Miami-Dade County Contract No. 1233-5/19-4 Page 1 of 23 Rev 11/01/2019 ` Contractor Contact Information: Timothy Cleckner: 305-375-2056 Percent Increase This Period Period: 2019 Labor @ Material @ Period: 2018 Labor @ 3.27% Material @ 9.34% Net percent change this adjustment: 4.43% Description # of units Overtime (per unit) Labor Material Unit Cost Adjustment Effective 10/01/2018 Total Monthly Eight (8) Westmount Industries Belt Type Moving Walk, DC# 6021: 8620D1 Skyride to Terminal D; DC# 6022, 8620D2 Skyride to Terminal D; DC# 6023, 8620E1 Skyride to Terminal E; DC# 6024, 8620E2 Skyride to Terminal E; DC# 6025, 8620E4 Skyride to Terminal E; DC# 6026, 8620E3 Skyride to Terminal E; DC# 6027, 8620F2 Skyride to Terminal F; DC# 6028, 8620F1 Skyride to Terminal F A Labor and Materials 8 2,720.16 $ 683.41 $ 3,403.57 $ 27,228.59 $ B Overtime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 8 1,634.49 $ 1,634.49 $ 13,075.94 $ Building 100, One (1) Mowrey Hydraulic Passenger Elevator, State Serial # 69294, DC # 6790 A Labor and Materials 1 75.18 $ 19.91 $ 95.09 $ 95.09 $ B Overtime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84 $ 58.84 $ 58.84 $ Building 100, One (1) Mowrey Hydraulic Passenger Elevator, State Serial# 66670, DC# 2653 A Labor and Materials 1 75.18 $ 19.91 $ 95.09 $ 95.09 $ B Overtime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84 $ 58.84 $ 58.84 $ Contractor Name: Thyssenkrup Elevator Elevator and Escalator Maintenance & Repair Services CONTRACT NO. 1233-5/19-4 Contract Period: June 1, 2010 to November 30, 2019 Internal Services Department Internal Services Department FUMD Office of Elevator Safety Contact Information: Nicolas Ortiz: 305-375-3912 Joel Perez ([email protected]); Moraes, Lucas ([email protected]); Guerrero, Ruben <[email protected]> GROUP: 1 Item No. 1.1 Item No. 1.2 Item No. 1.3 DEPARTMENT NAME: AVIATION DEPARTMENT

Upload: others

Post on 18-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CONTRACT NO. 1233-5/19-4 Elevator and Escalator ...€¦ · maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Contractor Name: Thyssenkrup

Miami-Dade County Contract No. 1233-5/19-4Page 1 of 23

Rev 11/01/2019

`

Contractor Contact Information: Timothy Cleckner: 305-375-2056

Percent Increase This PeriodPeriod: 2019 Labor @ Material @

Period: 2018 Labor @ 3.27% Material @ 9.34%

Net percent change this adjustment: 4.43%

Description # of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

Eight (8) Westmount Industries Belt Type Moving Walk, DC# 6021: 8620D1 Skyride to Terminal D; DC# 6022, 8620D2 Skyride to Terminal D; DC# 6023, 8620E1 Skyride to Terminal E; DC# 6024, 8620E2 Skyride to Terminal E; DC# 6025, 8620E4 Skyride to Terminal E; DC# 6026, 8620E3 Skyride to Terminal E; DC# 6027, 8620F2 Skyride to Terminal F; DC# 6028, 8620F1 Skyride to Terminal F

A Labor and Materials 8 2,720.16$ 683.41$ 3,403.57$ 27,228.59$

BOvertime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 8 1,634.49$ 1,634.49$ 13,075.94$ Building 100, One (1) Mowrey Hydraulic Passenger Elevator, State Serial # 69294, DC # 6790

A Labor and Materials 1 75.18$ 19.91$ 95.09$ 95.09$

BOvertime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Building 100, One (1) Mowrey Hydraulic Passenger Elevator, State Serial# 66670, DC# 2653

A Labor and Materials 1 75.18$ 19.91$ 95.09$ 95.09$

BOvertime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$

Contractor Name: Thyssenkrup ElevatorElevator and Escalator Maintenance & Repair Services

CONTRACT NO. 1233-5/19-4

Contract Period: June 1, 2010 to November 30, 2019

Internal Services Department

Internal Services Department FUMD Office of Elevator Safety Contact Information:

Nicolas Ortiz: 305-375-3912Joel Perez ([email protected]); Moraes, Lucas ([email protected]); Guerrero, Ruben <[email protected]>

GROUP: 1

Item No. 1.1

Item No. 1.2

Item No. 1.3

DEPARTMENT NAME: AVIATION DEPARTMENT

Page 2: CONTRACT NO. 1233-5/19-4 Elevator and Escalator ...€¦ · maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Contractor Name: Thyssenkrup

Miami-Dade County Contract No. 1233-5/19-4Page 2 of 23

Description # of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

Building 700, Three (3) Mowrey Hydraulic Passenger Elevator, State Serial# 70384 - 70386, DC# 7971-7973

A Labor and Materials 3 75.18$ 19.91$ 95.09$ 285.28$

BOvertime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 3 176.52$ 176.52$ 529.57$

Building 702, Three (3) Mowrey Hydraulic Passenger Elevator, State Serial# 70381 - 70383, DC# 7968 - 7970

A Labor and Materials 3 75.18$ 19.91$ 95.09$ 285.28$

BOvertime preventive maintenance and repair: In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 3 176.52$ 176.52$ 529.57$

Building 706 (South), One (1) Mowrey Hydraulic Passenger Elevator, State Serial# 71103, DC# 8743

A Labor and Materials 1 75.18$ 19.91$ 95.09$ 95.09$

BOvertime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Building 706 (South), One (1) Mowrey Hydraulic Passenger Elevator, State Serial # 71104, DC# 8744

A Labor and Materials 1 75.18$ 19.91$ 95.09$ 95.09$

BOvertime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Building 706 (North Center), One (1) Mowrey Hydraulic Passenger Elevator, State Serial # 71105, DC# 8745

A Labor and Materials 1 75.18$ 19.91$ 95.09$ 95.09$

BOvertime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive

maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Building 706 (North Center), One (1) Mowrey Hydraulic Passenger Elevator, State Serial# 71106, DC# 8746

A Labor and Materials 1 75.18$ 19.91$ 95.09$ 95.09$

BOvertime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Building 706 (North), One (1) Mowrey Hydraulic Passenger Elevator, State Serial# 71117, DC# 8757

A Labor and Materials 1 75.18$ 19.91$ 95.09$ 95.09$

BOvertime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Building 706 (North Center), One (1) Mowrey Hydraulic Passenger Elevator, State Serial # 71118, DC# 8758

A Labor and Materials 1 75.18$ 19.91$ 95.09$ 95.09$

BOvertime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Building 708 (South Center), One (1) Mowrey Hydraulic Passenger Elevator, State Serial # 71119, DC# 8759

Item No. 1.9

Item No. 1.4

Item No. 1.5

Item No. 1.6

Item No. 1.10

Item No. 1.11

Item No. 1.12

Item No. 1.7

Item No. 1.8

Page 3: CONTRACT NO. 1233-5/19-4 Elevator and Escalator ...€¦ · maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Contractor Name: Thyssenkrup

Miami-Dade County Contract No. 1233-5/19-4Page 3 of 23

Description # of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

A Labor and Materials 1 75.18$ 19.91$ 95.09$ 95.09$

BOvertime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Building 708 (South Center), One (1) Mowrey Hydraulic Passenger Elevator, State Serial # 71120, DC# 8760

A Labor and Materials 1 75.18$ 19.91$ 95.09$ 95.09$

BOvertime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Building 716A, One (1) Mowrey Hydraulic Passenger Elevator, State Serial# 71122, DC# 8762

A Labor and Materials 1 75.18$ 19.91$ 95.09$ 95.09$

BOvertime preventive maintenance and repair. In additional to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Concourse E, Gate E-7, One (1) Mowrey/Sedwich Dumbwaiter, State Serial # 65340, DC# 1253

A Labor and Materials 1 75.18$ 19.91$ 95.09$ 95.09$

BOvertime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$

Concourse H, Gate H-12 Dobs House, Deli Bar, One (1) Mowrey Hydraulic Passenger Elevator, State Serial# 70160, DC# 7727; Manufacturer ID# 98914

A Labor and Materials 1 75.18$ 19.91$ 95.09$ 95.09$

BOvertime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Various Concourses, Two (2) Mobilift Model AX Manually Operated Wheelchair Lift, Permanent Serial# 46339, 46340; Manufacturer ID# AE92318, AE92319

A Labor and Materials 2 89.52$ 23.69$ 113.21$ 226.42$

BOvertime preventive maintenance and repair. In additional to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 2 127.45$ 127.45$ 254.90$

GROUP 1 MONTHLY TOTAL: 29,261.75$

Description # of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

MODERNIZATION OF INDIVIDUAL COMPONENTS FOR EXISTING ELEVATORS

1 Infrared Door Detector (without trade-in)

A Material per car entrance (without trade-in of light ray and door edge) 1 360.81$ 360.81$ 360.81$

B Labor per car entrance (without trade-in of light ray and door edge) 1 924.28$ 924.28$ 924.28$

2 Infrared Door Detector (with trade-in)

A Material per car entrance (with trade-in of light ray and door edge) 1 360.81$ 360.81$ 360.81$

B Labor per car entrance (with trade-in of light ray and door edge) 1 924.28$ 924.28$ 924.28$

Item No. 1.13

Item No. 1.14

Item No. 1.15

Item No. 1.16

Item No. 1.17

Item No.

Page 4: CONTRACT NO. 1233-5/19-4 Elevator and Escalator ...€¦ · maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Contractor Name: Thyssenkrup

Miami-Dade County Contract No. 1233-5/19-4Page 4 of 23

Description # of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

3 ADA Compliant Car Operating Panel (4 Floors or Less)

A Material per each car station (4 floors or less) 1 5,051.32$ 5,051.32$ 5,051.32$

B Labor per each car station (4 floors or less) 1 2,772.85$ 2,772.85$ 2,772.85$

4 ADA Compliant Car Operating Panel (5 or more floors)

A Material per each car station (5 or more floors) 1 5,116.92$ 5,116.92$ 5,116.92$

A Landing Material per each car station (5 or more floors) 1 65.60$ 65.60$ 65.60$

B Labor per each car station (5 or more floors) 1 3,003.14$ 3,003.14$ 3,003.14$

B Landing Labor per each car station (5 or more floors) 1 230.30$ 230.30$ 230.30$ 5 ADA Compliant Hall Fixtures

A Material per landing 1 429.69$ 429.69$ 429.69$

B Labor per landing 1 501.90$ 501.90$ 501.90$

6 ADA Car Fixtures and Signals (except COP)

A Material per entrance 1 324.73$ 324.73$ 324.73$

B Labor per entrance 1 994.51$ 994.51$ 994.51$

7 CCTV Compatible Infrastructure (up to 60')A Material per elevator (up to 60') 1 65.60$ 65.60$ 65.60$

B Labor per elevator (up to 60') 1 921.18$ 921.18$ 921.18$ 8 CCTV Compatible Infrastructure (above 60')

A Material add per foot of travel (above 60') 1 3.28$ 3.28$ 3.28$

B Labor add per foot of travel (above 60') 1 22.72$ 22.72$ 22.72$ 9 Universal Firefighter Service Access Key Switch

A Material per elevator (one elevator with two switches) 1 328.01$ 328.01$ 328.01$

B Labor per elevator (one elevator with two switches) 1 178.66$ 178.66$ 178.66$

C Material per each additional car 1 164.00$ 164.00$ 164.00$

D Labor per each additional car 1 178.66$ 178.66$ 178.66$

10 Rubber Belt

A Westmont moving walk rubber belt 43" x 649' 1 203,652.33$ 203,652.33$ 203,652.33$

B Westmont moving walk rubber belt 31" x 580' 1 159,171.20$ 159,171.20$ 159,171.20$

11 Remote Elevator Monitoring

A Material per elevator 1 1,049.62$ 1,049.62$ 1,049.62$

B Labor per elevator 1 1,123.60$ 1,123.60$ 1,123.60$

12 ADA Compliant Telephone Installation

A Material per elevator 1 196.80$ 196.80$ 196.80$

B Labor per elevator 1 303.62$ 303.62$ 303.62$

DEPARTMENT NAME: INTERNAL SERVICESGROUP: 2

Page 5: CONTRACT NO. 1233-5/19-4 Elevator and Escalator ...€¦ · maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Contractor Name: Thyssenkrup

Miami-Dade County Contract No. 1233-5/19-4Page 5 of 23

Description # of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

# of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

Hickman Garage, 270 NW 2nd Street, Two (2) Mowrey Gear Traction Passenger Elevators, S/N 71618, 71619

Labor and Materials component of price 2 205.69$ 54.45$ 260.14$ 520.27$

Coral Gables Courts, 3100 Ponce de Leon Boulevard, Coral Gables, One (1) Mowrey Hydraulic Passenger Elevator, S/N 8030; Manufacturer ID# 9403

Labor and Material Component of Price 1 76.34$ 20.21$ 96.54$ 96.54$

Miami-Dade County Courthouse, 73 West Flagler Street, Miami, Florida, One (1) Eastern 500 lbs. capacity Dumbwaiter, DC #1390

Labor and Material Component of Price 1 105.50$ 9.98$ 115.48$ 115.48$

Miami-Dade County Courthouse, 73 West Flagler Street, Miami, Florida, One (1) Matot 25 lbs. capacity Dumbwaiter, 2 stops/openings, DC #1789

Labor and Material Component of Price 1 105.50$ 9.98$ 115.48$ 115.48$

Miami-Dade County Courthouse, 73 West Flagler Street, Miami, Florida, One (1) Vertical Mobility, LLC, Wheelchair lift, capacity, 750 lbs, s/n 73562

Labor and Material Component of Price 1 138.83$ 13.15$ 151.98$ 151.98$

GSA Fleet Management Division; Shop #3, 8801 Nw 58th Street, Miami, Florida, One (1) Matot Geared Traction Dumbwaiter, Mfg. ID #19892, DC #7203

Labor and Material Component of Price 1 105.50$ 9.98$ 115.48$ 115.48$

Emergency Operation Center, One (1) American Starglide Vertical Wheelchair Lift, Mfg ID #9482-6000, DC #2433

Labor and Material Component of Price 1 105.50$ 9.98$ 115.48$ 115.48$

GROUP 2 MONTHLY TOTAL: 1,230.74$

MODERNIZATION OF INDIVIDUAL COMPONENTS FOR EXISTING ELEVATORS

1 Infrared Door Detector (without trade-in)

A Material per car entrance (without trade-in of light ray and door edge) 1 360.81$ 360.81$ 360.81$

B Labor per car entrance (without trade-in of light ray and door edge) 1 924.28$ 924.28$ 924.28$

2 Infrared Door Detector (with trade-in)

A Material per car entrance (with trade-in of light ray and door edge) 1 360.81$ 360.81$ 360.81$

B Labor per car entrance (with trade-in of light ray and door edge) 1 924.28$ 924.28$ 924.28$

3 ADA Compliant Car Operating Panel (4 Floors or Less)

A Material per each car station (4 floors or less) 1 5,051.32$ 5,051.32$ 5,051.32$

Item No. 2.1

Description

Item No. 2.3

Item No. 2.4

Item No.

Item No. 2.5

Item No. 2.6

Item No. 2.7

Item No. 2.2

Page 6: CONTRACT NO. 1233-5/19-4 Elevator and Escalator ...€¦ · maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Contractor Name: Thyssenkrup

Miami-Dade County Contract No. 1233-5/19-4Page 6 of 23

Description # of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

B Labor per each car station (4 floors or less) 1 2,772.85$ 2,772.85$ 2,772.85$

4 ADA Compliant Car Operating Panel (5 or more floors)

A Material per each car station (5 or more floors) 1 5,116.92$ 5,116.92$ 5,116.92$

A Landing Material per each car station (5 or more floors) 1 65.60$ 65.60$ 65.60$

B Labor per each car station (5 or more floors) 1 3,003.14$ 3,003.14$ 3,003.14$

B Landing Labor per each car station (5 or more floors) 1 230.30$ 230.30$ 230.30$ 5 ADA Compliant Hall Fixtures

A Material per landing 1 429.69$ 429.69$ 429.69$

B Labor per landing 1 501.90$ 501.90$ 501.90$

6 ADA Car Fixtures and Signals (except COP)

A Material per entrance 1 324.73$ 324.73$ 324.73$

B Labor per entrance 1 994.51$ 994.51$ 994.51$

7 CCTV Compatible Infrastructure (up to 60')

A Material per elevator (up to 60') 1 65.60$ 65.60$ 65.60$

B Labor per elevator (up to 60') 1 921.18$ 921.18$ 921.18$

8 CCTV Compatible Infrastructure (above 60')

A Material add per foot of travel (above 60') 1 3.28$ 3.28$ 3.28$

B Labor add per foot of travel (above 60') 1 22.72$ 22.72$ 22.72$

9 Universal Firefighter Service Access Key Switch

A Material per elevator (one elevator with two switches) 1 328.01$ 328.01$ 328.01$

B Labor per elevator (one elevator with two switches) 1 178.66$ 178.66$ 178.66$

C Material per each additional car 1 164.00$ 164.00$ 164.00$

D Labor per each additional car 1 178.66$ 178.66$ 178.66$

10 Remote Elevator Monitoring

A Material per elevator 1 1,049.62$ 1,049.62$ 1,049.62$

B Labor per elevator 1 1,123.60$ 1,123.60$ 1,123.60$

11 ADA Compliant Telephone Installation

A Material per elevator 1 196.80$ 196.80$ 196.80$

B Labor per elevator 1 303.62$ 303.62$ 303.62$

# of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

South Miami HUD #5-45, 6701 SW 62nd Avenue, Two (2) Southeastern Westbrook Hydraulic Passenger Elevators

Item No. 3.1

GROUP: 3DEPARTMENT NAME: PUBLIC HOUSING

Description

Page 7: CONTRACT NO. 1233-5/19-4 Elevator and Escalator ...€¦ · maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Contractor Name: Thyssenkrup

Miami-Dade County Contract No. 1233-5/19-4Page 7 of 23

Description # of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

Labor and Materials component of price 0 -$ -$ -$ -$

Stirrup Plaza HUD #5-58, Two (2) Southeastern Westbrook Hydraulic Passenger Elevators, Permanent Serial# 7971, 7973; Manufacturer ID# 1-4915, 1-4917

Labor and Materials component of price 0 -$ -$ -$ -$ Palm Court HUD #5-65, 930 NW 95th Street, Two (2) Southeastern Westbrook Hydraulic Passenger Elevators, Serial # 66038, 66039; Manufacturer ID# 6108

Labor and Materials component of price 2 95.03$ 25.15$ 120.18$ 240.36$

Lemon City HUD #5-51, 150 NE 68th Street, Two (2) Imperial Hydraulic Passenger Elevators, Permanent S/N# 69480, 69481; Manufacturer ID#74356, 74357

Labor and Materials component of price 2 84.93$ 22.48$ 107.41$ 214.82$ Edison Park HUD #5-56, 200 NW 55th Street, Two (2) Montgomery Hydraulic Passenger Elevators, Permanent S/N# 69504, 69505; Manufacturer ID# CP-36143, CP-36144

Labor and Materials component of price 2 95.03$ 25.15$ 120.18$ 240.36$ Smathers Plaza Apartment FLA #5-18, 2970 SW 9th Street, Two (2) Eastern Hydraulic Passenger Elevators

Labor and Materials component of price 2 95.03$ 25.15$ 120.18$ 240.36$ Smathers Plaza (High Rise), 935 SW 30th Avenue, Two (2) ThyssenKrupp/Eastern Geared Traction Passenger Elevators, Permanent Serial# 69510, 69511; Manufacturer ID# 7015, 7016

Labor and Materials component of price 2 302.27$ 80.00$ 382.27$ 764.53$

GROUP 3 MONTHLY TOTAL: 1,700.42$

MODERNIZATION OF INDIVIDUAL COMPONENTS FOR EXISTING ELEVATORS

1 Infrared Door Detector (without trade-in)

A Material per car entrance (without trade-in of light ray and door edge) 1 360.81$ 360.81$ 360.81$

B Labor per car entrance (without trade-in of light ray and door edge) 1 924.28$ 924.28$ 924.28$

2 Infrared Door Detector (with trade-in)

A Material per car entrance (with trade-in of light ray and door edge) 1 360.81$ 360.81$ 360.81$

B Labor per car entrance (with trade-in of light ray and door edge) 1 924.28$ 924.28$ 924.28$

3 ADA Compliant Car Operating Panel (4 Floors or Less)

A Material per each car station (4 floors or less) 1 5,051.32$ 5,051.32$ 5,051.32$

B Labor per each car station (4 floors or less) 1 2,772.85$ 2,772.85$ 2,772.85$

4 ADA Compliant Car Operating Panel (5 or more floors)

A Material per each car station (5 or more floors) 1 5,116.92$ 5,116.92$ 5,116.92$

A Landing Material per each car station (5 or more floors) 1 65.60$ 65.60$ 65.60$

B Labor per each car station (5 or more floors) 1 3,003.14$ 3,003.14$ 3,003.14$

Item No.

Item No. 3.3

Item No. 3.4

Item No. 3.5

Item No. 3.6

Item No. 3.7

Item No. 3.2

Page 8: CONTRACT NO. 1233-5/19-4 Elevator and Escalator ...€¦ · maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Contractor Name: Thyssenkrup

Miami-Dade County Contract No. 1233-5/19-4Page 8 of 23

Description # of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

B Landing Labor per each car station (5 or more floors) 1 230.30$ 230.30$ 230.30$

5 ADA Compliant Hall Fixtures

A Material per landing 1 429.69$ 429.69$ 429.69$

B Labor per landing 1 501.90$ 501.90$ 501.90$

6 ADA Car Fixtures and Signals (except COP)

A Material per entrance 1 324.73$ 324.73$ 324.73$

B Labor per entrance 1 994.51$ 994.51$ 994.51$

7 CCTV Compatible Infrastructure (up to 60')

A Material per elevator (up to 60') 1 65.60$ 65.60$ 65.60$

B Labor per elevator (up to 60') 1 921.18$ 921.18$ 921.18$

8 CCTV Compatible Infrastructure (above 60')

A Material add per foot of travel (above 60') 1 3.28$ 3.28$ 3.28$

B Labor add per foot of travel (above 60') 1 22.72$ 22.72$ 22.72$

9 Universal Firefighter Service Access Key Switch

A Material per elevator (one elevator with two switches) 1 328.01$ 328.01$ 328.01$

B Labor per elevator (one elevator with two switches) 1 178.66$ 178.66$ 178.66$

C Material per each additional car 1 164.00$ 164.00$ 164.00$

D Labor per each additional car 1 178.66$ 178.66$ 178.66$

10 Remote Elevator Monitoring

A Material per elevator 1 1,049.62$ 1,049.62$ 1,049.62$

B Labor per elevator 1 1,123.60$ 1,123.60$ 1,123.60$

11 ADA Compliant Telephone Installation

A Material per elevator 1 196.80$ 196.80$ 196.80$

B Labor per elevator 1 303.62$ 303.62$ 303.62$

# of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

Northwest Station, 5975 Miami Lakes Drive, One (1) Dover Hydraulic Passenger Elevator

Labor and Materials component of price 1 75.43$ 19.96$ 95.39$ 95.39$

Labor and Materials component of price 0 -$ -$ -$ -$

Item No. 4.1

Item No. 4.2

Description

Cutler Ridge Station, 10800 SW 211 Street, One (1) Dover Hydraulic Passenger Elevator

Northside Station, 2950 NW 83rd Street, One (1) Dover Hydraulic Passenger Elevator, Permanent S/N # 5562; Manufacturer ID# E-70928

Item No. 4.3

GROUP: 4DEPARTMENT NAME: POLICE

Page 9: CONTRACT NO. 1233-5/19-4 Elevator and Escalator ...€¦ · maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Contractor Name: Thyssenkrup

Miami-Dade County Contract No. 1233-5/19-4Page 9 of 23

Description # of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

Labor and Materials component of price 1 75.43$ 19.96$ 95.39$ 95.39$

Kendall Station, 7707 SW 117th Avenue, One (1) Dover Hydraulic Passenger Elevator

Labor and Materials component of price 1 75.43$ 19.96$ 95.39$ 95.39$ Intracoastal Station, 15655 Biscayne Boulevard, One (1) Dover Hydraulic Passenger Elevator

Labor and Materials component of price 1 75.43$ 19.96$ 95.39$ 95.39$

GROUP 4 MONTHLY TOTAL: 381.58$

MODERNIZATION OF INDIVIDUAL COMPONENTS FOR EXISTING ELEVATORS

1 Infrared Door Detector (without trade-in)

A Material per car entrance (without trade-in of light ray and door edge) 1 360.81$ 360.81$ 360.81$

B Labor per car entrance (without trade-in of light ray and door edge) 1 924.28$ 924.28$ 924.28$

2 Infrared Door Detector (with trade-in)

A Material per car entrance (with trade-in of light ray and door edge) 1 360.81$ 360.81$ 360.81$

B Labor per car entrance (with trade-in of light ray and door edge) 1 924.28$ 924.28$ 924.28$

3 ADA Compliant Car Operating Panel (4 Floors or Less)

A Material per each car station (4 floors or less) 1 5,051.32$ 5,051.32$ 5,051.32$

B Labor per each car station (4 floors or less) 1 2,772.85$ 2,772.85$ 2,772.85$

4 ADA Compliant Car Operating Panel (5 or more floors)

A Material per each car station (5 or more floors) 1 5,116.92$ 5,116.92$ 5,116.92$

A Landing Material per each car station (5 or more floors) 1 65.60$ 65.60$ 65.60$

B Labor per each car station (5 or more floors) 1 3,003.14$ 3,003.14$ 3,003.14$

B Landing Labor per each car station (5 or more floors) 1 230.30$ 230.30$ 230.30$

5 ADA Compliant Hall Fixtures

A Material per landing 1 429.69$ 429.69$ 429.69$

B Labor per landing 1 501.90$ 501.90$ 501.90$

6 ADA Car Fixtures and Signals (except COP)

A Material per entrance 1 324.73$ 324.73$ 324.73$

B Labor per entrance 1 994.51$ 994.51$ 994.51$

7 CCTV Compatible Infrastructure (up to 60')

A Material per elevator (up to 60') 1 65.60$ 65.60$ 65.60$

B Labor per elevator (up to 60') 1 921.18$ 921.18$ 921.18$

8 CCTV Compatible Infrastructure (above 60')

A Material add per foot of travel (above 60') 1 3.28$ 3.28$ 3.28$

B Labor add per foot of travel (above 60') 1 22.72$ 22.72$ 22.72$

9 Universal Firefighter Service Access Key Switch

Item No.

Item No. 4.4

Item No. 4.5

Page 10: CONTRACT NO. 1233-5/19-4 Elevator and Escalator ...€¦ · maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Contractor Name: Thyssenkrup

Miami-Dade County Contract No. 1233-5/19-4Page 10 of 23

Description # of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

A Material per elevator (one elevator with two switches) 1 328.01$ 328.01$ 328.01$

B Labor per elevator (one elevator with two switches) 1 178.66$ 178.66$ 178.66$

C Material per each additional car 1 164.00$ 164.00$ 164.00$

D Labor per each additional car 1 178.66$ 178.66$ 178.66$

10 Remote Elevator Monitoring

A Material per elevator 1 1,049.62$ 1,049.62$ 1,049.62$

B Labor per elevator 1 1,123.60$ 1,123.60$ 1,123.60$

11 ADA Compliant Telephone Installation

A Material per elevator 1 196.80$ 196.80$ 196.80$

B Labor per elevator 1 303.62$ 303.62$ 303.62$

# of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

Alexander Orr Water Treatment Plant, 6800 SW 87th Avenue, One (1) Mowrey Hydraulic Passenger Elevator

Labor and Materials component of price 1 79.67$ 21.06$ 100.73$ 100.73$ South District Waste Water Treatment Plant (Oxygen Plant), 8950 SW 232nd Street, One (1) Mowrey Hydraulic Passenger Elevator, S/N # 71624, Manufacturer ID# 95-051181

Labor and Materials component of price 1 79.67$ 21.06$ 100.73$ 100.73$

Alexander Orr Water Treatment Plant, 6800 SW 87th Avenue, One (1) Sheppard Dumbwaiter, S/N # 65354, DC# 1270

Labor and Materials component of price 1 150.11$ 39.73$ 189.84$ 189.84$

John E. Preston Water Plant, 1100 West 2nd Avenue, Hialeah, One (1) Westinghouse Geared Traction Service Elevator, S/N # 67731; DC # 4175

Labor and Materials component of price 1 200.13$ 52.97$ 253.10$ 253.10$

John E. Preston Water Plant, 1100 West 2nd Avenue, Hialeah, One (1) Sedgwick Dumbwaiter, S/N # 67732; DC# 4176

Labor and Materials component of price 1 99.84$ 26.43$ 126.27$ 126.27$ Main Office, 3575 S. LeJune Road, One (1) Dover Hydraulic Passenger Elevator, S/N # 64657

Labor and Materials component of price 1 121.06$ 32.05$ 153.10$ 153.10$

South District Waste Water Treatment Plant, 8950 SW 232nd Street, One (1) Dover Hydraulic Passenger Elevator, DC# 5511

Labor and Materials component of price 1 166.27$ 44.01$ 210.28$ 210.28$

Description

Item No. 5.1

Item No. 5.2

Item No. 5.3

Item No. 5.4

Item No. 5.5

Item No. 5.6

GROUP: 5DEPARTMENT NAME: WATER AND SEWER

Item No. 5.7

Page 11: CONTRACT NO. 1233-5/19-4 Elevator and Escalator ...€¦ · maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Contractor Name: Thyssenkrup

Miami-Dade County Contract No. 1233-5/19-4Page 11 of 23

Description # of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

Central District Wastewater Treatment Plant, Virginia Key, One (1) Dover Hydraulic Passenger Elevator, D/C # 5984;

Labor and Materials component of price 1 95.84$ 25.37$ 121.20$ 121.20$

GROUP 5 MONTHLY TOTAL: 1,255.26$

MODERNIZATION OF INDIVIDUAL COMPONENTS FOR EXISTING ELEVATORS

1 Infrared Door Detector (without trade-in)

A Material per car entrance (without trade-in of light ray and door edge) 1 360.81$ 360.81$ 360.81$

B Labor per car entrance (without trade-in of light ray and door edge) 1 924.28$ 924.28$ 924.28$

2 Infrared Door Detector (with trade-in)

A Material per car entrance (with trade-in of light ray and door edge) 1 360.81$ 360.81$ 360.81$

B Labor per car entrance (with trade-in of light ray and door edge) 1 924.28$ 924.28$ 924.28$

3 ADA Compliant Car Operating Panel (4 Floors or Less)

A Material per each car station (4 floors or less) 1 5,051.32$ 5,051.32$ 5,051.32$

B Labor per each car station (4 floors or less) 1 2,772.85$ 2,772.85$ 2,772.85$

4 ADA Compliant Car Operating Panel (5 or more floors)

A Material per each car station (5 or more floors) 1 5,116.92$ 5,116.92$ 5,116.92$

A Landing Materials per each car station (5 or more floors) 1 65.60$ 65.60$ 65.60$

B Labor per each car station (5 or more floors) 1 3,003.14$ 3,003.14$ 3,003.14$

B Landing per each car station (5 or more floors) 1 230.30$ 230.30$ 230.30$

5 ADA Compliant Hall Fixtures

A Material per landing 1 429.69$ 429.69$ 429.69$

B Labor per landing 1 501.90$ 501.90$ 501.90$

6 ADA Car Fixtures and Signals (except COP)

A Material per entrance 1 324.73$ 324.73$ 324.73$

B Labor per entrance 1 994.51$ 994.51$ 994.51$

7 CCTV Compatible Infrastructure (up to 60')

A Material per elevator (up to 60') 1 65.60$ 65.60$ 65.60$

B Labor per elevator (up to 60') 1 921.18$ 921.18$ 921.18$

8 CCTV Compatible Infrastructure (above 60')

A Material add per foot of travel (above 60') 1 3.28$ 3.28$ 3.28$

B Labor add per foot of travel (above 60') 1 22.72$ 22.72$ 22.72$

9 Universal Firefighter Service Access Key Switch

A Material per elevator (one elevator with two switches) 1 328.01$ 328.01$ 328.01$

B Labor per elevator (one elevator with two switches) 1 178.66$ 178.66$ 178.66$

C Material per each additional car 1 164.00$ 164.00$ 164.00$

Item No.

Item No. 5.8

Page 12: CONTRACT NO. 1233-5/19-4 Elevator and Escalator ...€¦ · maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Contractor Name: Thyssenkrup

Miami-Dade County Contract No. 1233-5/19-4Page 12 of 23

Description # of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

D Labor per each additional car 1 178.66$ 178.66$ 178.66$

10 Remote Elevator Monitoring

A Material per elevator 1 1,049.62$ 1,049.62$ 1,049.62$

B Labor per elevator 1 1,123.60$ 1,123.60$ 1,123.60$

11 ADA Compliant Telephone Installation

A Material per elevator 1 196.80$ 196.80$ 196.80$

B Labor per elevator 1 303.62$ 303.62$ 303.62$

# of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

South Dade Regional Library, 10750 SW 211th Street, Miami, Two (2) Westinghouse Hydraulic Passenger Elevators, S/N # 65650, 65651; DC# 1583, 1598

Monthly Cost for Maintenance Services

A Labor and Materials component of price 2 96.19$ 25.46$ 121.65$ 243.30$

MODERNIZATION OF INDIVIDUAL COMPONENTS FOR EXISTING ELEVATORS

1 Infrared Door Detector (without trade-in)

A Material per car entrance (without trade-in of light ray and door edge) 1 360.81$ 360.81$ 360.81$

B Labor per car entrance (without trade-in of light ray and door edge) 1 924.28$ 924.28$ 924.28$

2 Infrared Door Detector (with trade-in)

A Material per car entrance (with trade-in of light ray and door edge) 1 360.81$ 360.81$ 360.81$

B Labor per car entrance (with trade-in of light ray and door edge) 1 924.28$ 924.28$ 924.28$

3 ADA Compliant Car Operating Panel (4 Floors or Less)

A Material per each car station (4 floors or less) 1 5,051.32$ 5,051.32$ 5,051.32$

B Labor per each car station (4 floors or less) 1 2,772.85$ 2,772.85$ 2,772.85$

4 ADA Compliant Car Operating Panel (5 or more floors)

A Material per each car station (5 or more floors) 1 5,116.92$ 5,116.92$ 5,116.92$

A Landing Material per each care station (5 or more floors) 1 65.60$ 65.60$ 65.60$

B Labor per each car station (5 or more floors) 1 3,003.14$ 3,003.14$ 3,003.14$ B Landing Labor per each car station (5 or more floors) 1 230.30$ 230.30$ 230.30$

5 ADA Compliant Hall FixturesA Material per landing 1 429.69$ 429.69$ 429.69$ B Labor per landing 1 501.90$ 501.90$ 501.90$

6 ADA Car Fixtures and Signals (except COP)

A Material per entrance 1 324.73$ 324.73$ 324.73$

Item No.

DEPARTMENT NAME: LIBRARY SYSTEM

Description

Item No. 6.1

GROUP: 6

Page 13: CONTRACT NO. 1233-5/19-4 Elevator and Escalator ...€¦ · maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Contractor Name: Thyssenkrup

Miami-Dade County Contract No. 1233-5/19-4Page 13 of 23

Description # of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

B Labor per entrance 1 994.51$ 994.51$ 994.51$

7 CCTV Compatible Infrastructure (up to 60')

A Material per elevator (up to 60') 1 65.60$ 65.60$ 65.60$

B Labor per elevator (up to 60') 1 921.18$ 921.18$ 921.18$

8 CCTV Compatible Infrastructure (above 60')

A Material add per foot of travel (above 60') 1 3.28$ 3.28$ 3.28$

B Labor add per foot of travel (above 60') 1 22.72$ 22.72$ 22.72$

9 Universal Firefighter Service Access Key Switch

A Material per elevator (one elevator with two switches) 1 328.01$ 328.01$ 328.01$

B Labor per elevator (one elevator with two switches) 1 178.66$ 178.66$ 178.66$

C Material per each additional car 1 164.00$ 164.00$ 164.00$

D Labor per each additional car 1 178.66$ 178.66$ 178.66$

10 Remote Elevator Monitoring

A Material per elevator 1 1,049.62$ 1,049.62$ 1,049.62$

B Labor per elevator 1 1,123.60$ 1,123.60$ 1,123.60$

11 ADA Compliant Telephone Installation

A Material per elevator 1 196.80$ 196.80$ 196.80$

B Labor per elevator 1 303.62$ 303.62$ 303.62$

# of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

Dade County Jail – East Wing, 1321 Nw 13th Street, Miami, Florida, One (1) Montgomery Hydraulic Passenger Elevator, Mfg. ID #CP-24102, DC #0154

Monthly Cost for Maintenance ServicesLabor and Materials component of price 1 127.72$ 12.09$ 139.81$ 139.81$

# of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

Dade County Auditorium, 2901 West Flagler Street, Miami, Florida, One (1) Globe Hoist Company Stage Lift, Mfg. Id #B-17475-CHS

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 639.60$ 58.88$ 698.48$ 698.48$

Item No. 8.1

GROUP: 7DEPARTMENT NAME: CORRECTIONS AND REHABILITATION

Description

Item No. 7.1

GROUP: 8DEPARTMENT NAME: PARKS, RECREATION AND OPEN SPACES

Description

Page 14: CONTRACT NO. 1233-5/19-4 Elevator and Escalator ...€¦ · maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Contractor Name: Thyssenkrup

Miami-Dade County Contract No. 1233-5/19-4Page 14 of 23

Description # of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

Deering Estate, 16701 SW 72nd Avenue, Miami, Florida, One (1) Garaventa Type SP/SPC Passenger Wheelchair Lift,MFG Id. 8204, DC # 9234

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 105.50$ 9.98$ 115.48$ 115.48$ Joseph Caleb Center, 5400 Nw 22 Avenue, Miami, Wheelchair Lift, Concord Lift Model # 72246, S/N 72246

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 105.50$ 9.98$ 115.48$ 115.48$ A.D. BARNES AQUATIC CENTER, 3701 SW 72 AVENUE, MIAMI, FLORIDA Wheelchair Lift, Garaventa Vertical Lift Model - GenesisS/N 75935, DC-12087

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 56.76$ 139.12$ 195.88$ 195.88$ Crandon Park Marina Dock Master, 4000 Crandon Boulevard, Key Biscayne, FL 33149, One (1) Hydraulic Passenger Elevator, State Serial #76418, DC-12558

Monthly Cost for Maintenance ServicesLabor and Materials component of price 1 150.43$ 24.56$ 174.98$ 174.98$

GROUP 8 MONTHLY TOTAL: 1,300.31$

# of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

Wynwood Neighborhood Center, (Eugenio De Hostos), 2902 NW 2nd Avenue, Miami, Two (2) Dover IVO Passenger Elevator, Mfg. ID #E-51154, E-51155, DC #4574, 4575

Monthly Cost for Maintenance Services

Labor and Materials component of price 2 221.00$ 20.93$ 241.93$ 483.86$

North Dade Victim Center, 7831 NE Miami Court, Miami, One (1) Allstate Hydraulic Passenger Elevator, DC #6695

Monthly Cost for Maintenance ServicesLabor and Materials component of price 1 109.94$ 10.41$ 120.35$ 120.35$

GROUP 9 MONTHLY TOTAL: 604.21$

# of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

Item No. 8.3

Item No. 8.2

Item No. 8.4

Item No. 8.5

GROUP: 9DEPARTMENT NAME: HUMAN SERVICES

Description

Item No. 9.1

Item No. 9.2

GROUP: 10DEPARTMENT NAME: MIAMI DADE LIBRARIES

Description

Page 15: CONTRACT NO. 1233-5/19-4 Elevator and Escalator ...€¦ · maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Contractor Name: Thyssenkrup

Miami-Dade County Contract No. 1233-5/19-4Page 15 of 23

Description # of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

Coconut Grove Library, 2875 Mc Farlane Road, Coconut Grove, Matot Dumbwaiter

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 105.50$ 9.98$ 115.48$ 115.48$

Coral Gables Library, 3443 Segovia Street, All State Hydraulic Passenger Elevator

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 105.50$ 9.98$ 115.48$ 115.48$ West Dade Regional Library, 9445 SW 24th Street, Miami, Century Hydraulic Passenger Elevators

Monthly Cost for Maintenance Services

Labor and Materials component of price 2 221.00$ 20.93$ 241.93$ 483.86$

West Dade Regional Library, 10201 Hammocks Boulevard, Miami, Mowrey Hydraulic Passenger Elevators, Mfg. ID #9-2-928554 A & B, DC #7482, 83

Monthly Cost for Maintenance ServicesLabor and Materials component of price 2 221.00$ 20.93$ 241.93$ 483.86$

GROUP 10 MONTHLY TOTAL: 1,198.68$

# of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

Dodge Island, Miami, Florida, Terminal 6 & 7, ESS/Southeastern Hydraulic Passenger Elevators, DC #0147, 0148, 0149

Monthly Cost for Maintenance ServicesLabor and Materials component of price 3 329.84$ 31.23$ 361.07$ 1,083.20$

# of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

Vizcaya Art Museum, 3251 South Miami Avenue, Miami, Otis Pushbutton Traction Service Elevator, Mfg. ID #303555, SS#65443, DC #1368

Monthly Cost for Maintenance Services

Labor and Materials component of price 0 -$ -$ -$ -$

GROUP: 11

Item No. 11.1

GROUP: 12DEPARTMENT NAME: VIZCAYA MUSEUM & GARDENS

Description

Item No. 12.1

Item No. 10.1

Item No. 10.2

Item No. 10.3

Item No. 10.4

DEPARTMENT NAME: SEAPORT

Description

Page 16: CONTRACT NO. 1233-5/19-4 Elevator and Escalator ...€¦ · maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Contractor Name: Thyssenkrup

Miami-Dade County Contract No. 1233-5/19-4Page 16 of 23

Description # of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

Vizcaya Art Museum, 3251 South Miami Avenue, Miami, Garaventa Stair Climber (outside) Wheelchair Lift, Mfg. Id. #89-0731-45, SS#75284

Monthly Cost for Maintenance Services

Labor and Materials component of price 0 -$ -$ -$ -$ Vizcaya Art Museum, 3251 South Miami Avenue, Miami, Garaventa Stair-Lift (Gift Shop) Wheelchair Lift, SS#76537, DC #12660

Monthly Cost for Maintenance ServicesLabor and Materials component of price 0 -$ -$ -$ -$

GROUP 12 MONTHLY TOTAL: -$

# of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

Dadeland South Station, 9150 Dadeland Boulevard, Miami, One (1) Hydraulic Passenger Elevator, State Serial # 72630, DC # 6073

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$

Dadeland North Station, 8320 S. Dixie Highway, Miami, One (1) Hydraulic Passenger Elevator, SS#72631, DC #6074

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$ South Miami Station, 5949 S.W. 72nd Street, Miami, One (1) Hydraulic Passenger Elevator, SS #72632, DC #6075

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$

South Miami Station, Parking Garage, One (1) Mowrey Hydraulic Passenger Elevator, SS# 72605, DC #5921

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 303.35$ 65.78$ 369.13$ 369.13$

South Miami Station, Parking Garage, One (1) Mowrey Hydraulic Passenger Elevator, SS# 72606, DC #5922

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 303.35$ 65.78$ 369.13$ 369.13$ University Station, 55 Ponce de Leon Boulevard, Miami, One (1) Hydraulic Passenger Elevator, SS #72633, DC #6076

Item No. 12.2

Item No. 12.3

GROUP: 13DEPARTMENT NAME: DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS (TRANSIT)

Description

Item No. 13.1

Item No. 13.2

Item No. 13.3

Item No. 13.4

Item No. 13.5

Item No. 13.6

Page 17: CONTRACT NO. 1233-5/19-4 Elevator and Escalator ...€¦ · maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Contractor Name: Thyssenkrup

Miami-Dade County Contract No. 1233-5/19-4Page 17 of 23

Description # of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$

Douglas Road Station, 2780 S.W. 27th Avenue, Miami, FL, One (1) Hydraulic Passenger Elevator, SS #72634, DC #6077

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$

Coconut Grove Station, 2780 S.W. 27th Avenue, Miami, One (1) Hydraulic Passenger Elevator, SS # 72635, DC #6078

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$ Brickell Station, 1001 S.W. 1st Avenue, Miami, One (1) Hydraulic Passenger Elevator, SS #72637, DC #6080

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$

Overtown Station, 100 N.W. 6 Street, Miami, One (1) Hydraulic Passenger Elevator, SS # 72644, DC #6087

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$

Culmer Station, 701 N.W. 11 Street, Miami, One (1) Hydraulic Passenger Elevator,SS# 72645, DC # 6088

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$ Allapattah Station, 3501 N.W. 12 Avenue, Miami, One (1) Hydraulic Passenger Elevator, SS #72653, DC #6096

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$

Earlington Heights, 2100 N.W. 41st Street, Miami, One (1) Hydraulic Passenger Elevator, SS #72654, DC # 6097

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$

Hialeah Station,6601 East 21Street, Hialeah, One (1) Hydraulic Passenger Elevator, SS #72664, DC #6107

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$ Hialeah Station, Parking Overpass, One (1) Hydraulic Passenger Elevator, SS #72671, DC #6186

Item No. 13.8

Item No. 13.9

Item No. 13.10

Item No. 13.11

Item No. 13.12

Item No. 13.13

Item No. 13.14

Item No. 13.15

Item No. 13.7

Page 18: CONTRACT NO. 1233-5/19-4 Elevator and Escalator ...€¦ · maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Contractor Name: Thyssenkrup

Miami-Dade County Contract No. 1233-5/19-4Page 18 of 23

Description # of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 234.64$ 51.54$ 286.18$ 286.18$

Hialeah Station, Parking Garage, One (1) Hydraulic Passenger Elevator, SS #72672, DC #6187

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 234.64$ 51.54$ 286.18$ 286.18$

Okeechobee Station, 2005 W. Okeechobee Road, Hialeah, FL, One (1) Hydraulic Passenger Elevator, SS #72666, DC #6109

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$ Okeechobee Station, Parking Garage, One (1) Hydraulic Passenger Elevator, SS # 72667, DC #6112

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 240.11$ 52.08$ 292.18$ 292.18$

Okeechobee Station, Parking Garage, One (1) Hydraulic Passenger Elevator, SS #72668, DC #6113

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 240.11$ 52.08$ 292.18$ 292.18$

Metrobus Central Administration Building, 3300 N.W. 32 Avenue, Hialeah, FL, One (1) Hydraulic Passenger Elevator, SS #72572, DC #5601

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 288.22$ 62.50$ 350.72$ 350.72$ Metrobus Central Administration Building, 3300 N.W. 32 Avenue, Hialeah, FL, One (1) Hydraulic Passenger Elevator, SS #72577, DC #5648

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$

Metrobus Central Administration Building, 3300 N.W. 32 Avenue, Hialeah, FL, One (1) Electric Passenger Elevator, SS #72561, DC #0984

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 363.25$ 78.77$ 442.01$ 442.01$

Metrobus Coral Way Facility, 2175 S.W. 74th Avenue, Miami, One (1) Hydraulic Passenger Elevator, SS #72566, DC #2763

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$ Metrobus Coral Way Facility, 2175 S.W. 74th Avenue, Miami, One (1) Hydraulic Passenger Elevator, SS #72567, DC #2764

Item No. 13.21

Item No. 13.22

Item No. 13.16

Item No. 13.20

Item No. 13.23

Item No. 13.24

Item No. 13.17

Item No. 13.18

Item No. 13.19

Page 19: CONTRACT NO. 1233-5/19-4 Elevator and Escalator ...€¦ · maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Contractor Name: Thyssenkrup

Miami-Dade County Contract No. 1233-5/19-4Page 19 of 23

Description # of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$

William Lehman Center (Palmetto Yard), 6601 N.W. 72nd Avenue, Miami, One (1) Hydraulic Passenger Elevator, SS # 72569, DC # 5556

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$ William Lehman Center (Palmetto Yard), 6601 N.W. 72nd Avenue, Miami, One (1) Hydraulic Passenger Elevator, SS #72570, DC #5557

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$

William Lehman Center (Palmetto Yard), 6601 N.W. 72nd Avenue, Miami, One (1) Hydraulic Passenger Elevator, SS #72570, DC #5557

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$

Vizcaya Station, 3201 S.W. 1st Avenue, Miami, FL, One Hydraulic Passenger Elevator, SS #72636, DC #6079

Monthly Cost for Maintenance ServicesLabor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$

GROUP 13 MONTHLY TOTAL: 9,054.37$

# of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

Jackson Memorial Hospital, Long Term Care, Institute Annex Building, 4th Floor, Miami, FL, Three (3) Hydraulic Passenger Elevators, SS #'s 65861, 65860, 70095; DC#’s 1801, 1800, 7662

Monthly Cost for Maintenance ServicesLabor and Materials component of price 0 -$ -$ -$ -$

# of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

Jackson Memorial Hospital, Alamo, One (1) Century/Eastern Hydraulic Passenger Elevator, SS #68819, DC #6168

Monthly Cost for Maintenance Services

Item No. 13.28

DEPARTMENT NAME: JACKSON MEMORIAL HOSPITAL - LONG TERM CARE

Description

Item No. 14.1

Item No. 15.1

Item No. 13.25

Item No. 13.26

Item No. 13.27

GROUP: 15DEPARTMENT NAME: JACKSON MEMORIAL HOSPITAL

Description

GROUP: 14

Page 20: CONTRACT NO. 1233-5/19-4 Elevator and Escalator ...€¦ · maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Contractor Name: Thyssenkrup

Miami-Dade County Contract No. 1233-5/19-4Page 20 of 23

Description # of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

Labor and Materials component of price 1 376.94$ 147.60$ 524.55$ 524.55$ Jackson Memorial Hospital, Ambulatory Care Center (ACC) East, One (1) Century/Eastern Hydraulic Passenger (Glass) Elevator, SS # 64821, DC # 0680

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 407.92$ 169.47$ 577.39$ 577.39$

Jackson Memorial Hospital, Ambulatory Care Center West, Four (4) Montgomery Geared Passenger Elevators, SS #'s 67333, 67334, 67335, 67336; DC#’s 3576, 3577, 3578, 3579

Monthly Cost for Maintenance Services

Labor and Materials component of price 0 -$ -$ -$ -$

Jackson Memorial Hospital, Highland Park Garage, Two (2) Montgomery Geared Passenger Elevator, State S/N’s 70512, 70513; DC#’s 8131, 8132

Monthly Cost for Maintenance Services

Labor and Materials component of price 0 -$ -$ -$ -$ Jackson Memorial Hospital, Highland Park Garage, Three (3) Montgomery Geared Passenger Elevators, State S/N’s 70514, 70515, 70516; DC#’s 8133, 8134, 8135

Monthly Cost for Maintenance Services

Labor and Materials component of price 0 -$ -$ -$ -$ Jackson Memorial Hospital, Highland Pavillion, Two (2) Montgomery Geared Passenger Elevators, State S/N’s 69699, 69700; DC#’s 7210, 7211

Monthly Cost for Maintenance Services

Labor and Materials component of price 2 877.81$ 333.47$ 1,211.28$ 2,422.57$

Jackson Memorial Hospital, Park Plaza West, Two (2) Montgomery Geared Passenger Elevators, SS # 65985, 65987; DC#’s 1932, 1934

Monthly Cost for Maintenance Services

Labor and Materials component of price 0 -$ -$ -$ -$ Jackson Memorial Hospital, Park Plaza West, Two (2) Montgomery Geared Passenger Elevators, SS # 65986, 65986, DC#’s 1933, 1935

Monthly Cost for Maintenance Services

Labor and Materials component of price 0 -$ -$ -$ -$ Jackson Memorial Hospital, Park Plaza West, One (1) Armor Hydraulic Freight Elevator, SS # 65989, DC# 1936

Monthly Cost for Maintenance Services

Labor and Materials component of price 0 -$ -$ -$ -$

Additional Charge for Resident Mechanic

Monthly Cost for Maintenance ServicesLabor and Materials component of price 0 -$ -$ -$ -$

GROUP 15 MONTHLY TOTAL: 3,524.51$

Item No. 15.6

Item No. 15.7

Item No. 15.8

Item No. 15.10

Item No. 15.5

Item No. 15.2

Item No. 15.3

Item No. 15.4

Item No. 15.9

Page 21: CONTRACT NO. 1233-5/19-4 Elevator and Escalator ...€¦ · maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Contractor Name: Thyssenkrup

Miami-Dade County Contract No. 1233-5/19-4Page 21 of 23

Description # of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

# of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

Jackson South Community Hospital, 9333 S.W. 152 Street, Miami, Six (6) Eastern Hydraulic Passenger Elevators, SS #'s 65469, 65470, 65135, 65136, 65472, 65471, DC#’s 1396, 1397, 1024, 1025, 1399, 1398

Monthly Cost for Maintenance ServicesLabor and Materials component of price 0 -$ -$ -$ -$

# of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

Jackson North Medical Center, One (1) Dover Hydraulic Passenger Elevator, Elevator # 15, SS #70083, 4000lb, 100FPM, 2 stops/ 2 openings

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 210.67$ 24.79$ 235.46$ 235.46$ Jackson North Medical Center, One (1) Dover Hydraulic Passenger Elevator, Elevator # 11, SS #67407, 2500lb, 100FPM, 3 stops/ 3 openings

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 210.67$ 24.79$ 235.46$ 235.46$

Jackson North Medical Center, One (1) Dover Hydraulic Passenger Elevator, Elevator # 10, SS #68352, 2500lb, 100FPM, 2 stops/ 2 openings

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 204.48$ 24.05$ 228.53$ 228.53$

Jackson North Medical Center, One (1) ThyssenKrupp Traction Passenger Elevator, Elevator # 2, SS #67397, 3000lb, 200FPM, 7 stops/ 7 openings

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 618.08$ 72.71$ 690.79$ 690.79$

Jackson North Medical Center, One (1) ThyssenKrupp Hydraulic Passenger Elevator, Elevator # 1, SS #67396, 2500lb, 100FPM, 2 stops/ 2 openings

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 216.10$ 25.42$ 241.52$ 241.52$ Jackson North Medical Center, One (1) Southeastern Hydraulic Passenger Elevator, Elevator # 9, SS #60872, 2500lb, 100FPM, 2 stops/ 2 openings

GROUP: 16

Item No. 17.1

Item No. 17.2

Item No. 17.4

Item No. 17.5

Item No. 17.6

Item No. 16.1

DEPARTMENT NAME: JACKSON SOUTH COMMUNITY HOSPITAL

Description

GROUP: 17DEPARTMENT NAME: JACKSON NORTH COMMUNITY HOSPITAL, 160 NW 170th Street, North Miami Beach, FL

Description

Item No. 17.3

Page 22: CONTRACT NO. 1233-5/19-4 Elevator and Escalator ...€¦ · maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Contractor Name: Thyssenkrup

Miami-Dade County Contract No. 1233-5/19-4Page 22 of 23

Description # of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 216.10$ 25.42$ 241.52$ 241.52$

Jackson North Medical Center, One (1) ThyssenKrupp Hydraulic Passenger Elevator, Elevator # 7, SS #67398, 2500lb, 100FPM, 3 stops/ 3 openings

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 204.48$ 24.05$ 228.53$ 228.53$

Jackson North Medical Center, One (1) ThyssenKrupp Hydraulic Passenger Elevator, Elevator # 8, SS #67399, 2500lb, 100FPM, 3 stops/ 3 openings

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 204.48$ 24.05$ 228.53$ 228.53$ Jackson North Medical Center, One (1) DA Matot Clean Dumbwaiter, Elevator # 1 , SS #60873, 700lb, 70FPM, 7 stops/ 7 openings

Monthly Cost for Maintenance Services

Labor and Materials component of price 1 164.98$ 19.41$ 184.38$ 184.38$

Jackson North Medical Center, One (1) DA Matot Dirty Dumbwaiter, Elevator # 2, SS #60874, 700lb, 70FPM 7 stops/ 7 openings

Monthly Cost for Maintenance ServicesLabor and Materials component of price 1 164.98$ 19.41$ 184.38$ 184.38$

GROUP 15 MONTHLY TOTAL: 2,699.11$

During Regular Work Hours

During Other Than Regular Working Hours and Saturdays

During Sundays and Holidays

During Regular Work Hours

During Other Than Regular Working Hours and Saturdays

Elevator Mechanic

$ 258.18 $ 258.18 $ 258.18

Stand-By Effective 8/1/2018 Minor Repair 8/1/2018 Major Repair 8/1/2018

Item No. 18.2

$ 167.82 $ 167.82 $ 167.82

Item No. 18.3

CHARGES FOR OPTIONAL EMERGENCY/ADDITIONAL SERVICES

Item No. 18.1

GROUP: 18

Elevator Mechanic Helper Stand-By Effective 8/1/2018 Minor Repair 8/1/2018 Major Repair 8/1/2018

$ 129.09 $ 129.09 $ 129.09

Item No. 18.4

$ 151.81 $ 151.81 $ 151.81

Item No. 18.5

$ 197.35 $ 197.35 $ 197.35

Item No. 17.8

Item No. 17.10

Item No. 17.7

Item No. 17.9

Page 23: CONTRACT NO. 1233-5/19-4 Elevator and Escalator ...€¦ · maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Contractor Name: Thyssenkrup

Miami-Dade County Contract No. 1233-5/19-4Page 23 of 23

Description # of units Overtime (per unit) Labor Material Unit Cost

Adjustment Effective

10/01/2018 Total Monthly

During Sundays and Holidays

During Regular Work Hours

During Other Than Regular Working Hours and Saturdays

During Sundays and Holidays

Item No. 18.7

$ 178.66 $ 178.66 $ 178.66

Item No. 18.8

$ 232.32 $ 232.32 $ 232.32

Item No. 18.6

$ 303.62 $ 303.62 $ 303.62

Item No. 18.9

$ 357.32 $ 357.32 $ 357.32

Elevator Adjuster Stand-By Effective 8/1/2018 Minor Repair 8/1/2018 Major Repair 8/1/2018