copa planning

19
COPA Planning Scope: This document explains Planning in COPA, using simple illustrations under Manual planning method. This document covers: a) Introduction to Planning in COPA b) Creation of Planning Framework c) Creation of Planning Layout d) Planning in COPA with Integrated Excel e) Copy of layouts to next years Page 1

Upload: amit-tuteja

Post on 28-Mar-2015

699 views

Category:

Documents


24 download

TRANSCRIPT

Page 1: COPA Planning

COPA Planning

Scope: This document explains Planning in COPA, using simple illustrations under Manual planning method. This document covers:

a) Introduction to Planning in COPAb) Creation of Planning Frameworkc) Creation of Planning Layoutd) Planning in COPA with Integrated Excele) Copy of layouts to next years

Page 1

Page 2: COPA Planning

COPA Planning

Table of Contents

1. INTRODUCTION.......................................................................................................32. DEFINING PLANNING FRAMEWORK..........................................................................33. CREATING PLANNING LAYOUT T CODE KE15...........................................................84. PLANNING WITH INTEGRATED EXCEL......................................................................95. PLANNING WITH EXCEL UPLOAD...........................................................................106. Copy current year layouts to next year.........................................................................14

Page 2

Page 3: COPA Planning

COPA Planning

1. Introduction

The planning framework is the main working environment for sales and profit planning. It contains all the possible settings for building your planning architecture.

Using Microsoft Excel: Excel can be used as a planning screen for your planning data in the SAP System

2. Defining Planning Framework

Planning Framework includes elements like Planning Level, Planning Package, Planning Method, and Parameter Set. Let’s create these elements.

Transaction: KEPM

Set the Operating Concern

Create Planning level

Planning level is used to determine the level at which planning is to occur, using Characteristics.

In KEPM, right click on planning levels

Enter the Planning Level name & description.

Page 3

Page 4: COPA Planning

COPA Planning

You can include the relevant characteristics required by you for the planning level e.g.: controlling area, division etc.

You can enter certain values to be defaulted. E.g.: Controlling Area and Version.

Create Planning package

You specify characteristic values in a planning package. Example: a market segment or the period for which planning is done.

Right click on the Planning level you created earlier and click on “Create_Planning Package”

Enter the name & description

You can enter the values to be defaulted. E.g. for Period, CO Area or Version.

Page 4

Page 5: COPA Planning

COPA Planning

Planning method

Planning methods are functions with which planning data can be entered and changed.

- Manual Planning Method- Automatic Planning Method

The manual planning function lets you define planning screens. Planning can be performed at any degree of detail. The illustrations given in this document is based on Manual Planning method

In automatic planning, you can copy and revaluate actual or planning data for a large number of profitability segments at once.

There are no settings to be made here. It is only the selection of the existing methods as shown below.

Create Parameter set

A parameter set contains all the settings necessary for executing a planning method.

Right click on “Enter Planning Data” and click on “Create Parameter Set”

Page 5

Page 6: COPA Planning

COPA Planning

Alternatively you can use: Edit > Method > Create Parameter Set

Enter the Parameter Set name & description:

In the next screen, enter the required details viz Planning Layout, Currency etc and SAVE it.

Page 6

Page 7: COPA Planning

COPA Planning

Important Note:

In the Parameter Set, you need to “check” () Active for Integrated Excel (if excel integration is desired). However, if excel integration is not required, then do NOT check this.

Page 7

Page 8: COPA Planning

COPA Planning

3. Creating Planning Layout T Code KE15

Enter the Layout name & description. E.g. LAYOUT1 Test Layout

Choose the Characteristics as Header and as Lead Column as required.

Choose the Value Fields that you need and SAVE.

(Go to the Value Fields tab > select the Value Field from your right side and click on the Arrow/Direction button to include in the layout)

Page 8

Page 9: COPA Planning

COPA Planning

4. Planning with Integrated EXCEL

Excel is activated in the standard SAP planning screen. This enables you to plan using the functions of both the SAP System and Excel.

To do this, ensure the check is Active for “Integrated Excel” in the Parameter Set.

Now, double click on the Parameter Set to Open the Excel planning screen. You would get the following warning. Pl click on “Enable Macros” . These Macros are created by SAP and are required in integration.

Once you do that you will get the Planning Screen in EXCEL (embedded in SAP) as shown below:

Page 9

Page 10: COPA Planning

COPA Planning

5. Planning with Excel Upload

You can enter your planning data into Excel spreadsheets and this data can then be uploaded into the SAP System.

Initial Settings required in KEPM to enable this:

1) Ensure that the “Integrated Excel” check is Active in your Parameter Set (in KEPM).

2) Double click on Parameter Set and go to the Excel Integrated Planning Screen (Enable the Macros)

3) In the planning screen, go to Settings and click on Formatting

Page 10

Page 11: COPA Planning

COPA Planning

This will generate a File Description as shown below

Notice that the Planning Screen changes as shown below: You now get option to save the File description and Layout.

1. Now click on “Save file description”. Once saved, you will get the following message:

2. Now click on “Save Excel Layout” to save your Excel worksheet in the SAP System

The above steps complete the “Initial Settings”

Page 11

Page 12: COPA Planning

COPA Planning

Once the initial settings are done, you do NOT have to come to KEPM again. Just use the saved excel layout file , enter the planned data , save it as TXT file and upload it using Transaction KE13N

You will get the result as below:

Page 12

Page 13: COPA Planning

COPA Planning

In KE25 (Display plan line items), you can that the uploaded entries are POSTED successfully.

Page 13

Page 14: COPA Planning

COPA Planning

6. Copy current year layouts to next year

Following steps to be performed for copy of current year layouts to next year

T Code KEPM: Go to KEPM and set the operating concern

Copy the current year Planning levels to New Year.

Enter the New Year information and save it.

Copy of Planning level will copy Planning Package and planning methods

Page 14

Page 15: COPA Planning

COPA Planning

Right click on planning level and change the Selection information. Here we have to change the current year 2011 to New Year 2012 and save it.

Changing of planning year will be applied for all Planning Package and method.

Create new Planning Layouts and assign the same to new planning methods.

T Code KE15 to create the planning layouts: We can copy the current year layouts and change the required information for New Year.

Page 15

Page 16: COPA Planning

COPA Planning

We need to change the year to 2012 for all month of above layouts so that year 2012 data can be uploaded.

Double click on each month and change the year to 2012

Assign the above created layouts to planning method in KEPM and generate the file description.

Page 16

Page 17: COPA Planning

COPA Planning

In the planning screen, go to Settings and click on Formatting

This will generate a File Description as shown below

Page 17

Page 18: COPA Planning

COPA Planning

Notice that the Planning Screen changes as shown below: You now get option to save the File description and Layout.

o Upload of planning data from KE13N: Now we can upload planning data for year 2012 using new planning layout.

Page 18