copper environmental e.. arla prism spectrum company +o6 e_ast f ark street, suite 2 anaconda, mt 5...
TRANSCRIPT
![Page 1: Copper Environmental E.. arlA PRISM SPECTRUM COMPANY +o6 E_ast f ark Street, Suite 2 Anaconda, MT 5 9 71 I I I I 7018 3090 DODO 2794 3955 Copper E.nvironmental Con6ulting A PRISM SPECTRUM](https://reader036.vdocuments.mx/reader036/viewer/2022071018/5fd1a4bd3e5c2a564b001161/html5/thumbnails/1.jpg)
Copper Environmental Consulting
A PRISM SPECTRUM COMPANY
October 8, 2019
United States Nuclear Regulatory Commission (NRC), Region IV Attn: Carol Hill 1600 E. Lamar Blvd. Arlington, Texas 76011-4511
-to6 E.. F arl Avenue, Suite 2
Anaconda., Montana 5 9 71 l
(+o6) 56}-2700
Fax: (+06) 56}-270 I
@fE~fEllW![Eij ~ OCTQ@;x,tf /0 ~ DNMS
Subject: Request for Amendment to Radioactive Materials License {RML) License No. 25-35244-01
Dear Ms. Hill,
We would like to submit an amendment request for License No. 25-35244-01. This letter shall document the organization name change from Copper Environmental Consulting to Prism Response LLC (of which Copper Environmental Consulting is a Division). Additionally, the Radiation Safety Officer (RSO) is currently listed as Shelby Fortune per Condition 12 of the license. Effective immediately, our new RSO candidate will be Andie Hogan. Please amend our license to reflect these changes.
Ms. Hogan currently serves as a Staff Engineer with field experience operating a portable nuclear gauge. She received a B.S. degree in Chemical Engineering from Montana State University. Included with this letter is a copy of her completed Portable Nuclear Gauge Safety Certification and HazMat Training Certification.
Thank you for your assistance. Should you have any questions regarding this matter please feel free to contact our office at (406) 563-2700.
Sincerely, Prism Response LLC (of which Copper Environmental Consulting is a Division)
Executive Vice President
Enclosures:
2ajr&;iq Shelby Fortune CurrentRSO
~~ Appointed RSO
Andie Hogan - Portable Nuclear Gauge Safety Certificate; HazMat Certification
Contact Information: Andie Hogan Staff Engineer Copper Environmental Consulting Office: ( 406) 563-2700 Cell: ( 406) 498-7759 Email: andie.hogan(a)copperenv .com 406 E. Park Ave., Suite 2 Anaconda, MT 59711
PUBLIC ~ mediate Release ~ Normal Release
NON-PUBLIC Cl A.3 Sensitive-Security Related Cl A.7 Sensitive Internal Cl Other: - ""'.""'"-----
Rev I ewer: Q /ti I ( Date: IO /1 7 /t '/
![Page 2: Copper Environmental E.. arlA PRISM SPECTRUM COMPANY +o6 E_ast f ark Street, Suite 2 Anaconda, MT 5 9 71 I I I I 7018 3090 DODO 2794 3955 Copper E.nvironmental Con6ulting A PRISM SPECTRUM](https://reader036.vdocuments.mx/reader036/viewer/2022071018/5fd1a4bd3e5c2a564b001161/html5/thumbnails/2.jpg)
0)
__,,
0)
I'\)
I'\)
0)
APNGAPortable Nuclear Gauge Safety & U.S. D.O.T. Hazmat Certification Class
Certificate of Completion to:
Andie Hogan J-IAZMAT refresher training is required within 3 years after today's date:
November 26, 2018
This course covers training criteria ofNUREG 1556, The Agreement States. and 49 CFR 172, Subpart H.
The Company RSO completes the training req.uirements by familiarizing the employee with: • State specific regulations including introduction to the state regulatory ,-vcbsitc • The company radiation safety program, specifically gauge safety operating and emergency pmcedmes • A tour of storage area with emphasis on security. documents and postings • Loading, security and transporting gauges in company vehicles • Hands-on training with the gauge and methods in use by the company • Introduction to gauge safety content on gauge manufacturer website • Certificate covers both Gauge Safety and USDOT HAZMAT requirements
The acknowledgement and signature oft
Crvw w,irrn~ C011f irltz~~ , 6 < H., 11/IJ .'I \ I VI,{ 1.r - v r: .....,, Company Name /
American Portable Nuclear Gauge Association P.O. Box 423, Emmitsburg, MD 21727 • www.apnga.com
PNGA
George E. Marshall - Director 240-888-6426
![Page 3: Copper Environmental E.. arlA PRISM SPECTRUM COMPANY +o6 E_ast f ark Street, Suite 2 Anaconda, MT 5 9 71 I I I I 7018 3090 DODO 2794 3955 Copper E.nvironmental Con6ulting A PRISM SPECTRUM](https://reader036.vdocuments.mx/reader036/viewer/2022071018/5fd1a4bd3e5c2a564b001161/html5/thumbnails/3.jpg)
Copper E.nvironmental Consulting
A PRISM SPECTRUM COMPANY
+o6 E_ast f ark Street, Suite 2
Anaconda, MT 5 9 7 1 I
I I I 7018 3090 DODO 2794 3955
Copper E.nvironmental Con6ulting
A PRISM SPECTRUM COMPANY
United States Nuclear Regulatory Commission (NRC), Region IV Attn: Carol Hill 1600 E. Lamar Blvd. Arlington, Texas 76011-4511
j;f ~ F'O".d'SERVIC.U
1000 76011
U.S. POSTAGE PAlt FCM LG ENI/ -ANACONDA, MT 59711 OCT o~,.19 AMOUNI
$7.45 R2304Y121933-97
![Page 4: Copper Environmental E.. arlA PRISM SPECTRUM COMPANY +o6 E_ast f ark Street, Suite 2 Anaconda, MT 5 9 71 I I I I 7018 3090 DODO 2794 3955 Copper E.nvironmental Con6ulting A PRISM SPECTRUM](https://reader036.vdocuments.mx/reader036/viewer/2022071018/5fd1a4bd3e5c2a564b001161/html5/thumbnails/4.jpg)
Hill, Carol
From: Se::it To: Cc: Subject: Attachments:
Carol,
Andie Hogan <[email protected]>
Tuesday, October 08, 20191 :25 PM Hill, Carol Dave McCarthy; Shelby Fortune [External_Sender] Request for Amendment to RML No. 25 -35244-01 191 OOB_RML_Amendment_Request.pdf
Please find attached to this e-mail an electronic copy of our request for amendment to Radioactive Materials License No. 25-35244-01. A hard copy will be distributed via regular mail.
If you have any questions regarding this submittal, please feel free to contact me.
Sincerely, Andie
Copper [.1wiro11m-c11tal (.o··. ,-ul11n::1
A t>'RISM SPECTl';!LJM COMP~N Y
Andie Hogan Staff Engineer
Copper Environmental Consulting 406 East Park Avenue, Suite 2 Anaconda, MT 59711 T: 406-563-2700 I M: 406-498-7759
This message contains confidential information and is intended only for the intended recipients. If you are not an intended recipient you should not disseminate, distribute or copy this e-mail. Please notify us immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. E-mail transmission cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. Therefore, we do not accept liability for any errors or omissions in the contents of this message, which arise as a result of e-mail transmisslon.
1 6 1 6 2 2 6