MTD ACPI ENGINEERING BERHAD
Mr Tee Kim SiewChief Executive Officer
Presentation to Shareholders6 September 2018
-
Contents
CORPORATE INFORMATION➢ Key Senior Management
KEY HIGHLIGHTS➢ Construction➢ Manufacturing
PROJECT UPDATES➢ Completed Projects (Financial Year Ended 2018
[FYE 2018])➢ Current Projects (FYE 2018/FYE 2019)➢ Potential Projects Being Pursued (FYE 2019)
FINANCIAL HIGHLIGHTS➢ 5-Year financial highlights
1
2
3
4
-
CORPORATE INFORMATION
-
Key Senior Management
LOW CHONG BOO, HARRY
Advisor, Overseas Ventures-Manufacturing
KOR JIANN KYANSenior Manager, Head,
Finance & Treasury Division
AHMAD TARMIZI ISMAILGeneral Manager, Head,
Construction DivisionTEE KIM SIEW
Chief Executive Officer
VIJAYARAJ A/L GOVINDARAJOOGeneral Manager,
Business Development
MAHADZIR HASSAN @ MD. HASSAN
Assistant General Manager,Head, Manufacturing Division
-
Key Highlights (Construction)
KVMRT Line 1(Sg. Buloh – Kajang)
➢ Package V7 (Bandar Tun
Hussein to Taman Mesra)
• Contract amount: RM500
million
• Status: Completed on 17
July 2017 (Contractual
completion date - 31 July
2017)
KVMRT Line 2(Sg. Buloh – Serdang – Putrajaya)
➢ Package V208 (Taman
Pinggiran Putra to Taman
Alpinia)
• Contract amount: RM679
million
• Progress to date: 26%
Residensi Sutera 7(Taman Sutera Kajang)
➢ 392 Service Apartment Units
• Contract amount: RM106
million
• Progress to date: 5%
-
Key Highlights (Manufacturing)
Petronas Rapid - P12B Solid Product Jetty & Associated Handling FacilitiesTanjung Setapa, Johor Bahru
➢ Phase 1
• Contract amount: RM13.4 million
• Status: Completed in May 2017 (on time)
➢ Phase 2
• Contract amount: RM 38.0 million
• Status: Completed in June 2018 (on time)
T250 Trackwork Thomson Line Project, Singapore
➢ Contract amount: RM30.0 million
• Supply of trackwork products
• Status: To be completed in June 2019
-
FINANCIAL HIGHLIGHTS
-
Financial Highlights
➢ The Group achieved a revenue of RM274.2 million as compared to RM250.8 million registered in the previous financial year.
➢ The increase of revenue was due to higher turnover registered in both Construction and Manufacturing divisions.
➢ For the financial year ended 31 March 2018, MTD ACPI posted a pre-tax profit of RM9.0 million versus pre-tax loss of RM8.5 million recorded in the preceding year.
➢ The improvement of profit was mainly due to the finalization of the acceleration claims in the Klang Valley Mass Rapid Transit Project Package 7 (MRT Package V7).
➢ As at 31 March 2018, MTD ACPI’s net assets per share stood at RM0.41.
REVENUE
274.2 Mil
PRE-TAX PROFIT
9.0 MilEARNING PER SHARE
3 SenSHAREHOLDERS’
FUND
80.2 milNET ASSETS PER SHARE
0.41
-
5-Year Financial Highlights
*excluding discontinued operations
PRE-TAX PROFIT/(LOSS) (RM Million)
*2017
2018
*2016
2015
2014
9.00
(8.55)
5.24
(27.40)
(100.97)
(100) (50) 0 3 6 9
REVENUE (RM Million)
*2017
2018
*2016
2015
2014
0 100 200 300
274.16
250.79
249.54
353.28
328.19
-
5-Year Financial Highlights
NET ASSETS PER SHARE (RM)
2017
2018
2016
2015
2014
0 0.1 0.2 0.3
0.41
0.43
0.460.27
0.38
0.4
SHAREHOLDERS’ FUND (RM Million)
2017
2018
2016
2015
2014
0 20 40 60
80.24
82.11
91.40
47.07
75.99
80 100
EARNING/(LOSS) PER SHARE (Sen)
2017
2018
2016
2015
2014
(50) (40) (30) (20) (10) (0)
3
(3)
(2)
(14)
(41)
-
PROJECT UPDATES
-
MTD ACPI ENGINEERING BERHAD
Completed Projects (FYE 2018)
Value: RM3.03 millionCompleted in April 2017
Jabatan Kimia, Cawangan Terengganu
Balai Polis Country Homes, RawangValue: RM2.67 millionCompleted in May 2017
Value: RM500 millionCompleted in July 2017
KVMRT Sungai Buloh – KajangLine Package V7
Jimah East Coal Fired Plant,Port DicksonValue: RM8 millionCompleted in September 2017
BALAIPOLIS
JABATANKIMIA
FIREDPLANT
Petronas Rapid – P12B Solid Product Jetty & Associated Handling Facilities at TanjungSetapa, JohorValue: RM13.4 millionCompleted in May 2017
PETRONASRAPID
MRTV7
Manufacturing Construction
file:///E:/AR2018/ACPM/SELECTED/BalaiPolisCountryHomes.jpgfile:///E:/AR2018/ACPM/SELECTED/Jabatan Kimia KT.jpgfile:///E:/AR2018/ACPM/SELECTED/Jimah PD-01.jpgfile:///E:/AR2018/ACPM/SELECTED/Pengerang4_Edited.jpgfile:///E:/AR2018/ACPM/SELECTED/KVMRT V7.jpg
-
MTD ACPI ENGINEERING BERHAD
KVMRT Sungai Buloh – Kajang Line Package V7
• Client: MRT Corp• Location: Bandar Tun Hussein Onn, Cheras to Taman Mesra, Kajang• Station: Station 30 - Batu 11, Cheras and Station 31 – Bukit Dukung, Kajang• Length: 4km• Project duration: 5 years
Station 31 - Bukit Dukung, KajangStation 30 – Batu 11, Cheras
-
MTD ACPI ENGINEERING BERHAD
Jabatan Kimia, Cawangan Terengganu
• Client: Jabatan Kerja Raya (JKR)• Product Supplied: Industrialised Building System (IBS)-Column, beam, staircase, slab and wall• Project duration: 4 months
-
MTD ACPI ENGINEERING BERHAD
Balai Polis Country Homes, Rawang
• Client: Jabatan Kerja Raya (JKR)• Product Supplied: IBS - Column beam and slab• Project duration: 4 months
-
MTD ACPI ENGINEERING BERHAD
Jimah East Coal Fired Plant, Port Dickson
• Client: Tenaga Nasional Berhad (TNB)• Project detail: Jetty for power coal plant• Product Supplied: Precast concrete beam• Project duration: 16 months
-
MTD ACPI ENGINEERING BERHAD
Petronas Rapid – P12B Solid Product Jetty & Associated Handling Facilities at Tanjung Setapa, Johor
• Client: Petroliam Nasional Berhad (PETRONAS)• Project detail: Pengerang Marine Jetty• Product supplied: Precast slab and beam• Project duration: 12 months
-
MTD ACPI ENGINEERING BERHAD Manufacturing Construction
Current Projects (FYE 2018/FYE 2019)
FLOOD MITIGATION
JETTY
TAMANSUTERA
Taman Sutera Kajang, SelangorValue: RM106 millionExpected completion date: July 2020
Taman Tasik Utama, Ayer Keroh, Melaka – Phase 19C & 19DValue: RM14.5 millionExpected completion date: November 2018
Flood Mitigation - Sg. Tok Jiring, TerengganuValue: RM19.8 millionExpected completion date: March 2019
EPCC Solid Product Jetty & AssociatedHandling Facilities at Tanjung Setapa,JohorValue: RM38 millionExpected completion date: July 2018
KVMRT Sungai Buloh – PutrajayaLine Package V208Value: RM679 millionExpected completion date:April 2022
TAMANTASIK
UTAMA
DASH/SUKEValue: RM25 millionExpected completion date: December 2019
SINGAPORE
Singapore T250 TrackworkThomson LineValue: RM30 millionExpected completion date: June 2019
IBS
Universiti Sultan Zainal Abidin (UniSZA), TerengganuValue: RM8 millionExpected completion date: October 2018
Ibu Pejabat Polis Daerah Nilai, Negeri SembilanValue: RM3 millionExpected completion date: March 2019
IPD
DASH/SUKE
MRTV208
SOLID PRODUCT
JETTY
-
MTD ACPI ENGINEERING BERHAD
Flood Mitigation - Sg. Tok Jiring, Terengganu
• Client: Jabatan Pengairan dan Saliran Negeri Terengganu (JPS)• Product supplied: Precast pre-stressed sheet pile• Length: 8.64 km• Target completion date: March 2019
-
MTD ACPI ENGINEERING BERHAD
Sungai Besi-Ulu Klang Elevated Expressway (SUKE)
CB5
SUKE
: Project area
• Client: Projek Lintasan Kota Holdings Sdn Bhd (Prolintas)• Location: CB5 - Ulu Klang to Ampang Point• Product supplied: Precast beam• Target completion date: December 2019
-
MTD ACPI ENGINEERING BERHAD
Damansara- Shah Alam Elevated Expressway (DASH)
DASH
: Project area
• Client: Projek Lintasan Kota Holdings Sdn Bhd (Prolintas)• Location: CA1 - UiTM Puncak Perdana to Alam Suria
CB1 - Surian to Section 5, Kota Damansara CB2 - Section 5, Kota Damansara to NKVE
• Product supplied: Precast pre-stressed beam, parapet• Target completion date: December 2019
-
MTD ACPI ENGINEERING BERHAD
Singapore T250 Trackwork Thomson Line (From Mandai Depot, Woodlands to Garden Bay)
• Client: Land Transport Authority (LTA), Singapore
• Product supplied: Railway products (Precast walkway, cable trough, precast level crossing, pit cover)
• Length: 43 KM• Target completion date: June
2019
-
MTD ACPI ENGINEERING BERHAD
KVMRT Sungai Buloh – Putrajaya Line Package V208
• Client: MRT Corp• Location: Taman Pinggiran Putra to Persiaran Alpina, Seri
Kembangan
Zeva Residence
The Atmosphere
View of the construction area from Jalan Putra Permai, Sri Kembangan
View of the construction area nearby Zeva Residence, Jalan Pinggiran Putra, Sri Kembangan
• Station: Equine Park and Taman Putra Permai• Length: 3.5km• Target completion date: 30 April 2022
-
MTD ACPI ENGINEERING BERHAD
Taman Sutera Kajang - Phase 7
• Client: Modal Ehsan Sdn Bhd• Project detail:
-Construction of 2 blocks of 18 storey building comprising 392 units of service apartments
-Built up units from 872 sq.ft. to 2,089 sq.ft.
Location map
• Target completion date: 10 July 2022
-
MTD ACPI ENGINEERING BERHAD
Taman Tasik Utama, Ayer Keroh, Melaka – Phase 19C & 19D
• Client: Metacorp Berhad• Project detail : Construction of 93 units of single storey terrace house (25’x 80’)• Target completion date: 21 November 2018
Location map
-
MTD ACPI ENGINEERING BERHAD
Potential Projects Being Pursued (FYE 2019)
RM900 millionSabah
Sabah Pan Borneo Highway Sindumin – Tawau(2 packages)
PANBORNEO
Lebuhraya Damansara – Shah Alam (DASH) Package CB2
RM17 millionSelangor
RM26 millionPerak - Selangor
West Coast Expressway (WCE)
WCE
RM22 millionSelangor
LRT3
LRT3
RM6.5 millionJohor
Pengerang Deep Water Jetty 2 – Phase 3 DEEP-
WATER
Paroi-Senawang-KLIA-Salak TinggiExpressway (SKLIA)
RM300 millionNegeri Sembilan - Selangor
SKLIA
RM15 millionSelangor
Bukit Raja Phase 2 Mix Development
BUKIT RAJA
RM37 millionSingapore
Housing Project Singapore- SengkangWestway, Changi
HOUSINGPROJECTRM20.5 million
Singapore
Track World for Circle Line 6 -Depot Terminal & North East Mainline, Singapore
CIRCLE LINE
6
PenangAirport Upgrading
RM10 millionPenang
AIRPORT
Various projects
RM10 millionTerengganu
IBS
RM48 millionJohor
Gemas – Johor BahruDouble Track DOUBLE
TRACK
DASH
Manufacturing Construction
-
THANK YOU