container handling equipment

157
1 CONTAINER HANDLING CONTAINER HANDLING EQUIPMENT EQUIPMENT SHIP/SHORE CRANE SHIP/SHORE CRANE TUGMASTER/CHASSIS TUGMASTER/CHASSIS FORK LIFT TRUCK FORK LIFT TRUCK REACH STACKER REACH STACKER STRADDLE CARRIER STRADDLE CARRIER RUBBER TYRED GANTRY (RTG) RUBBER TYRED GANTRY (RTG) RAIL MOUNTED GANTRY (RMG) RAIL MOUNTED GANTRY (RMG) OVERHEAD BRIDGE CRANE (OHBC) OVERHEAD BRIDGE CRANE (OHBC)

Upload: kirti

Post on 01-Feb-2016

70 views

Category:

Documents


4 download

DESCRIPTION

CONTAINER HANDLING EQUIPMENT. SHIP/SHORE CRANE TUGMASTER/CHASSIS FORK LIFT TRUCK REACH STACKER STRADDLE CARRIER RUBBER TYRED GANTRY (RTG) RAIL MOUNTED GANTRY (RMG) OVERHEAD BRIDGE CRANE (OHBC). JIB CRANE. CONTAINER CRANE. (PORTAINER*) Panamax - Post - Super Post - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: CONTAINER HANDLING EQUIPMENT

1

CONTAINER HANDLING CONTAINER HANDLING EQUIPMENTEQUIPMENT

►SHIP/SHORE CRANESHIP/SHORE CRANE►TUGMASTER/CHASSIS TUGMASTER/CHASSIS ►FORK LIFT TRUCKFORK LIFT TRUCK►REACH STACKERREACH STACKER►STRADDLE CARRIERSTRADDLE CARRIER►RUBBER TYRED GANTRY (RTG)RUBBER TYRED GANTRY (RTG)►RAIL MOUNTED GANTRY (RMG)RAIL MOUNTED GANTRY (RMG)►OVERHEAD BRIDGE CRANE (OHBC)OVERHEAD BRIDGE CRANE (OHBC)

Page 2: CONTAINER HANDLING EQUIPMENT

2

Page 3: CONTAINER HANDLING EQUIPMENT

3

Page 4: CONTAINER HANDLING EQUIPMENT

4

Page 5: CONTAINER HANDLING EQUIPMENT

5

JIB CRANEJIB CRANE

Page 6: CONTAINER HANDLING EQUIPMENT

6

Page 7: CONTAINER HANDLING EQUIPMENT

7

Page 8: CONTAINER HANDLING EQUIPMENT

8

Page 9: CONTAINER HANDLING EQUIPMENT

9

Page 10: CONTAINER HANDLING EQUIPMENT

10

Page 11: CONTAINER HANDLING EQUIPMENT

11

Page 12: CONTAINER HANDLING EQUIPMENT

12

Page 13: CONTAINER HANDLING EQUIPMENT

13

Page 14: CONTAINER HANDLING EQUIPMENT

14

Page 15: CONTAINER HANDLING EQUIPMENT

15

CONTAINER CRANECONTAINER CRANE

►(PORTAINER*)(PORTAINER*)►Panamax - Post - Super PostPanamax - Post - Super Post►Capacity: Capacity: 35 - 65 tons35 - 65 tons►Outreach:Outreach: 35 - 55 mtrs35 - 55 mtrs►Railgauge:Railgauge: 20 - 30 mtrs20 - 30 mtrs►Backreach:Backreach: 15 - 22 mtrs 15 - 22 mtrs

Page 16: CONTAINER HANDLING EQUIPMENT

16

CONTAINER CRANECONTAINER CRANE

►Hoist Speed:Hoist Speed: 50/160 m/min50/160 m/min►Lift above rail: 25 - 36 mtrsLift above rail: 25 - 36 mtrs►Length:Length: 27 mtrs27 mtrs►Productivity:Productivity: 25 - 35 ctrs/hr25 - 35 ctrs/hr►Single Hoist - Double HoistSingle Hoist - Double Hoist►Spreader: Fixed - Telescopic - TwinliftSpreader: Fixed - Telescopic - Twinlift► Investment:Investment: > $ 5.0 mio > $ 5.0 mio

Page 17: CONTAINER HANDLING EQUIPMENT

17

Page 18: CONTAINER HANDLING EQUIPMENT

18

Page 19: CONTAINER HANDLING EQUIPMENT

19

PLUS SHIP’S GANTRYPLUS SHIP’S GANTRY

Page 20: CONTAINER HANDLING EQUIPMENT

20

Page 21: CONTAINER HANDLING EQUIPMENT

21

Page 22: CONTAINER HANDLING EQUIPMENT

22

Page 23: CONTAINER HANDLING EQUIPMENT

23

Double Hoist Crane + Multi Trailer System Double Hoist Crane + Multi Trailer System

Page 24: CONTAINER HANDLING EQUIPMENT

24

Page 25: CONTAINER HANDLING EQUIPMENT

25 GIAIO TAUROGIAIO TAURO

Page 26: CONTAINER HANDLING EQUIPMENT

26

Page 27: CONTAINER HANDLING EQUIPMENT

27

Page 28: CONTAINER HANDLING EQUIPMENT

28

Page 29: CONTAINER HANDLING EQUIPMENT

29

BACK REACHBACK REACH

Page 30: CONTAINER HANDLING EQUIPMENT

30 OVERHEIGHT SPREADER - FIXED OVERHEIGHT SPREADER - FIXED

Page 31: CONTAINER HANDLING EQUIPMENT

31

SPREADERSPREADER

Page 32: CONTAINER HANDLING EQUIPMENT

32

SPREADERSPREADER

Page 33: CONTAINER HANDLING EQUIPMENT

33

SPREADERSPREADER

Page 34: CONTAINER HANDLING EQUIPMENT

34

SPREADERSPREADER

Page 35: CONTAINER HANDLING EQUIPMENT

35

CONTAINER CRANECONTAINER CRANE

►Containership future development:Containership future development:8000/10.000/15.000 TEU8000/10.000/15.000 TEU

►Now: 6690 TEU Ship: 17 rows acrossNow: 6690 TEU Ship: 17 rows across►Future: 18/20/22 rows acrossFuture: 18/20/22 rows across►Port turn around time not to be extended:Port turn around time not to be extended:►Mega crane (Supertainer)Mega crane (Supertainer)►Ship in a slip (recess dock) - handling Ship in a slip (recess dock) - handling

both sides both sides

Page 36: CONTAINER HANDLING EQUIPMENT

36

CONTAINER CRANECONTAINER CRANE

►Mega crane - Supertainer*Mega crane - Supertainer*►Capacity:Capacity: 65 tons65 tons►Outreach:Outreach: up to 61 mtrsup to 61 mtrs►Railgauge:Railgauge: 30 - 45 mtrs30 - 45 mtrs►Backreach:Backreach: 15 - 23 mtrs15 - 23 mtrs►Hoist Speed:Hoist Speed: 100/200 m/min100/200 m/min

Page 37: CONTAINER HANDLING EQUIPMENT

37

CONTAINER CRANECONTAINER CRANE

►Lift above rail:Lift above rail: 40 mtrs40 mtrs►Length:Length: 27 mtrs27 mtrs►Productivity:Productivity: 65 - 85 ctrs/hr65 - 85 ctrs/hr

Page 38: CONTAINER HANDLING EQUIPMENT

38

Page 39: CONTAINER HANDLING EQUIPMENT

39

CONTAINER CRANECONTAINER CRANEDOCKDOCK

►Ship in a slip/recess dockShip in a slip/recess dock►ECT - Rotterdam;ECT - Rotterdam; 19921992►FCT - Zeebrugge:FCT - Zeebrugge: 19941994►CMTI - Amsterdam:CMTI - Amsterdam: 1998 1998 ►Not (yet) realisedNot (yet) realised

Page 40: CONTAINER HANDLING EQUIPMENT

40

Page 41: CONTAINER HANDLING EQUIPMENT

41

Page 42: CONTAINER HANDLING EQUIPMENT

42

CONTAINER CRANECONTAINER CRANEDOCKDOCK

►Design:Design:►Length:Length: 390 mtrs390 mtrs►Width:Width: 55 mtrs 55 mtrs►Operated by:Operated by: 5 + 4 = 9 (Super) Post 5 + 4 = 9 (Super) Post

Panamax Panamax cranescranes

►Total productivity:Total productivity: 300 ctrs/hr 300 ctrs/hr

Page 43: CONTAINER HANDLING EQUIPMENT

43

Page 44: CONTAINER HANDLING EQUIPMENT

44

Page 45: CONTAINER HANDLING EQUIPMENT

45

TUGMASTERTUGMASTER(TRACTOR)(TRACTOR)

►Horizontal TransportHorizontal Transport►Easy (dis)connecting ChassisEasy (dis)connecting Chassis►Easy manoeuvrableEasy manoeuvrable►Pulling force > 80 tonsPulling force > 80 tons►4 x 4 Wheel Drive for Ro-Ro’s4 x 4 Wheel Drive for Ro-Ro’s►With Gooseneck -> slavetrailers for Ro-RoWith Gooseneck -> slavetrailers for Ro-Ro►Reversable steering system Reversable steering system ► Investment:Investment: $ 100.000$ 100.000

Page 46: CONTAINER HANDLING EQUIPMENT

46

Page 47: CONTAINER HANDLING EQUIPMENT

47

Page 48: CONTAINER HANDLING EQUIPMENT

48

Page 49: CONTAINER HANDLING EQUIPMENT

49

Page 50: CONTAINER HANDLING EQUIPMENT

50

MULTI - TRAILER SYSTEMMULTI - TRAILER SYSTEM

Page 51: CONTAINER HANDLING EQUIPMENT

51

Page 52: CONTAINER HANDLING EQUIPMENT

52

Page 53: CONTAINER HANDLING EQUIPMENT

53

Page 54: CONTAINER HANDLING EQUIPMENT

54

Page 55: CONTAINER HANDLING EQUIPMENT

55

TERMINAL CHASSISTERMINAL CHASSIS

►Horizontal Transport - Storage Horizontal Transport - Storage specified containersspecified containers

►Extremely strong/sturdy constructionExtremely strong/sturdy construction►Guiding devices for easy loadingGuiding devices for easy loading►Suitable for 2 x 20’Suitable for 2 x 20’►Two - high ?Two - high ?► Investment:Investment: $ 10.000$ 10.000

Page 56: CONTAINER HANDLING EQUIPMENT

56

Page 57: CONTAINER HANDLING EQUIPMENT

57

Page 58: CONTAINER HANDLING EQUIPMENT

58

Page 59: CONTAINER HANDLING EQUIPMENT

59

Page 60: CONTAINER HANDLING EQUIPMENT

60

Page 61: CONTAINER HANDLING EQUIPMENT

61

Page 62: CONTAINER HANDLING EQUIPMENT

62

ROAD CHASSISROAD CHASSIS

►Brakes - Lights - RegulationsBrakes - Lights - Regulations►Storage:Storage: USAUSA►Advantage: No additional yardhandling Advantage: No additional yardhandling

equipment -Easy access for equipment -Easy access for roadtruckersroadtruckers

►Disadvantage: Extremely area Disadvantage: Extremely area consumingconsuming (up to 45 m2/TEU) - (up to 45 m2/TEU) - Availability of chassis from Container Availability of chassis from Container Operator Operator

Page 63: CONTAINER HANDLING EQUIPMENT

63

Page 64: CONTAINER HANDLING EQUIPMENT

64

Page 65: CONTAINER HANDLING EQUIPMENT

65

STRADDLE CARRIERSTRADDLE CARRIER

►Straddling one container rowStraddling one container row►Stacking 1 over 2/3Stacking 1 over 2/3►Storage:Storage: 14/16 m2/TEU14/16 m2/TEU►Productivity:Productivity: 10 - 15 ctrs/hr10 - 15 ctrs/hr►Weight:Weight: 55 tons (+container)55 tons (+container)►Wheelloads:Wheelloads: 10 tons10 tons► Investment:Investment: $ 0.6 mio$ 0.6 mio

Page 66: CONTAINER HANDLING EQUIPMENT

66

STRADDLE CARRIERSTRADDLE CARRIER

►Systems:Systems:►All Straddle Carrier: Transport and All Straddle Carrier: Transport and

StackingStacking►Straddle Carrier/Chassis: Stacking only Straddle Carrier/Chassis: Stacking only

Page 67: CONTAINER HANDLING EQUIPMENT

67

STRADDLE CARRIERSTRADDLE CARRIER

►Advantages:Advantages:►Flexibility - Relatively low wheelloads Flexibility - Relatively low wheelloads ►Disadvantages:Disadvantages:►Flexibility (Safety) - Long travel Flexibility (Safety) - Long travel

distances - Damage sensitivity - Less distances - Damage sensitivity - Less suitable for automation - (Reliability) suitable for automation - (Reliability)

Page 68: CONTAINER HANDLING EQUIPMENT

68

Page 69: CONTAINER HANDLING EQUIPMENT

69

Page 70: CONTAINER HANDLING EQUIPMENT

70

Page 71: CONTAINER HANDLING EQUIPMENT

71

Page 72: CONTAINER HANDLING EQUIPMENT

72

Page 73: CONTAINER HANDLING EQUIPMENT

73

Page 74: CONTAINER HANDLING EQUIPMENT

74

Page 75: CONTAINER HANDLING EQUIPMENT

75

Page 76: CONTAINER HANDLING EQUIPMENT

76

RUBBER TYRED GANTRYRUBBER TYRED GANTRY

►Straddling 6 - 8 containers plus Straddling 6 - 8 containers plus trucklanetrucklane

►Stacking:Stacking: 1 over 3/4/5 1 over 3/4/5►Storage:Storage: 10 - 12 m2/TEU10 - 12 m2/TEU►Productivity:Productivity: 20 - 25 ctrs/hr20 - 25 ctrs/hr►Weight:Weight: >110 tons>110 tons►Wheelloads:Wheelloads: up to 40 tons (8 wheels)up to 40 tons (8 wheels)► Investment:Investment: $ 1.3 mio$ 1.3 mio

Page 77: CONTAINER HANDLING EQUIPMENT

77

Page 78: CONTAINER HANDLING EQUIPMENT

78

Page 79: CONTAINER HANDLING EQUIPMENT

79

Page 80: CONTAINER HANDLING EQUIPMENT

80

Page 81: CONTAINER HANDLING EQUIPMENT

81

RUBBER TYRED GANTRYRUBBER TYRED GANTRY

►Advantages:Advantages:►Ample flexibility (transferable from Ample flexibility (transferable from

stack to stack by turning wheels 90 stack to stack by turning wheels 90 degrees)degrees)

►High productivity: One RTG can match High productivity: One RTG can match one Ship/shore container craneone Ship/shore container crane

►Reliability - Less sensitive to damage - Reliability - Less sensitive to damage - Suitable for automation - Efficient Suitable for automation - Efficient stackingstacking

Page 82: CONTAINER HANDLING EQUIPMENT

82

RUBBER TYRED GANTRYRUBBER TYRED GANTRY

►Disadvantages:Disadvantages:►High wheelloads ( to be reduced by High wheelloads ( to be reduced by

applying 16 wheels) applying 16 wheels)

Page 83: CONTAINER HANDLING EQUIPMENT

83

RUBBER TYRED GANTRYRUBBER TYRED GANTRY

►Automated steering systems: Automated steering systems: Damage preventionDamage prevention

► Inductive loop in wheelpathInductive loop in wheelpath►OpticalOptical

Page 84: CONTAINER HANDLING EQUIPMENT

84

Page 85: CONTAINER HANDLING EQUIPMENT

85

RUBBER TYRED GANTRYRUBBER TYRED GANTRY

►Auto - steering plus Positioning:Auto - steering plus Positioning:►Magnetic platesMagnetic plates►Metal strips - sensorsMetal strips - sensors►DGPS - Satellite navigation/positioningDGPS - Satellite navigation/positioning

Page 86: CONTAINER HANDLING EQUIPMENT

86

Page 87: CONTAINER HANDLING EQUIPMENT

87

RAIL MOUNTED GANTRYRAIL MOUNTED GANTRY

►Straddling 15 + containers plus Straddling 15 + containers plus trucklane(s) (and railtrack)trucklane(s) (and railtrack)

►Stacking:Stacking: 1 over 5/61 over 5/6►Storage: Storage: 7 - 9 m2/TEU7 - 9 m2/TEU►Productivity:Productivity: 25 ctrs/hr25 ctrs/hr►RailtracksRailtracks► Investment: > $ 1.5 mioInvestment: > $ 1.5 mio

Page 88: CONTAINER HANDLING EQUIPMENT

88

Page 89: CONTAINER HANDLING EQUIPMENT

89

Page 90: CONTAINER HANDLING EQUIPMENT

90

Page 91: CONTAINER HANDLING EQUIPMENT

91

RAIL MOUNTED GANTRYRAIL MOUNTED GANTRY

►Advantages:Advantages:►Reliability - High productivity - Less Reliability - High productivity - Less

sensitive to damage - Suitable for sensitive to damage - Suitable for automation (ASC)automation (ASC)

Page 92: CONTAINER HANDLING EQUIPMENT

92

RAIL MOUNTED GANTRYRAIL MOUNTED GANTRY

►Disadvantages:Disadvantages:►Not flexible - not transferable to other Not flexible - not transferable to other

stackstack►High investmentsHigh investments►High Throughput TerminalsHigh Throughput Terminals

Page 93: CONTAINER HANDLING EQUIPMENT

93

RMGRMG

Page 94: CONTAINER HANDLING EQUIPMENT

94

Page 95: CONTAINER HANDLING EQUIPMENT

95

RAIL MOUNTED GANTRYRAIL MOUNTED GANTRY

►ECT - Delta Sea Land TerminalECT - Delta Sea Land Terminal►Double hoist Super Post Panamax Double hoist Super Post Panamax

ship-shore cranesship-shore cranes►Automated Guided Vehicles (AGV)Automated Guided Vehicles (AGV)►Automated Stacking cranes (ASC)Automated Stacking cranes (ASC)

(3-high/5 wide)(3-high/5 wide)

Page 96: CONTAINER HANDLING EQUIPMENT

96

Page 97: CONTAINER HANDLING EQUIPMENT

97

Page 98: CONTAINER HANDLING EQUIPMENT

98

Page 99: CONTAINER HANDLING EQUIPMENT

99

Page 100: CONTAINER HANDLING EQUIPMENT

100

Page 101: CONTAINER HANDLING EQUIPMENT

101

Page 102: CONTAINER HANDLING EQUIPMENT

102

OVERHEAD BRIDGE CRANEOVERHEAD BRIDGE CRANE

►OHBCOHBC►Rigid constructionRigid construction►Fully automatedFully automated►Transfer area sea/land side served by Transfer area sea/land side served by

Straddle carrier - ? -Straddle carrier - ? -►High stacking capacity High stacking capacity

Page 103: CONTAINER HANDLING EQUIPMENT

103

Page 104: CONTAINER HANDLING EQUIPMENT

104

Page 105: CONTAINER HANDLING EQUIPMENT

105

Page 106: CONTAINER HANDLING EQUIPMENT

106

Page 107: CONTAINER HANDLING EQUIPMENT

107

OVERHEAD BRIDGE CRANEOVERHEAD BRIDGE CRANE

►High Throughput Terminals:High Throughput Terminals: (Pasir (Pasir Panjang Terminal PSA - Design Panjang Terminal PSA - Design capacity: 35 mio TEU/yrcapacity: 35 mio TEU/yr

►(Mid 1980 constructed by Container (Mid 1980 constructed by Container Repair Company in Rotterdam for Repair Company in Rotterdam for servicing its MT depot) servicing its MT depot)

Page 108: CONTAINER HANDLING EQUIPMENT

108

MISCELLANEOUSMISCELLANEOUS

►FLT + AttachmentsFLT + Attachments►Side stacker/loaderSide stacker/loader►Reach StackerReach Stacker►Container Freight Station (CFS)Container Freight Station (CFS)►MT Depot (Storage)MT Depot (Storage)

Page 109: CONTAINER HANDLING EQUIPMENT

109

Page 110: CONTAINER HANDLING EQUIPMENT

110

Page 111: CONTAINER HANDLING EQUIPMENT

111

Page 112: CONTAINER HANDLING EQUIPMENT

112

Page 113: CONTAINER HANDLING EQUIPMENT

113

Page 114: CONTAINER HANDLING EQUIPMENT

114

Page 115: CONTAINER HANDLING EQUIPMENT

115

Page 116: CONTAINER HANDLING EQUIPMENT

116

Page 117: CONTAINER HANDLING EQUIPMENT

117

Page 118: CONTAINER HANDLING EQUIPMENT

118

Page 119: CONTAINER HANDLING EQUIPMENT

119

Page 120: CONTAINER HANDLING EQUIPMENT

120

Page 121: CONTAINER HANDLING EQUIPMENT

121

COMMUNICATIONCOMMUNICATION

►Mobilophone SystemMobilophone System►Mobilophone: Yard Operator - Handling Mobilophone: Yard Operator - Handling

Equipment Equipment ►Portophone: Ass. Manager - Foreman - Portophone: Ass. Manager - Foreman -

CheckerChecker►Separate Portophones for Ship - Shore Separate Portophones for Ship - Shore

cranes (driver and radioman - safety) cranes (driver and radioman - safety)

Page 122: CONTAINER HANDLING EQUIPMENT

122

COMMUNICATIONCOMMUNICATION

►Mobilophone System:Mobilophone System:►Disadvantage:Disadvantage:►Too many frequencies - external Too many frequencies - external

disturbances - hifg degree of discipline disturbances - hifg degree of discipline required - sensitive to mistakesrequired - sensitive to mistakes

Page 123: CONTAINER HANDLING EQUIPMENT

123

CONTROLCONTROL

►Automated Container Terminal Control Automated Container Terminal Control SystemSystem

►NAVIS - SPARCS/EXPRESSNAVIS - SPARCS/EXPRESS►COSMOSCOSMOS►Radio Data TransmissionRadio Data Transmission► Instructions and confirmations via LCD Instructions and confirmations via LCD

screen/keyboard. Equipment: fixed units screen/keyboard. Equipment: fixed units - others mobile hand held terminals- others mobile hand held terminals

Page 124: CONTAINER HANDLING EQUIPMENT

124

Page 125: CONTAINER HANDLING EQUIPMENT

125

Page 126: CONTAINER HANDLING EQUIPMENT

126

Page 127: CONTAINER HANDLING EQUIPMENT

127

Page 128: CONTAINER HANDLING EQUIPMENT

128

Page 129: CONTAINER HANDLING EQUIPMENT

129

Page 130: CONTAINER HANDLING EQUIPMENT

130

Page 131: CONTAINER HANDLING EQUIPMENT

131

Page 132: CONTAINER HANDLING EQUIPMENT

132

COMMUNICATIONCOMMUNICATION

►Mobilophone/Portophone Mobilophone/Portophone

►For “normal”verbal communication For “normal”verbal communication and safety reasonsand safety reasons

Page 133: CONTAINER HANDLING EQUIPMENT

133

LABOURLABOUR

►Less physical functionsLess physical functions► Increasing need specialist/combi Increasing need specialist/combi

functionsfunctions►Flexibility/EmployabilityFlexibility/Employability►Automation: Automation:

Administration - Planning - Administration - Planning - OperationsOperations

Page 134: CONTAINER HANDLING EQUIPMENT

134

Page 135: CONTAINER HANDLING EQUIPMENT

135

Page 136: CONTAINER HANDLING EQUIPMENT

136

LABOURLABOURCOMBI FUNCTIONSCOMBI FUNCTIONS

►MainfunctionMainfunction + A + A

TugmasterTugmaster CheckerCheckerRTGRTG ugmasterugmaster

CheckerChecker

Ctr. CraneCtr. Crane RTGRTGTugmasterTugmasterCheckerChecker

Page 137: CONTAINER HANDLING EQUIPMENT

137

EQUIPMENT CAPACITY EQUIPMENT CAPACITY ANNUALANNUAL

►Ship-Shore Container Crane:Ship-Shore Container Crane:3-4000 hrs x 25 ctrs/hr = 75-100.000 3-4000 hrs x 25 ctrs/hr = 75-100.000 ctrs ctrs

►Straddle Carrier:Straddle Carrier:3000 hrs x 12 ctrs/hr = 36.000 ctrs3000 hrs x 12 ctrs/hr = 36.000 ctrs

►Rubber Tyred Gantry: Rubber Tyred Gantry: 3000 hrs x 20 ctrs/hr = 60.000 ctrs3000 hrs x 20 ctrs/hr = 60.000 ctrs

►Rail Mounted Gantry:Rail Mounted Gantry:3000 hrs x 25 ctrs/hr = 75.000 ctrs3000 hrs x 25 ctrs/hr = 75.000 ctrs

Page 138: CONTAINER HANDLING EQUIPMENT

138

EQUIPMENT CAPACITYEQUIPMENT CAPACITYSTORAGESTORAGE

►Chassis:Chassis: 45 m2/TEU45 m2/TEU►Straddle CarrierStraddle Carrier 16 m2/TEU16 m2/TEU►RTGRTG 12 m2/TEU12 m2/TEU►RMGRMG 9 m2/TEU 9 m2/TEU►FLT (MT)FLT (MT) 7 m2/TEU 7 m2/TEU►FLT (Full)FLT (Full) 25 m2/TEU25 m2/TEU►ReachstackerReachstacker 15 m2/TEU15 m2/TEU

Page 139: CONTAINER HANDLING EQUIPMENT

139

EQUIPMENT CAPACITYEQUIPMENT CAPACITY

►EQUIPMENT:EQUIPMENT:Containers/Moves per Hour/Shift/YearContainers/Moves per Hour/Shift/Year

►STORAGE:STORAGE: TEU’sTEU’s►SHIPS:SHIPS: TEU’sTEU’s►TEU = Twenty feet Equivalent UnitTEU = Twenty feet Equivalent Unit►FEU = Fourty feet Equivalent UnitFEU = Fourty feet Equivalent Unit

Page 140: CONTAINER HANDLING EQUIPMENT

140

Page 141: CONTAINER HANDLING EQUIPMENT

141

EQUIPMENT COSTSEQUIPMENT COSTSEXAMPLEEXAMPLE

►CONTAINER CRANECONTAINER CRANE Investment:Investment:$ 6.0 mio$ 6.0 mio

►Annual:Annual:►Depreciation 25 yrsDepreciation 25 yrs $ 240.000$ 240.000

Interest Costs (8%)Interest Costs (8%) $ 260.000$ 260.000M&R 2.5% IM&R 2.5% I $ 150.000$ 150.000PowerPower $ 100.000$ 100.000TotalTotal $ 750.000$ 750.000

Page 142: CONTAINER HANDLING EQUIPMENT

142

EQUIPMENT COSTSEQUIPMENT COSTSEXAMPLEEXAMPLE

►TOTAL PER YEAR:TOTAL PER YEAR: $ 750.000$ 750.000

►Running Hours:Running Hours: 30003000

►Per Hour:Per Hour: $ 250$ 250

Page 143: CONTAINER HANDLING EQUIPMENT

143

Page 144: CONTAINER HANDLING EQUIPMENT

144

EQUIPMENT COSTSEQUIPMENT COSTSEXAMPLEEXAMPLE

►RUBBER TYRED GANTRYRUBBER TYRED GANTRY► Investment:Investment: $ 1.3 mio$ 1.3 mio►Annual:Annual:►Depreciation 12 yrsDepreciation 12 yrs $ 108.500$ 108.500

Interestcosts 8%Interestcosts 8% $ 61.000$ 61.000 M&R M&R 7.5 % I7.5 % I $ 97.500$ 97.500 Fuel 20 Fuel 20 ltr/hrltr/hr $ 45.000$ 45.000 TotalTotal

$ 312.000$ 312.000

Page 145: CONTAINER HANDLING EQUIPMENT

145

EQUIPMENT COSTSEQUIPMENT COSTSEXAMPLEEXAMPLE

►TOTAL PER YEAR:TOTAL PER YEAR: $ 312.000$ 312.000

►Running Hours:Running Hours: 30003000

►Per Hour:Per Hour: $ 104$ 104

Page 146: CONTAINER HANDLING EQUIPMENT

146

Page 147: CONTAINER HANDLING EQUIPMENT

147

EQUIPMENT COSTSEQUIPMENT COSTSEXAMPLEEXAMPLE

►TUGMASTERTUGMASTER► Investment:Investment: $ 100.000$ 100.000►Annual:Annual:►Depreciation 10 yrs:Depreciation 10 yrs: $ 10.000$ 10.000

Interestcosts 8 %Interestcosts 8 % $ 4.800$ 4.800M&R 15% I:M&R 15% I: $ 15.000$ 15.000Fuel 10 ltr/hr:Fuel 10 ltr/hr: $ $

22.50022.500 TotalTotal$ 52.300$ 52.300

Page 148: CONTAINER HANDLING EQUIPMENT

148

EQUIPMENT COSTSEQUIPMENT COSTSEXAMPLEEXAMPLE

►TOTAL PER YEAR:TOTAL PER YEAR: $ 52.300$ 52.300

►Running Hours:Running Hours: 30003000

►Per Hour:Per Hour: $ 17.50$ 17.50

►Chassis:Chassis: $ 2.50$ 2.50

Page 149: CONTAINER HANDLING EQUIPMENT

149

Page 150: CONTAINER HANDLING EQUIPMENT

150

GANG COST STRUCTUREGANG COST STRUCTUREEXAMPLEEXAMPLE

►Per Gang/hr:Per Gang/hr:►a) Labour:a) Labour:

1 Foreman1 Foreman $ 50$ 502 Cranedrivers2 Cranedrivers $ 80$ 80

2 Checkers2 Checkers $ 60$ 605 Tugm. Drivers5 Tugm. Drivers $ 150$ 1501 RTG Driver1 RTG Driver $ 40$ 403 Lashers3 Lashers $ 60$ 60

TotalTotal Labour: Labour: $ 440 $ 440

Page 151: CONTAINER HANDLING EQUIPMENT

151

GANG COST STRUCTUREGANG COST STRUCTUREEXAMPLEEXAMPLE

►b) Equipment:b) Equipment:1 Contr. Crane1 Contr. Crane $ $

250250 5 Tugmasters + Chassis5 Tugmasters + Chassis $ $ 100100 1 RTG1 RTG $ 104$ 104

Total EquipmentTotal Equipment $ 454$ 454►c) Working Area etc.c) Working Area etc. $ 106$ 106

TOTALTOTAL $ 1000$ 1000

Page 152: CONTAINER HANDLING EQUIPMENT

152

RATE STRUCTURERATE STRUCTUREEXAMPLEEXAMPLE

►Total Gang CostsTotal Gang Costs $ 1000$ 1000Overhead 40%Overhead 40% $ 400$ 400

Total CostsTotal Costs $ 1400$ 1400Profit 20%Profit 20% $ 280$ 280

Grand TotalGrand Total $ 1680$ 1680 per Hourper Hour

Page 153: CONTAINER HANDLING EQUIPMENT

153

Page 154: CONTAINER HANDLING EQUIPMENT

154

RATE STRUCTURERATE STRUCTUREEXAMPLEEXAMPLE

►Total Gangcosts per hour:Total Gangcosts per hour: $ 1680$ 1680

Total Gangcosts per shift:Total Gangcosts per shift: $ $ 1344013440

►Productivity:Productivity:GrossGross 200 ctrs/shift200 ctrs/shiftLost Labour etc. 30%Lost Labour etc. 30% 60 60 ctrs/shift ctrs/shiftNetNet 140 ctrs/shift140 ctrs/shift

Page 155: CONTAINER HANDLING EQUIPMENT

155

RATE STRUCTURERATE STRUCTUREEXAMPLEEXAMPLE

►Net productivity:Net productivity: 140 ctrs/shift140 ctrs/shift

►Rate per container/move:Rate per container/move:13440 : 140 =13440 : 140 = $ 96.- $ 96.-

Page 156: CONTAINER HANDLING EQUIPMENT