Miami-Dade County Contract No. 1233-5/19-4Page 1 of 23
Rev 11/01/2019
`
Contractor Contact Information: Timothy Cleckner: 305-375-2056
Percent Increase This PeriodPeriod: 2019 Labor @ Material @
Period: 2018 Labor @ 3.27% Material @ 9.34%
Net percent change this adjustment: 4.43%
Description # of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
Eight (8) Westmount Industries Belt Type Moving Walk, DC# 6021: 8620D1 Skyride to Terminal D; DC# 6022, 8620D2 Skyride to Terminal D; DC# 6023, 8620E1 Skyride to Terminal E; DC# 6024, 8620E2 Skyride to Terminal E; DC# 6025, 8620E4 Skyride to Terminal E; DC# 6026, 8620E3 Skyride to Terminal E; DC# 6027, 8620F2 Skyride to Terminal F; DC# 6028, 8620F1 Skyride to Terminal F
A Labor and Materials 8 2,720.16$ 683.41$ 3,403.57$ 27,228.59$
BOvertime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 8 1,634.49$ 1,634.49$ 13,075.94$ Building 100, One (1) Mowrey Hydraulic Passenger Elevator, State Serial # 69294, DC # 6790
A Labor and Materials 1 75.18$ 19.91$ 95.09$ 95.09$
BOvertime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Building 100, One (1) Mowrey Hydraulic Passenger Elevator, State Serial# 66670, DC# 2653
A Labor and Materials 1 75.18$ 19.91$ 95.09$ 95.09$
BOvertime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$
Contractor Name: Thyssenkrup ElevatorElevator and Escalator Maintenance & Repair Services
CONTRACT NO. 1233-5/19-4
Contract Period: June 1, 2010 to November 30, 2019
Internal Services Department
Internal Services Department FUMD Office of Elevator Safety Contact Information:
Nicolas Ortiz: 305-375-3912Joel Perez ([email protected]); Moraes, Lucas ([email protected]); Guerrero, Ruben <[email protected]>
GROUP: 1
Item No. 1.1
Item No. 1.2
Item No. 1.3
DEPARTMENT NAME: AVIATION DEPARTMENT
Miami-Dade County Contract No. 1233-5/19-4Page 2 of 23
Description # of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
Building 700, Three (3) Mowrey Hydraulic Passenger Elevator, State Serial# 70384 - 70386, DC# 7971-7973
A Labor and Materials 3 75.18$ 19.91$ 95.09$ 285.28$
BOvertime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 3 176.52$ 176.52$ 529.57$
Building 702, Three (3) Mowrey Hydraulic Passenger Elevator, State Serial# 70381 - 70383, DC# 7968 - 7970
A Labor and Materials 3 75.18$ 19.91$ 95.09$ 285.28$
BOvertime preventive maintenance and repair: In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 3 176.52$ 176.52$ 529.57$
Building 706 (South), One (1) Mowrey Hydraulic Passenger Elevator, State Serial# 71103, DC# 8743
A Labor and Materials 1 75.18$ 19.91$ 95.09$ 95.09$
BOvertime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Building 706 (South), One (1) Mowrey Hydraulic Passenger Elevator, State Serial # 71104, DC# 8744
A Labor and Materials 1 75.18$ 19.91$ 95.09$ 95.09$
BOvertime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Building 706 (North Center), One (1) Mowrey Hydraulic Passenger Elevator, State Serial # 71105, DC# 8745
A Labor and Materials 1 75.18$ 19.91$ 95.09$ 95.09$
BOvertime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive
maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Building 706 (North Center), One (1) Mowrey Hydraulic Passenger Elevator, State Serial# 71106, DC# 8746
A Labor and Materials 1 75.18$ 19.91$ 95.09$ 95.09$
BOvertime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Building 706 (North), One (1) Mowrey Hydraulic Passenger Elevator, State Serial# 71117, DC# 8757
A Labor and Materials 1 75.18$ 19.91$ 95.09$ 95.09$
BOvertime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Building 706 (North Center), One (1) Mowrey Hydraulic Passenger Elevator, State Serial # 71118, DC# 8758
A Labor and Materials 1 75.18$ 19.91$ 95.09$ 95.09$
BOvertime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Building 708 (South Center), One (1) Mowrey Hydraulic Passenger Elevator, State Serial # 71119, DC# 8759
Item No. 1.9
Item No. 1.4
Item No. 1.5
Item No. 1.6
Item No. 1.10
Item No. 1.11
Item No. 1.12
Item No. 1.7
Item No. 1.8
Miami-Dade County Contract No. 1233-5/19-4Page 3 of 23
Description # of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
A Labor and Materials 1 75.18$ 19.91$ 95.09$ 95.09$
BOvertime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Building 708 (South Center), One (1) Mowrey Hydraulic Passenger Elevator, State Serial # 71120, DC# 8760
A Labor and Materials 1 75.18$ 19.91$ 95.09$ 95.09$
BOvertime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Building 716A, One (1) Mowrey Hydraulic Passenger Elevator, State Serial# 71122, DC# 8762
A Labor and Materials 1 75.18$ 19.91$ 95.09$ 95.09$
BOvertime preventive maintenance and repair. In additional to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Concourse E, Gate E-7, One (1) Mowrey/Sedwich Dumbwaiter, State Serial # 65340, DC# 1253
A Labor and Materials 1 75.18$ 19.91$ 95.09$ 95.09$
BOvertime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$
Concourse H, Gate H-12 Dobs House, Deli Bar, One (1) Mowrey Hydraulic Passenger Elevator, State Serial# 70160, DC# 7727; Manufacturer ID# 98914
A Labor and Materials 1 75.18$ 19.91$ 95.09$ 95.09$
BOvertime preventive maintenance and repair. In addition to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 1 58.84$ 58.84$ 58.84$ Various Concourses, Two (2) Mobilift Model AX Manually Operated Wheelchair Lift, Permanent Serial# 46339, 46340; Manufacturer ID# AE92318, AE92319
A Labor and Materials 2 89.52$ 23.69$ 113.21$ 226.42$
BOvertime preventive maintenance and repair. In additional to A)above, total cost for overtime-preventive maintenance & repairs requiring more than two (2) hours of unit down time. 2 127.45$ 127.45$ 254.90$
GROUP 1 MONTHLY TOTAL: 29,261.75$
Description # of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
MODERNIZATION OF INDIVIDUAL COMPONENTS FOR EXISTING ELEVATORS
1 Infrared Door Detector (without trade-in)
A Material per car entrance (without trade-in of light ray and door edge) 1 360.81$ 360.81$ 360.81$
B Labor per car entrance (without trade-in of light ray and door edge) 1 924.28$ 924.28$ 924.28$
2 Infrared Door Detector (with trade-in)
A Material per car entrance (with trade-in of light ray and door edge) 1 360.81$ 360.81$ 360.81$
B Labor per car entrance (with trade-in of light ray and door edge) 1 924.28$ 924.28$ 924.28$
Item No. 1.13
Item No. 1.14
Item No. 1.15
Item No. 1.16
Item No. 1.17
Item No.
Miami-Dade County Contract No. 1233-5/19-4Page 4 of 23
Description # of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
3 ADA Compliant Car Operating Panel (4 Floors or Less)
A Material per each car station (4 floors or less) 1 5,051.32$ 5,051.32$ 5,051.32$
B Labor per each car station (4 floors or less) 1 2,772.85$ 2,772.85$ 2,772.85$
4 ADA Compliant Car Operating Panel (5 or more floors)
A Material per each car station (5 or more floors) 1 5,116.92$ 5,116.92$ 5,116.92$
A Landing Material per each car station (5 or more floors) 1 65.60$ 65.60$ 65.60$
B Labor per each car station (5 or more floors) 1 3,003.14$ 3,003.14$ 3,003.14$
B Landing Labor per each car station (5 or more floors) 1 230.30$ 230.30$ 230.30$ 5 ADA Compliant Hall Fixtures
A Material per landing 1 429.69$ 429.69$ 429.69$
B Labor per landing 1 501.90$ 501.90$ 501.90$
6 ADA Car Fixtures and Signals (except COP)
A Material per entrance 1 324.73$ 324.73$ 324.73$
B Labor per entrance 1 994.51$ 994.51$ 994.51$
7 CCTV Compatible Infrastructure (up to 60')A Material per elevator (up to 60') 1 65.60$ 65.60$ 65.60$
B Labor per elevator (up to 60') 1 921.18$ 921.18$ 921.18$ 8 CCTV Compatible Infrastructure (above 60')
A Material add per foot of travel (above 60') 1 3.28$ 3.28$ 3.28$
B Labor add per foot of travel (above 60') 1 22.72$ 22.72$ 22.72$ 9 Universal Firefighter Service Access Key Switch
A Material per elevator (one elevator with two switches) 1 328.01$ 328.01$ 328.01$
B Labor per elevator (one elevator with two switches) 1 178.66$ 178.66$ 178.66$
C Material per each additional car 1 164.00$ 164.00$ 164.00$
D Labor per each additional car 1 178.66$ 178.66$ 178.66$
10 Rubber Belt
A Westmont moving walk rubber belt 43" x 649' 1 203,652.33$ 203,652.33$ 203,652.33$
B Westmont moving walk rubber belt 31" x 580' 1 159,171.20$ 159,171.20$ 159,171.20$
11 Remote Elevator Monitoring
A Material per elevator 1 1,049.62$ 1,049.62$ 1,049.62$
B Labor per elevator 1 1,123.60$ 1,123.60$ 1,123.60$
12 ADA Compliant Telephone Installation
A Material per elevator 1 196.80$ 196.80$ 196.80$
B Labor per elevator 1 303.62$ 303.62$ 303.62$
DEPARTMENT NAME: INTERNAL SERVICESGROUP: 2
Miami-Dade County Contract No. 1233-5/19-4Page 5 of 23
Description # of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
# of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
Hickman Garage, 270 NW 2nd Street, Two (2) Mowrey Gear Traction Passenger Elevators, S/N 71618, 71619
Labor and Materials component of price 2 205.69$ 54.45$ 260.14$ 520.27$
Coral Gables Courts, 3100 Ponce de Leon Boulevard, Coral Gables, One (1) Mowrey Hydraulic Passenger Elevator, S/N 8030; Manufacturer ID# 9403
Labor and Material Component of Price 1 76.34$ 20.21$ 96.54$ 96.54$
Miami-Dade County Courthouse, 73 West Flagler Street, Miami, Florida, One (1) Eastern 500 lbs. capacity Dumbwaiter, DC #1390
Labor and Material Component of Price 1 105.50$ 9.98$ 115.48$ 115.48$
Miami-Dade County Courthouse, 73 West Flagler Street, Miami, Florida, One (1) Matot 25 lbs. capacity Dumbwaiter, 2 stops/openings, DC #1789
Labor and Material Component of Price 1 105.50$ 9.98$ 115.48$ 115.48$
Miami-Dade County Courthouse, 73 West Flagler Street, Miami, Florida, One (1) Vertical Mobility, LLC, Wheelchair lift, capacity, 750 lbs, s/n 73562
Labor and Material Component of Price 1 138.83$ 13.15$ 151.98$ 151.98$
GSA Fleet Management Division; Shop #3, 8801 Nw 58th Street, Miami, Florida, One (1) Matot Geared Traction Dumbwaiter, Mfg. ID #19892, DC #7203
Labor and Material Component of Price 1 105.50$ 9.98$ 115.48$ 115.48$
Emergency Operation Center, One (1) American Starglide Vertical Wheelchair Lift, Mfg ID #9482-6000, DC #2433
Labor and Material Component of Price 1 105.50$ 9.98$ 115.48$ 115.48$
GROUP 2 MONTHLY TOTAL: 1,230.74$
MODERNIZATION OF INDIVIDUAL COMPONENTS FOR EXISTING ELEVATORS
1 Infrared Door Detector (without trade-in)
A Material per car entrance (without trade-in of light ray and door edge) 1 360.81$ 360.81$ 360.81$
B Labor per car entrance (without trade-in of light ray and door edge) 1 924.28$ 924.28$ 924.28$
2 Infrared Door Detector (with trade-in)
A Material per car entrance (with trade-in of light ray and door edge) 1 360.81$ 360.81$ 360.81$
B Labor per car entrance (with trade-in of light ray and door edge) 1 924.28$ 924.28$ 924.28$
3 ADA Compliant Car Operating Panel (4 Floors or Less)
A Material per each car station (4 floors or less) 1 5,051.32$ 5,051.32$ 5,051.32$
Item No. 2.1
Description
Item No. 2.3
Item No. 2.4
Item No.
Item No. 2.5
Item No. 2.6
Item No. 2.7
Item No. 2.2
Miami-Dade County Contract No. 1233-5/19-4Page 6 of 23
Description # of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
B Labor per each car station (4 floors or less) 1 2,772.85$ 2,772.85$ 2,772.85$
4 ADA Compliant Car Operating Panel (5 or more floors)
A Material per each car station (5 or more floors) 1 5,116.92$ 5,116.92$ 5,116.92$
A Landing Material per each car station (5 or more floors) 1 65.60$ 65.60$ 65.60$
B Labor per each car station (5 or more floors) 1 3,003.14$ 3,003.14$ 3,003.14$
B Landing Labor per each car station (5 or more floors) 1 230.30$ 230.30$ 230.30$ 5 ADA Compliant Hall Fixtures
A Material per landing 1 429.69$ 429.69$ 429.69$
B Labor per landing 1 501.90$ 501.90$ 501.90$
6 ADA Car Fixtures and Signals (except COP)
A Material per entrance 1 324.73$ 324.73$ 324.73$
B Labor per entrance 1 994.51$ 994.51$ 994.51$
7 CCTV Compatible Infrastructure (up to 60')
A Material per elevator (up to 60') 1 65.60$ 65.60$ 65.60$
B Labor per elevator (up to 60') 1 921.18$ 921.18$ 921.18$
8 CCTV Compatible Infrastructure (above 60')
A Material add per foot of travel (above 60') 1 3.28$ 3.28$ 3.28$
B Labor add per foot of travel (above 60') 1 22.72$ 22.72$ 22.72$
9 Universal Firefighter Service Access Key Switch
A Material per elevator (one elevator with two switches) 1 328.01$ 328.01$ 328.01$
B Labor per elevator (one elevator with two switches) 1 178.66$ 178.66$ 178.66$
C Material per each additional car 1 164.00$ 164.00$ 164.00$
D Labor per each additional car 1 178.66$ 178.66$ 178.66$
10 Remote Elevator Monitoring
A Material per elevator 1 1,049.62$ 1,049.62$ 1,049.62$
B Labor per elevator 1 1,123.60$ 1,123.60$ 1,123.60$
11 ADA Compliant Telephone Installation
A Material per elevator 1 196.80$ 196.80$ 196.80$
B Labor per elevator 1 303.62$ 303.62$ 303.62$
# of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
South Miami HUD #5-45, 6701 SW 62nd Avenue, Two (2) Southeastern Westbrook Hydraulic Passenger Elevators
Item No. 3.1
GROUP: 3DEPARTMENT NAME: PUBLIC HOUSING
Description
Miami-Dade County Contract No. 1233-5/19-4Page 7 of 23
Description # of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
Labor and Materials component of price 0 -$ -$ -$ -$
Stirrup Plaza HUD #5-58, Two (2) Southeastern Westbrook Hydraulic Passenger Elevators, Permanent Serial# 7971, 7973; Manufacturer ID# 1-4915, 1-4917
Labor and Materials component of price 0 -$ -$ -$ -$ Palm Court HUD #5-65, 930 NW 95th Street, Two (2) Southeastern Westbrook Hydraulic Passenger Elevators, Serial # 66038, 66039; Manufacturer ID# 6108
Labor and Materials component of price 2 95.03$ 25.15$ 120.18$ 240.36$
Lemon City HUD #5-51, 150 NE 68th Street, Two (2) Imperial Hydraulic Passenger Elevators, Permanent S/N# 69480, 69481; Manufacturer ID#74356, 74357
Labor and Materials component of price 2 84.93$ 22.48$ 107.41$ 214.82$ Edison Park HUD #5-56, 200 NW 55th Street, Two (2) Montgomery Hydraulic Passenger Elevators, Permanent S/N# 69504, 69505; Manufacturer ID# CP-36143, CP-36144
Labor and Materials component of price 2 95.03$ 25.15$ 120.18$ 240.36$ Smathers Plaza Apartment FLA #5-18, 2970 SW 9th Street, Two (2) Eastern Hydraulic Passenger Elevators
Labor and Materials component of price 2 95.03$ 25.15$ 120.18$ 240.36$ Smathers Plaza (High Rise), 935 SW 30th Avenue, Two (2) ThyssenKrupp/Eastern Geared Traction Passenger Elevators, Permanent Serial# 69510, 69511; Manufacturer ID# 7015, 7016
Labor and Materials component of price 2 302.27$ 80.00$ 382.27$ 764.53$
GROUP 3 MONTHLY TOTAL: 1,700.42$
MODERNIZATION OF INDIVIDUAL COMPONENTS FOR EXISTING ELEVATORS
1 Infrared Door Detector (without trade-in)
A Material per car entrance (without trade-in of light ray and door edge) 1 360.81$ 360.81$ 360.81$
B Labor per car entrance (without trade-in of light ray and door edge) 1 924.28$ 924.28$ 924.28$
2 Infrared Door Detector (with trade-in)
A Material per car entrance (with trade-in of light ray and door edge) 1 360.81$ 360.81$ 360.81$
B Labor per car entrance (with trade-in of light ray and door edge) 1 924.28$ 924.28$ 924.28$
3 ADA Compliant Car Operating Panel (4 Floors or Less)
A Material per each car station (4 floors or less) 1 5,051.32$ 5,051.32$ 5,051.32$
B Labor per each car station (4 floors or less) 1 2,772.85$ 2,772.85$ 2,772.85$
4 ADA Compliant Car Operating Panel (5 or more floors)
A Material per each car station (5 or more floors) 1 5,116.92$ 5,116.92$ 5,116.92$
A Landing Material per each car station (5 or more floors) 1 65.60$ 65.60$ 65.60$
B Labor per each car station (5 or more floors) 1 3,003.14$ 3,003.14$ 3,003.14$
Item No.
Item No. 3.3
Item No. 3.4
Item No. 3.5
Item No. 3.6
Item No. 3.7
Item No. 3.2
Miami-Dade County Contract No. 1233-5/19-4Page 8 of 23
Description # of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
B Landing Labor per each car station (5 or more floors) 1 230.30$ 230.30$ 230.30$
5 ADA Compliant Hall Fixtures
A Material per landing 1 429.69$ 429.69$ 429.69$
B Labor per landing 1 501.90$ 501.90$ 501.90$
6 ADA Car Fixtures and Signals (except COP)
A Material per entrance 1 324.73$ 324.73$ 324.73$
B Labor per entrance 1 994.51$ 994.51$ 994.51$
7 CCTV Compatible Infrastructure (up to 60')
A Material per elevator (up to 60') 1 65.60$ 65.60$ 65.60$
B Labor per elevator (up to 60') 1 921.18$ 921.18$ 921.18$
8 CCTV Compatible Infrastructure (above 60')
A Material add per foot of travel (above 60') 1 3.28$ 3.28$ 3.28$
B Labor add per foot of travel (above 60') 1 22.72$ 22.72$ 22.72$
9 Universal Firefighter Service Access Key Switch
A Material per elevator (one elevator with two switches) 1 328.01$ 328.01$ 328.01$
B Labor per elevator (one elevator with two switches) 1 178.66$ 178.66$ 178.66$
C Material per each additional car 1 164.00$ 164.00$ 164.00$
D Labor per each additional car 1 178.66$ 178.66$ 178.66$
10 Remote Elevator Monitoring
A Material per elevator 1 1,049.62$ 1,049.62$ 1,049.62$
B Labor per elevator 1 1,123.60$ 1,123.60$ 1,123.60$
11 ADA Compliant Telephone Installation
A Material per elevator 1 196.80$ 196.80$ 196.80$
B Labor per elevator 1 303.62$ 303.62$ 303.62$
# of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
Northwest Station, 5975 Miami Lakes Drive, One (1) Dover Hydraulic Passenger Elevator
Labor and Materials component of price 1 75.43$ 19.96$ 95.39$ 95.39$
Labor and Materials component of price 0 -$ -$ -$ -$
Item No. 4.1
Item No. 4.2
Description
Cutler Ridge Station, 10800 SW 211 Street, One (1) Dover Hydraulic Passenger Elevator
Northside Station, 2950 NW 83rd Street, One (1) Dover Hydraulic Passenger Elevator, Permanent S/N # 5562; Manufacturer ID# E-70928
Item No. 4.3
GROUP: 4DEPARTMENT NAME: POLICE
Miami-Dade County Contract No. 1233-5/19-4Page 9 of 23
Description # of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
Labor and Materials component of price 1 75.43$ 19.96$ 95.39$ 95.39$
Kendall Station, 7707 SW 117th Avenue, One (1) Dover Hydraulic Passenger Elevator
Labor and Materials component of price 1 75.43$ 19.96$ 95.39$ 95.39$ Intracoastal Station, 15655 Biscayne Boulevard, One (1) Dover Hydraulic Passenger Elevator
Labor and Materials component of price 1 75.43$ 19.96$ 95.39$ 95.39$
GROUP 4 MONTHLY TOTAL: 381.58$
MODERNIZATION OF INDIVIDUAL COMPONENTS FOR EXISTING ELEVATORS
1 Infrared Door Detector (without trade-in)
A Material per car entrance (without trade-in of light ray and door edge) 1 360.81$ 360.81$ 360.81$
B Labor per car entrance (without trade-in of light ray and door edge) 1 924.28$ 924.28$ 924.28$
2 Infrared Door Detector (with trade-in)
A Material per car entrance (with trade-in of light ray and door edge) 1 360.81$ 360.81$ 360.81$
B Labor per car entrance (with trade-in of light ray and door edge) 1 924.28$ 924.28$ 924.28$
3 ADA Compliant Car Operating Panel (4 Floors or Less)
A Material per each car station (4 floors or less) 1 5,051.32$ 5,051.32$ 5,051.32$
B Labor per each car station (4 floors or less) 1 2,772.85$ 2,772.85$ 2,772.85$
4 ADA Compliant Car Operating Panel (5 or more floors)
A Material per each car station (5 or more floors) 1 5,116.92$ 5,116.92$ 5,116.92$
A Landing Material per each car station (5 or more floors) 1 65.60$ 65.60$ 65.60$
B Labor per each car station (5 or more floors) 1 3,003.14$ 3,003.14$ 3,003.14$
B Landing Labor per each car station (5 or more floors) 1 230.30$ 230.30$ 230.30$
5 ADA Compliant Hall Fixtures
A Material per landing 1 429.69$ 429.69$ 429.69$
B Labor per landing 1 501.90$ 501.90$ 501.90$
6 ADA Car Fixtures and Signals (except COP)
A Material per entrance 1 324.73$ 324.73$ 324.73$
B Labor per entrance 1 994.51$ 994.51$ 994.51$
7 CCTV Compatible Infrastructure (up to 60')
A Material per elevator (up to 60') 1 65.60$ 65.60$ 65.60$
B Labor per elevator (up to 60') 1 921.18$ 921.18$ 921.18$
8 CCTV Compatible Infrastructure (above 60')
A Material add per foot of travel (above 60') 1 3.28$ 3.28$ 3.28$
B Labor add per foot of travel (above 60') 1 22.72$ 22.72$ 22.72$
9 Universal Firefighter Service Access Key Switch
Item No.
Item No. 4.4
Item No. 4.5
Miami-Dade County Contract No. 1233-5/19-4Page 10 of 23
Description # of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
A Material per elevator (one elevator with two switches) 1 328.01$ 328.01$ 328.01$
B Labor per elevator (one elevator with two switches) 1 178.66$ 178.66$ 178.66$
C Material per each additional car 1 164.00$ 164.00$ 164.00$
D Labor per each additional car 1 178.66$ 178.66$ 178.66$
10 Remote Elevator Monitoring
A Material per elevator 1 1,049.62$ 1,049.62$ 1,049.62$
B Labor per elevator 1 1,123.60$ 1,123.60$ 1,123.60$
11 ADA Compliant Telephone Installation
A Material per elevator 1 196.80$ 196.80$ 196.80$
B Labor per elevator 1 303.62$ 303.62$ 303.62$
# of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
Alexander Orr Water Treatment Plant, 6800 SW 87th Avenue, One (1) Mowrey Hydraulic Passenger Elevator
Labor and Materials component of price 1 79.67$ 21.06$ 100.73$ 100.73$ South District Waste Water Treatment Plant (Oxygen Plant), 8950 SW 232nd Street, One (1) Mowrey Hydraulic Passenger Elevator, S/N # 71624, Manufacturer ID# 95-051181
Labor and Materials component of price 1 79.67$ 21.06$ 100.73$ 100.73$
Alexander Orr Water Treatment Plant, 6800 SW 87th Avenue, One (1) Sheppard Dumbwaiter, S/N # 65354, DC# 1270
Labor and Materials component of price 1 150.11$ 39.73$ 189.84$ 189.84$
John E. Preston Water Plant, 1100 West 2nd Avenue, Hialeah, One (1) Westinghouse Geared Traction Service Elevator, S/N # 67731; DC # 4175
Labor and Materials component of price 1 200.13$ 52.97$ 253.10$ 253.10$
John E. Preston Water Plant, 1100 West 2nd Avenue, Hialeah, One (1) Sedgwick Dumbwaiter, S/N # 67732; DC# 4176
Labor and Materials component of price 1 99.84$ 26.43$ 126.27$ 126.27$ Main Office, 3575 S. LeJune Road, One (1) Dover Hydraulic Passenger Elevator, S/N # 64657
Labor and Materials component of price 1 121.06$ 32.05$ 153.10$ 153.10$
South District Waste Water Treatment Plant, 8950 SW 232nd Street, One (1) Dover Hydraulic Passenger Elevator, DC# 5511
Labor and Materials component of price 1 166.27$ 44.01$ 210.28$ 210.28$
Description
Item No. 5.1
Item No. 5.2
Item No. 5.3
Item No. 5.4
Item No. 5.5
Item No. 5.6
GROUP: 5DEPARTMENT NAME: WATER AND SEWER
Item No. 5.7
Miami-Dade County Contract No. 1233-5/19-4Page 11 of 23
Description # of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
Central District Wastewater Treatment Plant, Virginia Key, One (1) Dover Hydraulic Passenger Elevator, D/C # 5984;
Labor and Materials component of price 1 95.84$ 25.37$ 121.20$ 121.20$
GROUP 5 MONTHLY TOTAL: 1,255.26$
MODERNIZATION OF INDIVIDUAL COMPONENTS FOR EXISTING ELEVATORS
1 Infrared Door Detector (without trade-in)
A Material per car entrance (without trade-in of light ray and door edge) 1 360.81$ 360.81$ 360.81$
B Labor per car entrance (without trade-in of light ray and door edge) 1 924.28$ 924.28$ 924.28$
2 Infrared Door Detector (with trade-in)
A Material per car entrance (with trade-in of light ray and door edge) 1 360.81$ 360.81$ 360.81$
B Labor per car entrance (with trade-in of light ray and door edge) 1 924.28$ 924.28$ 924.28$
3 ADA Compliant Car Operating Panel (4 Floors or Less)
A Material per each car station (4 floors or less) 1 5,051.32$ 5,051.32$ 5,051.32$
B Labor per each car station (4 floors or less) 1 2,772.85$ 2,772.85$ 2,772.85$
4 ADA Compliant Car Operating Panel (5 or more floors)
A Material per each car station (5 or more floors) 1 5,116.92$ 5,116.92$ 5,116.92$
A Landing Materials per each car station (5 or more floors) 1 65.60$ 65.60$ 65.60$
B Labor per each car station (5 or more floors) 1 3,003.14$ 3,003.14$ 3,003.14$
B Landing per each car station (5 or more floors) 1 230.30$ 230.30$ 230.30$
5 ADA Compliant Hall Fixtures
A Material per landing 1 429.69$ 429.69$ 429.69$
B Labor per landing 1 501.90$ 501.90$ 501.90$
6 ADA Car Fixtures and Signals (except COP)
A Material per entrance 1 324.73$ 324.73$ 324.73$
B Labor per entrance 1 994.51$ 994.51$ 994.51$
7 CCTV Compatible Infrastructure (up to 60')
A Material per elevator (up to 60') 1 65.60$ 65.60$ 65.60$
B Labor per elevator (up to 60') 1 921.18$ 921.18$ 921.18$
8 CCTV Compatible Infrastructure (above 60')
A Material add per foot of travel (above 60') 1 3.28$ 3.28$ 3.28$
B Labor add per foot of travel (above 60') 1 22.72$ 22.72$ 22.72$
9 Universal Firefighter Service Access Key Switch
A Material per elevator (one elevator with two switches) 1 328.01$ 328.01$ 328.01$
B Labor per elevator (one elevator with two switches) 1 178.66$ 178.66$ 178.66$
C Material per each additional car 1 164.00$ 164.00$ 164.00$
Item No.
Item No. 5.8
Miami-Dade County Contract No. 1233-5/19-4Page 12 of 23
Description # of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
D Labor per each additional car 1 178.66$ 178.66$ 178.66$
10 Remote Elevator Monitoring
A Material per elevator 1 1,049.62$ 1,049.62$ 1,049.62$
B Labor per elevator 1 1,123.60$ 1,123.60$ 1,123.60$
11 ADA Compliant Telephone Installation
A Material per elevator 1 196.80$ 196.80$ 196.80$
B Labor per elevator 1 303.62$ 303.62$ 303.62$
# of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
South Dade Regional Library, 10750 SW 211th Street, Miami, Two (2) Westinghouse Hydraulic Passenger Elevators, S/N # 65650, 65651; DC# 1583, 1598
Monthly Cost for Maintenance Services
A Labor and Materials component of price 2 96.19$ 25.46$ 121.65$ 243.30$
MODERNIZATION OF INDIVIDUAL COMPONENTS FOR EXISTING ELEVATORS
1 Infrared Door Detector (without trade-in)
A Material per car entrance (without trade-in of light ray and door edge) 1 360.81$ 360.81$ 360.81$
B Labor per car entrance (without trade-in of light ray and door edge) 1 924.28$ 924.28$ 924.28$
2 Infrared Door Detector (with trade-in)
A Material per car entrance (with trade-in of light ray and door edge) 1 360.81$ 360.81$ 360.81$
B Labor per car entrance (with trade-in of light ray and door edge) 1 924.28$ 924.28$ 924.28$
3 ADA Compliant Car Operating Panel (4 Floors or Less)
A Material per each car station (4 floors or less) 1 5,051.32$ 5,051.32$ 5,051.32$
B Labor per each car station (4 floors or less) 1 2,772.85$ 2,772.85$ 2,772.85$
4 ADA Compliant Car Operating Panel (5 or more floors)
A Material per each car station (5 or more floors) 1 5,116.92$ 5,116.92$ 5,116.92$
A Landing Material per each care station (5 or more floors) 1 65.60$ 65.60$ 65.60$
B Labor per each car station (5 or more floors) 1 3,003.14$ 3,003.14$ 3,003.14$ B Landing Labor per each car station (5 or more floors) 1 230.30$ 230.30$ 230.30$
5 ADA Compliant Hall FixturesA Material per landing 1 429.69$ 429.69$ 429.69$ B Labor per landing 1 501.90$ 501.90$ 501.90$
6 ADA Car Fixtures and Signals (except COP)
A Material per entrance 1 324.73$ 324.73$ 324.73$
Item No.
DEPARTMENT NAME: LIBRARY SYSTEM
Description
Item No. 6.1
GROUP: 6
Miami-Dade County Contract No. 1233-5/19-4Page 13 of 23
Description # of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
B Labor per entrance 1 994.51$ 994.51$ 994.51$
7 CCTV Compatible Infrastructure (up to 60')
A Material per elevator (up to 60') 1 65.60$ 65.60$ 65.60$
B Labor per elevator (up to 60') 1 921.18$ 921.18$ 921.18$
8 CCTV Compatible Infrastructure (above 60')
A Material add per foot of travel (above 60') 1 3.28$ 3.28$ 3.28$
B Labor add per foot of travel (above 60') 1 22.72$ 22.72$ 22.72$
9 Universal Firefighter Service Access Key Switch
A Material per elevator (one elevator with two switches) 1 328.01$ 328.01$ 328.01$
B Labor per elevator (one elevator with two switches) 1 178.66$ 178.66$ 178.66$
C Material per each additional car 1 164.00$ 164.00$ 164.00$
D Labor per each additional car 1 178.66$ 178.66$ 178.66$
10 Remote Elevator Monitoring
A Material per elevator 1 1,049.62$ 1,049.62$ 1,049.62$
B Labor per elevator 1 1,123.60$ 1,123.60$ 1,123.60$
11 ADA Compliant Telephone Installation
A Material per elevator 1 196.80$ 196.80$ 196.80$
B Labor per elevator 1 303.62$ 303.62$ 303.62$
# of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
Dade County Jail – East Wing, 1321 Nw 13th Street, Miami, Florida, One (1) Montgomery Hydraulic Passenger Elevator, Mfg. ID #CP-24102, DC #0154
Monthly Cost for Maintenance ServicesLabor and Materials component of price 1 127.72$ 12.09$ 139.81$ 139.81$
# of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
Dade County Auditorium, 2901 West Flagler Street, Miami, Florida, One (1) Globe Hoist Company Stage Lift, Mfg. Id #B-17475-CHS
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 639.60$ 58.88$ 698.48$ 698.48$
Item No. 8.1
GROUP: 7DEPARTMENT NAME: CORRECTIONS AND REHABILITATION
Description
Item No. 7.1
GROUP: 8DEPARTMENT NAME: PARKS, RECREATION AND OPEN SPACES
Description
Miami-Dade County Contract No. 1233-5/19-4Page 14 of 23
Description # of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
Deering Estate, 16701 SW 72nd Avenue, Miami, Florida, One (1) Garaventa Type SP/SPC Passenger Wheelchair Lift,MFG Id. 8204, DC # 9234
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 105.50$ 9.98$ 115.48$ 115.48$ Joseph Caleb Center, 5400 Nw 22 Avenue, Miami, Wheelchair Lift, Concord Lift Model # 72246, S/N 72246
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 105.50$ 9.98$ 115.48$ 115.48$ A.D. BARNES AQUATIC CENTER, 3701 SW 72 AVENUE, MIAMI, FLORIDA Wheelchair Lift, Garaventa Vertical Lift Model - GenesisS/N 75935, DC-12087
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 56.76$ 139.12$ 195.88$ 195.88$ Crandon Park Marina Dock Master, 4000 Crandon Boulevard, Key Biscayne, FL 33149, One (1) Hydraulic Passenger Elevator, State Serial #76418, DC-12558
Monthly Cost for Maintenance ServicesLabor and Materials component of price 1 150.43$ 24.56$ 174.98$ 174.98$
GROUP 8 MONTHLY TOTAL: 1,300.31$
# of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
Wynwood Neighborhood Center, (Eugenio De Hostos), 2902 NW 2nd Avenue, Miami, Two (2) Dover IVO Passenger Elevator, Mfg. ID #E-51154, E-51155, DC #4574, 4575
Monthly Cost for Maintenance Services
Labor and Materials component of price 2 221.00$ 20.93$ 241.93$ 483.86$
North Dade Victim Center, 7831 NE Miami Court, Miami, One (1) Allstate Hydraulic Passenger Elevator, DC #6695
Monthly Cost for Maintenance ServicesLabor and Materials component of price 1 109.94$ 10.41$ 120.35$ 120.35$
GROUP 9 MONTHLY TOTAL: 604.21$
# of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
Item No. 8.3
Item No. 8.2
Item No. 8.4
Item No. 8.5
GROUP: 9DEPARTMENT NAME: HUMAN SERVICES
Description
Item No. 9.1
Item No. 9.2
GROUP: 10DEPARTMENT NAME: MIAMI DADE LIBRARIES
Description
Miami-Dade County Contract No. 1233-5/19-4Page 15 of 23
Description # of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
Coconut Grove Library, 2875 Mc Farlane Road, Coconut Grove, Matot Dumbwaiter
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 105.50$ 9.98$ 115.48$ 115.48$
Coral Gables Library, 3443 Segovia Street, All State Hydraulic Passenger Elevator
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 105.50$ 9.98$ 115.48$ 115.48$ West Dade Regional Library, 9445 SW 24th Street, Miami, Century Hydraulic Passenger Elevators
Monthly Cost for Maintenance Services
Labor and Materials component of price 2 221.00$ 20.93$ 241.93$ 483.86$
West Dade Regional Library, 10201 Hammocks Boulevard, Miami, Mowrey Hydraulic Passenger Elevators, Mfg. ID #9-2-928554 A & B, DC #7482, 83
Monthly Cost for Maintenance ServicesLabor and Materials component of price 2 221.00$ 20.93$ 241.93$ 483.86$
GROUP 10 MONTHLY TOTAL: 1,198.68$
# of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
Dodge Island, Miami, Florida, Terminal 6 & 7, ESS/Southeastern Hydraulic Passenger Elevators, DC #0147, 0148, 0149
Monthly Cost for Maintenance ServicesLabor and Materials component of price 3 329.84$ 31.23$ 361.07$ 1,083.20$
# of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
Vizcaya Art Museum, 3251 South Miami Avenue, Miami, Otis Pushbutton Traction Service Elevator, Mfg. ID #303555, SS#65443, DC #1368
Monthly Cost for Maintenance Services
Labor and Materials component of price 0 -$ -$ -$ -$
GROUP: 11
Item No. 11.1
GROUP: 12DEPARTMENT NAME: VIZCAYA MUSEUM & GARDENS
Description
Item No. 12.1
Item No. 10.1
Item No. 10.2
Item No. 10.3
Item No. 10.4
DEPARTMENT NAME: SEAPORT
Description
Miami-Dade County Contract No. 1233-5/19-4Page 16 of 23
Description # of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
Vizcaya Art Museum, 3251 South Miami Avenue, Miami, Garaventa Stair Climber (outside) Wheelchair Lift, Mfg. Id. #89-0731-45, SS#75284
Monthly Cost for Maintenance Services
Labor and Materials component of price 0 -$ -$ -$ -$ Vizcaya Art Museum, 3251 South Miami Avenue, Miami, Garaventa Stair-Lift (Gift Shop) Wheelchair Lift, SS#76537, DC #12660
Monthly Cost for Maintenance ServicesLabor and Materials component of price 0 -$ -$ -$ -$
GROUP 12 MONTHLY TOTAL: -$
# of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
Dadeland South Station, 9150 Dadeland Boulevard, Miami, One (1) Hydraulic Passenger Elevator, State Serial # 72630, DC # 6073
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$
Dadeland North Station, 8320 S. Dixie Highway, Miami, One (1) Hydraulic Passenger Elevator, SS#72631, DC #6074
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$ South Miami Station, 5949 S.W. 72nd Street, Miami, One (1) Hydraulic Passenger Elevator, SS #72632, DC #6075
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$
South Miami Station, Parking Garage, One (1) Mowrey Hydraulic Passenger Elevator, SS# 72605, DC #5921
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 303.35$ 65.78$ 369.13$ 369.13$
South Miami Station, Parking Garage, One (1) Mowrey Hydraulic Passenger Elevator, SS# 72606, DC #5922
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 303.35$ 65.78$ 369.13$ 369.13$ University Station, 55 Ponce de Leon Boulevard, Miami, One (1) Hydraulic Passenger Elevator, SS #72633, DC #6076
Item No. 12.2
Item No. 12.3
GROUP: 13DEPARTMENT NAME: DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS (TRANSIT)
Description
Item No. 13.1
Item No. 13.2
Item No. 13.3
Item No. 13.4
Item No. 13.5
Item No. 13.6
Miami-Dade County Contract No. 1233-5/19-4Page 17 of 23
Description # of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$
Douglas Road Station, 2780 S.W. 27th Avenue, Miami, FL, One (1) Hydraulic Passenger Elevator, SS #72634, DC #6077
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$
Coconut Grove Station, 2780 S.W. 27th Avenue, Miami, One (1) Hydraulic Passenger Elevator, SS # 72635, DC #6078
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$ Brickell Station, 1001 S.W. 1st Avenue, Miami, One (1) Hydraulic Passenger Elevator, SS #72637, DC #6080
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$
Overtown Station, 100 N.W. 6 Street, Miami, One (1) Hydraulic Passenger Elevator, SS # 72644, DC #6087
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$
Culmer Station, 701 N.W. 11 Street, Miami, One (1) Hydraulic Passenger Elevator,SS# 72645, DC # 6088
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$ Allapattah Station, 3501 N.W. 12 Avenue, Miami, One (1) Hydraulic Passenger Elevator, SS #72653, DC #6096
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$
Earlington Heights, 2100 N.W. 41st Street, Miami, One (1) Hydraulic Passenger Elevator, SS #72654, DC # 6097
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$
Hialeah Station,6601 East 21Street, Hialeah, One (1) Hydraulic Passenger Elevator, SS #72664, DC #6107
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$ Hialeah Station, Parking Overpass, One (1) Hydraulic Passenger Elevator, SS #72671, DC #6186
Item No. 13.8
Item No. 13.9
Item No. 13.10
Item No. 13.11
Item No. 13.12
Item No. 13.13
Item No. 13.14
Item No. 13.15
Item No. 13.7
Miami-Dade County Contract No. 1233-5/19-4Page 18 of 23
Description # of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 234.64$ 51.54$ 286.18$ 286.18$
Hialeah Station, Parking Garage, One (1) Hydraulic Passenger Elevator, SS #72672, DC #6187
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 234.64$ 51.54$ 286.18$ 286.18$
Okeechobee Station, 2005 W. Okeechobee Road, Hialeah, FL, One (1) Hydraulic Passenger Elevator, SS #72666, DC #6109
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$ Okeechobee Station, Parking Garage, One (1) Hydraulic Passenger Elevator, SS # 72667, DC #6112
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 240.11$ 52.08$ 292.18$ 292.18$
Okeechobee Station, Parking Garage, One (1) Hydraulic Passenger Elevator, SS #72668, DC #6113
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 240.11$ 52.08$ 292.18$ 292.18$
Metrobus Central Administration Building, 3300 N.W. 32 Avenue, Hialeah, FL, One (1) Hydraulic Passenger Elevator, SS #72572, DC #5601
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 288.22$ 62.50$ 350.72$ 350.72$ Metrobus Central Administration Building, 3300 N.W. 32 Avenue, Hialeah, FL, One (1) Hydraulic Passenger Elevator, SS #72577, DC #5648
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$
Metrobus Central Administration Building, 3300 N.W. 32 Avenue, Hialeah, FL, One (1) Electric Passenger Elevator, SS #72561, DC #0984
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 363.25$ 78.77$ 442.01$ 442.01$
Metrobus Coral Way Facility, 2175 S.W. 74th Avenue, Miami, One (1) Hydraulic Passenger Elevator, SS #72566, DC #2763
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$ Metrobus Coral Way Facility, 2175 S.W. 74th Avenue, Miami, One (1) Hydraulic Passenger Elevator, SS #72567, DC #2764
Item No. 13.21
Item No. 13.22
Item No. 13.16
Item No. 13.20
Item No. 13.23
Item No. 13.24
Item No. 13.17
Item No. 13.18
Item No. 13.19
Miami-Dade County Contract No. 1233-5/19-4Page 19 of 23
Description # of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$
William Lehman Center (Palmetto Yard), 6601 N.W. 72nd Avenue, Miami, One (1) Hydraulic Passenger Elevator, SS # 72569, DC # 5556
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$ William Lehman Center (Palmetto Yard), 6601 N.W. 72nd Avenue, Miami, One (1) Hydraulic Passenger Elevator, SS #72570, DC #5557
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$
William Lehman Center (Palmetto Yard), 6601 N.W. 72nd Avenue, Miami, One (1) Hydraulic Passenger Elevator, SS #72570, DC #5557
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$
Vizcaya Station, 3201 S.W. 1st Avenue, Miami, FL, One Hydraulic Passenger Elevator, SS #72636, DC #6079
Monthly Cost for Maintenance ServicesLabor and Materials component of price 1 261.60$ 56.73$ 318.33$ 318.33$
GROUP 13 MONTHLY TOTAL: 9,054.37$
# of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
Jackson Memorial Hospital, Long Term Care, Institute Annex Building, 4th Floor, Miami, FL, Three (3) Hydraulic Passenger Elevators, SS #'s 65861, 65860, 70095; DC#’s 1801, 1800, 7662
Monthly Cost for Maintenance ServicesLabor and Materials component of price 0 -$ -$ -$ -$
# of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
Jackson Memorial Hospital, Alamo, One (1) Century/Eastern Hydraulic Passenger Elevator, SS #68819, DC #6168
Monthly Cost for Maintenance Services
Item No. 13.28
DEPARTMENT NAME: JACKSON MEMORIAL HOSPITAL - LONG TERM CARE
Description
Item No. 14.1
Item No. 15.1
Item No. 13.25
Item No. 13.26
Item No. 13.27
GROUP: 15DEPARTMENT NAME: JACKSON MEMORIAL HOSPITAL
Description
GROUP: 14
Miami-Dade County Contract No. 1233-5/19-4Page 20 of 23
Description # of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
Labor and Materials component of price 1 376.94$ 147.60$ 524.55$ 524.55$ Jackson Memorial Hospital, Ambulatory Care Center (ACC) East, One (1) Century/Eastern Hydraulic Passenger (Glass) Elevator, SS # 64821, DC # 0680
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 407.92$ 169.47$ 577.39$ 577.39$
Jackson Memorial Hospital, Ambulatory Care Center West, Four (4) Montgomery Geared Passenger Elevators, SS #'s 67333, 67334, 67335, 67336; DC#’s 3576, 3577, 3578, 3579
Monthly Cost for Maintenance Services
Labor and Materials component of price 0 -$ -$ -$ -$
Jackson Memorial Hospital, Highland Park Garage, Two (2) Montgomery Geared Passenger Elevator, State S/N’s 70512, 70513; DC#’s 8131, 8132
Monthly Cost for Maintenance Services
Labor and Materials component of price 0 -$ -$ -$ -$ Jackson Memorial Hospital, Highland Park Garage, Three (3) Montgomery Geared Passenger Elevators, State S/N’s 70514, 70515, 70516; DC#’s 8133, 8134, 8135
Monthly Cost for Maintenance Services
Labor and Materials component of price 0 -$ -$ -$ -$ Jackson Memorial Hospital, Highland Pavillion, Two (2) Montgomery Geared Passenger Elevators, State S/N’s 69699, 69700; DC#’s 7210, 7211
Monthly Cost for Maintenance Services
Labor and Materials component of price 2 877.81$ 333.47$ 1,211.28$ 2,422.57$
Jackson Memorial Hospital, Park Plaza West, Two (2) Montgomery Geared Passenger Elevators, SS # 65985, 65987; DC#’s 1932, 1934
Monthly Cost for Maintenance Services
Labor and Materials component of price 0 -$ -$ -$ -$ Jackson Memorial Hospital, Park Plaza West, Two (2) Montgomery Geared Passenger Elevators, SS # 65986, 65986, DC#’s 1933, 1935
Monthly Cost for Maintenance Services
Labor and Materials component of price 0 -$ -$ -$ -$ Jackson Memorial Hospital, Park Plaza West, One (1) Armor Hydraulic Freight Elevator, SS # 65989, DC# 1936
Monthly Cost for Maintenance Services
Labor and Materials component of price 0 -$ -$ -$ -$
Additional Charge for Resident Mechanic
Monthly Cost for Maintenance ServicesLabor and Materials component of price 0 -$ -$ -$ -$
GROUP 15 MONTHLY TOTAL: 3,524.51$
Item No. 15.6
Item No. 15.7
Item No. 15.8
Item No. 15.10
Item No. 15.5
Item No. 15.2
Item No. 15.3
Item No. 15.4
Item No. 15.9
Miami-Dade County Contract No. 1233-5/19-4Page 21 of 23
Description # of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
# of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
Jackson South Community Hospital, 9333 S.W. 152 Street, Miami, Six (6) Eastern Hydraulic Passenger Elevators, SS #'s 65469, 65470, 65135, 65136, 65472, 65471, DC#’s 1396, 1397, 1024, 1025, 1399, 1398
Monthly Cost for Maintenance ServicesLabor and Materials component of price 0 -$ -$ -$ -$
# of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
Jackson North Medical Center, One (1) Dover Hydraulic Passenger Elevator, Elevator # 15, SS #70083, 4000lb, 100FPM, 2 stops/ 2 openings
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 210.67$ 24.79$ 235.46$ 235.46$ Jackson North Medical Center, One (1) Dover Hydraulic Passenger Elevator, Elevator # 11, SS #67407, 2500lb, 100FPM, 3 stops/ 3 openings
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 210.67$ 24.79$ 235.46$ 235.46$
Jackson North Medical Center, One (1) Dover Hydraulic Passenger Elevator, Elevator # 10, SS #68352, 2500lb, 100FPM, 2 stops/ 2 openings
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 204.48$ 24.05$ 228.53$ 228.53$
Jackson North Medical Center, One (1) ThyssenKrupp Traction Passenger Elevator, Elevator # 2, SS #67397, 3000lb, 200FPM, 7 stops/ 7 openings
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 618.08$ 72.71$ 690.79$ 690.79$
Jackson North Medical Center, One (1) ThyssenKrupp Hydraulic Passenger Elevator, Elevator # 1, SS #67396, 2500lb, 100FPM, 2 stops/ 2 openings
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 216.10$ 25.42$ 241.52$ 241.52$ Jackson North Medical Center, One (1) Southeastern Hydraulic Passenger Elevator, Elevator # 9, SS #60872, 2500lb, 100FPM, 2 stops/ 2 openings
GROUP: 16
Item No. 17.1
Item No. 17.2
Item No. 17.4
Item No. 17.5
Item No. 17.6
Item No. 16.1
DEPARTMENT NAME: JACKSON SOUTH COMMUNITY HOSPITAL
Description
GROUP: 17DEPARTMENT NAME: JACKSON NORTH COMMUNITY HOSPITAL, 160 NW 170th Street, North Miami Beach, FL
Description
Item No. 17.3
Miami-Dade County Contract No. 1233-5/19-4Page 22 of 23
Description # of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 216.10$ 25.42$ 241.52$ 241.52$
Jackson North Medical Center, One (1) ThyssenKrupp Hydraulic Passenger Elevator, Elevator # 7, SS #67398, 2500lb, 100FPM, 3 stops/ 3 openings
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 204.48$ 24.05$ 228.53$ 228.53$
Jackson North Medical Center, One (1) ThyssenKrupp Hydraulic Passenger Elevator, Elevator # 8, SS #67399, 2500lb, 100FPM, 3 stops/ 3 openings
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 204.48$ 24.05$ 228.53$ 228.53$ Jackson North Medical Center, One (1) DA Matot Clean Dumbwaiter, Elevator # 1 , SS #60873, 700lb, 70FPM, 7 stops/ 7 openings
Monthly Cost for Maintenance Services
Labor and Materials component of price 1 164.98$ 19.41$ 184.38$ 184.38$
Jackson North Medical Center, One (1) DA Matot Dirty Dumbwaiter, Elevator # 2, SS #60874, 700lb, 70FPM 7 stops/ 7 openings
Monthly Cost for Maintenance ServicesLabor and Materials component of price 1 164.98$ 19.41$ 184.38$ 184.38$
GROUP 15 MONTHLY TOTAL: 2,699.11$
During Regular Work Hours
During Other Than Regular Working Hours and Saturdays
During Sundays and Holidays
During Regular Work Hours
During Other Than Regular Working Hours and Saturdays
Elevator Mechanic
$ 258.18 $ 258.18 $ 258.18
Stand-By Effective 8/1/2018 Minor Repair 8/1/2018 Major Repair 8/1/2018
Item No. 18.2
$ 167.82 $ 167.82 $ 167.82
Item No. 18.3
CHARGES FOR OPTIONAL EMERGENCY/ADDITIONAL SERVICES
Item No. 18.1
GROUP: 18
Elevator Mechanic Helper Stand-By Effective 8/1/2018 Minor Repair 8/1/2018 Major Repair 8/1/2018
$ 129.09 $ 129.09 $ 129.09
Item No. 18.4
$ 151.81 $ 151.81 $ 151.81
Item No. 18.5
$ 197.35 $ 197.35 $ 197.35
Item No. 17.8
Item No. 17.10
Item No. 17.7
Item No. 17.9
Miami-Dade County Contract No. 1233-5/19-4Page 23 of 23
Description # of units Overtime (per unit) Labor Material Unit Cost
Adjustment Effective
10/01/2018 Total Monthly
During Sundays and Holidays
During Regular Work Hours
During Other Than Regular Working Hours and Saturdays
During Sundays and Holidays
Item No. 18.7
$ 178.66 $ 178.66 $ 178.66
Item No. 18.8
$ 232.32 $ 232.32 $ 232.32
Item No. 18.6
$ 303.62 $ 303.62 $ 303.62
Item No. 18.9
$ 357.32 $ 357.32 $ 357.32
Elevator Adjuster Stand-By Effective 8/1/2018 Minor Repair 8/1/2018 Major Repair 8/1/2018