container freight - ctaction.com.auctaction.com.au/wp-content/uploads/2018/09/paul-molenaar... ·...
TRANSCRIPT
![Page 1: Container Freight - ctaction.com.auctaction.com.au/wp-content/uploads/2018/09/Paul-Molenaar... · EXECUTIVE (of a legal entity) In general terms, a director or a person concerned](https://reader030.vdocuments.mx/reader030/viewer/2022020415/5c45865293f3c34c5a38837e/html5/thumbnails/1.jpg)
Container Freight
“Last Mile CoR”
![Page 2: Container Freight - ctaction.com.auctaction.com.au/wp-content/uploads/2018/09/Paul-Molenaar... · EXECUTIVE (of a legal entity) In general terms, a director or a person concerned](https://reader030.vdocuments.mx/reader030/viewer/2022020415/5c45865293f3c34c5a38837e/html5/thumbnails/2.jpg)
Primary Duty: A new direction in legislation
What is coming – Primary Duties
Source: NHVR CoR Info Session Brisbane Presentation March 2017
![Page 3: Container Freight - ctaction.com.auctaction.com.au/wp-content/uploads/2018/09/Paul-Molenaar... · EXECUTIVE (of a legal entity) In general terms, a director or a person concerned](https://reader030.vdocuments.mx/reader030/viewer/2022020415/5c45865293f3c34c5a38837e/html5/thumbnails/3.jpg)
1) Each party in the chain of responsibility for a heavy vehicle must ensure, so far as is reasonably practicable, the safety of the party’s transport activities relating to the vehicle.
2) Without limiting subsection (1), each party must, so far as is reasonably practicable—a) eliminate public risks and, to the extent that is not reasonably practicable to eliminate
public risks, minimise the public risks; andb) ensure the party’s conduct does not directly or indirectly cause or encourage—
i. the driver of the heavy vehicle to contravene this Law; or ii. the driver of the heavy vehicle to exceed a speed limit applying to the driver; or iii. another person, including another party in the chain of responsibility, to contravene
this Law. 3) For subsection (2)(b), the party’s conduct includes, for example—
a) the party asking, directing or requiring another person to do, or not do, something; and b) the party entering into a contract—
i. with another person for the other person to do, or not do, something; or ii. that purports to annul, exclude, restrict or otherwise change the effect of this Law.
26C Primary Duty - HVNL
Source: NHVR CoR Info Session Brisbane Presentation March 2017
![Page 4: Container Freight - ctaction.com.auctaction.com.au/wp-content/uploads/2018/09/Paul-Molenaar... · EXECUTIVE (of a legal entity) In general terms, a director or a person concerned](https://reader030.vdocuments.mx/reader030/viewer/2022020415/5c45865293f3c34c5a38837e/html5/thumbnails/4.jpg)
• Category 3 – breaches safety duty• $50,000 Individual; $500,000 Corporation
• Category 2 – risk of death/injury• $150,000 Individual; $1.5m Corporation
• Category 1 – recklessness• 5 years imprisonment • $300,000 Individual; $3m Corporation
CoR New Primary Duty Penalties
Source: NHVR CoR Info Session Brisbane Presentation March 2017
![Page 5: Container Freight - ctaction.com.auctaction.com.au/wp-content/uploads/2018/09/Paul-Molenaar... · EXECUTIVE (of a legal entity) In general terms, a director or a person concerned](https://reader030.vdocuments.mx/reader030/viewer/2022020415/5c45865293f3c34c5a38837e/html5/thumbnails/5.jpg)
SMS Framework
Source: NHVR CoR Info Session Brisbane Presentation March 2017
![Page 6: Container Freight - ctaction.com.auctaction.com.au/wp-content/uploads/2018/09/Paul-Molenaar... · EXECUTIVE (of a legal entity) In general terms, a director or a person concerned](https://reader030.vdocuments.mx/reader030/viewer/2022020415/5c45865293f3c34c5a38837e/html5/thumbnails/6.jpg)
• Management commitment
• Safety accountabilities
• Appointment of key safety personnel
• Documentation
Pillar 1 – Safety Policy
Source: NHVR CoR Info Session Brisbane Presentation March 2017
![Page 7: Container Freight - ctaction.com.auctaction.com.au/wp-content/uploads/2018/09/Paul-Molenaar... · EXECUTIVE (of a legal entity) In general terms, a director or a person concerned](https://reader030.vdocuments.mx/reader030/viewer/2022020415/5c45865293f3c34c5a38837e/html5/thumbnails/7.jpg)
ALC Master Code: Roles and ResponsibilitiesCoR role CoR role definition Section of the Code
EMPLOYER, PRIME CONTRACTOR, OPERATOR
Employer – in general terms, the employer responsible for controlling or directing the use of a heavy vehicle. Prime Contractor – in general terms, a person responsible for engaging a driver of a heavy vehicle by contract. Operator – in general terms, a person responsible for controlling or
directing the use of a heavy vehicle.
5.3.16.3.17.3.18.3.1
Appendix D.1
SCHEDULER In general terms, a person who plans the transport of goods or schedules the work and rest times of a driver.
5.3.26.3.27.3.28.3.2
Appendix D.2
CONSIGNOR AND CONSIGNEE
Consignor – in general terms the named sender of goods by road transport. Consignee – in general terms the named receiver of goods after their
completion of road transport.
5.3.36.3.37.3.38.3.3
Appendix D.3
PACKER In general terms, a person engaged in the process of packaging goods for a heavy vehicle load.
5.3.46.3.47.3.48.3.4
Appendix D.4
LOADING MANAGER, LOADER AND UNLOADER
Loading Manager – in general terms, a person who supervises loading or unloading or manages the premises where this occurs. Loader and Unloader – in general terms, a person engaged in the
process of loading or unloading a heavy vehicle.
5.3.56.3.57.3.58.3.5
Appendix D.5
EXECUTIVE (of a legal entity)
In general terms, a director or a person concerned with the management of a corporation responsible for controlling or directing the use of a heavy vehicle.
5.3.66.3.67.3.68.3.6
Appendix D.6
![Page 8: Container Freight - ctaction.com.auctaction.com.au/wp-content/uploads/2018/09/Paul-Molenaar... · EXECUTIVE (of a legal entity) In general terms, a director or a person concerned](https://reader030.vdocuments.mx/reader030/viewer/2022020415/5c45865293f3c34c5a38837e/html5/thumbnails/8.jpg)
Risk management allows you to: • identify risks • understand risks • make informed decisions
Pillar 2 – Safety Risk Management
Source: NHVR CoR Info Session Brisbane Presentation March 2017
![Page 9: Container Freight - ctaction.com.auctaction.com.au/wp-content/uploads/2018/09/Paul-Molenaar... · EXECUTIVE (of a legal entity) In general terms, a director or a person concerned](https://reader030.vdocuments.mx/reader030/viewer/2022020415/5c45865293f3c34c5a38837e/html5/thumbnails/9.jpg)
• Monitoring how the system operates
• Measuring safety performance
• Managing change
In order to:• Continually improve the system
Pillar 3 – Safety Assurance
Source: NHVR CoR Info Session Brisbane Presentation March 2017
![Page 10: Container Freight - ctaction.com.auctaction.com.au/wp-content/uploads/2018/09/Paul-Molenaar... · EXECUTIVE (of a legal entity) In general terms, a director or a person concerned](https://reader030.vdocuments.mx/reader030/viewer/2022020415/5c45865293f3c34c5a38837e/html5/thumbnails/10.jpg)
An SMS must include:
• Education and processes for training personnel in safety-critical areas
• Effective two-way communication between managers and employees
Pillar 4 – Safety Promotion
Source: NHVR CoR Info Session Brisbane Presentation March 2017
![Page 11: Container Freight - ctaction.com.auctaction.com.au/wp-content/uploads/2018/09/Paul-Molenaar... · EXECUTIVE (of a legal entity) In general terms, a director or a person concerned](https://reader030.vdocuments.mx/reader030/viewer/2022020415/5c45865293f3c34c5a38837e/html5/thumbnails/11.jpg)
Client
Client
Client
ClientThird Party Logistics
Warehouse – Container straight thru
Warehouse – Container unpacked
Warehouse Regional/RuralQuarantine
Wharf
Container Freight: “Last Mile CoR”
![Page 12: Container Freight - ctaction.com.auctaction.com.au/wp-content/uploads/2018/09/Paul-Molenaar... · EXECUTIVE (of a legal entity) In general terms, a director or a person concerned](https://reader030.vdocuments.mx/reader030/viewer/2022020415/5c45865293f3c34c5a38837e/html5/thumbnails/12.jpg)
Sample Risk Register
![Page 13: Container Freight - ctaction.com.auctaction.com.au/wp-content/uploads/2018/09/Paul-Molenaar... · EXECUTIVE (of a legal entity) In general terms, a director or a person concerned](https://reader030.vdocuments.mx/reader030/viewer/2022020415/5c45865293f3c34c5a38837e/html5/thumbnails/13.jpg)
The Risks: (what can happen?)
• The business practices of a supply chain party causes or encourages the driver of aheavy vehicle to exceed the speed limit
• The driver of the heavy vehicle exceeds the speed limit
• The driver is fined and/or the speeding heavy vehicle loses control
• The driver and/or other road users are seriously injured or killed
• There is damage to the road infrastructure and the environment
• The supply chain party is fined or prosecuted
5.0 Speed Management: Risk Assessment and Control Framework (Sect 5.0)
![Page 14: Container Freight - ctaction.com.auctaction.com.au/wp-content/uploads/2018/09/Paul-Molenaar... · EXECUTIVE (of a legal entity) In general terms, a director or a person concerned](https://reader030.vdocuments.mx/reader030/viewer/2022020415/5c45865293f3c34c5a38837e/html5/thumbnails/14.jpg)
Sample Risk Assessment - Speed
![Page 15: Container Freight - ctaction.com.auctaction.com.au/wp-content/uploads/2018/09/Paul-Molenaar... · EXECUTIVE (of a legal entity) In general terms, a director or a person concerned](https://reader030.vdocuments.mx/reader030/viewer/2022020415/5c45865293f3c34c5a38837e/html5/thumbnails/15.jpg)
The Risks: (what can happen?)
• The business practices of a supply chain party causes or encourages the driver of aheavy vehicle to drive whilst fatigued and/or breach their work and rest hours
• The driver of the heavy vehicle drives whilst fatigued and/or breaches their work andrest hours
• The driver is fined and/or the driver has a micro sleep and loses control of the heavyvehicle
• The driver and/or other road users are seriously injured or killed
• There is damage to the road infrastructure and the environment
• The supply chain party is fined or prosecuted
6.0 Fatigue Management: Risk Assessment and Control Framework (Sect 6.0)
![Page 16: Container Freight - ctaction.com.auctaction.com.au/wp-content/uploads/2018/09/Paul-Molenaar... · EXECUTIVE (of a legal entity) In general terms, a director or a person concerned](https://reader030.vdocuments.mx/reader030/viewer/2022020415/5c45865293f3c34c5a38837e/html5/thumbnails/16.jpg)
Sample Risk Assessment - Fatigue
![Page 17: Container Freight - ctaction.com.auctaction.com.au/wp-content/uploads/2018/09/Paul-Molenaar... · EXECUTIVE (of a legal entity) In general terms, a director or a person concerned](https://reader030.vdocuments.mx/reader030/viewer/2022020415/5c45865293f3c34c5a38837e/html5/thumbnails/17.jpg)
The Risks: (what can happen?)
• The business practices of a supply chain party causes or encourages the driver of a heavyvehicle to breach mass, dimension and/or loading requirements – for example, the heavyvehicle is overloaded or over dimension, and/or the load is unevenly distributed, notadequately secured or restrained
• The driver of the heavy vehicle breaches mass, dimension and/or loading requirements
• The driver is fined and/or the driver loses control of the heavy vehicle or the load shifts,protrudes or falls from the heavy vehicle
• The driver and/or other road users are seriously injured or killed
• There is damage to the road infrastructure and the environment
• The supply chain party is fined or prosecuted
7.0 Mass, Dimension and Loading: Risk Assessment and Control Framework (Sect 7.0)
![Page 18: Container Freight - ctaction.com.auctaction.com.au/wp-content/uploads/2018/09/Paul-Molenaar... · EXECUTIVE (of a legal entity) In general terms, a director or a person concerned](https://reader030.vdocuments.mx/reader030/viewer/2022020415/5c45865293f3c34c5a38837e/html5/thumbnails/18.jpg)
Sample Risk Assessment – Mass, Dimension
and Loading
![Page 19: Container Freight - ctaction.com.auctaction.com.au/wp-content/uploads/2018/09/Paul-Molenaar... · EXECUTIVE (of a legal entity) In general terms, a director or a person concerned](https://reader030.vdocuments.mx/reader030/viewer/2022020415/5c45865293f3c34c5a38837e/html5/thumbnails/19.jpg)
The Risks: (what can happen?)
• The business practices of a supply chain party causes or encourages a driver of a heavyvehicle to drive an unsafe or defective vehicle
• The driver of the heavy vehicle drives an unsafe or defective vehicle
• The driver is fined and/or the speeding heavy vehicle loses control of the heavy vehicle– for example, due to faulty brakes
• The driver and/or other road users are seriously injured or killed
• There is damage to the road infrastructure and the environment
• The supply chain party is fined or prosecuted
8.0 Vehicle Standards: Risk Assessment and Control Framework (Sect 8.0)
![Page 20: Container Freight - ctaction.com.auctaction.com.au/wp-content/uploads/2018/09/Paul-Molenaar... · EXECUTIVE (of a legal entity) In general terms, a director or a person concerned](https://reader030.vdocuments.mx/reader030/viewer/2022020415/5c45865293f3c34c5a38837e/html5/thumbnails/20.jpg)
Sample Risk Assessment – Vehicle Standards
![Page 21: Container Freight - ctaction.com.auctaction.com.au/wp-content/uploads/2018/09/Paul-Molenaar... · EXECUTIVE (of a legal entity) In general terms, a director or a person concerned](https://reader030.vdocuments.mx/reader030/viewer/2022020415/5c45865293f3c34c5a38837e/html5/thumbnails/21.jpg)
Vehicle Standards
• Vehicle Manufacture Maintenance Standards
• National Heavy Vehicle Inspection Manualhttps://www.nhvr.gov.au/files/201705-0542-nat-heavy-vehicle-inspection-manual.pdf• Pre-departure check• Fault Identification and Reporting• Scheduled Maintenance• Annual Roadworthiness
![Page 22: Container Freight - ctaction.com.auctaction.com.au/wp-content/uploads/2018/09/Paul-Molenaar... · EXECUTIVE (of a legal entity) In general terms, a director or a person concerned](https://reader030.vdocuments.mx/reader030/viewer/2022020415/5c45865293f3c34c5a38837e/html5/thumbnails/22.jpg)
Questions
Any questions?
![Page 23: Container Freight - ctaction.com.auctaction.com.au/wp-content/uploads/2018/09/Paul-Molenaar... · EXECUTIVE (of a legal entity) In general terms, a director or a person concerned](https://reader030.vdocuments.mx/reader030/viewer/2022020415/5c45865293f3c34c5a38837e/html5/thumbnails/23.jpg)
Location5 / 46-50 Old Princes Hwy
Beaconsfield VIC 3807
Phone
+61 3 9707 4841
Email / Website
www.complianceexperts.com
Contact