corporate 28th june 2011 profile. ‘about us’ 28th june 2011

26
Corporate 28th June 2011 Profile

Upload: flora-imogene-harvey

Post on 16-Dec-2015

219 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Corporate 28th June 2011 Profile. ‘About us’ 28th June 2011

Corporate

28th June 2011

Profile

Page 2: Corporate 28th June 2011 Profile. ‘About us’ 28th June 2011

GOAL •To provide High Quality, Energy Efficient products with a cost effective ventilation solution”

‘About us’

28th June 2011

Page 3: Corporate 28th June 2011 Profile. ‘About us’ 28th June 2011

About us

28th June 2011

Since 2007, Airovient is a 360° ductless car

park ventilation solutions provider

delivering its customers with tailor

made innovative cutting edge

ventilation solutions that are cost &

energy efficient.

Our all projects are eco-friendly & energy efficient. Use of high quality gas detectors,

frequency drives & PLC helps keeping a

constant balance and effective energy use

by maintaining sufficient and necessary air

exchange

We abide by the local legislation and also

bring in international standards that results in

effective use of ventilation systems

during operations. We also extend our services by further enhancing by

implementing DCV systems to completely

automize and maximize energy savings

Page 4: Corporate 28th June 2011 Profile. ‘About us’ 28th June 2011

Philosophy

28th June 2011

Airovient team to always stay focused on reducing the initial cost of the product / systems

with an aim to operate at a bare minimum operational cost

Page 5: Corporate 28th June 2011 Profile. ‘About us’ 28th June 2011

Vision

28th June 2011

Establishing ‘Airovient’ as the Leadership brand in the

ventilation industry and be recognized as a complete solution

provider by delivering the highest quality of products &

services to its esteemed customers

Page 6: Corporate 28th June 2011 Profile. ‘About us’ 28th June 2011

Mission

28th June 2011

Deliver high quality energy efficient products and services at a reasonable price to Real Estate

Developers & HVAC organizations.

Translating our services as value for our customers

Page 7: Corporate 28th June 2011 Profile. ‘About us’ 28th June 2011

28th June 2011

Our CommitmentsOur CPV Systems compared at par with

fire fighting systems

To protect the developer’s investment

To deliver efficient Products / Systems

To adhere to Green Building Standards to reduce carbon foot prints

To continuously develop DCV solutions

To assign a reliable system to our customers for their Ventilation needs

Structured After sales service

Page 8: Corporate 28th June 2011 Profile. ‘About us’ 28th June 2011

Founder of Airovient offering 30 years of experience in fan industry. Excel in steering operations emphasizing on attaining overall organizational goals &

objectives with an aim to service their customer with innovative cost effective solutions.

28th June 2011

The Founder

Dilip Kumar Nemani CMD

Page 9: Corporate 28th June 2011 Profile. ‘About us’ 28th June 2011

28th June 2011

Quality Policy

At Airovient, we ensure International Standard quality

processes are followed across our business process to deliver quality

products and services which ensures high efficiency and

committed results for our customer requirements.

Page 10: Corporate 28th June 2011 Profile. ‘About us’ 28th June 2011

28th June 2011

‘Key services’

Page 11: Corporate 28th June 2011 Profile. ‘About us’ 28th June 2011

28th June 2011

Ventilation Systems Design

Designed to Perform

• Airovient designs the most efficient and cost effective car parking ventilation systems.

• Airovient aims in delivering an optimum usage of air exchange rate on one hand while reducing the cost of implementation & operations on the other.

• It is an absolute measured deliverable by Airovient

Page 12: Corporate 28th June 2011 Profile. ‘About us’ 28th June 2011

• Assessing the load requirement • Selecting right mix of air moving devices that has low noise

and energy efficient• Defining logic of operation at varying pollution levels• Analyzing and validating the design engineering through CFD

(Computational Fluid Dynamics)• Controls system is designed for automatic operation. These are

with digital variable speed setup to reduce the operational cost.

28th June 2011

Ventilation Systems Engineering

Engineered To Optimize

Page 13: Corporate 28th June 2011 Profile. ‘About us’ 28th June 2011

We seamlessly combine world-class technology with our engineering.

Our Project Implementation follows standards which are best of practices

From Project Initiation to Go-live scenario we follow work- breakdown-structure model to ensure every delivery milestones are implemented to our customers 100% satisfaction and meet our corporate philosophy

28th June 2011

Project Implementation

Implemented to Perfection

Page 14: Corporate 28th June 2011 Profile. ‘About us’ 28th June 2011

Post implementation of projects, we conduct cold smoke test to demonstrate post fire smoke clearance, sight length and total time taken to completely clear the smoke.

This test is the only practical tool to validate the system effectiveness.

28th June 2011

Compliance Certification

Secured to Safety

Page 15: Corporate 28th June 2011 Profile. ‘About us’ 28th June 2011

‘Landmark projects’

28th June 2011

Page 16: Corporate 28th June 2011 Profile. ‘About us’ 28th June 2011

28th June 2011

Statistics saysCase 1

• Installed load for a Project has reduced by 917 KW.

Case 2

• By using the ducted systems 2240 KW load have been reduced thru value engineering

Case 3

• 20% cost was reduced in spite of the system being automatic.

Case 4

• With a pilot project success, the Client have now given clear instructions to all concerned that only our CPV system shall be used by them on all their project.

Page 17: Corporate 28th June 2011 Profile. ‘About us’ 28th June 2011

KOLKATA PROJECT OF BENGAL AMBUJA

– Backdrop – This project, when planned, was supposed to get power supply from State Electricity Board after considerable delay as a reasons entire building was operable through its own power generation.

– Client wish - Client preferred the system which could be run consuming bare minimum load.

– Airovient solutions - We designed and executed this project in 2007 where we operated all the jet Induction units & smoke spill fans through VFD’s to regulate the speed depending upon the CO Level.

– Result - The system on an average consumed only 11 KW load of the total installed load of 170 KW. Smoke clearance test was conducted and the design was validated.

28th June 2011

Rajarhat, Kolkata

City Centre New Town

Page 18: Corporate 28th June 2011 Profile. ‘About us’ 28th June 2011

PROJECT OF DAINIK BHASKAR GROUP

– Airovient Solution - System installed is based on 12 & 30 ACH during normal pollution & Fire Mode but the operational logic was designed to achieve between 2 ACH and 6 ACH maximum step-lessly depending upon the CO level.

– Result - The system draws only 22 KW on an average against installed load of 352 KW.

28th June 2011

Bhopal

D B Mall

Page 19: Corporate 28th June 2011 Profile. ‘About us’ 28th June 2011

A PROJECT OF TISHMAN SPEYER & ICICI VENTURE

– Backdrop – Wave-Rock has a world class office campus serving over 20,000 professionals, providing 2.45 million sq.ft. of Class A office space in a Special Economic Zone. The project is LEED certified green building

– Client wish - Reduce carbon foot-prints – Airovient Solution - Two level basement having

parking area of 46821 sq m where we engineered and provided ventilation using only 363 KW load as against tender load of 874 KW

– Result – A net saving of 511 KW giving client huge saving in both capital cost and operating cost

28th June 2011

TSI WAVEROCK – Hi-tech City Hyderabad

SEZ GREEN BUILDING

Page 20: Corporate 28th June 2011 Profile. ‘About us’ 28th June 2011

• Airovient Solution - We helped the client convert the system from using 2 speed exhaust fans to single speed fans with correct estimation on load and from manual to fully automatic system with DCV feature

• Result - 20% cost was reduced in spite of the system being automatic following DCV philosophy

• Current Status - Tower 2 & 3 is also under execution

28th June 2011

India Bulls – Finance CentreParel – Mumbai

Tower 1

Page 21: Corporate 28th June 2011 Profile. ‘About us’ 28th June 2011

A PROJECT OF TATA GROUP• Airovient Solution - Fully automated system

with demand control philosophy using combination of Jet Induction & Impulse fans and smoke spill fans.

• Results - Consumes only 14% of the installed load in 6 & 12 ACH system.

28th June 2011

Tata Communication

s

BKC – Mumbai

Page 22: Corporate 28th June 2011 Profile. ‘About us’ 28th June 2011

28th June 2011

Project RealizationsReduction in Initial & Operating cost

• Since 2007, we have been successfully driving our all projects in saving overall cost of systems

Reduction of Load

• Resolve to reduce the load by re-assessing the system design

Deliver Automatic Systems

• Conversion of the system from semi-automatic to fully automatic DCV system with operational logic limited to 6 ACH in peak pollution mode without affecting any change on the installed capacity to achieve higher rate of ACH as per local authority’s requirement.

Enriched Knowledgebase

• In the process we had the privilege of meeting leading brains in the field and getting rich with their vital design and engineering inputs.

Page 23: Corporate 28th June 2011 Profile. ‘About us’ 28th June 2011

28th June 2011

Our Trusts

• Bengal Ambuja Housing Development Ltd, Kolkata

• Dainik Bhaskar Group, Bhopal• Eta Star Properties Ltd, Chennai• Indiabulls Real Estate Company Pvt. Ltd.,

Mumbai• Tata Housing Development Co. Ltd.,

Mumbai• Nagarjuna Construction Company Ltd.,

Hyderabad• Brigade Group, Bangalore• Magarpatta Retail Pvt Ltd, Pune• Market City Group (Phoenix Mills),

Mumbai• Lodha Group, Mumbai

Page 24: Corporate 28th June 2011 Profile. ‘About us’ 28th June 2011

‘Connect us’

28th June 2011

Page 25: Corporate 28th June 2011 Profile. ‘About us’ 28th June 2011

28th June 2011

Geo-spread• 86, Tollygunge Circular Road, Kolkata - 700 053

Ph: +91 33 32923946 Fax : +91 33 24988126M : + 91 9831106114 Email : [email protected]

KOLKATA

• 209, BhavaniIndl. Estate, Jain Mandir Road, Opp. IIT Main Gate, PowaiMumbai – 400076 M : + 91 9833634691 Email : [email protected]

MUMBAI

• L-47, Gali No. 7, Mahipalpur Extn. Hall No.203, 2nd Floor, Delhi - 110037Telefax : + 91 11 30622651 M : +91 8800434400 Email : [email protected]

DELHI

• Raheja Arcade, Kormangala, 240 - 241, 2nd floor, Bangalore – 560 095Telefax : + 91 080 25532506 M : :- + 91 9663863028Email : [email protected]

BANGALORE

Page 26: Corporate 28th June 2011 Profile. ‘About us’ 28th June 2011

28th June 2011