CONTRACTOR MANAGEMENT IN OFFSHORE RENEWABLES. A PRAGMATIC APPROACH
Mark Jenkins
Unrestricted
AGENDA
• Safety Moment – Risk appetite
• Background
• Context
• London Array Limited (LAL)
• Control of Contractors– Selection
– Assess risks
– Inform instruct
• Pragmatic approach
Safety Moment (Risk Appetite)
Murphy’s Law as amendedby Sydney Dekker
Background
• GMB Safety Representative•EHS Advisor Eastern Electricity• EHS Manager London Array• Head of EHS UK&I• Global Risk Manager WP offshore
• VC of IOSH offshore group• Committee member Essex Branch
London Array Limited (2009-2012)
•176 3.6 MW Siemens turbines create largest offshore wind farm in the works•£1.8 Billion costs• Owners DONG (50%) EoN ( 30%) Masdar (20%) owners of LAL•CDM covers construction phase only
Question. With this limited info what problems do you foresee ?
• Differing risk appetites• Reporting requirements• cultural clashes• Areas of responsibility•Safe systems of work and risk assessments• Emergency response plans
Control of contractors in construction
Control of contractors
Source HSE construction statistics
Contractor Management
Control of contractors CDM regs
Contractor selection
Selection
Prequalification
Procurement
Assess risk
Carry out riskassessment
Advise of siterelated risks
Inform/instruct/train
Liaison
Supervision
What could possibly go wrong ?
Contractor Management how difficult
can it be ? (Umoe Ventus)
Discussion point. Is Safety a Science oran art form or smoke and mirrors
Contractor Selection
Questions / conversation
What do you think of the following well usedstatements
• Safety is our number 1 priority
• Cost out
• Accident frequency rates
Contractor Selection
Assess the risks
• HAZOP / HAZID workshops– Best undertaken at design stages– Be informed of site risks
• Risk Assessments.– Templates– Proportionate to the risk
• Risk Appetite– Murphy’s Law “what can happen will happen”
Compliance /Risk based approach or both
?
Inform/Instruct /Train
• Worker engagement
– Team talks
– Feedback
– Involvement
• Emergency Management
– Drills
– Medical facilities and first aiders
–
Pragmatic approach
Conversation – cheapest no always the best, bewareprocurement !!!
OPPORTUNITY – Some more enlightened businessesdemand ‘cutting edge’ best practice
Do your homework - Understand risk appetite – Ask questions - Verify- work with safety and project teams – Contribute to workshops
– Face to face
Thank you for your attention
Questions ?