Page 1: CONTRACTOR MANAGEMENT IN OFFSHORE RENEWABLES. A … · 2018. 8. 6. · Mark Jenkins Unrestricted. AGENDA • Safety Moment – Risk appetite • Background • Context • London

CONTRACTOR MANAGEMENT IN OFFSHORE RENEWABLES. A PRAGMATIC APPROACH

Mark Jenkins

Unrestricted

Page 2: CONTRACTOR MANAGEMENT IN OFFSHORE RENEWABLES. A … · 2018. 8. 6. · Mark Jenkins Unrestricted. AGENDA • Safety Moment – Risk appetite • Background • Context • London

AGENDA

• Safety Moment – Risk appetite

• Background

• Context

• London Array Limited (LAL)

• Control of Contractors– Selection

– Assess risks

– Inform instruct

• Pragmatic approach

Page 3: CONTRACTOR MANAGEMENT IN OFFSHORE RENEWABLES. A … · 2018. 8. 6. · Mark Jenkins Unrestricted. AGENDA • Safety Moment – Risk appetite • Background • Context • London

Safety Moment (Risk Appetite)

Murphy’s Law as amendedby Sydney Dekker

Page 4: CONTRACTOR MANAGEMENT IN OFFSHORE RENEWABLES. A … · 2018. 8. 6. · Mark Jenkins Unrestricted. AGENDA • Safety Moment – Risk appetite • Background • Context • London

Background

• GMB Safety Representative•EHS Advisor Eastern Electricity• EHS Manager London Array• Head of EHS UK&I• Global Risk Manager WP offshore

• VC of IOSH offshore group• Committee member Essex Branch

Page 5: CONTRACTOR MANAGEMENT IN OFFSHORE RENEWABLES. A … · 2018. 8. 6. · Mark Jenkins Unrestricted. AGENDA • Safety Moment – Risk appetite • Background • Context • London

London Array Limited (2009-2012)

•176 3.6 MW Siemens turbines create largest offshore wind farm in the works•£1.8 Billion costs• Owners DONG (50%) EoN ( 30%) Masdar (20%) owners of LAL•CDM covers construction phase only

Question. With this limited info what problems do you foresee ?

• Differing risk appetites• Reporting requirements• cultural clashes• Areas of responsibility•Safe systems of work and risk assessments• Emergency response plans

Page 6: CONTRACTOR MANAGEMENT IN OFFSHORE RENEWABLES. A … · 2018. 8. 6. · Mark Jenkins Unrestricted. AGENDA • Safety Moment – Risk appetite • Background • Context • London

Control of contractors in construction

Page 7: CONTRACTOR MANAGEMENT IN OFFSHORE RENEWABLES. A … · 2018. 8. 6. · Mark Jenkins Unrestricted. AGENDA • Safety Moment – Risk appetite • Background • Context • London

Control of contractors

Source HSE construction statistics

Page 8: CONTRACTOR MANAGEMENT IN OFFSHORE RENEWABLES. A … · 2018. 8. 6. · Mark Jenkins Unrestricted. AGENDA • Safety Moment – Risk appetite • Background • Context • London

Contractor Management

Page 9: CONTRACTOR MANAGEMENT IN OFFSHORE RENEWABLES. A … · 2018. 8. 6. · Mark Jenkins Unrestricted. AGENDA • Safety Moment – Risk appetite • Background • Context • London

Control of contractors CDM regs

Page 10: CONTRACTOR MANAGEMENT IN OFFSHORE RENEWABLES. A … · 2018. 8. 6. · Mark Jenkins Unrestricted. AGENDA • Safety Moment – Risk appetite • Background • Context • London

Contractor selection

Selection

Prequalification

Procurement

Assess risk

Carry out riskassessment

Advise of siterelated risks

Inform/instruct/train

Liaison

Supervision

What could possibly go wrong ?

Page 11: CONTRACTOR MANAGEMENT IN OFFSHORE RENEWABLES. A … · 2018. 8. 6. · Mark Jenkins Unrestricted. AGENDA • Safety Moment – Risk appetite • Background • Context • London

Contractor Management how difficult

can it be ? (Umoe Ventus)

Page 12: CONTRACTOR MANAGEMENT IN OFFSHORE RENEWABLES. A … · 2018. 8. 6. · Mark Jenkins Unrestricted. AGENDA • Safety Moment – Risk appetite • Background • Context • London

Discussion point. Is Safety a Science oran art form or smoke and mirrors

Page 13: CONTRACTOR MANAGEMENT IN OFFSHORE RENEWABLES. A … · 2018. 8. 6. · Mark Jenkins Unrestricted. AGENDA • Safety Moment – Risk appetite • Background • Context • London

Contractor Selection

Questions / conversation

What do you think of the following well usedstatements

• Safety is our number 1 priority

• Cost out

• Accident frequency rates

Page 14: CONTRACTOR MANAGEMENT IN OFFSHORE RENEWABLES. A … · 2018. 8. 6. · Mark Jenkins Unrestricted. AGENDA • Safety Moment – Risk appetite • Background • Context • London

Contractor Selection

Page 15: CONTRACTOR MANAGEMENT IN OFFSHORE RENEWABLES. A … · 2018. 8. 6. · Mark Jenkins Unrestricted. AGENDA • Safety Moment – Risk appetite • Background • Context • London

Assess the risks

• HAZOP / HAZID workshops– Best undertaken at design stages– Be informed of site risks

• Risk Assessments.– Templates– Proportionate to the risk

• Risk Appetite– Murphy’s Law “what can happen will happen”

Page 16: CONTRACTOR MANAGEMENT IN OFFSHORE RENEWABLES. A … · 2018. 8. 6. · Mark Jenkins Unrestricted. AGENDA • Safety Moment – Risk appetite • Background • Context • London

Compliance /Risk based approach or both

?

Page 17: CONTRACTOR MANAGEMENT IN OFFSHORE RENEWABLES. A … · 2018. 8. 6. · Mark Jenkins Unrestricted. AGENDA • Safety Moment – Risk appetite • Background • Context • London

Inform/Instruct /Train

• Worker engagement

– Team talks

– Feedback

– Involvement

• Emergency Management

– Drills

– Medical facilities and first aiders

Page 18: CONTRACTOR MANAGEMENT IN OFFSHORE RENEWABLES. A … · 2018. 8. 6. · Mark Jenkins Unrestricted. AGENDA • Safety Moment – Risk appetite • Background • Context • London

Pragmatic approach

Conversation – cheapest no always the best, bewareprocurement !!!

OPPORTUNITY – Some more enlightened businessesdemand ‘cutting edge’ best practice

Do your homework - Understand risk appetite – Ask questions - Verify- work with safety and project teams – Contribute to workshops

– Face to face

Page 19: CONTRACTOR MANAGEMENT IN OFFSHORE RENEWABLES. A … · 2018. 8. 6. · Mark Jenkins Unrestricted. AGENDA • Safety Moment – Risk appetite • Background • Context • London

Thank you for your attention

Questions ?