contentssummary monthly construction...

80
EXTERIOR DESIGN BUILD TEAM I JE DUNN I TREANORHL ARCHITECTS I ADG OKLAHOMA STATE CAPITOL RESTORATION Exterior Rehabilitation Contents Summary Safety Window Progress Field Reports Progress Photos 1 2 3 4 5 6 ` 15039DB MONTHLY CONSTRUCTION PROGRESS REPORT Attachments JULY 2017 TATE CAPITOL RESTORA A STATE CAPITOL RESTOR

Upload: duongduong

Post on 04-May-2018

215 views

Category:

Documents


2 download

TRANSCRIPT

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Summary

Contents

Key Activities

Scope Development

Schedule

Progress Photos

12345

EXTERIOR DESIGN BUILD TEAM I JE DUNN I TREANOR ARCHITECTS I ADG

JULY 2016

OKLAHOMA STATE CAPITOL RESTORATION

Exterior Rehabilitation

EXTERIOR DESIGN BUILD TEAM I JE DUNN I TREANORHL ARCHITECTS I ADG

OKLAHOMA STATE CAPITOL RESTORATION

Exterior Rehabilitation

ContentsSummary

Safety

Window Progress

Field Reports

Progress Photos

123456

`15

039D

B M

ONTH

LY C

ONST

RUCT

ION

PROG

RESS

REP

ORT

Attachments

JULY 2017

TATE CAPITOL RESTORAA STATE CAPITOL RESTOR

LYNNTU
Snapshot

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

JULY 2017

Summary During the month of July on the Oklahoma Capitol Exterior Restoration project we have made siginificant progress on the completion of the north wing restoration With the final completion of the north wing taking place at the beginning of August the south wing has seen an increased amount of scaffolding acitivity All scaffold components that have been dismantled from the north wing are in the process of being erected on the south side of the Capitol The restoration of the south wing east elevation has begun with cleaning at the gutter level and raking from the top of the elevation down Once raking activities are complete our team will complete a joint masonry repair walk to determine if additional repairs are to be completed Further on the south wing south elevation other wise known as the ldquoSouth Porticordquo section scaffold erection has begun Due to the large cavity space below the steps of the South Portico the scaffolding is being erected on large beams that span columns beneath the stairs This section of scaffolding is scheduled to be completely erected by mid-August Furthermore the work taking place on the north and south wing of the building work on our largest elevation of scaffolding thus far Delta is progressing Due to the large size of the Delta eleva-tion we have split the elevation into two parts Delta Phase One (west) and Delta Phase Two (east) Work on Delta Phase One is in the process of being completed All masonry restoration items have been completed as well as exterior window restoration Final window sealants and spray testing have been completed on Delta Phase One as well This section of scaffolding is currently scheduled to be dismantled ahead of schedule in mid-August with Phase Two being dismantled at the end of September following the completion of the window restoration activities Both sections of scaffolding will then be moved to the east wing south elevation Foxtrot Lastly on our Echo elevation masonry cleaning activities are in progress and window pre-repairs are beginning Once window restoration activities are completed on Delta Phase Two they will continue onto Echo In addition to the work that we have taking place on the scaffoling over the course of the next few weeks our exterior team will begin planning for work on several remaining exterior restoration scope items around the Capitol These activities include restoration of the ballustrades restoration and foundation repairs to the battlements repairs to the granite steps replacement of the retaining walls and waterproofing replacement and repairs around the exterior of the Capitol

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

KeyActivities

- Bravo exterior window restoration complete - Bravo masonry restoration complete - Bravo scaffold removal complete - Charlie exterior window restoration complete - Charlie masonry restoration complete - Charlie scaffold removal complete - Delta masonry repairs complete - Delta cleaning complete - Delta Phase 1 (west half) window install complete - Delta Phase II (east half) window install in progress - Delta copper gutter install in progress - Delta parapet repairs in progress - Delta tarps removed - Echo masonry cleaning in progress - Echo window pre-repairs in progress - Golf scaffold erection complete - Golf masonry raking in progress - Hotel scaffold erection in progress

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

SafetyThe safety of our workforce and the general public during the course of construction is the most import-ant task that we must deliver To that end every craftsmen involved with the project receives a detailed project orientation and prior to performing any task the teams develop detailed task specific work plans These work plans are often called Job Site Analysis (JSA) and assist project teams with analyzing different hazards associated with each work activity prior to beginning work

Safety Data and Metrics

Orientations Performed through 073117 309

First Aid Incidents 0

OSHA Recordable Incidents 0

Trade Partner Incidents 0

Total Man-Hours for the month of July (hrs) 4136

Total Project Man-Hours (hrs) 58310

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

Safety Spotlight

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

A ldquoScaffold Modification Permitrdquo system has been put into place on our Exterior Capitol Restoration Project The scaf-folding on-site is a major component of the project Due to the nature of our work some trades require close access to the Capitolrsquos facade In order to maintain a safe work environment if any component of the scaffold has to be adjust-ed in order to complete work the above permit must be filled out and completed prior to any scaffold modificationrsquos taking place Once the scaffold component has been restored to its original state that specific area is reviewed and signed off by Mark 1 Restoration who is in charge of building the scaffold and ensuring it provides a safe work area

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Window Restoration Progress

The following pictures show progress of the window restoration process at ReViewrsquos off-site facility Once these components are fully restored off-site they will be shipped back to the jobsite and prepared for final installation

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Progress Photos amp Field Reports

The photos and field reports attached in the subsequent pages represent progress photos taken during the month of July and reports on recently completed work for the Oklahoma State Capitol Exterior Restoration project

Drone Footage

June Drone Footage gt Click Here httpsvimeocom222121078[vimeocom]

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 1 of 6

FIELD OBSERVATION REPORT REPORT NO 40 DATE 752017

TIME 1000 AM DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE 85deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Final pointing mortar work progressing on north elevation of dome platform

2 Window frame painting progressing on east elevation of north wing (Charlie)

3 Stone repair work progressing on north elevation of east wing (Delta)

4 Final pointing mortar work progressing on north elevation of east wing (Delta)

5 Window frame abatement progressing on east elevation of east wing (Echo)

6 Stone cleaning progressing on east elevation of east wing (Echo)

7 Scaffold installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 2 of 6

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Final pointing mortar work progressing on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 3 of 6

Window frame painting progressing on east elevation of north wing (Charlie)

Stitch pinning in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 4 of 6

Stone patch in progress on north elevation of east wing (Delta)

Final pointing mortar work in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 5 of 6

Window frame abatement in progress on east elevation of east wing (Echo)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 6 of 6

Scaffold installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 1 of 9

FIELD OBSERVATION REPORT REPORT NO 41 DATE 7112017

TIME 1115 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Scaffold tarp removed from east elevation of north wing (Charlie)

3 Final cleaning progressing on east elevation of north wing (Charlie)

4 Stone repair work progressing on north elevation of dome platform

5 Stone repair work progressing on north elevation of east wing (Delta)

6 Final pointing mortar work progressing on north elevation of east wing (Delta)

7 Sealant work progressing on north elevation of east wing (Delta)

8 Stone cleaning progressing on east elevation of east wing (Echo)

9 Ducts in place for air handler on east elevation of east wing (Echo)

10 Scaffold in place on east elevation of south wing (Golf)

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 11 2017 for items discussed during the meeting

2 The light well wall coating mockup was reviewed with the State at the north elevation west wing

(Lima) light well Trait Thompson Jason Cady Matthew Radcliffe Lindsey Ross Lynnsee Boyse

Mark Maska Peter Breninger and Mike Thompson were in attendance The light well wall

coating without the leveling compound was selected by those in attendance

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 2 of 9

3 The InteriorExterior Coordination Meeting occurred prior to the site visit in Room 104 Refer to

InteriorExterior Coordination Meeting dated July 11 2017 for items discussed during the

meeting

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 3 of 9

Scaffold tarp removed from east elevation of north wing (Charlie)

Final cleaning in progress on east elevation of north wing (Charlie)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 4 of 9

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 5 of 9

Final pointing mortar work in progress on north elevation of east wing (Delta)

Sealant work in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 6 of 9

Stone cleaning in progress on east elevation of east wing (Echo)

Ducts in place for air handler on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 7 of 9

Scaffold in place on east elevation of south wing (Golf)

Plywood in place at base of scaffold to protect stone pavers on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 8 of 9

Waterproofing in place on top of covered entry on east elevation of south wing (Golf)

Light well wall coating mockup 1 (elastomeric coating with leveling compound) on north wall of light well

on north elevation of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 9 of 9

Light well wall coating mockup 2 (elastomeric coating only) on north wall of light well on north elevation

of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 42 DATE 7182017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Final pointing mortar work progressing on backside of parapet on north elevation of east wing

(Delta)

4 Stone cleaning progressing on east elevation of east wing (Echo)

5 Stone repair work progressing on east elevation of east wing (Echo)

6 Tarp installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 2 of 5

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 3 of 5

Full stone replacement in progress on north elevation of dome platform

Final pointing mortar in progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 4 of 5

Stone cleaning in progress on east elevation of east wing (Echo)

Dutchman repair in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 5 of 5

Tarp installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 1 of 12

FIELD OBSERVATION REPORT REPORT NO 43 DATE 7252017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

Jason Cady Architect - Mass Architects

Doug Kellogg State Capitol - OMES

WORK OBSERVED

The following was observed during this site visit

1 Lead t-cap work progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Scaffold removal progressing on east elevation of north wing (Charlie)

4 Operable window component installation progressing on north elevation of east wing (Delta)

5 Window component installation progressing on north elevation of east wing (Delta)

6 Window frame painting progressing on north elevation of east wing (Delta)

7 Lead t-cap work progressing on parapet stone cap on north elevation of east wing (Delta)

8 Down rod work progressing on backside of parapet on north elevation of east wing (Delta)

9 Brick joint raking progressing on backside of parapet on north elevation of east wing (Delta)

10 Stone cleaning progressing on east elevation of east wing (Echo)

11 Scaffold tarp in place on east elevation of south wing (Golf)

12 Air handler in place on east elevation of south wing (Golf)

13 Interior partitions at windows progressing on east elevation of south wing (Golf)

14 Joint raking progressing on east elevation of south wing (Golf)

15 Gutter demolition progressing on east elevation of south wing (Golf)

16 Lightning protection removal progressing on east elevation of south wing (Golf)

17 Scaffold installation progressing on south elevation of south wing (Hotel)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 2 of 12

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 25 2017 for items discussed during the meeting

2 The relocation of the sanitary sewer line was reviewed with the State at the west elevation north

wing (Alpha) Doug Kellogg Jason Cady Mark Maska Peter Breninger and Streets Mechanical

were in attendance A manhole closer to the building was found during excavation The new

sanitary sewer line will tie into the closer manhole with a cleanout at the 90 degree bend as

indicated in the drawings

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Lead t-cap work in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

JULY 2017

Summary During the month of July on the Oklahoma Capitol Exterior Restoration project we have made siginificant progress on the completion of the north wing restoration With the final completion of the north wing taking place at the beginning of August the south wing has seen an increased amount of scaffolding acitivity All scaffold components that have been dismantled from the north wing are in the process of being erected on the south side of the Capitol The restoration of the south wing east elevation has begun with cleaning at the gutter level and raking from the top of the elevation down Once raking activities are complete our team will complete a joint masonry repair walk to determine if additional repairs are to be completed Further on the south wing south elevation other wise known as the ldquoSouth Porticordquo section scaffold erection has begun Due to the large cavity space below the steps of the South Portico the scaffolding is being erected on large beams that span columns beneath the stairs This section of scaffolding is scheduled to be completely erected by mid-August Furthermore the work taking place on the north and south wing of the building work on our largest elevation of scaffolding thus far Delta is progressing Due to the large size of the Delta eleva-tion we have split the elevation into two parts Delta Phase One (west) and Delta Phase Two (east) Work on Delta Phase One is in the process of being completed All masonry restoration items have been completed as well as exterior window restoration Final window sealants and spray testing have been completed on Delta Phase One as well This section of scaffolding is currently scheduled to be dismantled ahead of schedule in mid-August with Phase Two being dismantled at the end of September following the completion of the window restoration activities Both sections of scaffolding will then be moved to the east wing south elevation Foxtrot Lastly on our Echo elevation masonry cleaning activities are in progress and window pre-repairs are beginning Once window restoration activities are completed on Delta Phase Two they will continue onto Echo In addition to the work that we have taking place on the scaffoling over the course of the next few weeks our exterior team will begin planning for work on several remaining exterior restoration scope items around the Capitol These activities include restoration of the ballustrades restoration and foundation repairs to the battlements repairs to the granite steps replacement of the retaining walls and waterproofing replacement and repairs around the exterior of the Capitol

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

KeyActivities

- Bravo exterior window restoration complete - Bravo masonry restoration complete - Bravo scaffold removal complete - Charlie exterior window restoration complete - Charlie masonry restoration complete - Charlie scaffold removal complete - Delta masonry repairs complete - Delta cleaning complete - Delta Phase 1 (west half) window install complete - Delta Phase II (east half) window install in progress - Delta copper gutter install in progress - Delta parapet repairs in progress - Delta tarps removed - Echo masonry cleaning in progress - Echo window pre-repairs in progress - Golf scaffold erection complete - Golf masonry raking in progress - Hotel scaffold erection in progress

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

SafetyThe safety of our workforce and the general public during the course of construction is the most import-ant task that we must deliver To that end every craftsmen involved with the project receives a detailed project orientation and prior to performing any task the teams develop detailed task specific work plans These work plans are often called Job Site Analysis (JSA) and assist project teams with analyzing different hazards associated with each work activity prior to beginning work

Safety Data and Metrics

Orientations Performed through 073117 309

First Aid Incidents 0

OSHA Recordable Incidents 0

Trade Partner Incidents 0

Total Man-Hours for the month of July (hrs) 4136

Total Project Man-Hours (hrs) 58310

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

Safety Spotlight

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

A ldquoScaffold Modification Permitrdquo system has been put into place on our Exterior Capitol Restoration Project The scaf-folding on-site is a major component of the project Due to the nature of our work some trades require close access to the Capitolrsquos facade In order to maintain a safe work environment if any component of the scaffold has to be adjust-ed in order to complete work the above permit must be filled out and completed prior to any scaffold modificationrsquos taking place Once the scaffold component has been restored to its original state that specific area is reviewed and signed off by Mark 1 Restoration who is in charge of building the scaffold and ensuring it provides a safe work area

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Window Restoration Progress

The following pictures show progress of the window restoration process at ReViewrsquos off-site facility Once these components are fully restored off-site they will be shipped back to the jobsite and prepared for final installation

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Progress Photos amp Field Reports

The photos and field reports attached in the subsequent pages represent progress photos taken during the month of July and reports on recently completed work for the Oklahoma State Capitol Exterior Restoration project

Drone Footage

June Drone Footage gt Click Here httpsvimeocom222121078[vimeocom]

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 1 of 6

FIELD OBSERVATION REPORT REPORT NO 40 DATE 752017

TIME 1000 AM DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE 85deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Final pointing mortar work progressing on north elevation of dome platform

2 Window frame painting progressing on east elevation of north wing (Charlie)

3 Stone repair work progressing on north elevation of east wing (Delta)

4 Final pointing mortar work progressing on north elevation of east wing (Delta)

5 Window frame abatement progressing on east elevation of east wing (Echo)

6 Stone cleaning progressing on east elevation of east wing (Echo)

7 Scaffold installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 2 of 6

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Final pointing mortar work progressing on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 3 of 6

Window frame painting progressing on east elevation of north wing (Charlie)

Stitch pinning in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 4 of 6

Stone patch in progress on north elevation of east wing (Delta)

Final pointing mortar work in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 5 of 6

Window frame abatement in progress on east elevation of east wing (Echo)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 6 of 6

Scaffold installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 1 of 9

FIELD OBSERVATION REPORT REPORT NO 41 DATE 7112017

TIME 1115 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Scaffold tarp removed from east elevation of north wing (Charlie)

3 Final cleaning progressing on east elevation of north wing (Charlie)

4 Stone repair work progressing on north elevation of dome platform

5 Stone repair work progressing on north elevation of east wing (Delta)

6 Final pointing mortar work progressing on north elevation of east wing (Delta)

7 Sealant work progressing on north elevation of east wing (Delta)

8 Stone cleaning progressing on east elevation of east wing (Echo)

9 Ducts in place for air handler on east elevation of east wing (Echo)

10 Scaffold in place on east elevation of south wing (Golf)

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 11 2017 for items discussed during the meeting

2 The light well wall coating mockup was reviewed with the State at the north elevation west wing

(Lima) light well Trait Thompson Jason Cady Matthew Radcliffe Lindsey Ross Lynnsee Boyse

Mark Maska Peter Breninger and Mike Thompson were in attendance The light well wall

coating without the leveling compound was selected by those in attendance

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 2 of 9

3 The InteriorExterior Coordination Meeting occurred prior to the site visit in Room 104 Refer to

InteriorExterior Coordination Meeting dated July 11 2017 for items discussed during the

meeting

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 3 of 9

Scaffold tarp removed from east elevation of north wing (Charlie)

Final cleaning in progress on east elevation of north wing (Charlie)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 4 of 9

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 5 of 9

Final pointing mortar work in progress on north elevation of east wing (Delta)

Sealant work in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 6 of 9

Stone cleaning in progress on east elevation of east wing (Echo)

Ducts in place for air handler on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 7 of 9

Scaffold in place on east elevation of south wing (Golf)

Plywood in place at base of scaffold to protect stone pavers on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 8 of 9

Waterproofing in place on top of covered entry on east elevation of south wing (Golf)

Light well wall coating mockup 1 (elastomeric coating with leveling compound) on north wall of light well

on north elevation of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 9 of 9

Light well wall coating mockup 2 (elastomeric coating only) on north wall of light well on north elevation

of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 42 DATE 7182017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Final pointing mortar work progressing on backside of parapet on north elevation of east wing

(Delta)

4 Stone cleaning progressing on east elevation of east wing (Echo)

5 Stone repair work progressing on east elevation of east wing (Echo)

6 Tarp installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 2 of 5

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 3 of 5

Full stone replacement in progress on north elevation of dome platform

Final pointing mortar in progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 4 of 5

Stone cleaning in progress on east elevation of east wing (Echo)

Dutchman repair in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 5 of 5

Tarp installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 1 of 12

FIELD OBSERVATION REPORT REPORT NO 43 DATE 7252017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

Jason Cady Architect - Mass Architects

Doug Kellogg State Capitol - OMES

WORK OBSERVED

The following was observed during this site visit

1 Lead t-cap work progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Scaffold removal progressing on east elevation of north wing (Charlie)

4 Operable window component installation progressing on north elevation of east wing (Delta)

5 Window component installation progressing on north elevation of east wing (Delta)

6 Window frame painting progressing on north elevation of east wing (Delta)

7 Lead t-cap work progressing on parapet stone cap on north elevation of east wing (Delta)

8 Down rod work progressing on backside of parapet on north elevation of east wing (Delta)

9 Brick joint raking progressing on backside of parapet on north elevation of east wing (Delta)

10 Stone cleaning progressing on east elevation of east wing (Echo)

11 Scaffold tarp in place on east elevation of south wing (Golf)

12 Air handler in place on east elevation of south wing (Golf)

13 Interior partitions at windows progressing on east elevation of south wing (Golf)

14 Joint raking progressing on east elevation of south wing (Golf)

15 Gutter demolition progressing on east elevation of south wing (Golf)

16 Lightning protection removal progressing on east elevation of south wing (Golf)

17 Scaffold installation progressing on south elevation of south wing (Hotel)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 2 of 12

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 25 2017 for items discussed during the meeting

2 The relocation of the sanitary sewer line was reviewed with the State at the west elevation north

wing (Alpha) Doug Kellogg Jason Cady Mark Maska Peter Breninger and Streets Mechanical

were in attendance A manhole closer to the building was found during excavation The new

sanitary sewer line will tie into the closer manhole with a cleanout at the 90 degree bend as

indicated in the drawings

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Lead t-cap work in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

KeyActivities

- Bravo exterior window restoration complete - Bravo masonry restoration complete - Bravo scaffold removal complete - Charlie exterior window restoration complete - Charlie masonry restoration complete - Charlie scaffold removal complete - Delta masonry repairs complete - Delta cleaning complete - Delta Phase 1 (west half) window install complete - Delta Phase II (east half) window install in progress - Delta copper gutter install in progress - Delta parapet repairs in progress - Delta tarps removed - Echo masonry cleaning in progress - Echo window pre-repairs in progress - Golf scaffold erection complete - Golf masonry raking in progress - Hotel scaffold erection in progress

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

SafetyThe safety of our workforce and the general public during the course of construction is the most import-ant task that we must deliver To that end every craftsmen involved with the project receives a detailed project orientation and prior to performing any task the teams develop detailed task specific work plans These work plans are often called Job Site Analysis (JSA) and assist project teams with analyzing different hazards associated with each work activity prior to beginning work

Safety Data and Metrics

Orientations Performed through 073117 309

First Aid Incidents 0

OSHA Recordable Incidents 0

Trade Partner Incidents 0

Total Man-Hours for the month of July (hrs) 4136

Total Project Man-Hours (hrs) 58310

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

Safety Spotlight

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

A ldquoScaffold Modification Permitrdquo system has been put into place on our Exterior Capitol Restoration Project The scaf-folding on-site is a major component of the project Due to the nature of our work some trades require close access to the Capitolrsquos facade In order to maintain a safe work environment if any component of the scaffold has to be adjust-ed in order to complete work the above permit must be filled out and completed prior to any scaffold modificationrsquos taking place Once the scaffold component has been restored to its original state that specific area is reviewed and signed off by Mark 1 Restoration who is in charge of building the scaffold and ensuring it provides a safe work area

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Window Restoration Progress

The following pictures show progress of the window restoration process at ReViewrsquos off-site facility Once these components are fully restored off-site they will be shipped back to the jobsite and prepared for final installation

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Progress Photos amp Field Reports

The photos and field reports attached in the subsequent pages represent progress photos taken during the month of July and reports on recently completed work for the Oklahoma State Capitol Exterior Restoration project

Drone Footage

June Drone Footage gt Click Here httpsvimeocom222121078[vimeocom]

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 1 of 6

FIELD OBSERVATION REPORT REPORT NO 40 DATE 752017

TIME 1000 AM DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE 85deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Final pointing mortar work progressing on north elevation of dome platform

2 Window frame painting progressing on east elevation of north wing (Charlie)

3 Stone repair work progressing on north elevation of east wing (Delta)

4 Final pointing mortar work progressing on north elevation of east wing (Delta)

5 Window frame abatement progressing on east elevation of east wing (Echo)

6 Stone cleaning progressing on east elevation of east wing (Echo)

7 Scaffold installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 2 of 6

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Final pointing mortar work progressing on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 3 of 6

Window frame painting progressing on east elevation of north wing (Charlie)

Stitch pinning in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 4 of 6

Stone patch in progress on north elevation of east wing (Delta)

Final pointing mortar work in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 5 of 6

Window frame abatement in progress on east elevation of east wing (Echo)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 6 of 6

Scaffold installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 1 of 9

FIELD OBSERVATION REPORT REPORT NO 41 DATE 7112017

TIME 1115 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Scaffold tarp removed from east elevation of north wing (Charlie)

3 Final cleaning progressing on east elevation of north wing (Charlie)

4 Stone repair work progressing on north elevation of dome platform

5 Stone repair work progressing on north elevation of east wing (Delta)

6 Final pointing mortar work progressing on north elevation of east wing (Delta)

7 Sealant work progressing on north elevation of east wing (Delta)

8 Stone cleaning progressing on east elevation of east wing (Echo)

9 Ducts in place for air handler on east elevation of east wing (Echo)

10 Scaffold in place on east elevation of south wing (Golf)

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 11 2017 for items discussed during the meeting

2 The light well wall coating mockup was reviewed with the State at the north elevation west wing

(Lima) light well Trait Thompson Jason Cady Matthew Radcliffe Lindsey Ross Lynnsee Boyse

Mark Maska Peter Breninger and Mike Thompson were in attendance The light well wall

coating without the leveling compound was selected by those in attendance

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 2 of 9

3 The InteriorExterior Coordination Meeting occurred prior to the site visit in Room 104 Refer to

InteriorExterior Coordination Meeting dated July 11 2017 for items discussed during the

meeting

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 3 of 9

Scaffold tarp removed from east elevation of north wing (Charlie)

Final cleaning in progress on east elevation of north wing (Charlie)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 4 of 9

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 5 of 9

Final pointing mortar work in progress on north elevation of east wing (Delta)

Sealant work in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 6 of 9

Stone cleaning in progress on east elevation of east wing (Echo)

Ducts in place for air handler on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 7 of 9

Scaffold in place on east elevation of south wing (Golf)

Plywood in place at base of scaffold to protect stone pavers on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 8 of 9

Waterproofing in place on top of covered entry on east elevation of south wing (Golf)

Light well wall coating mockup 1 (elastomeric coating with leveling compound) on north wall of light well

on north elevation of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 9 of 9

Light well wall coating mockup 2 (elastomeric coating only) on north wall of light well on north elevation

of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 42 DATE 7182017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Final pointing mortar work progressing on backside of parapet on north elevation of east wing

(Delta)

4 Stone cleaning progressing on east elevation of east wing (Echo)

5 Stone repair work progressing on east elevation of east wing (Echo)

6 Tarp installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 2 of 5

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 3 of 5

Full stone replacement in progress on north elevation of dome platform

Final pointing mortar in progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 4 of 5

Stone cleaning in progress on east elevation of east wing (Echo)

Dutchman repair in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 5 of 5

Tarp installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 1 of 12

FIELD OBSERVATION REPORT REPORT NO 43 DATE 7252017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

Jason Cady Architect - Mass Architects

Doug Kellogg State Capitol - OMES

WORK OBSERVED

The following was observed during this site visit

1 Lead t-cap work progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Scaffold removal progressing on east elevation of north wing (Charlie)

4 Operable window component installation progressing on north elevation of east wing (Delta)

5 Window component installation progressing on north elevation of east wing (Delta)

6 Window frame painting progressing on north elevation of east wing (Delta)

7 Lead t-cap work progressing on parapet stone cap on north elevation of east wing (Delta)

8 Down rod work progressing on backside of parapet on north elevation of east wing (Delta)

9 Brick joint raking progressing on backside of parapet on north elevation of east wing (Delta)

10 Stone cleaning progressing on east elevation of east wing (Echo)

11 Scaffold tarp in place on east elevation of south wing (Golf)

12 Air handler in place on east elevation of south wing (Golf)

13 Interior partitions at windows progressing on east elevation of south wing (Golf)

14 Joint raking progressing on east elevation of south wing (Golf)

15 Gutter demolition progressing on east elevation of south wing (Golf)

16 Lightning protection removal progressing on east elevation of south wing (Golf)

17 Scaffold installation progressing on south elevation of south wing (Hotel)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 2 of 12

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 25 2017 for items discussed during the meeting

2 The relocation of the sanitary sewer line was reviewed with the State at the west elevation north

wing (Alpha) Doug Kellogg Jason Cady Mark Maska Peter Breninger and Streets Mechanical

were in attendance A manhole closer to the building was found during excavation The new

sanitary sewer line will tie into the closer manhole with a cleanout at the 90 degree bend as

indicated in the drawings

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Lead t-cap work in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

SafetyThe safety of our workforce and the general public during the course of construction is the most import-ant task that we must deliver To that end every craftsmen involved with the project receives a detailed project orientation and prior to performing any task the teams develop detailed task specific work plans These work plans are often called Job Site Analysis (JSA) and assist project teams with analyzing different hazards associated with each work activity prior to beginning work

Safety Data and Metrics

Orientations Performed through 073117 309

First Aid Incidents 0

OSHA Recordable Incidents 0

Trade Partner Incidents 0

Total Man-Hours for the month of July (hrs) 4136

Total Project Man-Hours (hrs) 58310

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

Safety Spotlight

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

A ldquoScaffold Modification Permitrdquo system has been put into place on our Exterior Capitol Restoration Project The scaf-folding on-site is a major component of the project Due to the nature of our work some trades require close access to the Capitolrsquos facade In order to maintain a safe work environment if any component of the scaffold has to be adjust-ed in order to complete work the above permit must be filled out and completed prior to any scaffold modificationrsquos taking place Once the scaffold component has been restored to its original state that specific area is reviewed and signed off by Mark 1 Restoration who is in charge of building the scaffold and ensuring it provides a safe work area

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Window Restoration Progress

The following pictures show progress of the window restoration process at ReViewrsquos off-site facility Once these components are fully restored off-site they will be shipped back to the jobsite and prepared for final installation

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Progress Photos amp Field Reports

The photos and field reports attached in the subsequent pages represent progress photos taken during the month of July and reports on recently completed work for the Oklahoma State Capitol Exterior Restoration project

Drone Footage

June Drone Footage gt Click Here httpsvimeocom222121078[vimeocom]

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 1 of 6

FIELD OBSERVATION REPORT REPORT NO 40 DATE 752017

TIME 1000 AM DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE 85deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Final pointing mortar work progressing on north elevation of dome platform

2 Window frame painting progressing on east elevation of north wing (Charlie)

3 Stone repair work progressing on north elevation of east wing (Delta)

4 Final pointing mortar work progressing on north elevation of east wing (Delta)

5 Window frame abatement progressing on east elevation of east wing (Echo)

6 Stone cleaning progressing on east elevation of east wing (Echo)

7 Scaffold installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 2 of 6

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Final pointing mortar work progressing on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 3 of 6

Window frame painting progressing on east elevation of north wing (Charlie)

Stitch pinning in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 4 of 6

Stone patch in progress on north elevation of east wing (Delta)

Final pointing mortar work in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 5 of 6

Window frame abatement in progress on east elevation of east wing (Echo)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 6 of 6

Scaffold installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 1 of 9

FIELD OBSERVATION REPORT REPORT NO 41 DATE 7112017

TIME 1115 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Scaffold tarp removed from east elevation of north wing (Charlie)

3 Final cleaning progressing on east elevation of north wing (Charlie)

4 Stone repair work progressing on north elevation of dome platform

5 Stone repair work progressing on north elevation of east wing (Delta)

6 Final pointing mortar work progressing on north elevation of east wing (Delta)

7 Sealant work progressing on north elevation of east wing (Delta)

8 Stone cleaning progressing on east elevation of east wing (Echo)

9 Ducts in place for air handler on east elevation of east wing (Echo)

10 Scaffold in place on east elevation of south wing (Golf)

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 11 2017 for items discussed during the meeting

2 The light well wall coating mockup was reviewed with the State at the north elevation west wing

(Lima) light well Trait Thompson Jason Cady Matthew Radcliffe Lindsey Ross Lynnsee Boyse

Mark Maska Peter Breninger and Mike Thompson were in attendance The light well wall

coating without the leveling compound was selected by those in attendance

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 2 of 9

3 The InteriorExterior Coordination Meeting occurred prior to the site visit in Room 104 Refer to

InteriorExterior Coordination Meeting dated July 11 2017 for items discussed during the

meeting

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 3 of 9

Scaffold tarp removed from east elevation of north wing (Charlie)

Final cleaning in progress on east elevation of north wing (Charlie)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 4 of 9

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 5 of 9

Final pointing mortar work in progress on north elevation of east wing (Delta)

Sealant work in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 6 of 9

Stone cleaning in progress on east elevation of east wing (Echo)

Ducts in place for air handler on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 7 of 9

Scaffold in place on east elevation of south wing (Golf)

Plywood in place at base of scaffold to protect stone pavers on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 8 of 9

Waterproofing in place on top of covered entry on east elevation of south wing (Golf)

Light well wall coating mockup 1 (elastomeric coating with leveling compound) on north wall of light well

on north elevation of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 9 of 9

Light well wall coating mockup 2 (elastomeric coating only) on north wall of light well on north elevation

of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 42 DATE 7182017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Final pointing mortar work progressing on backside of parapet on north elevation of east wing

(Delta)

4 Stone cleaning progressing on east elevation of east wing (Echo)

5 Stone repair work progressing on east elevation of east wing (Echo)

6 Tarp installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 2 of 5

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 3 of 5

Full stone replacement in progress on north elevation of dome platform

Final pointing mortar in progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 4 of 5

Stone cleaning in progress on east elevation of east wing (Echo)

Dutchman repair in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 5 of 5

Tarp installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 1 of 12

FIELD OBSERVATION REPORT REPORT NO 43 DATE 7252017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

Jason Cady Architect - Mass Architects

Doug Kellogg State Capitol - OMES

WORK OBSERVED

The following was observed during this site visit

1 Lead t-cap work progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Scaffold removal progressing on east elevation of north wing (Charlie)

4 Operable window component installation progressing on north elevation of east wing (Delta)

5 Window component installation progressing on north elevation of east wing (Delta)

6 Window frame painting progressing on north elevation of east wing (Delta)

7 Lead t-cap work progressing on parapet stone cap on north elevation of east wing (Delta)

8 Down rod work progressing on backside of parapet on north elevation of east wing (Delta)

9 Brick joint raking progressing on backside of parapet on north elevation of east wing (Delta)

10 Stone cleaning progressing on east elevation of east wing (Echo)

11 Scaffold tarp in place on east elevation of south wing (Golf)

12 Air handler in place on east elevation of south wing (Golf)

13 Interior partitions at windows progressing on east elevation of south wing (Golf)

14 Joint raking progressing on east elevation of south wing (Golf)

15 Gutter demolition progressing on east elevation of south wing (Golf)

16 Lightning protection removal progressing on east elevation of south wing (Golf)

17 Scaffold installation progressing on south elevation of south wing (Hotel)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 2 of 12

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 25 2017 for items discussed during the meeting

2 The relocation of the sanitary sewer line was reviewed with the State at the west elevation north

wing (Alpha) Doug Kellogg Jason Cady Mark Maska Peter Breninger and Streets Mechanical

were in attendance A manhole closer to the building was found during excavation The new

sanitary sewer line will tie into the closer manhole with a cleanout at the 90 degree bend as

indicated in the drawings

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Lead t-cap work in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

Safety Spotlight

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

A ldquoScaffold Modification Permitrdquo system has been put into place on our Exterior Capitol Restoration Project The scaf-folding on-site is a major component of the project Due to the nature of our work some trades require close access to the Capitolrsquos facade In order to maintain a safe work environment if any component of the scaffold has to be adjust-ed in order to complete work the above permit must be filled out and completed prior to any scaffold modificationrsquos taking place Once the scaffold component has been restored to its original state that specific area is reviewed and signed off by Mark 1 Restoration who is in charge of building the scaffold and ensuring it provides a safe work area

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Window Restoration Progress

The following pictures show progress of the window restoration process at ReViewrsquos off-site facility Once these components are fully restored off-site they will be shipped back to the jobsite and prepared for final installation

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Progress Photos amp Field Reports

The photos and field reports attached in the subsequent pages represent progress photos taken during the month of July and reports on recently completed work for the Oklahoma State Capitol Exterior Restoration project

Drone Footage

June Drone Footage gt Click Here httpsvimeocom222121078[vimeocom]

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 1 of 6

FIELD OBSERVATION REPORT REPORT NO 40 DATE 752017

TIME 1000 AM DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE 85deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Final pointing mortar work progressing on north elevation of dome platform

2 Window frame painting progressing on east elevation of north wing (Charlie)

3 Stone repair work progressing on north elevation of east wing (Delta)

4 Final pointing mortar work progressing on north elevation of east wing (Delta)

5 Window frame abatement progressing on east elevation of east wing (Echo)

6 Stone cleaning progressing on east elevation of east wing (Echo)

7 Scaffold installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 2 of 6

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Final pointing mortar work progressing on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 3 of 6

Window frame painting progressing on east elevation of north wing (Charlie)

Stitch pinning in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 4 of 6

Stone patch in progress on north elevation of east wing (Delta)

Final pointing mortar work in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 5 of 6

Window frame abatement in progress on east elevation of east wing (Echo)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 6 of 6

Scaffold installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 1 of 9

FIELD OBSERVATION REPORT REPORT NO 41 DATE 7112017

TIME 1115 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Scaffold tarp removed from east elevation of north wing (Charlie)

3 Final cleaning progressing on east elevation of north wing (Charlie)

4 Stone repair work progressing on north elevation of dome platform

5 Stone repair work progressing on north elevation of east wing (Delta)

6 Final pointing mortar work progressing on north elevation of east wing (Delta)

7 Sealant work progressing on north elevation of east wing (Delta)

8 Stone cleaning progressing on east elevation of east wing (Echo)

9 Ducts in place for air handler on east elevation of east wing (Echo)

10 Scaffold in place on east elevation of south wing (Golf)

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 11 2017 for items discussed during the meeting

2 The light well wall coating mockup was reviewed with the State at the north elevation west wing

(Lima) light well Trait Thompson Jason Cady Matthew Radcliffe Lindsey Ross Lynnsee Boyse

Mark Maska Peter Breninger and Mike Thompson were in attendance The light well wall

coating without the leveling compound was selected by those in attendance

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 2 of 9

3 The InteriorExterior Coordination Meeting occurred prior to the site visit in Room 104 Refer to

InteriorExterior Coordination Meeting dated July 11 2017 for items discussed during the

meeting

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 3 of 9

Scaffold tarp removed from east elevation of north wing (Charlie)

Final cleaning in progress on east elevation of north wing (Charlie)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 4 of 9

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 5 of 9

Final pointing mortar work in progress on north elevation of east wing (Delta)

Sealant work in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 6 of 9

Stone cleaning in progress on east elevation of east wing (Echo)

Ducts in place for air handler on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 7 of 9

Scaffold in place on east elevation of south wing (Golf)

Plywood in place at base of scaffold to protect stone pavers on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 8 of 9

Waterproofing in place on top of covered entry on east elevation of south wing (Golf)

Light well wall coating mockup 1 (elastomeric coating with leveling compound) on north wall of light well

on north elevation of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 9 of 9

Light well wall coating mockup 2 (elastomeric coating only) on north wall of light well on north elevation

of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 42 DATE 7182017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Final pointing mortar work progressing on backside of parapet on north elevation of east wing

(Delta)

4 Stone cleaning progressing on east elevation of east wing (Echo)

5 Stone repair work progressing on east elevation of east wing (Echo)

6 Tarp installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 2 of 5

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 3 of 5

Full stone replacement in progress on north elevation of dome platform

Final pointing mortar in progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 4 of 5

Stone cleaning in progress on east elevation of east wing (Echo)

Dutchman repair in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 5 of 5

Tarp installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 1 of 12

FIELD OBSERVATION REPORT REPORT NO 43 DATE 7252017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

Jason Cady Architect - Mass Architects

Doug Kellogg State Capitol - OMES

WORK OBSERVED

The following was observed during this site visit

1 Lead t-cap work progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Scaffold removal progressing on east elevation of north wing (Charlie)

4 Operable window component installation progressing on north elevation of east wing (Delta)

5 Window component installation progressing on north elevation of east wing (Delta)

6 Window frame painting progressing on north elevation of east wing (Delta)

7 Lead t-cap work progressing on parapet stone cap on north elevation of east wing (Delta)

8 Down rod work progressing on backside of parapet on north elevation of east wing (Delta)

9 Brick joint raking progressing on backside of parapet on north elevation of east wing (Delta)

10 Stone cleaning progressing on east elevation of east wing (Echo)

11 Scaffold tarp in place on east elevation of south wing (Golf)

12 Air handler in place on east elevation of south wing (Golf)

13 Interior partitions at windows progressing on east elevation of south wing (Golf)

14 Joint raking progressing on east elevation of south wing (Golf)

15 Gutter demolition progressing on east elevation of south wing (Golf)

16 Lightning protection removal progressing on east elevation of south wing (Golf)

17 Scaffold installation progressing on south elevation of south wing (Hotel)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 2 of 12

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 25 2017 for items discussed during the meeting

2 The relocation of the sanitary sewer line was reviewed with the State at the west elevation north

wing (Alpha) Doug Kellogg Jason Cady Mark Maska Peter Breninger and Streets Mechanical

were in attendance A manhole closer to the building was found during excavation The new

sanitary sewer line will tie into the closer manhole with a cleanout at the 90 degree bend as

indicated in the drawings

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Lead t-cap work in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Window Restoration Progress

The following pictures show progress of the window restoration process at ReViewrsquos off-site facility Once these components are fully restored off-site they will be shipped back to the jobsite and prepared for final installation

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Progress Photos amp Field Reports

The photos and field reports attached in the subsequent pages represent progress photos taken during the month of July and reports on recently completed work for the Oklahoma State Capitol Exterior Restoration project

Drone Footage

June Drone Footage gt Click Here httpsvimeocom222121078[vimeocom]

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 1 of 6

FIELD OBSERVATION REPORT REPORT NO 40 DATE 752017

TIME 1000 AM DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE 85deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Final pointing mortar work progressing on north elevation of dome platform

2 Window frame painting progressing on east elevation of north wing (Charlie)

3 Stone repair work progressing on north elevation of east wing (Delta)

4 Final pointing mortar work progressing on north elevation of east wing (Delta)

5 Window frame abatement progressing on east elevation of east wing (Echo)

6 Stone cleaning progressing on east elevation of east wing (Echo)

7 Scaffold installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 2 of 6

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Final pointing mortar work progressing on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 3 of 6

Window frame painting progressing on east elevation of north wing (Charlie)

Stitch pinning in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 4 of 6

Stone patch in progress on north elevation of east wing (Delta)

Final pointing mortar work in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 5 of 6

Window frame abatement in progress on east elevation of east wing (Echo)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 6 of 6

Scaffold installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 1 of 9

FIELD OBSERVATION REPORT REPORT NO 41 DATE 7112017

TIME 1115 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Scaffold tarp removed from east elevation of north wing (Charlie)

3 Final cleaning progressing on east elevation of north wing (Charlie)

4 Stone repair work progressing on north elevation of dome platform

5 Stone repair work progressing on north elevation of east wing (Delta)

6 Final pointing mortar work progressing on north elevation of east wing (Delta)

7 Sealant work progressing on north elevation of east wing (Delta)

8 Stone cleaning progressing on east elevation of east wing (Echo)

9 Ducts in place for air handler on east elevation of east wing (Echo)

10 Scaffold in place on east elevation of south wing (Golf)

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 11 2017 for items discussed during the meeting

2 The light well wall coating mockup was reviewed with the State at the north elevation west wing

(Lima) light well Trait Thompson Jason Cady Matthew Radcliffe Lindsey Ross Lynnsee Boyse

Mark Maska Peter Breninger and Mike Thompson were in attendance The light well wall

coating without the leveling compound was selected by those in attendance

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 2 of 9

3 The InteriorExterior Coordination Meeting occurred prior to the site visit in Room 104 Refer to

InteriorExterior Coordination Meeting dated July 11 2017 for items discussed during the

meeting

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 3 of 9

Scaffold tarp removed from east elevation of north wing (Charlie)

Final cleaning in progress on east elevation of north wing (Charlie)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 4 of 9

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 5 of 9

Final pointing mortar work in progress on north elevation of east wing (Delta)

Sealant work in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 6 of 9

Stone cleaning in progress on east elevation of east wing (Echo)

Ducts in place for air handler on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 7 of 9

Scaffold in place on east elevation of south wing (Golf)

Plywood in place at base of scaffold to protect stone pavers on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 8 of 9

Waterproofing in place on top of covered entry on east elevation of south wing (Golf)

Light well wall coating mockup 1 (elastomeric coating with leveling compound) on north wall of light well

on north elevation of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 9 of 9

Light well wall coating mockup 2 (elastomeric coating only) on north wall of light well on north elevation

of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 42 DATE 7182017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Final pointing mortar work progressing on backside of parapet on north elevation of east wing

(Delta)

4 Stone cleaning progressing on east elevation of east wing (Echo)

5 Stone repair work progressing on east elevation of east wing (Echo)

6 Tarp installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 2 of 5

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 3 of 5

Full stone replacement in progress on north elevation of dome platform

Final pointing mortar in progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 4 of 5

Stone cleaning in progress on east elevation of east wing (Echo)

Dutchman repair in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 5 of 5

Tarp installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 1 of 12

FIELD OBSERVATION REPORT REPORT NO 43 DATE 7252017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

Jason Cady Architect - Mass Architects

Doug Kellogg State Capitol - OMES

WORK OBSERVED

The following was observed during this site visit

1 Lead t-cap work progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Scaffold removal progressing on east elevation of north wing (Charlie)

4 Operable window component installation progressing on north elevation of east wing (Delta)

5 Window component installation progressing on north elevation of east wing (Delta)

6 Window frame painting progressing on north elevation of east wing (Delta)

7 Lead t-cap work progressing on parapet stone cap on north elevation of east wing (Delta)

8 Down rod work progressing on backside of parapet on north elevation of east wing (Delta)

9 Brick joint raking progressing on backside of parapet on north elevation of east wing (Delta)

10 Stone cleaning progressing on east elevation of east wing (Echo)

11 Scaffold tarp in place on east elevation of south wing (Golf)

12 Air handler in place on east elevation of south wing (Golf)

13 Interior partitions at windows progressing on east elevation of south wing (Golf)

14 Joint raking progressing on east elevation of south wing (Golf)

15 Gutter demolition progressing on east elevation of south wing (Golf)

16 Lightning protection removal progressing on east elevation of south wing (Golf)

17 Scaffold installation progressing on south elevation of south wing (Hotel)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 2 of 12

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 25 2017 for items discussed during the meeting

2 The relocation of the sanitary sewer line was reviewed with the State at the west elevation north

wing (Alpha) Doug Kellogg Jason Cady Mark Maska Peter Breninger and Streets Mechanical

were in attendance A manhole closer to the building was found during excavation The new

sanitary sewer line will tie into the closer manhole with a cleanout at the 90 degree bend as

indicated in the drawings

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Lead t-cap work in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Progress Photos amp Field Reports

The photos and field reports attached in the subsequent pages represent progress photos taken during the month of July and reports on recently completed work for the Oklahoma State Capitol Exterior Restoration project

Drone Footage

June Drone Footage gt Click Here httpsvimeocom222121078[vimeocom]

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 1 of 6

FIELD OBSERVATION REPORT REPORT NO 40 DATE 752017

TIME 1000 AM DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE 85deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Final pointing mortar work progressing on north elevation of dome platform

2 Window frame painting progressing on east elevation of north wing (Charlie)

3 Stone repair work progressing on north elevation of east wing (Delta)

4 Final pointing mortar work progressing on north elevation of east wing (Delta)

5 Window frame abatement progressing on east elevation of east wing (Echo)

6 Stone cleaning progressing on east elevation of east wing (Echo)

7 Scaffold installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 2 of 6

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Final pointing mortar work progressing on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 3 of 6

Window frame painting progressing on east elevation of north wing (Charlie)

Stitch pinning in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 4 of 6

Stone patch in progress on north elevation of east wing (Delta)

Final pointing mortar work in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 5 of 6

Window frame abatement in progress on east elevation of east wing (Echo)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 6 of 6

Scaffold installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 1 of 9

FIELD OBSERVATION REPORT REPORT NO 41 DATE 7112017

TIME 1115 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Scaffold tarp removed from east elevation of north wing (Charlie)

3 Final cleaning progressing on east elevation of north wing (Charlie)

4 Stone repair work progressing on north elevation of dome platform

5 Stone repair work progressing on north elevation of east wing (Delta)

6 Final pointing mortar work progressing on north elevation of east wing (Delta)

7 Sealant work progressing on north elevation of east wing (Delta)

8 Stone cleaning progressing on east elevation of east wing (Echo)

9 Ducts in place for air handler on east elevation of east wing (Echo)

10 Scaffold in place on east elevation of south wing (Golf)

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 11 2017 for items discussed during the meeting

2 The light well wall coating mockup was reviewed with the State at the north elevation west wing

(Lima) light well Trait Thompson Jason Cady Matthew Radcliffe Lindsey Ross Lynnsee Boyse

Mark Maska Peter Breninger and Mike Thompson were in attendance The light well wall

coating without the leveling compound was selected by those in attendance

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 2 of 9

3 The InteriorExterior Coordination Meeting occurred prior to the site visit in Room 104 Refer to

InteriorExterior Coordination Meeting dated July 11 2017 for items discussed during the

meeting

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 3 of 9

Scaffold tarp removed from east elevation of north wing (Charlie)

Final cleaning in progress on east elevation of north wing (Charlie)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 4 of 9

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 5 of 9

Final pointing mortar work in progress on north elevation of east wing (Delta)

Sealant work in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 6 of 9

Stone cleaning in progress on east elevation of east wing (Echo)

Ducts in place for air handler on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 7 of 9

Scaffold in place on east elevation of south wing (Golf)

Plywood in place at base of scaffold to protect stone pavers on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 8 of 9

Waterproofing in place on top of covered entry on east elevation of south wing (Golf)

Light well wall coating mockup 1 (elastomeric coating with leveling compound) on north wall of light well

on north elevation of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 9 of 9

Light well wall coating mockup 2 (elastomeric coating only) on north wall of light well on north elevation

of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 42 DATE 7182017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Final pointing mortar work progressing on backside of parapet on north elevation of east wing

(Delta)

4 Stone cleaning progressing on east elevation of east wing (Echo)

5 Stone repair work progressing on east elevation of east wing (Echo)

6 Tarp installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 2 of 5

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 3 of 5

Full stone replacement in progress on north elevation of dome platform

Final pointing mortar in progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 4 of 5

Stone cleaning in progress on east elevation of east wing (Echo)

Dutchman repair in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 5 of 5

Tarp installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 1 of 12

FIELD OBSERVATION REPORT REPORT NO 43 DATE 7252017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

Jason Cady Architect - Mass Architects

Doug Kellogg State Capitol - OMES

WORK OBSERVED

The following was observed during this site visit

1 Lead t-cap work progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Scaffold removal progressing on east elevation of north wing (Charlie)

4 Operable window component installation progressing on north elevation of east wing (Delta)

5 Window component installation progressing on north elevation of east wing (Delta)

6 Window frame painting progressing on north elevation of east wing (Delta)

7 Lead t-cap work progressing on parapet stone cap on north elevation of east wing (Delta)

8 Down rod work progressing on backside of parapet on north elevation of east wing (Delta)

9 Brick joint raking progressing on backside of parapet on north elevation of east wing (Delta)

10 Stone cleaning progressing on east elevation of east wing (Echo)

11 Scaffold tarp in place on east elevation of south wing (Golf)

12 Air handler in place on east elevation of south wing (Golf)

13 Interior partitions at windows progressing on east elevation of south wing (Golf)

14 Joint raking progressing on east elevation of south wing (Golf)

15 Gutter demolition progressing on east elevation of south wing (Golf)

16 Lightning protection removal progressing on east elevation of south wing (Golf)

17 Scaffold installation progressing on south elevation of south wing (Hotel)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 2 of 12

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 25 2017 for items discussed during the meeting

2 The relocation of the sanitary sewer line was reviewed with the State at the west elevation north

wing (Alpha) Doug Kellogg Jason Cady Mark Maska Peter Breninger and Streets Mechanical

were in attendance A manhole closer to the building was found during excavation The new

sanitary sewer line will tie into the closer manhole with a cleanout at the 90 degree bend as

indicated in the drawings

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Lead t-cap work in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 1 of 6

FIELD OBSERVATION REPORT REPORT NO 40 DATE 752017

TIME 1000 AM DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE 85deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Final pointing mortar work progressing on north elevation of dome platform

2 Window frame painting progressing on east elevation of north wing (Charlie)

3 Stone repair work progressing on north elevation of east wing (Delta)

4 Final pointing mortar work progressing on north elevation of east wing (Delta)

5 Window frame abatement progressing on east elevation of east wing (Echo)

6 Stone cleaning progressing on east elevation of east wing (Echo)

7 Scaffold installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 2 of 6

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Final pointing mortar work progressing on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 3 of 6

Window frame painting progressing on east elevation of north wing (Charlie)

Stitch pinning in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 4 of 6

Stone patch in progress on north elevation of east wing (Delta)

Final pointing mortar work in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 5 of 6

Window frame abatement in progress on east elevation of east wing (Echo)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 6 of 6

Scaffold installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 1 of 9

FIELD OBSERVATION REPORT REPORT NO 41 DATE 7112017

TIME 1115 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Scaffold tarp removed from east elevation of north wing (Charlie)

3 Final cleaning progressing on east elevation of north wing (Charlie)

4 Stone repair work progressing on north elevation of dome platform

5 Stone repair work progressing on north elevation of east wing (Delta)

6 Final pointing mortar work progressing on north elevation of east wing (Delta)

7 Sealant work progressing on north elevation of east wing (Delta)

8 Stone cleaning progressing on east elevation of east wing (Echo)

9 Ducts in place for air handler on east elevation of east wing (Echo)

10 Scaffold in place on east elevation of south wing (Golf)

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 11 2017 for items discussed during the meeting

2 The light well wall coating mockup was reviewed with the State at the north elevation west wing

(Lima) light well Trait Thompson Jason Cady Matthew Radcliffe Lindsey Ross Lynnsee Boyse

Mark Maska Peter Breninger and Mike Thompson were in attendance The light well wall

coating without the leveling compound was selected by those in attendance

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 2 of 9

3 The InteriorExterior Coordination Meeting occurred prior to the site visit in Room 104 Refer to

InteriorExterior Coordination Meeting dated July 11 2017 for items discussed during the

meeting

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 3 of 9

Scaffold tarp removed from east elevation of north wing (Charlie)

Final cleaning in progress on east elevation of north wing (Charlie)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 4 of 9

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 5 of 9

Final pointing mortar work in progress on north elevation of east wing (Delta)

Sealant work in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 6 of 9

Stone cleaning in progress on east elevation of east wing (Echo)

Ducts in place for air handler on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 7 of 9

Scaffold in place on east elevation of south wing (Golf)

Plywood in place at base of scaffold to protect stone pavers on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 8 of 9

Waterproofing in place on top of covered entry on east elevation of south wing (Golf)

Light well wall coating mockup 1 (elastomeric coating with leveling compound) on north wall of light well

on north elevation of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 9 of 9

Light well wall coating mockup 2 (elastomeric coating only) on north wall of light well on north elevation

of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 42 DATE 7182017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Final pointing mortar work progressing on backside of parapet on north elevation of east wing

(Delta)

4 Stone cleaning progressing on east elevation of east wing (Echo)

5 Stone repair work progressing on east elevation of east wing (Echo)

6 Tarp installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 2 of 5

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 3 of 5

Full stone replacement in progress on north elevation of dome platform

Final pointing mortar in progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 4 of 5

Stone cleaning in progress on east elevation of east wing (Echo)

Dutchman repair in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 5 of 5

Tarp installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 1 of 12

FIELD OBSERVATION REPORT REPORT NO 43 DATE 7252017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

Jason Cady Architect - Mass Architects

Doug Kellogg State Capitol - OMES

WORK OBSERVED

The following was observed during this site visit

1 Lead t-cap work progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Scaffold removal progressing on east elevation of north wing (Charlie)

4 Operable window component installation progressing on north elevation of east wing (Delta)

5 Window component installation progressing on north elevation of east wing (Delta)

6 Window frame painting progressing on north elevation of east wing (Delta)

7 Lead t-cap work progressing on parapet stone cap on north elevation of east wing (Delta)

8 Down rod work progressing on backside of parapet on north elevation of east wing (Delta)

9 Brick joint raking progressing on backside of parapet on north elevation of east wing (Delta)

10 Stone cleaning progressing on east elevation of east wing (Echo)

11 Scaffold tarp in place on east elevation of south wing (Golf)

12 Air handler in place on east elevation of south wing (Golf)

13 Interior partitions at windows progressing on east elevation of south wing (Golf)

14 Joint raking progressing on east elevation of south wing (Golf)

15 Gutter demolition progressing on east elevation of south wing (Golf)

16 Lightning protection removal progressing on east elevation of south wing (Golf)

17 Scaffold installation progressing on south elevation of south wing (Hotel)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 2 of 12

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 25 2017 for items discussed during the meeting

2 The relocation of the sanitary sewer line was reviewed with the State at the west elevation north

wing (Alpha) Doug Kellogg Jason Cady Mark Maska Peter Breninger and Streets Mechanical

were in attendance A manhole closer to the building was found during excavation The new

sanitary sewer line will tie into the closer manhole with a cleanout at the 90 degree bend as

indicated in the drawings

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Lead t-cap work in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 2 of 6

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Final pointing mortar work progressing on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 3 of 6

Window frame painting progressing on east elevation of north wing (Charlie)

Stitch pinning in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 4 of 6

Stone patch in progress on north elevation of east wing (Delta)

Final pointing mortar work in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 5 of 6

Window frame abatement in progress on east elevation of east wing (Echo)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 6 of 6

Scaffold installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 1 of 9

FIELD OBSERVATION REPORT REPORT NO 41 DATE 7112017

TIME 1115 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Scaffold tarp removed from east elevation of north wing (Charlie)

3 Final cleaning progressing on east elevation of north wing (Charlie)

4 Stone repair work progressing on north elevation of dome platform

5 Stone repair work progressing on north elevation of east wing (Delta)

6 Final pointing mortar work progressing on north elevation of east wing (Delta)

7 Sealant work progressing on north elevation of east wing (Delta)

8 Stone cleaning progressing on east elevation of east wing (Echo)

9 Ducts in place for air handler on east elevation of east wing (Echo)

10 Scaffold in place on east elevation of south wing (Golf)

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 11 2017 for items discussed during the meeting

2 The light well wall coating mockup was reviewed with the State at the north elevation west wing

(Lima) light well Trait Thompson Jason Cady Matthew Radcliffe Lindsey Ross Lynnsee Boyse

Mark Maska Peter Breninger and Mike Thompson were in attendance The light well wall

coating without the leveling compound was selected by those in attendance

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 2 of 9

3 The InteriorExterior Coordination Meeting occurred prior to the site visit in Room 104 Refer to

InteriorExterior Coordination Meeting dated July 11 2017 for items discussed during the

meeting

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 3 of 9

Scaffold tarp removed from east elevation of north wing (Charlie)

Final cleaning in progress on east elevation of north wing (Charlie)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 4 of 9

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 5 of 9

Final pointing mortar work in progress on north elevation of east wing (Delta)

Sealant work in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 6 of 9

Stone cleaning in progress on east elevation of east wing (Echo)

Ducts in place for air handler on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 7 of 9

Scaffold in place on east elevation of south wing (Golf)

Plywood in place at base of scaffold to protect stone pavers on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 8 of 9

Waterproofing in place on top of covered entry on east elevation of south wing (Golf)

Light well wall coating mockup 1 (elastomeric coating with leveling compound) on north wall of light well

on north elevation of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 9 of 9

Light well wall coating mockup 2 (elastomeric coating only) on north wall of light well on north elevation

of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 42 DATE 7182017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Final pointing mortar work progressing on backside of parapet on north elevation of east wing

(Delta)

4 Stone cleaning progressing on east elevation of east wing (Echo)

5 Stone repair work progressing on east elevation of east wing (Echo)

6 Tarp installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 2 of 5

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 3 of 5

Full stone replacement in progress on north elevation of dome platform

Final pointing mortar in progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 4 of 5

Stone cleaning in progress on east elevation of east wing (Echo)

Dutchman repair in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 5 of 5

Tarp installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 1 of 12

FIELD OBSERVATION REPORT REPORT NO 43 DATE 7252017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

Jason Cady Architect - Mass Architects

Doug Kellogg State Capitol - OMES

WORK OBSERVED

The following was observed during this site visit

1 Lead t-cap work progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Scaffold removal progressing on east elevation of north wing (Charlie)

4 Operable window component installation progressing on north elevation of east wing (Delta)

5 Window component installation progressing on north elevation of east wing (Delta)

6 Window frame painting progressing on north elevation of east wing (Delta)

7 Lead t-cap work progressing on parapet stone cap on north elevation of east wing (Delta)

8 Down rod work progressing on backside of parapet on north elevation of east wing (Delta)

9 Brick joint raking progressing on backside of parapet on north elevation of east wing (Delta)

10 Stone cleaning progressing on east elevation of east wing (Echo)

11 Scaffold tarp in place on east elevation of south wing (Golf)

12 Air handler in place on east elevation of south wing (Golf)

13 Interior partitions at windows progressing on east elevation of south wing (Golf)

14 Joint raking progressing on east elevation of south wing (Golf)

15 Gutter demolition progressing on east elevation of south wing (Golf)

16 Lightning protection removal progressing on east elevation of south wing (Golf)

17 Scaffold installation progressing on south elevation of south wing (Hotel)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 2 of 12

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 25 2017 for items discussed during the meeting

2 The relocation of the sanitary sewer line was reviewed with the State at the west elevation north

wing (Alpha) Doug Kellogg Jason Cady Mark Maska Peter Breninger and Streets Mechanical

were in attendance A manhole closer to the building was found during excavation The new

sanitary sewer line will tie into the closer manhole with a cleanout at the 90 degree bend as

indicated in the drawings

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Lead t-cap work in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 3 of 6

Window frame painting progressing on east elevation of north wing (Charlie)

Stitch pinning in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 4 of 6

Stone patch in progress on north elevation of east wing (Delta)

Final pointing mortar work in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 5 of 6

Window frame abatement in progress on east elevation of east wing (Echo)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 6 of 6

Scaffold installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 1 of 9

FIELD OBSERVATION REPORT REPORT NO 41 DATE 7112017

TIME 1115 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Scaffold tarp removed from east elevation of north wing (Charlie)

3 Final cleaning progressing on east elevation of north wing (Charlie)

4 Stone repair work progressing on north elevation of dome platform

5 Stone repair work progressing on north elevation of east wing (Delta)

6 Final pointing mortar work progressing on north elevation of east wing (Delta)

7 Sealant work progressing on north elevation of east wing (Delta)

8 Stone cleaning progressing on east elevation of east wing (Echo)

9 Ducts in place for air handler on east elevation of east wing (Echo)

10 Scaffold in place on east elevation of south wing (Golf)

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 11 2017 for items discussed during the meeting

2 The light well wall coating mockup was reviewed with the State at the north elevation west wing

(Lima) light well Trait Thompson Jason Cady Matthew Radcliffe Lindsey Ross Lynnsee Boyse

Mark Maska Peter Breninger and Mike Thompson were in attendance The light well wall

coating without the leveling compound was selected by those in attendance

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 2 of 9

3 The InteriorExterior Coordination Meeting occurred prior to the site visit in Room 104 Refer to

InteriorExterior Coordination Meeting dated July 11 2017 for items discussed during the

meeting

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 3 of 9

Scaffold tarp removed from east elevation of north wing (Charlie)

Final cleaning in progress on east elevation of north wing (Charlie)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 4 of 9

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 5 of 9

Final pointing mortar work in progress on north elevation of east wing (Delta)

Sealant work in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 6 of 9

Stone cleaning in progress on east elevation of east wing (Echo)

Ducts in place for air handler on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 7 of 9

Scaffold in place on east elevation of south wing (Golf)

Plywood in place at base of scaffold to protect stone pavers on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 8 of 9

Waterproofing in place on top of covered entry on east elevation of south wing (Golf)

Light well wall coating mockup 1 (elastomeric coating with leveling compound) on north wall of light well

on north elevation of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 9 of 9

Light well wall coating mockup 2 (elastomeric coating only) on north wall of light well on north elevation

of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 42 DATE 7182017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Final pointing mortar work progressing on backside of parapet on north elevation of east wing

(Delta)

4 Stone cleaning progressing on east elevation of east wing (Echo)

5 Stone repair work progressing on east elevation of east wing (Echo)

6 Tarp installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 2 of 5

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 3 of 5

Full stone replacement in progress on north elevation of dome platform

Final pointing mortar in progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 4 of 5

Stone cleaning in progress on east elevation of east wing (Echo)

Dutchman repair in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 5 of 5

Tarp installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 1 of 12

FIELD OBSERVATION REPORT REPORT NO 43 DATE 7252017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

Jason Cady Architect - Mass Architects

Doug Kellogg State Capitol - OMES

WORK OBSERVED

The following was observed during this site visit

1 Lead t-cap work progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Scaffold removal progressing on east elevation of north wing (Charlie)

4 Operable window component installation progressing on north elevation of east wing (Delta)

5 Window component installation progressing on north elevation of east wing (Delta)

6 Window frame painting progressing on north elevation of east wing (Delta)

7 Lead t-cap work progressing on parapet stone cap on north elevation of east wing (Delta)

8 Down rod work progressing on backside of parapet on north elevation of east wing (Delta)

9 Brick joint raking progressing on backside of parapet on north elevation of east wing (Delta)

10 Stone cleaning progressing on east elevation of east wing (Echo)

11 Scaffold tarp in place on east elevation of south wing (Golf)

12 Air handler in place on east elevation of south wing (Golf)

13 Interior partitions at windows progressing on east elevation of south wing (Golf)

14 Joint raking progressing on east elevation of south wing (Golf)

15 Gutter demolition progressing on east elevation of south wing (Golf)

16 Lightning protection removal progressing on east elevation of south wing (Golf)

17 Scaffold installation progressing on south elevation of south wing (Hotel)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 2 of 12

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 25 2017 for items discussed during the meeting

2 The relocation of the sanitary sewer line was reviewed with the State at the west elevation north

wing (Alpha) Doug Kellogg Jason Cady Mark Maska Peter Breninger and Streets Mechanical

were in attendance A manhole closer to the building was found during excavation The new

sanitary sewer line will tie into the closer manhole with a cleanout at the 90 degree bend as

indicated in the drawings

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Lead t-cap work in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 4 of 6

Stone patch in progress on north elevation of east wing (Delta)

Final pointing mortar work in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 5 of 6

Window frame abatement in progress on east elevation of east wing (Echo)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 6 of 6

Scaffold installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 1 of 9

FIELD OBSERVATION REPORT REPORT NO 41 DATE 7112017

TIME 1115 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Scaffold tarp removed from east elevation of north wing (Charlie)

3 Final cleaning progressing on east elevation of north wing (Charlie)

4 Stone repair work progressing on north elevation of dome platform

5 Stone repair work progressing on north elevation of east wing (Delta)

6 Final pointing mortar work progressing on north elevation of east wing (Delta)

7 Sealant work progressing on north elevation of east wing (Delta)

8 Stone cleaning progressing on east elevation of east wing (Echo)

9 Ducts in place for air handler on east elevation of east wing (Echo)

10 Scaffold in place on east elevation of south wing (Golf)

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 11 2017 for items discussed during the meeting

2 The light well wall coating mockup was reviewed with the State at the north elevation west wing

(Lima) light well Trait Thompson Jason Cady Matthew Radcliffe Lindsey Ross Lynnsee Boyse

Mark Maska Peter Breninger and Mike Thompson were in attendance The light well wall

coating without the leveling compound was selected by those in attendance

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 2 of 9

3 The InteriorExterior Coordination Meeting occurred prior to the site visit in Room 104 Refer to

InteriorExterior Coordination Meeting dated July 11 2017 for items discussed during the

meeting

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 3 of 9

Scaffold tarp removed from east elevation of north wing (Charlie)

Final cleaning in progress on east elevation of north wing (Charlie)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 4 of 9

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 5 of 9

Final pointing mortar work in progress on north elevation of east wing (Delta)

Sealant work in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 6 of 9

Stone cleaning in progress on east elevation of east wing (Echo)

Ducts in place for air handler on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 7 of 9

Scaffold in place on east elevation of south wing (Golf)

Plywood in place at base of scaffold to protect stone pavers on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 8 of 9

Waterproofing in place on top of covered entry on east elevation of south wing (Golf)

Light well wall coating mockup 1 (elastomeric coating with leveling compound) on north wall of light well

on north elevation of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 9 of 9

Light well wall coating mockup 2 (elastomeric coating only) on north wall of light well on north elevation

of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 42 DATE 7182017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Final pointing mortar work progressing on backside of parapet on north elevation of east wing

(Delta)

4 Stone cleaning progressing on east elevation of east wing (Echo)

5 Stone repair work progressing on east elevation of east wing (Echo)

6 Tarp installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 2 of 5

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 3 of 5

Full stone replacement in progress on north elevation of dome platform

Final pointing mortar in progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 4 of 5

Stone cleaning in progress on east elevation of east wing (Echo)

Dutchman repair in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 5 of 5

Tarp installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 1 of 12

FIELD OBSERVATION REPORT REPORT NO 43 DATE 7252017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

Jason Cady Architect - Mass Architects

Doug Kellogg State Capitol - OMES

WORK OBSERVED

The following was observed during this site visit

1 Lead t-cap work progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Scaffold removal progressing on east elevation of north wing (Charlie)

4 Operable window component installation progressing on north elevation of east wing (Delta)

5 Window component installation progressing on north elevation of east wing (Delta)

6 Window frame painting progressing on north elevation of east wing (Delta)

7 Lead t-cap work progressing on parapet stone cap on north elevation of east wing (Delta)

8 Down rod work progressing on backside of parapet on north elevation of east wing (Delta)

9 Brick joint raking progressing on backside of parapet on north elevation of east wing (Delta)

10 Stone cleaning progressing on east elevation of east wing (Echo)

11 Scaffold tarp in place on east elevation of south wing (Golf)

12 Air handler in place on east elevation of south wing (Golf)

13 Interior partitions at windows progressing on east elevation of south wing (Golf)

14 Joint raking progressing on east elevation of south wing (Golf)

15 Gutter demolition progressing on east elevation of south wing (Golf)

16 Lightning protection removal progressing on east elevation of south wing (Golf)

17 Scaffold installation progressing on south elevation of south wing (Hotel)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 2 of 12

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 25 2017 for items discussed during the meeting

2 The relocation of the sanitary sewer line was reviewed with the State at the west elevation north

wing (Alpha) Doug Kellogg Jason Cady Mark Maska Peter Breninger and Streets Mechanical

were in attendance A manhole closer to the building was found during excavation The new

sanitary sewer line will tie into the closer manhole with a cleanout at the 90 degree bend as

indicated in the drawings

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Lead t-cap work in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 5 of 6

Window frame abatement in progress on east elevation of east wing (Echo)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 6 of 6

Scaffold installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 1 of 9

FIELD OBSERVATION REPORT REPORT NO 41 DATE 7112017

TIME 1115 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Scaffold tarp removed from east elevation of north wing (Charlie)

3 Final cleaning progressing on east elevation of north wing (Charlie)

4 Stone repair work progressing on north elevation of dome platform

5 Stone repair work progressing on north elevation of east wing (Delta)

6 Final pointing mortar work progressing on north elevation of east wing (Delta)

7 Sealant work progressing on north elevation of east wing (Delta)

8 Stone cleaning progressing on east elevation of east wing (Echo)

9 Ducts in place for air handler on east elevation of east wing (Echo)

10 Scaffold in place on east elevation of south wing (Golf)

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 11 2017 for items discussed during the meeting

2 The light well wall coating mockup was reviewed with the State at the north elevation west wing

(Lima) light well Trait Thompson Jason Cady Matthew Radcliffe Lindsey Ross Lynnsee Boyse

Mark Maska Peter Breninger and Mike Thompson were in attendance The light well wall

coating without the leveling compound was selected by those in attendance

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 2 of 9

3 The InteriorExterior Coordination Meeting occurred prior to the site visit in Room 104 Refer to

InteriorExterior Coordination Meeting dated July 11 2017 for items discussed during the

meeting

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 3 of 9

Scaffold tarp removed from east elevation of north wing (Charlie)

Final cleaning in progress on east elevation of north wing (Charlie)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 4 of 9

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 5 of 9

Final pointing mortar work in progress on north elevation of east wing (Delta)

Sealant work in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 6 of 9

Stone cleaning in progress on east elevation of east wing (Echo)

Ducts in place for air handler on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 7 of 9

Scaffold in place on east elevation of south wing (Golf)

Plywood in place at base of scaffold to protect stone pavers on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 8 of 9

Waterproofing in place on top of covered entry on east elevation of south wing (Golf)

Light well wall coating mockup 1 (elastomeric coating with leveling compound) on north wall of light well

on north elevation of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 9 of 9

Light well wall coating mockup 2 (elastomeric coating only) on north wall of light well on north elevation

of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 42 DATE 7182017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Final pointing mortar work progressing on backside of parapet on north elevation of east wing

(Delta)

4 Stone cleaning progressing on east elevation of east wing (Echo)

5 Stone repair work progressing on east elevation of east wing (Echo)

6 Tarp installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 2 of 5

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 3 of 5

Full stone replacement in progress on north elevation of dome platform

Final pointing mortar in progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 4 of 5

Stone cleaning in progress on east elevation of east wing (Echo)

Dutchman repair in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 5 of 5

Tarp installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 1 of 12

FIELD OBSERVATION REPORT REPORT NO 43 DATE 7252017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

Jason Cady Architect - Mass Architects

Doug Kellogg State Capitol - OMES

WORK OBSERVED

The following was observed during this site visit

1 Lead t-cap work progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Scaffold removal progressing on east elevation of north wing (Charlie)

4 Operable window component installation progressing on north elevation of east wing (Delta)

5 Window component installation progressing on north elevation of east wing (Delta)

6 Window frame painting progressing on north elevation of east wing (Delta)

7 Lead t-cap work progressing on parapet stone cap on north elevation of east wing (Delta)

8 Down rod work progressing on backside of parapet on north elevation of east wing (Delta)

9 Brick joint raking progressing on backside of parapet on north elevation of east wing (Delta)

10 Stone cleaning progressing on east elevation of east wing (Echo)

11 Scaffold tarp in place on east elevation of south wing (Golf)

12 Air handler in place on east elevation of south wing (Golf)

13 Interior partitions at windows progressing on east elevation of south wing (Golf)

14 Joint raking progressing on east elevation of south wing (Golf)

15 Gutter demolition progressing on east elevation of south wing (Golf)

16 Lightning protection removal progressing on east elevation of south wing (Golf)

17 Scaffold installation progressing on south elevation of south wing (Hotel)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 2 of 12

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 25 2017 for items discussed during the meeting

2 The relocation of the sanitary sewer line was reviewed with the State at the west elevation north

wing (Alpha) Doug Kellogg Jason Cady Mark Maska Peter Breninger and Streets Mechanical

were in attendance A manhole closer to the building was found during excavation The new

sanitary sewer line will tie into the closer manhole with a cleanout at the 90 degree bend as

indicated in the drawings

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Lead t-cap work in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 40 - 2017_07-05docx

Page 6 of 6

Scaffold installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 1 of 9

FIELD OBSERVATION REPORT REPORT NO 41 DATE 7112017

TIME 1115 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Scaffold tarp removed from east elevation of north wing (Charlie)

3 Final cleaning progressing on east elevation of north wing (Charlie)

4 Stone repair work progressing on north elevation of dome platform

5 Stone repair work progressing on north elevation of east wing (Delta)

6 Final pointing mortar work progressing on north elevation of east wing (Delta)

7 Sealant work progressing on north elevation of east wing (Delta)

8 Stone cleaning progressing on east elevation of east wing (Echo)

9 Ducts in place for air handler on east elevation of east wing (Echo)

10 Scaffold in place on east elevation of south wing (Golf)

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 11 2017 for items discussed during the meeting

2 The light well wall coating mockup was reviewed with the State at the north elevation west wing

(Lima) light well Trait Thompson Jason Cady Matthew Radcliffe Lindsey Ross Lynnsee Boyse

Mark Maska Peter Breninger and Mike Thompson were in attendance The light well wall

coating without the leveling compound was selected by those in attendance

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 2 of 9

3 The InteriorExterior Coordination Meeting occurred prior to the site visit in Room 104 Refer to

InteriorExterior Coordination Meeting dated July 11 2017 for items discussed during the

meeting

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 3 of 9

Scaffold tarp removed from east elevation of north wing (Charlie)

Final cleaning in progress on east elevation of north wing (Charlie)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 4 of 9

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 5 of 9

Final pointing mortar work in progress on north elevation of east wing (Delta)

Sealant work in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 6 of 9

Stone cleaning in progress on east elevation of east wing (Echo)

Ducts in place for air handler on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 7 of 9

Scaffold in place on east elevation of south wing (Golf)

Plywood in place at base of scaffold to protect stone pavers on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 8 of 9

Waterproofing in place on top of covered entry on east elevation of south wing (Golf)

Light well wall coating mockup 1 (elastomeric coating with leveling compound) on north wall of light well

on north elevation of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 9 of 9

Light well wall coating mockup 2 (elastomeric coating only) on north wall of light well on north elevation

of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 42 DATE 7182017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Final pointing mortar work progressing on backside of parapet on north elevation of east wing

(Delta)

4 Stone cleaning progressing on east elevation of east wing (Echo)

5 Stone repair work progressing on east elevation of east wing (Echo)

6 Tarp installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 2 of 5

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 3 of 5

Full stone replacement in progress on north elevation of dome platform

Final pointing mortar in progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 4 of 5

Stone cleaning in progress on east elevation of east wing (Echo)

Dutchman repair in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 5 of 5

Tarp installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 1 of 12

FIELD OBSERVATION REPORT REPORT NO 43 DATE 7252017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

Jason Cady Architect - Mass Architects

Doug Kellogg State Capitol - OMES

WORK OBSERVED

The following was observed during this site visit

1 Lead t-cap work progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Scaffold removal progressing on east elevation of north wing (Charlie)

4 Operable window component installation progressing on north elevation of east wing (Delta)

5 Window component installation progressing on north elevation of east wing (Delta)

6 Window frame painting progressing on north elevation of east wing (Delta)

7 Lead t-cap work progressing on parapet stone cap on north elevation of east wing (Delta)

8 Down rod work progressing on backside of parapet on north elevation of east wing (Delta)

9 Brick joint raking progressing on backside of parapet on north elevation of east wing (Delta)

10 Stone cleaning progressing on east elevation of east wing (Echo)

11 Scaffold tarp in place on east elevation of south wing (Golf)

12 Air handler in place on east elevation of south wing (Golf)

13 Interior partitions at windows progressing on east elevation of south wing (Golf)

14 Joint raking progressing on east elevation of south wing (Golf)

15 Gutter demolition progressing on east elevation of south wing (Golf)

16 Lightning protection removal progressing on east elevation of south wing (Golf)

17 Scaffold installation progressing on south elevation of south wing (Hotel)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 2 of 12

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 25 2017 for items discussed during the meeting

2 The relocation of the sanitary sewer line was reviewed with the State at the west elevation north

wing (Alpha) Doug Kellogg Jason Cady Mark Maska Peter Breninger and Streets Mechanical

were in attendance A manhole closer to the building was found during excavation The new

sanitary sewer line will tie into the closer manhole with a cleanout at the 90 degree bend as

indicated in the drawings

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Lead t-cap work in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 1 of 9

FIELD OBSERVATION REPORT REPORT NO 41 DATE 7112017

TIME 1115 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Scaffold tarp removed from east elevation of north wing (Charlie)

3 Final cleaning progressing on east elevation of north wing (Charlie)

4 Stone repair work progressing on north elevation of dome platform

5 Stone repair work progressing on north elevation of east wing (Delta)

6 Final pointing mortar work progressing on north elevation of east wing (Delta)

7 Sealant work progressing on north elevation of east wing (Delta)

8 Stone cleaning progressing on east elevation of east wing (Echo)

9 Ducts in place for air handler on east elevation of east wing (Echo)

10 Scaffold in place on east elevation of south wing (Golf)

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 11 2017 for items discussed during the meeting

2 The light well wall coating mockup was reviewed with the State at the north elevation west wing

(Lima) light well Trait Thompson Jason Cady Matthew Radcliffe Lindsey Ross Lynnsee Boyse

Mark Maska Peter Breninger and Mike Thompson were in attendance The light well wall

coating without the leveling compound was selected by those in attendance

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 2 of 9

3 The InteriorExterior Coordination Meeting occurred prior to the site visit in Room 104 Refer to

InteriorExterior Coordination Meeting dated July 11 2017 for items discussed during the

meeting

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 3 of 9

Scaffold tarp removed from east elevation of north wing (Charlie)

Final cleaning in progress on east elevation of north wing (Charlie)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 4 of 9

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 5 of 9

Final pointing mortar work in progress on north elevation of east wing (Delta)

Sealant work in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 6 of 9

Stone cleaning in progress on east elevation of east wing (Echo)

Ducts in place for air handler on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 7 of 9

Scaffold in place on east elevation of south wing (Golf)

Plywood in place at base of scaffold to protect stone pavers on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 8 of 9

Waterproofing in place on top of covered entry on east elevation of south wing (Golf)

Light well wall coating mockup 1 (elastomeric coating with leveling compound) on north wall of light well

on north elevation of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 9 of 9

Light well wall coating mockup 2 (elastomeric coating only) on north wall of light well on north elevation

of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 42 DATE 7182017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Final pointing mortar work progressing on backside of parapet on north elevation of east wing

(Delta)

4 Stone cleaning progressing on east elevation of east wing (Echo)

5 Stone repair work progressing on east elevation of east wing (Echo)

6 Tarp installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 2 of 5

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 3 of 5

Full stone replacement in progress on north elevation of dome platform

Final pointing mortar in progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 4 of 5

Stone cleaning in progress on east elevation of east wing (Echo)

Dutchman repair in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 5 of 5

Tarp installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 1 of 12

FIELD OBSERVATION REPORT REPORT NO 43 DATE 7252017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

Jason Cady Architect - Mass Architects

Doug Kellogg State Capitol - OMES

WORK OBSERVED

The following was observed during this site visit

1 Lead t-cap work progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Scaffold removal progressing on east elevation of north wing (Charlie)

4 Operable window component installation progressing on north elevation of east wing (Delta)

5 Window component installation progressing on north elevation of east wing (Delta)

6 Window frame painting progressing on north elevation of east wing (Delta)

7 Lead t-cap work progressing on parapet stone cap on north elevation of east wing (Delta)

8 Down rod work progressing on backside of parapet on north elevation of east wing (Delta)

9 Brick joint raking progressing on backside of parapet on north elevation of east wing (Delta)

10 Stone cleaning progressing on east elevation of east wing (Echo)

11 Scaffold tarp in place on east elevation of south wing (Golf)

12 Air handler in place on east elevation of south wing (Golf)

13 Interior partitions at windows progressing on east elevation of south wing (Golf)

14 Joint raking progressing on east elevation of south wing (Golf)

15 Gutter demolition progressing on east elevation of south wing (Golf)

16 Lightning protection removal progressing on east elevation of south wing (Golf)

17 Scaffold installation progressing on south elevation of south wing (Hotel)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 2 of 12

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 25 2017 for items discussed during the meeting

2 The relocation of the sanitary sewer line was reviewed with the State at the west elevation north

wing (Alpha) Doug Kellogg Jason Cady Mark Maska Peter Breninger and Streets Mechanical

were in attendance A manhole closer to the building was found during excavation The new

sanitary sewer line will tie into the closer manhole with a cleanout at the 90 degree bend as

indicated in the drawings

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Lead t-cap work in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 2 of 9

3 The InteriorExterior Coordination Meeting occurred prior to the site visit in Room 104 Refer to

InteriorExterior Coordination Meeting dated July 11 2017 for items discussed during the

meeting

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 3 of 9

Scaffold tarp removed from east elevation of north wing (Charlie)

Final cleaning in progress on east elevation of north wing (Charlie)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 4 of 9

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 5 of 9

Final pointing mortar work in progress on north elevation of east wing (Delta)

Sealant work in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 6 of 9

Stone cleaning in progress on east elevation of east wing (Echo)

Ducts in place for air handler on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 7 of 9

Scaffold in place on east elevation of south wing (Golf)

Plywood in place at base of scaffold to protect stone pavers on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 8 of 9

Waterproofing in place on top of covered entry on east elevation of south wing (Golf)

Light well wall coating mockup 1 (elastomeric coating with leveling compound) on north wall of light well

on north elevation of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 9 of 9

Light well wall coating mockup 2 (elastomeric coating only) on north wall of light well on north elevation

of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 42 DATE 7182017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Final pointing mortar work progressing on backside of parapet on north elevation of east wing

(Delta)

4 Stone cleaning progressing on east elevation of east wing (Echo)

5 Stone repair work progressing on east elevation of east wing (Echo)

6 Tarp installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 2 of 5

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 3 of 5

Full stone replacement in progress on north elevation of dome platform

Final pointing mortar in progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 4 of 5

Stone cleaning in progress on east elevation of east wing (Echo)

Dutchman repair in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 5 of 5

Tarp installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 1 of 12

FIELD OBSERVATION REPORT REPORT NO 43 DATE 7252017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

Jason Cady Architect - Mass Architects

Doug Kellogg State Capitol - OMES

WORK OBSERVED

The following was observed during this site visit

1 Lead t-cap work progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Scaffold removal progressing on east elevation of north wing (Charlie)

4 Operable window component installation progressing on north elevation of east wing (Delta)

5 Window component installation progressing on north elevation of east wing (Delta)

6 Window frame painting progressing on north elevation of east wing (Delta)

7 Lead t-cap work progressing on parapet stone cap on north elevation of east wing (Delta)

8 Down rod work progressing on backside of parapet on north elevation of east wing (Delta)

9 Brick joint raking progressing on backside of parapet on north elevation of east wing (Delta)

10 Stone cleaning progressing on east elevation of east wing (Echo)

11 Scaffold tarp in place on east elevation of south wing (Golf)

12 Air handler in place on east elevation of south wing (Golf)

13 Interior partitions at windows progressing on east elevation of south wing (Golf)

14 Joint raking progressing on east elevation of south wing (Golf)

15 Gutter demolition progressing on east elevation of south wing (Golf)

16 Lightning protection removal progressing on east elevation of south wing (Golf)

17 Scaffold installation progressing on south elevation of south wing (Hotel)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 2 of 12

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 25 2017 for items discussed during the meeting

2 The relocation of the sanitary sewer line was reviewed with the State at the west elevation north

wing (Alpha) Doug Kellogg Jason Cady Mark Maska Peter Breninger and Streets Mechanical

were in attendance A manhole closer to the building was found during excavation The new

sanitary sewer line will tie into the closer manhole with a cleanout at the 90 degree bend as

indicated in the drawings

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Lead t-cap work in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 3 of 9

Scaffold tarp removed from east elevation of north wing (Charlie)

Final cleaning in progress on east elevation of north wing (Charlie)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 4 of 9

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 5 of 9

Final pointing mortar work in progress on north elevation of east wing (Delta)

Sealant work in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 6 of 9

Stone cleaning in progress on east elevation of east wing (Echo)

Ducts in place for air handler on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 7 of 9

Scaffold in place on east elevation of south wing (Golf)

Plywood in place at base of scaffold to protect stone pavers on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 8 of 9

Waterproofing in place on top of covered entry on east elevation of south wing (Golf)

Light well wall coating mockup 1 (elastomeric coating with leveling compound) on north wall of light well

on north elevation of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 9 of 9

Light well wall coating mockup 2 (elastomeric coating only) on north wall of light well on north elevation

of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 42 DATE 7182017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Final pointing mortar work progressing on backside of parapet on north elevation of east wing

(Delta)

4 Stone cleaning progressing on east elevation of east wing (Echo)

5 Stone repair work progressing on east elevation of east wing (Echo)

6 Tarp installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 2 of 5

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 3 of 5

Full stone replacement in progress on north elevation of dome platform

Final pointing mortar in progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 4 of 5

Stone cleaning in progress on east elevation of east wing (Echo)

Dutchman repair in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 5 of 5

Tarp installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 1 of 12

FIELD OBSERVATION REPORT REPORT NO 43 DATE 7252017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

Jason Cady Architect - Mass Architects

Doug Kellogg State Capitol - OMES

WORK OBSERVED

The following was observed during this site visit

1 Lead t-cap work progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Scaffold removal progressing on east elevation of north wing (Charlie)

4 Operable window component installation progressing on north elevation of east wing (Delta)

5 Window component installation progressing on north elevation of east wing (Delta)

6 Window frame painting progressing on north elevation of east wing (Delta)

7 Lead t-cap work progressing on parapet stone cap on north elevation of east wing (Delta)

8 Down rod work progressing on backside of parapet on north elevation of east wing (Delta)

9 Brick joint raking progressing on backside of parapet on north elevation of east wing (Delta)

10 Stone cleaning progressing on east elevation of east wing (Echo)

11 Scaffold tarp in place on east elevation of south wing (Golf)

12 Air handler in place on east elevation of south wing (Golf)

13 Interior partitions at windows progressing on east elevation of south wing (Golf)

14 Joint raking progressing on east elevation of south wing (Golf)

15 Gutter demolition progressing on east elevation of south wing (Golf)

16 Lightning protection removal progressing on east elevation of south wing (Golf)

17 Scaffold installation progressing on south elevation of south wing (Hotel)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 2 of 12

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 25 2017 for items discussed during the meeting

2 The relocation of the sanitary sewer line was reviewed with the State at the west elevation north

wing (Alpha) Doug Kellogg Jason Cady Mark Maska Peter Breninger and Streets Mechanical

were in attendance A manhole closer to the building was found during excavation The new

sanitary sewer line will tie into the closer manhole with a cleanout at the 90 degree bend as

indicated in the drawings

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Lead t-cap work in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 4 of 9

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 5 of 9

Final pointing mortar work in progress on north elevation of east wing (Delta)

Sealant work in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 6 of 9

Stone cleaning in progress on east elevation of east wing (Echo)

Ducts in place for air handler on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 7 of 9

Scaffold in place on east elevation of south wing (Golf)

Plywood in place at base of scaffold to protect stone pavers on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 8 of 9

Waterproofing in place on top of covered entry on east elevation of south wing (Golf)

Light well wall coating mockup 1 (elastomeric coating with leveling compound) on north wall of light well

on north elevation of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 9 of 9

Light well wall coating mockup 2 (elastomeric coating only) on north wall of light well on north elevation

of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 42 DATE 7182017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Final pointing mortar work progressing on backside of parapet on north elevation of east wing

(Delta)

4 Stone cleaning progressing on east elevation of east wing (Echo)

5 Stone repair work progressing on east elevation of east wing (Echo)

6 Tarp installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 2 of 5

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 3 of 5

Full stone replacement in progress on north elevation of dome platform

Final pointing mortar in progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 4 of 5

Stone cleaning in progress on east elevation of east wing (Echo)

Dutchman repair in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 5 of 5

Tarp installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 1 of 12

FIELD OBSERVATION REPORT REPORT NO 43 DATE 7252017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

Jason Cady Architect - Mass Architects

Doug Kellogg State Capitol - OMES

WORK OBSERVED

The following was observed during this site visit

1 Lead t-cap work progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Scaffold removal progressing on east elevation of north wing (Charlie)

4 Operable window component installation progressing on north elevation of east wing (Delta)

5 Window component installation progressing on north elevation of east wing (Delta)

6 Window frame painting progressing on north elevation of east wing (Delta)

7 Lead t-cap work progressing on parapet stone cap on north elevation of east wing (Delta)

8 Down rod work progressing on backside of parapet on north elevation of east wing (Delta)

9 Brick joint raking progressing on backside of parapet on north elevation of east wing (Delta)

10 Stone cleaning progressing on east elevation of east wing (Echo)

11 Scaffold tarp in place on east elevation of south wing (Golf)

12 Air handler in place on east elevation of south wing (Golf)

13 Interior partitions at windows progressing on east elevation of south wing (Golf)

14 Joint raking progressing on east elevation of south wing (Golf)

15 Gutter demolition progressing on east elevation of south wing (Golf)

16 Lightning protection removal progressing on east elevation of south wing (Golf)

17 Scaffold installation progressing on south elevation of south wing (Hotel)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 2 of 12

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 25 2017 for items discussed during the meeting

2 The relocation of the sanitary sewer line was reviewed with the State at the west elevation north

wing (Alpha) Doug Kellogg Jason Cady Mark Maska Peter Breninger and Streets Mechanical

were in attendance A manhole closer to the building was found during excavation The new

sanitary sewer line will tie into the closer manhole with a cleanout at the 90 degree bend as

indicated in the drawings

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Lead t-cap work in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 5 of 9

Final pointing mortar work in progress on north elevation of east wing (Delta)

Sealant work in progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 6 of 9

Stone cleaning in progress on east elevation of east wing (Echo)

Ducts in place for air handler on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 7 of 9

Scaffold in place on east elevation of south wing (Golf)

Plywood in place at base of scaffold to protect stone pavers on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 8 of 9

Waterproofing in place on top of covered entry on east elevation of south wing (Golf)

Light well wall coating mockup 1 (elastomeric coating with leveling compound) on north wall of light well

on north elevation of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 9 of 9

Light well wall coating mockup 2 (elastomeric coating only) on north wall of light well on north elevation

of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 42 DATE 7182017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Final pointing mortar work progressing on backside of parapet on north elevation of east wing

(Delta)

4 Stone cleaning progressing on east elevation of east wing (Echo)

5 Stone repair work progressing on east elevation of east wing (Echo)

6 Tarp installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 2 of 5

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 3 of 5

Full stone replacement in progress on north elevation of dome platform

Final pointing mortar in progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 4 of 5

Stone cleaning in progress on east elevation of east wing (Echo)

Dutchman repair in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 5 of 5

Tarp installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 1 of 12

FIELD OBSERVATION REPORT REPORT NO 43 DATE 7252017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

Jason Cady Architect - Mass Architects

Doug Kellogg State Capitol - OMES

WORK OBSERVED

The following was observed during this site visit

1 Lead t-cap work progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Scaffold removal progressing on east elevation of north wing (Charlie)

4 Operable window component installation progressing on north elevation of east wing (Delta)

5 Window component installation progressing on north elevation of east wing (Delta)

6 Window frame painting progressing on north elevation of east wing (Delta)

7 Lead t-cap work progressing on parapet stone cap on north elevation of east wing (Delta)

8 Down rod work progressing on backside of parapet on north elevation of east wing (Delta)

9 Brick joint raking progressing on backside of parapet on north elevation of east wing (Delta)

10 Stone cleaning progressing on east elevation of east wing (Echo)

11 Scaffold tarp in place on east elevation of south wing (Golf)

12 Air handler in place on east elevation of south wing (Golf)

13 Interior partitions at windows progressing on east elevation of south wing (Golf)

14 Joint raking progressing on east elevation of south wing (Golf)

15 Gutter demolition progressing on east elevation of south wing (Golf)

16 Lightning protection removal progressing on east elevation of south wing (Golf)

17 Scaffold installation progressing on south elevation of south wing (Hotel)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 2 of 12

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 25 2017 for items discussed during the meeting

2 The relocation of the sanitary sewer line was reviewed with the State at the west elevation north

wing (Alpha) Doug Kellogg Jason Cady Mark Maska Peter Breninger and Streets Mechanical

were in attendance A manhole closer to the building was found during excavation The new

sanitary sewer line will tie into the closer manhole with a cleanout at the 90 degree bend as

indicated in the drawings

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Lead t-cap work in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 6 of 9

Stone cleaning in progress on east elevation of east wing (Echo)

Ducts in place for air handler on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 7 of 9

Scaffold in place on east elevation of south wing (Golf)

Plywood in place at base of scaffold to protect stone pavers on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 8 of 9

Waterproofing in place on top of covered entry on east elevation of south wing (Golf)

Light well wall coating mockup 1 (elastomeric coating with leveling compound) on north wall of light well

on north elevation of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 9 of 9

Light well wall coating mockup 2 (elastomeric coating only) on north wall of light well on north elevation

of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 42 DATE 7182017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Final pointing mortar work progressing on backside of parapet on north elevation of east wing

(Delta)

4 Stone cleaning progressing on east elevation of east wing (Echo)

5 Stone repair work progressing on east elevation of east wing (Echo)

6 Tarp installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 2 of 5

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 3 of 5

Full stone replacement in progress on north elevation of dome platform

Final pointing mortar in progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 4 of 5

Stone cleaning in progress on east elevation of east wing (Echo)

Dutchman repair in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 5 of 5

Tarp installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 1 of 12

FIELD OBSERVATION REPORT REPORT NO 43 DATE 7252017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

Jason Cady Architect - Mass Architects

Doug Kellogg State Capitol - OMES

WORK OBSERVED

The following was observed during this site visit

1 Lead t-cap work progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Scaffold removal progressing on east elevation of north wing (Charlie)

4 Operable window component installation progressing on north elevation of east wing (Delta)

5 Window component installation progressing on north elevation of east wing (Delta)

6 Window frame painting progressing on north elevation of east wing (Delta)

7 Lead t-cap work progressing on parapet stone cap on north elevation of east wing (Delta)

8 Down rod work progressing on backside of parapet on north elevation of east wing (Delta)

9 Brick joint raking progressing on backside of parapet on north elevation of east wing (Delta)

10 Stone cleaning progressing on east elevation of east wing (Echo)

11 Scaffold tarp in place on east elevation of south wing (Golf)

12 Air handler in place on east elevation of south wing (Golf)

13 Interior partitions at windows progressing on east elevation of south wing (Golf)

14 Joint raking progressing on east elevation of south wing (Golf)

15 Gutter demolition progressing on east elevation of south wing (Golf)

16 Lightning protection removal progressing on east elevation of south wing (Golf)

17 Scaffold installation progressing on south elevation of south wing (Hotel)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 2 of 12

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 25 2017 for items discussed during the meeting

2 The relocation of the sanitary sewer line was reviewed with the State at the west elevation north

wing (Alpha) Doug Kellogg Jason Cady Mark Maska Peter Breninger and Streets Mechanical

were in attendance A manhole closer to the building was found during excavation The new

sanitary sewer line will tie into the closer manhole with a cleanout at the 90 degree bend as

indicated in the drawings

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Lead t-cap work in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 7 of 9

Scaffold in place on east elevation of south wing (Golf)

Plywood in place at base of scaffold to protect stone pavers on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 8 of 9

Waterproofing in place on top of covered entry on east elevation of south wing (Golf)

Light well wall coating mockup 1 (elastomeric coating with leveling compound) on north wall of light well

on north elevation of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 9 of 9

Light well wall coating mockup 2 (elastomeric coating only) on north wall of light well on north elevation

of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 42 DATE 7182017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Final pointing mortar work progressing on backside of parapet on north elevation of east wing

(Delta)

4 Stone cleaning progressing on east elevation of east wing (Echo)

5 Stone repair work progressing on east elevation of east wing (Echo)

6 Tarp installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 2 of 5

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 3 of 5

Full stone replacement in progress on north elevation of dome platform

Final pointing mortar in progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 4 of 5

Stone cleaning in progress on east elevation of east wing (Echo)

Dutchman repair in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 5 of 5

Tarp installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 1 of 12

FIELD OBSERVATION REPORT REPORT NO 43 DATE 7252017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

Jason Cady Architect - Mass Architects

Doug Kellogg State Capitol - OMES

WORK OBSERVED

The following was observed during this site visit

1 Lead t-cap work progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Scaffold removal progressing on east elevation of north wing (Charlie)

4 Operable window component installation progressing on north elevation of east wing (Delta)

5 Window component installation progressing on north elevation of east wing (Delta)

6 Window frame painting progressing on north elevation of east wing (Delta)

7 Lead t-cap work progressing on parapet stone cap on north elevation of east wing (Delta)

8 Down rod work progressing on backside of parapet on north elevation of east wing (Delta)

9 Brick joint raking progressing on backside of parapet on north elevation of east wing (Delta)

10 Stone cleaning progressing on east elevation of east wing (Echo)

11 Scaffold tarp in place on east elevation of south wing (Golf)

12 Air handler in place on east elevation of south wing (Golf)

13 Interior partitions at windows progressing on east elevation of south wing (Golf)

14 Joint raking progressing on east elevation of south wing (Golf)

15 Gutter demolition progressing on east elevation of south wing (Golf)

16 Lightning protection removal progressing on east elevation of south wing (Golf)

17 Scaffold installation progressing on south elevation of south wing (Hotel)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 2 of 12

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 25 2017 for items discussed during the meeting

2 The relocation of the sanitary sewer line was reviewed with the State at the west elevation north

wing (Alpha) Doug Kellogg Jason Cady Mark Maska Peter Breninger and Streets Mechanical

were in attendance A manhole closer to the building was found during excavation The new

sanitary sewer line will tie into the closer manhole with a cleanout at the 90 degree bend as

indicated in the drawings

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Lead t-cap work in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 8 of 9

Waterproofing in place on top of covered entry on east elevation of south wing (Golf)

Light well wall coating mockup 1 (elastomeric coating with leveling compound) on north wall of light well

on north elevation of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 9 of 9

Light well wall coating mockup 2 (elastomeric coating only) on north wall of light well on north elevation

of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 42 DATE 7182017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Final pointing mortar work progressing on backside of parapet on north elevation of east wing

(Delta)

4 Stone cleaning progressing on east elevation of east wing (Echo)

5 Stone repair work progressing on east elevation of east wing (Echo)

6 Tarp installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 2 of 5

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 3 of 5

Full stone replacement in progress on north elevation of dome platform

Final pointing mortar in progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 4 of 5

Stone cleaning in progress on east elevation of east wing (Echo)

Dutchman repair in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 5 of 5

Tarp installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 1 of 12

FIELD OBSERVATION REPORT REPORT NO 43 DATE 7252017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

Jason Cady Architect - Mass Architects

Doug Kellogg State Capitol - OMES

WORK OBSERVED

The following was observed during this site visit

1 Lead t-cap work progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Scaffold removal progressing on east elevation of north wing (Charlie)

4 Operable window component installation progressing on north elevation of east wing (Delta)

5 Window component installation progressing on north elevation of east wing (Delta)

6 Window frame painting progressing on north elevation of east wing (Delta)

7 Lead t-cap work progressing on parapet stone cap on north elevation of east wing (Delta)

8 Down rod work progressing on backside of parapet on north elevation of east wing (Delta)

9 Brick joint raking progressing on backside of parapet on north elevation of east wing (Delta)

10 Stone cleaning progressing on east elevation of east wing (Echo)

11 Scaffold tarp in place on east elevation of south wing (Golf)

12 Air handler in place on east elevation of south wing (Golf)

13 Interior partitions at windows progressing on east elevation of south wing (Golf)

14 Joint raking progressing on east elevation of south wing (Golf)

15 Gutter demolition progressing on east elevation of south wing (Golf)

16 Lightning protection removal progressing on east elevation of south wing (Golf)

17 Scaffold installation progressing on south elevation of south wing (Hotel)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 2 of 12

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 25 2017 for items discussed during the meeting

2 The relocation of the sanitary sewer line was reviewed with the State at the west elevation north

wing (Alpha) Doug Kellogg Jason Cady Mark Maska Peter Breninger and Streets Mechanical

were in attendance A manhole closer to the building was found during excavation The new

sanitary sewer line will tie into the closer manhole with a cleanout at the 90 degree bend as

indicated in the drawings

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Lead t-cap work in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 41 - 2017_07-11docx

Page 9 of 9

Light well wall coating mockup 2 (elastomeric coating only) on north wall of light well on north elevation

of west wing (Lima)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 42 DATE 7182017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Final pointing mortar work progressing on backside of parapet on north elevation of east wing

(Delta)

4 Stone cleaning progressing on east elevation of east wing (Echo)

5 Stone repair work progressing on east elevation of east wing (Echo)

6 Tarp installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 2 of 5

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 3 of 5

Full stone replacement in progress on north elevation of dome platform

Final pointing mortar in progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 4 of 5

Stone cleaning in progress on east elevation of east wing (Echo)

Dutchman repair in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 5 of 5

Tarp installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 1 of 12

FIELD OBSERVATION REPORT REPORT NO 43 DATE 7252017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

Jason Cady Architect - Mass Architects

Doug Kellogg State Capitol - OMES

WORK OBSERVED

The following was observed during this site visit

1 Lead t-cap work progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Scaffold removal progressing on east elevation of north wing (Charlie)

4 Operable window component installation progressing on north elevation of east wing (Delta)

5 Window component installation progressing on north elevation of east wing (Delta)

6 Window frame painting progressing on north elevation of east wing (Delta)

7 Lead t-cap work progressing on parapet stone cap on north elevation of east wing (Delta)

8 Down rod work progressing on backside of parapet on north elevation of east wing (Delta)

9 Brick joint raking progressing on backside of parapet on north elevation of east wing (Delta)

10 Stone cleaning progressing on east elevation of east wing (Echo)

11 Scaffold tarp in place on east elevation of south wing (Golf)

12 Air handler in place on east elevation of south wing (Golf)

13 Interior partitions at windows progressing on east elevation of south wing (Golf)

14 Joint raking progressing on east elevation of south wing (Golf)

15 Gutter demolition progressing on east elevation of south wing (Golf)

16 Lightning protection removal progressing on east elevation of south wing (Golf)

17 Scaffold installation progressing on south elevation of south wing (Hotel)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 2 of 12

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 25 2017 for items discussed during the meeting

2 The relocation of the sanitary sewer line was reviewed with the State at the west elevation north

wing (Alpha) Doug Kellogg Jason Cady Mark Maska Peter Breninger and Streets Mechanical

were in attendance A manhole closer to the building was found during excavation The new

sanitary sewer line will tie into the closer manhole with a cleanout at the 90 degree bend as

indicated in the drawings

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Lead t-cap work in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 42 DATE 7182017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold removal progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Final pointing mortar work progressing on backside of parapet on north elevation of east wing

(Delta)

4 Stone cleaning progressing on east elevation of east wing (Echo)

5 Stone repair work progressing on east elevation of east wing (Echo)

6 Tarp installation progressing on east elevation of south wing (Golf)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 2 of 5

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 3 of 5

Full stone replacement in progress on north elevation of dome platform

Final pointing mortar in progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 4 of 5

Stone cleaning in progress on east elevation of east wing (Echo)

Dutchman repair in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 5 of 5

Tarp installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 1 of 12

FIELD OBSERVATION REPORT REPORT NO 43 DATE 7252017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

Jason Cady Architect - Mass Architects

Doug Kellogg State Capitol - OMES

WORK OBSERVED

The following was observed during this site visit

1 Lead t-cap work progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Scaffold removal progressing on east elevation of north wing (Charlie)

4 Operable window component installation progressing on north elevation of east wing (Delta)

5 Window component installation progressing on north elevation of east wing (Delta)

6 Window frame painting progressing on north elevation of east wing (Delta)

7 Lead t-cap work progressing on parapet stone cap on north elevation of east wing (Delta)

8 Down rod work progressing on backside of parapet on north elevation of east wing (Delta)

9 Brick joint raking progressing on backside of parapet on north elevation of east wing (Delta)

10 Stone cleaning progressing on east elevation of east wing (Echo)

11 Scaffold tarp in place on east elevation of south wing (Golf)

12 Air handler in place on east elevation of south wing (Golf)

13 Interior partitions at windows progressing on east elevation of south wing (Golf)

14 Joint raking progressing on east elevation of south wing (Golf)

15 Gutter demolition progressing on east elevation of south wing (Golf)

16 Lightning protection removal progressing on east elevation of south wing (Golf)

17 Scaffold installation progressing on south elevation of south wing (Hotel)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 2 of 12

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 25 2017 for items discussed during the meeting

2 The relocation of the sanitary sewer line was reviewed with the State at the west elevation north

wing (Alpha) Doug Kellogg Jason Cady Mark Maska Peter Breninger and Streets Mechanical

were in attendance A manhole closer to the building was found during excavation The new

sanitary sewer line will tie into the closer manhole with a cleanout at the 90 degree bend as

indicated in the drawings

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Lead t-cap work in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 2 of 5

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Scaffold removal in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 3 of 5

Full stone replacement in progress on north elevation of dome platform

Final pointing mortar in progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 4 of 5

Stone cleaning in progress on east elevation of east wing (Echo)

Dutchman repair in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 5 of 5

Tarp installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 1 of 12

FIELD OBSERVATION REPORT REPORT NO 43 DATE 7252017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

Jason Cady Architect - Mass Architects

Doug Kellogg State Capitol - OMES

WORK OBSERVED

The following was observed during this site visit

1 Lead t-cap work progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Scaffold removal progressing on east elevation of north wing (Charlie)

4 Operable window component installation progressing on north elevation of east wing (Delta)

5 Window component installation progressing on north elevation of east wing (Delta)

6 Window frame painting progressing on north elevation of east wing (Delta)

7 Lead t-cap work progressing on parapet stone cap on north elevation of east wing (Delta)

8 Down rod work progressing on backside of parapet on north elevation of east wing (Delta)

9 Brick joint raking progressing on backside of parapet on north elevation of east wing (Delta)

10 Stone cleaning progressing on east elevation of east wing (Echo)

11 Scaffold tarp in place on east elevation of south wing (Golf)

12 Air handler in place on east elevation of south wing (Golf)

13 Interior partitions at windows progressing on east elevation of south wing (Golf)

14 Joint raking progressing on east elevation of south wing (Golf)

15 Gutter demolition progressing on east elevation of south wing (Golf)

16 Lightning protection removal progressing on east elevation of south wing (Golf)

17 Scaffold installation progressing on south elevation of south wing (Hotel)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 2 of 12

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 25 2017 for items discussed during the meeting

2 The relocation of the sanitary sewer line was reviewed with the State at the west elevation north

wing (Alpha) Doug Kellogg Jason Cady Mark Maska Peter Breninger and Streets Mechanical

were in attendance A manhole closer to the building was found during excavation The new

sanitary sewer line will tie into the closer manhole with a cleanout at the 90 degree bend as

indicated in the drawings

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Lead t-cap work in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 3 of 5

Full stone replacement in progress on north elevation of dome platform

Final pointing mortar in progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 4 of 5

Stone cleaning in progress on east elevation of east wing (Echo)

Dutchman repair in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 5 of 5

Tarp installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 1 of 12

FIELD OBSERVATION REPORT REPORT NO 43 DATE 7252017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

Jason Cady Architect - Mass Architects

Doug Kellogg State Capitol - OMES

WORK OBSERVED

The following was observed during this site visit

1 Lead t-cap work progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Scaffold removal progressing on east elevation of north wing (Charlie)

4 Operable window component installation progressing on north elevation of east wing (Delta)

5 Window component installation progressing on north elevation of east wing (Delta)

6 Window frame painting progressing on north elevation of east wing (Delta)

7 Lead t-cap work progressing on parapet stone cap on north elevation of east wing (Delta)

8 Down rod work progressing on backside of parapet on north elevation of east wing (Delta)

9 Brick joint raking progressing on backside of parapet on north elevation of east wing (Delta)

10 Stone cleaning progressing on east elevation of east wing (Echo)

11 Scaffold tarp in place on east elevation of south wing (Golf)

12 Air handler in place on east elevation of south wing (Golf)

13 Interior partitions at windows progressing on east elevation of south wing (Golf)

14 Joint raking progressing on east elevation of south wing (Golf)

15 Gutter demolition progressing on east elevation of south wing (Golf)

16 Lightning protection removal progressing on east elevation of south wing (Golf)

17 Scaffold installation progressing on south elevation of south wing (Hotel)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 2 of 12

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 25 2017 for items discussed during the meeting

2 The relocation of the sanitary sewer line was reviewed with the State at the west elevation north

wing (Alpha) Doug Kellogg Jason Cady Mark Maska Peter Breninger and Streets Mechanical

were in attendance A manhole closer to the building was found during excavation The new

sanitary sewer line will tie into the closer manhole with a cleanout at the 90 degree bend as

indicated in the drawings

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Lead t-cap work in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 4 of 5

Stone cleaning in progress on east elevation of east wing (Echo)

Dutchman repair in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 5 of 5

Tarp installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 1 of 12

FIELD OBSERVATION REPORT REPORT NO 43 DATE 7252017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

Jason Cady Architect - Mass Architects

Doug Kellogg State Capitol - OMES

WORK OBSERVED

The following was observed during this site visit

1 Lead t-cap work progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Scaffold removal progressing on east elevation of north wing (Charlie)

4 Operable window component installation progressing on north elevation of east wing (Delta)

5 Window component installation progressing on north elevation of east wing (Delta)

6 Window frame painting progressing on north elevation of east wing (Delta)

7 Lead t-cap work progressing on parapet stone cap on north elevation of east wing (Delta)

8 Down rod work progressing on backside of parapet on north elevation of east wing (Delta)

9 Brick joint raking progressing on backside of parapet on north elevation of east wing (Delta)

10 Stone cleaning progressing on east elevation of east wing (Echo)

11 Scaffold tarp in place on east elevation of south wing (Golf)

12 Air handler in place on east elevation of south wing (Golf)

13 Interior partitions at windows progressing on east elevation of south wing (Golf)

14 Joint raking progressing on east elevation of south wing (Golf)

15 Gutter demolition progressing on east elevation of south wing (Golf)

16 Lightning protection removal progressing on east elevation of south wing (Golf)

17 Scaffold installation progressing on south elevation of south wing (Hotel)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 2 of 12

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 25 2017 for items discussed during the meeting

2 The relocation of the sanitary sewer line was reviewed with the State at the west elevation north

wing (Alpha) Doug Kellogg Jason Cady Mark Maska Peter Breninger and Streets Mechanical

were in attendance A manhole closer to the building was found during excavation The new

sanitary sewer line will tie into the closer manhole with a cleanout at the 90 degree bend as

indicated in the drawings

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Lead t-cap work in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 42 - 2017_07-18docx

Page 5 of 5

Tarp installation in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 1 of 12

FIELD OBSERVATION REPORT REPORT NO 43 DATE 7252017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

Jason Cady Architect - Mass Architects

Doug Kellogg State Capitol - OMES

WORK OBSERVED

The following was observed during this site visit

1 Lead t-cap work progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Scaffold removal progressing on east elevation of north wing (Charlie)

4 Operable window component installation progressing on north elevation of east wing (Delta)

5 Window component installation progressing on north elevation of east wing (Delta)

6 Window frame painting progressing on north elevation of east wing (Delta)

7 Lead t-cap work progressing on parapet stone cap on north elevation of east wing (Delta)

8 Down rod work progressing on backside of parapet on north elevation of east wing (Delta)

9 Brick joint raking progressing on backside of parapet on north elevation of east wing (Delta)

10 Stone cleaning progressing on east elevation of east wing (Echo)

11 Scaffold tarp in place on east elevation of south wing (Golf)

12 Air handler in place on east elevation of south wing (Golf)

13 Interior partitions at windows progressing on east elevation of south wing (Golf)

14 Joint raking progressing on east elevation of south wing (Golf)

15 Gutter demolition progressing on east elevation of south wing (Golf)

16 Lightning protection removal progressing on east elevation of south wing (Golf)

17 Scaffold installation progressing on south elevation of south wing (Hotel)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 2 of 12

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 25 2017 for items discussed during the meeting

2 The relocation of the sanitary sewer line was reviewed with the State at the west elevation north

wing (Alpha) Doug Kellogg Jason Cady Mark Maska Peter Breninger and Streets Mechanical

were in attendance A manhole closer to the building was found during excavation The new

sanitary sewer line will tie into the closer manhole with a cleanout at the 90 degree bend as

indicated in the drawings

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Lead t-cap work in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 1 of 12

FIELD OBSERVATION REPORT REPORT NO 43 DATE 7252017

TIME 1015 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 90deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Lindsey Ross Project Engineer - JE Dunn Construction

Lynnsee Boyse Project Manager - JE Dunn Construction

Jason Cady Architect - Mass Architects

Doug Kellogg State Capitol - OMES

WORK OBSERVED

The following was observed during this site visit

1 Lead t-cap work progressing on north elevation of north wing (Bravo)

2 Stone repair work progressing on north elevation of dome platform

3 Scaffold removal progressing on east elevation of north wing (Charlie)

4 Operable window component installation progressing on north elevation of east wing (Delta)

5 Window component installation progressing on north elevation of east wing (Delta)

6 Window frame painting progressing on north elevation of east wing (Delta)

7 Lead t-cap work progressing on parapet stone cap on north elevation of east wing (Delta)

8 Down rod work progressing on backside of parapet on north elevation of east wing (Delta)

9 Brick joint raking progressing on backside of parapet on north elevation of east wing (Delta)

10 Stone cleaning progressing on east elevation of east wing (Echo)

11 Scaffold tarp in place on east elevation of south wing (Golf)

12 Air handler in place on east elevation of south wing (Golf)

13 Interior partitions at windows progressing on east elevation of south wing (Golf)

14 Joint raking progressing on east elevation of south wing (Golf)

15 Gutter demolition progressing on east elevation of south wing (Golf)

16 Lightning protection removal progressing on east elevation of south wing (Golf)

17 Scaffold installation progressing on south elevation of south wing (Hotel)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 2 of 12

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 25 2017 for items discussed during the meeting

2 The relocation of the sanitary sewer line was reviewed with the State at the west elevation north

wing (Alpha) Doug Kellogg Jason Cady Mark Maska Peter Breninger and Streets Mechanical

were in attendance A manhole closer to the building was found during excavation The new

sanitary sewer line will tie into the closer manhole with a cleanout at the 90 degree bend as

indicated in the drawings

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Lead t-cap work in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 2 of 12

ITEMS DISCUSSED

The following items were discussed during this site visit

1 The OAC Meeting occurred prior to the site visit in the jobsite trailers Refer to OAC Meeting

Minutes dated July 25 2017 for items discussed during the meeting

2 The relocation of the sanitary sewer line was reviewed with the State at the west elevation north

wing (Alpha) Doug Kellogg Jason Cady Mark Maska Peter Breninger and Streets Mechanical

were in attendance A manhole closer to the building was found during excavation The new

sanitary sewer line will tie into the closer manhole with a cleanout at the 90 degree bend as

indicated in the drawings

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) JC Witcher (ADG) Robert

Meek (ADG) Amelia McKinney (TreanorHL) Julia Manglitz (TreanorHL) Todd Renyer

(TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Andy Wiese (Alvine) Ed

Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith

Roberts Baldischwiler)

Lead t-cap work in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 3 of 12

Dutchman repair in progress on north elevation of dome platform

Stone patch in progress on north elevation of dome platform

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 4 of 12

Scaffold removal in progress on east elevation of north wing (Charlie)

Operable window component installation progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 5 of 12

Window component installation progress on north elevation of east wing (Delta)

Window frame painting progress on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 6 of 12

Lead t-cap work progress on parapet stone cap on north elevation of east wing (Delta)

Treated down rod progress on backside of parapet on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 7 of 12

Brick joint raking in progress on backside of parapet on north elevation of east wing (Delta)

Stone cleaning in progress on east elevation of east wing (Echo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 8 of 12

Scaffold tarp in place on east elevation of south wing (Golf)

Air handler in place on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 9 of 12

Interior partition at window progress on east elevation of south wing (Golf)

Joint raking in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 10 of 12

Gutter demolition progress on east elevation of south wing (Golf)

Lightning protection removal in progress on east elevation of south wing (Golf)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 11 of 12

Scaffold installation in progress on south elevation of south wing (Hotel)

Sanitary sewer line trenching in progress with uncovered manhole on west elevation of north wing

(Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsADGOSCR FR 43 - 2017_07-25docx

Page 12 of 12

Sanitary sewer line existing location and proposed location in light well on west elevation of north wing

(Alpha)

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

ZFI Engineering Co

8411 S Walker Ave

OKC OK 73139

Ph 4056343393

Fx 4056346414

wwwzfiengrcom

ENGINEERrsquoSFIELDREPORTProject OklahomaStateCapitolExteriorRenovationProject 15071‐01DateTime June272017Temperature ~79degFWeather MostlyCloudybreezyWorkinProgress ExteriorMasonryRestorationProjectReasonforVisit VisittoexistingventshaftonnorthelevationforpossibleinfillPersonnel MikeThompsonndashZFIEngineering(StructuralEOR) MikeThompson(MDT)ofZFIwason‐sitetoobservetheexistingsubgradeventilationshaftthattheownerdesirestoinfillifpossibletopreventfutureleakincidents

Observations

1 Itismyunderstandingthatduringstonecleaningoperationsonthenorthwingnorthelevation(Bravoscaffoldelevation)asignificantvolumeofwatercollectedintheexistingventshaftandinfiltratedthebuildingrsquosbasementPreventativemeasures(coveringtheopening)weretakentopreventthisfromreoccurringduringconstruction

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 2 of 4

2 TheexistingshaftiscoveredbyanopengratedmanholewhichallowedforwatertoentertheshaftfromaboveThemanholeandringarecastintheslab‐on‐gradeimmediatelyadjacenttothenorthfaceofthebuildingjustwestoftheentrydoors

3 Therectangularshaftisapproximately8rsquo‐6rdquodeep(belowgrade)AnexistingpipewasobservedontheeastsideoftheshaftThebottomoftheshaftiscoveredinloosedirtanddebrisItisunclearifthereisaconcreteslabbeneath

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 3 of 4

4 AhorizontalcircularshaftextendsintotheadjacentbuildingrsquosbasementThebottomofthecircularshaftisapproximately2rsquo‐0rdquoabovethebottomofthemainshaftAnexistingpieceofloosedeterioratedmaterial(indicatedinphotoabove)isinthebottomoftheverticalshaftandmayatonetimecoveredthehorizontalopeningInsulationboardappearstobecoveringtheinteriorsideofthehorizontalshaftItismyunderstandingthatwallfinishesonthebuildinginteriorcouldbedemolishedtoaccessthisshaftWearelikelyseeingthebacksideofthosefinisheshere

5 Apossibleconceptualsolutiontoinfilltheshafttopreventfutureinfiltrationisasfollows

1) Verifythattheshaftandpipingintheshaftareabandonedandnolongerinservice

2) DemolishthemanholeringandsurroundingslabtoenlargetheopeningtothedimensionsoftheverticalshafttoallowforworkersandequipmentNotethatconfinedspaceentryandworkingsafeguardswilllikelyberequiredforthiswork

3) Removethelargedebris4) Constructasacrificialform(woodormetal)tocoverthehorizontal

circularshaftopeningandsealitsedges5) Placealift(orseriesoflifts)ofcementitiouscontrolledlow‐strength

material(CLSM)uptothetopofthehorizontalshaftopening6) Afterthatlift(s)hasreachedsufficientstrengthplaceanotherlift(or

seriesoflifts)ofCLSMuptotheundersideofthenewslabongrade7) Installwaterproofingbetweenthefilledshafttheexistingbuildingand

thenewslab‐on‐grade

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

Engineerrsquos Field Report Oklahoma State Capitol Exterior Renovation ZFI Project 15071-01 June 27 2017 Page 4 of 4

8) Castanewslab‐on‐gradecap(6rdquoto8rdquothick)flushwiththesurroundingexistingslab‐on‐gradeDowelsshallbedrilledinaswelltopreventdifferentialmovementbetweennewandexistingslab‐on‐gradeelements

9) Repairanydamagedwaterproofingsystemsorsealantintheimmediateareaaffectedbythedemolitionorinstallation

ReportedBy Mike Thompson PE ZFI Engineering Co

‐END‐

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 067 DATE 06282017 TIME 1030-400 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Lo 80s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross Victor Mendoza

(JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) WORK OBSERVED

Installation of carpentry for built in gutter on A209 (Delta)

Installation of operable window upper and lower sash for preliminary fitting and preliminary water testing of weather stripping This installation was an attempt to limit surface applied weather stripping to the meeting rail This approach was taken to limit changes in appearance and to protect the weather stripping from constant exposure Mockup was conducted on Window 342 on A209 (Delta) While the sashes could be adjusted to limit any light penetration it failed preliminary water spray testing Revisions to the weather stripping will be necessary

Four stone re-set repair in progress on A209 (Delta) This will leave only patching repairs outstanding on A209

Walked windows on A208 (Charlie) with JE Dunn as a preview for upcoming punch list ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 2 of 5

Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 3 of 5

Installation of upper sash of operable window mockup at window 342 on A209 (Delta)

Joints that would be caulked in final installation are taped for preliminary spray testing of window 342

mockup

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 4 of 5

Preliminary water testing of operable window mockup at window 342

Installing the final piece of the four piece remove and reset repair on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

DDropboxoklahoma - juliaCAOSCR FR TA067 - 2017_06-28docx Page 5 of 5

Gaps in filler sealant (between primer and intermediate paint coats) between cast iron elements

Condition needs to be corrected

Preliminary review of work on A208 prior to upcoming punch list

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 068 DATE 06292017 TIME 800am-430pm DAY OF WEEK Thursday OWNER OMES TEMP RANGE Hi 70s ndash Lo 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Mark Maska Landon Heaton Lindsey Ross Katie Blue (JE Dunn) Todd Maxwell (ReView) Lukasz Lesniak (Mark 1) Conley Group Will Henry Allen (Chamberlain) WORK OBSERVED

Re-testing (water spray) windows on A207 (Bravo) See Conley report

Revieweddocumented coatings at west balustrade railing to include removal in ASI-006 final revisions

Final pointing work in progress on A209 (Delta) ITEMS DISCUSSED

Punch list for A208 (Charlie) scheduled for July 13th Documented pre-punch from sub-contractors will be due prior to walking punch list Water spray testing by Conley Group of A208 (Charlie) windows scheduled for July 10th (JE Dunn)

Building facts and any good action photos requested for graphics at the protected entry on A212 (Golf) (JE Dunn)

Sealant joints and other window work on A208 (Charlie) that requires further attention prior to punch list on July 13th (ReView and Chamberlain)

Weather stripping and detailing for operable window mock up continuation (ReView)

Clerestory window related mock ups scheduling ndash Mark 1 needs to confirm materials will all be on site for July 11th12th (Mark 1 JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 2 of 4

ACTION REQUIRED

Schedule continuation of operable window mock up (ReView JE Dunn TreanorHL) ITEMS TO VERIFY

REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

Spray testing by Conley Group on A207 (Bravo) ndash retesting repaired windows

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 3 of 4

Conley Group spray testing nozzle and pressure gauge Testing on A207 (Bravo)

A206 (Alpha) with scaffold fully removed

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

DDropboxoklahoma - juliaCAOSCR FR TA068 - 2017_06-29docx Page 4 of 4

Over application of prior water proofing coatings on west balustrade Coating removal will be attempted as part of work described in forthcoming ASI-006

Repointing work on A209 (Delta)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 069 DATE 07122017 TIME 730-500 DAY OF WEEK Wednesday OWNER OMES TEMP RANGE Hi 70s ndash Mid 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear AM Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak Bromley Kelly (Mark 1) WORK OBSERVED

Cleaning starting on A212 (Golf)

Mockups for mortar joint cutting A212 using water and dust control to meet the OSHA silica rule

Cleaning continuing on A210 (Echo)

Final pointing on going at A209 (Delta)

Progress on brick repairs and parapet through wall flashing installation on C1 and E1A215 (Delta and Echo backside) ndash work is 95 complete Outstanding items include cutting reglet for sheet metal installation (raised one brick joint above existing) priming and painting the tops of down rod and plate assemblies to remain and finally filling pockets over down rods with mortar to provide a smooth substrate for sheet metal Some brick piers still have limited areas of unstable brick to be rebuilt prior to installation of rain screen cladding and associated flashing

Carpentry on going for built in gutter along A209 (Delta) and the north half of A210 (Echo)

Reviewed personnel certification mockup for patching John Lucero See mockup comments

Most repairs completed on B1A214 (Bravo platform) Revised size of DN-0R05 due to unforeseen damage Deleted repair DN-0R01 East louver will need to be removed and reinstalled to allow masonry repairs

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 2 of 8

ITEMS DISCUSSED

Revised cleaning outcome on A209 (Delta) Mark 1 reports good drying and overall good results Some follow-up spot cleaning is necessary to treat isolated areas of biological but the process is going much better Results appear to be more consistent Alkali staining has not been observed on A209 as it was on A206 A207 and A208 (Alpha Bravo and Charlie) Efflorescence has not been observed by masons or designers on A209 as it was on A206 A207 and A208 (Mark 1 L Lesniak) OSHA silica rule implementation was discussed The rule encourages the use of water for cutting operations to control dust Adding ldquomistingrdquo would be acceptable based on mockups Misting is defined as dampening the surface (sometimes repeatedly) but not enough to cause standing or pooling water Adding moisture to demolition processes does produce a damp sticky residue that adheres to the stone surfaces This residue has the potential to leave white cloudy deposits or lime streaks Striping has been leaving white marks that require treatment without the inclusion of water Water may exacerbate this issue Removal of the residue prior to drying is advised Adding water to the degree that is creates pools or areas of standing water is to be avoided Voids in the masonry may allow water to enter the building Excessive water may cause deterioration of ferrous anchors even when water does not penetrate to the interior Excessive water or water in contact with backing brick may result in efflorescence andor alkali staining Developing means and methods to comply with OSHA regulations for all situations will require adjusting the techniques demonstrated See mockup comments (Mark 1)

Requirements for resetting pavers on A201 (Hotel) to prevent scaffold loads damaging pavers and allowing loads to be transferred to the underlying concrete structure mortar will be full in areas that dunnage or beams are used to support scaffold (Mark 1 L Lesniak)

Pinning repair the paver that broke upon removal 38rdquo diameter pins shall be used with 6rdquo minimum imbed the pins shall be set 5rdquo from the edges and then equally spaced The crack will not be filled now but protection to prevent water from entering the crack shall be applied prior to setting scaffold (Mark 1 L Lesniak)

ACTION REQUIRED

ITEMS TO VERIFY

Techniques and tools to be used to comply with OSHA silica rule Designers shall be apprised of changes (Mark 1)

REMARKS

Revised masonry cleaning procedure appears to be producing acceptable results with less overall wetting and the faccedilade is drying more quickly Conditions will continue to be monitored

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 3 of 8

Cutting joints using a shroud joint misted with water White line below the joint is a line of dampened

dust residue that sticks to the wall A212 (Golf)

Limestone demolition using water mist performed similar to joint raking A210 (Echo)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 4 of 8

A212 (Golf) scaffold fully erected

Protected entry along A212 (Golf)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 5 of 8

A201 (Hotel) cracked paver ndash see text for pinning to stabilize for re-setting to allow scaffold installation

Missing eagle beak repaired on B1A214 (Bravo platform)

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 6 of 8

C1A215 (back of Delta) down rod repair pocket awaiting mortar fill at top of down rod Reglet for sheet

metal flashing needs to be cut one brick course higher than existing and old reglet filled

C1A215 (back of Delta ndash at corner with back of Echo) loose brick needs to be reset

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 7 of 8

A209 (Delta) carpentry for built-in gutter near complete Scupper detail shown

Results of sealant removal on A210 (Echo) ndash results appear to be good but resistant areas are still

encountered at some windows

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

DDropboxoklahoma - juliaCAOSCR FR TA069 - 2017_07-12docx Page 8 of 8

A208 (Charlie) with tarps removed to allow better viewing during punch list scheduled for 7-13-2017

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 070 DATE 07132017 TIME 730-400 DAY OF WEEK Thursday OWNER OMES TEMP RANGE Mid 70s ndash Hi 90s PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO 15039DB JE DUNN PROJECT NO 15025800 ADG PROJECT NO 15-007 TREANOR PROJECT NO HP 1500700B ZFI PROJECT NO 15071-01 ALVINE PROJECT NO 2014-4286 SRB PROJECT NO 114801 WEATHER Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS Clear Dusty Muddy Other ______________________ PERSONS CONTACTED Lynnsee Boyse Mark Maska Landon Heaton Lindsey Ross (JE Dunn) Lukasz Lesniak (Mark 1) Brandon Thompson (ReView) Jason Cady (Mass Architects) Todd Maxwell (ReView ndash via phone) WORK OBSERVED

Punch list for A208 (Charlie) from 830 to 100pm Jason Cady present along with JE Dunn and Mark 1 ReView representation by Brandon as Jim was out

A207 (Bravo) scaffold being dismantled to the top of the granite Cleaning and lead T-cap work will be completed at the top of the granite water table once the scaffold is out of the way

Preliminary cleaning at upper parapet area of A212 (Golf) is underway and planned to be complete before gutter liner is demolished

ITEMS DISCUSSED

Clerestory window mock up scheduling is awaiting delivery of materials Upcoming review items for work to continue (Mark 1) Sheet metal work schedule including outstanding mock ups Baker is anticipated to return week of July 24th (JE Dunn) Operable window mockup additional weather stripping parts to be ordered and on site for July 18th continuation (ReView and JE Dunn)

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 2 of 5

ACTION REQUIRED

ITEMS TO VERIFY

Scheduled repair for windows 218 and 216 on A212 (Golf) (TreanorHL) REMARKS

OBSERVED BY Julia Manglitz Associate Principal (TreanorHL) COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Jason Cady (MAI) Matthew Radcliffe (MAI) Mark Maska (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) JC Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

A208 (Charlie) eagle

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 3 of 5

A207 (Bravo) scaffold removal in progress

Temporary condition between A208 (Charlie) and A209 (Echo) needs sealant along loose edge of Grace

and backer rod installed at open reglet to prevent water infiltration under Charlie gutter

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 4 of 5

View of construction zone from A208 (Charlie) scaffold

Preliminary cleaning on corona of A212 (Golf) prior to placing tarps

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

DDropboxoklahoma - juliaCAOSCR FR TA070 - 2017_07-13docx Page 5 of 5

East chimera on A201 (Hotel) north face cleaning partially complete

East chimera on A201 (Hotel) south face cleaning not commenced except at face mane and front paws

which are accessible from A212 (Golf) scaffold

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017

Masonry Repair Certifications

On the exterior restoration project we are completing several stone repairs on each elevation Depending on the size and complexity of each repair the mason that completes these repairs must be certified by our hisorical preservation architect Julia Manglitz TreanorHL prior to completing any repairs The following reports describe the certification process for several masons on our project Ultimately if the mason does not pass the certification mock-up test they will not be permitted to complete any additional repairs on our Capitol project Thus far each certification mock-up has been passed

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

Date 7-12-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified John Lucero Jahn restoration mortars provided require certified worker John holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched 2 One patch was too dark remove and replace the patch with a lighter color that matches the stone

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 7-12-2017

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 7-12-2017

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

Date 5-10-2017

Project Oklahoma Capitol Restoration ndash Exterior Rehabilitation CAP PROJECT 15039DB

Company JE Dunn Mark 1 Attention Mark Maska Lukasz Lesniak

From Julia Mathias Manglitz CC L Boyce (JED) JC Witcher P Breninger (ADG) R Gebarowski B Kelly S Evett (M1)

Reference 040342 ndash 19D ndash Patch repair on Limestone

Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless

Architect specifically approves such deviations in writing Where review is made at an intermediate stage is partial or is one

scope of work within a larger mock-up assembly review comments are conditional based on the final full execution of the

mock-up(s)

Worker Certified Jacek Wolski Jahn restoration mortars provided require certified worker Jacek holds such certification

Mock Ups Reviewed Mock up performed on A209 (Delta)

The following are specific comments that are key-noted on the mock up documentation

1 None

The following are general comments regarding these mock ups

1 Mix standard colors and tint them to match each patch to the stone being patched

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

Mock Up Review

Worker Certification

Page 2 Project O1426-01 Date 5-10-2017

3 patches installed on chimera on A207 (Bravo) all are good color matches

Detail of one of the patches

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

Mock Up Review

Worker Certification

Page 3 Project O1426-01 Date 5-10-2017

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Bravo Charlie Delta and Echo We construct a phase of scaffolding at a time which is followed by hazardous material removal window restoration and stone and lighting repair As each phase is complet-ed the scaffolding will be disassembled and reassembled on similar elevations This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

RETURNS TO TABLE OF CONTENTSCLICK HERE

JULY 2017 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

Activity ID Activity Name Rem

Dur

Start Finish

ElevationsElevations 39 05-May-17 A 22-Sep-17

Alpha- North Wing West FaceAlpha- North Wing West Face 5 24-Jul-17 A 04-Aug-17

InteriorInterior 5 24-Jul-17 A 04-Aug-17

Typ-1370 Alpha-Interior storm windows 5 24-Jul-17 A 04-Aug-17

Bravo- North Wing North FaceBravo- North Wing North Face 5 07-Aug-17 11-Aug-17

InteriorInterior 5 07-Aug-17 11-Aug-17

CON-16040 Bravo-Interior storm windows 5 07-Aug-17 11-Aug-17

Charlie- North Wing East FaceCharlie- North Wing East Face 15 18-May-17 A 18-Aug-17

ScaffoldScaffold 4 24-Jul-17 A 03-Aug-17

CON-12780 Charlie-Demobilize scaffold and tarp 4 24-Jul-17 A 03-Aug-17

CON-12790 Charlie-Patch scaffold anchor holes 2 24-Jul-17 A 03-Aug-17

InteriorInterior 5 18-May-17 A 18-Aug-17

CON-12830 Charlie-Interior storm windows 5 14-Aug-17 18-Aug-17

CON-12840 Charlie-Remove interior partitions 5 18-May-17 A 18-Aug-17

Delta- East Wing North FaceDelta- East Wing North Face 33 05-May-17 A 14-Sep-17

InteriorInterior 11 11-Aug-17 25-Aug-17

CON-18430 Delta-Final Finish Windows 4 11-Aug-17 16-Aug-17

CON-18440 Delta-Interior storm windows 5 21-Aug-17 25-Aug-17

Window RemovalAbatementWindow RemovalAbatement 2 05-Jul-17 A 01-Aug-17

CON-25260 Delta-Bay 7-12-Frame PrepPrime 2 19-Jul-17 A 01-Aug-17

CON-32120 Delta-Bay 7-12-Frame Repairs 1 05-Jul-17 A 31-Jul-17

Window FinishesWindow Finishes 24 27-Jul-17 A 31-Aug-17

CON-18780 Delta-Bay 7-12-Final window finishes exterior 5 11-Aug-17 17-Aug-17

CON-18820 Delta-Bay 1-6-Bay-Re-install HVAC louvers 5 31-Jul-17 04-Aug-17

CON-18830 Delta-Bay 1-6-Window Spray Test 2 31-Jul-17 01-Aug-17

CON-25350 Delta-Bay 7-12-Re-install window sashes panels and trim 9 27-Jul-17 A 10-Aug-17

CON-32150 Delta-Bay 7-12-Bay-Re-install HVAC louvers 5 25-Aug-17 31-Aug-17

CON-32160 Delta-Bay 7-12-Caulk window frames to stone 5 18-Aug-17 24-Aug-17

CON-32170 Delta-Bay 7-12-Window Spray Test 2 25-Aug-17 28-Aug-17

CON-32260 Delta-Bay 1-6-Final window finishes exterior 5 07-Aug-17 11-Aug-17

Stone Cleaning amp SealantsStone Cleaning amp Sealants 19 02-Aug-17 05-Sep-17

CON-18840 Delta-Bay 1-6-Wash down brick and stone 4 02-Aug-17 08-Aug-17

CON-32180 Delta-Bay 7-12-Wash down brick and stone 4 29-Aug-17 05-Sep-17

GutterParapetGutterParapet 30 05-May-17 A 11-Sep-17

CON-28010 Delta-Cut Reglets 1 31-Jul-17 31-Jul-17

CON-28150 Delta-Mock-Up G Gutter Jog 1 31-Jul-17 31-Jul-17

CON-28160 Delta-Mock-Up F Ext Corner 2 31-Jul-17 01-Aug-17

CON-28170 Delta-Mock-Up Pier Flashing 2 31-Jul-17 01-Aug-17

CON-28180 Delta-Mock-Up D Scupper 2 31-Jul-17 01-Aug-17

CON-28210 Delta-Mock-Up Gutter Liner amp Scuppers 2 31-Jul-17 01-Aug-17

CON-28220 Delta-Install Underlayment 2 31-Jul-17 01-Aug-17

CON-28230 Delta-Install Gutter Liner 4 02-Aug-17 07-Aug-17

CON-28240 Delta-Install Counterflashing 1 08-Aug-17 08-Aug-17

CON-28250 Delta-Seal Counterflashing amp Install Lead Tees 1 09-Aug-17 09-Aug-17

CON-28270 Delta-Install Wood Blocking-Back of Parapet 5 10-Aug-17 16-Aug-17

CON-28280 Delta-Install Underlayment Base Flashing 2 17-Aug-17 18-Aug-17

CON-28290 Delta-Install Hanging Gutter 2 21-Aug-17 22-Aug-17

CON-28300 Delta-Metall Wall Panel Procurement 15 05-May-17 A 18-Aug-17

CON-28320 Delta-Install Metal Wall Panels 8 23-Aug-17 01-Sep-17

CON-28330 Delta-Install Metal Wall Panel Trim 2 05-Sep-17 06-Sep-17

CON-28340 Delta-Install Counterflashing Metal Wall Thru wall 2 07-Sep-17 08-Sep-17

CON-28350 Delta-Install Lead Tees 1 07-Sep-17 07-Sep-17

CON-28380 Delta-Re-Install Lightning Protection-High 2 07-Sep-17 11-Sep-17

Punch amp CompletePunch amp Complete 33 31-Jul-17 14-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Alpha-Interior storm windows

Bravo-Interior storm windows

Charlie-Demobilize scaffold and tarp

Charlie-Patch scaffold anchor holes

Charlie-Interior storm windows

Charlie-Remove interior partitions

Delta-Final Finish Windows

Delta-Interior storm windows

Delta-Bay 7-12-Frame PrepPrime

Delta-Bay 7-12-Frame Repairs

Delta-Bay 7-12-Final window finishes exterior

Delta-Bay 1-6-Bay-Re-install HVAC louvers

Delta-Bay 1-6-Window Spray Test

Delta-Bay 7-12-Re-install window sashes panels and trim

Delta-Bay 7-12-Bay-Re-install HVAC louvers

Delta-Bay 7-12-Caulk window frames to stone

Delta-Bay 7-12-Window Spray Test

Delta-Bay 1-6-Final window finishes exterior

Delta-Bay 1-6-Wash down brick and stone

Delta-Bay 7-12-Wash down brick and stone

Delta-Cut Reglets

Delta-Mock-Up G Gutter Jog

Delta-Mock-Up F Ext Corner

Delta-Mock-Up Pier Flashing

Delta-Mock-Up D Scupper

Delta-Mock-Up Gutter Liner amp Scuppers

Delta-Install Underlayment

Delta-Install Gutter Liner

Delta-Install Counterflashing

Delta-Seal Counterflashing amp Install Lead Tees

Delta-Install Wood Blocking-Back of Parapet

Delta-Install Underlayment Base Flashing

Delta-Install Hanging Gutter

Delta-Metall Wall Panel Procurement

Delta-Install Metal Wall Panels

Delta-Install Metal Wall Panel Trim

Delta-Install Counterflashing Metal Wall Thru wall

Delta-Install Lead Tees

Delta-Re-Install Lightning Protection-High

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 1 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-22600 Delta-Bay 1-6-Pre-punch 2 01-Sep-17 05-Sep-17

CON-22610 Delta-Bay 1-6-Complete pre-punch list 5 06-Sep-17 12-Sep-17

CON-30930 Delta-Window Restoration Complete 0 31-Jul-17

CON-32190 Delta-Bay 7-12-Pre-punch 2 06-Sep-17 07-Sep-17

CON-32200 Delta-Bay 7-12-Complete pre-punch list 5 08-Sep-17 14-Sep-17

Echo- East Wing East FaceEcho- East Wing East Face 29 19-Jun-17 A 08-Sep-17

Window RemovalAbatementWindow RemovalAbatement 28 31-Jul-17 07-Sep-17

CON-16770 Echo-Bay 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16800 Echo- Lvl 1-Frame PrepPrime 4 10-Aug-17 15-Aug-17

CON-16790 Echo-Bay 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16820 Echo-Lvl 2-Frame PrepPrime 4 16-Aug-17 21-Aug-17

CON-16810 Echo-Lvl 1-Frame Repairs 3 07-Aug-17 09-Aug-17

CON-16840 Echo-Lvl 3-Frame PrepPrime 4 22-Aug-17 25-Aug-17

CON-16830 Echo-Lvl 2-Frame Repairs 3 10-Aug-17 14-Aug-17

CON-16850 Echo-Lvl 4-Frame PrepPrime 4 28-Aug-17 31-Aug-17

CON-25490 Echo-Lvl 3-Frame Repairs 3 15-Aug-17 17-Aug-17

CON-25530 Echo-Lvl 4-Frame Repairs 3 18-Aug-17 22-Aug-17

CON-25720 Echo-Lvl 5-Frame Repairs 3 23-Aug-17 25-Aug-17

CON-25750 Echo-Lvl 5-Frame PrepPrime 4 01-Sep-17 07-Sep-17

CON-31090 Echo-Bay 3-7-Frame Testing 5 31-Jul-17 04-Aug-17

A1340 Echo-Bay 8-11-Frame Testing 5 31-Jul-17 04-Aug-17

A1350 Echo-Bay 1-2-Frame Testing 5 31-Jul-17 04-Aug-17

Early StoneEarly Stone 20 24-Jul-17 A 31-Aug-17

CON-16880 Echo-Micro-Abrasion Cleaning 8 24-Jul-17 A 10-Aug-17

CON-16890 Echo-Spot cleaning 2 14-Aug-17 15-Aug-17

CON-16920 Echo-Stone repairs 10 16-Aug-17 31-Aug-17

Tuck amp RepairTuck amp Repair 8 14-Aug-17 24-Aug-17

CON-16930 Echo-Final Re-Pointing 8 14-Aug-17 24-Aug-17

Window FinishesWindow Finishes 29 19-Jun-17 A 08-Sep-17

CON-16480 Echo-Shop restoration of windows 29 19-Jun-17 A 08-Sep-17

Golf- South Wing West FaceGolf- South Wing West Face 39 24-Jul-17 A 22-Sep-17

Submittals (E1)Submittals (E1) 15 01-Sep-17 22-Sep-17

CON-13750 Golf-FabDeliver-Copper Gutter 15 01-Sep-17 22-Sep-17

ScaffoldScaffold 2 31-Jul-17 01-Aug-17

CON-13820 Golf-Install temporary louversfresh air intake 2 31-Jul-17 01-Aug-17

Window RemovalAbatementWindow RemovalAbatement 25 02-Aug-17 06-Sep-17

CON-13950 Golf-Bay 1-Lead paint removal from window frames 3 07-Aug-17 09-Aug-17

CON-13930 Golf-Bay 1-WindowTrim Removal 2 02-Aug-17 03-Aug-17

CON-14030 Golf-Lvl 1-Frame Repairs 3 01-Sep-17 06-Sep-17

CON-13980 Golf-Bay 2-Lead paint removal from window frames 3 10-Aug-17 15-Aug-17

CON-13960 Golf-Bay 2-WindowTrim Removal 2 04-Aug-17 07-Aug-17

CON-14010 Golf-Bay 3-Lead paint removal from window frames 3 16-Aug-17 21-Aug-17

CON-13990 Golf-Bay 3-WindowTrim Removal 2 08-Aug-17 09-Aug-17

CON-14040 Golf-Bay 4-Lead paint removal from window frames 3 22-Aug-17 24-Aug-17

CON-14020 Golf-Bay 4-WindowTrim Removal 2 10-Aug-17 11-Aug-17

CON-14090 Golf-Lvl 2-Frame Repairs 3 25-Aug-17 29-Aug-17

CON-31010 Golf-Window Restoration Start 0 02-Aug-17

CON-31110 Golf-Bay 1-4-Frame Testing 5 25-Aug-17 31-Aug-17

Early StoneEarly Stone 31 24-Jul-17 A 12-Sep-17

CON-14120 Golf-Grinding and pointing step 1 12 24-Jul-17 A 17-Aug-17

CON-14130 Golf-General Cleaning (Steam) 5 21-Aug-17 28-Aug-17

CON-14140 Golf-Micro-Abrasion Cleaning 8 29-Aug-17 12-Sep-17

CON-14170 Golf-Inspect and confirm stone repair scope quantity 5 18-Aug-17 24-Aug-17

Window FinishesWindow Finishes 20 04-Aug-17 31-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Delta-Bay 1-6-Pre-punch

Delta-Bay 1-6-Complete pre-punch list

Delta-Window Restoration Complete

Delta-Bay 7-12-Pre-punch

Delta-Bay 7-12-Complete pre-punch list

Echo-Bay 1-Frame Repairs

Echo- Lvl 1-Frame PrepPrime

Echo-Bay 2-Frame Repairs

Echo-Lvl 2-Frame PrepPrime

Echo-Lvl 1-Frame Repairs

Echo-Lvl 3-Frame PrepPrime

Echo-Lvl 2-Frame Repairs

Echo-Lvl 4-Frame PrepPrime

Echo-Lvl 3-Frame Repairs

Echo-Lvl 4-Frame Repairs

Echo-Lvl 5-Frame Repairs

Echo-Lvl 5-Frame PrepPrime

Echo-Bay 3-7-Frame Testing

Echo-Bay 8-11-Frame Testing

Echo-Bay 1-2-Frame Testing

Echo-Micro-Abrasion Cleaning

Echo-Spot cleaning

Echo-Stone repairs

Echo-Final Re-Pointing

Echo-Shop restoration of windows

Golf-FabDeliver-Copper Gutter

Golf-Install temporary louversfresh air intake

Golf-Bay 1-Lead paint removal from window frames

Golf-Bay 1-WindowTrim Removal

Golf-Lvl 1-Frame Repairs

Golf-Bay 2-Lead paint removal from window frames

Golf-Bay 2-WindowTrim Removal

Golf-Bay 3-Lead paint removal from window frames

Golf-Bay 3-WindowTrim Removal

Golf-Bay 4-Lead paint removal from window frames

Golf-Bay 4-WindowTrim Removal

Golf-Lvl 2-Frame Repairs

Golf-Window Restoration Start

Golf-Bay 1-4-Frame Testing

Golf-Grinding and pointing step 1

Golf-General Cleaning (Steam)

Golf-Micro-Abrasion Cleaning

Golf-Inspect and confirm stone repair scope quantity

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 2 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

Activity ID Activity Name Rem

Dur

Start Finish

CON-13740 Golf-Shop restoration of windows 20 04-Aug-17 31-Aug-17

ParapetParapet 17 17-Aug-17 12-Sep-17

CON-14540 Golf-Remove Electrical 3 18-Aug-17 22-Aug-17

CON-14570 Golf-Remove Coping Stones 5 05-Sep-17 12-Sep-17

CON-14560 Golf-Remove Roof Membrane Beyond Cant 2 31-Aug-17 01-Sep-17

CON-14550 Golf-Install Temporary Water Mngmt System 3 23-Aug-17 25-Aug-17

CON-14530 Golf-Parapet Start 0 17-Aug-17

CON-30350 Golf-Roofing Abatement 3 28-Aug-17 30-Aug-17

GutterGutter 24 27-Jul-17 A 31-Aug-17

CON-14350 Golf-Rake Mortar Joints 2 27-Jul-17 A 01-Aug-17

CON-14360 Golf-Repair Brick 3 02-Aug-17 07-Aug-17

CON-14370 Golf-Point Mortar Joints 2 08-Aug-17 09-Aug-17

CON-14380 Golf-Drill Weeps 2 10-Aug-17 14-Aug-17

CON-14390 Golf-Layout New Gutter 1 15-Aug-17 15-Aug-17

CON-14400 Golf-Core Drill Roof Drain 1 16-Aug-17 16-Aug-17

CON-14420 Golf-Frame Gutter 3 22-Aug-17 24-Aug-17

CON-14430 Golf-Place Light-Weight Concrete 2 30-Aug-17 31-Aug-17

CON-14440 Golf-Sheath Gutter 2 28-Aug-17 29-Aug-17

CON-14410 Golf-Install Roof Drain amp Piping 3 17-Aug-17 21-Aug-17

Hotel- South Wing South FaceHotel- South Wing South Face 30 19-Jul-17 A 11-Sep-17

ScaffoldScaffold 23 19-Jul-17 A 30-Aug-17

CON-17120 Hotel-Erect Scaffold 12 19-Jul-17 A 17-Aug-17

CON-17140 Hotel-Cover scaffolding with tarp 7 21-Aug-17 30-Aug-17

CON-17130 Hotel-Install scaffold temporary power 3 18-Aug-17 22-Aug-17

CON-17150 Hotel-Install scaffold temporary HVAC 3 28-Aug-17 30-Aug-17

CON-17160 Hotel-Install temporary louversfresh air intake 2 28-Aug-17 29-Aug-17

CON-30670 Hotel-Erect Scaffold Complete 0 17-Aug-17

Early StoneEarly Stone 12 21-Aug-17 11-Sep-17

CON-17460 Hotel-Grinding and pointing step 1 12 21-Aug-17 11-Sep-17

India- South Wing East FaceIndia- South Wing East Face 36 10-Jul-17 A 19-Sep-17

ScaffoldScaffold 36 10-Jul-17 A 19-Sep-17

CON-14850 India-Erect Scaffold 20 15-Aug-17 19-Sep-17

CON-14800 India-Engineering approval of scaffold design 5 08-Aug-17 14-Aug-17

CON-14790 India-Submit Scaffold Engineering 5 10-Jul-17 A 07-Aug-17

CON-14840 India-Install Overhead Protection Entrances 5 15-Aug-17 21-Aug-17

InteriorInterior 25 15-Aug-17 19-Sep-17

CON-14950 India-Install interior partitions 10 06-Sep-17 19-Sep-17

CON-14940 India-Asbestos containing material initial survey 5 15-Aug-17 22-Aug-17

Clerestory- NorthEastClerestory- NorthEast 30 31-Jul-17 11-Sep-17

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-12420 ClerNE-Remove Ladder 5 31-Jul-17 04-Aug-17

CON-12430 ClerNE-Remove Brick Clerestory Windows Heads (Salvage) 5 31-Jul-17 04-Aug-17

CON-12440 ClerNE-Remove Exist Window 5 07-Aug-17 11-Aug-17

CON-12450 ClerNE-Remove Stone Sill Where Applicable 5 14-Aug-17 18-Aug-17

CON-12460 ClerNE-Install New Lintel 5 21-Aug-17 25-Aug-17

CON-12470 ClerNE-Re-Install Salvage Brick 5 28-Aug-17 01-Sep-17

CON-12480 ClerNE-Re-Install Stone Sill Where Applicable 5 05-Sep-17 11-Sep-17

CON-12520 ClerNE-Brick Repair 5 07-Aug-17 11-Aug-17

CON-12530 ClerNE-Re-coat Wall 5 14-Aug-17 18-Aug-17

CON-12540 ClerNE-Paint Door Frame 5 21-Aug-17 25-Aug-17

CON-12550 ClerNE-Reinstal l Ladder 5 28-Aug-17 01-Sep-17

CON-12560 ClerNE-Reinstal l Electrical 5 05-Sep-17 11-Sep-17

CON-21260 ClerNE-Start Window Replacement 0 31-Jul-17

Clerestory-SouthEastClerestory-SouthEast 30 31-Jul-17 11-Sep-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

Golf-Shop restoration of windows

Golf-Remove Electrical

Golf-Remove Coping Stones

Golf-Remove Roof Membrane Beyond Cant

Golf-Install Temporary Water Mngmt System

Golf-Parapet Start

Golf-Roofing Abatement

Golf-Rake Mortar Joints

Golf-Repair Brick

Golf-Point Mortar Joints

Golf-Drill Weeps

Golf-Layout New Gutter

Golf-Core Drill Roof Drain

Golf-Frame Gutter

Golf-Place Light-Weight Concrete

Golf-Sheath Gutter

Golf-Install Roof Drain amp Piping

Hotel-Erect Scaffold

Hotel-Cover scaffolding with tarp

Hotel-Install scaffold temporary power

Hotel-Install scaffold temporary HVAC

Hotel-Install temporary louversfresh air intake

Hotel-Erect Scaffold Complete

Hotel-Grinding and pointing step 1

India-Erect Scaffold

India-Engineering approval of scaffold design

India-Submit Scaffold Engineering

India-Install Overhead Protection Entrances

India-Install interior partitions

India-Asbestos containing material initial survey

ClerNE-Remove Ladder

ClerNE-Remove Brick Clerestory Windows Heads (Salvage)

ClerNE-Remove Exist Window

ClerNE-Remove Stone Sill Where Applicable

ClerNE-Install New Lintel

ClerNE-Re-Install Salvage Brick

ClerNE-Re-Install Stone Sill Where Applicable

ClerNE-Brick Repair

ClerNE-Re-coat Wall

ClerNE-Pai nt Door Frame

ClerNE-Reinstal l Ladder

ClerNE-Reinstal l Electrical

ClerNE-Start Window Replacement

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 3 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4

Activity ID Activity Name Rem

Dur

Start Finish

Window ReplacementWindow Replacement 30 31-Jul-17 11-Sep-17

CON-21290 ClerSE-Install Roof Protection 5 31-Jul-17 04-Aug-17

CON-21310 ClerSE-RemoveRelocate Electrical 5 07-Aug-17 11-Aug-17

CON-21300 ClerSE-Erect Interior Scaffold amp Partitions 5 31-Jul-17 04-Aug-17

CON-21320 ClerSE-Remove Ladder 5 14-Aug-17 18-Aug-17

CON-21330 ClerSE-Remove Brick Clerestory Windows Heads (Salvage) 5 14-Aug-17 18-Aug-17

CON-21340 ClerSE-Remove Exist Window 5 21-Aug-17 25-Aug-17

CON-21360 ClerSE-Remove Stone Sill Where Applicable 5 28-Aug-17 01-Sep-17

CON-21380 ClerSE-Install New Lintel 5 05-Sep-17 11-Sep-17

CON-21350 ClerSE-Br ick Repair 5 21-Aug-17 25-Aug-17

CON-21370 ClerSE-Re-coat Wall 5 28-Aug-17 01-Sep-17

CON-21390 ClerSE-Paint Door Frame 5 05-Sep-17 11-Sep-17

CON-21280 ClerSE-Start Window Replacement 0 31-Jul-17

Drum-Base NorthDrum-Base North 10 14-Jun-17 A 11-Aug-17

Wall RepairWall Repair 10 14-Jun-17 A 11-Aug-17

CON-12270 DBN-Limestone Repairs 5 14-Jun-17 A 04-Aug-17

CON-12300 DBN-Install Lead-Tees 5 31-Jul-17 04-Aug-17

CON-12310 DBN-Sealant Grilles 5 31-Jul-17 04-Aug-17

CON-12320 DBN-Remove amp Reinstall Sealants Exist Reglets 5 31-Jul-17 04-Aug-17

CON-12330 DBN-Rake amp Install Sealant Dissimilar Metals 5 31-Jul-17 04-Aug-17

CON-12340 DBN-Clean Prime amp Paint Door Frames 5 31-Jul-17 04-Aug-17

CON-12350 DBN-Reinstall Electrical 5 31-Jul-17 04-Aug-17

CON-12360 DBN-Reinstall Lightning Protection 5 31-Jul-17 04-Aug-17

CON-12370 DBN-Remove Scaffold 5 07-Aug-17 11-Aug-17

CON-12640 DBN-Finish Stone Repair 0 11-Aug-17

Drum-Base EastDrum-Base East 20 14-Aug-17 11-Sep-17

Wall RepairWall Repair 20 14-Aug-17 11-Sep-17

CON-21950 DBE-Install Roof Temp Protection 5 14-Aug-17 18-Aug-17

CON-21960 DBE-Remove Existing Elec 5 14-Aug-17 18-Aug-17

CON-21970 DBE-Erect Scaffold 5 21-Aug-17 25-Aug-17

CON-21980 DBE-Remove Lightning Protection 5 28-Aug-17 01-Sep-17

CON-21990 DBE-Rake Mortar Joints 5 05-Sep-17 11-Sep-17

CON-21940 DBE-Start Stone Repair 0 28-Aug-17

Drum-Base SouthDrum-Base South 15 18-Aug-17 08-Sep-17

Wall RepairWall Repair 15 18-Aug-17 08-Sep-17

CON-22150 DBS-Install Roof Temp Protection 5 18-Aug-17 24-Aug-17

CON-22160 DBS-Remove Existing Elec 5 18-Aug-17 24-Aug-17

CON-22170 DBS-Erect Scaffold 5 18-Aug-17 24-Aug-17

CON-22180 DBS-Remove Lightning Protection 5 25-Aug-17 31-Aug-17

CON-22190 DBS-Rake Mortar Joints 5 01-Sep-17 08-Sep-17

CON-22140 DBS-Start Stone Repair 0 18-Aug-17

Drum-Base WestDrum-Base West 10 25-Aug-17 08-Sep-17

Wall RepairWall Repair 10 25-Aug-17 08-Sep-17

CON-22350 DBW-Install Roof Temp Protection 5 25-Aug-17 31-Aug-17

CON-22360 DBW-Remove Existing Elec 5 25-Aug-17 31-Aug-17

CON-22370 DBW-Erect Scaffold 5 25-Aug-17 31-Aug-17

CON-22380 DBW-Remove Lightning Protection 5 01-Sep-17 08-Sep-17

CON-22340 DBW-Start Stone Repair 0 25-Aug-17

S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T W T Fri S S M T

Jul 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Sep 10 Sep 17 Sep 24 Oct 01

ClerSE-Install Roof Protection

ClerSE-RemoveRelocate Electrical

ClerSE-Erect Interior Scaffold amp Partitions

ClerSE-Remove Ladder

ClerSE-Remove Brick Clerestory Windows Heads (Salvage)

ClerSE-Remove Exist Window

ClerSE-Remove Stone Sill Where Applicable

ClerSE-Install New Lintel

ClerSE-Br ick Repair

ClerSE-Re-coat Wall

ClerSE-Paint Door Frame

ClerSE-Start Window Replacement

DBN-Limestone Repairs

DBN-Install Lead-Tees

DBN-Sealant Grilles

DBN-Remove amp Reinstall Sealants Exist Reglets

DBN-Rake amp Install Sealant Dissimilar Metals

DBN-Clean Prime amp Paint Door Frames

DBN-Reinstall Electrical

DBN-Reinstall Lightning Protection

DBN-Remove Scaffold

DBN-Finish Stone Repair

DBE-Install Roof Temp Protection

DBE-Remove Existing Elec

DBE-Erect Scaffold

DBE-Remove Lightning Protection

DBE-Rake Mortar Joints

DBE-Start Stone Repair

DBS-Install Roof Temp Protection

DBS-Remove Existing Elec

DBS-Erect Scaffold

DBS-Remove Lightning Protection

DBS-Rake Mortar Joints

DBS-Start Stone Repair

DBW-Install Roof Temp Protection

DBW-Remove Existing Elec

DBW-Erect Scaffold

DBW-Remove Lightning Protection

DBW-Start Stone Repair

6 -Week Look-Ahead

Data Date 31-Jul-17

Run Date 26-Jul-17 1410

Oklahoma State Capitol Exterior Renovation

Page 4 of 4