Design-Build:
RISKSOR REWARDSfor the
Consulting Engineer?
-
8/17/2019 Contracts and Relationships
3/29
Presented at the FIDIC Annual Conference
September 7, 2005
Gregs G !homopulos, P", FAC"C
-
8/17/2019 Contracts and Relationships
4/29
# Many of the old rules for project delivery that held sway
in the industry no longer have the
same potency as they once did…
-
8/17/2019 Contracts and Relationships
5/29
“Design-bid-build still has its many followers among owners who believe that
they can obtain the very best design and
the most cost-effective construction byholding both sides separate…
-
8/17/2019 Contracts and Relationships
6/29
“ Advocates of design-build believe that thesole-source method of procurement forces
the team to iron out many of the project
wrinkles on their own because the entireteam will be held accountable…
-
8/17/2019 Contracts and Relationships
7/29
“Still others believe that constructionmanagement for fee is the best way of
ensuring that the owner gets the best of all
worlds because there is an agentinspecting measuring observing and
protecting the owner!s interest…
-
8/17/2019 Contracts and Relationships
8/29
“"ans of #M At-$isk believe that the words%at risk! say it all and force the #M firm to‑
deliver what it promised on time and on
budget or face the conse&uences' (
"ng$neer$ng %e&s'(ecord, )ul* +, 2000
-
8/17/2019 Contracts and Relationships
9/29
Design-Build is not a new concept.
Most of the world’s great structureswere built under a Design-Buildarrangement by master builders.
-
8/17/2019 Contracts and Relationships
10/29
Project Delivery Systems Design-Bid-Build
Construction Management (CM)• CM At-Risk
• CM – Owner’s Representatie Design-Build
Ot!er "ariations
• Build-Operate-#rans$er (BO#)• Build-Own-Operate-#rans$er (BOO#)
• %rogram Management
-
8/17/2019 Contracts and Relationships
11/29
OWNER
Design-Bid-Build
Contractual Relations!ip
CE CONTRACTORS
-
8/17/2019 Contracts and Relationships
12/29
PROJECTSTART
SELECTCE
Design-Bid-Build
%ro&ect #ime 'ine
Contractual Relations!ip
CONSTRUCTION
DESIGN
PROJECTCOMPLETION
BIDDING/AWARD
-
8/17/2019 Contracts and Relationships
13/29
OWNER
Construction Management At-Risk
Contractual Relations!ip
CM / GCCE
-
8/17/2019 Contracts and Relationships
14/29
SELECTCE
PROJECTSTART
SELECTCM/GC
Construction Management At-Risk
%ro&ect #ime 'ine
Contractual Relations!ip
CONSTRUCTION
DESIGN
PROJECTCOMPLETION
PRE-CONSTRUCTION
-
8/17/2019 Contracts and Relationships
15/29
-
8/17/2019 Contracts and Relationships
16/29
Design-Build
%ro&ect #ime 'ine
Contractual Relations!ip
OWNER’SCE
PROJECTSTART
OR IN-HOUSE
CONSTRUCTION
SELECTDESIGNBUILDER
PROJECTCOMPLETION
DESIGN
PRE-CONSTRUCTION
-
8/17/2019 Contracts and Relationships
17/29
Why Owners Prefer Design-Build
!orter %ro&ect c!edule Better CostBudget Management
*$$icienc+ and ,nnoation(Contractors’ Means Met!ods)
ingle ource Responsi.ilit+(Aoids %ointing o$ /ingers)
Risk !aring(More Risks %assed Down to Design-Builder)
/ewer Claims and 'itigations
/ewer Contract Modi$ications
Opportunit+ to %ackage 'arger Contracts
-
8/17/2019 Contracts and Relationships
18/29
How Owners ProcureDesign-Build Services In the U.S.
0egotiated %rocurement• ole ource election (trategic Alliance)
• 1uali$ications Based election (1B)
• Best "alue (%rice and #ec!nical)
Competitie %rocurement• 'ow Bid ('owest %rice #ec!nicall+ Accepta.le)
• Ad&usted 'ow Bid (Mi2 o$ %rice3 c!edule3 etc4)
• /i2ed BudgetBest #ec!nical %roposal• Best and /inal O$$er
• 5eig!ted Matri2
-
8/17/2019 Contracts and Relationships
19/29
Organization of theDesign-Build Team In the U.S.
,ntegrated /irm(Design and Construction Capa.ilit+ in ame /irm)
Contractor As %rime
C* As %rime 6oint "enture Between t!e Contractor and C*
-
8/17/2019 Contracts and Relationships
20/29
“ )wners are willing to use
alternate project delivery methods
but firms worry that clients don!t always
understand what they need'(
"ng$neer$ng %e&s'(ecord, )une +, 2000
Design-Build Risks and Rewards
-
8/17/2019 Contracts and Relationships
21/29
Risks for theConsulting Engineer
%re-%roposal Design Cost Reduced /ee $or !are o$ %ro$it
*rrors and Omissions
'i7uidated Damages orConse7uential Damages
%er$ormance 8uarantee
%articipation in 'oss 6oint and eeral 'ia.ilit+
Client Relations!ips
-
8/17/2019 Contracts and Relationships
22/29
Rewards for theConsulting Engineer
uccess /ee
Mark-9p on %rocurement
:ig!er Margins on Design erices
!are in Oerall %ro$it
-
8/17/2019 Contracts and Relationships
23/29
Design-Build
“Best Practices”
for the CE inthe Unites States
-
8/17/2019 Contracts and Relationships
24/29
/or #!e C*3 u.contracting #ier %re$erred(ome Are ometimes t!e %rime)
0o /ree %re-Bid *ngineering erice
uccess /ee on uccess$ul Bids
Design /ees !ould ,nclude Additional Margins
Design /ees Ma+ Be Reduced$or !are in %ro$its
0o ;!aring in 'oss< Arrangements %rocurement erices $or Additional /ees
%ossi.le 6oint "enture 5it! Contractor
Best Practices For TheConsulting Engineer in Design-Build
-
8/17/2019 Contracts and Relationships
25/29
-
8/17/2019 Contracts and Relationships
26/29
Design-Build:
RISKSOR REWARDSfor the
Consulting Engineer?
-
8/17/2019 Contracts and Relationships
27/29
-
8/17/2019 Contracts and Relationships
28/29
hank .ou
-