Page 1: Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management

Corps of Engineers

BUILDING STRONG®

TABLE ROCK DAM SLIDE – CASE STUDYDave Paul, P.E.Lead Civil EngineerU.S. Army Corps of EngineersRisk Management Center [email protected]

Dam Safety WorkshopBrasília, Brazil20-24 May 2013

Page 2: Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management

Purpose

Provide real-life application for reporting distress

Review project conditions and distress reporting

timeline

Stress Dam Safety training and communication

Emphasize the importance of partnering with

regional experts

Page 3: Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management

Event Background

Page 4: Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management
Page 5: Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management

Rainfall Comparison

Average Rainfall Rainfall RainfallDAM April Rain 22-28 April April 2011 April

2008

Beaver 4.5 in 11.57 in 15.1 in 9.16 in

Table Rock 4.1 10.43 13.6 7.90

Bull Shoals 3.9 12.06 15.3 7.90

Norfork 4.1 13.23 16.8 8.15

Greers Ferry 4.9 7.4 10.6 9.21

Clearwater 4.5 11.31 14.01 9.16

Page 6: Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management

Rainfall Comparison

Average Rainfall Rainfall RainfallDAM April Rain 22-28 April April 2011 April

2008

Beaver 4.5 in 11.57 in 15.1 in 9.16 in

Table Rock 4.1 10.43 13.6 7.90

Bull Shoals 3.9 12.06 15.3 7.90

Norfork 4.1 13.23 16.8 8.15

Greers Ferry 4.9 7.4 10.6 9.21

Clearwater 4.5 11.31 14.01 9.16

Page 7: Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management

CHALLENGESDams

Page 8: Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management

CHALLENGESLevees

Page 9: Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management

CHALLENGESNavigation System

Page 10: Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management

Table Rock Lake Dam

Page 11: Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management

Records at Table Rock Dam

RECORD RAINFALL RECORD INFLOW

RECORD RELEASE RECORD POOL

Page 12: Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management

Distress Reporting Timeline

DiscoveryOPM Calls

DSO

DSO Engages

Tech Team

Media Outlets

Contacted

Tech Team Makes

Stability / Repair

Decisions

Emergency Contract

In-Place and Repairs

Completed

Normal Operation and

Follow-up Inspection

Tech Team Dispatched to Site/Evaluation

DSO/DSPM Upward Reports

Page 13: Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management

Distress Reporting Timeline

DiscoveryOPM Calls

DSO

DSO Engages

Tech Team

Media Outlets

Contacted

Tech Team Makes

Stability / Repair

Decisions

Emergency Contract

In-Place and Repairs

Completed

Normal Operation and

Follow-up Inspection

Tech Team Dispatched to Site/Evaluation

DSO/DSPM Upward Reports

Page 14: Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management

Table Rock Slide

Page 15: Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management

Table Rock Slide

Page 16: Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management

Distress Reporting Timeline

DiscoveryOPM Calls

DSO

DSO Engages

Tech Team

Media Outlets

Contacted

Tech Team Makes

Stability / Repair

Decisions

Emergency Contract

In-Place and Repairs

Completed

Normal Operation and

Follow-up Inspection

Tech Team Dispatched to Site/Evaluation

DSO/DSPM Upward Reports

Page 17: Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management

Tulsa Tech Team

Little Rock Tech Team

Page 18: Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management

24-Hour Observation

Page 19: Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management

Distress Reporting Timeline

DiscoveryOPM Calls

DSO

DSO Engages

Tech Team

Media Outlets

Contacted

Tech Team Makes

Stability / Repair

Decisions

Emergency Contract

In-Place and Repairs

Completed

Normal Operation and

Follow-up Inspection

Tech Team Dispatched to Site/Evaluation

DSO/DSPM Upward Reports

Page 20: Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management

Table Rock Event

Page 21: Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management

DSPMT Reporting

Page 22: Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management

Distress Reporting Timeline

DiscoveryOPM Calls

DSO

DSO Engages

Tech Team

Media Outlets

Contacted

Tech Team Makes

Stability / Repair

Decisions

Emergency Contract

In-Place and Repairs

Completed

Normal Operation and

Follow-up Inspection

Tech Team Dispatched to Site/Evaluation

DSO/DSPM Upward Reports

Page 23: Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management

Emergency Repair

Page 24: Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management

Distress Reporting Timeline

DiscoveryOPM Calls

DSO

DSO Engages

Tech Team

Media Outlets

Contacted

Tech Team Makes

Stability / Repair

Decisions

Emergency Contract

In-Place and Repairs

Completed

Normal Operation and

Follow-up Inspection

Tech Team Dispatched to Site/Evaluation

DSO/DSPM Upward Reports

Page 25: Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management

Repair

Page 26: Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management

Distress Reporting Timeline

DiscoveryOPM Calls

DSO

DSO Engages

Tech Team

Media Outlets

Contacted

Tech Team Makes

Stability / Repair

Decisions

Emergency Contract

In-Place and Repairs

Completed

Normal Operation and

Follow-up Inspection

Tech Team Dispatched to Site/Evaluation

DSO/DSPM Upward Reports

Page 27: Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management

Lesson’s Learned District and technical team reacted well

Anticipate the unexpected Project challenges Performance may change Resources will be thin Plan for backup DSO

Dam safety training is critical It works – project personnel noted the distress

Page 28: Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management

Lesson’s Learned Communication

Project Personnel to DSO DSO to Engineers/DSPM Engineers on Site to DSO/DSPM DSO/DSPM to MSC and HQ OPM/Lake Manager and PAO to Public and Media

Constantly educate the public Purpose and Value of Projects Consequences without Projects

Consult regional dam safety engineers

Page 29: Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management

QUESTIONS?