CÁLCULO FUERZAS APLICADAS A EDIFICO PARA MODELADO ETAB 1.-CÁLCULO DE CENTRO DE MASAS PRIMER ENTREPISO AREA (m2) X (m) Y (m) Area x X Area x Y A1 30.00 3.00 2.50 90.00 75.00 A2 30.00 9.00 2.50 270.00 75.00 A3 30.00 15.00 2.50 450.00 75.00 A4 30.00 21.00 2.50 630.00 75.00 A5 30.00 27.00 2.50 810.00 75.00 A6 21.00 3.00 6.75 63.00 141.75 A7 21.00 9.00 6.75 189.00 141.75 A8 21.00 15.00 6.75 315.00 141.75 A9 21.00 21.00 6.75 441.00 141.75 A10 21.00 27.00 6.75 567.00 141.75 A11 30.00 3.00 11.00 90.00 330.00 A12 30.00 9.00 11.00 270.00 330.00 A13 30.00 15.00 11.00 450.00 330.00 A14 30.00 21.00 11.00 630.00 330.00 A15 30.00 27.00 11.00 810.00 330.00 SUMA 405.00 6075.00 2733.75 Xm= 15.00 m -9.00 1.92 Ym= 6.75 m -6.00 3.28 SEGUNDO ENTREPISO AREA (m2) X (m) Y (m) Area x X Area x Y A1 30.00 3.00 2.50 90.00 75.00 A2 30.00 9.00 2.50 270.00 75.00 A3 30.00 15.00 2.50 450.00 75.00 A4 30.00 21.00 2.50 630.00 75.00 A5 30.00 27.00 2.50 810.00 75.00 A6 21.00 3.00 6.75 63.00 141.75 A7 21.00 9.00 6.75 189.00 141.75 A8 21.00 15.00 6.75 315.00 141.75 A9 21.00 21.00 6.75 441.00 141.75 A10 21.00 27.00 6.75 567.00 141.75 A11 30.00 3.00 11.00 90.00 330.00 A12 30.00 9.00 11.00 270.00 330.00 A13 30.00 15.00 11.00 450.00 330.00 A14 30.00 21.00 11.00 630.00 330.00 A15 30.00 27.00 11.00 810.00 330.00 SUMA 405.00 6075.00 2733.75 Xm= 15.00 m -9.00 1.92 Ym= 6.75 m -6.00 3.28

Upload: maribel-balvin-paucar

Post on 16-Feb-2016

233 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: correccion por torcion   CM, CR, EXr-EXa.xlsx

1.-CÁLCULO DE CENTRO DE MASAS

PRIMER ENTREPISONº AREA (m2) X (m) Y (m) Area x X Area x YA1 30.00 3.00 2.50 90.00 75.00A2 30.00 9.00 2.50 270.00 75.00A3 30.00 15.00 2.50 450.00 75.00A4 30.00 21.00 2.50 630.00 75.00A5 30.00 27.00 2.50 810.00 75.00A6 21.00 3.00 6.75 63.00 141.75A7 21.00 9.00 6.75 189.00 141.75A8 21.00 15.00 6.75 315.00 141.75A9 21.00 21.00 6.75 441.00 141.75

A10 21.00 27.00 6.75 567.00 141.75A11 30.00 3.00 11.00 90.00 330.00A12 30.00 9.00 11.00 270.00 330.00A13 30.00 15.00 11.00 450.00 330.00A14 30.00 21.00 11.00 630.00 330.00A15 30.00 27.00 11.00 810.00 330.00

SUMA 405.00 6075.00 2733.75

Xm= 15.00 m -9.00 1.92Ym= 6.75 m -6.00 3.28

SEGUNDO ENTREPISONº AREA (m2) X (m) Y (m) Area x X Area x YA1 30.00 3.00 2.50 90.00 75.00A2 30.00 9.00 2.50 270.00 75.00A3 30.00 15.00 2.50 450.00 75.00A4 30.00 21.00 2.50 630.00 75.00A5 30.00 27.00 2.50 810.00 75.00A6 21.00 3.00 6.75 63.00 141.75A7 21.00 9.00 6.75 189.00 141.75A8 21.00 15.00 6.75 315.00 141.75A9 21.00 21.00 6.75 441.00 141.75

A10 21.00 27.00 6.75 567.00 141.75A11 30.00 3.00 11.00 90.00 330.00A12 30.00 9.00 11.00 270.00 330.00A13 30.00 15.00 11.00 450.00 330.00A14 30.00 21.00 11.00 630.00 330.00A15 30.00 27.00 11.00 810.00 330.00

SUMA 405.00 6075.00 2733.75

Xm= 15.00 m -9.00 1.92Ym= 6.75 m -6.00 3.28

CÁLCULO FUERZAS APLICADAS A EDIFICO PARA MODELADO ETABS

Page 2: correccion por torcion   CM, CR, EXr-EXa.xlsx

TERCER ENTREPISONº AREA (m2) X (m) Y (m) Area x X Area x YA1 30.00 3.00 2.50 90.00 75.00A2 30.00 9.00 2.50 270.00 75.00A3 30.00 15.00 2.50 450.00 75.00A4 30.00 21.00 2.50 630.00 75.00A5 30.00 27.00 2.50 810.00 75.00A6 21.00 3.00 6.75 63.00 141.75A7 21.00 9.00 6.75 189.00 141.75A8 21.00 15.00 6.75 315.00 141.75A9 21.00 21.00 6.75 441.00 141.75

A10 21.00 27.00 6.75 567.00 141.75A11 30.00 3.00 11.00 90.00 330.00A12 30.00 9.00 11.00 270.00 330.00A13 30.00 15.00 11.00 450.00 330.00A14 30.00 21.00 11.00 630.00 330.00A15 30.00 27.00 11.00 810.00 330.00

SUMA 405.00 6075.00 2733.75

Xm= 15.00 m -9.00 1.92Ym= 6.75 m -6.00 3.28

CUARTO ENTREPISONº AREA (m2) X (m) Y (m) Area x X Area x YA1 30.00 3.00 2.50 90.00 75.00A2 30.00 9.00 2.50 270.00 75.00A3 30.00 15.00 2.50 450.00 75.00A4 30.00 21.00 2.50 630.00 75.00A5 30.00 27.00 2.50 810.00 75.00A6 21.00 3.00 6.75 63.00 141.75A7 21.00 9.00 6.75 189.00 141.75A8 21.00 15.00 6.75 315.00 141.75A9 21.00 21.00 6.75 441.00 141.75

A10 21.00 27.00 6.75 567.00 141.75A11 30.00 3.00 11.00 90.00 330.00A12 30.00 9.00 11.00 270.00 330.00A13 30.00 15.00 11.00 450.00 330.00A14 30.00 21.00 11.00 630.00 330.00A15 30.00 27.00 11.00 810.00 330.00

SUMA 405.00 6075.00 2733.75

Xm= 15.00 m -9.00 1.92Ym= 6.75 m -6.00 3.28

Page 3: correccion por torcion   CM, CR, EXr-EXa.xlsx

QUINTO ENTREPISONº AREA (m2) X (m) Y (m) Area x X Area x YA1 30.00 3.00 2.50 90.00 75.00A2 30.00 9.00 2.50 270.00 75.00A3 30.00 15.00 2.50 450.00 75.00A4 30.00 21.00 2.50 630.00 75.00A5 30.00 27.00 2.50 810.00 75.00A6 21.00 3.00 6.75 63.00 141.75A7 21.00 9.00 6.75 189.00 141.75A8 21.00 15.00 6.75 315.00 141.75A9 21.00 21.00 6.75 441.00 141.75

A10 21.00 27.00 6.75 567.00 141.75A11 30.00 3.00 11.00 90.00 330.00A12 30.00 9.00 11.00 270.00 330.00A13 30.00 15.00 11.00 450.00 330.00A14 30.00 21.00 11.00 630.00 330.00A15 30.00 27.00 11.00 810.00 330.00

SUMA 405.00 6075.00 2733.75

Xm= 15.00 m -9.00 1.92Ym= 6.75 m -6.00 3.28

SEXTO ENTREPISONº AREA (m2) X (m) Y (m) Area x X Area x YA1 30.00 3.00 2.50 90.00 75.00A2 30.00 9.00 2.50 270.00 75.00A3 30.00 15.00 2.50 450.00 75.00A4 30.00 21.00 2.50 630.00 75.00A5 30.00 27.00 2.50 810.00 75.00A6 21.00 3.00 6.75 63.00 141.75A7 21.00 9.00 6.75 189.00 141.75A8 21.00 15.00 6.75 315.00 141.75A9 21.00 21.00 6.75 441.00 141.75

A10 21.00 27.00 6.75 567.00 141.75A11 30.00 3.00 11.00 90.00 330.00A12 30.00 9.00 11.00 270.00 330.00A13 30.00 15.00 11.00 450.00 330.00A14 30.00 21.00 11.00 630.00 330.00A15 30.00 27.00 11.00 810.00 330.00

SUMA 405.00 6075.00 2733.75

Xm= 15.00 m -9.00 1.92Ym= 6.75 m -6.00 3.28

Page 4: correccion por torcion   CM, CR, EXr-EXa.xlsx

SÉPTIMO ENTREPISONº AREA (m2) X (m) Y (m) Area x X Area x YA1 30.00 3.00 2.50 90.00 75.00A2 30.00 9.00 2.50 270.00 75.00A3 30.00 15.00 2.50 450.00 75.00A4 30.00 21.00 2.50 630.00 75.00A5 30.00 27.00 2.50 810.00 75.00A6 21.00 3.00 6.75 63.00 141.75A7 21.00 9.00 6.75 189.00 141.75A8 21.00 15.00 6.75 315.00 141.75A9 21.00 21.00 6.75 441.00 141.75

A10 21.00 27.00 6.75 567.00 141.75A11 30.00 3.00 11.00 90.00 330.00A12 30.00 9.00 11.00 270.00 330.00A13 30.00 15.00 11.00 450.00 330.00A14 30.00 21.00 11.00 630.00 330.00A15 30.00 27.00 11.00 810.00 330.00

SUMA 405.00 6075.00 2733.75

Xm= 15.00 m -9.00 1.92Ym= 6.75 m -6.00 3.28

OCTAVO ENTREPISONº AREA (m2) X (m) Y (m) Area x X Area x YA1 30.00 3.00 2.50 90.00 75.00A2 30.00 9.00 2.50 270.00 75.00A3 30.00 15.00 2.50 450.00 75.00A4 30.00 21.00 2.50 630.00 75.00A5 30.00 27.00 2.50 810.00 75.00A6 21.00 3.00 6.75 63.00 141.75A7 21.00 9.00 6.75 189.00 141.75A8 21.00 15.00 6.75 315.00 141.75A9 21.00 21.00 6.75 441.00 141.75

A10 21.00 27.00 6.75 567.00 141.75A11 30.00 3.00 11.00 90.00 330.00A12 30.00 9.00 11.00 270.00 330.00A13 30.00 15.00 11.00 450.00 330.00A14 30.00 21.00 11.00 630.00 330.00A15 30.00 27.00 11.00 810.00 330.00

SUMA 405.00 6075.00 2733.75

Xm= 15.00 m -9.00 1.92Ym= 6.75 m -6.00 3.28

RESUMEN

1 2 3 4 5 6 7 8X 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00Y 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75

Page 5: correccion por torcion   CM, CR, EXr-EXa.xlsx

FACULTAD DE INGENIERIA CIVIL

INGENIERIA ANTISIMICA

RIGIDEZ LATERAL POR CADA PÓRTICO

PÓRTICO EN EL EJE X - X

PORTICO 1 - 1

EJE (EN TON/CM)A B C D E F KL portico

PRIMER PISO 5.64 6.31 6.31 6.31 6.31 5.64 36.55SEGUNDO PISO 3.96 5.42 5.42 5.42 5.42 3.96 29.60TERCER PISO 3.96 5.42 5.42 5.42 5.42 3.96 29.60CUARTO PISO 3.96 5.42 5.42 5.42 5.42 3.96 29.60QUINTO PISO 3.96 5.42 5.42 5.42 5.42 3.96 29.60SEXTO PISO 3.96 5.42 5.42 5.42 5.42 3.96 29.60SEPTIMO PISO 3.96 5.42 5.42 5.42 5.42 3.96 29.60OCTAVO PISO 5.50 7.59 7.59 7.59 7.59 5.50 41.36

PORTICO 2 - 2

EJE (EN TON/CM)A B C D E F KL portico

PRIMER PISO 6.67 6.53 6.53 6.53 6.53 6.67 39.47SEGUNDO PISO 6.20 5.90 5.90 5.90 5.90 6.20 36.00TERCER PISO 6.20 5.90 5.90 5.90 5.90 6.20 36.00CUARTO PISO 6.20 5.90 5.90 5.90 5.90 6.20 36.00QUINTO PISO 6.20 5.90 5.90 5.90 5.90 6.20 36.00SEXTO PISO 6.20 5.90 5.90 5.90 5.90 6.20 36.00SEPTIMO PISO 6.20 5.90 5.90 5.90 5.90 6.20 36.00OCTAVO PISO 8.72 8.28 8.28 8.28 8.28 8.72 50.57

PORTICO 3 - 3

EJE (EN TON/CM)A B C D E F KL portico

PRIMER PISO 6.67 6.53 6.53 6.53 6.53 6.67 39.47SEGUNDO PISO 6.20 5.90 5.90 5.90 5.90 6.20 36.00TERCER PISO 6.20 5.90 5.90 5.90 5.90 6.20 36.00CUARTO PISO 6.20 5.90 5.90 5.90 5.90 6.20 36.00QUINTO PISO 6.20 5.90 5.90 5.90 5.90 6.20 36.00SEXTO PISO 6.20 5.90 5.90 5.90 5.90 6.20 36.00SEPTIMO PISO 6.20 5.90 5.90 5.90 5.90 6.20 36.00OCTAVO PISO 8.72 8.28 8.28 8.28 8.28 8.72 50.57

Page 6: correccion por torcion   CM, CR, EXr-EXa.xlsx

FACULTAD DE INGENIERIA CIVIL

INGENIERIA ANTISIMICA

PORTICO 4 - 4

EJE (EN TON/CM)A B C D E F KL portico

PRIMER PISO 5.64 6.31 6.31 6.31 6.31 5.64 36.55SEGUNDO PISO 3.96 5.42 5.42 5.42 5.42 3.96 29.60TERCER PISO 3.96 5.42 5.42 5.42 5.42 3.96 29.60CUARTO PISO 3.96 5.42 5.42 5.42 5.42 3.96 29.60QUINTO PISO 3.96 5.42 5.42 5.42 5.42 3.96 29.60SEXTO PISO 3.96 5.42 5.42 5.42 5.42 3.96 29.60SEPTIMO PISO 3.96 5.42 5.42 5.42 5.42 3.96 29.60OCTAVO PISO 5.50 8.28 8.28 8.28 8.28 5.50 44.14

PÓRTICO EN EL EJE Y - Y

PORTICO A - A

EJE (EN TON/CM)1.00 2.00 3.00 4.00 KL portico

PRIMER PISO 5.95 7.93 7.93 5.95 27.75SEGUNDO PISO 4.62 9.06 9.06 4.62 27.37TERCER PISO 4.62 9.06 9.06 4.62 27.37CUARTO PISO 4.62 9.06 9.06 4.62 27.37QUINTO PISO 4.62 9.06 9.06 4.62 27.37SEXTO PISO 4.62 9.06 9.06 4.62 27.37SEPTIMO PISO 4.62 9.06 9.06 4.62 27.37OCTAVO PISO 6.44 12.94 12.94 6.44 38.77

PORTICO B - BEJE (EN TON/CM)

1.00 2.00 3.00 4.00 KL porticoPRIMER PISO 7.46 8.49 8.49 7.46 31.91SEGUNDO PISO 4.84 7.06 7.06 4.84 23.80TERCER PISO 4.84 7.06 7.06 4.84 23.80CUARTO PISO 4.84 7.06 7.06 4.84 23.80QUINTO PISO 4.84 7.06 7.06 4.84 23.80SEXTO PISO 4.84 7.06 7.06 4.84 23.80SEPTIMO PISO 4.84 7.06 7.06 4.84 23.80OCTAVO PISO 6.71 9.87 9.87 6.71 33.17

Page 7: correccion por torcion   CM, CR, EXr-EXa.xlsx

FACULTAD DE INGENIERIA CIVIL

INGENIERIA ANTISIMICA

PORTICO C - CEJE (EN TON/CM)

1.00 2.00 3.00 4.00 KL porticoPRIMER PISO 7.46 8.49 8.49 7.46 31.91SEGUNDO PISO 4.84 7.06 7.06 4.84 23.80TERCER PISO 4.84 7.06 7.06 4.84 23.80CUARTO PISO 4.84 7.06 7.06 4.84 23.80QUINTO PISO 4.84 7.06 7.06 4.84 23.80SEXTO PISO 4.84 7.06 7.06 4.84 23.80SEPTIMO PISO 4.84 7.06 7.06 4.84 23.80OCTAVO PISO 6.71 9.87 9.87 6.71 33.17

PORTICO D - D

EJE (EN TON/CM)1.00 2.00 3.00 4.00 KL portico

PRIMER PISO 7.46 8.49 8.49 7.46 31.91SEGUNDO PISO 4.84 7.06 7.06 4.84 23.80TERCER PISO 4.84 7.06 7.06 4.84 23.80CUARTO PISO 4.84 7.06 7.06 4.84 23.80QUINTO PISO 4.84 7.06 7.06 4.84 23.80SEXTO PISO 4.84 7.06 7.06 4.84 23.80SEPTIMO PISO 4.84 7.06 7.06 4.84 23.80OCTAVO PISO 6.71 9.87 9.87 6.71 33.17

PORTICO E - E

EJE (EN TON/CM)1.00 2.00 3.00 4.00 KL portico

PRIMER PISO 7.46 8.49 8.49 7.46 31.91SEGUNDO PISO 4.84 7.06 7.06 4.84 23.80TERCER PISO 4.84 7.06 7.06 4.84 23.80CUARTO PISO 4.84 7.06 7.06 4.84 23.80QUINTO PISO 4.84 7.06 7.06 4.84 23.80SEXTO PISO 4.84 7.06 7.06 4.84 23.80SEPTIMO PISO 4.84 7.06 7.06 4.84 23.80OCTAVO PISO 6.71 9.87 9.87 6.71 33.17

Page 8: correccion por torcion   CM, CR, EXr-EXa.xlsx

FACULTAD DE INGENIERIA CIVIL

INGENIERIA ANTISIMICA

PORTICO F - F

EJE (EN TON/CM)1.00 2.00 3.00 4.00 KL portico

PRIMER PISO 5.95 7.93 7.93 5.95 27.75SEGUNDO PISO 4.62 9.06 9.06 4.62 27.37TERCER PISO 4.62 9.06 9.06 4.62 27.37CUARTO PISO 4.62 9.06 9.06 4.62 27.37QUINTO PISO 4.62 9.06 9.06 4.62 27.37SEXTO PISO 4.62 9.06 9.06 4.62 27.37SEPTIMO PISO 4.62 9.06 9.06 4.62 27.37OCTAVO PISO 6.44 12.94 12.94 6.44 38.77

CENTRO DE RIGIDEZ

PRIMER PISO Yk Xk

DIST (m) DIST*RIG Yk (m) DIST. (m) RIG(t/cm) DIST*RIG Xk (m)

5.00 39.47 197.34 8.89 6 31.91 191.46 17.688.50 39.47 335.48 12 31.91 382.92

13.50 36.55 493.36 18 31.91 574.3924 31.91 765.8530 27.75 832.57

SUMA 115.48 1026.18 155.39 2747.19

SEGUNDO PISO Yk Xk

DIST (m) DIST*RIG Yk (m) DIST. (m) RIG(t/cm) DIST*RIG Xk (m)

5.00 36.00 180.02 8.72 6 23.80 142.81 18.358.50 36.00 306.03 12 23.80 285.63

13.50 29.60 399.62 18 23.80 428.4424 23.80 571.2630 27.37 821.06

SUMA 101.61 885.67 122.58 2249.21

RIG(t/cm)

RIG(t/cm)

Page 9: correccion por torcion   CM, CR, EXr-EXa.xlsx

FACULTAD DE INGENIERIA CIVIL

INGENIERIA ANTISIMICA

TERCER PISO Yk Xk

DIST (m) DIST*RIG Yk (m) DIST. (m) RIG(t/cm) DIST*RIG Xk (m)

5.00 36.00 180.02 8.72 6 23.80 142.81 18.358.50 36.00 306.03 12 23.80 285.63

13.50 29.60 399.62 18 23.80 428.4424 23.80 571.2630 27.37 821.06

SUMA 101.61 885.67 122.58 2249.21

CUARTO PISO Yk Xk

DIST (m) DIST*RIG Yk (m) DIST. (m) RIG(t/cm) DIST*RIG Xk (m)

5.00 36.00 180.02 8.72 6 23.80 142.81 18.358.50 36.00 306.03 12 23.80 285.63

13.50 29.60 399.62 18 23.80 428.4424 23.80 571.2630 27.37 821.06

SUMA 101.61 885.67 122.58 2249.21

QUINTO PISO Yk Xk

DIST (m) DIST*RIG Yk (m) DIST. (m) RIG(t/cm) DIST*RIG Xk (m)

5.00 36.00 180.02 8.72 6 23.80 142.81 18.358.50 36.00 306.03 12 23.80 285.63

13.50 29.60 399.62 18 23.80 428.4424 23.80 571.2630 27.37 821.06

SUMA 101.61 885.67 122.58 2249.21

RIG(t/cm)

RIG(t/cm)

RIG(t/cm)

Page 10: correccion por torcion   CM, CR, EXr-EXa.xlsx

FACULTAD DE INGENIERIA CIVIL

INGENIERIA ANTISIMICA

SEXTO PISO Yk Xk

DIST (m) DIST*RIG Yk (m) DIST. (m) RIG(t/cm) DIST*RIG Xk (m)

5.00 36.00 180.02 8.72 6 23.80 142.81 18.358.50 36.00 306.03 12 23.80 285.63

13.50 29.60 399.62 18 23.80 428.4424 23.80 571.2630 27.37 821.06

SUMA 101.61 885.67 122.58 2249.21

SEPTIMO PISO Yk Xk

DIST (m) DIST*RIG Yk (m) DIST. (m) RIG(t/cm) DIST*RIG Xk (m)

5.00 36.00 180.02 8.72 6 23.80 142.81 18.358.50 36.00 306.03 12 23.80 285.63

13.50 29.60 399.62 18 23.80 428.4424 23.80 571.2630 27.37 821.06

SUMA 101.61 885.67 122.58 2249.21

OCTAVO PISO Yk Xk

DIST (m) DIST*RIG Yk (m) DIST. (m) RIG(t/cm) DIST*RIG Xk (m)

5.00 50.57 252.85 8.80 6 33.17 198.99 18.398.50 50.57 429.84 12 33.17 397.99

13.50 44.14 595.94 18 33.17 596.9824 33.17 795.9830 38.77 1163.03

SUMA 145.28 1278.63 171.43 3152.97

RESUMEN

1 2 3 4 5 6 7 8X 17.68 18.35 18.35 18.35 18.35 18.35 18.35 18.39

Y 8.89 8.72 8.72 8.72 8.72 8.72 8.72 8.80

RIG(t/cm)

RIG(t/cm)

RIG(t/cm)

Page 11: correccion por torcion   CM, CR, EXr-EXa.xlsx

FACULTAD DE INGENIERIA CIVIL

INGENIERIA ANTISISMICA

RESUMEN Y CALCULO DE EXCENTRICIDAD

CENTRO DE MASASPISO 1 2 3 4 5 6 7 8

Xm (m) 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00Ym (m) 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75

CENTRO DE RIGIDECEZPISO 1 2 3 4 5 6 7 8

Xk (m) 17.68 18.35 18.35 18.35 18.35 18.35 18.35 18.39Yk (m) 8.89 8.72 8.72 8.72 8.72 8.72 8.72 8.80

EXCENTRICIDADES

EXCENTRICIDAD REALPISO 1 2 3 4 5 6 7 8

2.68 3.35 3.35 3.35 3.35 3.35 3.35 3.39

2.14 1.97 1.97 1.97 1.97 1.97 1.97 2.05

EXCENTRICIDAD ACCIDENTALPISO 1 2 3 4 5 6 7 8

1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50

0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68

ereal x (m)

ereal y (m)

eacc. x (m)

eacc. y (m)

Page 12: correccion por torcion   CM, CR, EXr-EXa.xlsx

FACULTAD DE INGENIERIA CIVIL

INGENIERIA ANTISISMICA

EXCENTRICIDAD TOTAL

Ex=ex+0.05LiEy=ey+0.05Li

PISO 1 2 3 4 5 6 7 8Lx (m) 30 30 30 30 30 30 30 30Ly (m) 13.5 13.5 13.5 13.5 13.5 13.5 13.5 13.5

4.18 4.85 4.85 4.85 4.85 4.85 4.85 4.892.82 2.65 2.65 2.65 2.65 2.65 2.65 2.73

CENTRO DE RIGIDEZ (donde se aplicara la fuerza inercial)PISO 1 2 3 4 5 6 7 8

XR (m) 17.68 18.35 18.35 18.35 18.35 18.35 18.35 18.39YR (m) 8.89 8.72 8.72 8.72 8.72 8.72 8.72 8.80

Etotal x (m)Etotal y (m)