corridor 4
TRANSCRIPT
-
8/8/2019 Corridor 4
1/15
Shaping the FutureFederal Ministry of Transport, Innovation and Technology
UN-ECE INLAND TRANSPORT COMMITTEE
Working Party on Transport Trends and Economics
Geneva, 2006-09-15
CORRIDORS AND AXES TOWARDS SOUTH-EAST
DI. Dr. Helmut AdelsbergerFederal Ministry of Transport, Innovation und Technology, Vienna, Austria,
Chairman of Pan-European Corridor IV
-
8/8/2019 Corridor 4
2/15
Shaping the FutureFederal Ministry of Transport, Innovation and Technology
CONTENTS
- TEN und Pan-European Corridors
- Pan-European Corridors IV, VII and X
- Pan-European Corridor IV, TEN-T Priority Projectsnos. 7 and 22
- Southeast Axis Austrian proposal and recommendationof HLG II
- Proposal for administration of major transnational axes
-
8/8/2019 Corridor 4
3/15
Shaping the FutureFederal Ministry of Transport, Innovation and Technology
TEN AND PAN-EUROPEAN CORRIDORS (1)
LEGAL BASE OF TEN:- Decision 1692/96/EC (1996)
Annex III: 14 priority projects (Essen 1994)- Decision 884/2004/EC (Revision 2004)
Annex III: 30 priority projects (van Miert 2004)
LEGAL BASE OF PAN-EUROPEAN CORRIDORS:- 2nd Pan-European conference of ministers of transport 1994 (Crete):
Corridors I IX;(Corridor IV = Bypass of former Yugoslavia)
- 3rd Pan-European conference of ministers of transport 1997 (Helsinki):Corridor X
TINA (Transport Infrastructure Needs Assessment; 1996 - 1999):- for preparation of EU enlargement 2004 2007:
Network condensation in addition to Pan-European Corridors(backbone network)=> TEN of new member states
-
8/8/2019 Corridor 4
4/15
Shaping the FutureFederal Ministry of Transport, Innovation and Technology
TEN AND PAN-EUROPEAN CORRIDORS (2)
HIGH LEVEL GROUP I (van Miert):- Definition of priorities in implementation of TEN (within EU):
Basis for Annex III: 30 priority axes(axes and projects, Motorways of the Sea, Galileo)incl. TEN-T priority axes no.7 und no.22 (Corridor IV);
- Horizontal Issues.HIGH LEVEL GROUP II (de Palacio):- Part of EU-neighbourship policy (Wider Europe);- Definition of main transport axes beyond EU-external borders:
- northern axis (Baltic Sea => Russia);- central axis (Central Europe => Ukraine);
- southeastern axis (Central Europe => Balkans, Caucasus, Near East);- southwestern axis: (Western Europe => Maghreb)- extension of Motorways of the Sea;
- Horizontal Issues.
-
8/8/2019 Corridor 4
5/15
Shaping the FutureFederal Ministry of Transport, Innovation and Technology
PAN-EUROPEAN CORRIDORS IV, VII AND X
Corr. IV: Dresden/Nrnberg Prag Wien/Bratislava Budapest Arad Constanta Sofia Istanbul/Thessaloniki;
Corr. VII: Danube (inland waterway);Corr. X: Salzburg Ljubljana/Graz Zagreb/Budapest Belgrad Nis
Sofia/Skopje Thessaloniki/Florina.
Corridors IV, VII und Xcomplementing each other:- spatially,- modally,- functionally.
Therefore:Co-operation!- MoU,- Common position of Chairs,- common meetings
-
8/8/2019 Corridor 4
6/15
-
8/8/2019 Corridor 4
7/15
Shaping the FutureFederal Ministry of Transport, Innovation and Technology
PRIORITY TEN-AXES NO. 7 AND NO. 22
No. 7 No. 22
Road Rail
-
8/8/2019 Corridor 4
8/15
Shaping the FutureFederal Ministry of Transport, Innovation and Technology
TEN-T PRIORITY AXIS NO. 22 CORRIDOR IV
ATHEN
TEN AXIS NO. 22
PRIORITY SECTION
-
8/8/2019 Corridor 4
9/15
Shaping the FutureFederal Ministry of Transport, Innovation and Technology
SITUATION OF CORRIDOR IV IN ROMANIA
- Motorway Oradea Brasov Bukarest,- "Shortcut" Turnu Severin - Calafat
-
8/8/2019 Corridor 4
10/15
Shaping the FutureFederal Ministry of Transport, Innovation and Technology
sts f r infrastructure in este ents al ng rri r I
90,00 illi n 500,00 illi n
900,00 illi n
2.825,63 illi n
52,18 illi n
2.096,14 illi n
340,00 illi n
902,00
illi
n
2.350,00 illi n 2.530,00 illi n
950,00
illi
n
3.900,00 illi n
900,00 illi n
470,00 illi n 400,00 illi n
1.559,30 illi n
600,00 illi n
0,00 million
500,00 million
1.000,00 million
1.500,00 million
2.000,00 million
2.500,00 million
3.000,00 million
3.500,00 million
4.000,00 million
Germa
y Czec
Re
ublic
Austria Sl vakia Hu
ary R ma
ia Bul
aria Greece urkey
Road infrastructure Rail infrastructure
INVESTMENT NEEDS FOR CORRIDOR IV (2005)
-
8/8/2019 Corridor 4
11/15
Shaping the FutureFederal Ministry of Transport, Innovation and Technology
Corridor IV
Corridor VII (Danube)
Corridor X
MoS Motorway of the sea
multimodal node
MoS
MoS
HLG II: AUSTRIAN PROPOSAL FOR SOUTHEAST AXIS (1)
NRNBERG
-
8/8/2019 Corridor 4
12/15
Shaping the FutureFederal Ministry of Transport, Innovation and Technology
HLG II: AUSTRIAN PROPOSAL FOR SOUTHEAST AXIS (2)
Corridors VI, VII and X (plus V, VIII and IX):- Spatial integration => economic, social and political integration
(One quarter of Europe needs more than one corridor!)
Western Balkans is a region- relatively small (hundreds, not thousands of km),
- surrounded by EU member states (present or near future),- with a transport network relevant for intra-EU transport.
Corridors IV, VII and X converge into Southeast Axis:- Corridors IV + VII to be continued from Constanta by MoS
to Black Sea and Caucasian countries;- Corridor IV to be continued from Istanbul to rest of Turkey, Near
East and Caucasian countries, with connection to TRACECA;- Corridor IV and X to be continued from Thessaloniki by MoS
to Near East, Northern Africa, Suez Canal.
Convergence to be understood both- in geographical-spatial and- in operational-administrative sense.
-
8/8/2019 Corridor 4
13/15
Shaping the FutureFederal Ministry of Transport, Innovation and Technology
MAJOR TRANS-NATIONAL AXES (HLG I + II)
TEN-T priority projects
Road
Railway
Inland Waterway
Motorway of the sea
TEN-T network
TEN-T Road
TEN-T Railway
TEN-T Inland waterway
Major multimodal axes:
Trans-national axis
Trans-national axis in the longerterm
Inland waterway axis
Inland waterway axis in the longerterm
Motorway of the sea
-
8/8/2019 Corridor 4
14/15
Shaping the FutureFederal Ministry of Transport, Innovation and Technology
*Chair
RegionalSubgroup
RegionalSubgroup
EC European o issionHLG igh Level Group
N Axis Northern xisC Axis entral xisSE Axis outh-East xisSW Axis outh-West xisMoS Motorways of the eaTS Technical ecretariat
Chair
EC HLG
SCN Axis
TS *SC
C AxisSC
SE AxisSC
SW AxisSC
MoSTS TSTS TS*
MAJOR TRANS-NATIONAL AXES: ADMINISTRATION
(AS PROPOSED BY MOST OF CORRIDORS)
-
8/8/2019 Corridor 4
15/15
Shaping the FutureFederal Ministry of Transport, Innovation and Technology
THANK YOU
FOR YOUR KIND ATTENTION!Helmut Adelsberger
Federal Ministry of Transport, Innovation and Technology,Vienna, Austria