
redundant and hence 2nos
of SAN switches is
recommended
the existing SAN fabric
switching available at
TNHSP. The vendor
should do the
augmentation required
for integrating Phase III
infrastructure. One
additional SAN switch
for integration to be
supplied, installed,
integrated, commissioned
and supported by the
supplier during the
contract period.
tender clause
only
75 Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 26 - Page
no (127)
The Vendor should
integrate the existing
backup technologies
available at TNHSP
with Phase III
infrastructure. In this
connection the
bidders can visit and
Whether the Bidder has to
supply the additional
licenses required for the
proposed setup or ELCOT/
TNHSP will supply the
licenses?
Bidder has to take care of
the licenses updates,
upgrades etc which is
compatible to the
Application Stack running
and revised from time to
time during the contract
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
60 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
study the existing
infrastructure before
submitting the bid
with detailed
technical and
commercial details.
The purchaser or the
client (TNHSP) is not
responsible for any
gaps noted and
reported by the bidder
after submission of
bids and the related
proceedings of bid
conditions.
The bidders can take
prior permission and
avail the required
assistance from
TNHSP through its
Server Administrators
available at TNHSP /
period as part of Backup
and data management
activities /
responsibilities as total
solution. All Licenses will
have to be in the
purchasers
(TNHSP/ELCOT) name.
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
61 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
TNSDC at ELCOT
Premises, Perungudi,
Chennai-96 with
escalation to the
HMIS Team at DMS
campus, Chennai-6.
76 Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 27 - Page
no (128)
Design and
implement the
detailed backup plan
for the all the
applications running
in the integrated
architecture such as:
o Increment
al - Daily
o Periodical
- Weekly –
(Full)
o Periodical
Please elaborate the exact
requirement for Online /
Offline Replication of data.
No replication license has
been asked explicitly
anywhere. Even
considering this as a future
requirement, whether
TNHSP / ELCOT intend to
request the bidder to factor
the necessary efforts and
costs is in the bid. Different
classes or type or brand of
storage replication requires
necessary hardware and/or
software in place if Storage
This is part of total
solution which includes
Data Management and
backup of data during
the entire contract
period. This should be
construed and
approached as an
integrated project
solution. The solution
proposed can be of any
name, the only
expectation from the
project is that it should
meet our requirements.
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
62 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
- Monthly
- (Full)
Onsite backup – Real-
time online data
replication
configuration to
onsite NAS
Offsite backup –
Real-time online data
replication to offsite
location, say at
TNHSP office at
DMS Campus,
Chennai-96 or any
other DR sites in
future during the
contract period.
to Storage Replication is
considered. Please clarify if
you are looking at near line
storage to storage
replication solution (DR
solution) or a Backup to
Disk solution. Similarly for
offsite location the solution
can only be designed once
we have details as to what
is your expectation with
respect to RPO/RTO for
various critical applications
and the number and nature
of critical application and
the size of data that needs
to be replicated.
The bidder cannot say
that they have provided
the solution and it has its
limitation. The bidder will
bear the responsibility of
the successful
functioning of the
solution provided or else
he has to change it at his
own cost, until the
desired results are
obtained. We may not
need a near DR setup but
the Backup and offsite
replications should be in
such a way that no data
is lost.
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
63 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
77 Section IV Schedule of
Requirements (3)
Requirement
Specification for Servers
and Storage for
HMIS/HMS/MIS, CMS
and others –
Requirement 27 - Page
(127)
Responsibilities of
the vendor service
provider on Data
Backup, data
validation, data
transfer, data
restoration and data
management
Whether TNHSP / ELCOT
will supply the necessary
tape cartridges required for
the necessary backup
policies?
If any additional
requirement other than
the available cartridges
now, the consumables
will be procured and
supplied by customer.
As per existing
tender clause
only
78 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 28 – Page
no (128)
Integrated
Architecture
Management, With
On-Line Monitoring
& Reporting Of
Service Support,
Incident Monitoring,
Call Log, Track,
Response, Resolution,
Knowledge Sharing,
Training And Support
Transfer By
Integrated Architecture
management, with on-line
monitoring & reporting of
service support, Incident
monitoring, call log, track,
response, resolution,
knowledge sharing,
training and support
transfer by establishing
Integrated Asset and SLA
using a Enterprise
Management tool with
No Change As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
64 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
Establishing
Integrated Asset And
Sla Management Tool
With Dash Board :
single Dash board
79 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 28 – Page
no (128)
The bidder with
support of OEMs for
Servers and Storage
should provide and
single window of
management to
improve datacenter
efficiencies and
reduces complexity in
enterprise architecture
of TNHSP.
Looking at the no of
elements and process to be
monitored there should be
single window act as
common dashboard for
entire IT infrastructure
including client/asset
management and service
desk. This will enable easy
management as well as
single window control over
entire IT.
No Change As per existing
tender clause
only
80 Section VI -Schedule of
Requirements (3) It should help
simplify operations
Should the tools be hand
phone compatible (Android
With the infrastructure in
the scope of bid. Any As per existing
tender clause
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
65 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 28 – Page
no (128)
by centralizing and
automating
management tasks
associated with
running infrastructure
efficiently.
& IOS) so as to have better
control, quick visibility and
management efficiency?
other future specific
requirements and
compatibility issues will
be dealt separately.
only
81 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 28 – Page
no (128)
One High End
System to run the
Management software
should be supplied by
the vendor and is to
be kept outside the
data center for
management and
auditing.
Should the system
implemented with High
Availability?
No Change As per existing
tender clause
only
82 Section VI -Schedule of
Requirements (3) The Management We recommend that the
bidders should provide a
The successful bidder has
to bring this demo and As per existing
tender clause
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
66 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 28 – Page
no (128)
software should
provide deep insight
into lower level
hardware, storage,
and network,
virtualization,
operating system,
patching and
provisioning layers
while presenting that
information concisely
at an enterprise layer
wherein it can control
all of TNHSP’s
servers and other IT
assets, inclusive of
Pilot, Phase I and
Phase II systems and
components.
live demo of the
management tool at
TNHSP environment with
all the process in a single
dash board and only
successful bidder should be
allowed.
refinement and obtaining
customer acceptance as a
part of SRS and Project
Rollout Plan document.
The solution proposed
can be of any name, the
only expectation from the
project is that it should
meet our requirements.
The bidder cannot say
that they have provided
the solution and it has its
limitation. The bidder
will bear the
responsibility of the
successful functioning of
the solution provided or
else he has to change it at
his own cost, until the
desired results are
obtained..
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
67 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
83 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 30 – Page
no (132)
Scope and Coverage Need more inputs in the
Application module with
related DB running in the
current scenario
Already provided in the
bid. The bidders have
been given opportunity to
study the existing
environment before
bidding and hence they
should be aware of.
The bidders can visit the
TNHSP infrastructure at
TNSDC and get details
from the Server
Administrators with one
day prior notice before
submission of bid. The
bidders should not use
this as en excuse.
As per existing
tender clause
only
84 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Postgresql database
should support Multi-
Master Replication
database server or
Please clarify how many
database servers would be
in Multi-master replication
mode?
Only Support for Multi
Master is required,
Implementation plans
may change based on
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
68 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 30 clause
(13) Page no: 132
equivalent wherever
required
Phase III roll out and
stabilization activities.
85 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 30 clause
(13) Page no: 132
Postgresql database
should support Multi-
Master Replication
database server or
equivalent wherever
required
To ensure the best support
and services to be provided
by the OEM - an OEM
undertaking letter for
support with defined SLAs
to be provided by the
bidder
The OEM may come as a
member in JV. Otherwise
MFA (Manufacturer
authorization is enough
which will incorporate
these undertakings.
As per existing
tender clause
only
86 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
All services (On site
consulting -30 days)
and support (RDBA)
should be provided
directly by OEM
To ensure the best support
and services to be provided
by the OEM - an OEM
undertaking letter for
support with defined SLAs
to be provided by the
bidder
The OEM may come as a
member in JV. Otherwise
MFA (Manufacturer
authorization) is enough
which will incorporate
these undertakings.
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
69 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
Requirement 30 clause
(14) Page no: 133
87 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 30 clause
(14) Page no: 133
All services (On site
consulting -30 days)
and support (RDBA)
should be provided
directly by OEM
In the clause of on-site
support from OEM, what is
the provision for bearing
the cost of Traveling,
Accommodation and other
expenses incurred during
the stay of support
engineer?
The cost should be
quoted for "per one on-
site professional man-day
cost", which is inclusive
of all charges such as
travelling,
accommodation etc.
As per existing
tender clause
only
88 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 30 clause
(14) Page no: 133
All services (On site
consulting -30 days)
and support (RDBA)
should be provided
directly by OEM
Kindly mention the time
frame for RDBA support as
5 years and the
specification could be
mentioned as:
All services (On site
consulting -30 days) and
support (RDBA for 5 years)
should be provided directly
by OEM.
Support must be provided
by bidder as per the SLA.
If required they need to
bring in the OEM
engineer on site as and
when required to meet
the SLA.
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
70 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
89 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 30 clause
(14) Page no: 133
All services (On site
consulting -30 days)
and support (RDBA)
should be provided
directly by OEM
Kindly clarify on whether
on-site consulting &
support to be done by OEM
On-site direct support by
OEM as and when
required which is decided
by the Server
Management Team which
comprises members from
TNHSP, TCS, Successful
bidders and any other
member selected and
authorized by purchaser
and customer.
As per existing
tender clause
only
90 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 30 clause
(14) Page no: 133
All services (On site
consulting -30 days)
and support (RDBA)
should be provided
directly by OEM
What will be the Role of
Bidder?
As part of SMT to
evaluate the incidence
and resolve the issue first
hand by (1) on-site
resources, (2) Back end
support through off site
and remote support
mechanism. (3) If SMT
decides that these efforts
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
71 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
have failed and OEM's
direct on-site support is
needed, then these
support is availed for
which the bidder has to
facilitate the visit of
OEM for on-site support
intervention and
resolution.
91 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 30 clause
(15) Page no: 133
All open source
software should be
individually
supported by 30 days
onsite OEM Support
(Post production
support) which will
be availed as & when
required during
contract period
In the clause of on-site
support from OEM, what is
the provision for bearing
the cost of Traveling,
Accommodation and other
expenses incurred during
the stay of support
engineer?
The cost should be
quoted for "per one on-
site professional man-day
cost", which is inclusive
of all charges such as
travelling,
accommodation etc.
As per existing
tender clause
only
92 Section VI -Schedule of All open source What will be the Role of As part of SMT to As per existing
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
72 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 30 clause
(15) Page no: 133
software should be
individually
supported by 30 days
onsite OEM Support
(Post production
support) which will
be availed as & when
required during
contract period
Bidder? evaluate the incidence
and resolve the issue first
hand by (1) on-site
resources, (2) Back end
support through off site
and remote support
mechanism. (3) If SMT
decides that these efforts
have failed and OEM's
direct on-site support is
needed, then these
support is availed for
which the bidder has to
facilitate the visit of
OEM for on-site support
intervention and
resolution.
tender clause
only
93 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
All open source
software should be
individually
supported by 30 days
onsite OEM Support
Please clarify if this is
same as mentioned in 14
above?
Yes. As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
73 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
HMIS/HMS/MIS, CMS,
and others –
Requirement 30 clause
(15) Page no: 133
(Post production
support) which will
be availed as & when
required during
contract period
94 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Requirement 30 clause
(16) Page no: 133
All open source
software should be
supplied with
necessary support
licenses (premium or
higher) for the period
of five years by
respective OEM’s
To ensure the best support
and services to be provided
by the OEM - an OEM
undertaking letter for
support with defined SLAs
to be provided by the
bidder
The OEM may come as a
member in JV. Otherwise
MFA (Manufacturer
authorization) is enough
which will incorporate
these undertakings.
As per existing
tender clause
only
95 Section VI -Schedule of
Requirements (3)
Requirement
Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
All open source
software should be
supplied with
necessary support
licenses (premium or
higher) for the period
of five years by
Please elaborate on the
exact licensing
requirements. Whether the
bidder has to supply the
additional licenses required
for the proposed setup or
ELCOT/ TNHSP
Bidder has to take care of
the licenses updates,
upgrades etc which is
compatible to the
Application Stack
running and revised from
time to time during the
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
74 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
Requirement 30 clause
(16) Page no: 133
respective OEM’s
contract period as part of
total solution with
commitment by OEM
through MFA and JV
member. All Licenses
should be under the
purchasers
(TNHSP/ELCOT) name.
The purchaser
requirement is
uninterrupted functioning
of HMIS. The adherence
to support license will be
the bidders responsibility.
The bidder cannot claim
that he has provided what
is asked. He should
provide support with the
support license procured.
If the support is not
satisfactory, he has to
change to another support
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
75 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
at his own cost.
96 Section IV Schedule of
Requirements (3)
Requirement
Specification for Servers
and Storage for
HMIS/HMS/MIS, CMS
and others – Page (130)
to (133)
Deployment and
Scope of Work for
Application and
Database Installation
This requirement does not
appear anywhere in the
Price Schedule or the List
of Related Services. Please
clarify.
This is part of
maintenance of already
existing infrastructure or
the new infrastructure
being supplied or the
related services. The
bidders need to provide
their cost appropriately.
As per existing
tender clause
only
97 Specifications for
Servers and Storage for
HMIS/HMS/MIS, CMS,
and others –
Architecture Diagram -
Page no (101)
Refer Tender The Architecture diagram
shows New SAN switch 1
and New SAN switch 2.
However the requirement is
only for one new SAN
switch. Please clarify.
The architecture diagram
depicts the deployment
of infrastructure as an
Integrated architecture
for the understanding of
all stake holders which
may be revised as per
requirement from time
to time. Bidders may
quote as per requirement
indicated in the bid
document.
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
76 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
98 Section VI – Schedule of
Requirement (2) List of
Related Services [ITB
Clause 14.6(D)] and
Completion Schedule –
S.No (12) Page No. (97)
Data Migration,
Provision of Software
tools required for
Data Backup, other
areas of the
Integrated
Architecture and
provide maintenance
support during the
entire contract period
of 5 years which
includes software
licenses, upgrade,
update, renewal etc.,
Requirement 26 –
Section VI Schedule
of Requirement -
Requirement
Specification
What is the current Data
Backup solution being
used? What is the scope of
Data Migration? The
responsibility of migration
of the Application must lie
with the respective
Application vendor (M/S
TCS). Backup and restore
function can be taken care
by the System Integrator
(Vendor).
The responsibility of the
said activity lies with the
selected service provider
(vendor). The validation
and acceptance will be
done by the Application
Developer M/s.TCS.
Activity Plan,
Assignment, Carrying out
the activity, monitoring,
validation and
acceptance within the
stipulated time frame is
the joint responsibility of
the Vendor and
Application Developer.
Activity log, start time,
response time, resolution
time, end time and SLA
should be defined for
both service providers.
As per existing
tender clause
only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
77 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
This may be covered as
part of tool based SLA
management.
99 Section VIII Special
Conditions of Contract –
GCC 18.6 – Page No.
(177)
In the event of any
correction of defects
or replacement of
defective equipment
during the warranty
period, the warranty
for the
corrected/replaced
equipment shall be
extended to a further
period of 12 months.
The performance
guarantee for a
proportionate value
shall be extended 60
days over and above
the extended warranty
period.
It is difficult for any OEM
to extend the warranty for a
period of 12 Months for
any replaced
equipment/spare. It is not
really a standard or
requirement followed by
any customer or even RFP
for that matter. Extension
of Warranty involves
additional cost and
including such costs into
the project cost will
unnecessarily raise the
TCO for ELCOT/TNHSP.
Request you to re-visit and
remove this clause
altogether.
Yes. This clause to be
removed as the replaced
part is covered under
warranty or CAMC
support during the entire
contract period.
Refer S.no 13 of
the Amendment /
Addendum table
2
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
78 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
100 Section VIII Special
Conditions of Contract –
GCC 42 – Hardware
Maintenance – Page No.
(180)
The Supplier will
accomplish
preventive and
breakdown
maintenance activities
to ensure that all
hardware execute
without defect or
interruption for at
least 99% uptime for
24 hours a day, 7 days
a week of operation
of the machine
worked on a quarterly
basis.
If any critical
component of the
entire configuration is
out of service for
more than8 working
hours, the Supplier
The Supplier will
accomplish preventive and
breakdown maintenance
activities to ensure that all
hardware execute without
defect or interruption for at
least 99% uptime for 24
hours a day, 7 days a week
of operation of the machine
worked on a quarterly
basis. If any critical
component of the entire
configuration is out of
service for more than 8
working hours, the Supplier
shall either immediately
replace the defective spare
to ensure there is no more
than 8 hours of out of
service. The Supplier will
respond to a site visit and
commence repair work on
The Supplier will
accomplish preventive
and breakdown
maintenance activities to
ensure that all hardware
infrastructure or software
/ tools are maintained and
support executed without
defect or interruption for
to maintain at least 99%
uptime for 24 hours a
day, 7 days a week of
operation of the
infrastructure
on a quarterly basis. If
any critical component of
the entire configuration is
out of service for more
than 8 working hours, the
Supplier shall either
immediately replace the
defective spare or the
Refer S.no 14 of
the Amendment /
Addendum table
2
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
79 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
shall either
immediately replace
the defective unit or
replace it at its own
cost.
The Supplier will
respond to a site visit
and commence repair
work on the
equipment within 8
hours of being
notified of equipment
malfunction.
the equipment within 8
hours of being notified of
equipment malfunction.
entire unit to ensure that
there is no more than 8
hours of "out of service".
The Supplier should
respond to a site visit and
commence repair work
on the equipment within
8 hours of being notified
of equipment
malfunction.
101 Section VIII Special
Conditions of Contract –
GCC 40 – Site
Preparation and
Installation – Page No.
(180)
The Supplier is solely
responsible for the
Preparation of the
sites in compliance
with the technical and
environmental
specifications. The
What is the responsibilities
of bidder expected here?
Will Data Center
Preparation work like,
Passive Cabling, drilling,
trenching, cable laying, tile
cutting, etc is under
The bidder have to make
pre-assessment of site
and submit a report of
Site Readiness with the
details of work to be done
by the (1) Bidder and (2)
Purchaser and Customer
As per the
existing tender
clause only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
80 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
purchaser will
facilitate assistance
through the site
officials and other
agencies involved.
The Purchaser will
inspect and certify the
site before the
scheduled installation
of the Infrastructure.
bidder's scope? Please be
elaborate on the exact
requirements the bidder is
expected to carried out.
separately for making the
site ready and fit for
commencing installation
of infrastructure.
102 Section VI Schedule of
Requirements (2) List of
Related Services [ITB
14.6 (D)] and
Completion Schedule –
S.No (2) Page (93)
Training of five
personnel identified
by TNHSP and
selected after pre-
assessment of skill set
every quarterly for (a
total of 40 days)
during the project
period of five years.
The training
documentation should
Please provide details on
what subject the training is
required. Also please
specify what is meant by
every quarterly. Do you
need training every
quarter?
Training to be imparted
as per the Training plan
finalized from time to
time on the management
of the entire server
infrastructure set up. The
bidder has to quote for 40
training days during the
contract period of five
years.
As per the
existing tender
clause only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
81 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
include pre-training
assessment report and
post training
assessment report to
justify impartment of
training and skill
Upgradation
programme.
103 Section VI Schedule of
Requirements (2) List of
Related Services [ITB
14.6 (D)] and
Completion Schedule –
S.No (3) Page (93)
The vendor should
include 90 days for
Critical Services to
provide on-site
measurable support
by OEMs for
application Layer,
Web Layer, Database
Layer etc., during the
entire project period
of five years. This
need not be utilized
based on requirement
of sorting out any
Please elaborate the exact
nature of services that is
required from OEM and for
which Products or
Applications.
No Change As per the
existing tender
clause only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
82 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
issue among the
critical service layers.
The reason for on-site
support should be
justified and
approved for availing
the on-site support by
TNHSP. The cost for
the support is payable
based on the
measurable services
rendered and
certification that the
issues resolved
satisfactorily.
104 Section VI Schedule of
Requirements (2) List of
Related Services [ITB
14.6 (D)] and
Completion Schedule –
S.No (12) Page (97)
Data Migration,
Provision of Software
tools required for
Data Backup, other
areas of the
Integrated
Architecture and
What is the current Data
Backup solution being
used? What is the scope of
Data Migration? The
responsibility of migration
of the Application must lie
with the respective
No Change As per the
existing tender
clause only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
83 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
provide maintenance
support during the
entire contract period
of 5 years which
includes software
licenses, upgrade,
update, renewal etc.,
Requirement 26 –
Section VI Schedule
of Requirement -
Requirement
Specification
Application vendor (M/S
TCS). Backup and restore
function can be taken care
by the System Integrator
(Vendor).
105 Section II Bidding Data
Sheet – ITB 14.7 – Page
(35)
A Bidder may be a
natural person,
private entity,
government-owned
entity—subject to
ITB 4.5—or any
combination of such
entities in the form of
Joint Venture Bidding
along with M/s. Oracle
India is not possible
legally. Hence we request
you to amend the clause
and all related clauses
accordingly as below. “A
Bidder may be a natural
person, private entity,
government-owned
The JV member can be
either OEM or the
Authorized Channel
partner of OEM.
As per the
existing tender
clause only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
84 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
a joint venture or
association (JVA)
under an existing
agreement or with the
intent to enter into
such an agreement
supported by a letter
of intent.
entity—subject to ITB 4.5."
106 Section VIII Special
Conditions of Contract –
GCC 28.7.3 - Page (179)
In case an item is not
usable beyond the
stipulated maximum
downtime the
supplier will be
required to arrange
for an immediate
replacement of the
same till it is repaired.
Failure to arrange for
the immediate
repair/replacement
Penalty should not be
deducted from Bank
Guarantee and should be
deducted from the payables
to the bidder, as per
industry norms.
Yes. The LD or penalty
as per SLA will be
deducted or recovered
from the amount payable
to the vendor / supplier /
service provider. If the
amount is not recoverable
from the amount payable,
then the option of
recovering from the bank
guarantee is invoked.
As per the
existing tender
clause only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
85 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
will be liable for
liquidated damage of
Rs.500 per day per
item. Apart from this
1% of the order value
will be levied quarter
wise if 99% SLA is
not met. The amount
of liquidated damage
will be recovered
from bank guarantee
during warranty or
annual maintenance
period as the case
may be.
107 Section VI Schedule of
Requirements (7)
Proforma for
Performance Statement
- Page (140)
Column 8: Has the
goods been supplied
satisfactorily / Has
the equipment been
satisfactorily
functioning? (Attach
It will be a violation of
Non-Disclosure Agreement
being signed with existing
customer will prevent us to
share such Certificates and
details. Request to removed
Satisfactory performance
certificate from the
existing customer is
required as part of
capacity assessment /
qualification /eligibility
As per the
existing tender
clause only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
86 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
a certificate from the
Purchaser/Consignee
the necessity of this
requirement
criteria of the bidder.
General Clarification:
108 For all OEM supported
components. Kindly
mention the period for
which support is required.
Support is required from
the OEM either directly
as a member of JV or
through authorized
partner as member of JV
for the project period is
five years plus one year
support transfer period.
As per the
existing tender
clause only
109 For all OEM supported
components
To ensure the best support
and services to be provided
by the OEM – an OEM
undertaking letter for
support with defined SLAs
to be provided by the
bidder
MFA is applicable. SLA
is as per bid conditions. As per the
existing tender
clause only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
87 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
Request from vendors
1 Section VII General
Conditions of Contract –
Clause (10) – Settlement
of Disputes
10.1The Purchaser
and the Supplier
shall make every
effort to resolve
amicably by direct
informal negotiation
any disagreement or
dispute arising
between them under
or in connection
with the Contract.
10.2 If, after twenty-
eight (28) days, the
parties have failed to
resolve their dispute
or difference by such
mutual consultation,
then either the
Purchaser or the
Supplier may give
Arbitrator shall be
appointed on mutual
agreement of the parties,
No Change As per the
existing tender
clause only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
88 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
notice to the other
party of its intention
to commence
arbitration, as
hereinafter provided,
as to the matter in
dispute, and no
arbitration in respect
of this matter may
be commenced
unless such notice is
given. Any dispute
or difference in
respect of which a
notice of intention to
commence
arbitration has been
given in accordance
with this Clause
shall be finally
settled by
arbitration.
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
89 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
Arbitration may be
commenced prior to
or after delivery of
the Goods under the
Contract. Arbitration
proceedings shall be
conducted in
accordance with the
rules of procedure
specified in the
SCC.
2 Section VIII Special
Conditions of Contract –
GCC 10.2 – Settlement
of Disputes
The dispute
settlement mechanism
to be applied shall be
as follows:
(a) In case of
Dispute or
difference arising
between the
We want deletion of this
provision wherein this right
can be exercised by
President of the Institution
of Engineers,(India).
No Change As per the
existing tender
clause only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
90 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
Purchaser and a
domestic supplier
relating to any
matter arising out
of or connected
with this
agreement, such
disputes or
difference shall
be settled in
accordance with
the Arbitration
and Conciliation
Act, 1996. The
arbitral tribunal
shall consist of 3
arbitrators one
each to be
appointed by the
Purchaser and the
Supplier. The
third Arbitrator
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
91 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
shall be chosen
by the two
Arbitrators so
appointed by the
Parties and shall
act as Presiding
arbitrator. In
case of failure of
the two
arbitrators
appointed by the
parties to reach
upon a consensus
within a period
of 30 days from
the appointment
of the arbitrator
appointed
subsequently, the
Presiding
Arbitrator shall
be appointed by
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
92 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
the President of
the Institution of
Engineers
(India), Chennai.
(b) In the case of a
dispute with a
Foreign Supplier,
the dispute shall
be settled in
accordance with
provisions of
UNCITRAL
(United nations
Commission on
International
Trade Law)
Arbitration
Rules. The
Arbitral Tribunal
shall consist of
three Arbitrators
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
93 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
one each to be
appointed by the
Purchaser and the
Supplier. The
third Arbitrator
shall be chosen
by the two
Arbitrators so
appointed by the
parties, and shall
act as presiding
arbitrator. In
case of failure of
the two
arbitrators
appointed by the
parties to reach
upon a consensus
within a period
of 30 days from
the appointment
of the arbitrator
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
94 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
appointed
subsequently, the
Presiding
Arbitrator shall
be appointed by
the President of
the Institution of
Engineers
(India), Chennai.
(c) If one of the
parties fails to
appoint its
arbitrator in
pursuance of sub-
clause (a) and (b)
above, within 30
days after receipt
of the notice of
the appointment
of its arbitrator
by the other
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
95 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
party, then the
president of the
Institution of
Engineers
(India),Chennai,
both in cases of
the Foreign
supplier as well
as Indian
supplier, shall
appoint the
arbitrator. A
certified copy of
the order of the
President of the
Institution of
Engineers (India)
Chennai. making
such an
appointment
shall be furnished
to each of the
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
96 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
parties.
(d) Arbitration
proceedings shall
be held at
CHENNAI,
Tamilnadu, India,
and the language
of the arbitration
proceedings and
that of all
documents and
communications
between the
parties shall be
English.
(e) The decision of
the majority of
arbitrators shall be
final and binding
upon both parties.
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
97 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
The cost and
expenses of
Arbitration
proceedings will be
paid as determined by
the arbitral tribunal.
However, the
expenses incurred by
each party in
connection with the
preparation,
presentation etc. of its
proceedings as also
the fees and expenses
paid to the arbitrator
appointed by such
party or on its behalf
shall be borne by
each party itself.
(f) Where the
value of the contract
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
98 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
is Rs. 10 million and
below, the disputes or
differences arising
shall be referred to
the Sole Arbitrator.
The Sole Arbitrator
should be appointed
by agreement
between the parties;
failing such
agreement, by the
appointing authority
namely President of
the Institution of
Engineers (India),
Chennai.
3 Section VII General
Conditions of Contract –
Clause (11) – Inspection
and Audit by the Bank
The Supplier shall
permit the Bank
and/or persons
appointed by the
Bank to inspect the
Supplier’s offices
Cost of audit shall always
be borne by Bank.
Written notice shall be
provided before conducting
any Audit.
We request an Audit shall
No Change As per the
existing tender
clause only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
99 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
and/or the accounts
and records of the
Supplier and its sub-
contractors relating to
the performance of
the Contract, and to
have such accounts
and records audited
by auditors appointed
by the Bank if
required by the Bank.
The Supplier’s
attention is drawn to
Clause 3, which
provides, inter alia,
that acts intended to
materially impede the
exercise of the Bank’s
inspection and audit
rights provided for
under Sub-Clause
11.1 constitute a
not be performed more that
once in a calendar year and
each Audit shall not last
more than 2 working days.
We request the auditors
will be required to sign a
confidentiality undertaking
in the format provided by
the Supplier.
The Audit shall not extend
to Supplier’s profit, margin
and cost base in any case.
The Audit rights shall cease
upon termination of this
Agreement.
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
100 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
prohibited practice
subject to contract
termination (as well
as to a determination
of ineligibility under
the Procurement
Guidelines).
4 Section VII General
Conditions of Contract –
Clause (20) –
Confidentiality – Page
(158)
Confidentiality The obligation of
Confidentiality shall
survive for five years after
the date of termination of
this agreement.
No Change As per the
existing tender
clause only
5 Section VII General
Conditions of Contract –
Clause (30) – Limitation
of Liability – Page (165)
Limitation of
Liability
We suggest incorporation
of the Limitation of
liability clause suggested at
the conclusion of this sheet
No Change As per the
existing tender
clause only
6 Section VII General
Conditions of Contract –
Clause (35) –
Termination – Page
(168)
Termination “fails to perform any other
Obligation under the
Contract” shall be replaced
with material breach.
No Change As per the
existing tender
clause only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
101 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
7 Section VII General
Conditions of Contract –
Clause (35.3) –
Termination for
Convenience – Page
(168)
Termination for
Convenience
The notice period in case of
termination for
convenience shall be 90
days. Purchaser hall not be
entitled to exercise the
termination right for
convenience within first
twelve months from the
effective date.
In case any upfront
investment is made by
HCL, termination charges
needs to be paid in case of
termination for
convenience.
Sales and Pricing team to
suggest the amount.
No termination right to
HCL including non -
payment by the Customer.
No Change As per the
existing tender
clause only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
102 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
HCL has no assignment
rights of obligations and
receipt of payments
Vendor has requested to incorporate the following clauses in RFP
1 Legal Clauses to be incorporated while bidding:
Limitation of liability
Notwithstanding anything contrary contained herein or any other document
made part of this agreement, the limitation of liability for direct damages
shall be limited to and not exceed the Charges paid by the Customer under
the relevant Statement of Work under which the liability arises, during the
period of twelve (12) months immediately preceding the month in which the
event giving rise to the claim first occurred. All indirect and consequential
damages, incidental, punitive, exemplary or special Losses; loss of
data/programs, loss of profits or revenue, loss of anticipated savings and loss
of goodwill under this Agreement are excluded even if the loss or damages
was reasonably foreseeable or a Party has been advised of the possibility of
such damages. Except for the warranties and representations expressly stated
herein, Vendor hereby excludes all implied and statutory warranties.
No change
As per the
existing tender
clause only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
103 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
2 IPR clause:
HCL to own its Pre-existing IP, Third Party IP to belong to third party,
Developed IP to belong to Customer (where asked & subject to payment)
• Restriction on use of Pre-existing and third party IP in isolation or as
stand-alone.
• Third party IP shall be subject to third party license terms and
conditions.
• No indemnity for general breach of contract. Standard
indemnification procedure should be included in any contract which
may be entered pursuant to the bid. No worldwide IP indemnity,
specifically for Patents and No IPR indemnity if Customer fails to
follow guidelines and instructions. Right with HCL to replace
infringing version / procure license to use / obligation to refund fee
after deducting usage charges
• Customer IP Indemnity for customer software/material.
No change
As per the
existing tender
clause only
3 Other Clauses
(i) Subcontracting clause- HCL to be able to perform services through its subsidiary and
affiliates Only with prior consent As per the
existing tender
clause only
(ii) No general or implied warranties to be provided. No Change As per the
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
104 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
existing tender
clause only
(iii) Defined Acceptance Test & Criteria and to have Deemed Acceptance clause wherever
necessary. Only defined Acceptance
Test & Criteria and No
Deemed acceptance.
As per the
existing tender
clause only
(iv) Compliance of back to back OEM obligations wherever applicable.
No Change As per the
existing tender
clause only
(v) HCL shall have the reasonable access to all the Onsite facilities As per agreed protocol,
procedures and norms. As per the
existing tender
clause only
(vi) Any penalty/SLA/liquidated damages should be appropriately capped and governed by LOL
clause No change As per the
existing tender
clause only
(vii) Finance team opinion must be taken on all commercials, tax and payment terms. No change As per the
existing tender
clause only
(viii) HCL should have the termination right with prior 30 days written notice on non -payment of
charges by the Customer. Not acceptable and hence
no change in existing
clause
As per the
existing tender
clause only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
105 of 126
S.No Clause No.
of
ITB/GCC/SC
C/ Forms
Existing Clause Gist of the Query Response Reference to Sl.
No.
of Amendment /
Addendum
[Table 2]
wherever
applicable
Remarks
(ix) Right of termination can be granted only if BIDDER commits a material breach and does not
cure the breach within 30 days of receiving notice to this effect. Material breach should due
reason directly attributable to HCL.
No change As per the
existing tender
clause only
(x) We do not recommend a right to termination for convenience by the Customer..The
agreement may be terminated only upon material breach of the obligations by Supplier
which is uncured after a reasonable notice period.
No change As per the
existing tender
clause only
(xi) In case of termination for reasons whatsoever, the Customer shall be obliged to pay all the
payments for the Services/ deliverables delivered up to the effective date of termination. No change As per the
existing tender
clause only
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
106 of 126
Table 2-Amendment / Addendum to Bidding Document
S.
No Section, Clause / Para & Page No Description Existing
Read As
1 Section II – Bidding Data Sheet (D)
Submission and Opening of Bids
ITB 24.1
ITB 24.1
Last date for
submission
The dead line for the
submission of bids is:
Date : 20.09.2013
Time : upto 03.00 pm
The dead line for the
submission of bids is:
Date : 03.10.2013
Time : upto 03.00 pm
2 Section II – Bidding Data Sheet (D)
Submission and Opening of Bids
ITB 27.1
ITB 27.1
Bid Opening date and
time
Bid Opening Date and Time
Date: 20.09.2013
Time: at 03.30 pm
Bid Opening Date and Time
Date: 03.10.2013
Time: at 03.30 pm
3 Section – III Evaluation and
Qualification Criteria (4) Post
Qualification Requirements (ITB
38.2) (A) Manufacturer Bidders
(A) Manufacturer
Bidders
Study, Analysis of total
infrastructure, design of
Integrated Server Architecture
plan, team formulation, Data
Migration and Submission of
Integrated Architecture Rollout
plan
Study, Analysis of total
infrastructure, design of
Integrated Server Architecture
plan, team formulation, Data
Migration and Submission of
Integrated Architecture Rollout
plan.
The bidder / JV member should
submit documentary proof for
having undertaken and
successfully completed atleast
one similar assignment in the
country during the last five
years.
4 Section – III Evaluation and
Qualification Criteria (4) Post
Qualification Requirements (ITB
38.2) (A) Manufacturer Bidders
(A) Manufacturer
Bidders
Deployment of Managed
Services & tools for
monitoring elements like
server, desktops, routers,
Deployment of Managed
Services & tools for monitoring
elements like server, desktops,
routers, switches etc.
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
107 of 126
S.
No Section, Clause / Para & Page No Description Existing
Read As
switches etc The bidder / JV member should
documentary proof for having
undertaken and successfully
completed atleast one similar
assignment in the country
during the last five years.
5 Section VIII Special Conditions of
Contract - GCC 16.1 – Payment
Terms
Payment Terms GCC 16.1—The method and
conditions of payment to be
made to the Supplier under this
Contract shall be as follows:
Payment : (excluding AMC
and Including the project
support transfer and
handholding period) :
(a) 10% mobilization
advance against BG valid
for project implementation
period + 30 days and
adjustable in subsequent
payments due to the
service provider.
(b) 20% amount will be
paid on successful
commissioning of ICT
infrastructure after
GCC 16.1—The method and
conditions of payment to be
made to the Supplier under this
Contract shall be as follows:
Payment : (excluding AMC
and Including the project
support transfer and
handholding period) :
(a) 10% mobilization
advance against BG
valid for project
implementation period +
30 days and adjustable
in subsequent payments
due to the service
provider.
(b) 50% amount will be
paid on successful
commissioning of ICT
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
108 of 126
S.
No Section, Clause / Para & Page No Description Existing
Read As
adjustment of the 10%
advance paid already and
deduction of LD / penalty
if any.
(c) 75% amount will be
divided into 20 equal
installments and will be
paid on quarterly basis
within 30 days from the
date of successful
rendering of services each
quarter with necessary
documents.
(d) Balance 5% of the
contract value will be
retained as Performance
Security for the successful
completion of project
period. Alternatively
irrevocable BG can be
submitted for an equal
amount valid for 39
months.
(e) The CAMC to be
entered and the CAMC
services to be rendered
continuously without any
discontinuance of support
infrastructure after
adjustment of the 10%
advance paid already
and deduction of LD /
penalty if any.
(c) Balance 50% will be
divided into equal
quarterly installments
(i.e. 20 installments for
5 years) and paid on
quarterly basis on
successful rendering of
services against QPC.
(d) Last quarter will be paid
only after entering to
CAMC period and
payment of 5% amount
for performance security
during the CAMC /
support transfer period.
(e) The professional charges
for on-site resources will
be paid on successful
rendering of services
every month within 15
days of the successive
month from the date of
claim along with
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
109 of 126
S.
No Section, Clause / Para & Page No Description Existing
Read As
for 3 years from the date
of completion of warranty
period. For this the
performance guarantee
will be 5% of the CAMC
value.
Payment of local currency
portion shall be made in Indian
Rupee within thirty (30) days
of presentation of claim
supported by a certificate from
the Purchaser declaring that the
Goods have been delivered and
that all other contracted
Services have been performed.
required documents.
(f) The OEM's direct on-
site support charges will
be paid within 15 days
from the date of claim
along with documents
certifying the successful
rendering of services.
(g) The CAMC to be
entered and the CAMC
services to be rendered
continuously without
any discontinuance of
support for one year
from the date of
completion of project
period of five years. For
this the performance
guarantee will be 5% of
the CAMC value
Payment of local currency
portion shall be made in Indian
Rupee within thirty (30) days of
presentation of claim supported
by a certificate from the
Purchaser declaring that the
Goods have been delivered and
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
110 of 126
S.
No Section, Clause / Para & Page No Description Existing
Read As
that all other contracted
Services have been performed.
6 Specifications for Servers and
Storage for HMIS/HMS/MIS,
CMS, and others –Requirement 6 –
Point (10) - Page no (108)
Requirement 6 –
Procurement of new
one Servers for
HMIS/HMS/MIS (1
No.) in Application
Layer - Point (10)
Necessary Installation and
implementation services
should be provided along with
24x7 supports for hardware for
3 years by the vendor.
Necessary Installation and
implementation services should
be provided along with 24x7
supports for hardware for the
entire project period of six (5
+1) years.
7 Specifications for Servers and
Storage for HMIS/HMS/MIS,
CMS, and others –Requirement 6a
– Point (11) - Page no (109)
Requirement 6a -
Procurement of new
two Servers for CMS
(2 Nos.) in
Application Layer -
Point (11)
Necessary Installation and
implementation services
should be provided along with
24x7 supports for hardware for
3 years by the vendor.
Necessary Installation and
implementation services should
be provided along with 24x7
supports for hardware for the
entire project period of six (5
+1) years.
8 Specifications for Servers and
Storage for HMIS/HMS/MIS,
CMS, and others –Requirement 8a
– Point (11) - Page no (113)
Requirement 8a - One
server to be procured
new for Staging in
Database Layer –
Point (11)
Necessary Installation and
implementation services
should be provided along with
24x7 supports for hardware for
3 years by the vendor.
Necessary Installation and
implementation services should
be provided along with 24x7
supports for hardware for the
entire project period of six (5
+1) years.
9 Specifications for Servers and
Storage for HMIS/HMS/MIS,
CMS, and others –Requirement 11
– Point (3) - Page no (115)
Requirement – 11:
One new server for
PGPOOL - staging
purpose - Point (3)
RAM - 64 GB DDR2 ECC–
expandable to 512 GB.
64 GB DDR2 ECC-expandable
to 512 GB or higher.
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
111 of 126
S.
No Section, Clause / Para & Page No Description Existing
Read As
10 Section VI -Schedule of
Requirements (3) Requirement
Specifications for Servers and
Storage for HMIS/HMS/MIS,
CMS, and others –Requirement 18
– Page no (119)
Reuse of the SAN
storage sub system
procured in Phase-1 –
Usable capacity of
existing storages
Nil Usable capacity of existing
storages
TNHSP-6140 Storage(HCL)
Total Capacity 4.464TB
Available Capacity 31.275GB
TNHSP-6580 Storage(Accel)
Total Capacity 42.206TB
Available Capacity 12.991TB
11 Section VI -Schedule of
Requirements (3) Requirement
Specifications for Servers and
Storage for HMIS/HMS/MIS,
CMS, and others –Requirement 18
– Page no (119)
Reuse of the SAN
storage sub system
procured in Phase-1 –
Number of host
connected to existing
storage and number of
host to be connected
to the new storage
Nil Number of hosts connected to
existing storage
TNHSP-6140 Storage(HCL)
4Hosts(DB1,DB2,Report,PGPo
ol)
TNHSP-6580 Storage(Accel)
4Hosts(DB1,DB2,Report,PGPo
ol)
Number of host to be connected
to the new storage 6 (DB1,
DB2, DB3, Report, PGPOOL
(1&2), Backup)
Implementation plans may
change based on Phase III roll
out and stabilization activities.
12 Section VI -Schedule of
Requirements (3) Requirement
Specifications for Servers and
Reuse of the SAN
storage sub system
procured in Phase-1 -
Nil TNHSP-6580 Storage(Accel) -
115K throughput 3000 MB per
sec. IOPS requires for Phase-3
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
112 of 126
S.
No Section, Clause / Para & Page No Description Existing
Read As
Storage for HMIS/HMS/MIS,
CMS, and others –Requirement 18
– Page no (119)
Performance in IOPS
of existing storage and
requirement for new
storage
is 3 times of the Max capability
of the Phase-2 setup. Bidders
should collect the existing
systems IOP during site survey.
13 Section VIII Special Conditions of
Contract – GCC 18.6 – Page No.
(177)
GCC 18.6 In the event of any correction
of defects or replacement of
defective equipment during the
warranty period, the warranty
for the corrected/replaced
equipment shall be extended to
a further period of 12 months.
The performance guarantee for
a proportionate value shall be
extended 60 days over and
above the extended warranty
period.
Deleted
14 Section VIII Special Conditions of
Contract – GCC 42 – Hardware
Maintenance – Page No. (180)
GCC 42 – Hardware
Maintenance
The Supplier will accomplish
preventive and breakdown
maintenance activities to
ensure that all hardware
execute without defect or
interruption for at least 99%
uptime for 24 hours a day, 7
days a week of operation of the
machine worked on a quarterly
basis.
If any critical component of
The Supplier will accomplish
preventive and breakdown
maintenance activities to ensure
that all hardware infrastructure
or software / tools are
maintained and support
executed without defect or
interruption for to maintain at
least 99% uptime for 24 hours a
day, 7 days a week of operation
of the infrastructure
on a quarterly basis. If any
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
113 of 126
S.
No Section, Clause / Para & Page No Description Existing
Read As
the entire configuration is out
of service for more than8
working hours, the Supplier
shall either immediately
replace the defective unit or
replace it at its own cost.
The Supplier will respond to a
site visit and commence repair
work on the equipment within
8 hours of being notified of
equipment malfunction.
critical component of the entire
configuration is out of service
for more than 8 working hours,
the Supplier shall either
immediately replace the
defective spare or the entire unit
to ensure that there is no more
than 8 hours of "out of service".
The Supplier should respond to
a site visit and commence repair
work on the equipment within 8
hours of being notified of
equipment malfunction.
15 Section VI Schedule of
Requirements (3) Requirement
Specification for Servers and
Storage for HMIS/HMS/MIS, CMS
and Others – Requirement 31:
General Requirement
Requirement 31:
General Requirement
NIL The solution (FMS, any
software tools, software
versions, virtualization etc.)
proposed can be of any name,
the only requirement from the
project is that it should meet
our requirements of running
HMIS applications without any
hindrance. The bidder cannot
say that they have provided the
solution and it has its
limitation. The bidder will bear
the responsibility of the
successful functioning of the
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
114 of 126
S.
No Section, Clause / Para & Page No Description Existing
Read As
solution provided or else he has
to change it at his own cost,
until the desired results are
obtained. He should analyze
the current architecture and
work out the requirements.
16 Section VI Schedule of
Requirements (3) Requirement
Specification for Servers and
Storage for HMIS/HMS/MIS, CMS
and Others – Requirement 31:
General Requirement
Requirement 31:
General Requirement
NIL Further the equipment offered
for supply shall be new and of
the most recent series models
incorporating the latest
improvements in design’ (ref.
Page 48 of the bid document).
The new technology should be
compatible with the existing
architecture / Hardware. It
should not affect the current
functioning of the architecture.
The successful bidder shall not
claim that he has provided
what was asked in the spec. He
should analyze the current
architecture and work out the
requirements.
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
115 of 126
S.
No Section, Clause / Para & Page No Description Existing
Read As
17 Section VI Schedule of
Requirements (3) Requirement
Specification for Servers and
Storage for HMIS/HMS/MIS, CMS
and Others – Requirement 31:
General Requirement
Requirement 31:
General Requirement
NIL Backups taken through a bidder
provided backup software
should be in a manner that it
can be used (restored) with
another backup software. The
solution proposed can be of any
name, the only expectation from
the project is that it should meet
our requirements. The bidder
cannot say that they have
provided the solution and it has
its limitation. The bidder will
bear the responsibility of the
successful functioning of the
solution provided or else he has
to change it at his own cost,
until the desired results are
obtained..
18 Section VI Schedule of
Requirements (3) Requirement
Specification for Servers and
Storage for HMIS/HMS/MIS, CMS
and Others – Requirement 31:
General Requirement
Requirement 31:
General Requirement
NIL Any License procured should
not restrict the usage of the
software, after the expiry of
license. The software at that
current state should continue
to function.
19 Section VI Schedule of
Requirements (3) Requirement
Specification for Servers and
RAM RAM - 8 GB Phase –II Web servers -4 No’s to
be upgraded to 16 GB of RAM
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
116 of 126
S.
No Section, Clause / Para & Page No Description Existing
Read As
Storage for HMIS/HMS/MIS, CMS
and Others – Requirement 1: Phase
1 Web Servers 4 Nos. – S.no (3) -
Page No (103)
from 8GB RAM
20 Section IV Bidding Forms – Price
Schedule: Goods Manufactured
Outside the Purchaser Country to
be imported,
Price Schedule: Goods
Manufactured Outside the
Purchaser Country already
imported &
Price Schedule: Goods
Manufactures in the Purchasers
Country – include S.No (14)
Description of Goods Nil Upgrade 4 Web Servers for
HMIS/HMS/MIS (phase1)– 8
GB to 16 GB RAM (Upgrade
from Requirement 1 to
Requirement 2) (as per the specification given in Section VI Schedule of Requirement - Requirement Specification vide Requirement 2 - PHASE III WEB SERVERS FOR
CMS)
21 Section VI Schedule of
Requirements (1) List of Goods and
Delivery Schedule – include S.No
(14)
Description of Goods Nil Upgrade 4 Web Servers for
HMIS/HMS/MIS (phase1)– 8
GB to 16 GB RAM (Upgrade
from Requirement 1 to
Requirement 2) (as per the specification given in Section VI Schedule of Requirement - Requirement Specification vide Requirement 2 - PHASE III WEB SERVERS FOR
CMS) 22 Section IV Bidding Forms – Price
Schedule: Goods Manufactured Description of Goods Nil If Upgradation is not possible
as required in the S.No 14
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
117 of 126
S.
No Section, Clause / Para & Page No Description Existing
Read As
Outside the Purchaser Country to
be imported, Price Schedule: Goods
Manufactured Outside the
Purchaser Country already
imported & Price Schedule: Goods
Manufactures in the Purchasers
Country – include S.No (15)
(newly added in the price
schedule as above), replace all
the 4 Web Servers (by taking
back the 4 non upgradable web
servers) as per the specification
given in Section VI Schedule of Requirement - Requirement Specification vide Requirement 2
23 Section VI Schedule of
Requirements (1) List of Goods and
Delivery Schedule – include S.No
(15)
Description of Goods Nil If Upgradation is not possible
as required in the S.No 14
(newly added in the List of
Goods and Delivery schedule
as above), replace all the 4 Web
(by taking back the 4 non
upgradable web servers)
Servers as per the specification
given in Section VI Schedule of Requirement - Requirement Specification given vide Requirement 2
24 Section IV Bidding Forms – Price
Schedule: Goods Manufactured
Outside the Purchaser Country to
be imported, Price Schedule: Goods
Manufactured Outside the
Purchaser Country already
imported & Price Schedule: Goods
Manufactures in the Purchasers
Country – include S.No (17)
Description of Goods Nil If Upgradation is not possible
as required in the S.No 12 (in
the price schedule), replace all
the 2 Data Base Servers (by
taking back the 2 non
upgradable Data Base servers) as per the specification given in Section VI Schedule of Requirement - Requirement Specification vide Requirement 8
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
118 of 126
S.
No Section, Clause / Para & Page No Description Existing
Read As
25 Section VI Schedule of
Requirements (1) List of Goods and
Delivery Schedule – include S.No
(17)
Description of Goods Nil If Upgradation is not possible
as required in the S.No 12 (in
the List of Goods and
Delivery schedule), replace all
the 2 Data Base Servers (by
taking back the 2 non
upgradable Data Base servers)
as per the specification given in
Section VI Schedule of
Requirement - Requirement
Specification vide Requirement
8
26 Section IV Bidding Forms – Price
Schedule: Goods Manufactured
Outside the Purchaser Country to
be imported, Price Schedule: Goods
Manufactured Outside the
Purchaser Country already
imported & Price Schedule: Goods
Manufactures in the Purchasers
Country – include S.No (18)
Description of Goods Nil If Upgradation is not possible
as required in the S.No 13 (in
the price schedule), replace all
the 2 Application Servers (by
taking back the 2 non
upgradable Application servers) as per the specification given in Section VI Schedule of Requirement - Requirement Specification vide Requirement 6
27 Section VI Schedule of
Requirements (1) List of Goods and
Delivery Schedule – include S.No
(18)
Description of Goods Nil If Upgradation is not possible
as required in the S.No 13 (in
the List of Goods and
Delivery schedule), replace all
the 2 Application Servers (by
taking back the 2 non
upgradable Application servers)
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
119 of 126
S.
No Section, Clause / Para & Page No Description Existing
Read As
as per the specification given in
Section VI Schedule of
Requirement - Requirement
Specification vide Requirement
6
28 Section IV Bidding Forms – Price
Schedule: Goods Manufactured
Outside the Purchaser Country to
be imported, Price Schedule: Goods
Manufactured Outside the
Purchaser Country already
imported & Price Schedule: Goods
Manufactures in the Purchasers
Country – include S.No (16)
Description of Goods Nil Support cost for the following
software sun solaris 10 9/10
(OS), PostgreSQL 9.2.1 (DB),
Slony 2.1.1 (Replication), Glass
Fish 2.1.1 (Application), Web
Server 7.0 (Web server), RHEL
6.0 (OS) and Postgres Plus
Advanced Server 9.1 (Load
Server), the current position
and usage of these softwares
are given in Annexure – I of this
CORRIGENDUM - 2.
29 Section VI Schedule of
Requirements (1) List of Goods and
Delivery Schedule – include S.No
(16)
Description of Goods Nil Support cost for the following
software sun solaris 10 9/10
(OS), PostgreSQL 9.2.1 (DB),
Slony 2.1.1 (Replication), Glass
Fish 2.1.1 (Application), Web
Server 7.0 (Web server), RHEL
6.0 (OS) and Postgres Plus
Advanced Server 9.1 (Load
Server), the current position
and usage of these softwares
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
120 of 126
S.
No Section, Clause / Para & Page No Description Existing
Read As
are given in Annexure – I of this
CORRIGENDUM - 2.
30 Section IV Bidding Forms – Price
Schedule: Goods Manufactured
Outside the Purchaser Country to
be imported, Price Schedule: Goods
Manufactured Outside the
Purchaser Country already
imported & Price Schedule: Goods
Manufactures in the Purchasers
Country – S.No (12)
Description of Goods Upgrade 2 Database Servers
HMIS/HMS/MIS (phase 2) –
4 CPU to 64 CPU and 128
GB to 1 TB RAM (as per the
specification given in Section VI Schedule of Requirement - RequirementSpecification vide Requirement 7)
Upgrade 2 Database Servers
HMIS/HMS/MIS (phase 2) –
16 core SPARC VII CPU to 64
core SPARC VII CPU and 128
GB to 1 TB RAM (as per the
specification given in Section VI Schedule of Requirement - RequirementSpecification vide Requirement 7)
31 Section VI Schedule of
Requirements (1) List of Goods and
Delivery Schedule – S.No (12)
Description of Goods Upgrade 2 Database Servers
HMIS/HMS/MIS (phase 2) –
4 CPU to 64 CPU and 128
GB to 1 TB RAM (as per the
specification given in Section VI Schedule of Requirement - RequirementSpecification vide Requirement 7)
Upgrade 2 Database Servers
HMIS/HMS/MIS (phase 2) –
16 core SPARC VII CPU to 64
core SPARC VII CPU and 128
GB to 1 TB RAM (as per the
specification given in Section VI Schedule of Requirement - RequirementSpecification vide Requirement 7)
32 Section IV Bidding Forms – Price
Schedule: Goods Manufactured
Outside the Purchaser Country to
be imported, Price Schedule: Goods
Manufactured Outside the
Purchaser Country already
imported & Price Schedule: Goods
Manufactures in the Purchasers
Description of Goods SAN – 12 TB RAW (as per the specification given in Section VI Schedule of Requirement - Requirement Specification vide Requirement 19)
SAN – 12 TB RAM (as per the specification given in Section VI Schedule of Requirement - Requirement Specification vide Requirement 19)
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
121 of 126
S.
No Section, Clause / Para & Page No Description Existing
Read As
Country – S.No (7)
33 Section VI Schedule of
Requirements (1) List of Goods and
Delivery Schedule – S.No (7)
Description of Goods SAN – 12 TB RAW (as per the specification given in Section VI Schedule of Requirement - Requirement Specification vide Requirement 19)
SAN – 12 TB RAM (as per the specification given in Section VI Schedule of Requirement - Requirement Specification vide Requirement 19)
34 Section IV Bidding Forms – Price
Schedule: Annual Maintenance and
repair charge after warranty period
for 6th
year – S.No (1)
Item Description Support Cost for the Integrated
Architecture involving all
components and services for
36 items as listed in the
previous two tables for the first
quarter of 6th
year.
Support Cost for the Integrated
Architecture involving all
components and services for 16
items as listed in the Revised
Price Schedule as above + 23
items as listed in the Price and
Completion Schedule –
Important Requirements (i.e.
total 39 (16+23) items) for the
first quarter of 6th
year.
35 Section IV Bidding Forms – Price
Schedule: Annual Maintenance and
repair charge after warranty period
for 6th
year – S.No (2)
Item Description Support Cost for the Integrated
Architecture involving all
components and services for
36 items as listed in the
previous two tables for the
second quarter of 6th
year.
Support Cost for the Integrated
Architecture involving all
components and services for 16
items as listed in the Revised
Price Schedule as above + 23
items as listed in the Price and
Completion Schedule –
Important Requirements (i.e.
total 39 (16+23) items) for the
second quarter of 6th
year.
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
122 of 126
S.
No Section, Clause / Para & Page No Description Existing
Read As
36 Section IV Bidding Forms – Price
Schedule: Annual Maintenance and
repair charge after warranty period
for 6th
year – S.No (3)
Item Description Support Cost for the Integrated
Architecture involving all
components and services for
36 items as listed in the
previous two tables for the
third quarter of 6th
year.
Support Cost for the Integrated
Architecture involving all
components and services for 16
items as listed in the Revised
Price Schedule as above + 23
items as listed in the Price and
Completion Schedule –
Important Requirements (i.e.
total 39 (16+23) items) for the
third quarter of 6th
year.
37 Section IV Bidding Forms – Price
Schedule: Annual Maintenance and
repair charge after warranty period
for 6th
year – S.No (4)
Item Description Support Cost for the Integrated
Architecture involving all
components and services for
36 items as listed in the
previous two tables for the
fourth quarter of 6th
year.
Support Cost for the Integrated
Architecture involving all
components and services for 16
items as listed in the Revised
Price Schedule as above + 23
items as listed in the Price and
Completion Schedule –
Important Requirements (i.e.
total 39 (16+23) items) for the
fourth quarter of 6th
year.
38 Section IV Bidding Forms – Price
Schedule: Goods Manufactured
Outside the Purchaser Country to
be imported, Price Schedule: Goods
Manufactured Outside the
Purchaser Country already
imported , Price Schedule: Goods
Manufactures in the Purchasers
Price Schedule Form Form Page no 62 to 72 (Price
Schedule: Goods
Manufactured Outside the
Purchaser Country to be
imported, Price Schedule:
Goods Manufactured Outside
the Purchaser Country already
imported , Price Schedule:
Deleted
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
123 of 126
S.
No Section, Clause / Para & Page No Description Existing
Read As
Country and Price Schedule:
Annual Maintenance and repair
charge after warranty period for 6th
year
Goods Manufactures in the
Purchasers Country) and From
Page no 82 to 83 (Price
Schedule: Annual Maintenance
and repair charge after
warranty period for 6th
year)
39 Section IV Bidding Forms – Price
Schedule: Goods Manufactured
Outside the Purchaser Country to
be imported, Price Schedule: Goods
Manufactured Outside the
Purchaser Country already
imported , Price Schedule: Goods
Manufactures in the Purchasers
Country and Price Schedule:
Annual Maintenance and repair
charge after warranty period for 6th
year
Revised Price
Schedule Forms
Deleted Bidders are instructed to quote
their offer in the revised price
schedule as per the Annexure
II to this Corrigendum -2
40 Specifications for Servers and
Storage for HMIS/HMS/MIS,
CMS, and others –Requirement 10
– Point (3) - Page no (114)
Requirement – 10:
Two servers for
PGPOOL Load
balancing purpose-
Point (3)
RAM - 64 GB DDR2 ECC–
expandable to 512 GB.
64 GB DDR2 ECC-expandable
to 512 GB or higher.
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
124 of 126
S.
No Section, Clause / Para & Page No Description Existing
Read As
41 Section IV Bidding Forms – Price
Schedule: Goods Manufactured
Outside the Purchaser Country to
be imported, Price Schedule: Goods
Manufactured Outside the
Purchaser Country already
imported & Price Schedule: Goods
Manufactures in the Purchasers
Country – S.No (3)
Description of Goods Database Servers for CMS and
Staging
(as per the specification given
in
Section VI Schedule of
Requirement -
RequirementSpecification vide
Requirement 8& 8a)
Database Servers for CMS
(as per the specification given
in
Section VI Schedule of
Requirement -
Requirement Specification vide
Requirement 8)
42 Section VI Schedule of
Requirements (1) List of Goods and
Delivery Schedule – S.No (3)
Description of Goods Database Servers for CMS and
Staging
(as per the specification given
in
Section VI Schedule of
Requirement -
RequirementSpecification vide
Requirement 8& 8a)
Database Servers for CMS
(as per the specification given
in
Section VI Schedule of
Requirement -
Requirement Specification vide
Requirement 8)
43 Section IV Bidding Forms – Price
Schedule: Goods Manufactured
Outside the Purchaser Country to
be imported, Price Schedule: Goods
Manufactured Outside the
Purchaser Country already
imported & Price Schedule: Goods
Manufactures in the Purchasers
Country – S.No (3a)
Description of Goods Nil Database Servers for Staging
(as per the specification given
in
Section VI Schedule of
Requirement -
Requirement Specification vide
Requirement 8a)
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
125 of 126
S.
No Section, Clause / Para & Page No Description Existing
Read As
44 Section VI Schedule of
Requirements (1) List of Goods and
Delivery Schedule – S.No (3a)
Description of Goods Nil Database Servers for Staging
(as per the specification given
in
Section VI Schedule of
Requirement -
Requirement Specification vide
Requirement 8a)
45 Section IV Bidding Forms – Price
Schedule: Goods Manufactured
Outside the Purchaser Country to
be imported, Price Schedule: Goods
Manufactured Outside the
Purchaser Country already
imported & Price Schedule: Goods
Manufactures in the Purchasers
Country – include in Note
Note Nil The cost of upgradation and
replacement will be considered
equal for evaluation.
Considering the cost quoted for
replacement, the purchaser will
decide to place orders for
replacement (with or without
bidder taking back the non
upgradable servers). For
replacement of servers without
bidder taking back the non
upgradable servers the cost of
new servers quoted in S.No 1, 2
& 3 will be considered as
replacement cost.
ICB No. ELCOT / TNHSP Phase III / ICB / AG68-P3H5 / Server / 2013-14
126 of 126
Load Details
S.No. Applications Number of institutions as
per scope No of expected users Expected Transactions
1 HMS + Speciality
EMR and MIS 49 DME institution ~ 10000 Users 7 Million transactions per day
2 CMS and Website 20 Govt. Medical colleges,
University and DME
~ 3500 Users (includes ~550
+250 Govt and private
institutions covering around 300
+50 courses)
2 Million transactions per day