consulting for a master plan stakeholder presentation › government › uploads › syst… ·...

57
CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE Commander 43 (Wessex) Brigade Commander 43 (Wessex) Brigade Alistair Cunningham Director Economic Development & Planning, Wiltshire Council Stephen Harness Senior Town & Country Planner, DIO David Alderson David Alderson Town Planner Q&A [POST PRESENTATION NOTE: The content of some pages has been adjusted and some pages have been [POST PRESENTATION NOTE: The content of some pages has been adjusted and some pages have been added to provide further information and clarification in accordance with questions asked and responses given at the original presentation made on 29 th January 2014]

Upload: others

Post on 09-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

CONSULTING FOR A MASTER PLANSTAKEHOLDER PRESENTATIONSTAKEHOLDER PRESENTATION

Brigadier Piers Hankinson MBECommander 43 (Wessex) BrigadeCommander 43 (Wessex) BrigadeAlistair Cunningham

Director Economic Development & Planning, Wiltshire CouncilStephen Harness

Senior Town & Country Planner, DIODavid AldersonDavid Alderson

Town PlannerQ & A

[POST PRESENTATION NOTE: The content of some pages has been adjusted and some pages have been[POST PRESENTATION NOTE: The content of some pages has been adjusted and some pages have beenadded to provide further information and clarification in accordance with questions asked andresponses given at the original presentation made on 29th January 2014]

Page 2: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Brigadier Piers Hankinson MBEBrigadier Piers Hankinson MBE

Comd 43 (Wessex) Bde

Page 3: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

The Core Functions of the Future Armyy

Contingentcapability for defence and

Defence engagement andoverseas capacitydefence and

deterrenceoverseas capacitybuilding

UK engagementUK engagementand homelandresilience

Page 4: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army 2020y

IntegratedIntegratedFFForceForce

112,000112,000RegularRegular

ArmyArmy

RR

yy

82,000 30,000

ReserveReserve

Page 5: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Regular Army Regional Summary: England

LocationOutcome

A2020 Location

Outcome

Change A2020 Liability

Aldershot +745 4,131

Salisbury Plain +4278 13336

Change A2020 Liability

Salisbury Plain +4278 13336

Salisbury Plain +4278 13336

North East England -1,357 7,318

Eastern England -36 9,344

Plain

Larkhill +2053 3955

Eastern England 36 9,344

Southern England +322 5,102

Greater London -191 3,190

Bulford +735 3453

Tidworth/Perham

D+1236 5397

South East England -823 1,197

North West England +106 1,382

Down

Upavon +254 531

West Midlands +1,170 3,107

South West England -44 4,033

Total +7138 52140

5

Total +7138 52140

Page 6: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Salisbury Plain Training Area (SPTA)y g ( )20142 MI Re-org

2014

1 Bde Sig Sqn 47 Regt RA

1 MERCIAN

2015

SPTA

UK ASOC MSSG 1 R ANGLIAN

20152015HQ 1 I &SR Bde

TIDWORTH20165 RIFLES

2015

4 RIFLES LIFC

2017QRH

35 Engr Regt

3 B REME

BULFORD

PERHAM DOWN

2017 - 2020

5 FS Bn REMEJSPC

3 Bn REME

5 Med Regt

1 Med Regt

PERHAM DOWN

LARKHILL20 2020

A net increase of ~ 4278 additional service personnel, along with their families and

UPAVON2017 - 20201 RHA

19 Regt RA

26 Regt RA

dependants totals to approximately 7,700

Salisbury Plain is the only place in the country that can accommodate the complex and demanding training exercises.

1 PWRR

HQ 20 Al Bde[POST PRESENTATION NOTE: The figures in the above table have been corrected following checks carried out on information received from units in Germany]

Page 7: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Rebasing InvolvingArmy Rebasing - Involving Local CommunitiesLocal Communities

Ali t i C i hAlistair Cunningham Director Economic

Development and Planning

Page 8: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

P t ti O tliPresentation Outline

• Briefing 27 November 2013• Work since then• Present Position• What more needs be done• Way Ahead• Formal Consultation Plans

Page 9: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Briefing 27 November 2013 - Recap• A significant increase in (Salisbury Plain) army personnel by

2018• Many troops will be accompanied by their families, increasing

population further• c £800 million MOD investment in Service Familyc. £800 million MOD investment in Service Family

Accommodation (SFA), single living accommodation (SLA) and base technical facilities, the training estate E l ithi UK ill t t id 2014 ith l• Early moves within UK will start mid 2014, with a some large units due to move out prior to 2017

• Whilst there were “No Plans’ as Stakeholders’ views were needed to help formulate them, the land available for SFA was shared with communities for comment

Page 10: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Work Since ThenWork Since Then

• Stakeholders’ views collated• Constraints/opportunities identified by statutory authorities

etc • DIO has drawn up initial plans• DIO has drawn up initial plans• DIO critical review of SFA requirement for present position

and for Army Basing changesand for Army Basing changes• Continued joint working between Wiltshire Council & MOD• Assessing implications for the range of services needed to g p g

meet increased numbers• Continuing dialogue with stakeholders

Page 11: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Present positionPresent position

• DIO plans, especially in respect of SFA, are to be t dpresented

• Need for some local short-term housing purchases• Potential SFA sites have been narrowed down• Potential SFA sites have been narrowed down • There is still time to shape the plans, both today and

during the formal consultation period AND when MODduring the formal consultation period AND when MOD submits its planning applications

Page 12: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

What more needs to be doneWhat more needs to be done

• Further refinement of SFA sites by DIO• Further refinement of SFA sites by DIO• Consider the wider MOD development in greater detail

(training estate and within bases)( g )• Look for opportunities to share facilities with MOD• Plan for increase in service provision • Consider opportunities to provide employment

Page 13: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Way Ahead• February 19 to April 1 2014 - Formal Consultation• Now to May 2014 - Environmental Assessments • May 2014 - Masterplan to be completed by DIO • Summer 2014 - Masterplan to be put before Wiltshire

Council’s Strategic Planning CommitteeCouncil s Strategic Planning Committee• Late summer 2014 - Planning Applications submitted

for SFA, other MOD facilities in the bases and the ,training estate

• From June 2016 - Build within bases and SFA starts, to t f G d i 2017 t 2019meet moves from Germany during 2017 to 2019

Page 14: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Formal Consultation - What is PlannedFormal Consultation - What is Planned• Exhibitions• Opportunity for all to comment on emerging DIO plans• Opportunity for all to comment on emerging DIO plans • Combined Area Board for Army Basing • Meetings / workshops with Statutory Authorities• Meetings / workshops with Statutory Authorities• Meetings with local schools• Meetings with health providersMeetings with health providers• Engagement with businesses• Publicity through newsletters, dedicated MOD and y g ,

Wiltshire Council web-pages, broadcasts & social media

Page 15: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

A B i PlArmy Basing Plan and the Salisbury Plain Area

Stephen HarnessDIO Senior Town & Country Planner

Page 16: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Salisbury Plain OverviewBackground: March 2013 Secretary of State for Defence announced Army Regular Basing Plan and the need to

relocate British Troops from Germany back to the UK, whilst reconfiguring units in the UK for their p y g gfuture role.

Between 2014 and 2019 approximately 4,000 additional military personnel will relocate to the Salisbury Plain Area raising the total number to 13,000 by 2018.

N d l t d d t Tid th B lf d P h D L khill d U New development needed at Tidworth, Bulford, Perham Down, Larkhill and Upavon. Up to 1,400 new homes to accommodate service families.Approach: DIO and the Army liaising closely with the Planning & Highway Authorities and Statutory Bodies: DIO and the Army liaising closely with the Planning & Highway Authorities and Statutory Bodies:

Requirement to prepare a Masterplan to cover the strategic issues across the Plain. Heading towards public exhibitions on the Master Plan from 19 Feb to 1 April 2014. Consulted on the approach last year – David Alderson will take you through the feedback received,

the approach that has been taken and the findings that will be incorporated into the consultation. The Master Plan once completed will set the context for any applications to the Planning Authority.

Q ti W h b f i li t il bl t d t ti t th d f thQuestions: We have a number of specialists available today to answer questions at the end of the presentation, they will introduce themselves and their role when they speak.

Page 17: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

A B i PlArmy Basing Plan and the Salisbury Plain Area

David AldersonTown Planner

Page 18: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Salisbury Plain Masterplan

Presentation Outline

• Key issues raised at the November/December Consultation last year

• Number of SFA Required• Number of SFA Required• Methodology of Site Selection Process• Preferred Sites/Potential Sites

Transport Impact• Transport Impact• Socio-Economics • Internal Camp Development

T i i• Training • Future Public Consultation• Timeline• Q&A

Page 19: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Salisbury Plain Masterplan

Key Issues raised at November/December Consultation

• Traffic Impact on the Strategic Road Network – SFA should be located as close to unit locations as possibleI t Ed ti d M di l I f t t• Impact on Education and Medical Infrastructure

• Development of SFA at Netheravon and Upavon?• Support for a cycle path linking settlements around Salisbury

Plain• Larkhill – concerns about coalescence with Durrington• Larkhill - Some support for development on brownfield land south pp p

of the Packway• Objections against development around Bulford Village - impact

on the adjoining Conservation Area affect rural nature of areaon the adjoining Conservation Area, affect rural nature of area

Page 20: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Salisbury Plain Masterplan

Number of SFA RequiredThe total number of SFA required is 1 380 and the proposal for the supply of these houses is:The total number of SFA required is 1,380 and the proposal for the supply of these houses is:

Number of SFA

199 Purchase commercial stock, this number of SFA is required by April 2015 and cannot be procured for construction in the time available

1,181 Remaining requirement for Army Basing Programme to be included in Master Plan

The figures above are additional and quite separate from the ongoing SFA procurement which is a legacy from previous housing initiatives and which fall outside the remit of the Salisbury Plain Masterplan.

Page 21: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Salisbury Plain Masterplan

SFA Site Selection Methodologygy

• Long list of sites presented at November and December – over 80 sites

• A robust methodology to refine the selection and verify the qualities of the sites.

Three key stages:(1) High level sift – site scoring process, excluding heavily constrained

sites Assessing constraints based on environmental factors socialsites. Assessing constraints based on environmental factors, social factors, and strategic impact (coalescence and proximity to duty stations)

(2) Low level sift – looking at site specific constraints and factoring in(2) Low level sift – looking at site specific constraints and factoring in consultee responses.

(3) Identify recommended options for military housing

Page 22: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Site Sift Stages

Stage 1 Include area only within 10 mile radius of the duty stationStage 2 Exclude non-MoD land within the 10 mile radius

Page 23: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Site Sift Stages

Stage 1 Include area only within 10 mile radius of the duty stationStage 3 Exclude land covered by international and national level d i tiStage 2 Exclude non-MoD land within the 10 mile radiusdesignations

Page 24: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Site Sift Stages

Stage 1 Include area only within 10 mile radius of the duty stationStage 3 Exclude land covered by international and national level d i ti

Stage 4 Exclude land with a high probability of floodingStage 2 Exclude non-MoD land within the 10 mile radiusdesignations

Page 25: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Site Sift Stages

Stage 1 Include area only within 10 mile radius of the duty stationStage 3 Exclude land covered by international and national level d i ti

Stage 4 Exclude land with a high probability of floodingStage 5 Exclude key MoD areas/facilitiesStage 2 Exclude non-MoD land within the 10 mile radiusdesignations

Page 26: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Site Sift Stages

Stage 1 Include area only within 10 mile radius of the duty stationStage 3 Exclude land covered by international and national level d i ti

Stage 4 Exclude land with a high probability of floodingStage 5 Exclude key MoD areas/facilitiesStage 6 Remove small areas Stage 2 Exclude non-MoD land within the 10 mile radiusdesignationsStage 7 Remove isolated areas

Page 27: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Heat Map

Multi Criteria Analysis (MCA) to create Heat Map

Page 28: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Heat Map

Multi Criteria Analysis (MCA) to create Heat MapSites scoring below Heat Map threshold omitted

Page 29: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Salisbury Plain Masterplan

Preferred Sites (Green)( )Scoring meets threshold, may require minor mitigationmitigation

Potential Sites (Orange)Potential Sites (Orange)Scoring meets threshold but requires mitigation

Page 30: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Perham Down/Ludgershall

Sites scoring below Heat Map threshold omitted

Page 31: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Perham Down/Ludgershall

Sites scoring below Heat Map threshold omittedPreferred and potential SFA sites refined

Page 32: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Perham Down/Ludgershall

[POST PRESENTATION NOTE: Additional plan has been added to provide further[POST PRESENTATION NOTE: Additional plan has been added to provide furtherinformation and clarification in accordance with questions asked and responses givenat the original presentation made on 29th January 2014]

Page 33: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Tidworth

Sites scoring below Heat Map threshold omitted

Page 34: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Tidworth

Sites scoring below Heat Map threshold omittedPreferred and potential SFA sites refined

Page 35: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Tidworth

[POST PRESENTATION NOTE: Additional plan has been added to provide further[POST PRESENTATION NOTE: Additional plan has been added to provide furtherinformation and clarification in accordance with questions asked and responses givenat the original presentation made on 29th January 2014]

Page 36: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Bulford

Sites scoring below Heat Map threshold omitted

Page 37: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Bulford

Sites scoring below Heat Map threshold omittedPreferred and potential SFA sites refined

Page 38: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Bulford

[POST PRESENTATION NOTE: Additional plan has been added to provide further[POST PRESENTATION NOTE: Additional plan has been added to provide furtherinformation and clarification in accordance with questions asked and responses givenat the original presentation made on 29th January 2014]

Page 39: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Larkhill

Sites scoring below Heat Map threshold omitted

Page 40: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Larkhill

Sites scoring below Heat Map threshold omittedPreferred and potential SFA sites refined

Page 41: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Larkhill

Sites scoring below Heat Map threshold omittedPreferred and potential SFA sites refinedSites below the Packway and heat Map scoring

Page 42: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Larkhill

[POST PRESENTATION NOTE: Additional plan has been added to provide further[POST PRESENTATION NOTE: Additional plan has been added to provide furtherinformation and clarification in accordance with questions asked and responses givenat the original presentation made on 29th January 2014]

Page 43: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Salisbury Plain Masterplan

Transport

Page 44: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Salisbury Plain MasterplanTransport•We have undertaken some preliminary transport work to inform the preparation of the Masterplan.

•The plan indicates our preliminary thoughts on which junctions are likely to require detailed assessment as part of the ‘over arching’ transport assessment that is to be prepared in support of the Master Plan.

•It should be stressed that all of the transport assessment work undertaken to date is very preliminary and has examined a range of hypothetical distributions for SFA development across Larkhill Bulford Tidworthexamined a range of hypothetical distributions for SFA development across Larkhill, Bulford, Tidworth, Ludgershall/Perham Down.

•Initial findings suggest that, in terms of cumulative traffic effects on the wider highway network, there is little difference between spreading SFA evenly across settlements or focussing it all on one location. However, there will clearly be differing implications for local roads that will need to be examined in detail.

•The transport assessment work undertaken to date is intended to provide a ‘high level’ indication of the extent of the highway network likely to be affected so that the scope of detailed assessment work can be discussed and agreed with the highway authorities. Individual junctions and links have not been assessed and we don’t yet know what g y j yinfrastructure improvements may be required.

•A meeting was held very recently with the Highways Agency, Wiltshire Council and Hampshire County Council Highways to discuss the transport assessment work to date and to seek to agree the scope of work for the next, more detailed stage of the assessmentdetailed, stage of the assessment.

•Once we have feedback from the highway authorities the next stage of transport work can commence

Page 45: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Salisbury Plain Masterplan

Socio-EconomicsAccommodation Units Military Spousal Pop Child Pop TotalAccommodation Units Military

AccommodationSpousal Pop Child Pop Total

SLA 2,898 2,898 0 0 2,898

SFA 1,380 1,380 1,380 2,041 4,801

Total 4,278 4,278 1,380 2,041 7,699

Education• Child population based on data of families relocating from Germany • Research indicates that the majority of school places that will be required are pre-school and primary school places. • In the short term Salisbury Plain will experience a net reduction in population until 2017. Therefore new school places

ill b i d f 2017 dwill be required from 2017 onwards.

Medical Facilities• Need for 1 to 2 New GPs to serve the new population• Need for 1 to 2 Dental Practitioners to serve the new population

[POST PRESENTATION NOTE: The figures in the above table have been corrected following checks carried out on information received from units in Germany]

Page 46: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Salisbury Plain Masterplan

Internal Camp Development

Upavon – Perham Down – Tidworth – Bulford – Larkhill

• Study process on requirements and options is ongoing• Currently work in progress at recommendation stage only• Currently work in progress at recommendation stage only• DIO & Army are studying proposals – nothing has been endorsed to

date• Proposals are subject to change in the decisions process• Time frame – process completion by mid March 2014

Page 47: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Salisbury Plain Masterplan

UpavonUpavon

TYPE AND POTENTIAL NUMBER OF NEW BUILDINGS

SLA Buildings 5Mess DiningHQ Building 1Large GaragesLarge GaragesWorkshop/Tech OfficesStoresArmouryTraining, Education Block 1Phys Training Building 1

[POST PRESENTATION NOTE: Revised plan has been added to provide further[POST PRESENTATION NOTE: Revised plan has been added to provide furtherinformation and clarification in accordance with questions asked and responses givenat the original presentation made on 29th January 2014]

Page 48: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Salisbury Plain Masterplan

Perham DownPerham Down

TYPE AND POTENTIAL NUMBER OF NEW BUILDINGSBUILDINGS

SLA Buildings 7Mess Dining 1HQ BuildingLarge Garages 3Workshop/Tech Offices 1Stores 1ArmouryTraining, Education BlockPhys Training Building 1Phys Training Building 1

[POST PRESENTATION NOTE: Revised plan has been added to provide further[POST PRESENTATION NOTE: Revised plan has been added to provide furtherinformation and clarification in accordance with questions asked and responses givenat the original presentation made on 29th January 2014]

Page 49: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Salisbury Plain Masterplan

TidworthTidworthTYPE AND POTENTIAL NUMBER OF NEW 

BUILDINGSld 7SLA Buildings 7

Mess Dining 3HQ Building 2Large Garages 4Workshop/Tech Offices 3p/Stores 5Armoury 2Training, Education Block 3Phys Training Building 1

[POST PRESENTATION NOTE: Revised plan has been added to provide further[POST PRESENTATION NOTE: Revised plan has been added to provide furtherinformation and clarification in accordance with questions asked and responses givenat the original presentation made on 29th January 2014]

Page 50: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Salisbury Plain Masterplan

BulfordTYPE AND POTENTIAL NUMBER OF NEWTYPE AND POTENTIAL NUMBER OF NEW 

BUILDINGSSLA Buildings 5Mess Dining 1HQ Building 1

4Large Garages 4Workshop/Tech Offices 1Stores 4Armoury 1Training, Education Block 1a g, ducat o ocPhys Training Building

[POST PRESENTATION NOTE: Revised plan has been added to provide further[POST PRESENTATION NOTE: Revised plan has been added to provide furtherinformation and clarification in accordance with questions asked and responses givenat the original presentation made on 29th January 2014]

Page 51: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Salisbury Plain Masterplan

Larkhill

TYPE AND POTENTIAL NUMBER OF NEW BUILDINGS

SLA B ildi 30SLA Buildings 30Mess Dining 4HQ BuildingLarge Garages 6Workshop/Tech Offices 6p/Stores 4Armoury 1Training, Education Block 2Phys Training Building

[POST PRESENTATION NOTE: Revised plan has been added to provide further[POST PRESENTATION NOTE: Revised plan has been added to provide furtherinformation and clarification in accordance with questions asked and responses givenat the original presentation made on 29th January 2014]

Page 52: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Salisbury Plain Masterplan

Training

Page 53: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Salisbury Plain Masterplan

Salisbury Plain Training Area Emerging Training RequirementsEmerging Training Requirements• Training expected to return to historic levels – these will remain within

existing and agreed capacity limitsexisting and agreed capacity limits• Minimal changes in military vehicle use anticipated• Upgraded Range provision around Centre and at Bulford• UK Centre of Specialisation for Unmanned Aerial Systems (UASs) atUK Centre of Specialisation for Unmanned Aerial Systems (UASs) at

Larkhill – increased UAS activity over SPTA likely

Training Features Unrelated to Army Basing • Defence Transformation will require development of existing training

features on SPTA:-• Development of a Complex Manoeuvre Environment across SPTA West

P ibl f bi h t f i ti C d ti b i i ti t d• Possible refurbishment of existing Camp accommodation being investigated

[POST PRESENTATION NOTE: The content of this page has been adjusted to f f fprovide further information and clarification in accordance with questions asked 

and responses given at the original presentation made on 29th January 2014]

Page 54: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Salisbury Plain Masterplan

Stakeholder Consultation

•Phase 3 report to be issued to stakeholders

•Workshops with stakeholders – February 2014:

Stat tor Cons ltees-Statutory Consultees

-Garrisons

-Healthcare Providers

-Education Providers

Page 55: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Salisbury Plain Masterplan

Public Consultation

•Formal 6 week consultation – 19th February to 1st April 2014

•Exhibitions:-Venues and Dates to be announced but expect to hold events in key areas e.g. Amesbury, Durrington/Larkhill, Ludgershall,areas e.g. Amesbury, Durrington/Larkhill, Ludgershall, Tidworth/Bulford, Salisbury

•Website:•Website:-Consultation Material to be uploaded to Wiltshire Council’s MCI Webpage and DIO’s www.gov.uk webpage. Link:https://www gov uk/government/consultations/salisbury plainhttps://www.gov.uk/government/consultations/salisbury-plain-training-area-master-plan-army-basing-programme

[POST PRESENTATION NOTE: The content of this page has been adjusted to [ p g jprovide further clarification in accordance with questions asked and responses given at the original presentation made on 29th January 2014]

Page 56: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Salisbury Plain Masterplan

TimelinePublic consultation 19th February to 1st April 2014

C ll t R A il 2014Collate Responses April 2014

Final Masterplan Late May 2014

Public Consultation on Final Masterplan Late May 2014 to Late June 2014

Endorsement of Masterplan by Wiltshire Post June 2014p yCouncil

Preparation of first ‘tranche’ of planning applications

May 2014 to September 2014

Submission of first ‘tranche’ of planning applications

September 2014

[POST PRESENTATION NOTE: Revised dates have been added to provide further[POST PRESENTATION NOTE: Revised dates have been added to provide furtherclarification in accordance with questions asked and responses given at the originalpresentation made on 29th January 2014]

Page 57: CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION › government › uploads › syst… · CONSULTING FOR A MASTER PLAN STAKEHOLDER PRESENTATION Brigadier Piers Hankinson MBE

Army Basing Programme – Salisbury Plain Masterplan

Open Floor Q&A Session