coordinate system: stateplane california v fips …...d d 3 1 17 15 2 13 11 14 10-n 12 9-s 16-s 10-s...

4
October 10, 2014 Coordinate System: StatePlane California V FIPS 0405 Feet Projection: Lambert Conformal Conic Datum: North American 1983 Scale: 1:24,000 Source: SBVWCD GIS GIS Contact: Erin Berger M:\2014 Projects\Wash Plan\Maps\Wash Plan Subcomponents O Wash Plan Subcomponents TOTAL WASH PLAN ACREAGE: 4,837 *All acreages are approxomate* 0 0.25 0.5 0.75 1 0.125 Miles LEGEND WASH PLAN BOUNDARY WOOLLY STAR PRESERVATION AREA (545 ACRES) WATER CONSERVATION (869 ACRES) EXISTING MINING (804 ACRES) NEW MINING (283 ACRES) NEWLY CONSERVED (977 ACRES) ADDITIONAL CONSERVATION (163 ACRES) ADDITIONALLY MANAGED (686 ACRES)

Upload: others

Post on 13-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Coordinate System: StatePlane California V FIPS …...D D 3 1 17 15 2 13 11 14 10-N 12 9-S 16-S 10-S 12-S Coordinate System: StatePlane California V FIPS 0405 Ft Projection: Lambert

October 10, 2014

Coordinate System: StatePlane California V FIPS 0405 FeetProjection: Lambert Conformal Conic

Datum: North American 1983Scale: 1:24,000

Source: SBVWCD GISGIS Contact: Erin Berger

M:\2014 Projects\Wash Plan\Maps\Wash Plan SubcomponentsOWash Plan Subcomponents

TOTAL WASH PLAN ACREAGE: 4,837*All acreages are approxomate*

0 0.25 0.5 0.75 10.125Miles

LEGEND

WASH PLAN BOUNDARY

WOOLLY STAR PRESERVATION AREA (545 ACRES)WATER CONSERVATION (869 ACRES)

EXISTING MINING (804 ACRES)NEW MINING (283 ACRES)

NEWLY CONSERVED (977 ACRES)ADDITIONAL CONSERVATION (163 ACRES)ADDITIONALLY MANAGED (686 ACRES)

Page 2: Coordinate System: StatePlane California V FIPS …...D D 3 1 17 15 2 13 11 14 10-N 12 9-S 16-S 10-S 12-S Coordinate System: StatePlane California V FIPS 0405 Ft Projection: Lambert

!.

!.

October 10, 2014

Coordinate System: StatePlane California V FIPS 0405 FeetProjection: Lambert Conformal Conic

Datum: North American 1983Scale: 1:24,000

Source: SBVWCD GISGIS Contact: Erin Berger

M:\2014 Projects\Wash Plan\Maps\Covered ActivitiesOWASH PLAN COVERED ACTIVITIES

Trails - Permissive Future Trail*On existing Roads*Needs description*Needs Conditions Pedestrian/Bike Patrol/Trash locations/ Signage/Maintenance Amenities/park ranger/patrol*Potential Trail Connection is across WSPA, SAR and Non-WSPA lands to the North

Wells & Water Infrastructure*Proposed wells need to be located w/USFWS/CDFW *Maintenance

General Note:* All acreages are approximate

0 0.5 10.25Miles

Wash Plan Boundary

A. TRAILS

WSPA Trail Connection (8.14 acres)

Alabama Street Trail (1.4 mi)Borrow Pit South Rim Trail (1.47 mi)Boulder Avenue / Orange Street Trail (1.95 mi)Cone Camp Road Trail (1.74 mi)Greenspot Road Trail (7.32 mi)Old Greenspot Road Horse Trail (0.75 mi)Old Greenspot Road Trail (0.77 mi)Old Rail Line Trail (1.02 mi)Plunge Creek Trail (0.4 mi)Pole Line Trail (2.5 mi)Santa Ana River Trail (7.02 mi)Weaver Street Trail (0.28 mi)

B. TRANSPORTATION IMPROVEMENTSAlabama Full Widening, RedlandsAlabama Widening East Side, Highland Alabama Widening East Side, RedlandsGreenspot Rd, Gold Buckle to S curveGreenspot Road (Bridge and Realignment)Greenspot Road (S Curve to Beg Br Realign)Greenspot Road (S Curve)Orange (Highland City Limit to WP N Boundary)Orange (Highland)Orange Signalization(Redlands)

G. HABITAT ENHANCEMENT AREASCone Camp Property DedicationD Levee Habitat EnhancementFlood Control Land DedicationGreenspot Levee RemovalPlunge Creek HabitatSpineflower Preservation AreaWoolly Star Preservation Area

H. MISCELLANEOUSEVWD Grove Maintenance

F. MININGExisting Haul RoadProposed Haul RoadFirst Mined AreaExisting MiningExpanded Mining

C. WELLS & WATER INFASTRUCTURE

City of Redlands N Orange Well 2

!.SARC Turnout at Santa Ana River!.Santa Ana Low Turnout Rebuild

Proposed SBVMWD WellsSBVWCD Observation Well 1-7B1SBVWCD Observation Well 2-7K1SBVWCD Observation Well 3-12J1SBVWCD Observation Well 4-11H1Alabama Street Connector PipelineEVWD Pipe 125East Branch Extension, Phase 2Foothill PipelineOrange Street ConnectorPlunge Pool PipelineRedlands Aqueduct TunnelRedlands Well Connector PipelineSARC PipelineSBVMWD Well Connector PipelineSBVWCD Canal

EVWD Well No 125

City of Redlands N Orange 1 Well

EVWD Possible Treatment Plant Locations

City of Redlands Proposed N Orange 3 WellCity of Redlands Orange Street Well

SBVMWD Temporary Pipeline

SBVMWD Temporary Pipeline

Redlands Drainage Facilities

Plunge Creek LeveeSAR Levee

Levee MaintenanceLevee Maintenance on SBVWCD land

Flood Maintenance ActivitiesHighland Flood Maintenance Activities

Levee Access Roads

Borrow Pit LeveeE. FLOOD CONTROL

Elder/Plunge Creek Restoration (Concrete Levee)Elder/Plunge Creek Restoration (Concreted Rock Spillway)Elder/Plunge Creek Restoration ( Project Footprint)

Elder/Plunge Creek Restoration (Concrete Arch Culvert)Elder/Plunge Creek Restoration (Concrete Channel)

D. WATER CONSERVATION

EVWD Planned Spreading BasinEnhanced Recharge CanalExisting Recharge BasinsPlanned Spreading Basin

SAR Maintenance Roads

Greenspot Channel ImprovementsRoad Buffers

Page 3: Coordinate System: StatePlane California V FIPS …...D D 3 1 17 15 2 13 11 14 10-N 12 9-S 16-S 10-S 12-S Coordinate System: StatePlane California V FIPS 0405 Ft Projection: Lambert

D

D

3 1

17

15

2

1311

1410-N

12

9-S

16-S

10-S12-S

Coordinate System: StatePlane California V FIPS 0405 FtProjection: Lambert Conformal Conic

Datum: North American 1983Source: SBVWCD GIS

Scale: 1:14,600GIS Contact: Erin BergerOSBVWCD SAR FACILITIES October 3, 2014

LegendFacility

Cuttle WeirIntakeMonitoring WellSand BoxTailrace ValvesCanalsSBVWCD Main CanalSeven Oaks DamSBVWCD Spreading Basins0 0.5 10.25 Miles

Page 4: Coordinate System: StatePlane California V FIPS …...D D 3 1 17 15 2 13 11 14 10-N 12 9-S 16-S 10-S 12-S Coordinate System: StatePlane California V FIPS 0405 Ft Projection: Lambert

78

31

28

18

13

14

2

31

5

30

15

12

9

21

34

6S

17

11

36

20

45

2933

4

24

46

10

47

26

23

43

27

50

35

3832

41

44

52

53

37

25

40

16-S

51

49

22

48

15-W

19

42

16-N

11-W

39

36-N

6-N

10-W

Coordinate System: StatePlane California V FIPS 0405 FtProjection: Lambert Conformal Conic

Datum: North American 1983Source: SBVWCD GIS

Scale: 1:7,900GIS Contact: Erin BergerOSBVWCD MILL CREEK FACILITIES October 3, 2014

KEYFacility

Mill Creek DiversionMill Creek IntakeCanalsSpreading Basins 0 0.25 0.50.125 Miles