Jarak Lokasi Ke sungai 14,5 km
Harga BB/ton = $ 58,44 Op.Cost/ton = $10,68 Stripping OB/BCM= $2,45
BESR = 58,44−10,68
2,45 = 19,5
![Page 2: coretan Tugas akhirsdf](https://reader036.vdocuments.mx/reader036/viewer/2022062309/5695d2691a28ab9b029a53b9/html5/thumbnails/2.jpg)
DESCRIPTION
drfgaasdgagasgsTRANSCRIPT
Jarak Lokasi Ke sungai 14,5 km
Harga BB/ton = $ 58,44 Op.Cost/ton = $10,68 Stripping OB/BCM= $2,45
BESR = 58,44−10,68
2,45 = 19,5