copyright 2014 riverbed inc. confidential. 1 kevin mcgowan principal consultant september 10, 2015...
TRANSCRIPT
Copyright 2014 Riverbed Inc. Confidential.1
Kevin McGowanPrincipal ConsultantSeptember 10, 2015
Achieving Excellence in Managing the UC LifecycleRiverbed SteelCentral™ UCExpert
Copyright 2014 Riverbed Inc. Confidential.2 Copyright 2014 Riverbed Inc. Confidential.2
Agenda
• Background
• Enterprise Gaps and Impacts
• Service Provider Gaps and Impacts
• Four Pillars of UC Deployment Management
• UC Lifecycle Transition
• Keys to Successful UC Lifecycle Management
• UC Lifecycle Management Benefits
Copyright 2014 Riverbed Inc. Confidential.3
Background
• 1998 – Voice over IP carrier integration/implementation
• 2002 – Cisco Unified Communication product development
• 2005 – Cisco UC Deployment Service Delivery
• 2 million + phones verified
• Hundreds of UC projects completed
• Service Providers & Enterprises
Copyright 2014 Riverbed Inc. Confidential.4 Copyright 2014 Riverbed Inc. Confidential.4
Enterprise Gaps and Impacts
• Design standards neglect
• Transformation and Operational Management Challenges
• Frustrating end-user experiences
• Poor adoption & underutilized resources
• Lack of management ‘visibility’ and support tools
• Slow transformation & feature adoption
Copyright 2014 Riverbed Inc. Confidential.5 Copyright 2014 Riverbed Inc. Confidential.5
Service Provider Gaps and Impacts
• Right tools for the job
• On-site support model and increased costs
• Required service assurance & visibility
• Slow project completion
• Verification of all stages of change
• Increased post change tickets
Copyright 2014 Riverbed Inc. Confidential.6
Four Pillars of UC Deployment Management
• Remote device control for UAT verification and advanced issues identification and remediation
• Reduces/eliminate need for end user involvement with troubleshooting
• Comprehensive call and system performance analysis and reports
• Flexible reporting for users, sites, system, and voice quality
• Post deployment initial business performance analysis and reports
• Scalable UAT for 1 – 100s of sites and users
• Emulates users calls, all test calls create CDR records
• Remote device control integrated into automated test results
• Comprehensive pre and post deployment analysis and reports
• Configuration Change Operational Verification
Copyright 2014 Riverbed Inc. Confidential.7
UC Lifecycle Transition
A solution that supports the transition between UC Lifecycle Implement and Operate stages
Day 1Deployment Assurance
Plan | Design | Implement
Day 2Management/SupportOperate | Troubleshoot | Optimize
• Configuration analysis, identify irregularities
• Phone registration monitoring• Comprehensive User Acceptance
Testing (UAT)• Remote troubleshooting &
remediation verification• Final acceptance implementation
and performance analysis and reporting
• Initial business day monitoring
Continuous Service Improvement:
• UC Deployment• UC Migration and
Consolidation• UC System Upgrades• SIP Trunk
Implementation or Migration
• UC Assessment and Optimization
• End user MACDs• Issue troubleshooting and
remediation and root cause analysis
• End User experience monitoring• System, gateway, trunk
performance utilization monitoring
• Call performance monitoring• Call Volume• Call History, Failure, CCR
Copyright 2014 Riverbed Inc. Confidential.8
Keys to Successful UC Lifecycle Management
• Pre-Sales/Sales– Objective:
• Establish Competitive Advantage• Close complete deal – eliminate partial
projects– Assess
• Customers understanding of UC• Customer Operational/Engineering
capabilities• Customers business requirements
– Visibility• Comprehensive deliverables• Adoption• Utilization
– Service Assurance• Implementation Analysis• UAT/root cause analysis/remediation• Post Change performance verification• End User adoption/utilization
Pre-Sales
Plan
Design
Implement
Operate
Optimize
Copyright 2014 Riverbed Inc. Confidential.9
Keys to Successful UC Lifecycle Management
• Plan– Objective:
• Establish Transformation Rate• Service Assurance adoption• Identify customer specific requirements
– Assess• Teams understanding of UC and
alignment with technical design• Implementation and operational
processes and gaps• Key technical and business stakeholders
– Visibility• Identify Analysis/Deliverables:
– System, site, end-user performance and utilization
• Day 2 UC management capabilities and requirements
– Service Assurance• Alignment of analysis and UAT to
implementation plan• Issue remediation and verification plan
Pre-Sales
Plan
Design
Implement
Operate
Optimize
Copyright 2014 Riverbed Inc. Confidential.10
Keys to Successful UC Lifecycle Management
• Design– Objective:
• Alignment to Engineering/Operational requirements
• Identify customer specific requirements– Assess
• Existing UC network implementation, performance and utilization
• Change impact on operational and engineering systems and requirements
– Visibility• Implementation and change analysis• Performance analysis, reporting, and
monitoring• Day 2 UC management capabilities and
requirements– Service Assurance
• Alignment of analysis and UAT to implementation plan
• Issue remediation resources and verification plan
Pre-Sales
Plan
Design
Implement
Operate
Optimize
Copyright 2014 Riverbed Inc. Confidential.11
Keys to Successful UC Lifecycle Management
• Implement– Objective:
• Attain optimal Transformation rate• Reduction/elimination of Day 2 issues• 100% root cause identification of systemic
problems– Assess
• Change execution performance and rate• Service Assurance plan, modify as required• Day 2 UC Management gaps
– Visibility• Pre and post implementation change,
performance, and utilization analysis and reporting
• Issue identification, remediation, and verification
– Service Assurance• Pre and post analysis, UAT, and reporting
Pre-Sales
Plan
Design
Implement
Operate
Optimize
Copyright 2014 Riverbed Inc. Confidential.12
Keys to Successful UC Lifecycle Management
• Operate– Objective:
• Adherence to UC Design Standards• Business adoption and performance
monitoring/reporting• 100% root cause identification of systemic
problems– Assess
• UC Monitoring and Management, capabilities:– Implementation changes– End user performance/adoption– System and resource performance
• Operational execution and issues• Day 2 UC Management gaps
– Visibility• Post change baseline:
– Performance– Utilization– Adoption
– Service Assurance• Modification of operational processes and
systems
Pre-Sales
Plan
Design
Implement
Operate
Optimize
Copyright 2014 Riverbed Inc. Confidential.13
Keys to Successful UC Lifecycle Management
• Optimize– Objective:
• Adherence to UC Design Standards• Pre transformation to ensure technical and
business success– Assess
• UC implementation• UC end user adoption• System performance, utilization, and failures
– Visibility• UC System baseline:
– Performance– Utilization– Adoption
– Service Assurance• Modification of monitoring and management
components as required
Pre-Sales
Plan
Design
Implement
Operate
Optimize
Copyright 2014 Riverbed Inc. Confidential.14 Copyright 2014 Riverbed Inc. Confidential.14
UC Lifecycle Management Benefits
Improved ROI• Standardization for all UC transformation projects
results in predictable transformation rates, resources, and costs accelerating time to value and cost reduction benefits.
EnhancedAdoption
• Increased visibility into feature, device, end-user usage for pre and post transformation enables proactive issue identification and remediation.
Accelerated Change
• Confidence to accelerate the transformation rate and maintain high customer satisfaction.
Superior user
experiences
• Enables organizations to deliver positive end-user experiences while increasing user productivity.
Consistent Managemen
t
• Ensures all required management systems, processes, and training are available to support planned changes.
Reduced Costs
• Reduce/eliminate customer/site visits.• Eliminates unexpected end-user or service impacting
issues.• Reduced mean time to repair/end user reliance.
Copyright 2014 Riverbed Inc. Confidential.15
Achieving Excellence in Managing the UC Lifecycle:Empowered by SteelCentral™ UCExpert
Kevin [email protected](415) 577-0533
Copyright 2014 Riverbed Inc. Confidential.16
Thank You
Copyright 2014 Riverbed Inc. Confidential.16