corrected paid summary -section 2

109
Central Engineering Consultancy Bureau Start Ending Quantity As per CS IPC No:#1 IPC No:#2 IPC No:#3 IPC No:#4 IPC No:#5 30+000 30+500 30+500 31+000 31+000 31+500 382.73 31+500 32+000 90.17 32+000 32+500 593.27 32+500 33+000 444.12 33+000 33+500 590.60 33+500 34+000 472.05 34+000 34+500 555.67 34+500 35+000 373.25 35+000 35+500 35+500 36+000 36+000 36+500 36+500 37+000 37+000 37+500 37+500 38+000 38+000 38+500 38+500 39+000 39+000 39+500 39+500 40+000 40+000 40+500 40+500 41+000 41+000 41+500 41+500 42+000 42+000 42+500 42+500 43+000 43+000 43+500 43+500 44+000 44+000 44+500 44+500 45+000 45+000 45+500 45+500 46+000 46+000 46+500 46+500 47+000 47+000 47+500 47+500 48+000 48+000 48+500 48+500 49+000 49+000 49+500 49+500 50+000 570.04 Item:- Clearing And Grubbing (m2) NOTHERN ROADS REHABILITATION PROJECT (CONTRACT PACKAGE NO. RD A/RNIP/PRP1/C1 Employer Engineer Road Development Authority

Upload: -

Post on 03-Jun-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 1/109

Central Engineering Consultancy Bureau

Start Ending

Quantity As

per CS   IPC No:#1 IPC No:#2 IPC No:#3 IPC No:#4 IPC No:#5

30+000 30+50030+500 31+000

31+000 31+500 382.73

31+500 32+000 90.17

32+000 32+500 593.27

32+500 33+000 444.12

33+000 33+500 590.60

33+500 34+000 472.05

34+000 34+500 555.67

34+500 35+000 373.25

35+000 35+500

35+500 36+000

36+000 36+500

36+500 37+000

37+000 37+500

37+500 38+000

38+000 38+500

38+500 39+000

39+000 39+500

39+500 40+000

40+000 40+500

40+500 41+00041+000 41+500

41+500 42+000

42+000 42+500

42+500 43+000

43+000 43+500

43+500 44+000

44+000 44+500

44+500 45+000

45+000 45+500

45+500 46+000

46+000 46+500

46+500 47+000

47+000 47+500

47+500 48+000

48+000 48+500

48+500 49+000

49+000 49+500

49+500 50+000 570.04

Item:- Clearing And Grubbing (m2)

NOTHERN ROADS REHABILITATION PROJECT (CONTRACT PACKAGE NO. RDA/RNIP/PRP1/C1

Employer Engineer

Road Development Authority

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 2/109

50+000 50+500 530.44

50+500 51+000 562.59

51+000 51+500 716.07

51+500 52+000 912.76

52+000 52+500 63.30

52+500 53+000

53+000 53+500

0.00 0.00 382.73 6,474.33 0.00Total

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 3/109

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 4/109

China National Aero-Technology International Engineering Corporation

IPC No:#6 IPC No:#7 IPC No:#8 IPC No:#9 IPC No:#10 IPC No:#11 IPC No:#12 IPC No:#13 IPC No:#14

847.411,774.74

494.93

48.54

487.27 481.02

426.06 1,298.12

572.82 536.71

194.02 1,492.94

2,153.31

1,163.90 349.06

552.21 279.18

1,360.52

633.45

1,574.24

1,565.001,076.70 153.57

1,034.00 168.84

1,123.57 124.84

655.85 481.54

1,362.69

461.50

611.57

605.83

826.82

780.37

626.60

1,176.14

840.70   1,401.48

1,067.10   1,309.00

1,171.30   1,154.41

1)

Contractor

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 5/109

0.00 1,456.80 7,795.92 8,521.22 5,180.93 3,483.93 1,546.97 2,839.60 5,674.48

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 6/109

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 7/109

IPC No:#15 IPC No:#16 IPC No:#17 IPC No:#18 IPC No:#19. IPC No:#20 IPC No:#21 IPC No:#22 IPC No:#23

730.56 74.43632.03

774.60

67.94

495.75

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 8/109

1,225.99

495.75 0.00 730.56 0.00 1,549.00 0.00 0.00 0.00 1,225.99

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 9/109

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 10/109

IPC No:#24 Paid Qty

1,652.40-504.04 1,902.73

715.89 715.89

1,165.02 1,659.95

1,428.46 1,477.00

804.43 804.43

822.68 822.68

741.33 741.33

77.80 77.80

139.50 1,107.79

-29.83 1,694.35

774.60

6.90 1,184.37

-451.03 1,235.93

-863.51 1,289.80

-168.30 1,344.66

244.79 1,076.18

1,360.52

0.00

633.45

1,574.24

1,565.001,230.27

1,202.84

1,248.41

0.00

1,137.39

1,362.69

1,148.60   1,610.10

1,139.12   1,750.69

923.67   1,529.50

1,128.38   1,955.20

1,096.78   1,877.15

994.30   1,620.90

299.66   1,475.80

-381.49   1,860.69

-661.67   1,714.43

-1,020.04   1,801.42

0.00

831.36 831.36

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 11/109

1,907.66 1,907.66

1,749.50 1,749.50

1,447.07 1,447.07

1,806.28 1,806.28

1,225.99

0.00

0.00

16,539.27 57,040.44

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 12/109

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 13/109

Central Engineering Consultancy Bureau

Start Ending

Quantity

As per CS   IPC No:#1 IPC No:#2 IPC No:#3 IPC No:#4 IPC No:#5 IPC No:#630+000 30+500 2.67 112.14

30+500 31+000 17.17 163.16

31+000 31+500 173.50 0.00

31+500 32+000 36.99

32+000 32+500 224.05

32+500 33+000 190.67

33+000 33+500 236.20

33+500 34+000 149.26

34+000 34+500 91.47

34+500 35+000 62.83

35+000 35+500

35+500 36+000

36+000 36+500

36+500 37+000

37+000 37+500

37+500 38+000

38+000 38+500

38+500 39+000

39+000 39+500

39+500 40+000

40+000 40+50040+500 41+000

41+000 41+500

41+500 42+000

42+000 42+500

42+500 43+000

43+000 43+500

43+500 44+000

44+000 44+500

44+500 45+000

45+000 45+500

45+500 46+000

46+000 46+500

46+500 47+000

47+000 47+500

47+500 48+000

48+000 48+500

48+500 49+000

49+000 49+500

Item:-Roadway Excavation Unsuitable Soil (m3)

NOTHERN ROADS REHABILITATION PROJECT (CONTRACT PACKAGE NO. RDA/RNIP/PRP1/C11)

Employer Engineer

Road Development Authority

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 14/109

49+500 50+000 287.04

50+000 50+500 12.30 425.55

50+500 51+000 2.17 444.22

51+000 51+500 99.15 351.41

51+500 52+000 5.63 519.74

52+000 52+500 79.06

52+500 53+00053+000 53+500

0.00 139.09 2,555.82 991.47 0.00 0.00

300.00 41.40 15.30

20.93 20.48 7.56

12.54 8.51 8.15

7.20 50.95

1.50 4.75

3.30 18.67

5.11 17.50

41.24 18.00

0.75

Total

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 15/109

China National Aero-Technology International Engineering Corporation

IPC No:#7 IPC No:#8 IPC No:#9 IPC No:#10 IPC No:#11 IPC No:#12 IPC No:#13 IPC No:#14 IPC No:#152.18

5.96

0.46

19.87

0.41

18.90

21.07

10.21

144.11 16.64

179.14 4.68

122.72 160.45

52.14 165.75

136.25

239.52 102.40

212.55 49.77

280.31

67.17

261.82 74.81 37.40339.51 95.88 48.38

243.08 46.17 32.14

466.31 -95.73 41.17

175.76 94.83

868.18

150.71 116.62

142.84

106.26

122.82

145.98

163.21

124.34

162.51

367.31

262.32

245.71

165.38 131.71

Contractor

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 16/109

23.04

5.19

9.09

11.68

744.41 382.01

0.00 1,808.83 1,063.90 1,192.01 971.55 1,453.58 596.04 1,107.89 131.71

2.76 5.40 11.43 13.20 4.40 3.55 25.48

8.29 13.32 1.53 10.08 10.48 4.96 42.58

4.14 8.04 10.17 10.82 4.52 1.56

9.57 10.26 22.26 2.66 13.58 70.81

0.92 4.48 18.00 5.55 11.90 2.10

6.18 28.09 14.40 2.18

1.00 3.90 4.10

8.88 3.15

6.13 2.40

25.08 5.70

1.08 2.34

9.75 5.70

4.05 2.90

7.92 8.78

5.20 30.40

10.94 4.80

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 17/109

IPC No:#16 IPC No:#17 IPC No:#18 IPC No:#19 IPC No:#20 IPC No:#21 IPC No:#22 IPC No:#23 IPC No:#2474.72 8.38

13.58

82.10

1,427.50

4.45

74.65

125.78

139.72

164.29

127.60

154.68

-3.30

-16.48

-35.52

-72.73

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 18/109

-1,126.42

0.00 74.72 0.00 1,536.01 0.00 0.00 0.00 -1,126.42 658.69

10.36 30.19 51.45

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 19/109

Total200.09 3.84

199.87 5.85

173.96 9.07

56.86 9.86

224.46 9.37

190.67 10.75

255.10 11.1

170.33 10.41

101.68 10.9

223.58 10.28

265.92 82.10 qty have to deduct from maga

1,427.50 256.52 10.62

287.62

217.89 102.05

136.25

341.92

262.32

280.31

0.00 0.00

67.17

374.03483.77

321.39

411.75

270.59

868.18

267.33

142.84

180.91

248.60

285.70

327.50

251.94

317.19

364.01

245.84

210.19

224.36

0.00

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 20/109

310.08

443.04

455.48

462.24

525.37

79.06

0.00 0.000.00 0.00

0.00

13,154.89

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 21/109

Central Engineering Consultancy Bureau

Start Ending

Quantity

As per CS   IPC No:#1 IPC No:#2 IPC No:#3 IPC No:#4 IPC No:#5 IPC No:#6

30+000 30+500 43.80 0.3030+500 31+000 7.60 -2.29

31+000 31+500 67.69

31+500 32+000 0.34

32+000 32+500 22.83

32+500 33+000 81.16

33+000 33+500 26.08

33+500 34+000 33.13

34+000 34+500 22.75

34+500 35+000 20.69

35+000 35+500

35+500 36+000

36+000 36+500

36+500 37+000

37+000 37+500

37+500 38+000

38+000 38+500

38+500 39+000

39+000 39+500

39+500 40+000

40+000 40+500

40+500 41+00041+000 41+500

41+500 42+000

42+000 42+500

42+500 43+000

43+000 43+500

43+500 44+000

44+000 44+500

44+500 45+000

45+000 45+500

45+500 46+000

46+000 46+500

46+500 47+000

47+000 47+500

47+500 48+000

48+000 48+500

48+500 49+000

49+000 49+500

49+500 50+000

Item:- Road excavation, subgrade replacement (m3)

Employer Engineer

Road Development Authority

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 22/109

50+000 50+500 16.40 -0.42

50+500 51+000 7.30 0.08

51+000 51+500 7.50 0.33

51+500 52+000 35.40 -1.45

52+000 52+500 6.20 0.00

52+500 53+000

53+000 53+500

0.00 124.20 -3.45 274.66 0.00 0.00Total

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 23/109

China National Aero-Technology International Engineering Corporation

IPC No:#7 IPC No:#8 IPC No:#9 IPC No:#10 IPC No:#11 IPC No:#12 IPC No:#13 IPC No:#14 IPC No:#15

Contractor

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 24/109

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 25/109

IPC No:#16 IPC No:#17 IPC No:#18 IPC No:#19 IPC No:#20 IPC No:#21 IPC No:#22 IPC No:#23 IPC No:#24

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 26/109

1,512.53

0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,512.53 0.00

241.78 558.82 1,829.04 437.15

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 27/109

Total

44.105.31

67.69

0.34

22.83

81.16

26.08

33.13

22.75

20.69

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 28/109

15.98

7.38

7.83

33.95

1,518.73

0.00

0.00

1,907.94

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 29/109

Central Engineering Consultancy

Start Ending

Quantity

As per CS   IPC No:#1 IPC No:#2 IPC No:#3 IPC No:#4 IPC No:#5 IPC No:#630+000 30+500 747.86

30+500 31+000 1,064.66

31+000 31+500 1,138.22

31+500 32+000 202.18

32+000 32+500 1,501.75

32+500 33+000 1,271.35

33+000 33+500 1,574.72

33+500 34+000 1,036.26

34+000 34+500 592.60

34+500 35+000 375.89

35+000 35+500

35+500 36+000

36+000 36+500

36+500 37+000

37+000 37+500

37+500 38+000

38+000 38+500

38+500 39+000

39+000 39+500

39+500 40+000

40+000 40+50040+500 41+000

41+000 41+500

41+500 42+000

42+000 42+500

42+500 43+000

43+000 43+500

43+500 44+000

44+000 44+500

44+500 45+000

45+000 45+500

45+500 46+000

46+000 46+500

46+500 47+000

47+000 47+500

47+500 48+000

48+000 48+500

48+500 49+000

49+000 49+500

Item:-Prepare Subgrade in Cut Areas (m2)

NOTHERN ROADS REHABILITATION PROJECT (CONTRACT PACKAGE

Employer Engineer

Road Development Authority

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 30/109

49+500 50+000 1,920.08

50+000 50+500 1,221.02 1,609.43

50+500 51+000 2,046.86 818.19

51+000 51+500 1,028.79 1,411.25

51+500 52+000 1,762.40 1,739.11

52+000 52+500 179.20 335.23

52+500 53+00053+000 53+500

0.00 6,238.26 10,784.03 6,554.75 0.00 0.00Total

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 31/109

 Bureau China National Aero-Technology International Engineering Corporation

IPC No:#7 IPC No:#8 IPC No:#9 IPC No:#10 IPC No:#11 IPC No:#12 IPC No:#13 IPC No:#14 IPC No:#158.56

33.64

1.40

734.77 104.43

83.45 2.70

100.94

124.48

50.80

514.04 239.80

345.84 242.60 612.84

238.40 1,186.93

118.65 853.75

793.75

794.35 474.77

744.46 172.28

1,190.58

378.57

1,003.76 430.181,013.35 460.33

1,092.50 282.24

1,139.30 264.42

1,272.19 141.35

740.15

363.67

729.18

466.63

554.33

717.48

732.16

573.29

655.68

1,365.54

402.30   1,072.98

302.40   982.70

288.90   1,011.40 467.69

 NO. RDA/RNIP/PRP1/C11)

Contractor

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 32/109

120.60

26.64

47.40

33.10

1,678.10 4,848.56 5,880.57 4,443.11 2,455.71 1,637.08 2,678.60 4,811.19 467.69

4,848.56

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 33/109

IPC No:#16 IPC No:#17 IPC No:#18 IPC No:#19 IPC No:#20 IPC No:#21 IPC No:#22 IPC No:#23 IPC No:#24382.96 28.93

86.58

90.00

5,357.30

29.53

560.36

959.08

705.84

718.14

604.74

652.21

-369.79

-302.34

-654.86

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 34/109

1,416.00

0.00 382.96 0.00 5,592.34 0.00 0.00 0.00 1,416.00 2,873.38

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 35/109

Total1,168.31

1,184.88

1,139.62

1,041.38

1,587.90

1,271.35

1,675.66

1,160.74

643.40

1,129.73

1,291.28 90 qty should be deducted deduct from maga

5,357.30

1,454.86 1,201.28

972.40 -84.88

793.75

1,269.12

916.74

1,190.58

0.00

378.57

1,433.941,473.68

1,374.74

1,403.72

1,413.54

740.15

363.67

729.18

1,026.99

1,513.41

1,423.32

1,450.30

1,178.03

1,307.89

1,365.54

1,105.49

982.76

1,113.13

0.00

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 36/109

2,040.68

2,857.09

2,912.44

2,473.14

3,501.51

1,930.43

0.000.00

62,742.34

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 37/109

Central Engineering Consultancy Bureau

Start Ending

Quantity

As per CS   IPC No:#1 IPC No:#2 IPC No:#3 IPC No:#4 IPC No:#5 IPC No:#630+000 30+500 274.35

30+500 31+000 520.39

31+000 31+500 382.73

31+500 32+000 76.65

32+000 32+500 504.29

32+500 33+000 377.57

33+000 33+500 501.94

33+500 34+000 401.24

34+000 34+500 472.32

34+500 35+000 317.26

35+000 35+500

35+500 36+000

36+000 36+500

36+500 37+000

37+000 37+500

37+500 38+000

38+000 38+500

38+500 39+000

39+000 39+500

39+500 40+000

40+000 40+50040+500 41+000

41+000 41+500

41+500 42+000

42+000 42+500

42+500 43+000

43+000 43+500

43+500 44+000

44+000 44+500

44+500 45+000

45+000 45+500

45+500 46+000

46+000 46+500

46+500 47+000

47+000 47+500

47+500 48+000

48+000 48+500

48+500 49+000

49+000 49+500

Item:- Trim, Level and Compact Road Bed (m2)

Employer Engineer

Road Development Authority

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 38/109

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 39/109

China National Aero-Technology International Engineering Corporation

IPC No:#7 IPC No:#8 IPC No:#9 IPC No:#10 IPC No:#11 IPC No:#12 IPC No:#13 IPC No:#14 IPC No:#15

595.80

141.28

75.54

79.24

71.23

83.35

650.35 373.93

501.25 1,222.93

572.82 536.71

194.02 1,389.94

2,256.31

1,163.90 209.44

552.21 279.18

1,327.36

633.45

1,574.241,565.00

1,048.68 58.56 123.03

1,062.02 20.54 120.28

1,123.57 120.19

590.27 544.13

1,358.59

519.19

764.46

605.83

826.82

780.37

626.60

1,171.63

1,296.00   1,386.22

900.00   1,301.24

900.00   1,149.04 493.01

Contractor

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 40/109

2,198.04 7,613.64 5,899.07 4,888.94 3,509.26 1,856.59 2,839.60 5,641.58 493.01

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 41/109

IPC No:#16 IPC No:#17 IPC No:#18 IPC No:#19 IPC No:#20 IPC No:#21 IPC No:#22 IPC No:#23 IPC No:#24747.04 186.76

779.46   745.31

766.21

1,070.85

1,405.82

786.00

783.62

702.37

464.95

248.74

-67.23

773.20   0.00

67.49   2.65

-364.07

-921.35

-396.46

232.78

1,086.01

983.21

913.33

1,091.58

1,078.75

990.20

299.99

-833.72

-496.18

-778.73

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 42/109

706.25

725.77

614.80

601.95

932.64

0.00 747.04 0.00 1,806.91 0.00 0.00 0.00 0.00 13,376.04

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 43/109

Total1,208.15 (659.45) 

2,045.16 (1,004.38) 

1,148.94 (383.48) 

1,743.30

2,051.39

1,239.11

1,364.80

1,174.84 (1,190.39) 

1,020.62 (1,005.46) 

1,590.28 (1,534.29) 

1,656.95

773.20

1,179.67

1,219.89

1,334.96

976.88

1,064.17

1,327.36

0.00

633.45

1,574.241,565.00

1,230.27 (1,258.07) 

1,202.84 (1,175.04) 

1,243.76

0.00 - 

1,134.40

1,358.59

1,605.20

1,747.67

1,519.16

1,918.40

1,859.12

1,616.80

1,471.62

1,848.50 (552.50) 

1,705.06 (805.06) 

1,763.32 (863.32) 

0.00 - 

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 44/109

1,395.06 (17.44) 

1,414.57 (2,424.60) 

1,327.41 (2,301.04) 

1,323.50 (2,150.00) 

2,008.21 (2,675.92) 

171.46 (324.62) 

0.00 - 0.00 - 

58,757.28

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 45/109

Central Engineering C

Start Ending

Quantity

As per CS   IPC No:#1 IPC No:#2 IPC No:#3 IPC No:#4 IPC No:#5 IPC No:#630+000 30+500 258.30 0.94

30+500 31+000 1,200.00 -388.91

31+000 31+500 457.55

31+500 32+000 58.45

32+000 32+500 635.27 596.90

32+500 33+000 361.68   1.58   83.91

33+000 33+500 482.93

33+500 34+000 482.52   54.92   56.06

34+000 34+500 508.83

34+500 35+000 256.71   70.39   194.87

35+000 35+500

35+500 36+000

36+000 36+500

36+500 37+000

37+000 37+500

37+500 38+000

38+000 38+500

38+500 39+000

39+000 39+500

39+500 40+000

40+000 40+50040+500 41+000

41+000 41+500

41+500 42+000

42+000 42+500

42+500 43+000

43+000 43+500

43+500 44+000

44+000 44+500

44+500 45+000

45+000 45+500

45+500 46+000

46+000 46+500

46+500 47+000

47+000 47+500

47+500 48+000

48+000 48+500

48+500 49+000

49+000 49+500

Item:-Embankment Construction,Type 01 (m3)

Employer

Road Development Authority

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 46/109

49+500 50+000 849.80

50+000 50+500 1,240.60 26.07

50+500 51+000 1,309.50 -13.02

51+000 51+500 1,163.60 3.76

51+500 52+000 1,287.00 48.84

52+000 52+500 311.93

52+500 53+00053+000 53+500

0.00 6,459.00 3,541.97 126.89 0.00 1,473.12

12.30 150.00   7.56

2.17 13.95   8.15

94.50 12.54   15.30

1.59 4.80

3.06 1.50

6.78 3.30

10.39 5.11

2.66

Total

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 47/109

  nsultancy Bureau China National Aero-Technology International Engineering Corpor

IPC No:#7 IPC No:#8 IPC No:#9 IPC No:#10 IPC No:#11 IPC No:#12 IPC No:#13 IPC No:#14 IPC No:#1567.85 1.52

841.48 5.84

10.79 -7.76 0.46

963.16 806.16 19.87

947.37 0.41

95.26

625.25 15.23

124.04 21.29

-7.91 12.82

471.65 -157.80 12.20

269.16 842.13 4.62

23.48

539.97 140.13

646.26 161.56

721.30 24.00 218.76

114.25 171.40 86.29

252.22 314.65

599.96

517.70

557.10 159.17550.57 154.43

619.00 111.00

554.67 4.67

658.40 351.15 45.73

318.42

382.64 180.19 121.58

580.74 348.44

274.22

344.25

396.13

422.25

423.70

378.43

415.60

456.92

416.46

345.30

NOTHERN ROADS REHABILITATION PROJECT (CONTRACT PACKAGE NO. RDA/RNIP/PRP1

Engineer

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 48/109

12.14

4.83

7.37

5.86

1,714.76 6,457.41 2,421.94 1,665.71 760.93 2,960.99 1,984.66 2,151.98 0.00

2.76 5.40 11.43 10.08 4.40 3.55 25.48

8.29 13.32 1.53 10.17 10.48 4.96 42.58

4.14 10.26 22.26 3.90 4.52 1.56

9.57 4.48 18.00 5.55 13.58 70.81

6.13 8.04 13.20 2.66 2.70

8.88   2.24   10.82 11.90

25.08   9.00

1.00   5.40

1.08   4.86

4.05   5.13

5.20   4.32

7.92   4.90

28.79   5.46

10.80

3.78

5.67

4.863.60

4.25

3.68

3.15

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 49/109

ation

IPC No:#16 IPC No:#17 IPC No:#18 IPC No:#19 IPC No:#20 IPC No:#21 IPC No:#22 IPC No:#23 IPC No:#24596.88 93.08 1.20

302.15 185.83

13.43 2.37

1,227.24 295.56 85.23

43.57 9.33

159.21 159.21

896.88

1,160.97

536.87

570.80

563.05

548.37

48.85 116.90 372.54

162.53 279.30

153.09 367.20

999.10

C11)

Contractor

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 50/109

1,393.26 597.12

0.00 596.88 159.21 1,679.47 1,830.04 1,035.66 920.91 5,161.83 597.12

10.36 30.19 48.83 11.12 826.94 35.78

6.66 7.71 36.57

10.15 17.58 91.39

9.7 0.92

61.53

93.78

100.85

7.99

15.09

50.58

11.89

51.45

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 51/109

 

Total1,019.77

2,146.39

461.04

1,847.64

2,179.95

542.43

1,123.41

738.83

513.74

848.02

1,131.71 15.80 should be deducted from maga 26.64

1,631.51 28.45

733.00 1,115.91 29.71

807.82 -21.78 26.88

964.06

371.94 111.68

566.87 145.03

599.96 256.71

0.00

517.70

716.27705.00

730.00

559.34

1,055.28

636.84

684.41

929.18

1,171.10

1,505.22

933.00

993.05

986.75

926.80

953.89

898.75

936.75

1,344.40

0.00

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 52/109

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 53/109

Central En

Start Ending

Quantity

As per CS   IPC No:#1 IPC No:#2 IPC No:#3 IPC No:#4 IPC No:#5 IPC No:#6

30+000 30+500 258.3030+500 31+000 1,200.00

31+000 31+500

31+500 32+000 0.96

32+000 32+500 731.94

32+500 33+000 3.20

33+000 33+500 148.82

33+500 34+000 47.58

34+000 34+500 1.86

34+500 35+000

35+000 35+500

35+500 36+000

36+000 36+500

36+500 37+000

37+000 37+500

37+500 38+000

38+000 38+500

38+500 39+000

39+000 39+500

39+500 40+000

40+000 40+500

40+500 41+00041+000 41+500

41+500 42+000

42+000 42+500

42+500 43+000

43+000 43+500

43+500 44+000

44+000 44+500

44+500 45+000

45+000 45+500

45+500 46+000

46+000 46+500

46+500 47+000

47+000 47+500

47+500 48+000

48+000 48+500

48+500 49+000

49+000 49+500

49+500 50+000 257.17

Item:-Embankment Construction,Type 02 (m3)

Employer

Road Development Authority

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 54/109

50+000 50+500 751.00 33.34

50+500 51+000 572.30 -4.82

51+000 51+500 352.30 -0.96

51+500 52+000 1,059.80 281.68

52+000 52+500 154.21

52+500 53+000

53+000 53+500

0.00 4,193.70 0.00 1,654.98 0.00 0.00

3.17

50.95

150.00

6.98

2.40

Total

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 55/109

  ineering Consultancy Bureau China National Aero-Technology International Enginee

IPC No:#7 IPC No:#8 IPC No:#9 IPC No:#10 IPC No:#11 IPC No:#12 IPC No:#13 IPC No:#14 IPC No:#15

250.28

28.36

74.01

321.35 155.28

27.70

39.89

116.13

43.44 25.28

47.08

37.05

72.61

63.3046.99

32.78

187.49 24.28

350.68

19.50

78.28

12.83

76.14

59.30

144.61

125.18

45.04

11.46

133.26

36.90

6.44

NOTHERN ROADS REHABILITATION PROJECT (CONTRACT PACKAGE NO. RDA/RNIP/PRP1/

Engineer

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 56/109

226.80 1,027.97

395.36 370.96 227.16 433.79 1,106.25 88.97 749.08 576.11 0.00

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 57/109

ring Corporation

IPC No:#16 IPC No:#17 IPC No:#18 IPC No:#19 IPC No:#20 IPC No:#21 IPC No:#22  IPC No:#23  IPC No:#24

-169.1079.95

144.30

58.66

263.02 263.02

183.97

228.68

102.20

209.99

175.12

90.56

7.54

124.74

62.20

273.96

11)

Contractor

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 58/109

-1,056.66

0.00 0.00 263.02 113.81 731.46 0.00 265.68   -331.82   0.00

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 59/109

Total

89.201,279.95

0.00

251.24

760.30

3.20

148.82

47.58

1.86

74.01

476.63

144.30

86.36

39.89

116.13

0.00

68.72

47.08

0.00

37.05

72.61

63.3046.99

32.78

211.77

876.72

19.50

78.28

196.80

304.82

161.50

354.60

300.30

135.60

19.00

258.00

99.10

280.40

0.00

257.17

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 60/109

784.34

567.48

351.34

1,341.48

352.32

0.00

0.00

10,838.52

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 61/109

Start Ending

Quantity

As per CS   IPC No:#1 IPC No:#2 IPC No:#3 IPC No:#4 IPC No:#5 IPC No:#6

30+000 30+500 73.9530+500 31+000 6.67

31+000 31+500 192.86

31+500 32+000

32+000 32+500

32+500 33+000

33+000 33+500

33+500 34+000 95.59

34+000 34+500 67.89

34+500 35+000

35+000 35+500

35+500 36+000

36+000 36+500

36+500 37+000

37+000 37+500

37+500 38+000

38+000 38+500

38+500 39+000

39+000 39+500

39+500 40+000

40+000 40+500

40+500 41+00041+000 41+500

41+500 42+000

42+000 42+500

42+500 43+000

43+000 43+500

43+500 44+000

44+000 44+500

44+500 45+000

45+000 45+500

45+500 46+000

46+000 46+500

46+500 47+000

47+000 47+500

47+500 48+000

48+000 48+500

48+500 49+000

49+000 49+500

49+500 50+000 435.70 435.70

Item:-Sub Base as Compacted in Position (m3)

Employer

Road Development Authority

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 62/109

50+000 50+500 1,060.30 31.36

50+500 51+000 1,097.60 -5.03

51+000 51+500 1,094.40 20.98

51+500 52+000 1,031.01

52+000 52+500

52+500 53+000

53+000 53+500

0.00 3,252.30 1,514.02 436.96 0.00 435.70

Total

Total

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 63/109

Central Engineering Consultancy China National Aero-Technology

IPC No:#7 IPC No:#8 IPC No:#9 IPC No:#10 IPC No:#11 IPC No:#12 IPC No:#13 IPC No:#14 IPC No:#15

133.74623.31 -171.16

385.72 531.73 -177.98

224.66 454.12 170.55

170.23 1,015.25 276.00

640.17 183.55 91.31

261.19 69.91 360.86

305.86 265.00 90.76 -89.35 183.62

217.24 481.75 94.32 52.62

668.75 149.59 51.31 100.68

369.64 371.08 90.99

6.28 735.91 81.77

425.40 202.49 300.79

337.20 652.56

10.90

NOTHERN ROADS REHABILITATION PROJECT (CONTRACT PACKAGE NO. RDA/RNIP

Engineer

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 64/109

0.36

1.72

5.82

908.82 1,785.14 3,315.86 1,480.54 2,243.65 640.38 1,035.12 0.00 0.00

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 65/109

 International Engineering Corporation

IPC No:#16 IPC No:#17 IPC No:#18 IPC No:#19 IPC No:#20 IPC No:#21 IPC No:#22 IPC No:#23 IPC No:#24

501.76 104.7395.35

262.97

113.92

90.99 60.00

1,519.70 313.90

9.92 9.92

703.30   179.30

922.29

1,040.15

914.30

867.25

818.95

80.15 96.40   602.15

522.50 288.37

506.10 291.00

477.90 348.02

54.33

/PRP1/C11)

Contractor

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 66/109

416.29

0.00 501.76 376.89 291.07 3,176.27 1,347.61 1,421.10 3,579.33 1,517.88

5.63

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 67/109

Total

814.18554.17

932.33

849.33

1,461.48

915.03

954.93

851.48

1,027.74

970.33

982.70 60 Qty should be deducted from maga

1,833.60

843.80

928.68 770.4

989.76

0.00 - 

0.00 - 

0.00 - 

0.00 - 

0.00 - 

0.00 - 

0.00 - 0.00 - 

0.00 - 

0.00 - 

0.00 - 

0.00 - 

0.00 - 

882.60

922.29

1,040.15

914.30

867.25

818.95

778.70

810.87

797.10

825.92

54.33

882.30

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 68/109

1,092.02

1,094.29

1,121.20

1,031.01

416.29

0.00

0.00

29,259.11

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 69/109

34.48

34.13

33.87

34.09

30.51

31.75

34.79

32.36 279.202

31.78 86.06

32.97 218.87

34.44

33.69

398.86

279.202

35.05

33.88

33.2830.91

34.49

37.81

37.77

243.19

218.871

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 70/109

Central Engineering Consultancy

Start Ending

Quantity

As per CS   IPC No:#1 IPC No:#2 IPC No:#3 IPC No:#4 IPC No:#5 IPC No:#630+000 30+500

30+500 31+000

31+000 31+500

31+500 32+000

32+000 32+500

32+500 33+000

33+000 33+500

33+500 34+000

34+000 34+500

34+500 35+000

35+000 35+500

35+500 36+000

36+000 36+500

36+500 37+000

37+000 37+500

37+500 38+000

38+000 38+500

38+500 39+000

39+000 39+500

39+500 40+000

40+000 40+50040+500 41+000

41+000 41+500

41+500 42+000

42+000 42+500

42+500 43+000

43+000 43+500

43+500 44+000

44+000 44+500

44+500 45+000

45+000 45+500

45+500 46+000

46+000 46+500

46+500 47+000

47+000 47+500

47+500 48+000

48+000 48+500

48+500 49+000

49+000 49+500

CONTRACT PACKAGE NO. RDA/NRRP/CGF/C1A

NOTHERN ROADS REHABILITATION PROJECT (CONTRACT PACKAGE N

Employer Engineer

Road Development Authority

Item:- Dense Graded Aggregate Base (m3)

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 71/109

49+500 50+000 197.85

50+000 50+500

50+500 51+000

51+000 51+500

51+500 52+000

52+000 52+500

52+500 53+00053+000 53+500

0.00 0.00 0.00 0.00 0.00 197.85Total

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 72/109

 Bureau China National Aero-Technology International Engineering Corporation

IPC No:#7 IPC No:#8 IPC No:#9 IPC No:#10 IPC No:#11 IPC No:#12 IPC No:#13 IPC No:#14 IPC No:#15

163.52 259.12

346.00 346.00

550.28 138.40

89.96 596.09

110.72 510.14

  O. RDA/RNIP/PRP1/C11)

Contractor

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 73/109

130.93 200.62 113.81 -20.65

73.54 435.75 81.85 67.07 86.05

453.95 33.19 251.14

439.04 193.87 96.49

179.97 348.46 127.77

204.47 636.37 649.61 882.79 0.00 870.54 829.38 1,096.96 1,244.63

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 74/109

IPC No:#16 IPC No:#17 IPC No:#18 IPC No:#19 IPC No:#20 IPC No:#21 IPC No:#22 IPC No:#23 IPC No:#24647.00

330.73

62.19

365.11 16.58 280.70 175.25 -13.36

41.46 162.44 140.13 346.97 65.03

116.09 284.69 55.28 239.94

207.30 241.85 242.85

207.30 249.21 269.49

1,213.90

14.77

364.00

583.70

243.10

552.50

455.00   175.50   404.40

453.25   194.25   95.00

418.60 228.90   17.00

455.00 192.50

97.54

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 75/109

543.39 58.04 369.74 772.69 0.00 1,244.26 2,880.93 2,982.62 2,041.47

9.84

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 76/109

Total647.00

753.37

692.00

688.68

686.05

683.05

824.28 22.16

756.03

696.00 691.00

692.00

726.00 35 m3 we should deduct from maga

1,213.90

14.77

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

364.00

583.70

243.10

552.50

1,034.90

742.50

664.50

647.50

97.54

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 77/109

622.56

744.26

738.28

729.40

656.20

0.00

0.000.00

17,494.07

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 78/109

Start Ending

Quantity

As per CS   IPC No:#1 IPC No:#2 IPC No:#3 IPC No:#4 IPC No:#5 IPC No:#6

30+000 30+50030+500 31+000

31+000 31+500

31+500 32+000

32+000 32+500

32+500 33+000

33+000 33+500

33+500 34+000

34+000 34+500

34+500 35+000

35+000 35+500

35+500 36+000

36+000 36+500

36+500 37+000

37+000 37+500

37+500 38+000

38+000 38+500

38+500 39+000

39+000 39+500

39+500 40+000

40+000 40+500

40+500 41+00041+000 41+500

41+500 42+000

42+000 42+500

42+500 43+000

43+000 43+500

43+500 44+000

44+000 44+500

44+500 45+000

45+000 45+500

45+500 46+000

46+000 46+500

46+500 47+000

47+000 47+500

47+500 48+000

48+000 48+500

48+500 49+000

49+000 49+500

49+500 50+000 95.1

Item:-Shoulder material

Employer

Road Development Authority

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 79/109

50+000 50+500 83.25

50+500 51+000 28.27

51+000 51+500

51+500 52+000

52+000 52+500

52+500 53+000

53+000 53+500

0.00 0.00 0.00 0.00 0.00 206.62Total

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 80/109

Central Engineering Consultancy Bureau China National Aero-Technology

IPC No:#7 IPC No:#8 IPC No:#9 IPC No:#10 IPC No:#11 IPC No:#12 IPC No:#13 IPC No:#14 IPC No:#15

75.362

156.29

97.15 21.12

88

88

35.2

17.60 21.12

17.60 79.2

105.6

38.02

NOTHERN ROADS REHABILITATION PROJECT (CONTRACT PACKAGE NO. RDA/RNIP/PRP1/C

Engineer

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 81/109

79.88 3.68

131.15

100.44 89.28

89.28 72.54

0.00 346.67 426.18 328.80 304.86 0.00 0.00 0.00 0.00

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 82/109

 International Engineering Corporation

IPC No:#16 IPC No:#17 IPC No:#18 IPC No:#19 IPC No:#20 IPC No:#21 IPC No:#22 IPC No:#23 IPC No:#24

94.08

134.40

168.00

52.99 115.01

165.60

165.60

168.00

168.00   18.48

168.00   42.00

168.00   42.00

11)

Contractor

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 83/109

0.00 0.00 0.00 0.00 0.00 336.00 336.00 384.19 613.97

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 84/109

Total

0.0075.36

156.29

118.27

88.00

88.00

35.20

38.72

96.80

105.60

38.02

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.000.00

0.00

0.00

0.00

0.00

0.00

94.08

134.40

168.00

168.00

165.60

165.60

168.00

186.48

210.00

210.00

0.00

95.10

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 85/109

166.81

159.42

189.72

161.82

0.00

0.00

0.000.00

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 86/109

Start Ending

Quantity

As per CS   IPC No:#1 IPC No:#2 IPC No:#3 IPC No:#4 IPC No:#5 IPC No:#6

30+000 30+50030+500 31+000

31+000 31+500

31+500 32+000

32+000 32+500

32+500 33+000

33+000 33+500

33+500 34+000

34+000 34+500

34+500 35+000

35+000 35+500

35+500 36+000

36+000 36+500

36+500 37+000

37+000 37+500

37+500 38+000

38+000 38+500

38+500 39+000

39+000 39+500

39+500 40+000

40+000 40+500

40+500 41+00041+000 41+500

41+500 42+000

42+000 42+500

42+500 43+000

43+000 43+500

43+500 44+000

44+000 44+500

44+500 45+000

45+000 45+500

45+500 46+000

46+000 46+500

46+500 47+000

47+000 47+500

47+500 48+000

48+000 48+500

48+500 49+000

49+000 49+500

49+500 50+000

Item:- Bituminous Prime Coat Using MC 30 @1 Litre per m 2(m2)

Employer

Road Development Authority

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 87/109

50+000 50+500

50+500 51+000

51+000 51+500

51+500 52+000

52+000 52+500

52+500 53+000

53+000 53+500

0.00 0.00 0.00 0.00 0.00 0.00Total

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 88/109

Central Engineering Consultancy Bureau

IPC No:#7 IPC No:#8 IPC No:#9 IPC No:#10 IPC No:#11 IPC No:#12 IPC No:#13 IPC No:#14 IPC No:#15

1,619.50 1,343.00

2,883.50

1,185.00

2,607.00

967.75 1,155.38 335.75 128.37

NOTHERN ROADS REHABILITATION PROJECT (CONTRACT PACKAGE NO. RDA/

Engineer

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 89/109

391.05 462.15 1,402.25 1,256.10

483.48 553.00 1,975.00

355.50 948.00 1,935.50

513.50 2,508.25

0.00 0.00 0.00 1,358.80 2,456.51 3,752.50 7,803.22 1,619.50 8,018.50

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 90/109

IPC No:#16 IPC No:#17 IPC No:#18 IPC No:#19 IPC No:#20 IPC No:#21 IPC No:#22 IPC No:#23 IPC No:#24

3,700.001,576.05 2,404.45

641.50 346.00

1,106.00

1,461.50 829.50 0.00 474.00

474.00 770.25 99.00

711.00 2,627.00 1,355.25 62.75

110.00 2,102.00 660.00 1,078.00

829.50 829.50 790.00 1,027.00 237.00

592.50 3,357.50

753.00 3,081.00

7,167.86

84.36

2,442.00

3,700.00

518.00   3,700.00

3,330.00   370.00

3,700.00

2,368.00   1,332.00

3,700.00

514.80

177.75

RNIP/PRP1/C11)

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 91/109

-197.50

-19.75

3,752.50 2,987.80 829.50 3,566.50 829.50 4,247.25 14,841.20 19,070.52 16,848.00

56.25

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 92/109

474.00

China National Aero-Technology International Engineering Corporation

Total

3,700.003,980.50

3,950.00

3,989.50

3,950.00

3,950.25 740

4,756.00

3,950.00

3,713.00

3,950.00

3,834.00 200 should be deducted from maga

7,167.86

84.36

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2,442.00

3,700.00

4,218.00

3,700.00

3,700.00

3,700.00

3,700.00

514.80

2,765.00

Contractor

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 93/109

3,511.55

3,011.48

3,041.50

3,002.00

0.00

0.00

0.000.00

91,981.80

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 94/109

Central Engineering C

Start Ending

Quantity

As per CS   IPC No:#1 IPC No:#2 IPC No:#3 IPC No:#4 IPC No:#5 IPC No:#6

30+000 30+50030+500 31+000

31+000 31+500

31+500 32+000

32+000 32+500

32+500 33+000

33+000 33+500

33+500 34+000

34+000 34+500

34+500 35+000

35+000 35+500

35+500 36+000

36+000 36+500

36+500 37+000

37+000 37+500

37+500 38+000

38+000 38+500

38+500 39+000

39+000 39+500

39+500 40+000

40+000 40+500

40+500 41+00041+000 41+500

41+500 42+000

42+000 42+500

42+500 43+000

43+000 43+500

43+500 44+000

44+000 44+500

44+500 45+000

45+000 45+500

45+500 46+000

46+000 46+500

46+500 47+000

47+000 47+500

47+500 48+000

48+000 48+500

48+500 49+000

49+000 49+500

49+500 50+000

Item:-Bituminous Tack Coat (Cationic Emulsion grade CRS1 at 0.3 litre/m2)(m

2)

Employer

Road Development Authority

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 95/109

50+000 50+500

50+500 51+000

51+000 51+500

51+500 52+000

52+000 52+500

52+500 53+000

53+000 53+500

0.00 0.00 0.00 0.00 0.00 0.00Total

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 96/109

  nsultancy Bureau China National Aero-Technology International Engineering Corpor

IPC No:#7 IPC No:#8 IPC No:#9 IPC No:#10 IPC No:#11 IPC No:#12 IPC No:#13 IPC No:#14 IPC No:#15

NOTHERN ROADS REHABILITATION PROJECT (CONTRACT PACKAGE NO. RDA/RNIP/PRP1/C

Engineer

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 97/109

711.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 711.00 0.00

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 98/109

ation

IPC No:#16 IPC No:#17 IPC No:#18 IPC No:#19 IPC No:#20 IPC No:#21 IPC No:#22 IPC No:#23 IPC No:#24

3,700.001,887.00 1,844.65

3,002.00 1,204.75

513.50 435.00

100.00 100.00

2,700.00 2,481.90

2,738.00

3,700.00

3,700.00

1,258.00   2,442.00

3,397.00

11)

Contractor

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 99/109

3,950.00

869.00 3,081.00

3,634.00

2,370.00

0.00 4,503.00 12,798.00 3,515.50 0.00 0.00 5,587.00 7,107.40 15,596.90

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 100/109

Total

3,700.003,731.65

4,206.75

948.50

0.00

0.00

0.00

0.00

0.00

0.00

200.00

5,181.90

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.000.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2,738.00

3,700.00

3,700.00

3,700.00

0.00

3,397.00

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 101/109

3,950.00

3,950.00

3,634.00

3,081.00

0.00

0.00

0.000.00

49,818.80

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 102/109

Central Engineering C

Start Ending

Quantity

As per CS   IPC No:#1 IPC No:#2 IPC No:#3 IPC No:#4 IPC No:#5 IPC No:#6

30+000 30+50030+500 31+000

31+000 31+500

31+500 32+000

32+000 32+500

32+500 33+000

33+000 33+500

33+500 34+000

34+000 34+500

34+500 35+000

35+000 35+500

35+500 36+000

36+000 36+500

36+500 37+000

37+000 37+500

37+500 38+000

38+000 38+500

38+500 39+000

39+000 39+500

39+500 40+000

40+000 40+500

40+500 41+00041+000 41+500

41+500 42+000

42+000 42+500

42+500 43+000

43+000 43+500

43+500 44+000

44+000 44+500

44+500 45+000

45+000 45+500

45+500 46+000

46+000 46+500

46+500 47+000

47+000 47+500

47+500 48+000

48+000 48+500

48+500 49+000

49+000 49+500

49+500 50+000

Item:-Asphalt Concrete in wearing course 50mm compacted thickness(m2)

NOTHERN ROADS REHABILITATION PROJECT (CONTRACT PACKAGE NO. RDA/RNIP/PRP1/C11)

Employer Engineer

Road Development Authority

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 103/109

50+000 50+500

50+500 51+000

51+000 51+500

51+500 52+000

52+000 52+500

52+500 53+000

53+000 53+500

0.00 0.00 0.00 0.00 0.00 0.00Total

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 104/109

  nsultancy Bureau China National Aero-Technology International Engineering Corpor

IPC No:#7 IPC No:#8 IPC No:#9 IPC No:#10 IPC No:#11 IPC No:#12 IPC No:#13 IPC No:#14 IPC No:#15

Contractor

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 105/109

711.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 711.00 0.00

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 106/109

ation

IPC No:#16 IPC No:#17 IPC No:#18 IPC No:#19 IPC No:#20 IPC No:#21 IPC No:#22 IPC No:#23 IPC No:#24

3,700.001,887.00 1,475.72

2,338.40 963.80 821.60

379.20 316.00

100.00 100.00

2,700.00 2,481.90

66.60

2,738.00

3,700.00

3,700.00

1,258.00   2,442.00

514.80

2,780.80

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 107/109

3,160.00

869.00 2,464.80

3,634.00

1,769.60

0.00 4,503.00 10,175.20 0.00 2,717.60 0.00 5,587.00 7,012.32 16,366.10

56.25

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 108/109

8/12/2019 Corrected Paid Summary -Section 2

http://slidepdf.com/reader/full/corrected-paid-summary-section-2 109/109

3,160.00

3,333.80

3,634.00

2,480.60

0.00

0.00

0.00 - 

47,072.22