contract plans - movable bridge resource
TRANSCRIPT
3
2
11
25
3635
26
34
27
33
2829
3231
30
31
6
7
18
19
30
31
20
1
12
13
66th
St.
Tyrone Blvd.
Long B
ayou
Cross
Bayou
Joe
Bear
M
E
X
Boca
Bay
Johns
Pass
IS
LA
ND
TR
EA
SU
RE
K E
Y
KEY
TRIPOD
CONCH
Pt.
Turtlecrawl
ISLE
CAPRI
Oakhurst
Tyrone
REDINGTON SHORES
NORTH REDINGTON
BEACH
REDINGTON
BEACH
MADEIRA
BEACH
Pop. 1,474
Pop. 1,539
Pop. 4,511
TREASURE ISLAND
Pop. 7,450
KENNETH
SOUTH
PASADENA
693
693
666
321
501
150
16
1
1
ALT
19A
Gulf Blvd.
IS.
699
IS.
SEMINOLEPop. 10,890
KEY
Ciega
CRYSTAL
BAY PINES
PARADISE
S.CAUSEWAYISLE
Pop. 5,778
Boca Ciega Bay
4:23:17 PM T:\Tampa\Projects\581660.09\600_CADD\43956515201\struct\B\B0KeySheet01.dgn1/11/2021
BEE LINEEXPRESSWAY
FLO
RID
A STU
RNPIK
E
10
PENSACOLA
FORT WALTON
BEACH
PANAMA
CITY
CHIPLEY
TALLAHASSEE
75
10
LAKE CITY 295
95
JACKSONVILLE
ST AUGUSTINE
GAINESVILLE
OCALA DAYTONA BEACH
DELAND
4
NEW PORT RICHEY
TAMPA
754
LAKELAND
MELBOURNE -
COCOA
ORLANDO
BARTOWST PETERSBURG
275
SARASOTA -
BRADENTON75
95
FT PIERCE
FT MYERS
WEST
PALM
BEACH
FT LAUDERDALE
MIAMI
75
75
NAPLES
KEY WEST
LMarzilli
N
MP 6.339 (150254)
MP 6.337 (150253)
STA. 128+30.53
150253 AND 150254
END BRIDGE NOS.
MP 6.178 (150254)
MP 6.176 (150253)
STA. 119+79.64
150253 AND 150254
BEGIN BRIDGE NOS.
STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
CONTRACT PLANS
NO.
SHEET
YEAR
FISCAL
B-1
CONTRACT NO.
CONSTRUCTION
FDOT PROJECT MANAGER
ENGINEER OF RECORD:
STRUCTURES PLANS
GOVERNING STANDARD SPECIFICATIONS:
LOCATION OF PROJECT
GOVERNING STANDARD PLANS:
R 15 E
R 16 E
SHEET DESCRIPTIONSHEET NO.
CONTRACT PLANS COMPONENTS
STRUCTURES PLANS
SEE INDEX OF SHEETS, SHEET B-2
CLEARWATER
TO
TAMPA
TO
TH
E
OF
FI
CI
AL
RE
CO
RD
OF
THI
S
SH
EE
T I
S
TH
E
EL
EC
TR
ONI
C
FI
LE
DI
GI
TA
LL
Y
SI
GN
ED
AN
D
SE
AL
ED
UN
DE
R
RU
LE 61
G15-23.004,
F.
A.
C.
T 31 S
T 30 S
INDEX OF STRUCTURES PLANS
ST. PETE
TO
PINELLAS COUNTY (15100)
FINANCIAL PROJECT ID 439565-1-52-01
JOHNS PASS BRIDGE
MOVEABLE BRIDGE REPAIR PINELLAS COUNTY
MANDY T. GAUGH
E7N76 21
VENDOR NO.: 941598707
CONTRACT NO. CA116
(813) 775-7063
TAMPA, FL 33637
12802 TAMPA OAKS BLVD., SUITE 245
T. Y. LIN INTERNATIONAL
P.E. NO. 85399
SANDRA L. McCORMACK, P.E.
http://www.fdot.gov/programmanagement/Implemented/SpecBooks
for Road and Bridge Construction at the following website:
Florida Department of Transportation, January 2021 Standard Specifications
PROJECT ID: 448122-1-52-01
CONTRACT WITH FINANCIAL
THIS PROJECT TO BE LET TO
Component.
Standard Plans for Bridge Construction are included in the Structures Plans
APPLICABLE IRs: IR 102-600
following website: http://www.fdot.gov/design/standardplans
Standard Plans for Road Construction and associated IRs are available at the
Bridge Construction.
Florida Department of Transportation, FY2020-21 Standard Plans for Road and
TH
E
OF
FI
CI
AL
RE
CO
RD
OF
THI
S
SH
EE
T I
S
TH
E
EL
EC
TR
ONI
C
FI
LE
DI
GI
TA
LL
Y
SI
GN
ED
AN
D
SE
AL
ED
UN
DE
R
RU
LE 61
G15-23.004,
F.
A.
C.
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
DATE BY DESCRIPTION DATE BY DESCRIPTION
SR 699 PINELLAS 439565-1-52-01
LMarzilli 1/11/2021 4:23:27 PM T:\Tampa\Projects\581660.09\600_CADD\43956515201\struct\B\B0Index01.dgn
DEPARTMENT OF TRANSPORTATION
STATE OF FLORIDA
LMM 4-20
AHA 4-20
BRIDGE NOS. 150253, 150254
SLM 4-20
FZ 4-20
TAMPA, FL 33637
SUITE 245
12802 TAMPA OAKS BLVD.,
T. Y. LIN INTERNATIONAL
P.E. NO. 85399
SANDRA L. McCORMACK, P.E.
INDEX OF SHEETS
B-2
INDEX OF SHEETS
EXISTING BRIDGE PLANS
BRIDGE NOS. 150253 & 150254
SHEET DESCRIPTIONDRAWING NO.SHEET NO.
GENERAL SHEETS
SHEET NO. SHEET DESCRIPTION
SHEET NO. DRAWING NO. SHEET DESCRIPTION
BRIDGE NOS. 150253 & 150254
BRIDGE NOS. 150253 & 150254
BX1-1 THRU BX1-889
BM-5
BM-4
BM-3
BM-2
BM-1
AR-8
AR-7
AR-6
AR-5
AR-4
AR-3
AR-2
AR-1
BL-1
SPAN LOCK MACHINERY DETAILS
SPAN LOCK MACHINERY PLAN & ELEVATION
LIVE LOAD BEARING ASSEMBLY REPAIRS
MECHANICAL PLAN AND ELEVATION
MECHANICAL GENERAL NOTES
CONTROL TOWER WINDOW SCHEDULE
CONTROL TOWER DOOR SCHEDULE AND DETAILS
CONTROL TOWER ROOF SECTIONS
CONTROL TOWER TENDER LEVEL ELEVATIONS II
CONTROL TOWER TENDER LEVEL ELEVATIONS I
CONTROL TOWER REHABILITATION PLANS II
CONTROL TOWER REHABILITATION PLANS I
CONTROL TOWER GENERAL NOTES & SYMBOLS
BASCULE SPAN PLAN & ELEVATION
ARCHITECTURAL LIGHTING POWER LOGIC SCHEMATIC
ARCHITECTURAL LIGHTING ELEVATIONS TYPICAL PIER
ARCHITECTURAL LIGHTING ELEVATIONS CONTROL HOUSE
ARCHITECTURAL LIGHTING ELEVATIONS FAR SIDE BASCULE PIER
ARCHITECTURAL LIGHTING PLAN (3 OF 3)
ARCHITECTURAL LIGHTING PLAN (2 OF 3)
ARCHITECTURAL LIGHTING PLAN (1 OF 3)
ARCHITECTURAL LIGHTING OVERALL LAYOUT
LUMINAIRE DATA SHEET
LEGEND
RISER DIAGRAM
CCTV PLAN AND DETAILS
NAVIGATIONAL LIGHTING DETAILS
SUBMARINE CABLE DETAILS
EXISTING MAIN DISCONNECT CABINET DETAILS
PIT ROOM LAYOUT
MACHINERY ROOM LAYOUT
ELECTRICAL ROOM LAYOUT
CONTROL ROOM LAYOUT
CONTROL SCHEMATIC (21 OF 21)
CONTROL SCHEMATIC (20 OF 21)
CONTROL SCHEMATIC (19 OF 21)
CONTROL SCHEMATIC (18 OF 21)
CONTROL SCHEMATIC (17 OF 21)
CONTROL SCHEMATIC (16 OF 21)
CONTROL SCHEMATIC (15 OF 21)
CONTROL SCHEMATIC (14 OF 21)
CONTROL SCHEMATIC (13 OF 21)
CONTROL SCHEMATIC (12 OF 21)
CONTROL SCHEMATIC (11 OF 21)
CONTROL SCHEMATIC (10 OF 21)
CONTROL SCHEMATIC (9 OF 21)
CONTROL SCHEMATIC (8 OF 21)
CONTROL SCHEMATIC (7 OF 21)
CONTROL SCHEMATIC (6 OF 21)
CONTROL SCHEMATIC (5 OF 21)
CONTROL SCHEMATIC (4 OF 21)
CONTROL SCHEMATIC (3 OF 21)
CONTROL SCHEMATIC (2 OF 21)
CONTROL SCHEMATIC (1 OF 21)
RELAY CONTROL PANEL DETAILS (CP-4)
EXISTING PLC PANEL (CP-1) DETAILS
CONTROL DEVICE DETAILS
MAINTENANCE CONTROL DESK (CP-3) DETAILS
MAINTENANCE CONTROL CONSOLE (CP-3) LAYOUT
EXISTING CONTROL DESK (CP-2) DETAILS
EXISTING CONTROL CONSOLE (CP-2) LAYOUT
SEQUENCE DIAGRAM - CLOSE BRIDGE
SEQUENCE DIAGRAM - OPEN BRIDGE
LIGHTING PANEL (LP-2) SCHEDULE
ELECTRICAL PLAN AND ELEVATION
ELECTRICAL ABBREVIATIONS
ELECTRICAL SYMBOLS & LEGEND
ELECTRICAL NOTES AND SCOPE OF WORK
BASCULE PIER PLUMBING DETAILS
BASCULE PIER PLUMBING PLAN & ELEVATION
B1-80
B1-79
B1-78
B1-77
B1-76
B1-75
B1-74
B1-73
B1-72
B1-71
B1-70
B1-69
B1-68
B1-67
B1-66
B1-65
B1-64
B1-63
B1-62
B1-61
B1-60
B1-59
B1-58
B1-57
B1-56
B1-55
B1-54
B1-53
B1-52
B1-51
B1-50
B1-49
B1-48
B1-47
B1-46
B1-45
B1-44
B1-43
B1-42
B1-41
B1-40
B1-39
B1-38
B1-37
B1-36
B1-35
B1-34
B1-33
B1-32
B1-31
B1-30
B1-29
B1-28
B1-27
B1-26
B1-25
BE-54
BE-53
BE-52
BE-51
BE-50
BE-49
BE-48
BE-47
BE-46
BE-45
BE-44
BE-43
BE-42
BE-41
BE-40
BE-39
BE-38
BE-37
BE-36
BE-35
BE-34
BE-33
BE-32
BE-31
BE-30
BE-29
BE-28
BE-27
BE-26
BE-25
BE-24
BE-23
BE-22
BE-21
BE-20
BE-19
BE-18
BE-17
BE-16
BE-15
BE-14
BE-13
BE-12
BE-11
BE-10
BE-9
BE-8
BE-7
BE-6
BE-5
BE-4
BE-3
BE-2
BE-1
BM-7
BM-6
FENDER SYSTEM DETAILS
FENDER SYSTEM ELEVATION
FENDER SYSTEM PLAN
RAILING COATING (2 OF 2)
RAILING COATING (1 OF 2)
BEAM CRACK SEALER DETAILS AND NOTES
SPALL REPAIR DETAILS
SURFACE FINISH DETAILS
STEEL SPOT COATING LOCATIONS
TYPICAL SECTION (2 OF 2)
TYPICAL SECTION (1 OF 2)
PLAN AND ELEVATION
B1-24
B1-23
B1-22
B1-21
B1-20
B1-19
B1-18
B1-17
B1-16
B1-15
B1-14
B1-13
B1-12
B1-11
B1-10
B1-9
B1-8
B1-7A
B1-7
B1-6
B1-5
B1-4
B1-3A
B1-3
B1-2
B1-1
B-25
B-24
B-23
B-22
B-21
B-20
B-19
B-18
B-17
B-16
B-15
B-14
B-13
B-12
B-11
B-10
B-9
B-8
B-7
B-6
BQ2-2
BQ2-1
BQ1-2
BQ1-1
BQ-2
BQ-1
B-5A
B-5
B-4
B-3
B-2
B-1
GUIDE SIGN WORKSHEET
SIGN LOCATION DETAILS
TEMPORARY TRAFFIC CONTROL PLAN PHASE VI (3 OF 3)
TEMPORARY TRAFFIC CONTROL PLAN PHASE VI (2 OF 3)
TEMPORARY TRAFFIC CONTROL PLAN PHASE VI (1 OF 3)
TEMPORARY TRAFFIC CONTROL PLAN PHASE V (3 OF 3)
TEMPORARY TRAFFIC CONTROL PLAN PHASE V (2 OF 3)
TEMPORARY TRAFFIC CONTROL PLAN PHASE V (1 OF 3)
TEMPORARY TRAFFIC CONTROL PLAN PHASE IV
PEDESTRIAN DETOUR PLAN DURING PHASE III & VI
TEMPORARY TRAFFIC CONTROL PLAN PHASE III
TEMPORARY TRAFFIC CONTROL PLAN PHASE II
PEDESTRIAN DETOUR PLAN DURING PHASE I & V
TEMPORARY TRAFFIC CONTROL PLAN PHASE I
TEMPORARY TRAFFIC CONTROL PLAN SECTIONS (2 OF 2)
TEMPORARY TRAFFIC CONTROL PLAN SECTIONS (1 OF 2)
TEMPORARY TRAFFIC CONTROL PLAN GENERAL NOTES
GENERAL NOTES (3 OF 3)
GENERAL NOTES (2 OF 3)
GENERAL NOTES (1 OF 3)
SUMMARY OF QUANTITIES (6 OF 6)
SUMMARY OF QUANTITIES (5 OF 6)
SUMMARY OF QUANTITIES (4 OF 6)
SUMMARY OF QUANTITIES (3 OF 6)
SUMMARY OF QUANTITIES (2 OF 6)
SUMMARY OF QUANTITIES (1 OF 6)
SUMMARY OF PAY ITEMS (2 OF 2)
SUMMARY OF PAY ITEMS (1 OF 2)
SIGNATURE SHEET (2 OF 2)
SIGNATURE SHEET (1 OF 2)
INDEX OF SHEETS
KEY SHEET
JOHNS PASS BRIDGE
MOVEABLE BRIDGE REPAIR PINELLAS COUNTY
STATE OF
� � �
RE
ENI
GNE LANOI
SS
E
FO
RP
ESNECI
L
ADIRO
LF
No 87097
DO
OMHAM RAIR
HA
HS
STATE OF
� � �
RE
ENI
GNE LANOI
SS
E
FO
RP
ESNECI
L
ADIRO
LF
No 85399 KC
A
MROCcM .L AR
DN
AS
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
DATE BY DESCRIPTION DATE BY DESCRIPTION
SR 699 PINELLAS 439565-1-52-01
LMarzilli 1/11/2021 4:23:40 PM T:\Tampa\Projects\581660.09\600_CADD\43956515201\struct\B\B0Signst01.dgn
DEPARTMENT OF TRANSPORTATION
STATE OF FLORIDA
LMM 4-20
AHA 4-20
BRIDGE NOS. 150253, 150254
SLM 4-20
FZ 4-20
TAMPA, FL 33637
SUITE 245
12802 TAMPA OAKS BLVD.,
T. Y. LIN INTERNATIONAL
P.E. NO. 85399
SANDRA L. McCORMACK, P.E.
WITH RULE 61G15-23.004, F.A.C
RESPONSIBLE FOR THE FOLLOWING SHEETS IN ACCORDANCE
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE
SHEET NO.
B-3
SIGNATURE SHEET (1 OF 2)
ON ANY ELECTRONIC COPIES.
AND THE SIGNATURE MUST BE VERIFIED
NOT CONSIDERED SIGNED AND SEALED
PRINTED COPIES OF THIS DOCUMENT ARE
ON THE DATE ADJACENT TO THE SEAL
SIGNED AND SEALED BY:
THIS ITEM HAS BEEN DIGITALLY
DRAWING NO. SHEET DESCRIPTION
WITH RULE 61G15-23.004, F.A.C
RESPONSIBLE FOR THE FOLLOWING SHEETS IN ACCORDANCE
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE
SHEET NO. SHEET DESCRIPTION
ON ANY ELECTRONIC COPIES.
AND THE SIGNATURE MUST BE VERIFIED
NOT CONSIDERED SIGNED AND SEALED
PRINTED COPIES OF THIS DOCUMENT ARE
ON THE DATE ADJACENT TO THE SEAL
SIGNED AND SEALED BY:
THIS ITEM HAS BEEN DIGITALLY
SANDRA L. McCORMACK, P.E. NO. 85399
TAMPA, FL 33637
12802 TAMPA OAKS BLVD, SUITE 245
T. Y. LIN INTERNATIONAL
SHAHRIAR MAHMOOD, P.E. NO. 87097
ORLANDO, FL 32817
225 E. ROBINSON ST., SUITE 490
T. Y. LIN INTERNATIONAL
B-23
B-22
B-21
B-20
B-19
B-18
B-17
B-16
B-15
B-14
B-13
B-12
B-11
B-10
B-9
BQ-2
BQ-1
B-3
TEMPORARY TRAFFIC CONTROL PLAN PHASE VI (3 OF 3)
TEMPORARY TRAFFIC CONTROL PLAN PHASE VI (2 OF 3)
TEMPORARY TRAFFIC CONTROL PLAN PHASE VI (1 OF 3)
TEMPORARY TRAFFIC CONTROL PLAN PHASE V (3 OF 3)
TEMPORARY TRAFFIC CONTROL PLAN PHASE V (2 OF 3)
TEMPORARY TRAFFIC CONTROL PLAN PHASE V (1 OF 3)
TEMPORARY TRAFFIC CONTROL PLAN PHASE IV
PEDESTRIAN DETOUR PLAN DURING PHASE III & VI
TEMPORARY TRAFFIC CONTROL PLAN PHASE III
TEMPORARY TRAFFIC CONTROL PLAN PHASE II
PEDESTRIAN DETOUR PLAN DURING PHASE I & V
TEMPORARY TRAFFIC CONTROL PLAN PHASE I
TEMPORARY TRAFFIC CONTROL PLAN SECTIONS (2 OF 2)
TEMPORARY TRAFFIC CONTROL PLAN SECTIONS (1 OF 2)
TEMPORARY TRAFFIC CONTROL PLAN GENERAL NOTES
SUMMARY OF QUANTITIES (2 OF 4)
SUMMARY OF QUANTITIES (1 OF 4)
SIGNATURE SHEET (1 OF 2)
B1-10
B1-9
B1-8
B1-7A
B1-7
B1-6
B1-5
B1-4
B1-3A
B1-3
B1-2
B1-1
B-25
B-24
B-8
B-7
B-6
BQ2-1
BQ1-1
B-5A
B-5
B-4
B-3
B-2
B-1
FENDER SYSTEM DETAILS
FENDER SYSTEM ELEVATION
FENDER SYSTEM PLAN
RAILING COATING (2 OF 2)
RAILING COATING (1 OF 2)
BEAM CRACK SEALER DETAILS AND NOTES
SPALL REPAIR DETAILS
SURFACE FINISH DETAILS
STEEL SPOT COATING LOCATIONS
TYPICAL SECTION (2 OF 2)
TYPICAL SECTION (1 OF 2)
PLAN AND ELEVATION
GUIDE SIGN WORKSHEET
SIGN LOCATION DETAILS
GENERAL NOTES (3 OF 3)
GENERAL NOTES (2 OF 3)
GENERAL NOTES (1 OF 3)
SUMMARY OF QUANTITIES (5 OF 5)
SUMMARY OF QUANTITIES (3 OF 5)
SUMMARY OF PAY ITEMS (2 OF 2)
SUMMARY OF PAY ITEMS (1 OF 2)
SIGNATURE SHEET (2 OF 2)
SIGNATURE SHEET (1 OF 2)
INDEX OF SHEETS
KEY SHEET
JOHNS PASS BRIDGE
MOVEABLE BRIDGE REPAIR PINELLAS COUNTY
STATE OF
� � �
ESNECI
L
ADIRO
LF
RE
ENI
GNE LANOI
SS
E
FO
RP
No 36865
III
SPILL
IHP .M SEM
AJ
STATE OF
� � �
RE
ENI
GNE LANOI
SS
E
FO
RP
ESNECI
L
ADIRO
LF
No 73365
YR
REBWEN .P SE
MAJ
STATE OF
� � �
RE
ENI
GNE LANOI
SS
E
FO
RP
ESNECI
L
ADIRO
LF
No 78414
ARAL .
A OCRAM
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
DATE BY DESCRIPTION DATE BY DESCRIPTION
SR 699 PINELLAS 439565-1-52-01
LMarzilli 1/11/2021 4:23:51 PM T:\Tampa\Projects\581660.09\600_CADD\43956515201\struct\B\B0Signst02.dgn
DEPARTMENT OF TRANSPORTATION
STATE OF FLORIDA
LMM 4-20
AHA 4-20
BRIDGE NOS. 150253, 150254
SLM 4-20
FZ 4-20
TAMPA, FL 33637
SUITE 245
12802 TAMPA OAKS BLVD.,
T. Y. LIN INTERNATIONAL
P.E. NO. 85399
SANDRA L. McCORMACK, P.E.
WITH RULE 61G15-23.004, F.A.C
RESPONSIBLE FOR THE FOLLOWING SHEETS IN ACCORDANCE
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE
SHEET NO.
B-4
SIGNATURE SHEET (2 OF 2)
ON ANY ELECTRONIC COPIES.
AND THE SIGNATURE MUST BE VERIFIED
NOT CONSIDERED SIGNED AND SEALED
PRINTED COPIES OF THIS DOCUMENT ARE
ON THE DATE ADJACENT TO THE SEAL
SIGNED AND SEALED BY:
THIS ITEM HAS BEEN DIGITALLY
DRAWING NO. SHEET DESCRIPTION
ON ANY ELECTRONIC COPIES.
AND THE SIGNATURE MUST BE VERIFIED
NOT CONSIDERED SIGNED AND SEALED
PRINTED COPIES OF THIS DOCUMENT ARE
ON THE DATE ADJACENT TO THE SEAL
WITH RULE 61G15-23.004, F.A.C
RESPONSIBLE FOR THE FOLLOWING SHEETS IN ACCORDANCE
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE
SIGNED AND SEALED BY:
THIS ITEM HAS BEEN DIGITALLY
JAMES P. NEWBERRY, P.E. NO. 73365
TAMPA, FL 33634
5110 EISENHOWER BLVD, SUITE 310
HARDESTY & HANOVER, LLC.
AR-8
AR-7
AR-6
AR-5
AR-4
AR-3
AR-2
AR-1
BL-1
SHEET NO. DRAWING NO. SHEET DESCRIPTION
MARCO A. LARA, P.E. NO. 78414
TAMPA, FL 33634
5110 EISENHOWER BLVD, SUITE 310
HARDESTY & HANOVER, LLC.
WITH RULE 61G15-23.004, F.A.C
RESPONSIBLE FOR THE FOLLOWING SHEETS IN ACCORDANCE
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE
SHEET NO.
ON ANY ELECTRONIC COPIES.
AND THE SIGNATURE MUST BE VERIFIED
NOT CONSIDERED SIGNED AND SEALED
PRINTED COPIES OF THIS DOCUMENT ARE
ON THE DATE ADJACENT TO THE SEAL
SIGNED AND SEALED BY:
THIS ITEM HAS BEEN DIGITALLY
DRAWING NO.
SHEET NO. DRAWING NO. SHEET DESCRIPTION
BE-42
BE-41
BE-40
BE-39
BE-38
BE-37
BE-36
BE-35
BE-34
BE-33
BE-32
BE-31
BE-30
BE-29
BE-28
BE-27
BE-26
BE-25
BE-24
BE-23
BE-22
BE-21
BE-20
BE-19
BE-18
BE-17
BE-16
BE-15
BE-14
BE-13
BE-12
BE-11
BE-10
BE-9
BE-8
BE-7
BE-6
BE-5
BE-4
BE-3
BE-2
BE-1
NAVIGATIONAL LIGHTING DETAILS
SUBMARINE CABLE DETAILS
EXISTING MAIN DISCONNECT CABINET DETAILS
PIT ROOM LAYOUT
MACHINERY ROOM LAYOUT
ELECTRICAL ROOM LAYOUT
CONTROL ROOM LAYOUT
CONTROL SCHEMATIC (21 OF 21)
CONTROL SCHEMATIC (20 OF 21)
CONTROL SCHEMATIC (19 OF 21)
CONTROL SCHEMATIC (18 OF 21)
CONTROL SCHEMATIC (17 OF 21)
CONTROL SCHEMATIC (16 OF 21)
CONTROL SCHEMATIC (15 OF 21)
CONTROL SCHEMATIC (14 OF 21)
CONTROL SCHEMATIC (13 OF 21)
CONTROL SCHEMATIC (12 OF 21)
CONTROL SCHEMATIC (11 OF 21)
CONTROL SCHEMATIC (10 OF 21)
CONTROL SCHEMATIC (9 OF 21)
CONTROL SCHEMATIC (8 OF 21)
CONTROL SCHEMATIC (7 OF 21)
CONTROL SCHEMATIC (6 OF 21)
CONTROL SCHEMATIC (5 OF 21)
CONTROL SCHEMATIC (4 OF 21)
CONTROL SCHEMATIC (3 OF 21)
CONTROL SCHEMATIC (2 OF 21)
CONTROL SCHEMATIC (1 OF 21)
RELAY CONTROL PANEL DETAILS (CP-4)
EXISTING PLC PANEL (CP-1) DETAILS
CONTROL DEVICE DETAILS
MAINTENANCE CONTROL DESK (CP-3) DETAILS
MAINTENANCE CONTROL CONSOLE (CP-3) LAYOUT
EXISTING CONTROL DESK (CP-2) DETAILS
EXISTING CONTROL CONSOLE (CP-2) LAYOUT
SEQUENCE DIAGRAM - CLOSE BRIDGE
SEQUENCE DIAGRAM - OPEN BRIDGE
LIGHTING PANEL (LP-2) SCHEDULE
ELECTRICAL PLAN AND ELEVATION
ELECTRICAL ABBREVIATIONS
ELECTRICAL SYMBOLS & LEGEND
ELECTRICAL NOTES AND SCOPE OF WORK
SIGNATURE SHEET (2 OF 2)
SHEET DESCRIPTION
LMM 5-20
JWE 5-20
QPO 5-20
JWE 5-20
B1-26
B1-25
B1-24
B1-23
B1-22
B1-21
B1-20
B-4
BM-7
BM-6
BM-5
BM-4
BM-3
BM-2
BM-1
BASCULE PIER PLUMBING DETAILS
BASCULE PIER PLUMBING PLAN & ELEVATION
SPAN LOCK MACHINERY DETAILS
SPAN LOCK MACHINERY PLAN & ELEVATION
LIVE LOAD BEARING ASSEMBLY REPAIRS
MECHANICAL PLAN AND ELEVATION
MECHANICAL GENERAL NOTES
SIGNATURE SHEET (2 OF 2)
B1-68
B1-67
B1-66
B1-65
B1-64
B1-63
B1-62
B1-61
B1-60
B1-59
B1-58
B1-57
B1-56
B1-55
B1-54
B1-53
B1-52
B1-51
B1-50
B1-49
B1-48
B1-47
B1-46
B1-45
B1-44
B1-43
B1-42
B1-41
B1-40
B1-39
B1-38
B1-37
B1-36
B1-35
B1-34
B1-33
B1-32
B1-31
B1-30
B1-29
B1-28
B1-27
B-4
B1-80
B1-79
B1-78
B1-77
B1-76
B1-75
B1-74
B1-73
B1-72
B1-71
B1-70
B1-69
ARCHITECTURAL LIGHTING POWER LOGIC SCHEMATIC
TYPICAL PIER
ARCHITECTURAL LIGHTING ELEVATIONS
CONTROL HOUSE
ARCHITECTURAL LIGHTING ELEVATIONS
FAR SIDE BASCULE PIER
ARCHITECTURAL LIGHTING ELEVATIONS
ARCHITECTURAL LIGHTING PLAN (3 OF 3)
ARCHITECTURAL LIGHTING PLAN (2 OF 3)
ARCHITECTURAL LIGHTING PLAN (1 OF 3)
ARCHITECTURAL LIGHTING OVERALL LAYOUT
LUMINAIR DATA SHEET
LEGEND
RISER DIAGRAM
CCTV PLAN AND DETAILS
BE-54
BE-53
BE-52
BE-51
BE-50
BE-49
BE-48
BE-47
BE-46
BE-45
BE-44
BE-43
JAMES M. PHILLIPS III, P.E. NO. 36865
TAMPA, FL 33634
5110 EISENHOWER BLVD, SUITE 310
HARDESTY & HANOVER, LLC.
B1-19
B1-18
B1-17
B1-16
B1-15
B1-14
B1-13
B1-12
B1-11
BQ2-2
BQ1-2
B-4
CONTROL TOWER WINDOW SCHEDULE
CONTROL TOWER DOOR SCHEDULE AND DETAILS
CONTROL TOWER ROOF SECTIONS
CONTROL TOWER TENDER LEVEL ELEVATIONS II
CONTROL TOWER TENDER LEVEL ELEVATIONS I
CONTROL TOWER REHABILITATION PLANS II
CONTROL TOWER REHABILITATION PLANS I
CONTROL TOWER GENERAL NOTES & SYMBOLS
BASCULE SPAN PLAN & ELEVATION
SUMMARY OF QUANTITIES (6 OF 6)
SUMMARY OF QUANTITIES (4 OF 6)
SIGNATURE SHEET (2 OF 2)
JOHNS PASS BRIDGE
MOVEABLE BRIDGE REPAIR PINELLAS COUNTY
TH
E
OF
FI
CI
AL
RE
CO
RD
OF
THI
S
SH
EE
T I
S
TH
E
EL
EC
TR
ONI
C
FI
LE
DI
GI
TA
LL
Y
SI
GN
ED
AN
D
SE
AL
ED
UN
DE
R
RU
LE 61
G15-23.004,
F.
A.
C.
01/11/2021 15:46:03 PM
FOR PROPOSAL: E7N76
PROPOSAL SUMMARY OF PAY ITEMS
FLORIDA DEPARTMENT OF TRANSPORTATION
LEAD PROJECT : 439565-1-52-01 DISTRICT : 07 COUNTY/SECTION : 15100000
PROJECT(S) : 43956515201, 44812215201 COUNTY : PINELLAS
0001 SUMMARY OF STRUCTURES
SPC ALT ITEM NUMBER ITEM DESCRIPTION UNIT 43956515201 44812215201 43956515201 BR# 150253 43956515201 BR# 150254 QUANTITY TOTAL
0104- 11- FLOATING TURBIDITY BARRIER LF 1167.000 1167.000
A 0400-143- CLEANING & COATING CONCRETE SURFACE, CLASS 5 SF 56917.000 51380.000 108297.000
T 0401- 70- 3 RESTORE SPALLED AREAS, LATEX MODIFIED MORTAR- ACRYLIC CF 7.800 3.200 11.000
0413-151- METHACRYLATE MONOMER GA 139.000 139.000 278.000
0413-154-METHACRYLATES
CLEANING & SEALING CONCRETE SURFACES - PENETRANT SEALER ORSF 13852.000 13852.000 27704.000
0460- 1- 13 STRUCTURAL STEEL REHAB- BOLTS, NUTS, WASHERS & PLATES LB 846.000 846.000
T 0465- 2-105LOCKS
MOVABLE BRIDGE MACHINERY & CASTING-REHABILITATION, F&I SPANAS 2.000 2.000 4.000
T 0465- 2-401RECONDITION, SPEED REDUCER & GEAR TRAIN 43956515201
MOVABLE BRIDGE MACHINERY & CASTING-REHABILITATION,LS 1.000 1.000
T 0465- 2-401RECONDITION, SPEED REDUCER & GEAR TRAIN 43956515201
MOVABLE BRIDGE MACHINERY & CASTING-REHABILITATION,LS 1.000 1.000
T 0465- 2-508MODIFY, LIVE LOAD SHOES 43956515201
MOVABLE BRIDGE MACHINERY & CASTING-REHABILITATION, ADJUST/LS 1.000 1.000
T 0465- 2-508MODIFY, LIVE LOAD SHOES 43956515201
MOVABLE BRIDGE MACHINERY & CASTING-REHABILITATION, ADJUST/LS 1.000 1.000
T 0465- 2-605& DISPOSE-CONTRACTOR OWNS, SPAN LOCKS
MOVABLE BRIDGE MACHINERY & CASTING-REHABILITATION, REMOVEAS 2.000 2.000 4.000
T 0465- 3- 50 MOVABLE BRIDGE COUNTERWEIGHT, ADJUST EA 2.000 2.000 4.000
T 0465- 20-43956515201
MOVABLE BRIDGE- PREVENTATIVE MAINTENANCE & ROUTINE REPAIR(LS) 1.000 1.000
T 0465- 20-43956515201
MOVABLE BRIDGE- PREVENTATIVE MAINTENANCE & ROUTINE REPAIR(LS) 1.000 1.000
T 0465- 21- MOVABLE BRIDGE OPERATOR DA 300.000 300.000
T 0465- 71- 3 MOVABLE BRIDGE FUNCTIONAL CHECKOUT, PHASE C 43956515201 LS 1.000 1.000
T 0465- 71- 3 MOVABLE BRIDGE FUNCTIONAL CHECKOUT, PHASE C 43956515201 LS 1.000 1.000
S 0471- 1- 1 FENDER SYSTEM,PLASTIC MARINE LUMBER,REINFORCED MB 4.300 4.300
S 0471- 1- 2 FENDER SYSTEM,PLASTIC MARINE LUMBER, NON-REINFORCED MB 0.900 0.900
T 0508- 4-43956515201
MOVABLE BRIDGE ELECTRICAL EQUIPMENT, REHABILITATIONLS 1.000 1.000
T 0508- 4-43956515201
MOVABLE BRIDGE ELECTRICAL EQUIPMENT, REHABILITATIONLS 1.000 1.000
T 0508- 77- 1 MOVABLE BRIDGE-REHAB,PROGRAMMABLE LOGIC CONTROLLER F&I EA 1.000 1.000
T 0508- 77- 5PROGRAMMING
MOVABLE BRIDGE-REHAB,PROGRAMMABLE LOGIC CONTROLLEREA 1.000 1.000
T 0508- 78- 143956515201
MOVABLE BRIDGE-REHAB, LIMIT SWITCHES & TRANSDUCERS F&ILS 1.000 1.000
T 0508- 78- 143956515201
MOVABLE BRIDGE-REHAB, LIMIT SWITCHES & TRANSDUCERS F&ILS 1.000 1.000
T 0508- 78- 443956515201
MOVABLE BRIDGE-REHAB, LIMIT SWITCHES & TRANSDUCERS REMOVELS 1.000 1.000
T 0508- 78- 443956515201
MOVABLE BRIDGE-REHAB, LIMIT SWITCHES & TRANSDUCERS REMOVELS 1.000 1.000
T 0508- 79- 1 MOVABLE BRIDGE-REHAB,CONTROL CONSOLE, F&I EA 1.000 1.000
T 0512- 1- 1 MOVABLE BRIDGE-CONTROL HOUSE, RENOVATE 43956515201 LS 1.000 1.000
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
DATE BY DESCRIPTION DATE BY DESCRIPTION
SR 699 PINELLAS 439565-1-52-01
LMarzilli 1/11/2021 4:24:00 PM T:\Tampa\Projects\581660.09\600_CADD\43956515201\struct\B\B0SumOfPayItems01.dgn
DEPARTMENT OF TRANSPORTATION
STATE OF FLORIDA
LMM 4-20
AHA 4-20
BRIDGE NOS. 150253, 150254
SLM 4-20
FZ 4-20
TAMPA, FL 33637
SUITE 245
12802 TAMPA OAKS BLVD.,
T. Y. LIN INTERNATIONAL
P.E. NO. 85399
SANDRA L. McCORMACK, P.E.
B-5
SUMMARY OF PAY ITEMS (1 OF 2)
JOHNS PASS BRIDGE
MOVEABLE BRIDGE REPAIR PINELLAS COUNTY
TH
E
OF
FI
CI
AL
RE
CO
RD
OF
THI
S
SH
EE
T I
S
TH
E
EL
EC
TR
ONI
C
FI
LE
DI
GI
TA
LL
Y
SI
GN
ED
AN
D
SE
AL
ED
UN
DE
R
RU
LE 61
G15-23.004,
F.
A.
C.
01/11/2021 15:46:03 PM
FOR PROPOSAL: E7N76
PROPOSAL SUMMARY OF PAY ITEMS
FLORIDA DEPARTMENT OF TRANSPORTATION
LEAD PROJECT : 439565-1-52-01 DISTRICT : 07 COUNTY/SECTION : 15100000
PROJECT(S) : 43956515201, 44812215201 COUNTY : PINELLAS
0001 SUMMARY OF STRUCTURES
SPC ALT ITEM NUMBER ITEM DESCRIPTION UNIT 43956515201 44812215201 43956515201 BR# 150253 43956515201 BR# 150254 QUANTITY TOTAL
T 0512- 71- 1 MOVABLE BRIDGE PLUMBING SYSTEM, FURNISH & INSTALL EA 1.000 1.000
0561- 1- COATING EXISTING STRUCTURAL STEEL 43956515201 (LS) 1.000 1.000
0561- 1- COATING EXISTING STRUCTURAL STEEL 43956515201 (LS) 1.000 1.000
T 0561- 2- COATING EXISTING STRUCTURAL STEEL SF 245.000 245.000
0630- 2- 11 CONDUIT, FURNISH & INSTALL, OPEN TRENCH LF 200.000 200.000 400.000
0630- 2- 12 CONDUIT, FURNISH & INSTALL, DIRECTIONAL BORE LF 200.000 200.000 400.000
0715- 1- 12 LIGHTING CONDUCTORS, F&I, INSULATED, NO.8 - 6 LF 5400.000 5400.000 10800.000
0715- 7- 21 LOAD CENTER, REWORK, SECONDARY VOLTAGE EA 1.000 1.000 2.000
0715- 11-225MOUNT
LUMINAIRE, F&I- REPLACE EXISTING LUMINAIRE, ROADWAY, WALLEA 15.000 12.000 27.000
01/11/2021 15:46:03 PM
FOR PROPOSAL: E7N76
PROPOSAL SUMMARY OF PAY ITEMS
FLORIDA DEPARTMENT OF TRANSPORTATION
LEAD PROJECT : 439565-1-52-01 DISTRICT : 07 COUNTY/SECTION : 15100000
PROJECT(S) : 43956515201, 44812215201 COUNTY : PINELLAS
0002 SUMMARY OF ROADWAY
SPC ALT ITEM NUMBER ITEM DESCRIPTION UNIT 43956515201 44812215201 QUANTITY TOTAL
0101- 1- MOBILIZATION 43956515201 LS 1.000 1.000
0102- 1- MAINTENANCE OF TRAFFIC 43956515201 (LS) 1.000 1.000
0102- 14- TRAFFIC CONTROL OFFICER HR 1320.000 1320.000
0102- 60- WORK ZONE SIGN ED 8410.000 8410.000
0102- 74- 1 CHANNELIZING DEVICE- TYPES I, II, DI, VP, DRUM, OR LCD ED 28082.000 28082.000
0102- 74- 8CHANNELIZING DEVICE)
CHANNELIZING DEVICE- PEDESTRIAN LCD (LONGITUDINALFD 4960.000 4960.000
0102- 75- 1 TEMPORARY SEPARATOR, F&I REMOVE LF 309000.000 309000.000
0102- 76- ARROW BOARD / ADVANCE WARNING ARROW PANEL ED 360.000 360.000
0102- 99- PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY ED 388.000 388.000
0102-115- TYPE III BARRICADE ED 600.000 600.000
0999- 25- INITIAL CONTINGENCY AMOUNT, DO NOT BID 43956515201 LS 1.000 N 1.000
01/11/2021 15:46:03 PM
FOR PROPOSAL: E7N76
PROPOSAL SUMMARY OF PAY ITEMS
FLORIDA DEPARTMENT OF TRANSPORTATION
LEAD PROJECT : 439565-1-52-01 DISTRICT : 07 COUNTY/SECTION : 15100000
PROJECT(S) : 43956515201, 44812215201 COUNTY : PINELLAS
0003 SUMMARY OF SIGNING
SPC ALT ITEM NUMBER ITEM DESCRIPTION UNIT 43956515201 44812215201 QUANTITY TOTAL
0700- 1- 11 SINGLE POST SIGN, F&I GROUND MOUNT, UP TO 12 SF AS 6.000 6.000
01/11/2021 15:46:03 PM
FOR PROPOSAL: E7N76
PROPOSAL SUMMARY OF PAY ITEMS
FLORIDA DEPARTMENT OF TRANSPORTATION
LEAD PROJECT : 439565-1-52-01 DISTRICT : 07 COUNTY/SECTION : 15100000
PROJECT(S) : 43956515201, 44812215201 COUNTY : PINELLAS
0004 SUMMARY OF LIGHTING
SPC ALT ITEM NUMBER ITEM DESCRIPTION UNIT 43956515201 44812215201 QUANTITY TOTAL
0101- 1- MOBILIZATION 44812215201 LS 1.000 1.000
0102- 1- MAINTENANCE OF TRAFFIC 44812215201 (LS) 1.000 1.000
0102- 60- WORK ZONE SIGN ED 4080.000 4080.000
0102- 74- 1 CHANNELIZING DEVICE- TYPES I, II, DI, VP, DRUM, OR LCD ED 6720.000 6720.000
0102- 74- 8CHANNELIZING DEVICE)
CHANNELIZING DEVICE- PEDESTRIAN LCD (LONGITUDINALFD 480.000 480.000
0102- 76- ARROW BOARD / ADVANCE WARNING ARROW PANEL ED 120.000 120.000
0102-115- TYPE III BARRICADE ED 240.000 240.000
0639- 3- 11 ELECTRICAL SERVICE DISCONNECT, F&I, POLE MOUNT EA 5.000 5.000
0639- 3- 60REMAIN
ELECTRICAL SERVICE DISCONNECT, REMOVE- POLE OR CABINET TOEA 5.000 5.000
0715- 4- 70 LIGHT POLE COMPLETE, REMOVE POLE AND FOUNDATION EA 8.000 8.000
0715- 4- 71 LIGHT POLE COMPLETE, REMOVE POLE, FOUNDATION REMAINS EA 20.000 20.000
0715- 7- 21 LOAD CENTER, REWORK, SECONDARY VOLTAGE EA 2.000 2.000
0715-500- 1CONVENTIONAL
POLE CABLE DISTRIBUTION SYSTEM, FURNISH AND INSTALL,EA 28.000 28.000
P 0715-510-230FOUNDATION, GALVANIZED STEEL, 30'
LIGHT POLE- SPECIAL DESIGN, F&I NEW POLE ON EXISTINGEA 20.000 20.000
T 0715-511-230SHOULDER MOUNT, GALVANIZED STEEL, 30'
LIGHT POLE COMPLETE- SPECIAL DESIGN, F&I, SINGLE ARMEA 8.000 8.000
0999- 25- INITIAL CONTINGENCY AMOUNT, DO NOT BID LS 1.000 N 1.000
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
DATE BY DESCRIPTION DATE BY DESCRIPTION
SR 699 PINELLAS 439565-1-52-01
LMarzilli 1/11/2021 4:24:10 PM T:\Tampa\Projects\581660.09\600_CADD\43956515201\struct\B\B0SumOfPayItems02.dgn
DEPARTMENT OF TRANSPORTATION
STATE OF FLORIDA
LMM 4-20
AHA 4-20
BRIDGE NOS. 150253, 150254
SLM 4-20
FZ 4-20
TAMPA, FL 33637
SUITE 245
12802 TAMPA OAKS BLVD.,
T. Y. LIN INTERNATIONAL
P.E. NO. 85399
SANDRA L. McCORMACK, P.E.
B-6
SUMMARY OF PAY ITEMS (2 OF 2)
JOHNS PASS BRIDGE
MOVEABLE BRIDGE REPAIR PINELLAS COUNTY
TH
E
OF
FI
CI
AL
RE
CO
RD
OF
THI
S
SH
EE
T I
S
TH
E
EL
EC
TR
ONI
C
FI
LE
DI
GI
TA
LL
Y
SI
GN
ED
AN
D
SE
AL
ED
UN
DE
R
RU
LE 61
G15-23.004,
F.
A.
C.
$DATE$$USER$ $FILE$$TIME$
439565-1-52-01 PINELLAS
ROAD NO. FINANCIAL PROJECT IDCOUNTY
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEETSTATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
SR 699
BRIDGE NOS. 150253, 150254
ORLANDO, FL 32817
SUITE 490
225 E. ROBINSON ST.,
T. Y. LIN INTERNATIONAL
P.E. NO. 87097
SHAHRIAR MAHMOOD, P.E.
BQ-1
(1 OF 6)
SUMMARY OF QUANTITIES
PAY ITEM NOTES:
SUMMARY OF LUMP SUM ITEMS
NO.
PAY ITEMPAY ITEM DESCRIPTION
QUANTITY
NOTES
DESIGN
REMARKS
CONSTRUCTION
P F
0101-1 MOBILIZATION 1
Pay Item.
with the fender system repairs shall be incidental to this
including all tools, work, hardware and materials associated
5. Pay Item No. 460-1-13: Payment for structural steel rehab
be included.
couplers are substituted for lap splices, their costs are to
include demolition of high strength materials. If mechanical
reinforcing steel and mesh incidental to this work. This may
including but not limited to, demolition, latex modified mortar,
includes all tools, work, reinforcing steel, etc., and materials
4. Pay Item No. 401-70-3: Payment for concrete spall repairs
cleaning and coating.
removal of tiles and incidental items associated with concrete
concrete surface, Class 5 includes all tools, labor, materials,
3. Pay Item No. 400-143: Payment for cleaning and coating
navigation lights shall be incidental to this Pay Item.
maintaining navigation lights including providing temporary
2. Pay Item No. 102-1: Payment for boat TTCP sign and for
to this Pay Item.
boat(s) for the Engineer and FDOT representatives is incidental
1. Pay Item No. 101-1: Payment to furnish, operate and maintain
SUMMARY OF TEMPORARY TRAFFIC CONTROL PLAN ITEMS (BRIDGE NO. 150253)
NO.
PAY ITEMPAY ITEM DESCRIPTION UNIT
PHASE I PHASE IITOTAL
NOTES
DESIGN
REMARKS
CONSTRUCTION
DURATION QUANTITY TOTAL DURATION QUANTITY TOTAL
DAYS P P DAYS P P P F
102-1 MAINTENANCE OF TRAFFIC LS 1
Days
240 Total Construction
300 Total Contract Days
102-14 TRAFFIC CONTROL OFFICER HR
102-60 WORK ZONE SIGN ED 40 22 880 10 8 80 960
102-74-1LCD
CHANNELIZING DEVICE-TYPES I, II, DI, VP, DRUM, ORED 40 86 3496 10 75 750 4246
protection.
for 14 days advance PCMS
Additional devices added
102-75-1 TRAFFIC SEPARATOR, F&I REMOVE LF
102-76 ARROW BOARD/ADVANCE WARNING ARROW PANEL ED 40 1 40 10 1 10 50
102-99 PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY ED 54 1 54 10 1 10 64
102-115 TYPE III BARRICADE ED
SUMMARY OF TEMPORARY TRAFFIC CONTROL PLAN ITEMS (BRIDGE NO. 150254)
NO.
PAY ITEMPAY ITEM DESCRIPTION UNIT
PHASE III PHASE IVTOTAL
NOTES
DESIGN
REMARKS
CONSTRUCTION
DURATION QUANTITY TOTAL DURATION QUANTITY TOTAL
DAYS P P DAYS P P P F
102-1 MAINTENANCE OF TRAFFIC LS 1 1
Days
240 Total Construction
300 Total Contract Days
102-14 TRAFFIC CONTROL OFFICER HR
102-60 WORK ZONE SIGN ED 60 22 1320 10 7 70 1390
102-74-1LCD
CHANNELIZING DEVICE-TYPES I, II, DI, VP, DRUM, ORED 60 75 4556 10 68 680 5236
protection.
for 14 days advance PCMS
Additional devices added
102-75-1 TRAFFIC SEPARATOR, F&I REMOVE LF
102-76 ARROW BOARD/ADVANCE WARNING ARROW PANEL ED 60 1 60 10 1 10 70
102-99 PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY ED 74 1 74 10 1 10 84
102-115 TYPE III BARRICADE ED
steel in the machinery areas is incidental to this Pay Item.
7. Pay Item No. 561-2: Payment to clean and coat the structural
existing condition and configuration prior to installation.
well as detail design and associated field review to determine the
and all other work as needed to install conduit, wire, supports, as
shall be included with this Pay Item. This includes coring, drilling,
bridge and to interface the new controls with the existing equipment
supporting devices, lighting for electrical system installation on the
cable seals, devices, boxes, terminal blocks, electrical identification,
wiring, main circuit breaker, navigation lighting system, submarine
Pay Item No. 508-4: Payment to furnish and install new conduit, 6.
TH
E
OF
FI
CI
AL
RE
CO
RD
OF
THI
S
SH
EE
T I
S
TH
E
EL
EC
TR
ONI
C
FI
LE
DI
GI
TA
LL
Y
SI
GN
ED
AN
D
SE
AL
ED
UN
DE
R
RU
LE 61
G15-23.004,
F.
A.
C.
$DATE$$USER$ $FILE$$TIME$
439565-1-52-01 PINELLAS
ROAD NO. FINANCIAL PROJECT IDCOUNTY
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEETSTATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
SR 699
BRIDGE NOS. 150253, 150254
ORLANDO, FL 32817
SUITE 490
225 E. ROBINSON ST.,
T. Y. LIN INTERNATIONAL
P.E. NO. 87097
SHAHRIAR MAHMOOD, P.E.
BQ-2 (2 OF 6)
SUMMARY OF QUANTITIES
SUMMARY OF PEDESTRIAN LONGITUDINAL CHANNELING DEVICES
PHASE
CONST.LOCATION
SIDE LENGTH DAYS
QUANTITY
NOTES
DESIGN
REMARKS
CONSTRUCTION0102 74 8
STA. TO STA.FD
P F
I & V NA 8 100 800 LCD-1 (SEE SHEET B-13) (40 & 60 days for Phase I & V)
I & V NA 8 100 800 LCD-2 (SEE SHEET B1-13) (40 & 60 days for Phase I & V)
III & VI NA 8 120 960 LCD-3 (SEE SHEET B1-16) (60 & 60 days for Phase III & VI)
III & VI NA 8 120 960 LCD-4 (SEE SHEET B1-16) (60 & 60 days for Phase III & VI)
III & VI NA 12 120 1440 LCD-5 (SEE SHEET B1-16) (60 & 60 days for Phase III & VI)
SUB-TOTAL: 4960
TOTAL: 4960
TABULATION OF QUANTITIES
NO.
ITEM
PAY
DESCRIPTION UNIT
SHEET NUMBERS
SHEET
THIS
TOTAL
TOTAL
GRAND
B-24
PLAN FINAL PLAN FINAL PLAN FINAL PLAN FINAL PLAN FINAL PLAN FINAL PLAN FINAL PLAN FINAL PLAN FINAL
700-1-11 SINGLE POST SIGN, F&I GROUND MOUNT, UP TO 12 SF AS 6 6 6
PAY ITEM NOTES (CONT'D):
SUMMARY OF TEMPORARY TRAFFIC CONTROL PLAN ITEMS
NO.
PAY ITEMPAY ITEM DESCRIPTION UNIT
150253)
PHASE V (BRIDGE NO.
150254)
PHASE VI (BRIDGE NO.
TOTALTOTAL
GRAND
NOTES
DESIGN
REMARKS
CONSTRUCTION
DURATION QUANTITY TOTAL DURATION QUANTITY TOTAL
DAYS P P DAYS P P P F P F
102-1 MAINTENANCE OF TRAFFIC LS 1
Days
240 Total Construction
300 Total Contract Days
102-14 TRAFFIC CONTROL OFFICER HR 60 11 660 60 11 660 1320 1320 1 Officer/11 hrs per day
102-60 WORK ZONE SIGN ED 60 48 2880 60 53 3180 6060 8410
102-74-1LCD
CHANNELIZING DEVICE-TYPES I, II, DI, VP, DRUM, ORED 60 150 9000 60 160 9600 18600 28082
102-75-1 TRAFFIC SEPARATOR, F&I REMOVE LF 60 2400 144000 60 2750 165000 309000 309000 Counted for 60 days
102-76 ARROW BOARD/ADVANCE WARNING ARROW PANEL ED 60 2 120 60 2 120 240 360
102-99 PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY ED 60 2 120 60 2 120 240 388
102-115 TYPE III BARRICADE ED 60 5 300 60 5 300 600 600
No. BE-46 for additional information.
with 316 Stainless Steel Mounting Hardware. Refer to Dwg.
new LED architectural lights in existing luminaire locations
hardware. Payment also includes furnishing and installing
existing high pressure sodium luminaires and associated
Luminaire, Roadway, Wall Mount. Payment includes removing
11. Pay Item No. 715-11-225 - Luminaire, F&I, Replace Existing
Refer to Dwg. No. BE-54 for additional information.
associated miscellaneous components in existing load centers.
breakers, fuses, fuse holders, conductors, terminal blocks, and
Voltage. Payment includes furnishing and installing new circuit
10. Pay Item No. 715-7-21 - Load Center, Rework, Secondary
Lighting Plans for locations and additional information.
item required when spare conduit is not available. Refer to
9. Pay Item No. 630-2-12 - Conduit, F&I, Directional Bore - Pay
to Lighting Plans for locations and additional information.
required when spare open trench conduit is not available. Refer
8. Pay Item No. 630-2-11 - Conduit, F&I, Open Trench - Pay item
TH
E
OF
FI
CI
AL
RE
CO
RD
OF
THI
S
SH
EE
T I
S
TH
E
EL
EC
TR
ONI
C
FI
LE
DI
GI
TA
LL
Y
SI
GN
ED
AN
D
SE
AL
ED
UN
DE
R
RU
LE 61
G15-23.004,
F.
A.
C.
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
DATE BY DESCRIPTION DATE BY DESCRIPTION
SR 699 PINELLAS 439565-1-52-01
LMarzilli 1/11/2021 4:24:32 PM T:\Tampa\Projects\581660.09\600_CADD\43956515201\struct\B\B0SumOfQuantities02.dgn
DEPARTMENT OF TRANSPORTATION
STATE OF FLORIDA
LMM 4-20
AHA 4-20
BRIDGE NOS. 150253, 150254
SLM 4-20
FZ 4-20
TAMPA, FL 33637
SUITE 245
12802 TAMPA OAKS BLVD.,
T. Y. LIN INTERNATIONAL
P.E. NO. 85399
SANDRA L. McCORMACK, P.E.
BQ1-1
SUMMARY OF QUANTITIES (3 OF 6)
BRIDGE NOS. 150253
JOHNS PASS BRIDGE
MOVEABLE BRIDGE REPAIR PINELLAS COUNTY
SUMMARY OF STRUCTURE QUANTITIES - BRIDGE 150253
SECTIONNO.
PAY ITEMPAY ITEM DESCRIPTION LOCATION UNIT
QUANTITY TOTAL
NOTES
DESIGN
REMARKS
CONSTRUCTION
P F P F
SUBSTRUCTURE
104-11 Floating Turbidity Barrier Fender System LF 1,167 1,167
400-143Class 5
Cleaning & Coating Concrete Surface,
Bascule Pier Walls SF 13,317 56,917
Approach Piers SF 5,791
End Bents SF 688
Control House SF 5,537
Prestressed Beams SF 9,533
Traffic Barriers SF 13,045
Concrete Parapet SF 6,231
Overhangs SF 2,775
401-70-3Mortar - Acrylic
Restore Spalled Areas, Latex Modified
No.
BridgeElement
(ft)
Length
(ft)
Width
(ft)
Depth
150253
south corner
Beam 1-5 at Abutment 1 bottom0.83 0.42 0.42 CF 0.140 7.8
exterior walls
intermittently throughout
Bascule Piers 3 and 4
32 0.5 0.33 CF 5.280
of Bascule Pier 3
Left Ped. Railing Parapet 30ft. N1 0.5 0.33 CF 0.170
intermittently throughout
West Traffic Barrier12 0.5 0.33 CF 1.980
1st steel post
concrete post at the base of the
Left parapet adjacent to the 4th
0.83 0.25 0.33 CF 0.070
1st steel post
concrete post at the base of the
Left parapet adjacent to the 5th
1 0.25 0.33 CF 0.080
south corner on the west side
south of Abutment 1 in the top
MSE Wall - Second bottom panel
0.67 0.25 0.33 CF 0.060
413-151 Methacrylate Monomer All Bulb T-78 Beam 20 ft from Ends GA 139 139MX-30
Utilize only Sealate T-70
413-154Penetrant Sealer or Methacrylates
Cleaning & Sealing Concrete Surfaces -All Bulb T-78 Beam 20 ft from Ends SF 13,852 13,852
460-1-13& Washer Assemblies
Structural Steel Rehab - Screws, BoltsLower Wale LB 846 846
471-1-1Reinforced
Fender System, Plastic Marine Lumber,Lower Wale MB 4.3 4.3
471-1-2Non-Reinforced
Fender System, Plastic Marine Lumber,Wale Spacer Blocks MB 0.9 0.9
561-1 Coating Existing Structural Steel Bascule Span, Steel handrails and guardrails LS 1 1
4913.8 SF
Handrails Approx.
drawings
686.9 TN per exist.
Bascule Span Approx.
EXISTING STRUCTURAL STEEL
561-2 Coating Existing Structural Steel Machinery Room SF 245 245Coating Locations
See Sheet B1-3A for Spot
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
DATE BY DESCRIPTION DATE BY DESCRIPTION
SR 699 PINELLAS
jnewberry 1/11/2021 10:41:17 AM G:\Projects\3879 Johns Pass Rehabilitation\CADD\43956515201\struct\B1SumofQuantities01_HH.DGN
DEPARTMENT OF TRANSPORTATION
STATE OF FLORIDA
TH
E
OF
FICIA
L
RE
CO
RD
OF T
HIS S
HE
ET IS T
HE E
LE
CT
RO
NIC FILE
DIGIT
ALL
Y SIG
NE
D
AN
D S
EA
LE
D
UN
DE
R
RU
LE 61G
15-2
3.0
04,
F.A.C.
439565-1-52-01
SUMMARY OF QUANTITIES (4 OF 6) QPO 04-20
04-20QPO
BQ1-2
JPN 12-20
FOR PAY ITEM NOTES, SEE SHEET NO. BQ-1.
NOTE:
JPN 12-20
BRIDGE NO. 150253
JOHNS PASS BRIDGE
MOVEABLE BRIDGE REPAIR PINELLAS COUNTY
HARDESTY & HANOVER, LLC
5110 EISENHOWER BLVD, SUITE 310
TAMPA, FLORIDA 33634
JAMES P. NEWBERRY, P.E.
P.E. LICENSE NUMBER 73365
SUMMARY OF STRUCTURE QUANTITIES - BRIDGE NO. 150253
SECTIONNO.
PAY ITEMPAY ITEM DESCRIPTION LOCATION UNIT
QUANTITY TOTAL
NOTES
DESIGN
REMARKS
CONSTRUCTION
P F P F
MECHANICAL
MOVEABLE BRIDGE/
0465-2-105REHABILITATION, FURNISH & INSTALL, SPAN LOCKS
MOVABLE BRIDGE MACHINERY & CASTING -BASCULE SPAN 3 AS 2 2
INCLUDING TEMPORARY SPAN LOCKS.
LOCK GUIDES AND RECEIVERS,
FURNISH AND INSTALL NEW SPAN
0465-2-401
TRAIN
REHABILITAION, RECONDITION SPEED REDUCER & GEAR
MOVEABLE BRIDGE MACHINERY & CASTING -
BASCULE SPAN 3 LS 1 1
LEAF. REFILL WITH NEW OIL.
SPEED REDUCER ON NEAR ADJACENT
REPLACE SEALS AND FLUSH EXISTING
0465-2-508REHABILITAITON, ADJUST/MODIFY, LIVE LOAD SHOES
MOVEABLE BRIDGE MACHINERY & CASTING -BASCULE SPAN 3 LS 1 1 ADJUST FOR DECK ALIGNMENT.
0465-2-605REHABILITAITON, REMOVE AND DISPOSE, SPAN LOCKS
MOVEABLE BRIDGE MACHINERY & CASTING -BASCULE SPAN 3 AS 2 2
AND RECEIVERS.
REMOVE EXISTING SPAN LOCK GUIDES
0465-3-50 MOVEABLE BRIDGE - COUNTERWEIGHT, ADJUST BASCULE SPAN 3 EA 2 2
0465-20ROUTINE REPAIR
MOVEABLE BRIDGE - PREVENTATIVE MAINTENANCE &BASCULE SPAN 3 LS/DA 1/300 1/300
(300 DAYS).
CONTRACTOR ROUTINE MAINTENANCE
0465-21 MOVEABLE BRIDGE OPERATOR BASCULE SPAN 3 DA 300 300 CONTRACTOR BRIDGE OPERATION.
0465-71-3COMPLETE
MOVEABLE BRIDGE FUNCTIONAL CHECKOUT, PHASE C,BASCULE SPAN 3 LS 1 1
ELECTRICAL
MOVEABLE BRIDGE/
0508-4REHABILITATION
MOVEABLE BRIDGE ELECTRICAL EQUIPMENT -BASCULE SPAN 3 LS 1 1
ELECTRICAL SYSTEM.
INCLUDES REHAB OF BASCULE SPAN 3
0508-77-1CONTROLLER F&I
MOVEABLE BRIDGE - REHAB, PROGRAMMABLE LOGICBASCULE SPAN 3 EA 1 1
EQUIPMENT.
INSTALL NEW PLC AND ASSOCIATED
0508-77-5CONTROLLER PROGRAMMING F&I
MOVEABLE BRIDGE - REHAB, PROGRAMMABLE LOGICBASCULE SPAN 3 EA 1 1 PROGRAM NEW PLC.
0508-78-1TRANSDUCERS F&I
MOVEABLE BRIDGE - REHAB, LIMIT SWITCHES &BASCULE SPAN 3 LS 1 1
SWITCHES & TRANSDUCERS.
FURNISH & INSTALL NEW LIMIT
0508-78-4TRANSDUCERS REMOVE
MOVEABLE BRIDGE - REHAB, LIMIT SWITCHES &BASCULE SPAN 3 LS 1 1
LIMIT SWITCHES & TRANSDUCERS.
REMOVE AND DISPOSE EXISTING
0508-79-1 MOVEABLE BRIDGE - REHAB, CONTROL CONSOLE, F&I BASCULE SPAN 3 EA 1 1CONSOLE.
FURNISH & INSTALL NEW CONTROL
CONTROL HOUSE
MOVEABLE BRIDGE/
0512-1-1 MOVEABLE BRIDGE - CONTROL HOUSE, RENOVATE BASCULE SPAN 3 LS 1 1
HOUSE ROOF.
EXTERIOR DOORS. REPAIR CONTROL
GLAZING AND CONTROL LEVEL
REPLACE CONTROL HOUSE WINDOW
0512-71-1 MOVEABLE BRIDGE PLUMBING SYSTEM, F&I BASCULE SPAN 3 EA 1 1
BASCULE PIER AT MACHINERY LEVEL.
WATER LINE WITHIN FAR ADJACENT
FURNISH & INSTALL NEW POTABLE
LIGHTING
MOVABLE BRIDGE/
0630-2-11 CONDUIT, F&I OPEN TRENCH LF 200 200/ARCHITECTURAL LIGHTS
NEW CONDUITS FOR ACCENT
0630-2-12 CONDUIT, F&I, DIRECTIONAL BORE LF 200 200/ARCHITECTURAL LIGHTS
NEW CONDUITS FOR ACCENT
0715-1-12 LIGHTING CONDUCTORS, (F&I) (INSULATED NO. 8-6) LF 5,400 5,400/ARCHITECTURAL LIGHTS
NEW CONDUCTORS FOR ACCENT
0715-7-21 LOAD CENTER, REWORK, SECONDARY VOLTAGE EA 1 1ACCENT/ARCHITECTURAL LIGHTS
REWORK EXIST. LOAD CENTERS FOR
0715-11-225ROADWAY, WALL MOUNT
LUMINAIRE, F&I, REPLACE EXISTING LUMINAIRE,
INT. PIERS 2 & 5
BASCULE PIERS 3 & 4,EA 15 15
(PIER-MOUNTED)
NEW ACCENT/ARCHITECTURAL LIGHTS
TH
E
OF
FI
CI
AL
RE
CO
RD
OF
THI
S
SH
EE
T I
S
TH
E
EL
EC
TR
ONI
C
FI
LE
DI
GI
TA
LL
Y
SI
GN
ED
AN
D
SE
AL
ED
UN
DE
R
RU
LE 61
G15-23.004,
F.
A.
C.
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
DATE BY DESCRIPTION DATE BY DESCRIPTION
SR 699 PINELLAS 439565-1-52-01
LMarzilli 1/11/2021 4:24:39 PM T:\Tampa\Projects\581660.09\600_CADD\43956515201\struct\B\B0SumOfQuantities04.dgn
DEPARTMENT OF TRANSPORTATION
STATE OF FLORIDA
LMM 4-20
AHA 4-20
BRIDGE NOS. 150253, 150254
SLM 4-20
FZ 4-20
TAMPA, FL 33637
SUITE 245
12802 TAMPA OAKS BLVD.,
T. Y. LIN INTERNATIONAL
P.E. NO. 85399
SANDRA L. McCORMACK, P.E.
BQ2-1
SUMMARY OF QUANTITIES (5 OF 6)
BRIDGE NOS. 150254
JOHNS PASS BRIDGE
MOVEABLE BRIDGE REPAIR PINELLAS COUNTY
SUMMARY OF STRUCTURE QUANTITIES - BRIDGE 150254
SECTIONNO.
PAY ITEMPAY ITEM DESCRIPTION LOCATION UNIT
QUANTITY TOTAL
NOTES
DESIGN
REMARKS
CONSTRUCTION
P F P F
400-143Class 5
Cleaning & Coating Concrete Surface,
Bascule Pier Walls SF 13,317 51,380
Approach Piers SF 5,791
End Bents SF 688
Prestressed Beams SF 9,533
Traffic Barriers SF 13,045
Concrete Parapet SF 6,231
Overhangs SF 2,775
401-70-3Mortar - Acrylic
Restore Spalled Areas, Latex Modified
No.
BridgeElement
(ft)
Length
(ft)
Width
(ft)
Depth3.2
150254
Bottom Flange
Beam 1-5 over Bent 2, East Face,1.67 0.75 0.33 CF 0.410
bottom flange
Beam 4-4 over Bent 5, north face,2 1.17 0.33 CF 0.780
bottom flange
Beam 4-5 over Bent 5, north face,2 1.17 0.33 CF 0.780
above the grout keyway
footing, 17ft. S of the NE edge
Bascule Pier 3 E face at top of
2 0.92 0.33 CF 0.610
keyway
Bascule Pier 4 NE Corner at the2 0.83 0.33 CF 0.550
corner
corner block top southwest
MSE Wall at Abutment 1, east
0.33 0.42 0.33 CF 0.050
top north corner
2nd row from the bottom panel
MSE Wall at Abutment 1, east face
0.58 0.33 0.33 CF 0.060
413-151 Methacrylate Monomer All Bulb T-78 Beam 20 ft from Ends GA 139 139MX-30
Utilize only Sealate T-70
413-154Penetrant Sealer or Methacrylates
Cleaning & Sealing Concrete Surfaces -All Bulb T-78 Beam 20 ft from Ends SF 13,852 13,852
561-1 Coating Existing Structural Steel Bascule Span, Steel handrails and guardrails LS 1 1
4564.5 SF
Handrails Approx.
drawings
683.3 TN per exist.
Bascule Span Approx.
EXISTING STRUCTURAL STEEL
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
DATE BY DESCRIPTION DATE BY DESCRIPTION
SR 699 PINELLAS
jnewberry 1/11/2021 10:41:24 AM G:\Projects\3879 Johns Pass Rehabilitation\CADD\43956515201\struct\B1SumofQuantities02_HH.DGN
DEPARTMENT OF TRANSPORTATION
STATE OF FLORIDA
TH
E
OF
FICIA
L
RE
CO
RD
OF T
HIS S
HE
ET IS T
HE E
LE
CT
RO
NIC FILE
DIGIT
ALL
Y SIG
NE
D
AN
D S
EA
LE
D
UN
DE
R
RU
LE 61G
15-2
3.0
04,
F.A.C.
439565-1-52-01
SUMMARY OF QUANTITIES (6 OF 6) QPO 04-20
04-20QPO
BQ2-2
JPN 12-20
FOR PAY ITEM NOTES, SEE SHEET NO. BQ-1.
NOTE:
JPN 12-20
BRIDGE NO. 150254
JOHNS PASS BRIDGE
MOVEABLE BRIDGE REPAIR PINELLAS COUNTY
HARDESTY & HANOVER, LLC
5110 EISENHOWER BLVD, SUITE 310
TAMPA, FLORIDA 33634
JAMES P. NEWBERRY, P.E.
P.E. LICENSE NUMBER 73365
SUMMARY OF STRUCTURE QUANTITIES - BRIDGE NO. 150254
SECTIONNO.
PAY ITEMPAY ITEM DESCRIPTION LOCATION UNIT
QUANTITY TOTAL
NOTES
DESIGN
REMARKS
CONSTRUCTION
P F P F
MECHANICAL
MOVEABLE BRIDGE/
0465-2-105REHABILITATION, FURNISH & INSTALL, SPAN LOCKS
MOVABLE BRIDGE MACHINERY & CASTING -BASCULE SPAN 3 AS 2 2
INCLUDING TEMPORARY SPAN LOCKS.
LOCK GUIDES AND RECEIVERS,
FURNISH AND INSTALL NEW SPAN
0465-2-401
TRAIN
REHABILITAION, RECONDITION SPEED REDUCER & GEAR
MOVEABLE BRIDGE MACHINERY & CASTING -
BASCULE SPAN 3 LS 1 1
LEAF. REFILL WITH NEW OIL.
SPEED REDUCER ON NEAR ADJACENT
REPLACE SEALS AND FLUSH EXISTING
0465-2-508REHABILITAITON, ADJUST/MODIFY, LIVE LOAD SHOES
MOVEABLE BRIDGE MACHINERY & CASTING -BASCULE SPAN 3 LS 1 1 ADJUST FOR DECK ALIGNMENT.
0465-2-605REHABILITAITON, REMOVE AND DISPOSE, SPAN LOCKS
MOVEABLE BRIDGE MACHINERY & CASTING -BASCULE SPAN 3 AS 2 2
AND RECEIVERS.
REMOVE EXISTING SPAN LOCK GUIDES
0465-3-50 MOVEABLE BRIDGE - COUNTERWEIGHT, ADJUST BASCULE SPAN 3 EA 2 2
0465-20ROUTINE REPAIR
MOVEABLE BRIDGE - PREVENTATIVE MAINTENANCE &BASCULE SPAN 3 LS/DA 1/300 1/300
(300 DAYS).
CONTRACTOR ROUTINE MAINTENANCE
0465-71-3COMPLETE
MOVEABLE BRIDGE FUNCTIONAL CHECKOUT, PHASE C,BASCULE SPAN 3 LS 1 1
ELECTRICAL
MOVEABLE BRIDGE/
0508-4REHABILITATION
MOVEABLE BRIDGE ELECTRICAL EQUIPMENT -BASCULE SPAN 3 LS 1 1
ELECTRICAL SYSTEM.
INCLUDES REHAB OF BASCULE SPAN 3
0508-78-1TRANSDUCERS F&I
MOVEABLE BRIDGE - REHAB, LIMIT SWITCHES &BASCULE SPAN 3 LS 1 1
SWITCHES & TRANSDUCERS.
FURNISH & INSTALL NEW LIMIT
0508-78-4TRANSDUCERS REMOVE
MOVEABLE BRIDGE - REHAB, LIMIT SWITCHES &BASCULE SPAN 3 LS 1 1
LIMIT SWITCHES & TRANSDUCERS.
REMOVE AND DISPOSE EXISTING
LIGHTING
MOVABLE BRIDGE/
0630-2-11 CONDUIT, F&I OPEN TRENCH LF 200 200/ARCHITECTURAL LIGHTS
NEW CONDUITS FOR ACCENT
0630-2-12 CONDUIT, F&I, DIRECTIONAL BORE LF 200 200/ARCHITECTURAL LIGHTS
NEW CONDUITS FOR ACCENT
0715-1-12 LIGHTING CONDUCTORS, (F&I) (INSULATED NO. 8-6) LF 5,400 5,400/ARCHITECTURAL LIGHTS
NEW CONDUCTORS FOR ACCENT
0715-7-21 LOAD CENTER, REWORK, SECONDARY VOLTAGE EA 1 1ACCENT/ARCHITECTURAL LIGHTS
REWORK EXIST. LOAD CENTERS FOR
0715-11-225ROADWAY, WALL MOUNT
LUMINAIRE, F&I, REPLACE EXISTING LUMINAIRE,
INT. PIERS 2 & 5
BASCULE PIERS 3 & 4,EA 12 12
(PIER-MOUNTED)
NEW ACCENT/ARCHITECTURAL LIGHTS
TH
E
OF
FI
CI
AL
RE
CO
RD
OF
THI
S
SH
EE
T I
S
TH
E
EL
EC
TR
ONI
C
FI
LE
DI
GI
TA
LL
Y
SI
GN
ED
AN
D
SE
AL
ED
UN
DE
R
RU
LE 61
G15-23.004,
F.
A.
C.
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
DATE BY DESCRIPTION DATE BY DESCRIPTION
SR 699 PINELLAS 439565-1-52-01
LMarzilli 1/11/2021 4:24:49 PM T:\Tampa\Projects\581660.09\600_CADD\43956515201\struct\B\B0GeneralNotes01.dgn
DEPARTMENT OF TRANSPORTATION
STATE OF FLORIDA
LMM 4-20
AHA 4-20
BRIDGE NOS. 150253, 150254
SLM 4-20
FZ 4-20
TAMPA, FL 33637
SUITE 245
12802 TAMPA OAKS BLVD.,
T. Y. LIN INTERNATIONAL
P.E. NO. 85399
SANDRA L. McCORMACK, P.E.
GENERAL NOTES
C. SPECIFICATIONS:
A. PROJECT LOCATION:
D. ENVIRONMENTAL CLASSIFICATION:
E. MATERIALS:
F. CONCRETE COVER:
J. MISCELLANEOUS NOTES:
I. DIMENSIONS:
B-6
GENERAL NOTES (1 OF 3)
B. SCOPE OF WORK FOR BRIDGE NOS. 150253 AND 150254:
H. REGULATIONS:
Extremely aggressive
G. POLLUTION PREVENTION:
the vicinity.
9. Coordinate work with all other Contractors working on FDOT, Pinellas County or other projects in
includes boats with operators per Standard Specifications 5-9.1.
8. Always provide safe access to all work areas for FDOT representatives and CEI inspectors. This
7. Parking of equipment on the bascule bridge sections is prohibited.
to the Department.
Contractor's operation, the Contractor shall be held liable for the repair of such damage at no cost
6. In the event that any damage occurs to private or State property, including vehicles, as a result of
5. Clean and remove all debris from the project site on a daily basis.
activities without prior approval of the Engineer.
4. Do not tie or place upon any part of the existing bridge, equipment or material during construction
repair operations. Temporary lighting shall be included as needed.
operation, navigation lights, navigation horns, or signs except as specified in the Contract Plans for
3. Work methods shall not obstruct or interfere with the operation of the bascule leaf openings, general
and replace them in a manner suitable to the Engineer immediately after repair operations.
2. Prior to repair operations, remove and maintain on site, any signs that may be affected by construction
landside of the bridge.
1. Secure equipment properly and away from the bridge during severe weather or when unattended on the
materials. Bring any discrepancy to the Engineer's attention in writing immediately after discovery.
all existing field conditions shown on the drawings prior to start of construction and ordering of
1. Dimensions shown in the Plans were taken from existing drawings and spot checked in the field. Verify
Credential (TWIC). Those not having a TWIC card will be asked to leave the bridge.
8. All Contractor personnel are required to have and carry a current Transportation Worker Identification
in advance.
vertical clearance in the channel require approval from U.S.C.G. and the Engineer a minimum of 60 days
7. There shall be no changes to vertical clearance without prior approval from the U.S.C.G. Any changes to
prior approval from Engineer.
6. All bridge openings shall be for water vessels and no construction related opening is allowed without
to be closed to marine traffic, request approval from the Engineer and the U.S.C.G. 60 days in advance.
not permitted unless approval is given by U.S.C.G. and Engineer. In the event that the channel needs
equipment in channel. Allow single leaf operation of both bridges at all times. Closing the channel is
5. Request a notice to mariners from the U.S.C.G. to be published 60 days prior to placement of floating
remain operational during construction.
4. Navigation lights, lightning protection, signs, under deck lights and all utilities must be protected and
3. Immediately remove debris that falls in the water at the Contractor's own expense.
work area for deployment in the event of an accidental spill.
construction and as required for inspection. Maintain appropriate skimmers and absorbant materials at
times when personnel are present over water. This boat is in addition to the waterborne craft used for
& 7 Structures Maintenance Office (DSMO) at (813) 612-3355. An emergency boat shall be on site at all
2. All waterborne crafts shall display FDOT logo flag. FDOT logo flag is available from the FDOT District 1
at the U.S.C.G. Sector St. Petersburg, Ports and Waterways Branch at (813) 228-2191 Ext. 8105.
Specifications 7-8 Structures over Navigable Waters and 561-4 Quality Control. Contact Lt. Clark Sanford
1. Prior to beginning work, notify the United States Coast Guard (U.S.C.G.), in accordance with Standard
contact the Engineer immediately.
(including suspected asbestos) release may occur, or if contaminated soil/groundwater is encountered,
1. Prevent non-stormwater discharge into surface waters. If a spill does occur or if a hazardous material
Concrete repair = 2"
Plans, the following concrete covers shall be used:
as "minimum cover". See FDOT Specifications for allowable tolerance. Unless otherwise shown in the
1. Concrete cover shown in the Plans does not include placement or fabrication tolerance unless shown
" diameter unless noted otherwise.85 ASTM F1554 Grade 36 with
otherwise noted. Washers shall be per ASTM F436 and nuts per ASTM A563. Anchor bolts shall be
" diameter, unless214. All bolts shall conform to ASTM A325 Type 1, galvanized with typical size of
3. No field welding is permitted, except as shown in these Plans. Welding electrodes shall be E70xx.
ASTM A123, unless noted otherwise.
a. All structural steel shall be in accordance with ASTM A709, Grade 50 and hot dip galvanized per
2. Structural Steel:
1. Reinforcing steel shall be uncoated (black) ASTM A615 Grade 60.
Superstructure: Extremely aggressive
Substructure:
3. FDOT Structures Manual (January 2020).
2. AASHTO LRFD Movable Highway Bridge Design Specifications (2007, 2nd edition and approved Interims).
Specifications (8th edition 2017) with all applicable interims.
1. American Association of State Highway and Transportation Officials (AASHTO) LRFD Bridge Design
17. For more detailed moveable span Scope of Work, see Sheet B1-11 (Dwg. No BL-1).
16. Replace fire alarm panel.
15. Replace CCTV system.
14. Replace architectural lighting.
13. Replace navigational clearance lights.
fully close limit switches.
12. Replace main circuit breaker, submarine cable seals, sump pump switch and receptacle and
11. Furnish and install new control console.
10. Replace PLC system and install relay backup system.
9. Install new potable waterline to far adjacent bascule pier.
8. Adjust live load shoes and repair primary reducers.
7. Remove and recondition span locks.
6. Install new sign assemblies.
5. Perform control house window, door and roof repairs.
4. Repair spalls in concrete.
3. Seal beam ends.
bent wing walls and cheek walls, exterior faces of bascule pier and control tower.
the barrier and parapet, outside face of the slab, outside face of exterior beams, outside face of end
2. Clean and apply protective coating to side and bottom faces of pier caps, approach piers, all faces of
1. Clean and apply protective coating to bascule span structural steel, steel railings and steel handrails
over Johns Pass.
This project consists of repair and rehabilitation work on Bridge Nos. 150253 and 150254 - SR 699
JOHNS PASS BRIDGE
MOVEABLE BRIDGE REPAIR PINELLAS COUNTY
TH
E
OF
FI
CI
AL
RE
CO
RD
OF
THI
S
SH
EE
T I
S
TH
E
EL
EC
TR
ONI
C
FI
LE
DI
GI
TA
LL
Y
SI
GN
ED
AN
D
SE
AL
ED
UN
DE
R
RU
LE 61
G15-23.004,
F.
A.
C.
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
DATE BY DESCRIPTION DATE BY DESCRIPTION
SR 699 PINELLAS 439565-1-52-01
LMarzilli 1/11/2021 4:24:58 PM T:\Tampa\Projects\581660.09\600_CADD\43956515201\struct\B\B0GeneralNotes02.dgn
DEPARTMENT OF TRANSPORTATION
STATE OF FLORIDA
LMM 4-20
AHA 4-20
BRIDGE NOS. 150253, 150254
SLM 4-20
FZ 4-20
TAMPA, FL 33637
SUITE 245
12802 TAMPA OAKS BLVD.,
T. Y. LIN INTERNATIONAL
P.E. NO. 85399
SANDRA L. McCORMACK, P.E.
GENERAL NOTES
B-7
GENERAL NOTES (2 OF 3)
M. STEEL PAINTING:
L. UTILITY LOCATIONS:
K. STAGING AND STORAGE AREAS:
ix.
viii.
vii.
vi.
v.
iv.
iii.
ii.
i.
iv.
iii.
ii.
i.
vii.
vi.
v.
iv.
iii.
ii.
i.
vi.
v.
iv.
iii.
ii.
i.
surface profile of 1.5 mils.
Spot clean to SSPC SP11 Power Tool Cleaning to Bare Metal rusted areas with a minimum
Pressure wash all steel to remove debris and foreign materials.
tool cleaned, primed and top coated.
b. The work on the machinery area includes having the existing coating in rusted areas spot power
steel exhibiting pitting.
Apply an additional stripe coat of the epoxy intermediate coat to any areas of structural
existing acrylic system that remains.
Use a 100% solids epoxy penetrating sealer as a tie coat between the new system and the
before applications of next coat.
compatibility statement from the manufacturer including when to apply and how long to cure
Apply caulking to the required areas per the manufacturer's instructions. Provide
Apply clear coating to outside fascia beams only.
stripe coat and polyurethane clear coat. Provide contrasting colors for all coats.
epoxy intermediate coat, epoxy stripe coat, pigmented polyurethane coat, polyurethane
Provide a new four-coat system to include an inorganic zinc rich primer, prime stripe coat,
Cleaning, by abrasive blast cleaning.
Provide surfaces complying with requirements of SSPC SP 10, Near White Metal Blast
Mechanical Removal of Surface Defects.
Remove pack rust prior to pressure washing per the requirements of Section 561-6.2
surface preparation and overspray from coating applications.
Utilities are not to be cleaned and painted and shall be protected from damage during
access or inaccessible, which would prevent cleaning and painting per the contract document.
Submit a written procedure for cleaning and coating surfaces that are considered hard to
existing color.
a. Remove and replace the existing coating system on the structural steel of bascule span. Match
Specifications Sections 560, 561 and as indicated below:
1. Clean and paint all structural steel, handrail, steel curbs and machinery in accordance with FDOT Standard
the work.
4. The Contractor is responsible for ensuring that no damage occurs to the existing utilities as a result of
during construction.
3. Utilities shall remain unless otherwise noted. The exact location shall be determined by the Contractor
2. The locations of the utilities shown in the Plans should be considered approximate only.
1. Above ground or underground utilities may be in the area of this project.
to the Department.
then returned to original condition at the end of the project at the Contractor's expense and at no cost
for approval. Any FDOT right-of-way used by the Contractor must be maintained by the Contractor and
1. Any proposed staging or storage area changes in FDOT right-of-way shall be submitted to the Engineer
allowance as calculated per SSPC TU 7.
lead of 0.15 micrograms/cubic meter over a 90-day period NAAQS for lead or the daily adjusted
b. Control emissions from the containment area to prevent exceeding the Total Suspended Particulate
a. Water mist from pressure washing is not considered visible emissions.
3. Ambient Air Quality and Protection of Air:
level of 3A per ASTM D3359 Tape Test Adhesion after seven days of application.
repairs and overcoating. Include procedures to apply test areas to verify adhesion to a
Procedures of testing coating for generic resin identification in areas designated for spot
Repair procedures for deficient or defective surface preparation and coating applications.
attachment points.
Procedures for preparation and coating of hard to access areas including containment
QC inspection standards and instruments.
Receipt, distribution, and revisions of project documents.
Company's organization chart defining individual responsibilities.
Site-Specific QC Plan:
inspection used for verification of contract requirements. In addition, include the following in the
Contract Documents. Accompany all the FDOT Standard Specification Section numbers with all
d. Provide a Site-Specific QC Plan that includes written methods to verify the requirements in the
all personnel.
painting is certified by SSPC as a QP1 and QP2 Contractor. Provide certifications and records of
c. Provide records and certifications showing the contractor performing the surface preparation and
clean, chalk and soil free surface.
approval. Match the appearance of the pigmented coat with the existing color of the bridge on a
b. Submit three (3) color coupons for each of the polyurethane pigmented coat to the Engineer for
compatible with the coatings to be used. Use only one coating manufacturer for the entire project.
utilized on the project. Submit a letter from the coating Manufacturer stating the caulk is
a. Manufacturers Product Data Sheets (PDS) and Safety Data Sheets (SDS) for all materials to be
addition to submittal requirements of Section 561 provide the following submittals:
The written approval of the submittals by the Engineer is necessary prior to construction operations. In
2. Submittals:
Base the coating system on the coating manufacturer's recommendation.
Apply one coat of Acrylic to match the existing coating.
Apply full coat of universal primer.
Apply one spot coat of an epoxy mastic primer of at least 80% volume of solids.
Cleaning.
Spot power tool clean all red rust areas to SSPC SP15 Commercial Grade Power Tool
the approval of the Engineer.
Protect or remove the Stainless Steel cables for cleaning and painting the handrails with
Protect all surfaces not on the plans for cleaning and painting.
c. The work in the handrails and steel barriers includes cleaning and coating:
Apply two spot coats of an acrylic coating to match the existing color.
Apply spot primer of Inorganic Zinc Rich coating to cleaned areas.
JOHNS PASS BRIDGE
MOVEABLE BRIDGE REPAIR PINELLAS COUNTY
TH
E
OF
FI
CI
AL
RE
CO
RD
OF
THI
S
SH
EE
T I
S
TH
E
EL
EC
TR
ONI
C
FI
LE
DI
GI
TA
LL
Y
SI
GN
ED
AN
D
SE
AL
ED
UN
DE
R
RU
LE 61
G15-23.004,
F.
A.
C.N
Southbound
Northbound
¡ PIER NO. = SPAN NO. ¡ PIER NO. = SPAN NO. + 1
Mid Span Beams (Typ.)
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
ROAD NO. COUNTY FINANCIAL PROJECT ID
REVISIONS
DATE BY DESCRIPTION DATE BY DESCRIPTION
SR 699 PINELLAS 439565-1-52-01
LMarzilli 1/11/2021 4:25:06 PM T:\Tampa\Projects\581660.09\600_CADD\43956515201\struct\B\B0GeneralNotes03.dgn
DEPARTMENT OF TRANSPORTATION
STATE OF FLORIDA
LMM 4-20
AHA 4-20
BRIDGE NOS. 150253, 150254
SLM 4-20
FZ 4-20
TAMPA, FL 33637
SUITE 245
12802 TAMPA OAKS BLVD.,
T. Y. LIN INTERNATIONAL
P.E. NO. 85399
SANDRA L. McCORMACK, P.E.
GENERAL NOTES
SAMPLE ID LOCATIONPPM
LEAD
KTA-1
PPM
CHROMIUM
PPM
CADMIUM
KTA-3
KTA-4
BN150254 NB Girder 2
BN150253 SB Girder 2
Steel Barrier Wall
44.9
103
11.8
7.61
<47.7
<5.52
<2.92
<19.1
<2.21
SPAN BEAM
8-2
N. IDENTIFICATION OF MEMBERS:
B-8
GENERAL NOTES (3 OF 3)
M. STEEL PAINTING CONT'D.:
5
4
3
2
1
GIR
DE
R
NU
MB
ER
S
SPAN NO.
5
4
3
2
1
150253
Brid
ge
No.
Nomenclature Key:
150254
Brid
ge
No.
North End
North End
North End
North End
North End
North End
North End
North End
North End
North End
South End
South End
South End
South End
South End
South End
South End
South End
South End
South End
Example:
are identified by the span number followed by the beam number.
and piles are numbered consecutively from left to right when facing the northbound direction. Beams
1. Bents and piers are numbered consecutively in the direction of stationing, from south to north. Beams
following table:
8. Measurable levels of toxic heavy metals were found to be present in coating samples as provided in the
removal debris in accordance with all government regulations and guides.
for proper collection, handling, classification, packaging, storage, transportation, and disposal of all paint
7. Hazardous materials have been identified in the existing paint systems. The Contractor is responsible
Engineer.
6. All coating materials shall be from one source and come from the current FDOT APL or approved by the
5. See existing bridge plans for dimensions.
standards associated with Occupation Safety and Health Administration (OSHA).
g. In addition to the requirements of Section 561-10 of the Standard Specifications, implement all
f. Submit shop drawings of the containment systems for approval prior to start of work.
e. Drilling holes in the superstructure is prohibited.
a storage area acceptable to the Engineer.
d. Collect solid and liquid waste on a daily basis and place in FDOT approved containers and move to
Guide 6 Class 3P Containment.
c. During power tool cleaning provide a containment system that meets the requirements of SSPC
Class 2A containment.
b. During abrasive blasting provide a containment system that meets the requirements of SSPC Guide 6
requirements of SSPC Guide 6 Class 2W containment.
a. During pressure washing and wet surface preparation provide a containment system that meets the
4. Containment System:
the Engineer's approval. This does not eliminate the need for containments.
performed. If the data shows compliance with note 3.b above, monitoring may be discontinued with
c. Conduct Ambient Air Monitoring for a minimum of 3 full shifts while abrasive blast cleaning is
JOHNS PASS BRIDGE
MOVEABLE BRIDGE REPAIR PINELLAS COUNTY
A. MAINTENANCE OF TRAFFIC:
AHEAD
CONST.
BRIDGE
"DATE"
BEGINS
AHEAD
CLOSED
LANE
B-9
LEFT
MERGE
RIGHT
MERGEOR
PLAN GENERAL NOTES
TEMPORARY TRAFFIC CONTROL
Reduced Speed (North-bound & South-bound Gulf Blvd.) - 25 mph (Phase V & VI)
Posted Speed (North-bound & South-bound Gulf Blvd.) - 35 mph (Phase I to IV)
Posted speed to be maintained during construction:
expedite emergency vehicles through the work zone.
Construction Index 102-600 series. Modify the Traffic Control Plan as needed to assist and
Maintain traffic in accordance with the FY2020-21 FDOT Standard Plans for Road and Bridge
B. TRAFFIC CONTROL GENERAL NOTES FOR LANE CLOSURE ON SR 699
(PHASES I TO IV)
C. TRAFFIC CONTROL GENERAL NOTES FOR LANE CLOSURE ON SR 699
AHEAD
CLOSED
LANE
AHEAD
REDUCED
SPEED
(PHASES V & VI)
(ALL PHASES)
D. TRAFFIC CONTROL GENERAL NOTES FOR LANE CLOSURE ON SR 699
From 9:00 AM to 6:00 PM weekdays and weekends for GULF BLVD. (SR 699) NB & SB.
hours are:
2. Lane closure shall occur only during non-peak hours or non event days weekends. Non-peak
(DURING CONSTRUCTION) (14 DAYS PRIOR TO CONSTRUCTION)
PCMS SIGNAGE PCMS SIGNAGE
messages shall read as following:
1. PCMS shall be placed 14 days prior to closing lanes and during construction. Typical PCMS
at the bridge signals at a safe distance when the bridges open.
3. Traffic control officer will be required to stop opposing traffic (NB in Phase V and SB in Phase VI)
From 9:00 AM to 6:00 PM weekdays and weekends for GULF BLVD. (SR 699) NB & SB.
hours are:
2. Lane closure shall occur only during non-peak hours or non event days weekends. Non-peak
(DURING CONSTRUCTION)
PCMS SIGNAGE
1. Typical PCMS messages shall read as following:
FIGURE 1
COPY
SPACE
COPY
SPACE
COPY
SPACE
C A U T I O N
B R I D G E
X
Y
SIGN NAME QTYSIGN
NUMBERSTATION(S)
PANEL BORDER
WIDTH
HEIGHT
LEGEND
COLOR
SYMBOL(S) ANGLE
WIDTH
RADII
COLOR
WID HT
SIGN
NUMBER
NUMBER
OF POSTS
CLEARANCE
Edge Of Lane
COLUMN SIZE AVERAGE
LENGTH
NO. OF LIGHT FIXTURES FIXTURE SPACING PHOTOMETRIC CURVE WATT VOLTAGE
Boat 1 4
C O N S T R U C T I O N L
Black Black
Orange
9'-6" 0.63"
none
1'-6" 1.5"
4 3.9 4.5 4 3.7 1.8 4.5 3.4 6
4.2 4.2 1.9 4.2 4.3 3.1 6
4.2 4.5 4.2 3.8 3.7 4.2 4.3 3.9 3.7 1.8 4.5 3.4 4 106
4" 106" 4"
9'-6"
6"
6"C
6"
1'-
6"
Panel Style: construction_guide.ssi
BORDER
R=1.5"
TH=0.63"
IN=0.47"
Standard Plan Index 102-600.
3. All driveways to be maintained operational during work hour according to FDOT
etc. shall be stored within the right of way while the work zone is inactive.
safe vehicular traffic. No drop-off conditions are allowed to remain. No materials, equipment,
2. At the end of each day, the right of way (including all travel lanes) shall be restored for
1. Work zone signs will be covered in day time normal traffic operational hours.
- No work is allowed during spring break (March 1st thru the Monday after Easter).
- No nightly work is allowed.
anticipated crowd of 20K or higher.
Harbor, New Port Richey, Port Richey, Inverness, Crystal River, Homosassa Springs - with an
Clearwater, Plant City, Dade City, Zephyrhills, Brooksville, Tarpon Springs, Dunedin, Palm
Madeira Beach, Redington Beach, Redington Shores, Indian Rocks Beach, Indian Shores,
- Downtown Tampa, Bayshore Blvd, Ybor City, St. Petersburg, St. Pete Beach, Treasure Island,
- Tropicana Field with an anticipated crowd of 15K or higher.
- Forum/Ice Palace (Amelia Arena) with an anticipated crowd of 15K or higher.
anticipated crowd of 35K or higher.
- Florida State Fairgrounds, Amphitheater and Tampa Stadium (Raymond James Stadium) with an
special events; special events days for this project include:
9. Per FDOT Specification 8-6-4; Suspension of Contractor's Operations - Holidays and
8. Contractor to coordinate with bascule bridge operator prior to any lane closure.
the moveable span must be removed or secured.
7. During bridge operations all traffic control devices and/or construction materials/equipment on
under 102-1 LS.
signs to the bridge in a non-destructive way. This sign installatation and removal will be paid
visible to approaching boat traffic. The contractor shall develop the method of connecting the
6. One Boat TTCP sign (see Figure 1 below) shall be mounted on sides of the bridges where
5. Contractor to coordinate with PSTA transit authority prior to any lane closure.
unless approved by engineer.
4. Contractor will be penalized for any lane closure beyond the allowable time specified
TH
E
OF
FI
CI
AL
RE
CO
RD
OF
THI
S
SH
EE
T I
S
TH
E
EL
EC
TR
ONI
C
FI
LE
DI
GI
TA
LL
Y
SI
GN
ED
AN
D
SE
AL
ED
UN
DE
R
RU
LE 61
G15-23.004,
F.
A.
C.
1/11/2021LMarzilli T:\Tampa\Projects\581660.09\600_CADD\43956515201\roadway\TCGNRD01.dgn4:25:17 PM
439565-1-52-01 PINELLAS
ROAD NO. FINANCIAL PROJECT IDCOUNTY
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEETSTATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
SR 699
BRIDGE NOS. 150253, 150254
ORLANDO, FL 32817
SUITE 490
225 E. ROBINSON ST.,
T. Y. LIN INTERNATIONAL
P.E. NO. 87097
SHAHRIAR MAHMOOD, P.E.
TH
E
OF
FI
CI
AL
RE
CO
RD
OF
THI
S
SH
EE
T I
S
TH
E
EL
EC
TR
ONI
C
FI
LE
DI
GI
TA
LL
Y
SI
GN
ED
AN
D
SE
AL
ED
UN
DE
R
RU
LE 61
G15-23.004,
F.
A.
C.
$DATE$$USER$ $FILE$$TIME$
439565-1-52-01 PINELLAS
ROAD NO. FINANCIAL PROJECT IDCOUNTY
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEETSTATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
SR 699
BRIDGE NOS. 150253, 150254
ORLANDO, FL 32817
SUITE 490
225 E. ROBINSON ST.,
T. Y. LIN INTERNATIONAL
P.E. NO. 87097
SHAHRIAR MAHMOOD, P.E.
B-10
PHASE I NOTES:
DENOTES DIRECTION OF TRAFFIC
PHASE II NOTES:
PHASE I
PHASE II
PHASE III
PHASE IV
PHASE III NOTES:
NB OUTSIDE LANE CLOSURE
BRIDGE NO. 150254BRIDGE NO. 150253
BRIDGE NO. 150254BRIDGE NO. 150253
BRIDGE NO. 150254BRIDGE NO. 150253
BRIDGE NO. 150254BRIDGE NO. 150253
SB OUTSIDE LANE CLOSURE
PHASE IV NOTES:
NB INSIDE LANE CLOSURE
SB INSIDE LANE CLOSURE
SIDEWALK BIKE LANE
PLAN SECTIONS (1 OF 2)
TEMPORARY TRAFFIC CONTROL
(40 DAYS)
(60 DAYS)
BARRIER COATING.
2. PERFORM BRIDGE CONCRETE & STEEL
STANDARD PLANS INDEX 102-613.
SECTION PHASE IV & ACCORDING TO FOOT
THE TEMPORARY TRAFFIC CONTROL PLAN
TRAFFIC INTO SB OUTSIDE LANE AS PER
1. CLOSE SB INSIDE LANE BY SHIFTING
TRAFFIC PATTERN IS MODIFIED.
4. ALL CONFLICTING SIGNAGE SHALL BE COVERED OR MODIFIED WHILE THE
LANE TRANSITION AREAS.
3. ALL EXISTING PAVEMENT MARKINGS TO REMAIN IN THE WORK ZONES AND
IN THE FIELD.
2. LANE WIDTHS/SYMBOLS ARE FOR INFORMATION ONLY, WIDTHS TO BE VERIFIED
& MECHANICAL PLANS.
1. FOR THE DETAILS OF BRIDGE WORKS; FOLLOW STRUCTURAL, ELECTRICAL,
GENERAL NOTES (FOR ALL PHASES)
(10 DAYS)
(10 DAYS)
CHANNELIZING DEVICE (Type I, II, DI, VP, drum, or LCD)
HANDRAIL COATING & SPALL REPAIRS.
3. PERFORM BRIDGE PARAPET,BARRIER &
PLANS INDEX 102-660.
DETOUR PLAN (SHEET B-13) & STANDARD
2. DETOUR PEDESTRIAN AS PER THE PEDESTRIAN
DEVICE TO CLOSE THE SHOULDER/BIKE LANE.
PLANS INDEX 102-613. EXTEND CHANNELIZING
PHASE I & ACCORDING TO FOOT STANDARD
TEMPORARY TRAFFIC CONTROL PLAN SECTION
TRAFFIC INTO NB INSIDE LANE AS PER THE
1. CLOSE NB OUTSIDE LANE BY SHIFTING
COATING.
2. PERFORM CONCRETE & STEEL BARRIER
FOOT STANDARD PLANS INDEX 102-613.
SECTION PHASE II & ACCORDING TO
THE TEMPORARY TRAFFIC CONTROL PLAN
TRAFFIC INTO NB OUTSIDE LANE AS PER
1. CLOSE NB INSIDE LANE BY SHIFTING
REPLACEMENT, & OTHER ARCHITECTURAL WORKS.
ROOF REPAIR, GUTTER, WINDOW, & DOOR
CONTROL HOUSE CONCRETE WALLS COATING,
HANDRAIL COATING & SPALL REPAIRS,
3. PERFORM BRIDGE PARAPET, BARRIER,&
PLANS INDEX 102-660.
DETOUR PLAN (SHEET B-16) & STANDARD
2. DETOUR PEDESTRIAN AS PER THE PEDESTRIAN
SHOULDER/BIKE LANE.
CHANNELIZING DEVICE TO CLOSE THE
STANDARD PLANS INDEX 102-613. EXTEND
SECTION PHASE III & ACCORDING TO FOOT
THE TEMPORARY TRAFFIC CONTROL PLAN
TRAFFIC INTO NB INSIDE LANE AS PER
1. CLOSE SB OUTSIDE LANE BY SHIFTING
SYMBOLS
¡ Const. SR 699
SidewalkLaneLaneShldr.ShoulderSidewalk Lane Lane Shldr.
8'-0" 10'-0" 12'-0" 12'-0" 4'-0" 4'-0" 12'-0" 12'-0" 10'-0"
Shoulder
8'-0"
5'
¡ Const. SR 699
SidewalkLaneLaneShldr.ShoulderSidewalk Lane Lane Shldr.
8'-0" 10'-0" 12'-0" 12'-0" 4'-0" 4'-0" 12'-0" 12'-0" 10'-0"
Shoulder
8'-0"
¡ Const. SR 699
SidewalkLaneLaneShldr.ShoulderSidewalk Lane Lane Shldr.
8'-0" 10'-0" 12'-0" 12'-0" 4'-0" 4'-0" 12'-0" 12'-0" 10'-0"
Shoulder
8'-0"
WORK AREA
5'
¡ Const. SR 699
SidewalkLaneLaneShldr.ShoulderSidewalk Lane Lane Shldr.
8'-0" 10'-0" 12'-0" 12'-0" 4'-0" 4'-0" 12'-0" 12'-0" 10'-0"
Shoulder
8'-0"
WORK AREA
WORK AREA
WORK AREA
TH
E
OF
FI
CI
AL
RE
CO
RD
OF
THI
S
SH
EE
T I
S
TH
E
EL
EC
TR
ONI
C
FI
LE
DI
GI
TA
LL
Y
SI
GN
ED
AN
D
SE
AL
ED
UN
DE
R
RU
LE 61
G15-23.004,
F.
A.
C.
$DATE$$USER$ $FILE$$TIME$
439565-1-52-01 PINELLAS
ROAD NO. FINANCIAL PROJECT IDCOUNTY
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEETSTATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
SR 699
BRIDGE NOS. 150253, 150254
ORLANDO, FL 32817
SUITE 490
225 E. ROBINSON ST.,
T. Y. LIN INTERNATIONAL
P.E. NO. 87097
SHAHRIAR MAHMOOD, P.E.
PHASE V NOTES:
PHASE V
BRIDGE NO. 150254BRIDGE NO. 150253
DENOTES DIRECTION OF TRAFFIC
TEMPORARY LANE SEPARATOR
SIDEWALK
BIKE LANE
PHASE VI
BRIDGE NO. 150254BRIDGE NO. 150253
BRIDGE NO. 150254 CLOSURE
BRIDGE NO. 150253 CLOSURE
B-11
PHASE VI NOTES:
PLAN SECTIONS (2 OF 2)
TEMPORARY TRAFFIC CONTROL
(60 DAYS)
(60 DAYS)
TRAFFIC PATTERN IS MODIFIED.
4. ALL CONFLICTING SIGNAGE SHALL BE COVERED OR MODIFIED WHILE THE
LANE TRANSITION AREAS.
3. ALL EXISTING PAVEMENT MARKINGS TO REMAIN IN THE WORK ZONES AND
IN THE FIELD.
2. LANE WIDTHS/SYMBOLS ARE FOR INFORMATION ONLY, WIDTHS TO BE VERIFIED
& MECHANICAL PLANS.
1. FOR THE DETAILS OF BRIDGE WORKS; FOLLOW STRUCTURAL, ELECTRICAL,
GENERAL NOTES (FOR ALL PHASES)
CHANNELIZING DEVICE (Type I, II, DI, VP, drum, or LCD)
MACHINERY, AND ADJUST CUSHIONLOK GUIDES.
SYSTEMS, 2 CUSHIONLOK SYSTEMS, ACTUATOR
COATING, INSTALL TEMPORARY SPAN LOCK
6. PERFORM STRUCTURAL STEEL COATING, CONCRETE
LS.
AFTER WORK HOURS. THIS WILL BE PAID UNDER 102-1
AND REMOVE THE COVERS TO RESTORE NORMAL TRAFFIC
HEADS OVER THE OPPOSING LANES DURING WORK HOURS
5. CLOSE ENTIRE BRIDGE NO.150253. COVER SIGNAL
B-16 AND STANDARD PLANS INDEX 102-660.
EXISTING SIDEWALK AS SHOWN IN PLAN SHEET
4. DETOUR PEDESTRIANS TO BRIDGE NO. 150254
B-21.
INTO NB OUTSIDE LANE AS SHOWN IN SHEET
3. CLOSE NB INSIDE LANE BY SHIFTING TRAFFIC
SHOWN IN SHEET B-23.
2. SHIFT SB TRAFFIC INTO NB INSIDE LANE AS
INTO SB INSIDE LANE AS SHOWN IN SHEET B-23.
1. CLOSE SB OUTSIDE LANE BY SHIFTING TRAFFIC
MACHINERY, AND ADJUST CUSHIONLOK GUIDES.
SYSTEMS, 2 CUSHIONLOK SYSTEMS, ACTUATOR
COATING, INSTALL TEMPORARY SPAN LOCK
6. PERFORM STRUCTURAL STEEL COATING, CONCRETE
LS.
AFTER WORK HOURS. THIS WILL BE PAID UNDER 102-1
AND REMOVE THE COVERS TO RESTORE NORMAL TRAFFIC
HEADS OVER THE OPPOSING LANES DURING WORK HOURS
5. CLOSE ENTIRE BRIDGE NO.150254. COVER SIGNAL
SHEET B-13 AND STANDARD PLANS INDEX 102-660.
EXISTING SIDEWALK AS SHOWN IN PLAN SHEET
4. DETOUR PEDESTRIANS TO BRIDGE NO. 150253
B-20.
INTO SB OUTSIDE LANE AS SHOWN IN SHEET
3. CLOSE SB INSIDE LANE BY SHIFTING TRAFFIC
LANE AS SHOWN IN SHEETS B-18 & B-19.
2. SHIFT NB TRAFFIC INTO EXISTING SB INSIDE
INTO NB INSIDE LANE AS SHOWN IN SHEET B-18.
1. CLOSE NB OUTSIDE LANE BY SHIFTING TRAFFIC
SYMBOLS
¡ Const. SR 699
SidewalkLaneLaneShldr.ShoulderSidewalk Lane Lane Shldr.
8'-0" 10'-0" 11'-6" 11'-6" 4'-0" 4'-0" 12'-0" 12'-0" 10'-0"
Shoulder
8'-0"
WORK AREA
¡ Const. SR 699
SidewalkLaneLaneShldr.ShoulderSidewalk Lane Lane Shldr.
8'-0" 10'-0" 12'-0" 12'-0" 4'-0" 4'-0" 11'-6" 11'-6" 10'-0"
Shoulder
8'-0"
WORK AREA
TH
E
OF
FI
CI
AL
RE
CO
RD
OF
THI
S
SH
EE
T I
S
TH
E
EL
EC
TR
ONI
C
FI
LE
DI
GI
TA
LL
Y
SI
GN
ED
AN
D
SE
AL
ED
UN
DE
R
RU
LE 61
G15-23.004,
F.
A.
C.
1/11/2021LMarzilli T:\Tampa\Projects\581660.09\600_CADD\43956515201\roadway\TCPLRD08.dgn4:26:17 PM
439565-1-52-01 PINELLAS
ROAD NO. FINANCIAL PROJECT IDCOUNTY
DATE DESCRIPTION
REVISIONS
DATE DESCRIPTIONNO.
SHEETSTATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
SR 699
BRIDGE NOS. 150253, 150254
ORLANDO, FL 32817
SUITE 490
225 E. ROBINSON ST.,
T. Y. LIN INTERNATIONAL
P.E. NO. 87097
SHAHRIAR MAHMOOD, P.E.
Feet
100200
N
SYMBOLS:
WORK ZONE SIGN
WORK ZONE
ADVANCED WARNING ARROW BOARD
DENOTES DIRECTION OF TRAFFIC
PHASE I
TEMPORARY TRAFFIC CONTROL PLAN
AHEAD
WORK
ROAD
AHEAD
WORK
ROAD
127th
AV
E.
KINGFISH DR.
(SR 699)
GULF BLVD.
REFERENCE A
245'
TAPER
AHEADWORKROAD
AHEADWORKROAD
RO
AD
TH
ES
HA
RE
BRIDGE NO. 150254
BRIDGE NO. 150253
B-12
ELECTRICAL, & MECHANICAL PLAN SET.
4. PERFORM BRIDGE WORK ACCORDING TO STRUCTURAL,
INDEX 102-660 AS SHOWN IN SHEET B-13.
3. DETOUR PEDESTRIANS ACCORDING TO STANDARD PLAN
INDEX 102-613 ACCORDING TO THE PLAN.
2. SHIFT TRAFFIC INTO LEFT LANE AS PER, STANDARD
ON NB GULF BLVD.
1. PLACE A PCMS 300' BEFORE THE FIRST WORK ZONE SIGN
PHASE NOTES:
WORK ZONE
JOHNS PASS12
6th
AV
E.
250' BUFFER
245'
TAPER
AHEADWORKROAD
AHEADWORKROAD
AHEAD
WORK
ROAD
AHEAD
WORK
ROAD
SE
E IN
SE
RT
A
BE
LO
W
SE
E IN
SE
RT
B
BE
LO
W
INSERT B
WORK ZONE
or LCD)
CHANNELIZING DEVICE (Type I, II, DI, VP, drum,
REFERENCE AAHEAD
WORK
ROAD
Work Zone
100'
PRESENT
WHEN WORKERS
DOUBLED
SPEEDING FINES
ROAD WORK
END
200' 200'200' 245' TAPER 250' BUFFER 500'
ADVANCED SIGNING PLAN (SEE REFERENCE A ABOVE FOR PLACEMENT)
INSERT A
AHEAD
CLOSED
LANE
RIGHT