Contribution of JR East Hiroyuki WATANABE East Japan Railway Company

Upload: dian

Post on 23-Feb-2016

77 views

Category:

Documents


0 download

DESCRIPTION

Contribution of JR East. Hiroyuki WATANABE East Japan Railway Company. Contents. About JR East What we can contribute to WBSA railways. 2. Outline of JR EAST. About JR East. JR EAST is the largest railway company in JAPAN. Greater Tokyo area. As of March 2013. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Contribution of JR East

Contribution of JR East

Hiroyuki WATANABE East Japan Railway Company

Page 2: Contribution of JR East

2

2

Contents

- About JR East

- What we can contribute to WBSA railways

Page 3: Contribution of JR East

Greater Tokyo area

As of March 2013

Outline of JR EAST

JR EAST is the largest railway company in JAPAN

About JR East

Page 4: Contribution of JR East

4

4

What we can contribute to WBSA railways

- Business improvement

- Transport optimization

- Infrastructure management

- Operation improvement

Page 5: Contribution of JR East

5

5

What we can contribute to WABS railways

- Business improvement

- Transport optimization

- Infrastructure management

- Operation improvement

Page 6: Contribution of JR East

6

6

Division and Privatization of Japanese National Railways

Business improvement

Page 7: Contribution of JR East

Japanese National Railways (JNR): 1977 – 1986

Subsidies

After reforming: 1987 – 2001 Corporation taxes, Fixed

asset taxes etc.

€ 19   Billion

JR

Japanese National and Local

GovernmentsJNR

€ 46 Billion

Money flow

Business improvement

JapaneseNational and Local

Governments

Japanese National and Local

Governments

JapaneseNational and Local

Governments

※  €1=¥ 130

Page 8: Contribution of JR East

8

Business improvement

Page 9: Contribution of JR East

9

9

What we can contribute to WBSA railways

- Business improvement

- Transport optimization

- Infrastructure management

- Operation improvement

Page 10: Contribution of JR East

10

Transport optimizationTrain car km/day Number of trains/day(million km)

+22 % +27 %

Number of passengers/day

+20%

1987(JNR) 1987(JNR)

1987(JNR) 1987(JNR)

2012.3 2012.3

2011 2011

-25 %

Congestion rate of peak hour in Tokyo area(million)

(%) In the train

Page 11: Contribution of JR East

Large volume and high transport density (transport demand during peak hours in the Tokyo metropolitan area for each line: Approx. 3,000 persons/3 min.)

Yokohama

Takasaki Line3,500 persons/4 min. 30 sec. Saikyo Line

2,800 persons/2 min. 30 sec.

Joban Local Line2,400 persons/2 min. 30 sec.

Joban Line3,500 persons/

3 min.

Sobu Line3,000 persons/2 min.20 sec.

Keiyo Line2,600 persons/

3 min.

Keihin-Tohoku Line

2,900 persons/2 min. 20 sec.

(Legend) Line name

No. of passengers per train/ train interval

(FY2010)

Yamanote Line3,300 persons/2 min.20 sec.

Chuo Line2,900 persons/

2 min.

Tokaido Line3,500 persons/

3 min.

Omiya

ShinjukuIkebukuro

Ueno

TokyoShibuya

Osaki

Shinagawa

11

Transport optimization

Page 12: Contribution of JR East

Modal share (Passenger)

Transport optimization

Page 13: Contribution of JR East

13

13

What we can contribute to WBSA railways

- Business improvement

- Transport optimization

- Infrastructure management

- Operation improvement

Page 14: Contribution of JR East

14

Tunnels

882km (1,260 tunnels)   

Bridges

410km (31,050 bridges)

Viaducts

   660km (2,800 viaducts)

More than 50 % infrastructure is over its lifetime.

Shinkansen lines Conventional lines

1,134.7Km 6,377.9Km

Infrastructure management

Page 15: Contribution of JR East

JR East Partner companies

Rebuilding the construction system

Rebuilding the facilities inspection system

Strengthening, automation

Facility management Inspection, Maintenance

15

Page 16: Contribution of JR East

16

16

What we can contribute to WBSA railways

- Business improvement

- Transport optimization

- Infrastructure management

- Operation improvement

Page 17: Contribution of JR East

17

17

Operation improvementRailway accidents

1987(JNR) 2011

1987(JNR) 2011

Railway crossing accidents

-62 %

-85 %

Sensing device at level crossing

Fall detection mat Emergency train stop warning system

Page 18: Contribution of JR East

Rainfall disaster Snow disaster Rock fall Disaster

Snow damage measures

Natural disaster

Carried out in the self-financingRock fall damage measuresRainfall damage measures

18

Operation improvement

Railway forestSprinklerReinforcement

Page 19: Contribution of JR East

19

High-speed line Conventional line Total ( per 100km)

Rain gauges 29 537 566 ( 7.5)

Water gauges 0 592 592 (7.9)

Anemometers 158 699 857 (11.4)

Seismographs

97 196 293 (3.9)

March 2010

Anemometer

Snow gauge

Rail temp. gauge

Water gauge

Seismograph

Rain gauge

Scouring detector

Network

Landslide detector

Monitoring and restrictions ■ Speed restrictions■ Traffic suspension

Operation Control Center

Operation improvement

Page 20: Contribution of JR East

Extremely high rate of punctuality of operation (average operational delay per train: Shinkansen: 0.3 min.; Conventional lines: 1.1 min.)

Average delay per train

0

0.2

0.4

0.6

0.8

1

1.2

1.4

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Fiscal Year

min

utes

Conventional Train

Shinkansen

(JR East in-house document)

Additionally, railways in Japan are highly respected in society, and due to the national character of the Japanese people, highly punctual operations are expected.

For JR East lines with large passenger transport volume and high transport density, even a short train delay (2 or 3 minutes) can result in crowds of passengers at stations.

20

Operation improvement

JR East must be reliable to respond to customer expectation

Page 21: Contribution of JR East

21

21

JR East’s strong points

We have experience and know-how of not only high-speed, but also

urban, suburban and regional transport services. And we have provided

these services with a high reliability and punctuality.

We have experience and know-how of operation and maintenance

services as an integrated company. In addition, we have rolling stock

manufacturing business.

We think that JR East is the only railway company that has these

experience and know-how.

We have wide range of experience that can respond to any needs or

problems.

Page 22: Contribution of JR East

22

Thank you for your attention