Fiscal Year 2010 Budget Workshop
Cooling Tower Fill and Drift Eliminator Replacement
Bill LaFramboise, Manager
System Engineering
March 25, 2009
![Page 2: Cooling Tower Fill and Drift Eliminator Replacement](https://reader036.vdocuments.mx/reader036/viewer/2022062504/589ed6b31a28abcc4a8bf3c1/html5/thumbnails/2.jpg)
Fiscal Year 2010 Budget Workshop
2
Cooling Tower Function
�The Cooling Towers Serve the same Function as the Radiator in your Car
�Both Remove the Unused Heat from Power Production
�Just like the Radiator in your Car they are Important for Efficient Operation of the Machine
![Page 3: Cooling Tower Fill and Drift Eliminator Replacement](https://reader036.vdocuments.mx/reader036/viewer/2022062504/589ed6b31a28abcc4a8bf3c1/html5/thumbnails/3.jpg)
Fiscal Year 2010 Budget Workshop
3
Why Repack
�Material in Three Towers is Original and Degrading due to Age
�Material Supports in some Areas have given away (Fiberglass)
�Material and Supports have been Damaged over the Years due to Ice, Wind, Chemicals, and pH of the Water
�Fill has been Broken and some has De-laminated
![Page 4: Cooling Tower Fill and Drift Eliminator Replacement](https://reader036.vdocuments.mx/reader036/viewer/2022062504/589ed6b31a28abcc4a8bf3c1/html5/thumbnails/4.jpg)
Fiscal Year 2010 Budget Workshop
4
COOLING TOWER 2A DAMAGE
![Page 5: Cooling Tower Fill and Drift Eliminator Replacement](https://reader036.vdocuments.mx/reader036/viewer/2022062504/589ed6b31a28abcc4a8bf3c1/html5/thumbnails/5.jpg)
Fiscal Year 2010 Budget Workshop
5
![Page 6: Cooling Tower Fill and Drift Eliminator Replacement](https://reader036.vdocuments.mx/reader036/viewer/2022062504/589ed6b31a28abcc4a8bf3c1/html5/thumbnails/6.jpg)
Fiscal Year 2010 Budget Workshop
6
Scope of Project
�Remove all of the Old Fill and Drift Eliminators and Dispose of Material (Asbestos Cement)
�Remove Old Fiberglass Fill Supports
�Install New Fill Support Grids and Fill (New Material is PVC)
�Install New More Efficient Drift Eliminators (PVC)
�Repack 3 Cooling Towers, One in Fiscal Year 2010 and Two in Fiscal Year 2011
![Page 7: Cooling Tower Fill and Drift Eliminator Replacement](https://reader036.vdocuments.mx/reader036/viewer/2022062504/589ed6b31a28abcc4a8bf3c1/html5/thumbnails/7.jpg)
Fiscal Year 2010 Budget Workshop
7
Tower Fill Material (Each Tower)
�About 250,000 Splash Bars – 6’ Long by 4” Wide
�Over 2000 Support Grid Sections
�21000 Drift Eliminators, 5’ by 7”, and their Supports (to be removed)
�The Removed Material has to be Handled as Asbestos
�About 40 Semi Truck Loads will need Disposal at a Designated Asbestos Landfill
![Page 8: Cooling Tower Fill and Drift Eliminator Replacement](https://reader036.vdocuments.mx/reader036/viewer/2022062504/589ed6b31a28abcc4a8bf3c1/html5/thumbnails/8.jpg)
Fiscal Year 2010 Budget Workshop
8
![Page 9: Cooling Tower Fill and Drift Eliminator Replacement](https://reader036.vdocuments.mx/reader036/viewer/2022062504/589ed6b31a28abcc4a8bf3c1/html5/thumbnails/9.jpg)
Fiscal Year 2010 Budget Workshop
9
Repacking a Cooling Tower
�First, the Support Grid is Installed from the Bottom Up
�The Splash Bars (Fill) are then Installed from the Bottom Up, Inside to Outside and follow the Support Grid Up
�Then the Drift Eliminators are Installed in Sections that the Fill has been Completely Installed
![Page 10: Cooling Tower Fill and Drift Eliminator Replacement](https://reader036.vdocuments.mx/reader036/viewer/2022062504/589ed6b31a28abcc4a8bf3c1/html5/thumbnails/10.jpg)
Fiscal Year 2010 Budget Workshop
10
![Page 11: Cooling Tower Fill and Drift Eliminator Replacement](https://reader036.vdocuments.mx/reader036/viewer/2022062504/589ed6b31a28abcc4a8bf3c1/html5/thumbnails/11.jpg)
Fiscal Year 2010 Budget Workshop
11
![Page 12: Cooling Tower Fill and Drift Eliminator Replacement](https://reader036.vdocuments.mx/reader036/viewer/2022062504/589ed6b31a28abcc4a8bf3c1/html5/thumbnails/12.jpg)
Fiscal Year 2010 Budget Workshop
12
![Page 13: Cooling Tower Fill and Drift Eliminator Replacement](https://reader036.vdocuments.mx/reader036/viewer/2022062504/589ed6b31a28abcc4a8bf3c1/html5/thumbnails/13.jpg)
Fiscal Year 2010 Budget Workshop
13
Cooling Towers Wear Out
� A Repack is a Normal Process in the Life of a Cooling Tower
� There are Several Items that can Affect the Longevity of the Fill and Tower◘ Age of material◘ Type of tower◘ Materials used in construction◘ Weather (ice, wind, and, sun)◘ Water Chemistry (chlorine and Ph)
� Plants of our Generation have or are Currently Repacking Cooling Towers at this Time (River Bend Current)
![Page 14: Cooling Tower Fill and Drift Eliminator Replacement](https://reader036.vdocuments.mx/reader036/viewer/2022062504/589ed6b31a28abcc4a8bf3c1/html5/thumbnails/14.jpg)
Fiscal Year 2010 Budget Workshop
14
Cost of Repacking a Tower
�Estimated Cost is $2.4 Million per Tower
◘ Fiscal Year 2010 – $ 2.4 Million (one tower)
◘ Fiscal Year 2011 – $ 4.8 Million (two towers)
�This is based on Previous Costs when the Last Two Towers were Repacked in 2001 and Adjusted for Inflation.
�Bid will be a Single Bid for both Fiscal Years