AD-AIIO 321 AAI CORP COCKEYSVILLE MO F/6 5/9MINUTES OF PHYSICAL CONF IGURATION AUDIT FOR THE F-16 ELECTRONIC--ETC(U)
DEC_81 F3365779-C-0820
UNCLASSIFIED AAI-ER-11613 N
EEEEEommhhmmhohhI
I ffllffllffllffll.
1.0 3 28
III1I25 11111.41-6
U I L 'N !I f.4',?
A TA
~~~~~Y n v,4 (f
1 - V . ,
UWr4
45' 1 -- 'I. ,
$44
k. . j
Ao,
'Il *
Tjk*
LEVEL
A SUBSI0IARY OF UNITED INDUSTRIAL CORPORATION
MINUTES
OF
PHYSICAL CONFIGURATION AUDIT
FOR THE
F-16 ELECTRONIC WARFARE --- -
TRAINING DEVICE
Report No. ER-11613 "-
December 1981 * '-- -: I
Date
Contract No. F33657-79-C-0820
Sequence No. OOCData Item No. DI-E-3118/M
R. Putnam .
AAI/Configurat ion Manager
. - ' "" .. Z.: .-- - - : .:.... -- ,-,*- . . . . . ...
Table of Contents
Section Page
I I. Discussion1
II. Coimments on PCA 2
III. List of Attendees 3
IV. In Plant PCA Plan 4
V. List of Assemblies
to be Audited 5
VI. PCA Agenda 6
IVII. Configuration AuditDiscrepancy/Conunent Reports7
ii SECTION I-
DISCUSSION
Pae
I DISCUSSION
1In accordance with the contract and tht Configuration Management PlanI a Physical Configuration Audit (PCA) of the F-16 Electronic Warfare Training
Device was condi~cted by Aeronautical Systems Division personnel from
14~ December thru 16 December 1981 at the facilities of AAI Corporation,
ICockeysvil le, Maryland.The purpose of this audit was to conduct a formal examination of the
as-built version of the simulator against its technical engineering drawings
in order to establish the simulator's Product Baseline.
The audit team was supplied with all documentation required to
perform a complete PCA to the hardware consisting of hardware drawings,
manufacturing orders, release sheets, master engineering data list and
1commercial manuals of the computer and CRT units.Thirty discrepancy/comment reports were written. Each of these
reports have been annotated with corrective action and are included as
Section VII of these minutes.
IIIIIIIII SECTION II t
I COMMENTS ON PCA
IIII1IIII Page 2
t-. V.,,, "A.
The F-16 EWTD Physical Configuration Audit conducted 14-16 December 1981
was very well supported by the AAI team. The results showed very good
documentation and configuration control. A conditional product baseline is
established by this audit to be completed after correction of noted discrepancies
and recheck of any items changed as a result of integration with the F-16 TFS.
ITAC DTT will recheck the AAI corrections and clear the checklists as theyare presented. Documentation corrections may be cleared at AAI, but hardware
corrections must be cleared in Houston with accompanying documentation to
I be supplied by AAI.
I Peggy JonesCo-ChairpersonF-16 EWTD PCA
III
I We, TAC, conclude the F-16 EWTD Hardware PCA went extremely well.
I Good advance planning on the part of the USAF and AAI resulted in a smooth and
comprehensive audit. We wish to thank the AAI audit team for their efforts.I
Sgt. J. HigginsI •F-16 DTT
• - c:-•.. ", - ~' ' L.. ... . .*'" " : " e-"..' ' .: I
III
I1II
11I SECTION III
iLIST OF ATTENDEES
IIIIIIII Page 3
L-. I-. -....
LIST OF ATTENDEES
l NAME LOCATION/CODE PHONE
I R. Putnam AAI Corporation (301) 628-8410
Configuration Management
P. Jones ASD/YWC (513) 255-7296
Configuration Management
P. Hufham 388 CRS/MACD (801) 777-3085
Lt. Jay Trageser ASD/YWL (513) 255-7491
E. Rektorik AAI Corporation (301) 628-3042
Lead Engineer
C. Barnes AAI Corporation (301) 628-3157
Design
J. Higgins 388TFW/LGMD (801) 777-3827
I D. George ASD/YWD (513) 255-7288
D. Amsler AAI Corporation (301) 628-3617Quality Assurance
IIIIII
-,-
4,
1II1IIIIj SECTION IV
I IN PLANT PCA PLAN
IIIIIII Page 4
I a
DEPARTMENT OF THE AIR FORCEHEADQUARTERS AERONAUTICAL SYSTEMS OIVISION CAFSC)
WRIGHT-PATTERSON AIR FORCE BASE. OHIO 45433
YWKB
r -16 EWTD Contract F33657-79-C-0820, Functional Configuration
Audit/Physical Configuration Audit (FCA/PCA) Requirement
ITO. AAI CorporationAttn: Mr. H.W. WinstonP.O. Box 6767Baltimore, MD 21204
1. Paragraph B8062A.9 of the F-16 EWTD Statement of WorkI requires a PCA be conducted on the EWTD in accordance withMIL-STD-1521. This paragraph also states that the FCA/PCA
shall be continued after shipment and installation and
I finished prior to Air Force acceptance.
2. This plan takes into consideration the proposed schedulesubmitted by AAI letter 130/CE-4053, 12 Aug 81, which will beresponded to under a separate letter. During Phase 1, anIn-plant audit will be conducted immediately after USAF
I in-plant testing, to establish a conditional hardware base-line. It Is estimated to take three to four days for thiseffort. The product baseline will be fully establishedduring Phase II after integration and USAF testing. The FCAwill be conducted after completion of USAF testing justprior to the final PCA. A configuration inspection of unit#2 vill be required prior to tear down and shipment to the
I Integration site.
3. Request AAI review the attached plans and indicate con-currence or nonconcurrence by letter to the Air Force nolater than 21 Sep 81. Also provide start date for PCA.
2 AtchsW4I. In-plant PCA Plan
RICHARD S. WHITE, Major, USAF 1. PCA ChecklistI Group Leader, Contracts Div 4FCF 2 A c
Deputy for Simuilators-DATiu ( to: DCASMA, Baltimore
.. i.
-- ..- -
IN PLANT PCA PLAN
SCOPE: The purpose of this audit is to conduct a formal
examination of the as-built version of the simulator against
its technical documentation in order to establish the simulator's
basis.
TIME: After USAF in-plant testing and prior to tear down for
shipment. During the audit, the trainer will have power "off"
Iand therefore will be unavailable for any other activity.REQUIREMENT: a. At the time of audit, for the selected
assemblies AAI shall compile and make available the following
g information for ready references:
* List of approved/pending (if any) changes to the
I designated assemblies.
• List of shortage items.
* Drawing Index - breaking out family tree with
' current revision level and outstanding engineering changes.
0 A copy of current corporate engineering change
' procedures.
0 A list of outstanding deviatiens!aivers.
0 Component cross reference list.
0 Current blueprints of those assemblies/detail
parts, selected by ASD as those items to be audited. (To
I include inspection records)
g b. AAI shall provide the following for the
audit team:
. Equipment needed for the audit, as required.
h . A large working bench for blueprint layout near
the trainer.
It~
,-.if
PROCEDURES: a. A random selection of assemblies will be
I made using AAI's drawing tree. The QAR records, MRB action
records, shortage slips, deviations/waivers and drawings
I versus hardware will be thoroughly inspected. Five working
I days prior to the scheduled audit, AAI will be notified which
assemblies have been selected.
b. Upon start of the audit AAI will provide all
I of the required documentation.
c. The selected assemblies will be inspected
after the documentation has been thoroughly audited.*
d. The PCA team will conduct a "walk through"
review of the engineering release system for familiarization,
I • and to observe how the configuration management system operatesfrom initial design through release, including changes.
I *Recommend utilizing the attached checklist/DR form (modified
as/if required) for recording audit information.
POST PCA REQUIREMENTS - Upon completion of the PCA, AAI shall
I prepare and distribute minutes in accordance with DI-E-3118
documenting the audit. These minutes shall include, but not
I be limited to: I
• Overview
List of assemblies audited
.. Team members
* Findings (copies of checklist/DR Form)
1. Follow-up action
I -
I
I.
L S ". N-'t. PCA CIIECKLISI
T'PE: GF., SCRIE. PL, ETC. I |
:I NO.: SERIAL NO.: REJECT
C.,ATURE: YES NO MAJOR MINOR
(E I.ATlON ____ _ _ _ _ _ _ _ _ _ _ _I_ _ _ _ _
k v-fc.ed Changes Referenced on Dg (ECN)k oved Changes Incorporated in Dwg (ECN) __,_.
-CSON VERIFICATION ..... _
rclatest Revision Status
EC:s Incorporated '"__
er
W_:t- E AUDIT IPlt ,arking in Accordance with Dw8R urements
AM Materials/Parts Required by DwgI!orPora t e d ...
D ensions in Accordance with Drawing
Aproved Changes Incorporated ECN/DCNs
'1her
:RifANCI ES /COVIENTS DOCUMENTATION
I MHARD WARE
i I
AUDITED BY: DATE:
, |jIVE ACTION/CoMENTS
-I ...NAME: DATE:
:dIK ACTION/DISPOSITIONf, aI
I , m
SETOLITOISSMLETOBIUIE
PaeI
-Ole .n'ki f .Z1i L'v'
3. P3)eC As~r
8. 5619-494j Col.c Mruct.ary i) Andica~
7. 56919-01 i TI StInd A,,%, C7blv
10. 56919-c10- cnafi!r.are cont. ralie
12. 59.-.D5IhvS*,-.1 Fmrssor
I14. LYS-D)5-V3Z .45%"11r pv..er Supply15. .. S-B-24 4&25VPLC Povier Su.-',-1v1b. IX--54P'rSupp1-
18. 56919-9W)007 Rart~itlne 1520 CRT
9,5691 -91x01 r-16 11" Zc-utcr Sc
21.~9C%~ \T 511 Yiwka-Disz22. 1P131 1AL I zmLith Indicator23. -13 NOV39 Shlutart Floppy~ Disc
.%-(.56919-411030 IVIC and Overhrist S,-n-or23. 56919-40OD3 P.O.C. Sciisor26. 56919-40,5.10 IQTR YxtncrbosrdI 27 4013.4711-1DI-nIrecticoial1.1iff. Driver28. 401 33-47!J03 Lxpandab)e I)-Coder29. 40133-47001 NMRI) 110 CrmtrQ1I30. 56919-4-7002 Triple'16-bit Register31. 3 6919-1.7w5 lirl,ay Sym~ol Pticesq.or32. 56919-47005 sy-rlbnl- GeneratorI33. '6919-472101 69 Display Driver34. 0-133-020S P
36. 5'.919-470'09 Spclai Effects Audio37 . 3Vn/nector38. Sol~P1 & SIdc r39. M' 0~ 7 8- 1- 2 . 7 V1 re40. IMS 2 7,3 7 -2 6 Switch, Thct~!c
41. hM9500/521-02 Lig:ht, Dichd
43. 27!2-0I(.i.c*
4. 3I V5 - LI etclr
.Err!(Con i no,.l
55. 1,:2 .166so05
5 . .2 l .?9A ,. :24 . ! 5 eev Jr' , I ~ t a o59. Panl, Ed.e LitI ~6,.,F."-ST- Itzli citor Lamp
61. 1C'S003C tat
S6 . 1He1 Arithetic1Ok. 112 Regis. ers
66. OR Loete6711I67 4K PRON
60. 10Th Micr Addressing
72.1120 Tie C.,.rc-I ? 155lnt t /ru.t r= ol
72.112; Tans;ceiver rcntial
I 1119 Transceivcr r74 11Z5 Transceiver DatA75. 1166 Progra-:able ClockI316 104, Paging77. 117i W"Im'l Control7E. 1114 Panel 1Pansrseivcr79. 1115 lavp RegisterPC,. 1096 DLK Mdress81. 1093 granci; Transceiver82. 1101 $ranrh ControlSy . 1 326 3? ).1%' RA'
h4. 095 TerrjnI ,Buffer£f,. fillFlo:py Disc C:ontrol
S7)113q Floppy Disc Data
6I, 112 6 Cache .1cnoryS9,3 11i2 PYk Inervface
I1 D -f (en.t ia I: . r92. }01 3 De~vice o ;,st3J 3 3 -.4 TY. ,. .,% .r94. 1036 Disc Transcfi'vr905 10 3 .'7 L' IP.c Q.t rol96 1P37 Dei ,
M t {, isc i .0,1t.,,,,a t "
.., I '. S . . , /
I1I
I
S1. "0133- 47001
2. 1 33-470D I
1 3. 0M3-47011-1
4. 40133-472DS
S. 56919-4 7002
6 7 5b919-470r
7. 56919-47005
1 , 56919-47006
5 9. 56919-4,",20.
-10. 5 6919-472C,1
IUII
t i
II
IIIIIII SECTION VI
I PCA AGENDA
f
IIIII Page 6
~ - -. .. . ... ~
Physical Configuration Audit AgendaI F-16 Electronic Warfare Training Device
Audit Date: 14 - 16 December 1981
Location: AAI Corporation (F-16 Lab "N" Bldg.)
Security Clearance: Unclassified
Contract: F33657-79-C-0820
I Equipment: F-16 EWTD
I Scope/Purpose:
IA Physical Configuration Audit (PCA) will be conducted on the F-16 Device toinsure accuracy of the identifying documentation and to establish a finalproduct baseline.
I Previous Reviews:
I Preliminary Design Review 24 June 1980Critical Design Review 6 - 9 April 1981
Guidance Documentation for ?CA:
DOD-STD-480 Configuration Control - Engineering Changes, Deviations andWaivers - 12 April 1978
I MIL-STD-482 Configuration Status Accounting Data - 01 April 1974
MIL-STD-483 (USAF) Configuration Management Practices for Systems, Equipment,Munitions, and Computer Programs - 31 December 1970
i I'IL-STD-490 Specification Practices, with Change Dated 01 February 196930 October 1968
MIL-STD-1521A Technical Reviews and Audits for Systems, Equipment, andComputer Programs (Appendix F) - 29 September 1978
I~J
I0
. o 2-
I Detail Audit Itinerary
i 14 December 1981
0800Introduction of AttendeesReview of Equipment and Program StatusAudit Team Organization and Assignment of ResponsibilitiesReview of Drawings/Lists, Specifications, Etc.
1200Lunch
1300Audit Teams Continue Review
15 December 1981 Through 16 December if Required
0800Meeting of Audit TeamsReview of D!e-umentation Continued
i 1200 Lunch
1300 Audit Teaw -ontinue Review
I 16 December 1981 or Final Day
08001 1. Critique Audit
a. Identify Discrepancies and Corrective Actionsb. Prepare Minutes by Recording Audit Results/Discrepanciesc. Resolve Audit Discrepancies Recordedd. Establish Production Baseline for F-16 EWTD
1 2. Final Review and Audit
a. Prepare, Review and Sign minutes
III
* 9 -- , - .*- ,, ..-- -.- _.--,*, -.- --.-- ,Ill4~...,~
SETO1IIOF~RTO UI
DICEAC/OMNREOT
Pai
I--PEI0- -3The following assemblies in the NORD-10 computer were checked f or revision
levels, part numbers, and location in the computer. In the abbreviated
check, no discrepancies were found.
PIN Name
31062 Status1001 Arithmetic
31002 Registers
1007 Decoding
11006 OR Logic1167 4K Prom
11075 Micro Addressing
1120 Time Control
1058 Interrupt Control
I1008 Interrupt Register
1127 Transceiver Control
j1119 Transceiver Address
1125 Transceiver Data
1121 Panel Control
1114 Panel Transceiver
1115 Lamp Register
1096 DMA Address
1093 Branch Transceiver
1101 Branch Control1132 32 KW RAM
11095 Terminal Buffer1170 Ex~ternal Interrupt
11111 Floppy Disc Control
1118 Floppy Disc Data
1155 Bus Control
1126 Cache Memory
j1172 DMA Interface
1168 Differential DMA Adapter
1036 Disc Transceiver
1037 Disc Control1039 Disc Timing
- o.L PCA CHECKTST
..; ...... : Y q,9- 9d00,'- 9' , ¢ SERIAL NO. :
C .:.RE YES 1 MAJOR MINOR
Z. Ap:rcved C:ar.es Referenced on Dwg (ECN) I I I
,. A-prcved C.-.an3es Incorporated in Dwg (ECN) ___ ]_ _ _
-:,5=. CLO VERIFICA71ON'. To Latest Revision Status _ __ _ _ _
- :. Ec:" Incorporated ,
• Other i
:-DaWA:-RE AUDIT J_ _
7.. Parr Marking in Accordance with DwgRequirement s
S.. A1l Materials/Parts Required by Dwg
I ncorporated_
9. Dimensions in Accordance with Drawing
10. Approved Changes Incorporated ECN/DCNs __
il • Other
IMSCRET?AN'CES/COM2ENTS DOCUMEN4TATION
e"e /0 4 - 4 -S g!!" f / $-- //.-
" /- // C " , / I6 ,
AUDIED Y: ATE:*/ 4 /Z -RE
" /= - // '-7it "7#' - 9 ,. f
CORRCIE ACTIO /COV,4ENTS A-A- D 4-) C L
6rIGV -S /9 ,07 O7- A 19 AJ4 A./., 4AME: . DATE ; 2° / :/,
RECHECK ACTON/DISPOSZTION " ' l
"- . " "," -
.z.:- : N.. .A PCA CHECK .-S
:-:,:-::x E -. ., SS-A . ?L, ETC. 1 I
i ZV559/9-9 SERIAL NO.: REj EC:.
M EN... k 1 YES NO 0 MAJOR MINOR
z C2*-7- I ON1 _:.ra.,ing Released R
: A-.rcved Chanes Referenced on Dwg (ECN)
Aoorcved Changes Incorporated in Dwg (ECN) I_____ECTICN VE-R!FICATION I
. T:o Laces: Revision Status _ 1 _ _
: : E:.'s incornoraced I _ _ _ _
oterI
.RD,'ARE. AUDITP7. ?ar: Marking in Accordance with Dwg
* Reouirements
S. All Macerials/Parts Required by DwgS Incorporated
~.Dimensions in Accordance with Drawing ____________________
1J. Approved Changes Incorporated ECN/DCNs _ _ _
11L. Other I 1
3iSCREP.kCIES/CDIENTS DOCUMENTATION
HARDWARE
AUDITED BY: DATE://-/z
CORRECTIVE ACTION/COMENTS
T7, : A6 V c.
RECHECK ACTION IDISPOSITION
, .7"I M 41J . ---
- . FCA ChECKLIS[
-...:::: ..'.-- ., SCHE. FL, ETC. I " _ _ _ _ _ _ _"
-.:s:: I ___ __ __ __ __ __
.A: :;: O. : SERIAL ".0. REJECT
s *-,- Z: -t C., C-. .G P/Jro c YES NO MAJOR } 1INCORV N, 0MAJ O.t .41. '..CZ:: T TI 1.ON
Re:--: .,leased, ..--rzve-- Chzan;es Referenced on Dwg (ECN) 1
A, A';:rcved Changes Incorporated in Owg(C)'"e-r-S....=.,:E::TA7N r,.iFICA__ION___
-c;s inororaced I i
S. k-*I. Materials/Pars Required by Dwg 1Incorporazed
9. Diensions in Accordance with Drawing
10-. A oproved Changes Incorporated ECN/DCNs_11. Other _ 1.5 r R710 A N' C15J0NN E. . IN T S DOCUIENTATION
HARDWARE .
AUDITED BY: ,____DATE___
hl A E ae .... at R eiTe Eb
PEHC IcOoatDSIT
NAMiED : D)ATE i c '
\'O.~j CA CHECKLIST::::: T' ?: , Sj . L. ' C I
tIT I N':;.,:.- : SERIAL NO.: REJECT
"'"! ....... i r&, r? - !L £/, ,'-. P, I YES NO MAJOR MINOR
-AT.*!E: AT:c
L. 2rawing Released T. .pprc.'ed Canes Referenced on Owg (ECN) I I
3. Approved Chan3es incorporated in Dwg (ECN) _ _ j*..ECTTON V -RI FICA"'ON C____ N _____
. o Laces: Revision Status I _- ECs ~incoroorated jto Ocher i-iHARD'ARE AUDIT _
7. Par: Marking in Accordance with DwgRecui rements
8. Al Materials/Parts Required by Dwg
Zncor oraed _
9. Dimensions in Accordance with Drawing _ _
10. Approved Changes Incorporated ECN/DCNs
It. Other _
DISCR-?ANC!ES/COIMENTS DOCUMENTATION
c/ 9 /7., '-' , '-( z'c Re.' 6-,
.4 ed HARDWARE
'','.- /s .-., & c-..c
444 tc• ,e
AUDITED BY: DATE:
CORRECTIVE ACTION /CO.'LENTS /,) C, O/V eV3_&
N.~4 4. ~
RECHECK ACTION /DISPOSITION
. * e. . - - - - .. -- - " -
~-~5 ~FCA CHECKLIST
:YE .4, S-.PL. ETC.
.. SERIAL NO.: REJEC
e.R- . , ,. .i. i -C- t YES NO MAJOR MINOR
,. r:a',"-g Re' eased __ _ _ _
Apprvved C:a.ges Referenced on Dwg (ECN) 1 _ [
3. ADL'roved Chne Incorporaced in Dwg (ECN)____I_______________
,"S.= .CT 10\ VERIFICATION _
To La:es", Revision Status ___
. EC::s Incorporated J
. orher
i.?LRDWARE AUDIT , _ __
7. Par: Iarking in Accordance with DwgRequirements
S. All Materials/?arts Required by Dwg 7incor.ora ed_ I
3. irmensions in Accordance with Drawing
10. Approved Changes Incorporated ECN/DCNs [ "
i. Other
DISCREPANCIES/COMMENTS DOCUMENTATION
~HARDWARE
-L P
AUDITED BY: DATE: 90O~
CORRECTiVE ACTION /COMMENTS 77/145 .5A -p ,4.j i,OJu r
RECHECK ACTION/DISPOSITION
....... "J ---.. *..., -, e '.
.~S NO.~PCA CHECKLIST
)?;I~TYPE: GA, SC4E , PL, ETC. 62.t: , ZVI , 5I i0%,. *,.,. . -SERIAL NO: _______ REJECT
MC..YESE 1 1m40 N MAJOR. MINOR
1. Drawing Released A, _____±_____
1. Approved Chan3es Referenced on Dws (EC.N) 1 , _ _
3. Approved Changes Incorporated in Dwg (ECN)_ _ _
I:sPEcTION VERIFICATION
*. To Lacesc Revision Status ____ _ $5.E-C.s Incorporated _________I_____
o. Other 1
iARDWARE AUDIT __"
7. Part Marking in Accordance with DwgRequirement s
8. All Materials/Parts Required by Dwg
Incorporated ___ ,
9 Dimensions in Accordance with Drawing I
10. Approved Changes Incorporated ECN/DCNs _____' _
It. Other _
DISCREPANCIES/COIMENTS DOCUMENTATION
HARDWARE
AUDITED BY: ~IL- DATE:
..ORECTIVE ACTION /COM1ENTS
NAME; DATE:ECHECK ACTION /DISPOSITION
,jAMI1111111 11l : : " lI .. . . .ir. . .. ...
F, ECZL5 - NO.. . PCA CHECKLIST
.A.. 'TYPE: CA, SCE, PL, ETC. -6-1 IP'- I I I7 .o . SERIAL NO.: REJECT-
:"':E:;CL'TmE:.Fg ~ G- :'2.SE ( :_si)9 FI YES NO MAJOR MINOR
3~C MEXIT A 7 C.N 1D rawing Released ____
..pprove Changes Referenced on Dwg (ECN) ) , I _ _ .. ..__
K Approved Changes Incorporated in Dwg (EON) T _____1_____-I 1";S.=ECfON VERIFICATION ___ _
To Latest Revision Status _"_ _ I _-C.:s Incorporated I I ______
. other I "_,
LRDWARE AUDIT I7. Par: Marking in Accordance with Dwg
Reouirement s t _
i. All MaerialsIPares Required by DwgIncorporat ed____ __________________
. Dimensions in Accordance with Drawing
LO. Anproved Changes Incorporated ECN/DCNs I
11. Other I________________)ISCREPANCIES/COMENTS DOCUMENTATION
HARDWARE
AUDITED BY: i G / - DATE:
CORRECTIVE ACTION/COMMENTS
NAME: DATE:
RECHECK ACTION/DISPOSITION
. . - .. ,
::-E:KzI-: :0. _PCA CHECKLIST
:.-I:G TYPE: GA, SCHE, PL, ETC. L iEVis:0; 1 A II-
/9 70",- SERIAL NO.: REJECT
'3 N L. : ,T _Sdi i. ,_,0 c'<_Q . YES NO MAJOR . .MINOR
ra.ir. Released -lZFv __,.____
A:ozoved Changes Referenced on Dwg (ECN) ,__
A:provad Changes Incorporated in Dwg (ECN) __-
:NSPEZT:ON VERIFICATION
-. % Laces: Revision StatusE. .s Inc.rporated
~.Other P/ ~ ~ .
HARDWARE AUDIT7. Part Yarking in Accordance with Dwg
Reauirements LIX
S. All Ma:erials/Parts Required by Dwg 1Incorporated I
9. Dimensions in Accordance with Drawing 7 _
:0. Approved Changes Incorporated ECN/DCNs 1"-1. Other IDISCRZPANCIES/COMMENTS DOCUMENTATION , - . /. 7
'I'
- . J '5 - ",.5'O/o,, 7O/ 3 .C ;,Ci S/HARDWARE
AUDITED BY: L DATE:
COP-RECTIVE ACTION/COMMENTS /. ,e'e.e7" er l )i .9 A06 7V o /.
Dpu tr 779
RECHECK ACTION/DISPOSITIONE
NAME: DATE:..-L .__ _L ._ , "...." " ' -- --".DATE:"
:-'.K:-=.":':.'. /1PCA CHECKLISI .
~~IKZVF~ A,1 SCHE. PL., ETC. jg
:,:IN: :o.: SERIAL NO.: )0 _ REJECT
- -"'.T ' /j , .. ' - -, - '... YES NO MAJOR t
T:.:ATI -N
O.'n= Released
A:-rze-4 CanesReferenced on Dwg (ECN)
A;;roved Changes Incorporated in wg (ECN) _ "____ _
S.--ION VERIFICATION .
Tc Latest Revision S:acus f _
EC:;s inorporaced _ ___ _
RDW'RE ALDITPart Marking in Accordance with DwgRe3uirenents
ALL Materials/Parts Required by DwgIncorporated /Dimensions in Accordance with Drawing I
- Approved Changes Incorporated ECN/DCNs• Other
$c.RF 'ANCI ES / CO IFNT'S DOCUMENTATION '
HARDWARE
Q; u 6 .' - ,
AUDITED BY: DATE: . -- .
2RRECTlVE ACTION/COMtIENTS AMF4 -' I L A At-a V 6 A) e7-
:CECK ACTION/DISPOSITION
__ _ __ _ _ __ _ - NAME: DATE: .-- *-. -
-c;LS.0.:s O._ PCA CHECKLIST
-, PE: CA, S7E, FL, ETC.
- *,: :,o.: 4'o,2/ " - 7 -?SERIAL NO.: /~f __ rEJEC
UEC TREF- ' a rm4CYES No MAJOR 11 N
c*ETATI710Drawing Reieased _____I______ _____
Approved Changes Referenced on Dwg (ECN) ' _ "_
Approved Changes incorporated in Dwg (ECN) ___
.SF LION VERIFICATIONro Lac-esc Revi.sion, scaus '
* EC's Incor~orated_____ .______ _____
Other
,.RDIARE AUDIT __
Part Marking in Accordance with Dw&Recuirements
*All Materials/Parts Required by Dwg
Incornorated_____
Dimensions in Accordance with Drawing
I. Approved Changes Incorporated ECN/DCNs _______________
Other
tSCREPANCIES/COYIMENTS DOCUMENTATION
HARDWARE
AUDITED BY: *:~~- A A ~ ,DATE:/ Az 1/-ORIREC7VE ACTION /COEMNTS I /
NAME: DATE:
EC.EC. ACTION/DISPOSITION
TCL:ST NO PCA CHECKLIST
.%*: - TYPE: CA, SCHE, PL, ETC. l4-L~ I:v iS ION le 1ZI 17 f7;., ;0 :..: -, / 9.. SERIAL NO.: REjEC'
X IEN CLATUR E ,.-I YES .o MAJOR MINOR
)C17-ENTA71ONIDrawing ReLeased ___
*Approved Changes Referenced on Dwg (ECN) ____________________
Approved Changes Incorporated in Dwg (ECN) 1:.ECTION VERIFICATION
To Latest Revision Status ____
7C.;s Incorvorated _ __ _'
Other Ii"
;RDWA.RE AUDIT ., _
" Part Marking in Accordance with DwgReouirenents _ _ _
SAll MateriaLs/Parts Required by DwgIncorporated I
" Dimensions in Accordance wich Drawing _.,_,_"__ ....
3. Approved Changes Incorporated ECN/DC~s TI. Other
ISCREANCIES/COMMLVTS DOCUMENTATION
HARDWARE
AUDITED BY: . #(I F.,'kF '/yl DATE:
QRRECTIVE ACTION/COMf1ENTS
TCHECK ACTION/DISPOSITION
,...L-. *.7 -. .. ,_,,-
::~..s: ~~*LiPCA CHECKL:Si..,', TYPE: IA, $tiE PL ETC. I
, :;. :SERIAL NO.: REJECT
"''" -'"x E " / , . ?YES NO MAJOR MINOR
.: L -E:.=:AI O0.___I_____________
. ra-'i n Released
1. Ap.roved Changes Referenced on Dwg (ECN)
3. Approved Changes Incorporated in Dwg (ECN)
~I2:SECTION VERIFICATION:- To Lacest Revision Status
. C:s Incorporated6. Other
AROWA.RE AUDITj7. Parc Marking in Accordance with Dwgi Requirements
. All Materials/Parts Required by DwgIncorporated
9 Dimensions in Accordance with Drawing _
10. Approved Changes Incorporated ECN/DCNs _
11 • Other ,,_ _LSCRZPA'CIES /COMMENTS DOCUMENTATION
HARDWARE
AUDITED BY: DATE: // L,,' ,,
CORRECTIVE ACTION/COMMENTS
NAME: DATE:RECHECK ACTION/DISPOSITION
L~iE~LS ~O.L..PCA CHECKLIST
L;L%' TYPE: CA, SCHE, FL, ETC. _,
b.;i.N:C... :. - - , SERIAL NO.: REJECT
.ECLATURE: . .YES NO 1AJOR INOR
kCCU.'!ENTATION __.
. Drawing Rel.eased _ __ _
Apprcved Changes Referenced on DwS (ECN) . . ./ .3. Approved Changes Incorporated in Dwg (ECN) ---
INSPECTION VERIFICATION ._,_ _
4. To Latest Revision Scacus oz ____
. -CNs Incorporated __ _
. Ocher ,, i
ARDWARE AUDIT , IPar Mark ,:ing in Accordance with D,,g;Requirements V /
. All MateriaLs/Parts Required by Ow8
Incorporated_____J______ _____
9 Dimensions in Accordance with Drawing __ _ _0. Approved Changes Incorporated ECN/DCNs I1. Other o_
ISCRE?ANCIES /COMeIENTS DOCUMENTATION
/L A
AUDITED BY: o .DATE: ''rs
QIRRECTIVE-ACTION /COMHENTS
/1 455g M,6 t&'/ j) A) Wf L4L- e~ 0~f~ -- )
tECMEC( ACTION /DISPOSITION
NAME: DATE:
. . . I I4
bEC-i..TLST NO...L- PCA CHECKLIST
P.1.,,.ING TYPE: GA, SCHlE, PL, ETC. K i Ps-
rl.*I SIO 0.c.-' . N O .: S E R IA L N O .: (....-,_._-_ _..- ._-_RE J E C T
.^MENCLATURE: YES NO MAJ6A- MINOR
0C=,,ENTAT ION. Drawing Released ,_ _
. Ap.roved Changes Referenced on Dwg (ECN) _
3 Approved Chan~es Incorporated in Dwg (ECN) _ _ __ _
NSPECTION VERIFICA'TION _
. To Latest Revision Status 1_,'__ ISz.C.:s Incorporated ____
. Other I
WARE AUDIT
Part Marking in Accordance with DugRecuirements
* All MateriaLs/Parts Required by DwgIncorporated _
. Dimensions in Accordance with Drawing
0. Approved Changes Incorporated ECN/DCNs _
1. Other
ISCRZEPACIES/COMMENTS DOCUMENTATION
HARDWARE
AUDITED BY: DATE i) -
C.RRECTIVE ACTION/COM4ENTS
-7744F Bof D u /LL 1-f ~ ~ 7 7'0 T7Y'6- L--9-r~sJ- 'b'/oA.J t..."~ .
• . v : /, ,.,,. /* '/. /
RCHECK ACTIONIDISPOSITION
NAME: DATE-
!f-2-
UiEC'.LIST NO.-L- PCA CHECKLIST
).,.'.G TYPE: GA, SCHE, PL, ETC., .- A i'"
RA ;1 : ;; No. SERIAL NO.: 0V 0_____ REJECT
'.E'CLATURE: ' , , NO AJOR MINOR
GC.!ZTATI OND rawing Released
Z. Apprcved Changes Referenced on DwS (ECN) ________________
3. Approved Changes Incorporated in Dw. (ECN) ._
'SPECTION VERIFICATION ... To Latest Revision Status
~C: Incorporated F___________.Other
HARDWARE AUDITT. Part harking in Accordance with OwS
Requirements
a. All Macerials/Parts Required by DwSIncorporat ed.__..,,
4. Dimensions in Accordance with Drawing
0. Approved Changes Incorporated ECN/DCNs ,._ _ __
I.. Other
ISCREPANCIES /COM~ENTS DOCUMENTATION
HARDWARE
AUDITED BY: DATE: ' 7 /)',c
:QRRECTIVE ACTION /COMMENTSAlr &o. l 318 ~- '/ ~ 6AZ)O~o5 7V3 /Z6 19-A904
ECHIECK ACTION/DISPOSITION-- '. ' - 4 .. ..-
_ NA •. DATE: _
- I
ECK .4L P CA CHECK..IST
S:::N %YE .A S 3Z HT.0 -, E:C. jC-
c.-a .. : -d/ -' ,,x, . . SERIAL NO.: 00O / ._EJ -CNZ C Z 5 ~ ~YES NO MAOINO R
Drawing Releasedi" I _"_ __ _
"Aorzved C'ares Referenced on Dwg (ZCN)I
U2 Aporaved C.nan~es incorporaced in Dwg (ECN) - I_____ _____
To Lacest Revision Status5. -c::s Incorzorated ______ I _ "1. Oche' i _ _
.:,RD,4AR7_ AUDIT I _
Paret Marking in Accordance with Dwgiequirements j
. Al MaterialsiParts Required by DwgIncorporated
9. Dimensions in Accordance with Drawing _ ID. Approved Changes Incorporated ECN/DCNs I _
_SCRE . _CIES /C0.-_ E_ _S DOCUMENTATION
HARDWARE
AUDITED BY: . .DATE:_
CORRECTIVE ACTION/COMMENTS DED
NAME: DATE:RECHECK ACTIONIDISPOSITION
I '.1~% AUU -,
- , SERIAL NO.: &OO / REJECT
* ..C E : -YES ."0 MAOR M
.ra'i .Re.eased __,__ _ _
.A;p:rved Cha.ges Referenced on Dwg (ECN) I b- -
kpp rcved Changes Zncorporaced in Dwg (ECN) I__-J i
r.' ... n"V-RFICATION
o Lazes: Revision Status
-. -Cis Incor.ora ed _ ___ __I
~. Other __ _ _ _ _ _ _ __ _ _ _
.L2,DRXARE AUDIT _
7 ?ar-, Marking in Accordance with DwgRequirements
3. AL Macerials/?arts Required by Dwg:'.coroorated j____________________
1. Dimensions in Accordance with Drawing J - ___
10. Approved Changes Incorporated ECN/DCNs I 7 I
Ul. Other 1 __ _
DISCREANCIES /COMMENTS DOCUMENTATION
AUDITED BY
COaRECTIVE ACTION /COMMENTS :27 A4 A4PK DT:(-' -PP________7z___1Poef 4; p1)(.7E Ag~k~jC l b7/
m4D A 5sX #ase. ,,v: Pea ?.p -/-v Lh 7
-ECHECK ACTION/DISPOS:TION
V A-, - i
',, r# 7I- UAt.P laA-2) 5°. 3 dOlaO5 " ,.d .z 5"ad'* 1" 2 Z.Ii ,J6 Al
LHECKL:ST NL..Zl ?CA CHECKLIST
-1.'G TYPE: CA, SCHE, PL, ETC.I
:'o .: '5?6 9,9 SERIAL NO.:_______ REJECT
~2~LAUR: ~ ~ - 6 ~ ~ 4..~ .. ~ ~-'YES NO M1AJOR If INOR
GC;CENTA71ON __________
L rawing Released ,_
. Apprcved Changes Referenced on Dwg (ECN) /_
o A roved Changes incorporated in Dw& (ECN)
1,SE-CZION VERIFICATION* To Latest Revision Status
-'C:;s Incorporated I
DWARE AUDIT_____*Part Miarking in Accordance with DwgRequirements
"ALL Materials/Parts'Required by Dwg,Incorporated t
Dimensions in Accordance with Drawing
10. Approved Changes Incorporated ECN/DC~s / '"
11. Ocher
DISCREPANCIES /COMMENTS DOC Th .NATION
CMECTIVE ACTION/COMMENTS
_W 6-6; .e , to A... I ,A s Z' I •r
RECHECK ACTION/DISPOSITION
NAME: DATE:S---".... .4
"-- ._2 j ._:. ,. ,
L-:.icKLZ.ST NO.2 PCA CHECKLIST
CaTYPE: CA, SCHIE, PL, ETC. ~ ~ ______________
N. : a. 4' - SERIAL NO.: REJECT, : E'CLAUR1 06 .. '. %,:! ._ ' YES NO MAJOR MINOR
CL'1EXTATION__________________
Drawing ReleasedC
koAproved Changes Referenced onDwg _______ V_____ _____
3. Approved Changes Incorporated in Dwg (ECN) V ________________
:;SPCTION VERIFICATION ,,__
4. To Latest Revision Status / _
. -:s Incorporated - I.Other
DWARE AUDIT "__
P Part Marking in Accordance with DwgRecuiremencs _
ALL MaceriaLs/Parts Required by Dwg
Incorporated P 7
Dimensions in Accordance with Drawing __
0. Approved Changes Incorporated ECN/DCNs
1. Other
I ISCZ EPANCIES /COMHENTS DOCUMENTATION
7?.-A ,, 9, . /,3 /9." 4 7/ A" , ,/ . - C -" a- TI4c-ee-
HARD WARE
AUDITED BY: DATE: /5,1- -
CORRECTIVE ACTION COZOMENTS0
RECHECK ACTION/ D.SPOSITION
NAME:DATE-
.~z~s: N....~..PCA CHECKLIST
~G tPE:GA. SCHtE. PL, ETC. 1 r-I_______________
.~.~.SERIAL NO.: 0 0 ZV REJECZ
&PA 7X1 ,OAe 0 T5 YES JNO MAJOR MINOR
Drawing Released____________
Ap~rc-ved C-anges Referenced on Dwg (ECN)___________I !*Approved Chan~es Incorporated in Dwg (ECN)___________________
VERIFICATION IZo Latest Revision Status
E. C:.s Incornoraced_________ ______
~.Other ___ ____ ____
iARDWAAE AUDIT7. ?arc Marking in Accordance witch Dwgt
Requirements
S. All. Materials/Parts Required by Owg7
Incorporated___________
~.Dimrensions in Accordance with Drawing
LO. Approved Changes Incorporated ECNlDCNs_________
L1. Ocher___________
)ISCREANCIES ICC?1!NTS DOCUMENTATION
HARDWJARE
CORPECTIVE ACTION /COMMENTS AUDITED-BY: ,. ~ DAT E: )D~..
NAME: DATIE:RZCHECI( ACTION/DISPOSITION
-HECKLIST NO..j_ PCA CHECKLIST
:3AWIYC TYPE: CA, SCHE, PL, ETC. I .941I 1 1 1 1 1zVISION 6"RA, :o.- J' - , SERIAL NO.: ,___REJECT
'~ENLAtR: ~5.'YES NO MAJOR 11INOR
. Drawing Released
. kpprcved Changes Referenced on Dwg (ECN)
. Approved Chane Incorporated in Dwg (ECN) _<
NS$"CTI0N VERIFICATION I
. To Latest Revision Status
. EC::s Incorporated
. Other
*D4ARE AUDIT. Part Marking in Accordance with Dwg
Reauirements* Ali Materials/Parts Required by DwS
Incorporated* Dimensions in Accordance with Drawing _
0. Approved Changes Incorporated ECN/DCNs _,__
I1. Other
ISCREPANCIES ICO&frENTS DOCUMENTATION
HARDWARE
AUDITED BY: . , DATE: /S"/?w,.. /
•ORRECTIVEAACTION ICOMENTS
RCHECK ACTION /DISPOSITION
NAME: DATE:
: . No... CA CHECKLIST "
,?.. r"o ? L e A SC e . PL ETC. .
S C. [ 0
N::SERIAL NO.: 400/ _____REJECT
YE N~T NO MAJOR _XINCOR
1. Draw-,ing ReleasedJ
2. Approed C:'anes Referenced on Dwg (ECN)
3. Approved Changes Incorporated in Dwg (ECN) _
1''RECTION VERIFICAOMN-To Latest Revision Status___________
6. Other__________
kWARE AUDIT__________________VPart Marking in Accordance with Dwg4 Requi rement s _____I__________
S . All Materials/Parts Required by OwgIncorporated ________________
Dimensions in Accordance with Drawing
...... O......10G. Approved Changes Incorporated ECNlDCNs_______________
DISCREPANCIES /COMENTS DOCUMENTATION
HARD WARE
AUDITED BY: DATE:/JhaL
C ORRECTIVE AC'rION/COMtMENTS
RECHECK ACTION /DISPOSITION
VAAEW *
:CK-LIST NO.= - PCA CHECKLIST
..AING TYPE: GA, SCHE, PL, ETC. IEVI SION
LrA'I,.N NO.: - 4/',/.- SERIAL NO.: REJECT
'CMECLTURE YES NO MAJOR M INOR
. 'rawing Released 1Approved Changes Referenced on Dwg (MCN)
. Approved Changes Incorporated in Dwg (ECN) _____ , .
:,SPECTION' VERIFICATION- _________________________________I
*To Latest Revision Status. EC"s Incorporated -,,
. Other ._.,_ _ __,
* DWARE AUDIT.ePart Marking in Accordance with Dw'
Rvouirements Acrac w
*All Maerials/Parts Required by Dvg
. Dimensions in Accordance with Drawing L. .
0. Approved Changes Incorporated ECN/DCNs __ _
I .. Other , ,
DISCREPANCIES/COMMENTS DOCUMENTATION
/-/i< " "-,-" ' "" - -- ,HARDWARE
6-A -.' , : " ;" c;
/.A'--' ,.<-.-- = ,)/
AUDITED BY : DATE : -,/
4CK ACTIOC/DISPOSITION
ei-
AUDIED BY DAT:
5 Vo~ ~~~ &- A, 7Z 2 -0= -0
:'.CKL:57 NO. _PCA CHECKLIST
,R2.N. TPE: 'GA. S.E, PL, ETC. I7
., No.: J 9/ - SERIAL NO.: 0 ___-,_REJECT
F ZECAE: 7-, eZ - YES No MAJOR VINOR
D:CL E:;TATION .___,__ ______1. Drawina Released V/
Z. ApprCved Changes Referenced on Dwg (ECN) _
3. Approved Changes Incorporated in Dwg (ECN) _ _ I ....
:STECTION VERIFICATION
'. To Latest Revision Status
. £'C::s Incorporaced __
Other
HARDWARE AUDIT7. Part Marking in Accordance with Dwg
Requirements _
S.All. Materialsi/artsReurdb wIncorporated R_
9. Dimensions in Accordance with Drawing I__10. Approved Changes Incorporated ECN/DCNs _____I___________
1. Other _
DISCREPANCIES /COM!MENTS DOCUMENTATION
HARDWARE
PD = ry
AUDITED BY: - 7p.,6 DATE: / -/-IZ
CORRECTIVE ACTION/COMMENTS 4 A) A 7;7- e--a 42=..
MA. . .. -I'
Aer A7.o o
NAME 0 QA-ZE
RECEC ACION/, ,PSITION
L__'
L-HE CXIIST NOfi ? CA CHECKLIST
R~WIN'G TYPE: GA, SCHE, PL, ETC. C ,, I I
Iz.VISION C Z) [ I,
.,IN O :;o.: ,.,eG 4' " SERIAL NO.: REJECT:"MEC'ATUE: - , . ,- , . . YES NO MAJOR 1INOR
DOCZM..ENTATI ON.
. D rawing ReLeased
. Approved Changes Referenced on DwS (ECN) __
. Approved Changes Incorporated in Dwg (ECN) ,__
;SPECTION VERIFICATION. To Latesc Revision StatusS-C::s Incorporaced _/"
. Ocher
ARDWARE AUDIT. Part arking in Accordance with Dwg
Requirements
. All Materials/Parts Required by Dw/Incorporac ed ___
. Dimensions in Accordance with Drawing
0. Approved Changes Incorporated ECN/DCNs _"
_
1I. Ocber _________
ISCREPANCIES /COENTS DOCUMETATION
CAIJ /Z '-;qJ rxQ - '/l4 S ( . / ,
HARDWARE
SAUDITED BY: DATE:
CORRECTIVE ACTION/ CO ENTS I 'r
NlAME!60 DATE;RCHECK ACTION /DISQSITION
NMfE: DATE:. - - _ _ :. " , , . . ... ' _ . . .. ... . :, . .. ,
I:brc-.C- .:ST . . PCA CHECKLIST
TYPE: GA, SCHE, PL, ETC-
VI SION
NO.: ::o 57/ 31 SERIAL NO.: _____REJECT
'=CLATURE: '9e-,A -- rec -&- YE INo MAJOR HMOR
D Drawiig Released 7' _
. Aporoved Changes Referenced on Dwg (ECN) .
Approved Chan3es Incorporated in Dwg (ECN) ,____
S:SFECTION VERIFICATION .....
To Latest Revision Status _
.. Cs Incorporated .... _,,__..__
- Ocher
WARE AUDIT _____
Par Marking in Accordance with DugReau, remenc s
ALL Mactrials/Parts Required by DugIncorvoraced
Dimensions in Accordance with Drawing
0. Approved Changes Incorporated ECN/DCNs n
1.• Other
__SC____c__s/co__ __Ts DOCUMENTATION
HARDWARE
AUDITED BY: >, A4 .._ DATE: -
CORRECTIVE ACTION/COMENTS L.
CHIECK ACTION/DISPOSITZON
NAE DATE-
6'-.L.- No~j ?CA CHECKLIST
k.t'. TYPE: CA, SCHE, PL, ETC. 10M I I I I
;:L' : :;o . -I SERIAL NO.: R. " _,_EJECT
:XECATURE: )4(',U-,4 Iy rda 7Z YES T NO.4 MAOR MINOR
D rawinS Released___________
. proved Changes Referenced on DOg (ECN)
Approved Changes Tncorporated in Dwg (ECN) _ __
:;SFECTION' VERIFICATION -4
* To Latest Revision Scatus ___'
. EC':s Incorporaced 4.
. Other
. Pa:. Mrking in Accordance with DwgRequ rements LZ
. All Macerials/Par:s Required by DwgIncorporated
. Dimensions in Accordance with Drawing _"
0. Approved Changes Incorporated ECN/DCNs
1. Ocher
I0ISCREANCIES /CO?4ENTS DOCUMENTATION
HARDWARE
AUDITED BY: o's'sDATE: -- .- ... /ORRECTIVE ACTION/COMENTS
EC ACTION /DISPOSITIO M4:0&!
- . N. - 2 . -* DATE:
..-. TS XO .PCA CHECKLIST
"'-q$ TYPE: G&A, S E, PL, ETC. - I I _
R 17 IO:IN' :;2.: - , . SERIAL NO.: - REJECT.
,=IEN-C-AT-RE: :/.: - . . YES NO MAJOR M I.-OR
!I. rawing Released_
, Approved C:hanges Referenced on Dwg (ECN)
. Approved Changes Incorporated in Dwg (ECN) f 1IX;SPECTION VERIFICATION. To Latest Revision Status
C. ::s Incor.orated
6. Other _
I'ARDWARE AUDIT F-.
U. Part Marking in Accordance with DwgRecuirements
8, All Materials/Parts Required by Dwg
Incorporated9. Dimensions in Accordance with Drawing -
10. Approved Changes Incorporated ECN/DCNs __ _
:11. Ocher i
D!SCREANCIE$ /CO?21ENT$ DOCUMENTATION
HARD WARE
AUDITED BY: DATE: ~ '~&
CORRECTIVE ACTION /COMENTS
NAME: DATE:RECHECK ACTION /DISPOSITION
.LA
-- --~.; -
I:hECKST PCA CHECKLIST
3RAWI:;G TYPE: GA, SCHE, PL, ETC. IREVISION LEC I
' RAWI.C. NO.: p 4 = , zC; SERIAL NO.: REJECT
OCENCLATURE: , / ',dc'r _cd YES NO MAJOR MINOR
DCCa!-TN'7ATI ONDrawing Released __ _
A.proved Changes Referenced on Dwg (ECN) _
Approved Changes incorporated in Dwg (ECN) _ _
NISPECTION VERIFICATION _
4. To Latest Revision Status .-
5. ECNs Incorporated _ _
6. Other
HARDWARE AUDIT _
7. Part Marking in Accordance with DwgRecuirements
8. All Materials/Parts Required by Dwg *Incorporated
9. Dimensions in Accordance with Drawing
10. Approved Changes Incorporated ECN/DCNs
1. Other
DISCREPA;NCIES /COMENTS DOCUMENTATION
HARDWARE
AUDITED BY: DATE: /Z A"1 /
CORRECTIVE ACTION/COMMENTS
RECHECK ACTION/DISPOSITION
NAME: DATE:
~.~zL~s: CA CHECKLIST
'ci: Ek :TYF: 0- FCE L, ETC. I I
ULX;1*,s :;0.: - .1SERIAL NO.: REJECT
0 NC 7A:-: 4.h (- ,- YES NO M1AJOR I N 0R
C. A:-nrve-4 -hinzes Referenced on Dwg (ECN)______
A:~.~v ~nnge ±nccrporared in Dwg (ECN)
Tc LateitRc :s: Status
EC" s In orpzra:e:-
6.Other _____
H-AIRDWA-*RE AUDIT ___ _________
Part Markin, in kccordance with DwgReiuiremnl sI ______
8.All Maerias, Parts Required by Dwg
I bicorpcrate:-K Dimensions in Ac:o-.dance with Drawing______
~10. Approved Changes Incorporated ECN/DCNs ____________________
I.Other
DISCRE-P 'NIE/C^,2 'N-S DOCUMENTATION
HARDWARE
AUDITED BY: DATE: /& "- V
COR-RECTIVE ACTICS, CC!Y.!NTS
RECHECK ACTION/DISPOSITION
NAME: DATE:
.:L: .2 PCA CHECKLIST
"F-,'*IN.7 vFE: :A, SCHE, PL, ETC.
-,:I:2S :,o.: 5 " / ' - € , ./-/ SERIAL NO.: REJECT
"': !"C A'-"Z YES NO MAJOR MINOR
.Drawing ReleasedA:zrve' Changes Referenced on Dwg (ECN)
A zrcved Changes Incorporated in Dwg (ECN) _
L.SECTICN VERIFICATION I-. Tc Lacest Revision Status Z ______..___
-. ECXs Incorporated _
6. Other _
%iRDW-RE AUDIT _
7. Part Marking in Accordance with Dwg 1Reouirements
S. All Materials/Parts Required by Dwg 'iiIncorporated
C. Dimensions in Accordance with Drawing
3. Approved Changes Incorporated ECN/DCNs _
11. Other
DISCREPAXCIES/COMMENTS DOCUMENTATION
HARDWARE
AUDITED BY: DATE: /4:, j 'i
COR-RECTIVE ACTION/COMMENTS
LCHECK ACTION/DISPOSITION
NAME: DATE:
i C K 1 4- T . 0 PCA CHECKLIST
.A*1';G T'Y.: GA, SCHE, FL, ETC. I I"VI SRIOE
IA I;G NC.: . 7 SERIAL NO.: REJECT
,,,E,--..... r /-ZC;: YES NO MAJOR -/ ,OR
Dra-wir. Released _ _
S.-.p.-o,.e Changes Referenced on Dwg (ECN) __.
;Approved Changes Incorporated in Dwg (ECN) _
NSPECTION VERIFICATIONTo Laces: Revision Status 7 __ - -/ _ _
ECENs Incorporated II_ _
Other
.A.DWARE AUDIT* Part ,arking in Accordance with Dwg
Reouirements
AlAl Macerials/Parts Required by DwgIncorporated
Dimensions in Accordance with Drawing
0. Approved Changes Incorporated ECN/DCNs
1. Other
ISCREPANCIES/COMMENTS DOCUMENTATION
HARDWARE
AUDITED BY: DATE: /" /)E?¢C j
ORRECTIVE ACTION/COMMENTS
NAME: DATE:.ECHECK ACTION/DISPOSITION
NAME: DATE:
.. .I .. _ , .. . . . . ., . '-. . .
IT
U1RME