![Page 1: Coominya Quarry – Response to DILGP’s …...Updated PIA Analysis Sect Road Road Name Road Sections Lgth Total No. No. (km) To From To From To From ($) 1 2 411Coominya Connection](https://reader036.vdocuments.mx/reader036/viewer/2022081514/5fe0250dfef604240834be07/html5/thumbnails/1.jpg)
Department Principal: Bryce Trevilyan Project Contact: Bryce Trevilyan
Traffic Transport Engineering www.ttplus.com.au
ABN: 54 619 700 239 Queensland 6 Mayneview Street, Milton Qld 4064 PO Box 1779, Milton BC, Qld 4064 P: +61 7 3871 0411 F: +61 7 3367 3317 E: [email protected]
Ref: 10009:730 03 May 20108 Diane Kerr and Assoicates c/- Zanows’ Concrete and Quarries Pty Ltd Dear Diane
Re: Coominya Quarry
Traffic Advice – Response to DILGP’s Information Request
We refer to your request to provide traffic engineering advice in relation to the traffic-related items of the
Department of Infrastructure, Local Government and Planning (DILGP) information request related to the
proposed Coominya Quarry, dated 14 July 2017.
Traffic-related information request items and responses prepared by Traffic and Transport Plus are provided
below:
Information Request Item No. 1
“ Pavement Impact Assessment
In accordance with the State Development Assessment Provisions (SDAP) Module 18.1 – Filling, excavation
and structures state code, Table 18.1.1, Performance Outcome (PO) 11, the applicant should demonstrate that
where the quantity of fill or excavated spoil material being imported or exported for a development exceeds
10,000 tonnes, and haulage will be on a state-controlled road, any impact on the infrastructure is identified and
mitigation measures implemented.
The Rocky Gully Road, Coominya Quarry Traffic Report prepared by MRCagney Pty Ltd dated 25 May 2017,
issue 2 has identified for pavement impacts, a contribution rate of 20.20 cents / tonne for a production rate of
up to 500,000 tonnes. It is noted that the description states an anticipated maximum production threshold of up
to 500,000 tonnes per annum, however, the type of approval sought will allow for an extraction and screening
rate of up to 1,000,000 tonnes per year.
The applicant is requested to submit further information to ensure that impacts on the state-controlled road
network are identified and mitigation measures are implemented to compensate for the effects on the state -
controlled road for the entire extraction rate the approval will allow.
![Page 2: Coominya Quarry – Response to DILGP’s …...Updated PIA Analysis Sect Road Road Name Road Sections Lgth Total No. No. (km) To From To From To From ($) 1 2 411Coominya Connection](https://reader036.vdocuments.mx/reader036/viewer/2022081514/5fe0250dfef604240834be07/html5/thumbnails/2.jpg)
180503_10009__730_001_Response to DILGP IR 2
To demonstrate compliance with PO11, it is requested the applicant provides the following:
• An assessment of the pavement impacts for an extraction rate of 500,000 – 1,000,000 tonnes per year;
and
• Provide an electronic copy of the completed pavement impact assessment spreadsheet.
If a higher contribution rate is identified as required for 500,000 – 1,000,000 tonnes per year this would only be
applicable on any extraction exceeding 500,000 tonnes per annum.”
Response to Information Request Item No. 1
The maximum production rate being applied for in this development application is 500,000 tonnes per annum;
accordingly, the annual production rate of the site would not exceed 500,000 tonnes per annum. Whilst the
ERA category that the application falls within is less than 1 million tpa, the condi tions of approval sought would
include a cap at 500,000 tpa. In the event the annual production rate of the site was to look to exceed 500,000
tonnes per annum, another development application (including an additional pavement contribution analysis)
would be required to be submitted.
Since the time of writing the MRCagney traffic report (Ref. 1), updated MRD input costs have been provided
and have been requested to be included in the analysis.
The MRD input costs referred to in MRCagney’s Traffic Impact Assessment Report (Ref.1) and the updated
MRD input costs2 included in Attachment A – Updated MRD Input Costs, provided by Nicola Powell of the
Development of Transport and Main Roads (DTMR), are included in Table 1 - MRD Input Costs for comparison.
Table 1 – MRD Input Costs
MRD input costs
used in Ref.1
Updated MRD input costs
Provided by Nicola Powell of DTMR
1 “Traffic Impact Assessment Report, Rocky Gully Road, Coominya Quarry”, MRCagney, 25 May 2017. 2 Nicola Powell of DTMR did not provided the base year of the updated MRD input costs. We have been told by another DTMR officer that the base year of the updated MRD input costs is 2016 (the old MRD input costs was superseded on 17 October 2016).
![Page 3: Coominya Quarry – Response to DILGP’s …...Updated PIA Analysis Sect Road Road Name Road Sections Lgth Total No. No. (km) To From To From To From ($) 1 2 411Coominya Connection](https://reader036.vdocuments.mx/reader036/viewer/2022081514/5fe0250dfef604240834be07/html5/thumbnails/3.jpg)
180503_10009__730_001_Response to DILGP IR 3
The same assessment and project operational parameters that are outlined in MRCagney’s Traffic Impact
Assessment Report (Ref.1) have again been input into DTMR’s pavement contribution spreadsheet, but with
the updated MRD input costs requested to be adopted. The results of the updated pavement contribution
analysis show that the DTMR spreadsheet calculated pavement contribution increases from 20.20 to 23.29
cents / tonne with the updated MRD input costs.
An electronic copy of the excel file of the updated pavement contribution analysis has also been provided, and
a printed version of the PIA spreadsheet has been included in Attachment B – Updated PIA Analysis.
I trust that this information is of assistance. If you require any additional assistance in relation to this matter,
please do not hesitate to contact me.
Yours faithfully
Bryce Trevilyan – RPEQ #7745
Traffic and Transport Plus
![Page 4: Coominya Quarry – Response to DILGP’s …...Updated PIA Analysis Sect Road Road Name Road Sections Lgth Total No. No. (km) To From To From To From ($) 1 2 411Coominya Connection](https://reader036.vdocuments.mx/reader036/viewer/2022081514/5fe0250dfef604240834be07/html5/thumbnails/4.jpg)
180503_10009__730_001_Response to DILGP IR 4
Attachment A
Updated MRD Input Costs
![Page 5: Coominya Quarry – Response to DILGP’s …...Updated PIA Analysis Sect Road Road Name Road Sections Lgth Total No. No. (km) To From To From To From ($) 1 2 411Coominya Connection](https://reader036.vdocuments.mx/reader036/viewer/2022081514/5fe0250dfef604240834be07/html5/thumbnails/5.jpg)
![Page 6: Coominya Quarry – Response to DILGP’s …...Updated PIA Analysis Sect Road Road Name Road Sections Lgth Total No. No. (km) To From To From To From ($) 1 2 411Coominya Connection](https://reader036.vdocuments.mx/reader036/viewer/2022081514/5fe0250dfef604240834be07/html5/thumbnails/6.jpg)
180503_10009__730_001_Response to DILGP IR 5
Attachment B
Updated PIA Analysis
![Page 7: Coominya Quarry – Response to DILGP’s …...Updated PIA Analysis Sect Road Road Name Road Sections Lgth Total No. No. (km) To From To From To From ($) 1 2 411Coominya Connection](https://reader036.vdocuments.mx/reader036/viewer/2022081514/5fe0250dfef604240834be07/html5/thumbnails/7.jpg)
Sect Road Road Name Road Sections Lgth Total
No. No. (km) To From To From To From ($)
1
2 411Coominya Connection Road 0-4km (all directions) 4 1.7% 20.9% $459,328 $3,618 $92,877 $555,823
3
4 42ABrisbane Valley Highway 4-20.4km (East) 16.38 0.4% 4.7% $127,388 $127,388
5 42ABrisbane Valley Highway 20.4-31.2km (East) 10.99 0.4% 4.3% $66,951 $66,951
6 42ABrisbane Valley Highway 31.2-36.4km (East) 5.3 0.3% 3.4% $24,344 $24,344
7
8 18A Warrego Highway 36.4-44.2km (East->East) 0.0% 0.5% $0 $0
9 18A Warrego Highway 44.2-51.7km (East->East) 0.0% 0.2% $0 $0
10
11 42ABrisbane Valley Highway 4-25.2km (North) 0.1% 1.4% $0 $0
12 42ABrisbane Valley Highway 25.2-26.4km (North) 0.2% 1.7% $0 $0
13 42ABrisbane Valley Highway 26.4-29.6km (North) 0.1% 1.2% $0 $0
14 42ABrisbane Valley Highway 29.6-43.0km (North) 0.1% 1.4% $0 $0
15 42ABrisbane Valley Highway 43.0+60.9km (North) 0.1% 0.9% $0 $0
16
17 411Coominya Connection Road 0-8.9km (South) 8.88 0.2% 2.3% $18,260 $18,260
18 412Forest Hill Fernvale Road 8.9-22.9kim (South) 14 0.2% 2.4% $22,513 $22,513
19
20
21 18A Warrego Highway 22.9-30.7km (South) 0.0% 0.1% $0 $0
22 18A Warrego Highway 30.7-50.6km (South) 0.0% 0.1% $0 $0
23 18A Warrego Highway 50.6-58.6km (South) 0.0% 0.0% $0 $0
24 18A Warrego Highway 58.6-67.4km (South) 0.0% 0.1% $0 $0
25 18A Warrego Highway 57.4-69.0km (Southt) 0.0% 0.1% $0 $0
26 18A Warrego Highway 69.0-70.3km (South) 0.0% 0.1% $0 $0
27
28
29
30
Totals [1] = 59.6 $0 $459,328 $3,618 $352,333 $815,280
Start of Development Traffic = 2018 ESA Increase Trigger = 5.0%
Development Duration 30 years Total Tonnage = 3,500,000 tonnes
Developer Contribution expressed as a Cost per Tonne (@ the PV Base Yr.)
cents / tonne = 23.29
cents / tonne / km = 0.39
[1] Includes only road sections that are subject to Development Generated Traffic > 5%
Protection Passord for all worksheets = mrd
0
Developer Contribution Summary
Mtce ($)Rehab ($)Reduced Pvt Life
Dev. Contribution (@ the PV Base Yr.)
![Page 8: Coominya Quarry – Response to DILGP’s …...Updated PIA Analysis Sect Road Road Name Road Sections Lgth Total No. No. (km) To From To From To From ($) 1 2 411Coominya Connection](https://reader036.vdocuments.mx/reader036/viewer/2022081514/5fe0250dfef604240834be07/html5/thumbnails/8.jpg)
Seal Width Rehabilitation Costs Annual Routine Mtce.
m $ / km $ / km
3.6 $828,000 $4,700
4 $920,000 $5,070
4.5 $1,035,000 $5,720
5 $1,150,000 $6,000
5.5 $1,265,000 $7,900
6 $1,380,000 $9,800
6.5 $1,495,000 $9,450
7 $1,610,000 $9,100
7.5 $1,725,000 $9,700
8 $1,840,000 $10,300
8.5 $1,955,000 $10,650
9 $2,070,000 $11,000
9.5 $2,185,000 $11,600
10 $2,300,000 $12,200
10.5 $2,415,000 $12,550
11 $2,530,000 $12,900
11.5 $2,645,000 $13,500
12 $2,760,000 $14,100
Base year for the above costs = 2016
(a) ESA's / HV = 2.9 ESA's/HV (Bruce Hwy)
= 3.2 ESA's/HV (All Other Roads)
(b) Roughness Increase = 3 counts per year
(c Terminal Roughness*= 110 NRM (Bruce Hwy)
= 120 NRM (All other Roads)
(d) Inflation Rate = 7%
(e) Discount Rate = 6%
(f) HV Growth Rate = adopt a constant 3% for all road sections, unless
(background traffic) agreed otherwise by Central District.
INPUT COSTS
*Note :- Terminal Roughness is considered to be a more realistic indicator of rehabilitation
timing than pavement age or other methods of estimating the life of the existing
pavement.
MRD INPUT COSTS
BITUMEN ROADS REHAB. & MTCE (incl. RESEAL) COSTS
OTHER INPUT DATA
![Page 9: Coominya Quarry – Response to DILGP’s …...Updated PIA Analysis Sect Road Road Name Road Sections Lgth Total No. No. (km) To From To From To From ($) 1 2 411Coominya Connection](https://reader036.vdocuments.mx/reader036/viewer/2022081514/5fe0250dfef604240834be07/html5/thumbnails/9.jpg)
Bus / Truck O O
Axles Single Single
Tyres Single Dual
Legal Loading (t) 6 9 15.00 tonne
Base Load / ESA 5.4 8.2
Unloaded Axle Group Load (t) 4.5 4 8.5 tonne
ESA's 0.482 0.057 0.54 ESA
Loaded Axle Group Load (t) 6.00 9.00 15.00 tonne
ESA's [1] 1.524 1.451 2.98 ESA
Payload = 6.5 tonne ESA/t Payload = 0.0829 unloaded
Max Legal Payload = 6.5 tonne [2] ESA/t Payload = 0.4577 loaded
Tandem Truck O OO
Axles Single Tandem
Tyres Single Dual
Legal Loading (t) 6 16.5 22.50 tonne
Base Load / ESA 5.4 13.8
Unloaded Axle Group Load (t) 4.5 5 9.5 tonne
ESA's 0.482 0.017 0.50 ESA
Loaded Axle Group Load (t) 6.00 16.50 22.50 tonne
ESA's [1] 1.524 2.044 3.57 ESA
Payload = 13.0 tonne ESA/t Payload = 0.0384 unloaded
Max Legal Payload = 13.0 tonne [2] ESA/t Payload = 0.2745 loaded
Semi-Trailer O OO OOO
Axles Single Tandem Tri
Tyres Single Dual Dual
Legal Loading (t) 6 16.5 20.00 42.50 tonne
Base Load / ESA 5.4 13.8 18.5
Unloaded Axle Group Load (t) 4.5 5 6.5 16 tonne
ESA's 0.482 0.017 0.015 0.51 ESA
Loaded Axle Group Load (t) 6.00 16.50 20.00 42.50 tonne
ESA's [1] 1.524 2.044 1.366 4.93 ESA
Payload = 26.5 tonne ESA/t Payload = 0.0194 unloaded
Max Legal Payload = 26.5 tonne [2] ESA/t Payload = 0.1862 loaded
B-Double O OO OOO OOO
Axles Single Tandem Tri Tri
Tyres Single Dual Dual Dual
Legal Loading (t) 6 16.5 20.00 20.00 62.50 tonne
Base Load / ESA 5.4 13.8 18.5 18.5
Unloaded Axle Group Load (t) 4.5 5 6.5 6.5 22.5 tonne
ESA's 0.482 0.017 0.015 0.015 0.53 ESA
Loaded Axle Group Load (t) 6.00 16.50 20.00 20.00 62.50 tonne
ESA's [1] 1.524 2.044 1.366 1.366 6.30 ESA
Payload = 40.0 tonne ESA/t Payload = 0.0132 unloaded
Max Legal Payload = 40.0 tonne [2] ESA/t Payload = 0.1575 loaded
Road Train 1 O OO OOO OOO OOO
Axles Single Tandem Tri Tri Tri
Tyres Single Dual Dual Dual Dual
Legal Loading (t) 6 16.5 20.00 20.00 20.00 82.50 tonne
Base Load / ESA 5.4 13.8 18.5 18.5 18.5
Unloaded Axle Group Load (t) 4.5 5 6.5 6.5 6.5 29 tonne
ESA's 0.482 0.017 0.015 0.015 0.015 0.55 ESA
Loaded Axle Group Load (t) 6.00 16.50 20.00 20.00 20.00 82.50 tonne
ESA's [1] 1.524 2.044 1.366 1.366 1.366 7.67 ESA
Payload = 53.5 tonne ESA/t Payload = 0.0102 unloaded
Max Legal Payload = 53.5 tonne [2] ESA/t Payload = 0.1433 loaded
[1] If the "payload" is more or less than legal, "axle group loadings" are proportioned based on the legal and the unloaded tonnages.
[2] Calculated from the max legal loads & generic unloaded (tare) weights for each axle group of the HV.
Totals
Totals
Totals
_________ _____________
Totals
_________
Totals
Vehicle Combination / ESA Calculation 1 _______
_________
_________
![Page 10: Coominya Quarry – Response to DILGP’s …...Updated PIA Analysis Sect Road Road Name Road Sections Lgth Total No. No. (km) To From To From To From ($) 1 2 411Coominya Connection](https://reader036.vdocuments.mx/reader036/viewer/2022081514/5fe0250dfef604240834be07/html5/thumbnails/10.jpg)
Truck + 4 Dog O OO OO OO
Axles Single Tandem Tandem Tandem
Tyres Single Dual Dual Dual
Legal Loading (t) 6 16.5 16.50 16.50 55.50 tonne
Base Load / ESA 5.4 13.8 13.8 13.8
Unloaded Axle Group Load (t) 4.5 5 5 5 19.5 tonne
ESA's 0.482 0.017 0.017 0.017 0.53 ESA
Loaded Axle Group Load (t) 6.00 16.50 16.50 16.50 55.50 tonne
ESA's [1] 1.524 2.044 2.044 2.044 7.66 ESA
Payload = 36.0 tonne ESA/t Payload = 0.0148 unloaded
Max Legal Payload = 36.0 tonne [2] ESA/t Payload = 0.2126 loaded
AB Triple O OO OOO OOO OOO OOO
Axles Single Tandem Tri Tri Tri Tri
Tyres Single Dual Dual Dual Dual Dual
Legal Loading (t) 6 16.5 20.00 20.00 20.00 20.00 102.50 tonne
Base Load / ESA 5.4 13.8 18.5 18.5 18.5 18.5
Unloaded Axle Group Load (t) 4.5 5 6.5 6.5 6.5 6.5 35.5 tonne
ESA's 0.482 0.017 0.015 0.015 0.015 0.015 0.56 ESA
Loaded Axle Group Load (t) 6.00 16.50 20.00 20.00 20.00 20.00 102.50 tonne
ESA's [1] 1.524 2.044 1.366 1.366 1.366 1.366 9.03 ESA
Payload = 67 tonne ESA/t Payload = 0.0084 unloaded
Max Legal Payload = 67.0 tonne [2] ESA/t Payload = 0.1348 loaded
O OO
Axles Single Tandem
Tyres Single Dual
Legal Loading (t) 6 16.5 22.50 tonne
Base Load / ESA 5.4 13.8
Unloaded Axle Group Load (t) 0 tonne
ESA's 0.000 0.000 0.00 ESA
Loaded Axle Group Load (t) 0.00 0.00 0.00 tonne
ESA's [1] 0.000 0.000 0.00 ESA
Payload = tonne ESA/t Payload = #DIV/0! unloaded
Max Legal Payload = 22.5 tonne [2] ESA/t Payload = #DIV/0! loaded
ESA / t
(payload)
Bus / Truck 0.0829
Tandem Truck 0.0384 20.0% 0.0077
Semi-Trailer 0.0194
B-Double 0.0132 5.0% 0.0007
Road Train 1 0.0102
Truck + 4 Dog 0.0148 75.0% 0.0111
AB Triple 0.0084
0
100.0% 0.0195 ESAs / tonne of product "out the gate"
ESA / t
(payload)
Bus / Truck 0.4577
Tandem Truck 0.2745 20.0% 0.0549
Semi-Trailer 0.1862
B-Double 0.1575 5.0% 0.0079
Road Train 1 0.1433
Truck + 4 Dog 0.2126 75.0% 0.1595
AB Triple 0.1348
0
100.0% 0.2223 ESAs / tonne of product "out the gate"
Vehicle Combination / ESA Calculation 2 _______
Totals
_________ _____________
Totals
Totals
_______
Unloaded Vehicles
HV Type% of HV
fleet
Weigthed
Average
Loaded Vehicles
HV Type% of HV
fleet
Weigthed
Average
![Page 11: Coominya Quarry – Response to DILGP’s …...Updated PIA Analysis Sect Road Road Name Road Sections Lgth Total No. No. (km) To From To From To From ($) 1 2 411Coominya Connection](https://reader036.vdocuments.mx/reader036/viewer/2022081514/5fe0250dfef604240834be07/html5/thumbnails/11.jpg)
Start of Development Traffic = 2018 (= PV Base Yr.) ESA Increase Trigger = 5.0% Treasury Discount Rate = 6.0%
Development Duration = 30 years Roughness Increase = 3 Counts / yr Inflation % = 7.0% Inflation % = 7.0%
Base Year PV Base Yr. Base Year PV Base Yr.
2014 2014 2016 2018 2016 2018
Sect. Road Road Name Road Sections Ch. Ch Length AADT HV % Growth ESA Exist. Terminal Seal Mtce
No. No. (km) 2014 Adopt per HV Rough Rough. Width $/km $/lane-km $/km $/lane-km
1
2 411Coominya Connection Road0-4km (all directions) 0.0 4.0 4.0 1234 14.42 3.0% 3.2 67 120 7.06 $1,610,000 $921,645 $9,100 $5,209
3
4 42ABrisbane Valley Highway 4-20.4km (East) 32.7 16.3 16.4 3458 16.02 3.0% 3.2 60 120 10 $2,300,000 $1,316,635 $12,200 $6,984
5 42ABrisbane Valley Highway 20.4-31.2km (East) 16.3 5.3 11.0 7757 9.64 3.0% 3.2 82 120 11.4 $2,530,000 $1,448,299 $12,900 $7,385
6 42ABrisbane Valley Highway 31.2-36.4km (East) 5.3 0.0 5.3 9621 9.96 3.0% 3.2 83 120 11.6 $2,645,000 $1,514,130 $13,500 $7,728
7
8 18A Warrego Highway 36.4-44.2km (East->East) 15.1 7.2 7.8 38323 14.27 3.0% 3.2 67 120 7.3 $1,610,000 $921,645 $9,100 $5,209
9 18A Warrego Highway 44.2-51.7km (East->East) 7.2 0.0 7.2 48293 12.87 3.0% 3.2 48 120 10.2 $2,300,000 $1,316,635 $12,200 $6,984
10
11 42ABrisbane Valley Highway 4-25.2km (North) 32.7 53.6 20.9 2786 19.74 3.0% 3.2 65 120 9.3 $2,070,000 $1,184,972 $11,000 $6,297
12 42ABrisbane Valley Highway 25.2-26.4km (North) 53.6 55.0 1.4 4878 12.01 3.0% 3.2 94 120 16.5 $2,760,000 $1,579,962 $14,100 $8,072
13 42ABrisbane Valley Highway 26.4-29.6km (North) 55.0 58.2 3.2 3925 15.26 3.0% 3.2 61 120 9.4 $2,070,000 $1,184,972 $11,000 $6,297
14 42ABrisbane Valley Highway 29.6-43.0km (North) 58.2 71.6 13.4 3527 15.79 3.0% 3.2 66 120 8.8 $1,955,000 $1,119,140 $10,650 $6,097
15 42ABrisbane Valley Highway43.0+60.9km (North) 71.6 89.5 17.9 2720 17.76 3.0% 3.2 83 120 8.1 $1,840,000 $1,053,308 $10,300 $5,896
16
17 411Coominya Connection Road 0-8.9km (South) 4.0 12.9 8.9 1234 14.42 3.0% 3.2 70 120 7.8 $1,725,000 $987,476 $9,700 $5,553
18 412Forest Hill Fernvale Road 8.9-22.9kim (South) 4.4 18.4 14.0 1347 14.33 3.0% 3.2 82 120 6.7 $1,495,000 $855,813 $9,450 $5,410
19
20
21 18A Warrego Highway 22.9-30.7km (South) 47.7 55.5 7.8 20499 18.63 3.0% 3.2 49 120 10 $2,300,000 $1,316,635 $12,200 $6,984
22 18A Warrego Highway 30.7-50.6km (South) 55.5 75.4 19.9 14491 17.05 3.0% 3.2 54 120 10.7 $2,415,000 $1,382,467 $12,550 $7,184
23 18A Warrego Highway 50.6-58.6km (South) 75.4 83.4 8.0 18770 20.01 3.0% 3.2 33 120 9.8 $2,185,000 $1,250,803 $11,600 $6,640
24 18A Warrego Highway 58.6-67.4km (South) 83.4 92.2 8.8 21465 17.04 3.0% 3.2 67 120 10.3 $2,300,000 $1,316,635 $12,200 $6,984
25 18A Warrego Highway 57.4-69.0km (Southt) 92.2 93.8 1.6 14919 22.96 3.0% 3.2 78 120 17.3 $2,760,000 $1,579,962 $14,100 $8,072
26 18A Warrego Highway 69.0-70.3km (South) 93.8 95.0 1.3 15911 19.843 3.0% 3.2 91 120 20.1 $2,760,000 $1,579,962 $14,100 $8,072
27
28
29
30
Total = 178.7
ROAD SECTIONS AND LENGTHS ARMIS TRAFFIC DATA CONDITION AND STANDARDS
MRD INPUT DATA
Rehab. Costs Mtce. Costs
UNIT COSTS - Inflated up from Base Yr.
![Page 12: Coominya Quarry – Response to DILGP’s …...Updated PIA Analysis Sect Road Road Name Road Sections Lgth Total No. No. (km) To From To From To From ($) 1 2 411Coominya Connection](https://reader036.vdocuments.mx/reader036/viewer/2022081514/5fe0250dfef604240834be07/html5/thumbnails/12.jpg)
Increase Trigger = 5.0%
Discount Rate = 6.0% Discount Rate = 6.0%
Sect. Road Road Name Length ESA's/lane Routine Mtce Unit Cost 1 2 3 4 5 6 7 8 9 10 PV 1 2 3 4 5 6 7 8 9 10 PV
No. No. (km) per Year $/lane-km/yr $/ESA/km/yr 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Total 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Total
1
2 411 0-4km (all directions) 4 1.17E+05 $5,209 $0.0445 $880 $900 $914 $924 $3,618 $7,127 $7,850 $8,452 $8,976 $9,414 $9,759 $10,049 $10,274 $10,430 $10,546 $92,877
3
4 42A 4-20.4km (East) 16.38 3.64E+05 $6,984 $0.0192 $9,775 $10,767 $11,593 $12,311 $12,911 $13,386 $13,782 $14,091 $14,306 $14,465 $127,388
5 42A 20.4-31.2km (East) 10.99 4.92E+05 $7,385 $0.0150 $5,138 $5,659 $6,093 $6,470 $6,786 $7,035 $7,244 $7,406 $7,519 $7,602 $66,951
6 42A 31.2-36.4km (East) 5.3 6.30E+05 $7,728 $0.0123 $2,229 $2,400 $2,548 $2,673 $2,771 $2,853 $2,917 $2,961 $2,994 $24,344
7
8 18A 36.4-44.2km (East->East) 7.84 3.59E+06 $5,209 $0.0014 $0
9 18A 44.2-51.7km (East->East) 7.22 4.09E+06 $6,984 $0.0017 $0
10
11 42A 4-25.2km (North) 20.89 3.61E+05 $6,297 $0.0174 $0
12 42A 25.2-26.4km (North) 1.43 3.85E+05 $8,072 $0.0210 $0
13 42A 26.4-29.6km (North) 3.16 3.94E+05 $6,297 $0.0160 $0
14 42A 29.6-43.0km (North) 13.4 3.66E+05 $6,097 $0.0167 $0
15 42A 43.0+60.9km (North) 17.93 3.18E+05 $5,896 $0.0186 $0
16
17 411 0-8.9km (South) 8.88 1.17E+05 $5,553 $0.0475 $2,360 $2,475 $2,566 $2,642 $2,701 $2,742 $2,773 $18,260
18 412 8.9-22.9kim (South) 14 1.27E+05 $5,410 $0.0426 $3,505 $3,633 $3,741 $3,825 $3,883 $3,926 $22,513
19
20
21 18A 22.9-30.7km (South) 7.8 2.51E+06 $6,984 $0.0028 $0
22 18A 30.7-50.6km (South) 19.85 1.62E+06 $7,184 $0.0044 $0
23 18A 50.6-58.6km (South) 7.98 2.47E+06 $6,640 $0.0027 $0
24 18A 58.6-67.4km (South) 8.8 2.40E+06 $6,984 $0.0029 $0
25 18A 57.4-69.0km (Southt) 1.61 2.25E+06 $8,072 $0.0036 $0
26 18A 69.0-70.3km (South) 1.25 2.08E+06 $8,072 $0.0039 $0
27
28
29
30
Total = 178.7 $3,618 $352,333
Routine Mtce Contribution Calculation
Link Data Mtce Costs at PV Base Year ( 2018 ) TO(WARDS) Development - PV of Increases in Mtce Costs (year by year) FROM Development - PV of Increases in Mtce Costs (year by year)
![Page 13: Coominya Quarry – Response to DILGP’s …...Updated PIA Analysis Sect Road Road Name Road Sections Lgth Total No. No. (km) To From To From To From ($) 1 2 411Coominya Connection](https://reader036.vdocuments.mx/reader036/viewer/2022081514/5fe0250dfef604240834be07/html5/thumbnails/13.jpg)
Discount
Rate =6.0%
Discount
Rate =6.0%
20
Rehab. Bring Dev. Bring Dev.
Year for Forward Contrib. Forward Contrib.
Exist. Roughness Years to Rehab. Yr. Contrib Factor factor
Sect Road Road Name Road Sections Length Roughness at fail failure (Rough) Calc (2018)
No. No. (km) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
1
2 411Coominya Connection Road0-4km (all directions) 4 67 120 17.7 2032 2032 13.7 1.17E+05 2.00E+06 61,333 1.94E+06 13.3 0.35 0.0092 $33,934 700,088 1.30E+06 9.5 4.19 0.1246 $459,328
3
4 42ABrisbane Valley Highway 4-20.4km (East) 16.38 60 120 20.0 2034 2034 16.0 3.64E+05 7.56E+06 47,704 7.51E+06 15.9 0.08 0.0019 $39,936 544,513 7.02E+06 15.1 0.93 0.0219 $473,235
5 42ABrisbane Valley Highway 20.4-31.2km (East) 10.99 82 120 12.7 2027 2027 8.7 4.92E+05 4.93E+06 47,704 4.88E+06 8.6 0.07 0.0026 $41,567 544,513 4.38E+06 7.8 0.86 0.0309 $491,071
6 42ABrisbane Valley Highway 31.2-36.4km (East) 5.3 83 120 12.3 2026 2026 8.3 6.30E+05 6.04E+06 47,704 5.99E+06 8.3 0.06 0.0021 $16,828 544,513 5.50E+06 7.7 0.67 0.0246 $197,346
7
8 18A Warrego Highway 36.4-44.2km (East->East) 7.84 67 120 17.7 2032 2032 13.7 3.59E+06 6.14E+07 47,704 6.14E+07 13.7 0.01 0.0002 $1,658 544,513 6.09E+07 13.6 0.10 0.0026 $19,006
9 18A Warrego Highway 44.2-51.7km (East->East) 7.22 48 120 24.0 2038 2038 20.0 4.09E+06 1.13E+08 23,852 1.13E+08 20.0 0.00 0.0001 $550 272,256 1.13E+08 20.0 0.04 0.0007 $6,290
10
11 42ABrisbane Valley Highway 4-25.2km (North) 20.89 65 120 18.3 2032 2032 14.3 3.61E+05 6.55E+06 13,630 6.53E+06 14.3 0.02 0.0006 $15,234 155,575 6.39E+06 14.1 0.28 0.0071 $175,846
12 42ABrisbane Valley Highway 25.2-26.4km (North) 1.43 94 120 8.7 2023 2023 4.7 3.85E+05 1.96E+06 13,630 1.94E+06 4.6 0.03 0.0014 $3,052 155,575 1.80E+06 4.3 0.35 0.0156 $35,323
13 42ABrisbane Valley Highway 26.4-29.6km (North) 3.16 61 120 19.7 2034 2034 15.7 3.94E+05 7.96E+06 13,630 7.95E+06 15.6 0.02 0.0005 $1,882 155,575 7.81E+06 15.4 0.25 0.0058 $21,694
14 42ABrisbane Valley Highway 29.6-43.0km (North) 13.4 66 120 18.0 2032 2032 14.0 3.66E+05 6.44E+06 13,630 6.43E+06 14.0 0.02 0.0006 $9,385 155,575 6.29E+06 13.7 0.28 0.0072 $108,322
15 42ABrisbane Valley Highway 43.0+60.9km (North) 17.93 83 120 12.3 2026 2026 8.3 3.18E+05 3.04E+06 6,815 3.04E+06 8.3 0.02 0.0006 $11,202 77,788 2.97E+06 8.1 0.19 0.0068 $128,842
16
17 411Coominya Connection Road 0-8.9km (South) 8.88 70 120 16.7 2031 2031 12.7 1.17E+05 1.82E+06 6,815 1.82E+06 12.6 0.04 0.0011 $9,660 77,788 1.75E+06 12.2 0.45 0.0128 $112,294
18 412Forest Hill Fernvale Road 8.9-22.9kim (South) 14 82 120 12.7 2027 2027 8.7 1.27E+05 1.27E+06 6,815 1.27E+06 8.6 0.04 0.0014 $17,291 77,788 1.19E+06 8.2 0.47 0.0168 $201,137
19
20
21 18A Warrego Highway 22.9-30.7km (South) 7.8 49 120 23.7 2038 2038 19.7 2.51E+06 6.79E+07 6,815 6.79E+07 19.7 0.00 0.0000 $285 77,788 6.79E+07 19.6 0.02 0.0003 $3,251
22 18A Warrego Highway 30.7-50.6km (South) 19.85 54 120 22.0 2036 2036 18.0 1.62E+06 3.92E+07 6,815 3.92E+07 18.0 0.00 0.0000 $1,361 77,788 3.91E+07 18.0 0.03 0.0006 $15,550
23 18A Warrego Highway 50.6-58.6km (South) 7.98 33 120 29.0 2043 2043 25.0 2.47E+06 9.27E+07 3,407 9.27E+07 25.0 0.00 0.0000 $88 38,894 9.27E+07 25.0 0.01 0.0001 $1,005
24 18A Warrego Highway 58.6-67.4km (South) 8.8 67 120 17.7 2032 2032 13.7 2.40E+06 4.11E+07 3,407 4.11E+07 13.7 0.00 0.0000 $284 38,894 4.10E+07 13.7 0.01 0.0003 $3,242
25 18A Warrego Highway 57.4-69.0km (Southt) 1.61 78 120 14.0 2028 2028 10.0 2.25E+06 2.66E+07 3,407 2.66E+07 10.0 0.00 0.0000 $92 38,894 2.65E+07 10.0 0.01 0.0004 $1,049
26 18A Warrego Highway 69.0-70.3km (South) 1.25 91 120 9.7 2024 2024 5.7 2.08E+06 1.30E+07 3,407 1.30E+07 5.7 0.00 0.0001 $113 38,894 1.30E+07 5.7 0.02 0.0007 $1,293
27
28
29
30
$204,403 $2,455,124
Based on 2014 Roughness Data
Rehab. Year WITHOUT Dev Traffic. Cumul.B'gr
ESA (Dev
Start to
Rehab)
Years to
Rehab.
From Dev
Start
ESA's/yr at
Dev StartCumul.
Dev
Traffic
Reduced
B'ground
ESA's to
Rehab
Reduced
years to
Rehab.
Reduced
Pvt. Life
(years)
Cumul.
Dev TrafficYears to
Rehab (with
Dev)
Reduced
Pvt. Life
(years)
Reduced
B'ground
ESA's to
Rehab
To(wards) Development From Development
Rehabilitation Contribution Calculation
Reduced PVT. Life WITH Dev. Traffic -
(Dev. Start to Rehab. Year)PV - Rehab.PV - Rehab.
PVT. Life WITHOUT Dev. Traffic -
(Dev. Start to Rehab. Year)Rehab Design Life =
Reduced PVT. Life WITH Dev. Traffic - (Dev.
Start to Rehab. Year)
![Page 14: Coominya Quarry – Response to DILGP’s …...Updated PIA Analysis Sect Road Road Name Road Sections Lgth Total No. No. (km) To From To From To From ($) 1 2 411Coominya Connection](https://reader036.vdocuments.mx/reader036/viewer/2022081514/5fe0250dfef604240834be07/html5/thumbnails/14.jpg)
Estimated Background Traffic ESA'S at Development Start Date ( 2018 )
Pavement Design Life = 20 yrs
Cumul.
Sect. Length HV per ESA per ESA's per 1 2 3 4 5 6 7 8 9 10 B'ground
No. (km) 2014 % HV Growth 2018 %HV Heavy LANE HV Yr (2018) 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 ESAs
1 0.00E+00
2 411 0-4km (all directions) 4 1234 14.42 3.0% 1389 14.42 200 100 3.2 116,961 3.24E+06 1.17E+05 1.20E+05 1.24E+05 1.28E+05 1.32E+05 1.36E+05 1.40E+05 1.44E+05 1.48E+05 1.53E+05 1.34E+06
3 0.00E+00
4 42A 4-20.4km (East) 16.38 3458 16.02 3.0% 3892 16.02 623 312 3.2 364,124 1.01E+07 3.64E+05 3.75E+05 3.86E+05 3.98E+05 4.10E+05 4.22E+05 4.35E+05 4.48E+05 4.61E+05 4.75E+05 4.17E+06
5 42A 20.4-31.2km (East) 10.99 7757 9.64 3.0% 8731 9.64 842 421 3.2 491,510 1.36E+07 4.92E+05 5.06E+05 5.21E+05 5.37E+05 5.53E+05 5.70E+05 5.87E+05 6.04E+05 6.23E+05 6.41E+05 5.63E+06
6 42A 31.2-36.4km (East) 5.3 9621 9.96 3.0% 10829 9.96 1079 539 3.2 629,856 1.74E+07 6.30E+05 6.49E+05 6.68E+05 6.88E+05 7.09E+05 7.30E+05 7.52E+05 7.75E+05 7.98E+05 8.22E+05 7.22E+06
7 0.00E+00
8 18A 36.4-44.2km (East->East) 7.84 38323 14.27 3.0% 43133 14.27 6155 3078 3.2 3,594,556 9.95E+07 3.59E+06 3.70E+06 3.81E+06 3.93E+06 4.05E+06 4.17E+06 4.29E+06 4.42E+06 4.55E+06 4.69E+06 4.12E+07
9 18A 44.2-51.7km (East->East) 7.22 48293 12.87 3.0% 54354 12.87 6995 3498 3.2 4,085,305 1.13E+08 4.09E+06 4.21E+06 4.33E+06 4.46E+06 4.60E+06 4.74E+06 4.88E+06 5.02E+06 5.18E+06 5.33E+06 4.68E+07
10 0.00E+00
11 42A 4-25.2km (North) 20.89 2786 19.74 3.0% 3136 19.74 619 309 3.2 361,485 1.00E+07 3.61E+05 3.72E+05 3.83E+05 3.95E+05 4.07E+05 4.19E+05 4.32E+05 4.45E+05 4.58E+05 4.72E+05 4.14E+06
12 42A 25.2-26.4km (North) 1.43 4878 12.01 3.0% 5490 12.01 659 330 3.2 385,076 1.07E+07 3.85E+05 3.97E+05 4.09E+05 4.21E+05 4.33E+05 4.46E+05 4.60E+05 4.74E+05 4.88E+05 5.02E+05 4.41E+06
13 42A 26.4-29.6km (North) 3.16 3925 15.26 3.0% 4418 15.26 674 337 3.2 393,691 1.09E+07 3.94E+05 4.06E+05 4.18E+05 4.30E+05 4.43E+05 4.56E+05 4.70E+05 4.84E+05 4.99E+05 5.14E+05 4.51E+06
14 42A 29.6-43.0km (North) 13.4 3527 15.79 3.0% 3970 15.79 627 313 3.2 366,058 1.01E+07 3.66E+05 3.77E+05 3.88E+05 4.00E+05 4.12E+05 4.24E+05 4.37E+05 4.50E+05 4.64E+05 4.78E+05 4.20E+06
15 42A 43.0+60.9km (North) 17.93 2720 17.76 3.0% 3061 17.76 544 272 3.2 317,522 8.79E+06 3.18E+05 3.27E+05 3.37E+05 3.47E+05 3.57E+05 3.68E+05 3.79E+05 3.91E+05 4.02E+05 4.14E+05 3.64E+06
16 0.00E+00
17 411 0-8.9km (South) 8.88 1234 14.42 3.0% 1389 14.42 200 100 3.2 116,961 3.24E+06 1.17E+05 1.20E+05 1.24E+05 1.28E+05 1.32E+05 1.36E+05 1.40E+05 1.44E+05 1.48E+05 1.53E+05 1.34E+06
18 412 8.9-22.9kim (South) 14 1347 14.33 3.0% 1516 14.33 217 109 3.2 126,875 3.51E+06 1.27E+05 1.31E+05 1.35E+05 1.39E+05 1.43E+05 1.47E+05 1.51E+05 1.56E+05 1.61E+05 1.66E+05 1.45E+06
19 0.00E+00
20 0.00E+00
21 18A 22.9-30.7km (South) 7.8 20499 18.63 3.0% 23072 18.63 4298 2149 3.2 2,510,194 6.95E+07 2.51E+06 2.59E+06 2.66E+06 2.74E+06 2.83E+06 2.91E+06 3.00E+06 3.09E+06 3.18E+06 3.28E+06 2.88E+07
22 18A 30.7-50.6km (South) 19.85 14491 17.05 3.0% 16310 17.05 2781 1390 3.2 1,623,994 4.49E+07 1.62E+06 1.67E+06 1.72E+06 1.77E+06 1.83E+06 1.88E+06 1.94E+06 2.00E+06 2.06E+06 2.12E+06 1.86E+07
23 18A 50.6-58.6km (South) 7.98 18770 20.01 3.0% 21126 20.01 4227 2114 3.2 2,468,727 6.83E+07 2.47E+06 2.54E+06 2.62E+06 2.70E+06 2.78E+06 2.86E+06 2.95E+06 3.04E+06 3.13E+06 3.22E+06 2.83E+07
24 18A 58.6-67.4km (South) 8.8 21465 17.04 3.0% 24159 17.04 4117 2058 3.2 2,404,154 6.65E+07 2.40E+06 2.48E+06 2.55E+06 2.63E+06 2.71E+06 2.79E+06 2.87E+06 2.96E+06 3.05E+06 3.14E+06 2.76E+07
25 18A 57.4-69.0km (Southt) 1.61 14919 22.96 3.0% 16791 22.96 3855 1928 3.2 2,251,507 6.23E+07 2.25E+06 2.32E+06 2.39E+06 2.46E+06 2.53E+06 2.61E+06 2.69E+06 2.77E+06 2.85E+06 2.94E+06 2.58E+07
26 18A 69.0-70.3km (South) 1.25 15911 19.843 3.0% 17908 19.843 3553 1777 3.2 2,075,232 5.74E+07 2.08E+06 2.14E+06 2.20E+06 2.27E+06 2.34E+06 2.41E+06 2.48E+06 2.55E+06 2.63E+06 2.71E+06 2.38E+07
27 0.00E+00
28 0.00E+00
29 0.00E+00
30 0.00E+00
Background ESAs (EACH LANE) Year by Year without Dev.Design
Traffic (20
yr life)
APPENDIX 3
Estimated ESA's per Year at Dev Start (2018)
AADT Traffic (HV/day)
Link Road Section
![Page 15: Coominya Quarry – Response to DILGP’s …...Updated PIA Analysis Sect Road Road Name Road Sections Lgth Total No. No. (km) To From To From To From ($) 1 2 411Coominya Connection](https://reader036.vdocuments.mx/reader036/viewer/2022081514/5fe0250dfef604240834be07/html5/thumbnails/15.jpg)
Development Generated ESA's per Year
"Base" Annual Tonnage =
1 2 3 4 5 6 7 8 9 10
2018 2019 2020 2021 2022 2023 2024 2025 2026 2027
% of "Base" Annual Tonnage 40.0% 46.7% 53.3% 60.0% 66.7% 73.3% 80.0% 86.7% 93.3% 100.0% Total
Annual Tonnage 200,000 233,500 266,500 300,000 333,500 366,500 400,000 433,500 466,500 500,000 3,500,000
Cumul. Cumul.
Sect RoadRoad Name Road Section 1 2 3 4 5 6 7 8 9 10 Dev Traffic 1 2 3 4 5 6 7 8 9 10 Dev Traffic
No. No. % To From 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 ESA's 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 ESA's
1
2 411Coominya Connection Road0-4km (all directions) 90.0% 0.0195 0.2223 3.50E+03 4.09E+03 4.67E+03 5.26E+03 5.84E+03 6.42E+03 7.01E+03 7.60E+03 8.17E+03 8.76E+03 6.13E+04 4.00E+04 4.67E+04 5.33E+04 6.00E+04 6.67E+04 7.33E+04 8.00E+04 8.67E+04 9.33E+04 1.00E+05 7.00E+05
3
4 42ABrisbane Valley Highway4-20.4km (East) 70.0% 0.0195 0.2223 2.73E+03 3.18E+03 3.63E+03 4.09E+03 4.55E+03 5.00E+03 5.45E+03 5.91E+03 6.36E+03 6.81E+03 4.77E+04 3.11E+04 3.63E+04 4.15E+04 4.67E+04 5.19E+04 5.70E+04 6.22E+04 6.74E+04 7.26E+04 7.78E+04 5.45E+05
5 42ABrisbane Valley Highway20.4-31.2km (East) 70.0% 0.0195 0.2223 2.73E+03 3.18E+03 3.63E+03 4.09E+03 4.55E+03 5.00E+03 5.45E+03 5.91E+03 6.36E+03 6.81E+03 4.77E+04 3.11E+04 3.63E+04 4.15E+04 4.67E+04 5.19E+04 5.70E+04 6.22E+04 6.74E+04 7.26E+04 7.78E+04 5.45E+05
6 42ABrisbane Valley Highway31.2-36.4km (East) 70.0% 0.0195 0.2223 2.73E+03 3.18E+03 3.63E+03 4.09E+03 4.55E+03 5.00E+03 5.45E+03 5.91E+03 6.36E+03 6.81E+03 4.77E+04 3.11E+04 3.63E+04 4.15E+04 4.67E+04 5.19E+04 5.70E+04 6.22E+04 6.74E+04 7.26E+04 7.78E+04 5.45E+05
7
8 18AWarrego Highway36.4-44.2km (East->East) 70.0% 0.0195 0.2223 2.73E+03 3.18E+03 3.63E+03 4.09E+03 4.55E+03 5.00E+03 5.45E+03 5.91E+03 6.36E+03 6.81E+03 4.77E+04 3.11E+04 3.63E+04 4.15E+04 4.67E+04 5.19E+04 5.70E+04 6.22E+04 6.74E+04 7.26E+04 7.78E+04 5.45E+05
9 18AWarrego Highway44.2-51.7km (East->East) 35.0% 0.0195 0.2223 1.36E+03 1.59E+03 1.82E+03 2.04E+03 2.27E+03 2.50E+03 2.73E+03 2.95E+03 3.18E+03 3.41E+03 2.39E+04 1.56E+04 1.82E+04 2.07E+04 2.33E+04 2.59E+04 2.85E+04 3.11E+04 3.37E+04 3.63E+04 3.89E+04 2.72E+05
10
11 42ABrisbane Valley Highway4-25.2km (North) 20.0% 0.0195 0.2223 7.79E+02 9.09E+02 1.04E+03 1.17E+03 1.30E+03 1.43E+03 1.56E+03 1.69E+03 1.82E+03 1.95E+03 1.36E+04 8.89E+03 1.04E+04 1.18E+04 1.33E+04 1.48E+04 1.63E+04 1.78E+04 1.93E+04 2.07E+04 2.22E+04 1.56E+05
12 42ABrisbane Valley Highway25.2-26.4km (North) 20.0% 0.0195 0.2223 7.79E+02 9.09E+02 1.04E+03 1.17E+03 1.30E+03 1.43E+03 1.56E+03 1.69E+03 1.82E+03 1.95E+03 1.36E+04 8.89E+03 1.04E+04 1.18E+04 1.33E+04 1.48E+04 1.63E+04 1.78E+04 1.93E+04 2.07E+04 2.22E+04 1.56E+05
13 42ABrisbane Valley Highway26.4-29.6km (North) 20.0% 0.0195 0.2223 7.79E+02 9.09E+02 1.04E+03 1.17E+03 1.30E+03 1.43E+03 1.56E+03 1.69E+03 1.82E+03 1.95E+03 1.36E+04 8.89E+03 1.04E+04 1.18E+04 1.33E+04 1.48E+04 1.63E+04 1.78E+04 1.93E+04 2.07E+04 2.22E+04 1.56E+05
14 42ABrisbane Valley Highway29.6-43.0km (North) 20.0% 0.0195 0.2223 7.79E+02 9.09E+02 1.04E+03 1.17E+03 1.30E+03 1.43E+03 1.56E+03 1.69E+03 1.82E+03 1.95E+03 1.36E+04 8.89E+03 1.04E+04 1.18E+04 1.33E+04 1.48E+04 1.63E+04 1.78E+04 1.93E+04 2.07E+04 2.22E+04 1.56E+05
15 42ABrisbane Valley Highway43.0+60.9km (North) 10.0% 0.0195 0.2223 3.89E+02 4.55E+02 5.19E+02 5.84E+02 6.49E+02 7.14E+02 7.79E+02 8.44E+02 9.08E+02 9.74E+02 6.81E+03 4.45E+03 5.19E+03 5.92E+03 6.67E+03 7.41E+03 8.15E+03 8.89E+03 9.63E+03 1.04E+04 1.11E+04 7.78E+04
16
17 411Coominya Connection Road0-8.9km (South) 10.0% 0.0195 0.2223 3.89E+02 4.55E+02 5.19E+02 5.84E+02 6.49E+02 7.14E+02 7.79E+02 8.44E+02 9.08E+02 9.74E+02 6.81E+03 4.45E+03 5.19E+03 5.92E+03 6.67E+03 7.41E+03 8.15E+03 8.89E+03 9.63E+03 1.04E+04 1.11E+04 7.78E+04
18 412Forest Hill Fernvale Road8.9-22.9kim (South) 10.0% 0.0195 0.2223 3.89E+02 4.55E+02 5.19E+02 5.84E+02 6.49E+02 7.14E+02 7.79E+02 8.44E+02 9.08E+02 9.74E+02 6.81E+03 4.45E+03 5.19E+03 5.92E+03 6.67E+03 7.41E+03 8.15E+03 8.89E+03 9.63E+03 1.04E+04 1.11E+04 7.78E+04
19
20
21 18AWarrego Highway22.9-30.7km (South) 10.0% 0.0195 0.2223 3.89E+02 4.55E+02 5.19E+02 5.84E+02 6.49E+02 7.14E+02 7.79E+02 8.44E+02 9.08E+02 9.74E+02 6.81E+03 4.45E+03 5.19E+03 5.92E+03 6.67E+03 7.41E+03 8.15E+03 8.89E+03 9.63E+03 1.04E+04 1.11E+04 7.78E+04
22 18AWarrego Highway30.7-50.6km (South) 10.0% 0.0195 0.2223 3.89E+02 4.55E+02 5.19E+02 5.84E+02 6.49E+02 7.14E+02 7.79E+02 8.44E+02 9.08E+02 9.74E+02 6.81E+03 4.45E+03 5.19E+03 5.92E+03 6.67E+03 7.41E+03 8.15E+03 8.89E+03 9.63E+03 1.04E+04 1.11E+04 7.78E+04
23 18AWarrego Highway50.6-58.6km (South) 5.0% 0.0195 0.2223 1.95E+02 2.27E+02 2.59E+02 2.92E+02 3.25E+02 3.57E+02 3.89E+02 4.22E+02 4.54E+02 4.87E+02 3.41E+03 2.22E+03 2.59E+03 2.96E+03 3.33E+03 3.71E+03 4.07E+03 4.45E+03 4.82E+03 5.18E+03 5.56E+03 3.89E+04
24 18AWarrego Highway58.6-67.4km (South) 5.0% 0.0195 0.2223 1.95E+02 2.27E+02 2.59E+02 2.92E+02 3.25E+02 3.57E+02 3.89E+02 4.22E+02 4.54E+02 4.87E+02 3.41E+03 2.22E+03 2.59E+03 2.96E+03 3.33E+03 3.71E+03 4.07E+03 4.45E+03 4.82E+03 5.18E+03 5.56E+03 3.89E+04
25 18AWarrego Highway57.4-69.0km (Southt) 5.0% 0.0195 0.2223 1.95E+02 2.27E+02 2.59E+02 2.92E+02 3.25E+02 3.57E+02 3.89E+02 4.22E+02 4.54E+02 4.87E+02 3.41E+03 2.22E+03 2.59E+03 2.96E+03 3.33E+03 3.71E+03 4.07E+03 4.45E+03 4.82E+03 5.18E+03 5.56E+03 3.89E+04
26 18AWarrego Highway69.0-70.3km (South) 5.0% 0.0195 0.2223 1.95E+02 2.27E+02 2.59E+02 2.92E+02 3.25E+02 3.57E+02 3.89E+02 4.22E+02 4.54E+02 4.87E+02 3.41E+03 2.22E+03 2.59E+03 2.96E+03 3.33E+03 3.71E+03 4.07E+03 4.45E+03 4.82E+03 5.18E+03 5.56E+03 3.89E+04
27
28
29
30
Parked Formula Parked Formula
Av. ESA / t
500,000
TO(WARDS) - Development Generated ESA's (Year by Year) (AWAY) FROM - Development Generated ESA's (Year by Year)
Development Generated Tonnages (Year by Year)
![Page 16: Coominya Quarry – Response to DILGP’s …...Updated PIA Analysis Sect Road Road Name Road Sections Lgth Total No. No. (km) To From To From To From ($) 1 2 411Coominya Connection](https://reader036.vdocuments.mx/reader036/viewer/2022081514/5fe0250dfef604240834be07/html5/thumbnails/16.jpg)
Development Generated ESA % (Year by Year) ESA Increase Trigger = 5.0%
Sect RoadRoad Name Road Section Length 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10
No. No. 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027
1
2 411Coominya Connection Road0-4km (all directions) 3.0% 3.4% 3.8% 4.1% 4.4% 4.7% 5.0% 5.3% 5.5% 5.7% 34.2% 38.8% 43.0% 47.0% 50.7% 54.1% 57.3% 60.3% 63.0% 65.5%
3
4 42ABrisbane Valley Highway4-20.4km (East) 0.7% 0.8% 0.9% 1.0% 1.1% 1.2% 1.3% 1.3% 1.4% 1.4% 8.5% 9.7% 10.7% 11.7% 12.7% 13.5% 14.3% 15.1% 15.7% 16.4%
5 42ABrisbane Valley Highway20.4-31.2km (East) 0.6% 0.6% 0.7% 0.8% 0.8% 0.9% 0.9% 1.0% 1.0% 1.1% 6.3% 7.2% 8.0% 8.7% 9.4% 10.0% 10.6% 11.2% 11.7% 12.1%
6 42ABrisbane Valley Highway31.2-36.4km (East) 0.4% 0.5% 0.5% 0.6% 0.6% 0.7% 0.7% 0.8% 0.8% 0.8% 4.9% 5.6% 6.2% 6.8% 7.3% 7.8% 8.3% 8.7% 9.1% 9.5%
7
8 18AWarrego Highway36.4-44.2km (East->East) 0.1% 0.1% 0.1% 0.1% 0.1% 0.1% 0.1% 0.1% 0.1% 0.1% 0.9% 1.0% 1.1% 1.2% 1.3% 1.4% 1.4% 1.5% 1.6% 1.7%
9 18AWarrego Highway44.2-51.7km (East->East) 0.0% 0.0% 0.0% 0.0% 0.0% 0.1% 0.1% 0.1% 0.1% 0.1% 0.4% 0.4% 0.5% 0.5% 0.6% 0.6% 0.6% 0.7% 0.7% 0.7%
10
11 42ABrisbane Valley Highway4-25.2km (North) 0.2% 0.2% 0.3% 0.3% 0.3% 0.3% 0.4% 0.4% 0.4% 0.4% 2.5% 2.8% 3.1% 3.4% 3.6% 3.9% 4.1% 4.3% 4.5% 4.7%
12 42ABrisbane Valley Highway25.2-26.4km (North) 0.2% 0.2% 0.3% 0.3% 0.3% 0.3% 0.3% 0.4% 0.4% 0.4% 2.3% 2.6% 2.9% 3.2% 3.4% 3.6% 3.9% 4.1% 4.3% 4.4%
13 42ABrisbane Valley Highway26.4-29.6km (North) 0.2% 0.2% 0.2% 0.3% 0.3% 0.3% 0.3% 0.3% 0.4% 0.4% 2.3% 2.6% 2.8% 3.1% 3.3% 3.6% 3.8% 4.0% 4.2% 4.3%
14 42ABrisbane Valley Highway29.6-43.0km (North) 0.2% 0.2% 0.3% 0.3% 0.3% 0.3% 0.4% 0.4% 0.4% 0.4% 2.4% 2.8% 3.1% 3.3% 3.6% 3.8% 4.1% 4.3% 4.5% 4.7%
15 42ABrisbane Valley Highway43.0+60.9km (North) 0.1% 0.1% 0.2% 0.2% 0.2% 0.2% 0.2% 0.2% 0.2% 0.2% 1.4% 1.6% 1.8% 1.9% 2.1% 2.2% 2.3% 2.5% 2.6% 2.7%
16
17 411Coominya Connection Road0-8.9km (South) 0.3% 0.4% 0.4% 0.5% 0.5% 0.5% 0.6% 0.6% 0.6% 0.6% 3.8% 4.3% 4.8% 5.2% 5.6% 6.0% 6.4% 6.7% 7.0% 7.3%
18 412Forest Hill Fernvale Road8.9-22.9kim (South) 0.3% 0.3% 0.4% 0.4% 0.5% 0.5% 0.5% 0.5% 0.6% 0.6% 3.5% 4.0% 4.4% 4.8% 5.2% 5.5% 5.9% 6.2% 6.5% 6.7%
19
20
21 18AWarrego Highway22.9-30.7km (South) 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.2% 0.2% 0.2% 0.2% 0.3% 0.3% 0.3% 0.3% 0.3% 0.3%
22 18AWarrego Highway30.7-50.6km (South) 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.3% 0.3% 0.3% 0.4% 0.4% 0.4% 0.5% 0.5% 0.5% 0.5%
23 18AWarrego Highway50.6-58.6km (South) 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.1% 0.1% 0.1% 0.1% 0.1% 0.1% 0.2% 0.2% 0.2% 0.2%
24 18AWarrego Highway58.6-67.4km (South) 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.1% 0.1% 0.1% 0.1% 0.1% 0.1% 0.2% 0.2% 0.2% 0.2%
25 18AWarrego Highway57.4-69.0km (Southt) 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.1% 0.1% 0.1% 0.1% 0.1% 0.2% 0.2% 0.2% 0.2% 0.2%
26 18AWarrego Highway69.0-70.3km (South) 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.1% 0.1% 0.1% 0.1% 0.2% 0.2% 0.2% 0.2% 0.2% 0.2%
27
28
29
30
TO(WARDS) - Development Generated % Year by Year FROM - Development Generated % Year by Year