MTD ACPI ENGINEERING BERHAD Mr Tee Kim Siew Chief Executive Officer Presentation to Shareholders 6 September 2018

Upload: others

Post on 05-Feb-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

  • MTD ACPI ENGINEERING BERHAD

    Mr Tee Kim SiewChief Executive Officer

    Presentation to Shareholders6 September 2018

  • Contents

    CORPORATE INFORMATION➢ Key Senior Management

    KEY HIGHLIGHTS➢ Construction➢ Manufacturing

    PROJECT UPDATES➢ Completed Projects (Financial Year Ended 2018

    [FYE 2018])➢ Current Projects (FYE 2018/FYE 2019)➢ Potential Projects Being Pursued (FYE 2019)

    FINANCIAL HIGHLIGHTS➢ 5-Year financial highlights

    1

    2

    3

    4

  • CORPORATE INFORMATION

  • Key Senior Management

    LOW CHONG BOO, HARRY

    Advisor, Overseas Ventures-Manufacturing

    KOR JIANN KYANSenior Manager, Head,

    Finance & Treasury Division

    AHMAD TARMIZI ISMAILGeneral Manager, Head,

    Construction DivisionTEE KIM SIEW

    Chief Executive Officer

    VIJAYARAJ A/L GOVINDARAJOOGeneral Manager,

    Business Development

    MAHADZIR HASSAN @ MD. HASSAN

    Assistant General Manager,Head, Manufacturing Division

  • Key Highlights (Construction)

    KVMRT Line 1(Sg. Buloh – Kajang)

    ➢ Package V7 (Bandar Tun

    Hussein to Taman Mesra)

    • Contract amount: RM500

    million

    • Status: Completed on 17

    July 2017 (Contractual

    completion date - 31 July

    2017)

    KVMRT Line 2(Sg. Buloh – Serdang – Putrajaya)

    ➢ Package V208 (Taman

    Pinggiran Putra to Taman

    Alpinia)

    • Contract amount: RM679

    million

    • Progress to date: 26%

    Residensi Sutera 7(Taman Sutera Kajang)

    ➢ 392 Service Apartment Units

    • Contract amount: RM106

    million

    • Progress to date: 5%

  • Key Highlights (Manufacturing)

    Petronas Rapid - P12B Solid Product Jetty & Associated Handling FacilitiesTanjung Setapa, Johor Bahru

    ➢ Phase 1

    • Contract amount: RM13.4 million

    • Status: Completed in May 2017 (on time)

    ➢ Phase 2

    • Contract amount: RM 38.0 million

    • Status: Completed in June 2018 (on time)

    T250 Trackwork Thomson Line Project, Singapore

    ➢ Contract amount: RM30.0 million

    • Supply of trackwork products

    • Status: To be completed in June 2019

  • FINANCIAL HIGHLIGHTS

  • Financial Highlights

    ➢ The Group achieved a revenue of RM274.2 million as compared to RM250.8 million registered in the previous financial year.

    ➢ The increase of revenue was due to higher turnover registered in both Construction and Manufacturing divisions.

    ➢ For the financial year ended 31 March 2018, MTD ACPI posted a pre-tax profit of RM9.0 million versus pre-tax loss of RM8.5 million recorded in the preceding year.

    ➢ The improvement of profit was mainly due to the finalization of the acceleration claims in the Klang Valley Mass Rapid Transit Project Package 7 (MRT Package V7).

    ➢ As at 31 March 2018, MTD ACPI’s net assets per share stood at RM0.41.

    REVENUE

    274.2 Mil

    PRE-TAX PROFIT

    9.0 MilEARNING PER SHARE

    3 SenSHAREHOLDERS’

    FUND

    80.2 milNET ASSETS PER SHARE

    0.41

  • 5-Year Financial Highlights

    *excluding discontinued operations

    PRE-TAX PROFIT/(LOSS) (RM Million)

    *2017

    2018

    *2016

    2015

    2014

    9.00

    (8.55)

    5.24

    (27.40)

    (100.97)

    (100) (50) 0 3 6 9

    REVENUE (RM Million)

    *2017

    2018

    *2016

    2015

    2014

    0 100 200 300

    274.16

    250.79

    249.54

    353.28

    328.19

  • 5-Year Financial Highlights

    NET ASSETS PER SHARE (RM)

    2017

    2018

    2016

    2015

    2014

    0 0.1 0.2 0.3

    0.41

    0.43

    0.460.27

    0.38

    0.4

    SHAREHOLDERS’ FUND (RM Million)

    2017

    2018

    2016

    2015

    2014

    0 20 40 60

    80.24

    82.11

    91.40

    47.07

    75.99

    80 100

    EARNING/(LOSS) PER SHARE (Sen)

    2017

    2018

    2016

    2015

    2014

    (50) (40) (30) (20) (10) (0)

    3

    (3)

    (2)

    (14)

    (41)

  • PROJECT UPDATES

  • MTD ACPI ENGINEERING BERHAD

    Completed Projects (FYE 2018)

    Value: RM3.03 millionCompleted in April 2017

    Jabatan Kimia, Cawangan Terengganu

    Balai Polis Country Homes, RawangValue: RM2.67 millionCompleted in May 2017

    Value: RM500 millionCompleted in July 2017

    KVMRT Sungai Buloh – KajangLine Package V7

    Jimah East Coal Fired Plant,Port DicksonValue: RM8 millionCompleted in September 2017

    BALAIPOLIS

    JABATANKIMIA

    FIREDPLANT

    Petronas Rapid – P12B Solid Product Jetty & Associated Handling Facilities at TanjungSetapa, JohorValue: RM13.4 millionCompleted in May 2017

    PETRONASRAPID

    MRTV7

    Manufacturing Construction

    file:///E:/AR2018/ACPM/SELECTED/BalaiPolisCountryHomes.jpgfile:///E:/AR2018/ACPM/SELECTED/Jabatan Kimia KT.jpgfile:///E:/AR2018/ACPM/SELECTED/Jimah PD-01.jpgfile:///E:/AR2018/ACPM/SELECTED/Pengerang4_Edited.jpgfile:///E:/AR2018/ACPM/SELECTED/KVMRT V7.jpg

  • MTD ACPI ENGINEERING BERHAD

    KVMRT Sungai Buloh – Kajang Line Package V7

    • Client: MRT Corp• Location: Bandar Tun Hussein Onn, Cheras to Taman Mesra, Kajang• Station: Station 30 - Batu 11, Cheras and Station 31 – Bukit Dukung, Kajang• Length: 4km• Project duration: 5 years

    Station 31 - Bukit Dukung, KajangStation 30 – Batu 11, Cheras

  • MTD ACPI ENGINEERING BERHAD

    Jabatan Kimia, Cawangan Terengganu

    • Client: Jabatan Kerja Raya (JKR)• Product Supplied: Industrialised Building System (IBS)-Column, beam, staircase, slab and wall• Project duration: 4 months

  • MTD ACPI ENGINEERING BERHAD

    Balai Polis Country Homes, Rawang

    • Client: Jabatan Kerja Raya (JKR)• Product Supplied: IBS - Column beam and slab• Project duration: 4 months

  • MTD ACPI ENGINEERING BERHAD

    Jimah East Coal Fired Plant, Port Dickson

    • Client: Tenaga Nasional Berhad (TNB)• Project detail: Jetty for power coal plant• Product Supplied: Precast concrete beam• Project duration: 16 months

  • MTD ACPI ENGINEERING BERHAD

    Petronas Rapid – P12B Solid Product Jetty & Associated Handling Facilities at Tanjung Setapa, Johor

    • Client: Petroliam Nasional Berhad (PETRONAS)• Project detail: Pengerang Marine Jetty• Product supplied: Precast slab and beam• Project duration: 12 months

  • MTD ACPI ENGINEERING BERHAD Manufacturing Construction

    Current Projects (FYE 2018/FYE 2019)

    FLOOD MITIGATION

    JETTY

    TAMANSUTERA

    Taman Sutera Kajang, SelangorValue: RM106 millionExpected completion date: July 2020

    Taman Tasik Utama, Ayer Keroh, Melaka – Phase 19C & 19DValue: RM14.5 millionExpected completion date: November 2018

    Flood Mitigation - Sg. Tok Jiring, TerengganuValue: RM19.8 millionExpected completion date: March 2019

    EPCC Solid Product Jetty & AssociatedHandling Facilities at Tanjung Setapa,JohorValue: RM38 millionExpected completion date: July 2018

    KVMRT Sungai Buloh – PutrajayaLine Package V208Value: RM679 millionExpected completion date:April 2022

    TAMANTASIK

    UTAMA

    DASH/SUKEValue: RM25 millionExpected completion date: December 2019

    SINGAPORE

    Singapore T250 TrackworkThomson LineValue: RM30 millionExpected completion date: June 2019

    IBS

    Universiti Sultan Zainal Abidin (UniSZA), TerengganuValue: RM8 millionExpected completion date: October 2018

    Ibu Pejabat Polis Daerah Nilai, Negeri SembilanValue: RM3 millionExpected completion date: March 2019

    IPD

    DASH/SUKE

    MRTV208

    SOLID PRODUCT

    JETTY

  • MTD ACPI ENGINEERING BERHAD

    Flood Mitigation - Sg. Tok Jiring, Terengganu

    • Client: Jabatan Pengairan dan Saliran Negeri Terengganu (JPS)• Product supplied: Precast pre-stressed sheet pile• Length: 8.64 km• Target completion date: March 2019

  • MTD ACPI ENGINEERING BERHAD

    Sungai Besi-Ulu Klang Elevated Expressway (SUKE)

    CB5

    SUKE

    : Project area

    • Client: Projek Lintasan Kota Holdings Sdn Bhd (Prolintas)• Location: CB5 - Ulu Klang to Ampang Point• Product supplied: Precast beam• Target completion date: December 2019

  • MTD ACPI ENGINEERING BERHAD

    Damansara- Shah Alam Elevated Expressway (DASH)

    DASH

    : Project area

    • Client: Projek Lintasan Kota Holdings Sdn Bhd (Prolintas)• Location: CA1 - UiTM Puncak Perdana to Alam Suria

    CB1 - Surian to Section 5, Kota Damansara CB2 - Section 5, Kota Damansara to NKVE

    • Product supplied: Precast pre-stressed beam, parapet• Target completion date: December 2019

  • MTD ACPI ENGINEERING BERHAD

    Singapore T250 Trackwork Thomson Line (From Mandai Depot, Woodlands to Garden Bay)

    • Client: Land Transport Authority (LTA), Singapore

    • Product supplied: Railway products (Precast walkway, cable trough, precast level crossing, pit cover)

    • Length: 43 KM• Target completion date: June

    2019

  • MTD ACPI ENGINEERING BERHAD

    KVMRT Sungai Buloh – Putrajaya Line Package V208

    • Client: MRT Corp• Location: Taman Pinggiran Putra to Persiaran Alpina, Seri

    Kembangan

    Zeva Residence

    The Atmosphere

    View of the construction area from Jalan Putra Permai, Sri Kembangan

    View of the construction area nearby Zeva Residence, Jalan Pinggiran Putra, Sri Kembangan

    • Station: Equine Park and Taman Putra Permai• Length: 3.5km• Target completion date: 30 April 2022

  • MTD ACPI ENGINEERING BERHAD

    Taman Sutera Kajang - Phase 7

    • Client: Modal Ehsan Sdn Bhd• Project detail:

    -Construction of 2 blocks of 18 storey building comprising 392 units of service apartments

    -Built up units from 872 sq.ft. to 2,089 sq.ft.

    Location map

    • Target completion date: 10 July 2022

  • MTD ACPI ENGINEERING BERHAD

    Taman Tasik Utama, Ayer Keroh, Melaka – Phase 19C & 19D

    • Client: Metacorp Berhad• Project detail : Construction of 93 units of single storey terrace house (25’x 80’)• Target completion date: 21 November 2018

    Location map

  • MTD ACPI ENGINEERING BERHAD

    Potential Projects Being Pursued (FYE 2019)

    RM900 millionSabah

    Sabah Pan Borneo Highway Sindumin – Tawau(2 packages)

    PANBORNEO

    Lebuhraya Damansara – Shah Alam (DASH) Package CB2

    RM17 millionSelangor

    RM26 millionPerak - Selangor

    West Coast Expressway (WCE)

    WCE

    RM22 millionSelangor

    LRT3

    LRT3

    RM6.5 millionJohor

    Pengerang Deep Water Jetty 2 – Phase 3 DEEP-

    WATER

    Paroi-Senawang-KLIA-Salak TinggiExpressway (SKLIA)

    RM300 millionNegeri Sembilan - Selangor

    SKLIA

    RM15 millionSelangor

    Bukit Raja Phase 2 Mix Development

    BUKIT RAJA

    RM37 millionSingapore

    Housing Project Singapore- SengkangWestway, Changi

    HOUSINGPROJECTRM20.5 million

    Singapore

    Track World for Circle Line 6 -Depot Terminal & North East Mainline, Singapore

    CIRCLE LINE

    6

    PenangAirport Upgrading

    RM10 millionPenang

    AIRPORT

    Various projects

    RM10 millionTerengganu

    IBS

    RM48 millionJohor

    Gemas – Johor BahruDouble Track DOUBLE

    TRACK

    DASH

    Manufacturing Construction

  • THANK YOU