consultation on possible changes to bus route u5 · 4 1 introduction transport for london conducted...

18
Consultation on possible changes to bus route U5 Consultation Report September 2015

Upload: others

Post on 23-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Consultation on possible changes to bus route U5 · 4 1 Introduction Transport for London conducted a six week public consultation between the 17 July and 14 August 2015 on proposals

Consultation on possible changes to bus route U5

Consultation Report September 2015

Page 2: Consultation on possible changes to bus route U5 · 4 1 Introduction Transport for London conducted a six week public consultation between the 17 July and 14 August 2015 on proposals
Page 3: Consultation on possible changes to bus route U5 · 4 1 Introduction Transport for London conducted a six week public consultation between the 17 July and 14 August 2015 on proposals

2

Consultation on possible changes to bus route U5 Consultation Report

Page 4: Consultation on possible changes to bus route U5 · 4 1 Introduction Transport for London conducted a six week public consultation between the 17 July and 14 August 2015 on proposals

3

Contents 1 Introduction ....................................................................................................... 4

2 The consultation ................................................................................................ 5

3 Overview of consultation responses ................................................................. 7

4 Responses from members of the public ............................................................ 9

5 Responses from statutory bodies and other stakeholders .............................. 10

6 Conclusion ...................................................................................................... 10

Appendix A – Copy of the consultation material ....................................................... 11

Appendix B – All issues raised for Question 8 .......................................................... 15

Appendix C – List of stakeholders consulted ............................................................ 16

Page 5: Consultation on possible changes to bus route U5 · 4 1 Introduction Transport for London conducted a six week public consultation between the 17 July and 14 August 2015 on proposals

4

1 Introduction Transport for London conducted a six week public consultation between the 17 July and 14 August 2015 on proposals to extend route U5. The proposals would make it more convenient for passengers to travel between West Drayton, Uxbridge and a new supermarket, now open at Fairer Corner, Hayes.

Route U5 currently runs between Uxbridge station and Hayes & Harlington station serving Hillingdon Hospital, West Drayton Station and Stockley Park estate. It was proposed that the route be extended from its current terminus at Hayes and Harlington station along Station Road to Fairey Corner and the new supermarket, where a new bus stand facility has been created as part of the development.

Members of the public and stakeholders were invited to give their views either by filling in the questionnaire online or by responding via post or email. Letters were sent to those living near to the proposed new terminus. This document summarises their responses to the consultation. A separate document contains our responses to the main issues raised in the consultation. The consultation generated 97 responses from members of the public. There were no responses received from any stakeholders.

Subject to the comments put forward in this consultation it is intended that the proposals are introduced from 26 September 2015.

Page 6: Consultation on possible changes to bus route U5 · 4 1 Introduction Transport for London conducted a six week public consultation between the 17 July and 14 August 2015 on proposals

5

2 The consultation

The consultation was designed to enable TfL to understand opinion about the proposed changes

The potential outcomes of the consultation are: We decide the consultation raises no issues that should prevent us from

proceeding with the scheme as originally planned. We modify the scheme in response to issues raised in consultation We abandon the scheme as a result of issues raised in the consultation.

2.1 Consultation objectives The objectives of the consultation were:

To give stakeholders and the public easily-understandable information about the proposals and allow them to respond

To understand the level of support or opposition for the change To understand any issues that might affect the proposal of which we were not

previously aware To understand concerns and objections To allow respondents to make suggestions.

2.2 Who we consulted The public consultation intended to seek the views of people who live near to the proposed route, current users of the service and other potential users. We also consulted stakeholders including the affected local Council, traffic police, London TravelWatch, Members of Parliament, Assembly Members and local interest groups. A list of the stakeholders we consulted is shown in Appendix C.

2.3 Consultation material, distribution and publicity The consultation was published online where a dedicated webpage included the details and background to the proposal. We raised awareness of the consultation by sending a targeted email to 3,935 registered Oyster Card holders who are existing users of route U5. We also sent an email to key stakeholders. We wrote to 779 properties near to the proposed extension. In addition to the emails and letters sent, we displayed notices at bus stops and other locations along the proposed extension. The notices provided information on the proposal alongside a map, and how to respond. Copies of the consultation material are shown in Appendix A. 2.4 What questions did we ask in the consultation? We asked eight questions (five general and three specific). Of the general questions we asked respondents for their name, email address, postcode and if they were responding on behalf of an organisation.

There were two closed questions (questions 6-7), and one open question (question 8).

Page 7: Consultation on possible changes to bus route U5 · 4 1 Introduction Transport for London conducted a six week public consultation between the 17 July and 14 August 2015 on proposals

6

The following three closed questions specifically asked respondents about the scheme:

Question 6: Do you currently use route U5? Question 7: Are you in favour of our proposals to extend route U5?

The following open question specifically asked respondents about the scheme:

Question 8: Do you have any further comments relating to our proposal for route U5?

Page 8: Consultation on possible changes to bus route U5 · 4 1 Introduction Transport for London conducted a six week public consultation between the 17 July and 14 August 2015 on proposals

7

3 Overview of consultation responses

3.1 How people heard about the consultation We issued an email to 3,935 people with registered Oyster Cards who use route U5. 70 people responded as a result of the email. Four respondents had heard about the consultation through other means, with two specifying they read about it from posters placed along the extension.

3.2 How people responded

3.3 Where did people respond from? (postcode analysis) We asked respondents to provide a postcode. 84 people responded to this question. The map overleaf, illustrates plotted postcodes mapped against their level of support for the proposed changes.

Receivedan emailfrom TfL

Receiveda letter

from TfL

Saw it onthe TfLwebsite

Readabout it

on socialmedia

Readabout it inthe press

Other(pleasespecify)

NotAnswered

Number of replies 70 0 11 4 1 4 7

0

10

20

30

40

50

60

70

80

How did you hear about this consultation?

7%

93%

How people responded

Email Webpage

Page 9: Consultation on possible changes to bus route U5 · 4 1 Introduction Transport for London conducted a six week public consultation between the 17 July and 14 August 2015 on proposals

8

2.5 Where did people respond from? (postcode analysis)

Page 10: Consultation on possible changes to bus route U5 · 4 1 Introduction Transport for London conducted a six week public consultation between the 17 July and 14 August 2015 on proposals

9

4 Responses from members of the public We received 97 responses from members of the public.

Do you currently use route U5? 87 respondents answered this question. 84% (81) of the respondents indicated that they currently use route U5, while 6% said they did not.

Are you in favour of our proposals to extend route U5? 94 respondents answered this question. The majority of respondents indicated that they are in favour of extending the service; with 92% (89) of the respondents stating that they support the proposed extension and 1% (1) stating opposition. 3% (3) of the respondents were partially in favour of the scheme – usually on condition of other changes.

Yes No Not Answered

Number of replies 81 6 10

0

10

20

30

40

50

60

70

80

90

Do you use route U5?

Yes No Partially Not sure No opinionNot

Answered

Total 89 1 3 0 1 3

0

10

20

30

40

50

60

70

80

90

100

Are you in favour of our proposals for route U5?

Page 11: Consultation on possible changes to bus route U5 · 4 1 Introduction Transport for London conducted a six week public consultation between the 17 July and 14 August 2015 on proposals

10

Do you have any further comments? We also asked for any comments on the proposals. There were 17 overarching themes. The full list of issues and themes is provided in Appendix B. The table below indicates the top five issues raised.

Top five issues and themes Number of comments

Positive comment: Agree with proposal / good idea 34 Positive comment: Great help for shoppers and workers at shop 20 General comment: Change vehicle type / size 4 General comment: Good idea but may make route substantially busier 3 General comment: Increase frequency 3

5 Responses from statutory bodies and other stakeholders

We received no response from any statutory bodies or stakeholders with regards to this proposal.

6 Conclusion The responses show that route U5 remains popular for those wanting to connect between Uxbridge station, Hayes & Harlington station, Hillingdon Hospital, West Drayton Station and Stockley Park estate. Many respondents commented on the value of the current service and that extending it to the new supermarket would further enhance the attractiveness of route.

The responses from consultations are used to inform our decision making and final planning. We have listened to the views expressed in this consultation and will continue to monitor usage and capacity on the route to ensure they meet the demands placed upon them.

The majority of respondents were in support of our proposal. It is intended that the extended route start from 26 September 2015.

Page 12: Consultation on possible changes to bus route U5 · 4 1 Introduction Transport for London conducted a six week public consultation between the 17 July and 14 August 2015 on proposals

11

Appendix A – Copy of the consultation material A1 - Bus stop poster

Page 13: Consultation on possible changes to bus route U5 · 4 1 Introduction Transport for London conducted a six week public consultation between the 17 July and 14 August 2015 on proposals

12

A2 – Copy of the email issued to registered Oyster Card holders

A3 – Copy of the email sent to statutory bodies and stakeholders

Page 14: Consultation on possible changes to bus route U5 · 4 1 Introduction Transport for London conducted a six week public consultation between the 17 July and 14 August 2015 on proposals

13

A4 - Copy of the dedicated consultation web page

https://consultaitons.tfl.gov.uk/buses/route-u5

Page 15: Consultation on possible changes to bus route U5 · 4 1 Introduction Transport for London conducted a six week public consultation between the 17 July and 14 August 2015 on proposals

14

A5 - Copy of the letter delivered to properties near to the extension

Page 16: Consultation on possible changes to bus route U5 · 4 1 Introduction Transport for London conducted a six week public consultation between the 17 July and 14 August 2015 on proposals

15

Appendix B – All issues raised for Question 8

Issues and themes raised Number of comments

Service related comments: (Vehicle size, frequency, capacity etc.). Change vehicle type / size 4Good idea but may make route substantially busier 3Increase frequency 3Introduce night service 1Make U4 & U5 interwork better 1U4: More services on this route at school times 2

Negative comments Negative comment: Against because already made mind up 1Negative comment: Against because already put sign on bus stop 1

General comments Buses should serve stop in street beside shop 2New bus stop should not hold traffic up 2Passengers should be able to get off at stand 1Question: Turnaround point? 1Not Answered / No comment 51

Positive comments Agree with proposal / good idea 34Encourage greater use of route 3Great help for shoppers and workers at shop 20Will not impact my journey 1

Page 17: Consultation on possible changes to bus route U5 · 4 1 Introduction Transport for London conducted a six week public consultation between the 17 July and 14 August 2015 on proposals

16

Appendix C – List of stakeholders consulted London TravelWatch Elected Members Caroline Pidgeon AM Darren Johnson AM Gareth Bacon AM Jenny Jones AM Murad Qureshi AM Nicky Gavron AM Andrew Boff AM Victoria Borwick AM Tom Copley AM Stephen Knight AM Fiona Twycross AM Richard Tracey AM Onkar Sahota AM Hillingdon and Ealing John McDonnell MP Hayes & Harlington Local Authorities London Borough of Hillingdon Police, Fire & Health Authorities Hillingdon NHS Care Commissioning Group

London Ambulance Service

Hillingdon Safer Transport Team London Fire and Emergency Planning Authority

Metropolitan Police Transport Groups and Unions AA Motorcycle Action Group Association of British Drivers Motorcycle Industry Association Association of Car Fleet Operators Road Haulage Association British Motorcyclists Federation RMT Union Freight Transport Association Unions Together Green Flag Group Unite Local Interest Groups Northbank BID Living Streets

London Wildlife Trust Yiewsley & West Drayton Town Centre Action Group

Sustrans

Page 18: Consultation on possible changes to bus route U5 · 4 1 Introduction Transport for London conducted a six week public consultation between the 17 July and 14 August 2015 on proposals

17

Other Stakeholders Action on Hearing Loss (formerly RNID) London Councils Age Concern London London Cycling Campaign Age UK London Older People's Strategy Group Asian Peoples Disabilities Alliance London Tramlink BT London Underground Campaign for Better Transport MIND Confederation of British Industry (CBI) National Children's Bureau CTC - The national cycling charity National Grid Disability Voice Bromley RADAR London Access Forum Disability Alliance RNIB Disabled Persons Transport Advisory Committee

Royal Mail

EDF Energy Royal Parks Greater London Forum for the Elderly Sense Guide Dogs for the Blind Association Sixty Plus Joint Committee on Mobility of Blind and Partially Sighted People

Stroke Association

Joint Mobility Unit Sutton Centre for Voluntary Sector Living Streets Thames Water London City Airport The British Dyslexia Association