![Page 1: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/1.jpg)
1
CORRIDOR CITIES TRANSITWAY
Presented to:
Montgomery County RTS Steering Committee
March 25, 2015
![Page 2: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/2.jpg)
Agenda
• Schedule
• Transitway Alignment
• Typical Sections
• Station Architecture
• Operations Planning
2
![Page 3: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/3.jpg)
Schedule
• August 2014 – Draft EA and 15% Design Submittal
• June 2015 – EA Release/Public Hearing
• August 2015 – 30% Design Submittal
• Fall 2015 – FONSI
• Winter 2015/2016 – Initiate design activities
• Winter 2016/2017 – Begin Right-of Way Acquisition/ Permitting/ Agreements
• Spring 2018 – Begin Construction
• 2021 – Begin Service
3
![Page 4: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/4.jpg)
CCT - Phase I and II • 16 mile alignment
• Phase I: Metropolitan Grove to Shady Grove (9 miles)
• Phase II: COMSAT to Metropolitan Grove (7 miles)
4
![Page 5: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/5.jpg)
Transitway Alignment
• Nine miles dedicated right-of-way
• Side running along SHA and Montgomery County roadways
• Median running on Montgomery County and City of Rockville roadways
• Mixed traffic along CCT via Universities of Shady Grove (USG) Service
5
![Page 6: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/6.jpg)
Phase I - Project Map
6
![Page 7: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/7.jpg)
Metropolitan Grove to Muddy
Branch
7
![Page 8: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/8.jpg)
Muddy Branch to I-270
8
![Page 9: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/9.jpg)
I-270 to Shady Grove
9
![Page 10: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/10.jpg)
10
CCT Typical Sections
![Page 11: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/11.jpg)
11
CCT Typical Sections
![Page 12: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/12.jpg)
12
Station Architecture
![Page 13: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/13.jpg)
Process – Prototype
13
• Platforms: 150’ x 18’
• Entrances: Primary and Secondary
• Canopy: 60% Coverage
• Amenities: Ticketing, Benches, etc.
![Page 14: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/14.jpg)
Process – Station Specific
14
Station Areas Station Sites
![Page 15: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/15.jpg)
Process – 6 Station Types
15
Median Center
(5)
Side-Aligned
Center (4)
Side (1)
Aerial (1)
Split-Side (1)
Sidewalk (2)
BASIS OF ARCHITECTURAL
DESIGN:
6 UNIQUE STATION TYPES BASED ON A SINGLE PROTOTYPE
![Page 16: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/16.jpg)
System-wide Architecture
16
Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating an image for the system while also establishing the stations as amenities for the communities they serve.
![Page 17: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/17.jpg)
Conceptual Context
17
![Page 18: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/18.jpg)
Design Development Themes • Weather Protection
• Enclosure
• Safety
• Landscape
MEDIAN STATION
CURRENT HELIX DESIGN OPTION
MEDIAN STATION
PREVIOUS FRAMEWORK DESIGN OPTION
MEDIAN STATION
PREVIOUS HELIX DESIGN OPTION
![Page 19: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/19.jpg)
Median Center
19
Helix • Contextual Influence:
Bioscience
• Helix as Generative Form
• Translucent Canopy
• Tree Structure
– Concrete Column
– Steel Pipe Frame
EAST GAITHER STATION
AERIAL VIEW
EAST GAITHER STATION
PLATFORM VIEW
![Page 20: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/20.jpg)
Side-Aligned Center
20
Helix • Contextual Influence:
Bioscience
• Helix as Generative Form
• Translucent Canopy
• Tree Structure
– Concrete Column
– Steel Pipe Frame
FIRSTFIELD STATION
SIDEWALK VIEW
FIRSTFIELD STATION
PLATFORM VIEW
![Page 21: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/21.jpg)
Side
21
Helix • Contextual Influence:
Bioscience
• Helix as Generative Form
• Translucent Canopy
• Tree Structure
– Concrete Column
– Steel Pipe Frame
DANAC STATION
AERIAL VIEW
DANAC STATION
PLATFORM VIEW
![Page 22: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/22.jpg)
Aerial
22
Helix • Contextual Influence:
Bioscience
• Helix as Generative Form
• Translucent Canopy
• Tree Structure
– Concrete Column
– Steel Pipe Frame
• Community Space
• Vertical Circulation
KENTLANDS STATION
PLAZA LEVEL VIEW
KENTLANDS STATION
PLATFORM LEVEL VIEW
![Page 23: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/23.jpg)
Sidewalk
23
Helix • Contextual Influence:
Bioscience
• Helix as Generative Form
• Translucent Canopy
• Tree Structure
– Concrete Column
– Steel Pipe Frame
USG STATION
AERIAL VIEW
USG STATION
PLATFORM VIEW
![Page 24: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/24.jpg)
Split-Side
24
Helix • Maintain WMATA Focus
• Integrate CCT into existing condition
WMATA STANDARD SITE PLAN
![Page 25: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/25.jpg)
System-wide Architecture
25
Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating an image for the system while also establishing the stations as amenities for the communities they serve.
![Page 26: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/26.jpg)
Operations Planning
26
![Page 27: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/27.jpg)
Operations Planning
• Operations Planning
– Required buses per hour
– Bus fleet size
27
![Page 28: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/28.jpg)
Operations Planning • Step 1 – Final Policy Guidelines
– Vehicle type • 60’ articulated vehicle with 60 seats • Diesel-Electric Hybrid
– Acceptable maximum passenger load • 60 seated/30 standing passengers per vehicle (industry standard)
– Services utilizing transitway • Only CCT branded vehicles
– Two route patterns – CCT Direct and CCT via USG
– No proposed changes to RideOn, WMATA, or local shuttle Networks • Ongoing coordination with agencies
– Elements impacting CCT operations • Fare collection approach • Transit Signal Priority • Vehicle configuration
28
![Page 29: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/29.jpg)
Los Angeles Metro - Orange Line
29
![Page 30: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/30.jpg)
Lane Transit District (Eugene, Oregon) – Emerald Express (EmX) Green Line
30
![Page 31: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/31.jpg)
Operations Planning (cont.)
31
297 328 346
561 583 590
525 493
763
609 580
0
100
200
300
400
500
600
700
800
900
2020 - Station-to-Station Link Passenger Load AM Peak Hour - Inbound
AM Peak SB Passenger Load by Link
![Page 32: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/32.jpg)
Operations Planning (cont.)
32
1,071 1,108
690
590
486
255 266 209
152 103
68
0
200
400
600
800
1,000
1,200
2020 - Station-to-Station Link Passenger Load AM Peak Hour - Outbound
AM Peak NB Passenger Load by Link
![Page 33: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/33.jpg)
Operations Planning (cont.)
• Step 2 – Calculate required # of buses per hour
– Ridership forecast - determine maximum passenger load location and hour
• AM Peak
• Mid-Day
– Maximum load will dictate the required number of buses per hour
33
![Page 34: CORRIDOR CITIES TRANSITWAY...System-wide Architecture 16 Goal: Create a system-wide architectural scheme for stations that symbolizes the premium BRT project that the CCT is by creating](https://reader033.vdocuments.mx/reader033/viewer/2022053005/5f08fcb87e708231d424b019/html5/thumbnails/34.jpg)
Operations Planning (cont.)
• Step 2 – cont.
– Maximum Load – 893
• Northbound between East Gaither and West Gaither
– Required # of Bus Arrivals
• 893/90 passengers (allowable load) = 9.92 = 10 buses on CCT Direct required per hour to meet demand – Frequency = 60/10 = a bus every 6 minutes
34