Erection contractor Evaluation & Assessment Date of Issue tt-01-2012 Page 6 of9 TRUCK / TRAILOR OIL FILTER MACHINE FERRULE PRINTING MACHINE WELDING TRANSFORMERS WELDING RECTIFIERS GAS CUTTING SETS ANGLE CUTTING MACHINE MAGNETIC DRILL MACHINE HAMMERING DRILL MACHINE HS DRILL MACHINE BLOWER / VACUUM CLEANER HYDRAULIC CRIPPLING TOOL ELECTRICIAN TOOLS FITTER & WELDER TOOLS KNOCK OUT PUNCH I HOIE SRW LIFTING TOOLS & TACKLES ALL OTHER REQUIRED TOOLS oPERATIoNAL CAPABlLlrlES : Organization Structure submitted additionat Manpower - generally hired as per project requirements. 1' HEAD oFFlcE SET UP (Building, Number of employees at Ho, tnfrastructure etc.) 2' site office establishment ( Type of site office, indoor & outdoor stores, staff & employee accommodation, conveyance, health & hygiene) [ffiXn:3ffii3iJIl?:,(YearlY turnover or the companv ror erection & suppties separatery, Number or jobs 1- Erection (rn Mir BDT): Fy2009: 3.5, Fy 2010:4.2,F y2011:7.1, Y2012: 1.0, Fy2013: 16.5 2 srpply(in Mil. USD), FY2010'0.63, FY2011,0.45, Fy2012,0.51, Fy2013:0.25 \rfi .l(p I- I< / ^-" sbl

Upload: abdus-salam

Post on 14-Dec-2015

11 views

Category:

Documents


1 download

DESCRIPTION

Evaluation of contractor and assessment

TRANSCRIPT

Page 1: Contractor Evaluation and Assessment -1-9 PDF

Erection contractor Evaluation & AssessmentDate of Issue

tt-01-2012

Page 6 of9

TRUCK / TRAILOR

OIL FILTER MACHINE

FERRULE PRINTING MACHINE

WELDING TRANSFORMERS

WELDING RECTIFIERS

GAS CUTTING SETS

ANGLE CUTTING MACHINE

MAGNETIC DRILL MACHINE

HAMMERING DRILL MACHINE

HS DRILL MACHINE

BLOWER / VACUUM CLEANER

HYDRAULIC CRIPPLING TOOL

ELECTRICIAN TOOLS

FITTER & WELDER TOOLS

KNOCK OUT PUNCH I HOIE SRW

LIFTING TOOLS & TACKLES

ALL OTHER REQUIRED TOOLS

oPERATIoNAL CAPABlLlrlES : Organization Structure submitted additionat Manpower -generally hired as per project requirements.

1' HEAD oFFlcE SET UP (Building, Number of employees at Ho, tnfrastructure etc.)

2' site office establishment ( Type of site office, indoor & outdoor stores, staff & employeeaccommodation, conveyance, health & hygiene)

[ffiXn:3ffii3iJIl?:,(YearlY turnover or the companv ror erection & suppties separatery, Number or jobs

1- Erection (rn Mir BDT): Fy2009: 3.5, Fy 2010:4.2,F y2011:7.1,Y2012: 1.0, Fy2013: 16.5

2 srpply(in Mil. USD), FY2010'0.63, FY2011,0.45, Fy2012,0.51, Fy2013:0.25

\rfi.l(pI-I</ ^-"sbl

Page 2: Contractor Evaluation and Assessment -1-9 PDF

ABB Erection contractor Evaluation & AssessmentPrepared by Checked bv Approved by Date of Issue Revision

AKK SPD RS lt-0t-2012

Revised: 2210112014

ERECTION CONTRACTOREVALUATION

&ESSMENT

ffimY/&

Page I of9

Page 3: Contractor Evaluation and Assessment -1-9 PDF

rlHry- :i-1{::iq=eeP. rc<E{ l-

ABB Erection contractor Bvaluation & AssessmentPrenared bv Checked bv Approved bv Date of Issue Revision

AKK SPD RS ll-01-2012

Page 9 of9

Page 4: Contractor Evaluation and Assessment -1-9 PDF

ABB Erection contractor Evaluation & AssessmentPrepared by Checked bv Anproved bv Date of Issue Revision

AKK SPD RS ll-01-20t2

DECLARATION

l, ...Md. Nurul lslam the undersigned, declare

that the above information is correct & complete to the best of my knowledge and belief.

o^r"4-?/or f ft, Signature of authorised

,,r"" Tleb, .

(With company seal)

Name:Md, Nurulslam

Designation: CEO

AKA) gl

1,.f,

sEcrloN c - EVALUATION & REGOMMENDATION (For ABB use onty):

INSTALLATION MANAGEMENT TEAM'S COMMENT & REMARKS :

RECOMMENDATION: tr RECOMMENDED

DATE OF EVALUATION:

tr NOT RECOMMENDED

SIGNATURE OF INSTALLATION MANAGER

NAME OF INSTALLATION MANAGER

REVIEWER'S (INSTALLATION & SITE MANAGEMENT HEAD) COMMENTS:

CONCLUSION: tr APPROVED tr NOT APPROVED

VALUE OF THE JOB

Below 5 MINR

Page 8 of9

Page 5: Contractor Evaluation and Assessment -1-9 PDF

TYPE OF PROJECTS EXECUTED IN PAST:

n orulv LABoUR supply (wrrHour coNSUMABLES)

I corurnncr wrrH coNSUMABLES

I encr ro BAcK (REcErvrNG, uNLoADrNc, sroRAGE, EREcroN,coMMrssroNrNG ASSTSTANCE AND HANDTNG OVER COMPLETE)

I coNrnncr TNcLUDTNG suppy & EREcroN.

LIST OF COMPLETION CERTIFICATES AND CUSTOMER APPRECIATION LETTERS (Documents to beattached, if any) :

1. STEMENS BANGLADESH LTMTTED (COPY ENCLOSED)

DOES CONTRACTOR HAVE ANY SAFETY, ENVIORNMENT, QUALITY POLICY FOR THE ORGNISATION(Documents to be attached, if any) :

1. Not yet (under implementation)

ls CoNTRACTOR CERTTFIED BY ANY REPUTED CERTTF|CATION BODY (QUALITY / SAFETY &ENVIORNMENT) (Documents to be attached, if any) : NOT YET.

DOES CONTRACTOR POSSESS'A'CLASS ELECTRICAL CONTRACTOR'S LICENCE FOR ANY STATE, IFso, ATTAQH DETATL / COpy OF THE VALTD LTCENCE:

Applied for "A" Class Electrical Contractor Licence, which wil! be available withinFebruary, 2014.

Page 4 of9

Page 6: Contractor Evaluation and Assessment -1-9 PDF

ABB Erection contractor Evaluation & AssessmentPrenared bv Checked bv Annroved bv Date of Issue Revision

AKK SPD RS rt-01-2012

Page2 of9

SECTION A - BASIC DETAIIS (To be filled by erection contractor)

NAME OF THE COMPANY :

SCIENTECH ENGINEERING ANDSERVICES.

ADDRESS FOR COMMUNICATION :

HOUSE # 67, ROAD # 15, BLOCK # D,DHAKA.I 2{ 3, BANGLADESH

CONTACT PERSON WITHDESIGNATION:

MD. NURUL ISLAM, CEO.

MOBILE & TELEPHONE NUMBERS :

+880 18415 20023+880 28815164

E-MAIL ID & FAxNUMBER:

Nurul. [email protected]+88 02 881 5164

TypE oF coMpANy I tNDUSTRY / FtRM (T|CK AS AppROpRtATE)

n PUBLtc I pRtvATE ! GovERNMENT ! eARTNERSHIe Ednopnrerny

rZCor'rrnACToRS !oTHERS(SPEoIFY)

SECTION B - EVALUATION REQUIREMENTS (To be filled by erection contractor)

TYPE OF ERECTION & INSTALLATION / ENGG SERVTCES WHTCH CONTRACTOR CAN pROVtDE (T|CK ASAPPROPRTATE)

lEfN o u SrR tAL E LEcTRt Ft CAT| O N IE fwrrcHyARD

rz'-rnnrusMrssroN LINE E nunnl ELECTRTFToATToN

I rNsrnuHaENTATtoN f rpc coNTRACTS

lEGxorruEERtNG sERVtcES )E-erre / sroRE /ADMN sERVtcES

r senuces FoR supERvrsroN oF ERECTToN & coMMrssroNrNG woRKS

CIrya",;\Dh4K4\?

;"-.(9

Page 7: Contractor Evaluation and Assessment -1-9 PDF

I

Erection contractor Evaluation & Assessment

It-01-20t2

STATUS oF LEGAL coMpLtANCE (Documents to be attached, if any) :

1. pF REGtsTRATtoN : Trade Licence No. 0S - 15437.

2. ESI REGISTRAION',VAT Registration No. 5071040106, Area code: 50202.

3. SERVICE TAX REGISTRAION : TIN CErtifiCAtE - ENCIOSEd.

4. PAN CARD:N/A

5. TtN No : Enclosed

6. Bank Certificate: Enctosed.

CONTRACTOR ORGANISATION -NEED TO PROVIDE DETAILS OF LIST OF EMPLOYEES WORKING IN THE ORGANISATION INCLUDINGENGINEERS, SUPERVISORS, STOREKEEPERS, SAFETY OFF|CERS, reCHrrrrcrnrus, elecrnrcArus,'WELDEER, FlrrERS, RTGGERS ETC (Documents to be attached) :

Organogram

Engr. Md. Nurul lslam, (EEE)Engr. Abdul Baten (EEE)Engr. Md. Nur Jamat Biswas, (ME)Engr. Md. Showkotul lslam (EEE)Engr. Saydur Rahman (EEE)Md. Gulzar Hossain (ACAD Design)Ripon Roy (Dip. Mec.)lmam Hossain Babu, (Dip. Elect.)Jahangir Alam Sr. ForemanAkram Hossain, Sr. Mech. FitterSiddiqur Rahman, Mech. FitterMd. Sharfuddin, Sr. CommercialM. A. Quadir, Administration & StoreMd. Omar Ali, Office Assistance

1.

2.3.4.5.6,7.8.9.10.11.12.13.14.

SPECIFY THE JOB / JOBS, WHERE CUSTOMER IMPOSED PENALTY TO THE CONTRACTOR FOR THEREASONS ATTRIBUTABLE oN ACcoUNT oF THE AGENCY: N/A

LIST OF OWNED ANDrAcKlesll@

Page 5 of9

Page 8: Contractor Evaluation and Assessment -1-9 PDF

EXPERIENCE AS ERECTION CONTRACTOR IN THIS FIELD :

LIST OF PROJECTS EXECUTED IN PAST FOR ABB :

SLNO

NAME OF THEPROJECT /LOCATION

NAME OFDtvtstoN NAME OF

BU

VALUE OFTHE JOB

PERIOD OFEXECUTION

MANPOWERDEPLOYED

DUR!NGPEAK

1 N/A

2

3

4

LIST OF PROJECTS EXECUTED IN PAST FOR OTHER CUSTOMERS (OTHER THAN ABB

NAME OF THEPROJECT / LOCATION

VALUE OFTHE JOB

Shahjibazar PowerCo. Ltd., Sylhet

lnstallation of LVPower & control cableand cable trays for100MW Power

BDT 4,200,000usD 630,000

HV/MV Cable supply &lnstallation

50MW Norther PowerCo. Ltd ( A project of

BDT 937,000usD 397,964

Sylhet Plasticlndustries Ltd

BDT 2, 800,000usD s5,000

2011t12

Sitalpur Steel MillsLtd, Chittagong

13Z33kV Substation BDT 3,400,000 2012t13

33/1 1kV 35MVASubstation atCEPZ&DEPZ

BDT 3,034,000

Page 3 of9

Page 9: Contractor Evaluation and Assessment -1-9 PDF

SAFETY TRACK RECORD (LIST OF PROJECTS WITH ANY LOST TIME INJURY RECORD FOR PAST THREEYEARS To BE MENTIONED AND RECORDS TO BE ATTACHED ): N/A

PROPOSED EXISTING SITES BY ERECTION CONTRACTOR WHICH ARE OFFERED TO ABB FORINSPECTION:

NAME OF THE SITE /LOCATION

Mr. MohammadAli, ChiefEngineer.

Installation of132t11 kV3OMVA GlSSubstation

Modern Steel Mills,Chittagong

Engr. Md.AsaduzzamanSiemensBangladesh Ltd.orMr. lsmail, GM.Regent Power,Ghorashal.

Regent Power(A Project of SiemensBangladesh Limited)Ghorashal, Narshingdi

lnstallation of230 t11 KV,I5O MVASubstation

REFERENCES (Feedback about the contractor from the customer):

PERSONS REFFERED (Organisation, Name , Designation & Contact number)1. Mr. Asaduzzaman, Div. Head, Energy, Siemens Bangladesh Limited: Mob: +880 17115200262. Mr. Mohammad Ali, Chief Engineer, Modern Steel Mills Limited, mob: +880 1199215497

LATEST CREDENTIALS (On going projects) :

NAME OF THEPROJECT / LOCATION

NAME OFCUSTOMER

BDT.17,803,429us$. 59,000

Regent Energy &Power( A project ofSiemensBangladesh

230 kV Substationincluding 230kVTransmission line for108MW Power plant

2013t14

230 kV U/G Cableincluding outdoorterminations for108MW Power plant

BDT. 2,995,000us$. 194,500

Regent Energy &Power( A project ofSiemensBangladesh

2013t14

,'€

'KoruPage 7 of9