container management using otm otmsig2012

Upload: nidhi-saxena

Post on 04-Jun-2018

232 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/13/2019 Container Management Using Otm Otmsig2012

    1/20

    Copyright 2012 KPIT Cummins Infosystems Limited.

    Container Managementusing OTM

    OTM SIG 2012,Philadelphia, USA, 13-15th August

    KPIT Cummins Infosystems Ltd.

    Hrishikesh Mhatre

    Nikhil Gupta

  • 8/13/2019 Container Management Using Otm Otmsig2012

    2/20

    Copyright 2012 KPIT Cummins Infosystems Limited.

    Contents

    Introduction

    Business Scenarios

    Key Requirements

    Leveraging OTM features

    Business Value

  • 8/13/2019 Container Management Using Otm Otmsig2012

    3/20

    Copyright 2012 KPIT Cummins Infosystems Limited.

    Introduction

  • 8/13/2019 Container Management Using Otm Otmsig2012

    4/20

    Copyright 2012 KPIT Cummins Infosystems Limited.

    Introduction

    Leading Export House

    Large volume of Reefer

    and Dry Containers

    movement

    Domestic distribution

    Own Fleet of flatbed

    and Reefer Vans

    About ClientOTM Modules

    ImplementedOTM-EBS Integration

    OTM-Third Party

    Integration

    Transportation

    Management

    Operational Planning

    Freight Settlement

    Fleet Management

    Current ERP

    EBS

    Delivery to OTM

    Planned Shipment to

    EBS

    Actual Shipment to

    OTM

    Freight Accrual from

    OTM to EBS

    A/P Invoice to EBS

    Driver Synchronization

    from EBS to OTM

    OTM Maersk line

    (Sailing Schedule,

    Booking Request,

    Container events)

    OTM INTTRA (Sailing

    Schedule, Booking

    Request)

    Key Requirement How do we manage containers in OTM?

  • 8/13/2019 Container Management Using Otm Otmsig2012

    5/20

    Copyright 2012 KPIT Cummins Infosystems Limited.

    Business Scenario

  • 8/13/2019 Container Management Using Otm Otmsig2012

    6/20

    Copyright 2012 KPIT Cummins Infosystems Limited.

    Container Journey

    EmptyContainer

    Yard

    Stuffing Factory

    Port ofLoading(POL)

    Port ofDischarge(POD)

    Customer Factory/ WH

    EmptyContainerYard

    ICD

    START

    END

    Factory Locations

    Inland Container Depot (ICD)

    Port

    Empty Container Yard

    ICD

    RailHead

    Rail

    Head

  • 8/13/2019 Container Management Using Otm Otmsig2012

    7/20

    Copyright 2012 KPIT Cummins Infosystems Limited.

    Port ofLoading(POL)

    Port ofDischarge (POD)

    CustomerFactory /WH

    Rail Head

    START

    ICD Factory Rail Head EmptyContainer Yard

    ICDEmptyContainerYard

    S1 S2 S3 S4 S5 S6

    Empty Pick-up fromcontainer yard

    Capture containerdetails

    Pick-up date andtime (free daysstart)

    Container numbercheck

    EmptyContainers at ICD

    Selectionof best

    container

    Road movement can be by own fleet (fleetmanagement module) or third party

    Road Rail Road Road Rail Road Ocean Road Road

    - Handover to Liner

    - Detention on(Total Turnaroundtime - Free days)

    END

    ContainerTracking till it

    reachesdestination

    X

    X

    X X X X

    Booking Containeragainst forecasts

    (Manual Orders)

    Consume Container from empty inventory asper Orders from EBS

    No shipment created forthese legs

    Ship Confirm fromEBS

    Empty Loaded

    - LoadingConfirmation

    - Excise/Customssealing

  • 8/13/2019 Container Management Using Otm Otmsig2012

    8/20

    Copyright 2012 KPIT Cummins Infosystems Limited.

    Delivery Details from EBS

    Deliveries from EBS to OTM (One delivery is one container)

    Delivery ID

    Estimated Stuffing Date (Early Pick-up Date)

    Stuffing factory (Source Location)

    Customer (Destination Location)

    POD (Plan-to Location)

    Cargo Details (Item ID, Commodity, Weight, Volume)

    Mode, Liner, Equipment (Container Type) constraints

    Inco Terms, Container Specifications (temperature, vent settings)

  • 8/13/2019 Container Management Using Otm Otmsig2012

    9/20

    Copyright 2012 KPIT Cummins Infosystems Limited.

    Key Requirements for

    Container management

  • 8/13/2019 Container Management Using Otm Otmsig2012

    10/20

    Copyright 2012 KPIT Cummins Infosystems Limited.

    System to help user select

    the correct container from

    the inventory yard based

    on customer requirements

    Operational Requirements | Financial Requirements | Tracking/VisibilityRequirements

    Vessel schedules from

    shipping lines.

    Validation of container data

    E.g.- Is container number is correct?

    - Tare weight, payload, seal numberentered by user ?

    - Is the container overloaded(Weight > Payload)

    Easy to search for containers

    Display of containers details in

    single screen

    Minimum data entry time

  • 8/13/2019 Container Management Using Otm Otmsig2012

    11/20

    Copyright 2012 KPIT Cummins Infosystems Limited.

    Daily tracking of

    detention incurred on a

    container and alerts in

    case of free days expiry

    Operational Requirements | Financial Requirements | Tracking/VisibilityRequirements

    Calculation of Actual

    detention incurred on

    container based on thecontract with owner of

    that container

    (shipping line)

  • 8/13/2019 Container Management Using Otm Otmsig2012

    12/20

    Copyright 2012 KPIT Cummins Infosystems Limited.

    Tracking current position of acontainer.

    Tracking container based onLoad /Damage/Assignment

    Status and current shipmentand order.

    Tracking of containers based onvarious parameters like type,temperature, payload/tare

    weight, line, cargo, stuffinglocation & date, pickup yardand date, excise & customs etc.

    Operational Requirements | Financial Requirements | Tracking/VisibilityRequirements

    Visibility of number ofcontainers at or intransit to a particularContainer InventoryLocation or at/in-transit

    to a factory.

    Visibility of totalcontainers exported ina time frame (by typeand cargo)

  • 8/13/2019 Container Management Using Otm Otmsig2012

    13/20

    Copyright 2012 KPIT Cummins Infosystems Limited.

    C RTShipment Event:

    Container Gate-In at PORT

    Container Created asEquipment in OTM

    Container Free Daysvalue set to 0

    Enter

    Container Details onEmpty leg shipment

    ValidateContainer Number

    Shipment Event:

    Empty ContainerPicked up from Yard

    Calculate

    Over Due Days

    CalculateActual Detention value

    Shipment Event:Container ReturnedEmpty to Depot

    Create Version ofContainer in

    Equipment Object

    Delete OriginalContainer Equipment

    (To Handle repetition ofsame container)

    Scheduled Process

    in OTM

    Balance Free DaysCalculation

    Set Balance Free Daysto Free Days (System

    Date-Pickup Date)

    StopOver Due Days andEstimated Detention

    Calculation

    CalculateEstimated Detention

    Update Hand Over Date

    And CalculateTurn Around Time

    Container Life Cycle Event Driven

  • 8/13/2019 Container Management Using Otm Otmsig2012

    14/20

    Copyright 2012 KPIT Cummins Infosystems Limited.

    Operational

    Proposed Container Logic Validate Container Logic

    Liner Integration

    Screen Customization

    Financial

    Estimated Detention Logic Actual Detention Logic

    Tracking &Visibility

    Event based Status Updates

    Screen Customization

    Reports

    Requirements Mapping

    Event based configuration.

    Container as an equipment.

    Container Versioning.

    Container Validation using ISO 6346.

    Integration with Liner/INTTRA.

    Detention calculation (Estimated & Actual).

    Assignment of best container from

    inventory

  • 8/13/2019 Container Management Using Otm Otmsig2012

    15/20

    Copyright 2012 KPIT Cummins Infosystems Limited.

    Container EDI events

    Gate-out empty against a booking

    Gate-in full for a booking

    Container loaded on rail

    Container unloaded rail

    Container loaded to vessel

    Vessel departure

    Vessel arrival

    Discharge from vessel

    Customs release (US Import Only)

    Freight release

    Container available

    Gate-out for delivery to customer

    Container returned empty to depot

  • 8/13/2019 Container Management Using Otm Otmsig2012

    16/20

    Copyright 2012 KPIT Cummins Infosystems Limited.

    Use of Shipment Group

    Train / Rake Formation

    S1

    S2

    S3

    S4

    S45

    SG1

    Rake Plan toTrainOperator(Email orFax)

    45 containers on a rake

    Booking Request &

    Shipping Bill

    S1

    S2

    S3

    S4

    SG1

    4 containers on asame booking

    Booking

    Request toLiner /INTTRA(Integration)

    .

    .

  • 8/13/2019 Container Management Using Otm Otmsig2012

    17/20

    Copyright 2012 KPIT Cummins Infosystems Limited.

    Business Value Created

  • 8/13/2019 Container Management Using Otm Otmsig2012

    18/20

    Copyright 2012 KPIT Cummins Infosystems Limited.

    Business Value Created

    Better Visibility of Containers in Inventory across

    various locations.

    Automated location update of container based on

    events from Liner through OTM-Liner/INTTRA

    Integration.

    Track and Trace of containers at any given point in

    time (including in-transit containers).

    Visibility on container detention costs

    Increase in productivity with easy data

    entry and reduced errors with container

    validation check.

    Automated process for updating of

    Vessel schedules from liners resulting in

    fewer vessel misses

    Single integrated platform to plan,

    execute and track shipments from

    container pickup from empty yard till

    final delivery to the customer.

  • 8/13/2019 Container Management Using Otm Otmsig2012

    19/20

    Copyright 2012 KPIT Cummins Infosystems Limited.

    Q&A

  • 8/13/2019 Container Management Using Otm Otmsig2012

    20/20

    Copyright 2012 KPIT Cummins Infosystems Limited.

    Presenters

    Hrishikesh Mhatre

    Principal Consultant,

    Supply Chain Applications Practice

    [email protected]

    Nikhil Gupta

    Functional Consultant,

    Supply Chain Applications Practice

    [email protected]

    Nikhil is a Functional consultant with experience in

    implementation of Oracle Transportation Management in an

    integrated environment (integration with Oracle EBS and

    other third party systems).

    A Computer Engineer and a MBA Gold Medalist, Nikhil has

    demonstrated innovation in various dimensions of his work

    and was awarded a national level prize for the best project

    idea presentation

    Hrishikesh leads the pre-sales for Supply Chain

    Applications practice. He has implemented OTM

    projects in various capacities like functional

    consultant, solution architect and project

    manager.

    Hrishikesh is a graduate in Production Engineering

    and has a post-graduation in Industrial

    Management from NITIE with specialization

    Supply Chain Management.