coordinate system: stateplane california v fips …...d d 3 1 17 15 2 13 11 14 10-n 12 9-s 16-s 10-s...
TRANSCRIPT
October 10, 2014
Coordinate System: StatePlane California V FIPS 0405 FeetProjection: Lambert Conformal Conic
Datum: North American 1983Scale: 1:24,000
Source: SBVWCD GISGIS Contact: Erin Berger
M:\2014 Projects\Wash Plan\Maps\Wash Plan SubcomponentsOWash Plan Subcomponents
TOTAL WASH PLAN ACREAGE: 4,837*All acreages are approxomate*
0 0.25 0.5 0.75 10.125Miles
LEGEND
WASH PLAN BOUNDARY
WOOLLY STAR PRESERVATION AREA (545 ACRES)WATER CONSERVATION (869 ACRES)
EXISTING MINING (804 ACRES)NEW MINING (283 ACRES)
NEWLY CONSERVED (977 ACRES)ADDITIONAL CONSERVATION (163 ACRES)ADDITIONALLY MANAGED (686 ACRES)
!.
!.
October 10, 2014
Coordinate System: StatePlane California V FIPS 0405 FeetProjection: Lambert Conformal Conic
Datum: North American 1983Scale: 1:24,000
Source: SBVWCD GISGIS Contact: Erin Berger
M:\2014 Projects\Wash Plan\Maps\Covered ActivitiesOWASH PLAN COVERED ACTIVITIES
Trails - Permissive Future Trail*On existing Roads*Needs description*Needs Conditions Pedestrian/Bike Patrol/Trash locations/ Signage/Maintenance Amenities/park ranger/patrol*Potential Trail Connection is across WSPA, SAR and Non-WSPA lands to the North
Wells & Water Infrastructure*Proposed wells need to be located w/USFWS/CDFW *Maintenance
General Note:* All acreages are approximate
0 0.5 10.25Miles
Wash Plan Boundary
A. TRAILS
WSPA Trail Connection (8.14 acres)
Alabama Street Trail (1.4 mi)Borrow Pit South Rim Trail (1.47 mi)Boulder Avenue / Orange Street Trail (1.95 mi)Cone Camp Road Trail (1.74 mi)Greenspot Road Trail (7.32 mi)Old Greenspot Road Horse Trail (0.75 mi)Old Greenspot Road Trail (0.77 mi)Old Rail Line Trail (1.02 mi)Plunge Creek Trail (0.4 mi)Pole Line Trail (2.5 mi)Santa Ana River Trail (7.02 mi)Weaver Street Trail (0.28 mi)
B. TRANSPORTATION IMPROVEMENTSAlabama Full Widening, RedlandsAlabama Widening East Side, Highland Alabama Widening East Side, RedlandsGreenspot Rd, Gold Buckle to S curveGreenspot Road (Bridge and Realignment)Greenspot Road (S Curve to Beg Br Realign)Greenspot Road (S Curve)Orange (Highland City Limit to WP N Boundary)Orange (Highland)Orange Signalization(Redlands)
G. HABITAT ENHANCEMENT AREASCone Camp Property DedicationD Levee Habitat EnhancementFlood Control Land DedicationGreenspot Levee RemovalPlunge Creek HabitatSpineflower Preservation AreaWoolly Star Preservation Area
H. MISCELLANEOUSEVWD Grove Maintenance
F. MININGExisting Haul RoadProposed Haul RoadFirst Mined AreaExisting MiningExpanded Mining
C. WELLS & WATER INFASTRUCTURE
City of Redlands N Orange Well 2
!.SARC Turnout at Santa Ana River!.Santa Ana Low Turnout Rebuild
Proposed SBVMWD WellsSBVWCD Observation Well 1-7B1SBVWCD Observation Well 2-7K1SBVWCD Observation Well 3-12J1SBVWCD Observation Well 4-11H1Alabama Street Connector PipelineEVWD Pipe 125East Branch Extension, Phase 2Foothill PipelineOrange Street ConnectorPlunge Pool PipelineRedlands Aqueduct TunnelRedlands Well Connector PipelineSARC PipelineSBVMWD Well Connector PipelineSBVWCD Canal
EVWD Well No 125
City of Redlands N Orange 1 Well
EVWD Possible Treatment Plant Locations
City of Redlands Proposed N Orange 3 WellCity of Redlands Orange Street Well
SBVMWD Temporary Pipeline
SBVMWD Temporary Pipeline
Redlands Drainage Facilities
Plunge Creek LeveeSAR Levee
Levee MaintenanceLevee Maintenance on SBVWCD land
Flood Maintenance ActivitiesHighland Flood Maintenance Activities
Levee Access Roads
Borrow Pit LeveeE. FLOOD CONTROL
Elder/Plunge Creek Restoration (Concrete Levee)Elder/Plunge Creek Restoration (Concreted Rock Spillway)Elder/Plunge Creek Restoration ( Project Footprint)
Elder/Plunge Creek Restoration (Concrete Arch Culvert)Elder/Plunge Creek Restoration (Concrete Channel)
D. WATER CONSERVATION
EVWD Planned Spreading BasinEnhanced Recharge CanalExisting Recharge BasinsPlanned Spreading Basin
SAR Maintenance Roads
Greenspot Channel ImprovementsRoad Buffers
D
D
3 1
17
15
2
1311
1410-N
12
9-S
16-S
10-S12-S
Coordinate System: StatePlane California V FIPS 0405 FtProjection: Lambert Conformal Conic
Datum: North American 1983Source: SBVWCD GIS
Scale: 1:14,600GIS Contact: Erin BergerOSBVWCD SAR FACILITIES October 3, 2014
LegendFacility
Cuttle WeirIntakeMonitoring WellSand BoxTailrace ValvesCanalsSBVWCD Main CanalSeven Oaks DamSBVWCD Spreading Basins0 0.5 10.25 Miles
78
31
28
18
13
14
2
31
5
30
15
12
9
21
34
6S
17
11
36
20
45
2933
4
24
46
10
47
26
23
43
27
50
35
3832
41
44
52
53
37
25
40
16-S
51
49
22
48
15-W
19
42
16-N
11-W
39
36-N
6-N
10-W
Coordinate System: StatePlane California V FIPS 0405 FtProjection: Lambert Conformal Conic
Datum: North American 1983Source: SBVWCD GIS
Scale: 1:7,900GIS Contact: Erin BergerOSBVWCD MILL CREEK FACILITIES October 3, 2014
KEYFacility
Mill Creek DiversionMill Creek IntakeCanalsSpreading Basins 0 0.25 0.50.125 Miles