conversion of off-peak nuclear energy to h2 and …...1 conversion of off-peak nuclear energy to h 2...
TRANSCRIPT
![Page 1: Conversion of Off-peak Nuclear Energy to H2 and …...1 Conversion of Off-peak Nuclear Energy to H 2 and Onboard H 2 Supply 8th International Hydrail Conference (Hydrail 2013), Toronto,](https://reader034.vdocuments.mx/reader034/viewer/2022042205/5ea78a869e13a023ab0cff74/html5/thumbnails/1.jpg)
1
Conversion of Off-peak Nuclear Energy to H2and Onboard H2 Supply
8th International Hydrail Conference (Hydrail 2013), Toronto, Canada, June 11-12, 2013
Dr. Forest Wang, Prof. Greg F. Naterer, Prof. Marc Rosen, Prof. Ibrahim Dincer, Prof. Kamiel S. Gabriel
Clean Energy Research Laboratory (CERL),University of Ontario Institute of Technology (UOIT),
Oshawa, Ontario
![Page 2: Conversion of Off-peak Nuclear Energy to H2 and …...1 Conversion of Off-peak Nuclear Energy to H 2 and Onboard H 2 Supply 8th International Hydrail Conference (Hydrail 2013), Toronto,](https://reader034.vdocuments.mx/reader034/viewer/2022042205/5ea78a869e13a023ab0cff74/html5/thumbnails/2.jpg)
2
1. CERL (Clean Energy Research Laboratory) and ACE (Automotive Centre of Excellence ) of UOIT
2. Off-peak nuclear energy for hydrogen production
3. Onboard hydrogen storage and release
4. Major achievements
Outline
![Page 3: Conversion of Off-peak Nuclear Energy to H2 and …...1 Conversion of Off-peak Nuclear Energy to H 2 and Onboard H 2 Supply 8th International Hydrail Conference (Hydrail 2013), Toronto,](https://reader034.vdocuments.mx/reader034/viewer/2022042205/5ea78a869e13a023ab0cff74/html5/thumbnails/3.jpg)
3
1.1 Clean Energy Research Laboratory (CERL)
• Hydrogen: 30 researchers for H2 projects• Nuclear, solar, wind, heat engine, and heat recovery
Nuclear-based H2productionCERL
Onboard H2 storage & releaseH2 research team
Wind turbine
![Page 4: Conversion of Off-peak Nuclear Energy to H2 and …...1 Conversion of Off-peak Nuclear Energy to H 2 and Onboard H 2 Supply 8th International Hydrail Conference (Hydrail 2013), Toronto,](https://reader034.vdocuments.mx/reader034/viewer/2022042205/5ea78a869e13a023ab0cff74/html5/thumbnails/4.jpg)
• The signature test chamber: a climatic wind tunnel. Wind: 260 km/h -40˚C to +60˚C 5% to 95% humidity Snow, rain, freezing rain
1.2 Automotive Centre of Excellence (ACE)
• Large enough: trucks, buses, light rail, aerospace components and wind turbines.
![Page 5: Conversion of Off-peak Nuclear Energy to H2 and …...1 Conversion of Off-peak Nuclear Energy to H 2 and Onboard H 2 Supply 8th International Hydrail Conference (Hydrail 2013), Toronto,](https://reader034.vdocuments.mx/reader034/viewer/2022042205/5ea78a869e13a023ab0cff74/html5/thumbnails/5.jpg)
5
Natural gas reforming: GHG emissions, not renewable
2.1 Why water splitting for hydrogen?Environmentally friendly !
Water (H2O) H2+ ½ O2
CH4
H2O
Heat
H2 + CO2
Water splitting: Renewable
![Page 6: Conversion of Off-peak Nuclear Energy to H2 and …...1 Conversion of Off-peak Nuclear Energy to H 2 and Onboard H 2 Supply 8th International Hydrail Conference (Hydrail 2013), Toronto,](https://reader034.vdocuments.mx/reader034/viewer/2022042205/5ea78a869e13a023ab0cff74/html5/thumbnails/6.jpg)
(http://www.mei.gov.on.ca/en/energy/electricity/?page=nuclear-ontario-plants)
Gap: 7,000 MW (daily)Modulation: frequent & large
2.2 Why nuclear-based?-Renewable and economic !
H2?
![Page 7: Conversion of Off-peak Nuclear Energy to H2 and …...1 Conversion of Off-peak Nuclear Energy to H 2 and Onboard H 2 Supply 8th International Hydrail Conference (Hydrail 2013), Toronto,](https://reader034.vdocuments.mx/reader034/viewer/2022042205/5ea78a869e13a023ab0cff74/html5/thumbnails/7.jpg)
2.3 Nuclear energy for H2-based GO Trains - economic !
![Page 8: Conversion of Off-peak Nuclear Energy to H2 and …...1 Conversion of Off-peak Nuclear Energy to H 2 and Onboard H 2 Supply 8th International Hydrail Conference (Hydrail 2013), Toronto,](https://reader034.vdocuments.mx/reader034/viewer/2022042205/5ea78a869e13a023ab0cff74/html5/thumbnails/8.jpg)
8
2.4 H2 production projects at CERL-- Thermochemical H2 Production
Sulfur-Based Cycles(USA, France, Japan, China, South
Korea)
Max. temperature of 850 oC
Copper-Chlorine Cycle (Canada, USA, France, Romania, South Africa)
Max. temperature of 530 oC, matching SCWR of Canada
Direct water splitting: >4000oC
Indirect splitting: thermochemical cycles
![Page 9: Conversion of Off-peak Nuclear Energy to H2 and …...1 Conversion of Off-peak Nuclear Energy to H 2 and Onboard H 2 Supply 8th International Hydrail Conference (Hydrail 2013), Toronto,](https://reader034.vdocuments.mx/reader034/viewer/2022042205/5ea78a869e13a023ab0cff74/html5/thumbnails/9.jpg)
9
2.5 Hydrogen production projects at CERL-- Copper-Chlorine Cycle
WATEROXYGEN
HYDROGENdrying(70 oC) CuCl (s)
OUTPUT
OUTPUTINPUT
high-gradeheat heat
INPUTHCl(aq)
HCl (g)
CuO*CuCl2 (s)
hydrolysis(400 oC)
CuCl2(s)
CuCl2 (aq)
waste heat
heat
heat
decomposition(500 oC)
electrolysis (70 oC)Copper-Chlorine Cycle
heatrecovery
CuCl (l)
![Page 10: Conversion of Off-peak Nuclear Energy to H2 and …...1 Conversion of Off-peak Nuclear Energy to H 2 and Onboard H 2 Supply 8th International Hydrail Conference (Hydrail 2013), Toronto,](https://reader034.vdocuments.mx/reader034/viewer/2022042205/5ea78a869e13a023ab0cff74/html5/thumbnails/10.jpg)
10
Oxychloride Decomposer
WATER + HEAT
HYDROGEN
Electrolyzer
Spray Dryer
Fluidized Bed
2.6 Hydrogen production projects at CERL-- Experimental loops
![Page 11: Conversion of Off-peak Nuclear Energy to H2 and …...1 Conversion of Off-peak Nuclear Energy to H 2 and Onboard H 2 Supply 8th International Hydrail Conference (Hydrail 2013), Toronto,](https://reader034.vdocuments.mx/reader034/viewer/2022042205/5ea78a869e13a023ab0cff74/html5/thumbnails/11.jpg)
11
Fluidized Bed (at UOIT)
Molten Salt Reactor (at UOIT)
Electrolyzer (at AECL)
Spray Dryer (at UOIT)
WATER + HEAT
HYDROGENNote: Auxiliary equipment, flow loops and heat exchangers for Cu-Cl cycle at UOIT not shown
2.7 Hydrogen production projects at CERL-- Experimental apparatus
![Page 12: Conversion of Off-peak Nuclear Energy to H2 and …...1 Conversion of Off-peak Nuclear Energy to H 2 and Onboard H 2 Supply 8th International Hydrail Conference (Hydrail 2013), Toronto,](https://reader034.vdocuments.mx/reader034/viewer/2022042205/5ea78a869e13a023ab0cff74/html5/thumbnails/12.jpg)
12
2.8 Hydrogen projects at CERL-- Photocatalytic H2 Production
Direct water splitting with sunlight
![Page 13: Conversion of Off-peak Nuclear Energy to H2 and …...1 Conversion of Off-peak Nuclear Energy to H 2 and Onboard H 2 Supply 8th International Hydrail Conference (Hydrail 2013), Toronto,](https://reader034.vdocuments.mx/reader034/viewer/2022042205/5ea78a869e13a023ab0cff74/html5/thumbnails/13.jpg)
3.1 Onboard H2 storage-- ammonia (NH3)
Target: 500 km / tank
Challenges:
Gas tank: P > 500 bars
Liquid tank: T < -253oC
Toyota Prius: 960km (High P, Liquid, -260oC)
http://www.ecogeek.org/content/view/1717/
UOIT Solution: H2 carrier (hydride)
Carrier H2 (wt%)
Natural gas (CH4) 25.0
Propane (C3H8) 18.2
Butane (C4H10) 17.2
Ethanol(C2H5OH) 13.0
Methanol(CH3OH) 12.5
NH3Manufacturing is mature in industry.
17.6
CO2emissions
![Page 14: Conversion of Off-peak Nuclear Energy to H2 and …...1 Conversion of Off-peak Nuclear Energy to H 2 and Onboard H 2 Supply 8th International Hydrail Conference (Hydrail 2013), Toronto,](https://reader034.vdocuments.mx/reader034/viewer/2022042205/5ea78a869e13a023ab0cff74/html5/thumbnails/14.jpg)
3.2 Onboard H2 storage and release-- ammonia-based
• Novel ammonia decomposition and separation reactor design, built and tested at UOIT• Catalytic membrane reactor type (plate and tubular design versions)• More than 60 kW H2 power per kg of Nickel catalyst
![Page 15: Conversion of Off-peak Nuclear Energy to H2 and …...1 Conversion of Off-peak Nuclear Energy to H 2 and Onboard H 2 Supply 8th International Hydrail Conference (Hydrail 2013), Toronto,](https://reader034.vdocuments.mx/reader034/viewer/2022042205/5ea78a869e13a023ab0cff74/html5/thumbnails/15.jpg)
15
4.1 Major achievements in H2 energy
Nuclear-based H2 production:• AECL / UOIT leading the Cu-Cl nuclear hydrogen program in the world.• Phase 1 (2006 -2011): $11 million received.• Phase 2 (2012 -2017): $10 million granted.• A number of industrial partners.
Onboard H2storage and release:
![Page 16: Conversion of Off-peak Nuclear Energy to H2 and …...1 Conversion of Off-peak Nuclear Energy to H 2 and Onboard H 2 Supply 8th International Hydrail Conference (Hydrail 2013), Toronto,](https://reader034.vdocuments.mx/reader034/viewer/2022042205/5ea78a869e13a023ab0cff74/html5/thumbnails/16.jpg)
Solar Energy Research at UOITDr. Franco Gaspari
4.2 Industry Partners
![Page 17: Conversion of Off-peak Nuclear Energy to H2 and …...1 Conversion of Off-peak Nuclear Energy to H 2 and Onboard H 2 Supply 8th International Hydrail Conference (Hydrail 2013), Toronto,](https://reader034.vdocuments.mx/reader034/viewer/2022042205/5ea78a869e13a023ab0cff74/html5/thumbnails/17.jpg)
Many thanks!