CS = DBR = DW = F = H = LOA = SA = District 1 Construction 801 N. Broadway, Bartow, FL 33830 (863) 519-2222 (863) 534-0071 District Secretary: Billy Hattaway (863) 519-2201 (863) 519-1902 Ft. Myers Ops Center 2981 N.E. Pine Island Rd., Ft. Myers, FL 33902 (239) 656-7850 (239) 656-7737 Operations Director: Randy Prescott (863) 519-2202 (863) 534-7265 Sarasota Ops Center 1840 61st Street, Sarasota, FL 34243 (941) 359-7350 (941) 359-5636 Construction Engineer: Jon Sands (863) 519-2223 (863) 534-0071 Bartow Ops Center 2730 S.R. 60 West, Bartow, FL 33830 (863) 519-4100 (863) 519-7924 Ass't Constr. Engineer: Brian Blair (863) 519-2224 (863) 534-0071 Sebring Ops Center 4730 Kenilworth Blvd., Sebring, FL 33870 (863) 386-6112 (863) 386-6116 Consultant Svcs. Manager: Jan Thompson (863) 519-2256 (863) 534-0071 Consultant Svcs. Specialist Kelly Kautz (863) 519-2232 (863) 534-0071 Seq. Financial Project ID/(Fund) Design Project Manager/Phone No./Fax No. No. WPI No.(Old)/SPN(Old) Resident Construction Office/Resident Engineer 1 2 3 4 5 6 7 8 9 10 11 Federal Project (WP21) Construction Project Manager/Phone No./Fax No. (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Project Name Type Project/English-Metric Limit-From Number of Bridges/Alt. Contract Limit -To Letting Date (Mo-Year)/Construction Time (Days) Oral/ Scope Dist.(Mi.)/Prop. X- Sect. Ph 52 Budget $ (% of CEI FY Total Ph 52) Scope Long Short Scope Written Consult. Proposal Clarif. Negot. Agree, County Work Type Ph 62 Budget $ (% of Ph 52) Due Advert List List Meeting Present. Select. Review Meeting Meeting Execution 1Fa 193898-2-62-01 J. Ray Porter (863) 519-2484 Schedule Date-Prop. 01/16/14 02/03/14 03/19/14 04/03/14 N/A N/A 05/01/14 05/28/14 06/06/14 06/18/14 07/31/14 NHPP Albert Rosenstein (941) 359-7315 Actual Date 01/21/14 02/03/14 03/19/14 04/03/14 N/A N/A 05/01/14 05/28/14 06/05/14 N/A 08/15/14 N/A James Nichols (941) 359-7370 Shortlisted Name: AMEC Environment & Infra HDR Construction Control Tetra Tech, Inc. Comments: ELOR AMEC US 17 ADD LANES & REHABILITATE PVMNT Consultant Address: 4919 West Laurel Street 2601 Cattleman Road, Sui 201 East Pine Street, Suite 1000 Project Info: RC,AR, JT FROM CR 760A (NOCATEE) Tampa, Fl 33607 Sarasota, FL 34232 Orlando, FL 32801 Funds Encumbered ($): $2,971,233.00 TO HEARD STREET September 24, 2014 (850) Contact: Richard Ward, PE Gary Downing, PE Danny Tidwell Funds Encumb. Date: 08/08/14 4.4 $22,493,426 ( 7.96% ) Phone: 813-636-1539 941-342-2709 863-241-6323 Contractor Award Date: N/A CES-KSI-JRP DESOTO 10.1 $2,972,661 ( 13.22% ) Email: [email protected] gary.downing@hdrinc.c [email protected] CEI Contract No.: C9G33 1Fb 429109-1-62-01 Joe M. Lauk (863) 519-2251 Schedule Date-Prop. 01/16/14 02/03/14 03/19/14 04/03/14 N/A N/A 05/01/14 05/28/14 06/06/14 06/18/14 07/31/14 DS Albert Rosenstein (941) 359-7315 Actual Date 01/21/14 02/03/14 03/19/14 04/03/14 N/A N/A 05/01/14 05/28/14 06/05/14 N/A 08/28/14 N/A James Nichols (941) 359-7370 Shortlisted Name: AMEC Environment & Infra HDR Construction Control Tetra Tech, Inc. Comments: ELOR Added VIA AMD 1 US 17 / SR 35 SB RESURFACING Consultant Address: 4919 West Laurel Street 2601 Cattleman Road, Sui 201 East Pine Street, Suite 1000 Project Info: RC,AR, JT FROM US 17 NB Tampa, Fl 33607 Sarasota, FL 34232 Orlando, FL 32801 Funds Encumbered ($): $157,068.00 TO PALMETTO ST September 24, 2014 (220) Contact: Richard Ward, PE Gary Downing, PE Danny Tidwell Funds Encumb. Date: 08/25/14 1.736 $1,652,596 ( 0.58% ) Phone: 813-636-1539 941-342-2709 863-241-6323 Contractor Award Date: N/A CES-KSI-JML DESOTO 10.1 $213,221 ( 12.90% ) Email: [email protected] gary.downing@hdrinc.c [email protected] CEI Contract No.: C9G33 Event LEGEND: District One Construction Continuing Services Notes: District Bridge Contract Consultant CEI Acquisition Plan - FY14/15 District Wide Contract Sequence Nos. that include an L are "limited," which means that the CCEI firm will be performing most, but not all of the customary consultant functions. Full CEI Contract Hybrid Project Letter of Authorization GW 429110-1 Sequence Nos. that include an H are "hybrids," which will require primarily inspection personnel. Those that include a lower case letter will be grouped under under one (1) Consultant CEI contract. Those with both H and lower case letters are hybrids that will be grouped. For example 1Ha - 1Hd are 4 separate projects which will be grouped in one CCEI Contract and will require primarily inspection services. Supplemental Amendment S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2014-2015 CEI CAP 4.3.15 1 of 21 4/7/2015 - 1:15 PM

Upload: doandang

Post on 23-Aug-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

CS = DBR = DW = F =H = LOA =SA =

District 1 Construction 801 N. Broadway, Bartow, FL 33830 (863) 519-2222 (863) 534-0071 District Secretary: Billy Hattaway (863) 519-2201 (863) 519-1902Ft. Myers Ops Center 2981 N.E. Pine Island Rd., Ft. Myers, FL 33902 (239) 656-7850 (239) 656-7737 Operations Director: Randy Prescott (863) 519-2202 (863) 534-7265Sarasota Ops Center 1840 61st Street, Sarasota, FL 34243 (941) 359-7350 (941) 359-5636 Construction Engineer: Jon Sands (863) 519-2223 (863) 534-0071Bartow Ops Center 2730 S.R. 60 West, Bartow, FL 33830 (863) 519-4100 (863) 519-7924 Ass't Constr. Engineer: Brian Blair (863) 519-2224 (863) 534-0071Sebring Ops Center 4730 Kenilworth Blvd., Sebring, FL 33870 (863) 386-6112 (863) 386-6116 Consultant Svcs. Manager: Jan Thompson (863) 519-2256 (863) 534-0071 Consultant Svcs. Specialist Kelly Kautz (863) 519-2232 (863) 534-0071

Seq. Financial Project ID/(Fund) Design Project Manager/Phone No./Fax No.No. WPI No.(Old)/SPN(Old) Resident Construction Office/Resident Engineer 1 2 3 4 5 6 7 8 9 10 11

Federal Project (WP21) Construction Project Manager/Phone No./Fax No. (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Project Name Type Project/English-Metric

Limit-From Number of Bridges/Alt. ContractLimit -To Letting Date (Mo-Year)/Construction Time (Days) Oral/ Scope

Dist.(Mi.)/Prop. X- Sect. Ph 52 Budget $ (% of CEI FY Total Ph 52) Scope Long Short Scope Written Consult. Proposal Clarif. Negot. Agree,County Work Type Ph 62 Budget $ (% of Ph 52) Due Advert List List Meeting Present. Select. Review Meeting Meeting Execution

1Fa 193898-2-62-01 J. Ray Porter (863) 519-2484 Schedule Date-Prop. 01/16/14 02/03/14 03/19/14 04/03/14 N/A N/A 05/01/14 05/28/14 06/06/14 06/18/14 07/31/14NHPP Albert Rosenstein (941) 359-7315 Actual Date 01/21/14 02/03/14 03/19/14 04/03/14 N/A N/A 05/01/14 05/28/14 06/05/14 N/A 08/15/14

N/A James Nichols (941) 359-7370 Shortlisted Name: AMEC Environment & Infra HDR Construction Control Tetra Tech, Inc. Comments: ELOR AMECUS 17 ADD LANES & REHABILITATE PVMNT Consultant Address: 4919 West Laurel Street 2601 Cattleman Road, Sui 201 East Pine Street, Suite 1000 Project Info: RC,AR, JT

FROM CR 760A (NOCATEE) Tampa, Fl 33607 Sarasota, FL 34232 Orlando, FL 32801 Funds Encumbered ($): $2,971,233.00TO HEARD STREET September 24, 2014 (850) Contact: Richard Ward, PE Gary Downing, PE Danny Tidwell Funds Encumb. Date: 08/08/14

4.4 $22,493,426 ( 7.96% ) Phone: 813-636-1539 941-342-2709 863-241-6323 Contractor Award Date: N/ACES-KSI-JRP DESOTO 10.1 $2,972,661 ( 13.22% ) Email: [email protected] [email protected]@tetratech.com CEI Contract No.: C9G33

1Fb 429109-1-62-01 Joe M. Lauk (863) 519-2251 Schedule Date-Prop. 01/16/14 02/03/14 03/19/14 04/03/14 N/A N/A 05/01/14 05/28/14 06/06/14 06/18/14 07/31/14DS Albert Rosenstein (941) 359-7315 Actual Date 01/21/14 02/03/14 03/19/14 04/03/14 N/A N/A 05/01/14 05/28/14 06/05/14 N/A 08/28/14

N/A James Nichols (941) 359-7370 Shortlisted Name: AMEC Environment & Infra HDR Construction Control Tetra Tech, Inc. Comments: ELOR Added VIA AMD 1US 17 / SR 35 SB RESURFACING Consultant Address: 4919 West Laurel Street 2601 Cattleman Road, Sui 201 East Pine Street, Suite 1000 Project Info: RC,AR, JT

FROM US 17 NB Tampa, Fl 33607 Sarasota, FL 34232 Orlando, FL 32801 Funds Encumbered ($): $157,068.00TO PALMETTO ST September 24, 2014 (220) Contact: Richard Ward, PE Gary Downing, PE Danny Tidwell Funds Encumb. Date: 08/25/14

1.736 $1,652,596 ( 0.58% ) Phone: 813-636-1539 941-342-2709 863-241-6323 Contractor Award Date: N/ACES-KSI-JML DESOTO 10.1 $213,221 ( 12.90% ) Email: [email protected] [email protected]@tetratech.com CEI Contract No.: C9G33

Event

LEGEND:

District One ConstructionContinuing Services

Notes: District Bridge Contract

Consultant CEI Acquisition Plan - FY14/15

District Wide Contract

Sequence Nos. that include an L are "limited," which means that the CCEI firm will be performing most, but not all of the customary consultant functions.Full CEI Contract Hybrid ProjectLetter of Authorization

GW 429110-1

Sequence Nos. that include an H are "hybrids," which will require primarily inspection personnel. Those that include a lower case letter will be grouped under under one (1) Consultant CEI contract. Those with both H and lower case letters are hybrids that will be grouped. For example 1Ha - 1Hd are 4 separate projects which will be grouped in one CCEI Contract and will require primarily inspection services.

Supplemental Amendment

S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2014-2015 CEI CAP 4.3.15 1 of 21 4/7/2015 - 1:15 PM

Seq. Financial Project ID/(Fund) Design Project Manager/Phone No./Fax No.No. WPI No.(Old)/SPN(Old) Resident Construction Office/Resident Engineer 1 2 3 4 5 6 7 8 9 10 11

Federal Project (WP21) Construction Project Manager/Phone No./Fax No. (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Project Name Type Project/English-Metric

Limit-From Number of Bridges/Alt. ContractLimit -To Letting Date (Mo-Year)/Construction Time (Days) Oral/ Scope

Dist.(Mi.)/Prop. X- Sect. Ph 52 Budget $ (% of CEI FY Total Ph 52) Scope Long Short Scope Written Consult. Proposal Clarif. Negot. Agree,County Work Type Ph 62 Budget $ (% of Ph 52) Due Advert List List Meeting Present. Select. Review Meeting Meeting Execution

Event

1Fc 429110-1-62-01 Joe M. Lauk (863) 519-2251 Schedule Date-Prop. 01/16/14 02/03/14 03/19/14 04/03/14 N/A N/A 05/01/14 05/28/14 06/06/14 06/18/14 07/31/14DDR Albert Rosenstein (941) 359-7315 Actual Date 01/21/14 02/03/14 03/19/14 04/03/14 N/A N/A 05/01/14 05/28/14 06/05/14 N/A 08/28/14

N/A James Nichols (941) 359-7370 Shortlisted Name: AMEC Environment & Infra HDR Construction Control Tetra Tech, Inc. Comments: ELOR Added VIA AMD 1US 17 / SR 35 SB RESURFACING Consultant Address: 4919 West Laurel Street 2601 Cattleman Road, Sui 201 East Pine Street, Suite 1000 Project Info: RC,AR, JT

FROM PALMETTO ST Tampa, Fl 33607 Sarasota, FL 34232 Orlando, FL 32801 Funds Encumbered ($): $160,695.00to DESOTO AVE September 24, 2014 (220) Contact: Richard Ward, PE Gary Downing, PE Danny Tidwell Funds Encumb. Date: 08/25/14

$1,608,945 ( 0.57% ) Phone: 813-636-1539 941-342-2709 863-241-6323 Contractor Award Date: N/ACES-KSI-JML DESOTO 10.1 $162,591 ( 10.11% ) Email: [email protected] [email protected]@tetratech.com CEI Contract No.: C9G33

2Fa 196114-2-62-01 Kellie F. Spurgeon (863) 519-2654 Schedule Date-Prop. 12/08/14 12/29/14 01/28/15 02/10/15 N/A N/A 03/05/15 03/27/15 04/10/15 04/21/15 05/31/15SA Albert Rosenstein (941) 359-7315 Actual Date 12/02/14 12/29/14 01/29/15 02/10/15 N/A N/A 03/05/15 03/27/15

N/A James Nichols (941) 359-7370 Shortlisted Name: HighSpans Engineering, Inc. Rummel, Klepper & Kahl, LURS Corporation Southern Comments: ELOR RC, TH, KKUS 41 (SR 45) RESURFACING Consultant Address: 1500 Jackson Street, Suite 2 101 W Main Street, Suite 27650 W. Courtney Campbell Causeway Project Info:

FROM I-275 Fort Myers, FL 33901 Lakeland, FL 33815 Tampa, FL 33607 Funds Encumbered ($):TO HILLSBOROUGH CL June 17, 2015 (320) Contact: Vince Zaliauskas, PE Dan Foss J. Larry Sauls Funds Encumb. Date:

3.99 $5,428,393 ( 1.92% ) Phone: 239-433-3000 863-940-4704 813-675-6728 Contractor Award Date: CES-MMG-KFS MANATEE 10.1 $589,697 ( 10.86% ) Email: [email protected] [email protected] [email protected] CEI Contract No.: 15120

2Fb 196114-3-62-01 Joe M. Lauk (863) 519-2251 Schedule Date-Prop. 12/08/14 12/29/14 01/28/15 02/10/15 N/A N/A 03/05/15 03/27/15 04/10/15 04/21/15 05/31/15DS Albert Rosenstein (941) 359-7315 Actual Date 12/02/14 12/19/14 01/29/15 02/10/15 N/A N/A 03/05/15 03/27/15

N/A James Nichols (941) 359-7370 Shortlisted Name: HighSpans Engineering, Inc. Rummel, Klepper & Kahl, LURS Corporation Southern Comments: ELOR RC, TH, KKSR 45 (US 41/TAMIAMI INTERSECTION IMPROVEMENT Consultant Address: 1500 Jackson Street, Suite 2 101 W Main Street, Suite 27650 W. Courtney Campbell Causeway Project Info:

TRAIL) AT PINEY POINT RD Fort Myers, FL 33901 Lakeland, FL 33815 Tampa, FL 33607 Funds Encumbered ($):AND DOCK ST(PORT MANATEE) June 17, 2015 (320) Contact: Vince Zaliauskas, PE Dan Foss J. Larry Sauls Funds Encumb. Date:

3.99 $8,248,080 ( 2.92% ) Phone: 239-433-3000 863-940-4704 813-675-6728 Contractor Award Date: CES-KSI-JML MANATEE 10.1 $935,290 ( 11.34% ) Email: [email protected] [email protected] [email protected] CEI Contract No.: 15120

3Fa 198017-4-62-01 Chuck E. Wood (863) 519-2770 Schedule Date-Prop. 07/07/14 07/28/14 08/28/14 09/16/14 N/A N/A 10/13/14 11/03/14 11/17/14 12/01/14 01/31/15SU Albert Rosenstein (941) 359-7315 Actual Date 06/23/14 07/28/14 08/28/14 09/16/14 N/A N/A 10/10/14 11/03/14 11/19/14 N/A 01/14/15

N/A James Nichols (941) 359-7370 Shortlisted Name: Johnson-Adams & Associate KCCS, Inc. Tetra Tech, Inc. Comments: ELOR Tetra TechUS 41(VENICE BYPASS) ADD LANES & RECONSTRUCT Consultant Address: 6907 S Alexander Street, Sui201 N Franklin Street, Suit 201 E pine Street, Suite 100 Project Info: JN, AA, KS

FROM GULF COAST BLVD Plant City, FL 33563 Tampa, FL 33607 Orlando, FL 32801 Funds Encumbered ($): $2,244,945.00TO BIRD BAY June 17, 2015 (600) Contact: William R Adams, III, PE Paul Wingard, PE Danny Tidwell Funds Encumb. Date: 01/02/15

2.322 $15,630,697 ( 5.53% ) Phone: 813-927-6011 239-278-5999 863-241-6323 Contractor Award Date: N/ACES-KSI-CEW SARASOTA 10.1 $2,244,945 ( 14.36% ) Email: Bill.Adams@Johnson-Ad [email protected]@tetratech.com CEI Contract No.: C9H92

GW 196114-3

GW 196114-2

GW 429109-1

S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2014-2015 CEI CAP 4.3.15 2 of 21 4/7/2015 - 1:15 PM

Seq. Financial Project ID/(Fund) Design Project Manager/Phone No./Fax No.No. WPI No.(Old)/SPN(Old) Resident Construction Office/Resident Engineer 1 2 3 4 5 6 7 8 9 10 11

Federal Project (WP21) Construction Project Manager/Phone No./Fax No. (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Project Name Type Project/English-Metric

Limit-From Number of Bridges/Alt. ContractLimit -To Letting Date (Mo-Year)/Construction Time (Days) Oral/ Scope

Dist.(Mi.)/Prop. X- Sect. Ph 52 Budget $ (% of CEI FY Total Ph 52) Scope Long Short Scope Written Consult. Proposal Clarif. Negot. Agree,County Work Type Ph 62 Budget $ (% of Ph 52) Due Advert List List Meeting Present. Select. Review Meeting Meeting Execution

Event

4Fa 406313-4-62-01 Amy E. Setchell (863) 519-2609 Schedule Date-Prop. 09/02/14 09/22/14 10/20/14 11/04/14 N/A N/A 12/04/14 12/29/14 01/06/15 01/16/15 02/28/15DI Nikesh Patel (941) 465-0411 Actual Date 08/21/14 09/22/14 10/22/14 11/04/14 N/A N/A 12/04/14 12/29/14 01/06/15 N/A 02/26/51

N/A Marlena Gore (863) 272-5008 Shortlisted Name: Atkins North America, Inc. HighSpans Engineering, InKinard-Stone, Inc. Comments: ELOR Kinard-Stone, Inc.I-75 ADD LANES & RECONSTRUCT Consultant Address: 1514 Broadway, Suite 203 1500 Jackson Street, Suite28690 Sweet Bay Lane Project Info: NP, MG, JT

FROM N OF SR 951 Fort Myers, FL 33901 Fort Myers, FL 33901 Bonita Springs, FL 34135 Funds Encumbered ($): $2,450,957.00TO N OF GOLDEN GATE March 25, 2015 (725) Contact: Michael Ryan, PE, PMP Vince Zaliauskas, PE Tom Deer, PE Funds Encumb. Date: 02/20/15

3.354 $31,929,263 ( 11.30% ) Phone: 239-334-7275 239-433-3000 239-340-3886 Contractor Award Date: N/ACES-KSI-AES COLLIER 10.1 $2,450,957 ( 7.68% ) Email: Michael.Ryan@[email protected]@kinardstone.com CEI Contract No.: C9I63

4Fb 433255-1-62-01 Amy E. Setchell (863) 519-2609 Schedule Date-Prop. 09/02/14 09/22/14 10/20/14 11/04/14 N/A N/A 12/04/14 12/29/14 01/06/15 01/16/15 02/28/15DI Nikesh Patel (941) 465-0411 Actual Date 08/21/14 09/22/14 10/22/14 11/04/14 N/A N/A 12/04/14 12/29/14 01/06/15 N/A 2/26/205

N/A Marlena Gore (863) 272-5008 Shortlisted Name: Atkins North America, Inc. HighSpans Engineering, InKinard-Stone, Inc. Comments: ELOR Kinard-Stone, Inc.I-75 RESURFACING Consultant Address: 1514 Broadway, Suite 203 1500 Jackson Street, Suite28690 Sweet Bay Lane Project Info: NP, MG, JT

from TOLL BOOTH TO SR 951 Fort Myers, FL 33901 Fort Myers, FL 33901 Bonita Springs, FL 34135 Funds Encumbered ($): $63,754.00TO N OF GOLDEN GATE October 15, 2015 (70) Contact: Michael Ryan, PE, PMP Vince Zaliauskas, PE Tom Deer, PE Funds Encumb. Date: Waiting until 10/15/2015

$184,812 ( 0.07% ) Phone: 239-334-7275 239-433-3000 239-340-3886 Contractor Award Date: N/ACES-KSI-AES COLLIER 10.1 $36,962 ( 20.00% ) Email: Michael.Ryan@[email protected]@kinardstone.com CEI Contract No.: C9I63

7Fa 422710-2-62-01 Joe M. Lauk (863) 519-2251 Schedule Date-Prop. 01/21/14 02/10/14 03/13/14 04/03/14 N/A N/A 04/23/14 05/16/14 05/27/14 06/09/14 07/31/14DDR Eunice Usher (239) 656-7852 Actual Date 01/24/14 02/10/14 03/13/14 04/03/14 N/A N/A 04/23/14 05/15/14 N/A N/A 07/23/14

N/A Dennis Day (239) 656-7870 Shortlisted Name: AIM Engineering & Surveyi SAI Consulting Engineers, URS Corporation Southern Comments: ELOR AIM Eng. US 41 (SR 45) ADD LANES & REHABILITATE PVMNT Consultant Address: 5300 Lee Boulevard 1153 Miranda Lane 7650 W. Courtney Campbell Causeway Project Info: PH,JB,DD

FROM ENTERPRISE DRIVE Lehigh Acres, FL 33971 Kissimmee, FL 34741 Tampa, FL 33607 Funds Encumbered ($): $2,947,232.00TO SARASOTA COUNTY LINE July 30, 2014 (850) Contact: Thomas Deer, PE Allan Wander, Pe J. Larry Sauls Funds Encumb. Date: 07/21/14

3.621 $26,252,824 ( 9.29% ) Phone: 239-340-3886 239-410-2201 813-675-6728 Contractor Award Date: N/ACES-KSI-JML CHARLOTTE 10.1 $2,881,464 ( 10.98% ) Email: [email protected] [email protected]@urs.com CEI Contract No.: C9G13

7Fb 431959-1-62-01 Nicolas A. Leon (863) 519-2376 Schedule Date-Prop. 01/21/14 02/10/14 03/13/14 04/03/14 N/A N/A 04/23/14 05/16/14 05/27/14 06/09/14 07/31/14DDR Eunice Usher (239) 656-7852 Actual Date 01/24/14 02/10/14 03/13/14 04/03/14 N/A N/A 04/23/14 05/15/14 N/A N/A 07/23/14

N/A Dennis Day (239) 656-7870 Shortlisted Name: AIM Engineering & Surveyi SAI Consulting Engineers, URS Corporation Southern Comments: ELOR AIM Eng. SR 31 RESURFACING Consultant Address: 5300 Lee Boulevard 1153 Miranda Lane 7650 W. Courtney Campbell Causeway Project Info: PH,JB,DD

FROM LEE COUNTY LINE Lehigh Acres, FL 33971 Kissimmee, FL 34741 Tampa, FL 33607 Funds Encumbered ($): $609,347.00TO CR 74 March 25, 2015 (300) Contact: Thomas Deer, PE Allan Wander, Pe J. Larry Sauls Funds Encumb. Date: Waiting Until 3/25/15

12.126 $6,369,233 ( 2.25% ) Phone: 239-340-3886 239-410-2201 813-675-6728 Contractor Award Date: N/ACES-RLM-NAL CHARLOTTE 10.1 $822,998 ( 12.92% ) Email: [email protected] [email protected]@urs.com CEI Contract No.: C9G13

G/W 433255-1

G/W 406313-4

S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2014-2015 CEI CAP 4.3.15 3 of 21 4/7/2015 - 1:15 PM

Seq. Financial Project ID/(Fund) Design Project Manager/Phone No./Fax No.No. WPI No.(Old)/SPN(Old) Resident Construction Office/Resident Engineer 1 2 3 4 5 6 7 8 9 10 11

Federal Project (WP21) Construction Project Manager/Phone No./Fax No. (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Project Name Type Project/English-Metric

Limit-From Number of Bridges/Alt. ContractLimit -To Letting Date (Mo-Year)/Construction Time (Days) Oral/ Scope

Dist.(Mi.)/Prop. X- Sect. Ph 52 Budget $ (% of CEI FY Total Ph 52) Scope Long Short Scope Written Consult. Proposal Clarif. Negot. Agree,County Work Type Ph 62 Budget $ (% of Ph 52) Due Advert List List Meeting Present. Select. Review Meeting Meeting Execution

Event

8Fa 427995-1-62-01 Kati Sherrard (563) 519-2990 Schedule Date-Prop. 09/08/14 09/29/14 10/31/14 11/18/14 N/A N/A 12/16/14 01/16/15 01/29/15 02/25/15 04/30/15DDR Albert Rosenstein (941) 359-7315 Actual Date 09/08/14 09/29/14 10/31/14 11/18/14 N/A N/A 12/16/14 01/16/15 01/30/15 N/A 02/26/15

N/A James Nichols (941) 359-7370 Shortlisted Name: HighSpans Engineering, Inc. Johnson-Adams & Stanley Consultants, Inc. Comments: ELOR Johnson-AdamsUS 301 (SR 43) ADD LANES & RECONSTRUCT Consultant Address: 1500 Jackson Street, Suite 2 607 S Alexander Street, S28690 Sweet Bay Lane Project Info: BDI

FROM CR 675 Fort Myers, FL 33901 Plant City, FL 33563 Bonita Springs, FL 34135 Funds Encumbered ($): $821,132.00TO MOCCASIN WALLOW RD May 21, 2015 (300) Contact: Vince Zaliauskas, PE William R Adams, III, PE Tom Deer, PE Funds Encumb. Date: 02/19/15

1.212 $6,405,684 ( 2.27% ) Phone: 239-433-3000 813-927-6011 239-340-3886 Contractor Award Date: CES-KSI-KCS MANATEE 10.1 $821,132 ( 12.82% ) Email: [email protected] [email protected]@kinardstone.com CEI Contract No.: C9I64

9Fa 431209-1-62-01 Dwayne D. Barnhill (863) 519-2276 Schedule Date-Prop. 01/13/14 02/03/14 03/05/14 03/18/14 N/A N/A 04/23/14 05/14/14 05/22/14 06/04/14 12/31/14DDR Jennifer Perry (863) 519-4101 Actual Date 01/13/14 02/03/14 03/05/14 03/18/14 N/A N/A 04/23/14 05/14/14 05/22/14 N/A 12/31/14

N/A Doug McClintock (863) 519-4326 Shortlisted Name: Johnson-Adams & Associate Parsons Brinckerhoff, Inc. Rummel, Klepper & Kahl, LLP Comments: ELOR LT, JH, JTSR 60 SIDEWALK Consultant Address: 607 S Alexander Street, Suite2202 N West Shore Blvd, S101 W Main Street, Suite 240 Project Info: RK&K

FROM VAN FLEET DR Plant City, FL 33563 Tampa, FL 33607 Lakeland, FL 33815 Funds Encumbered ($): $383,385.00TO CONNERSVILLE RD February 20, 2015 (300) Contact: William R Adams, III, PE Toni Friedman Dan Foss Funds Encumb. Date: 01/06/15

1.828 $3,172,000 ( 1.12% ) Phone: 813-927-6011 813-520-4363 863-940-4704 Contractor Award Date: N/ACES-MMG-DDB POLK 10.1 $383,385 ( 12.09% ) Email: Bill.Adams@Johnson-Ad [email protected]@rkk.com CEI Contract No.: C9H97

9Fb 429103-1-62-01 Matthew S. Weaver (863) 519-2521 Schedule Date-Prop. 01/13/14 02/03/14 03/05/14 03/18/14 N/A N/A 04/23/14 05/14/14 05/22/14 06/04/14 12/31/14DS Jennifer Perry (863) 519-4101 Actual Date 01/13/14 02/03/14 03/05/14 3/18/201 N/A N/A 04/23/14 05/14/14 05/22/14 N/A 12/31/14

N/A Doug McClintock (863) 519-4326 Shortlisted Name: Johnson-Adams & Associate Parsons Brinckerhoff, Inc. Rummel, Klepper & Kahl, LLP Comments: ELOR LT, JH, JTUS 17 / SR 555 RESURFACING Consultant Address: 607 S Alexander Street, Suite2202 N West Shore Blvd, S101 W Main Street, Suite 240 Project Info: RK&K

FROM VAN FLEET DRIVE Plant City, FL 33563 Tampa, FL 33607 Lakeland, FL 33815 Funds Encumbered ($): $429,406.00TO 1ST STREET December 12, 2014 (170) Contact: William R Adams, III, PE Toni Friedman Dan Foss Funds Encumb. Date: 01/06/15

3.012 $2,539,891 ( 0.90% ) Phone: 813-927-6011 813-520-4363 863-940-4704 Contractor Award Date: N/ACES-MMG-MWS POLK 10.1 $492,406 ( 19.39% ) Email: Bill.Adams@Johnson-Ad [email protected]@rkk.com CEI Contract No.: C9H97

9Fc 433402-1-62-01 Amy E. Blair (863) 519-2272 Schedule Date-Prop. 01/13/14 02/03/14 03/05/14 03/18/14 N/A N/A 04/23/14 05/14/14 05/22/14 06/04/14 12/31/14HSP Jennifer Perry (863) 519-4101 Actual Date 01/13/14 02/03/14 03/05/14 03/18/14 N/A N/A 04/23/14 05/14/14 05/22/14 N/A 12/31/14

N/A Doug McClintock (863) 519-4326 Shortlisted Name: Johnson-Adams & Associate Parsons Brinckerhoff, Inc. Rummel, Klepper & Kahl, LLP Comments: ELOR LT, JH, JTSR 60 INTERSECTION IMPROVEMENT Consultant Address: 607 S Alexander Street, Suite2202 N West Shore Blvd, S101 W Main Street, Suite 240 Project Info: RK&K

AT SOUTH CREEK DRIVE Plant City, FL 33563 Tampa, FL 33607 Lakeland, FL 33815 Funds Encumbered ($):May 20, 2015 (75) Contact: William R Adams, III, PE Toni Friedman Dan Foss Funds Encumb. Date: Waiting Until Letting - LOA

0.563 $535,003 ( 0.19% ) Phone: 813-927-6011 813-520-4363 863-940-4704 Contractor Award Date: N/ACES-NEM-AEB POLK 10.1 $139,554 ( 26.08% ) Email: Bill.Adams@Johnson-Adams [email protected]@rkk.com CEI Contract No.: C9H97

GW 433409-1

S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2014-2015 CEI CAP 4.3.15 4 of 21 4/7/2015 - 1:15 PM

Seq. Financial Project ID/(Fund) Design Project Manager/Phone No./Fax No.No. WPI No.(Old)/SPN(Old) Resident Construction Office/Resident Engineer 1 2 3 4 5 6 7 8 9 10 11

Federal Project (WP21) Construction Project Manager/Phone No./Fax No. (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Project Name Type Project/English-Metric

Limit-From Number of Bridges/Alt. ContractLimit -To Letting Date (Mo-Year)/Construction Time (Days) Oral/ Scope

Dist.(Mi.)/Prop. X- Sect. Ph 52 Budget $ (% of CEI FY Total Ph 52) Scope Long Short Scope Written Consult. Proposal Clarif. Negot. Agree,County Work Type Ph 62 Budget $ (% of Ph 52) Due Advert List List Meeting Present. Select. Review Meeting Meeting Execution

Event

9Fd 433409-1-62-01 Walter H. Breuggeman (863) 519-2451 Schedule Date-Prop. 01/13/14 02/03/14 03/05/14 03/18/14 N/A N/A 04/23/14 05/14/14 05/22/14 06/04/14 12/31/14HSP Jennifer Perry (863) 519-4101 Actual Date 01/13/14 02/03/14 03/05/14 03/18/14 N/A N/A 04/23/14 05/14/14 05/22/14 N/A 12/31/14

N/A Doug McClintock (863) 519-4326 Shortlisted Name: Johnson-Adams & Associate Parsons Brinckerhoff, Inc. Rummel, Klepper & Kahl, LLP Comments: ELOR LT, JH, JTSR 60 INTERSECTION IMPROVEMENT Consultant Address: 607 S Alexander Street, Suite2202 N West Shore Blvd, S101 W Main Street, Suite 240 Project Info: RK&K

AT WILLOW OAK RD Plant City, FL 33563 Tampa, FL 33607 Lakeland, FL 33815 Funds Encumbered ($):May 20, 2015 (75) Contact: William R Adams, III, PE Toni Friedman Dan Foss Funds Encumb. Date: Waiting Until Letting - LOA

0.388 $338,657 ( 0.12% ) Phone: 813-927-6011 813-520-4363 863-940-4704 Contractor Award Date: N/ACES-AEB-WHB POLK 10.1 $188,868 ( 55.77% ) Email: Bill.Adams@Johnson-Adams [email protected]@rkk.com CEI Contract No.: C9H97

10Fa 431306-1-62-01 Chris M. Zeigler (863) 519-2253 Schedule Date-Prop. 09/02/14 09/22/14 10/21/14 11/04/14 N/A N/A 12/04/14 01/05/15 02/02/15 02/02/15 03/31/15ACSA Albert Rosenstein (941) 359-7315 Actual Date 07/18/14 09/22/14 10/20/14 11/04/14 N/A N/A 12/04/14 01/06/15 02/02/15 02/02/15

N/A James Nichols (941) 359-7370 Shortlisted Name: Johnson, Miriam & Thompso KCCS, Inc. Stanley Consultants, Inc. Comments: ELOR JN, AA, KKSR 758 RESURFACING Consultant Address: 1000 Corporate Drive Suite 1201 N Franklin Street, Su 4910 Lakewood Ranch Blvd, Suite 300 Project Info: KCCS, Inc

FROM SIESTA DRIVE Fort Lauderdale, FL 33334 Tampa, FL 33607 Sarasota, FL 34240 Funds Encumbered ($):TO BOND PL April 29, 2015 (450) Contact: Karina Jackson, PE Paul Wingard, PE David Dixon, PE Funds Encumb. Date:

3.821 $11,936,752 ( 4.22% ) Phone: 954-444-5479 239-278-5999 813-376-9252 Contractor Award Date: CES-AEB-CMZ SARASOTA 10.1 $1,103,540 ( 9.24% ) Email: [email protected] Pwingard@[email protected] CEI Contract No.: 15128

10Fb 431423-1-62-01 Janet Middleton (863) 519-2309 Schedule Date-Prop. 09/02/14 09/22/14 10/21/14 11/04/14 N/A N/A 12/04/14 01/05/15 02/02/15 02/02/15 03/31/15DDR Albert Rosenstein (941) 359-7315 Actual Date 07/18/14 09/22/14 10/20/14 11/04/14 N/A N/A 12/04/14 01/06/15 02/02/15 02/02/15

N/A James Nichols (941) 359-7370 Shortlisted Name: Johnson, Miriam & Thompso KCCS, Inc. Stanley Consultants, Inc. Comments: ELOR JN, AA, KKUS 41 (SR 45) RESURFACING Consultant Address: 1000 Corporate Drive Suite 1201 N Franklin Street, Su 4910 Lakewood Ranch Blvd, Suite 300 Project Info: KCCS, Inc

FROM WOODMERE ROAD Fort Lauderdale, FL 33334 Tampa, FL 33607 Sarasota, FL 34240 Funds Encumbered ($):TO LOWES ENTRANCE May 21, 2015 (210) Contact: Karina Jackson, PE Paul Wingard, PE David Dixon, PE Funds Encumb. Date:

1.841 $3,465,385 ( 1.23% ) Phone: 954-444-5479 239-278-5999 813-376-9252 Contractor Award Date: CES-RLM-JWM SARASOTA 10.1 $568,142 ( 16.39% ) Email: [email protected] Pwingard@[email protected] CEI Contract No.: 15128

10Fc 430855-1-62-01 Justin R. Reck (863) 519-2502 Schedule Date-Prop. 09/02/14 09/22/14 10/21/14 11/04/14 N/A N/A 12/04/14 01/05/15 02/02/15 02/02/15 03/31/15HSP Albert Rosenstein (941) 359-7315 Actual Date 07/18/14 09/22/14 10/20/14 11/04/14 N/A N/A 12/04/14 01/06/15 02/02/15 02/02/15

N/A James Nichols (941) 359-7370 Shortlisted Name: Johnson, Miriam & Thompso KCCS, Inc. Stanley Consultants, Inc. Comments: ELOR JN, AA, KKSR758 (BEE RIDGE RD) PEDESTRIAN SAFETY IMPROVEMENT Consultant Address: 1000 Corporate Drive Suite 1201 N Franklin Street, Su 4910 Lakewood Ranch Blvd, Suite 300 Project Info: KCCS, Inc

FROM US 41 (SR 45) Fort Lauderdale, FL 33334 Tampa, FL 33607 Sarasota, FL 34240 Funds Encumbered ($):TO DUNN DRIVE April 29, 2015 (75) Contact: Karina Jackson, PE Paul Wingard, PE David Dixon, PE Funds Encumb. Date:

3.623 $318,282 ( 0.11% ) Phone: 954-444-5479 239-278-5999 813-376-9252 Contractor Award Date: CES-AEB-JRR SARASOTA 10.1 $68,624 ( 21.56% ) Email: [email protected] Pwingard@[email protected] CEI Contract No.: 15128

GW 430855-1

GW 431306-1

GW 433402-1

S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2014-2015 CEI CAP 4.3.15 5 of 21 4/7/2015 - 1:15 PM

Seq. Financial Project ID/(Fund) Design Project Manager/Phone No./Fax No.No. WPI No.(Old)/SPN(Old) Resident Construction Office/Resident Engineer 1 2 3 4 5 6 7 8 9 10 11

Federal Project (WP21) Construction Project Manager/Phone No./Fax No. (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Project Name Type Project/English-Metric

Limit-From Number of Bridges/Alt. ContractLimit -To Letting Date (Mo-Year)/Construction Time (Days) Oral/ Scope

Dist.(Mi.)/Prop. X- Sect. Ph 52 Budget $ (% of CEI FY Total Ph 52) Scope Long Short Scope Written Consult. Proposal Clarif. Negot. Agree,County Work Type Ph 62 Budget $ (% of Ph 52) Due Advert List List Meeting Present. Select. Review Meeting Meeting Execution

Event

11Fa 431422-1-62-01 Janet Middleton (863) 519-2309 Schedule Date-Prop. 07/14/14 08/04/14 09/03/14 09/16/14 N/A N/A 10/13/14 11/05/14 11/12/14 11/21/14 01/31/15DDR Eunice Usher (239) 656-7852 Actual Date 06/26/14 08/04/14 09/03/14 09/16/14 N/A N/A 10/10/14 11/03/14 11/12/14 N/A 01/29/15

N/A Leighton Elliot (239) 656-7869 Shortlisted Name: AE Engineering, Inc. HighSpans Engineering, InKinard-Stone, Inc. Comments: ELOR Kinard-Stone, Inc.US 41 (SR 90) RESURFACING Consultant Address: 6440 Southpoint Parkway, Su1500 Jackson Street, Suite28690 Sweet Bay Lane Project Info: BDI

FROM MOSQUITO CANAL Jacksonville, FL 32216 Fort Myers, FL 33901 Bonita Springs, FL 34135 Funds Encumbered ($): $686,361.00TO SR 29 February 25, 2015 (360) Contact: Cory Nichols, PE Vince Zaliauskas, PE Steven Coker, PE Funds Encumb. Date: 01/23/15

10.647 $5,592,147 ( 1.98% ) Phone: 906-614-4800 239-433-3000 239-913-7132 Contractor Award Date: N/ACES-RLM-JWM COLLIER 10.1 $686,361 ( 12.27% ) Email: [email protected] [email protected]@kinardstone.com CEI Contract No.: C9I25

12Fa 425183-1-62-01 Benjamin B. Loeser (813) 975-7574 Schedule Date-Prop. 06/16/14 07/07/14 08/14/14 09/05/14 N/A N/A 10/02/14 10/27/14 11/05/14 11/17/14 12/31/14BRRP Albert Rosenstein (941) 359-7315 Actual Date 06/19/14 07/07/14 08/14/14 09/05/14 N/A N/A 10/02/14 10/27/14 N/A N/A 12/22/14

N/A James Nichols (941) 359-7370 Shortlisted Name: American Consulting EngineeParsons Brinckerhoff, IncStanley Consultants, Inc. Comments: ELOR RC, AA, SSSR 72 (STICKNEY PT) BRIDGE-REPAIR/REHABILITATION Consultant Address: 2818 Cypress Ridge Blvd, Su2202 N West Shore Blvd, 4910 Lakewood Ranch Blvd, Suite 300 Project Info: PB

FROM EAST OF SR 758 Wesley Chapel, FL 33544 Tampa, FL 33607 Sarasota, FL 34240 Funds Encumbered ($): $750,229.00TO WEST OF BEACHWOOD AVE December 12, 2014 (250) Contact: Jack Knowlton, pE Ed Racila, pE David Dixon, PE Funds Encumb. Date: 12/18/14

0.107 $5,396,929 ( 1.91% ) Phone: 813-927-4714 813-520-4340 813-376-9252 Contractor Award Date: N/ACES-MTH-BBL SARASOTA 10.1, 10.4 $850,607 ( 15.76% ) Email: [email protected] [email protected] [email protected] CEI Contract No.: C9H79

13Fa 201032-4-62-01 Kevin S. Ingle (863) 519-2740 Schedule Date-Prop. 11/10/14 11/21/14 12/03/14 12/16/14 12/18/14 01/21/15 02/10/15 02/24/15 03/02/15 03/05/15 05/31/15ACNP Nikesh Patel (941) 465-0411 Actual Date 11/10/14 11/21/14 12/03/14 12/16/14 12/18/14 01/21/15 02/10/15 03/03/15 03/10/15 N/A

N/A Marlena Gore (863) 272-5008 Shortlisted Name: DRMP, Inc. Metric Engineering, Inc. Parson's Brinckerhoff, Inc. Comments: ORAL PRES NP, MG, KSI-75 (SR93) AT UNIVE INTERCHANGE - ADD LANES Consultant Address: 1125 Bartow Road, Suite 100615 Cresent Executive Co2202 N West Shore Blvd, Suite 300 Project Info: Metric Engineering

RSITY INTERCHANGE Lakeland, FL 33801 Lake Mary, FL 32746 Tampa, FL 33607 Funds Encumbered: May 20, 2015 (745) Contact: Rickey Langley, PE Ed Decresie Ken Spillett Funds Encumb. Date:

1 $37,171,792 ( 13.15% ) Phone: 863-860-1478 407-660-4720 813-520-4380 Contractor Award Date: CES-NEM-KSI MANATEE 10.1, 10.5.1, 10.5.2 $3,146,529 ( 8.46% ) Fax: [email protected] [email protected]@pbworld.com CEI Contract #: 15153

13Fb 201277-2-62-01 Kevin S. Ingle (863) 519-2740 Schedule Date-Prop. 11/10/14 11/21/14 12/03/14 12/16/14 12/18/14 01/21/15 02/10/15 02/24/15 03/02/15 03/05/15 05/31/15ACNP Nikesh Patel (941) 465-0411 Actual Date 11/10/14 11/21/14 12/03/14 12/16/14 12/18/14 01/21/15 2/10/215 03/03/15 03/10/15 N/A

N/A Marlena Gore (863) 272-5008 Shortlisted Name: DRMP, Inc. Metric Engineering, Inc. Parson's Brinckerhoff, Inc. Comments: ORAL PRES NP, MG, KSI-75 (SR93) AT UNIVE INTERCHANGE - ADD LANES Consultant Address: 1125 Bartow Road, Suite 100615 Cresent Executive Co2202 N West Shore Blvd, Suite 300 Project Info: Metric Engineering

RSITY PARKWAY Lakeland, FL 33801 Lake Mary, FL 32746 Tampa, FL 33607 Funds Encumbered: May 20, 2015 (745) Contact: Rickey Langley, PE Ed Decresie Ken Spillett Funds Encumb. Date:

0.413 $35,762,734 ( 12.65% ) Phone: 863-860-1478 407-660-4720 813-520-4380 Contractor Award Date: CES-NEM-KSI SARASOTA 10.1, 10.5.1, 10.5.2 $2,690,608 ( 7.52% ) Fax: [email protected] [email protected]@pbworld.com CEI Contract #: 15153

S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2014-2015 CEI CAP 4.3.15 6 of 21 4/7/2015 - 1:15 PM

Seq. Financial Project ID/(Fund) Design Project Manager/Phone No./Fax No.No. WPI No.(Old)/SPN(Old) Resident Construction Office/Resident Engineer 1 2 3 4 5 6 7 8 9 10 11

Federal Project (WP21) Construction Project Manager/Phone No./Fax No. (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Project Name Type Project/English-Metric

Limit-From Number of Bridges/Alt. ContractLimit -To Letting Date (Mo-Year)/Construction Time (Days) Oral/ Scope

Dist.(Mi.)/Prop. X- Sect. Ph 52 Budget $ (% of CEI FY Total Ph 52) Scope Long Short Scope Written Consult. Proposal Clarif. Negot. Agree,County Work Type Ph 62 Budget $ (% of Ph 52) Due Advert List List Meeting Present. Select. Review Meeting Meeting Execution

Event

C/S 431750-2-62-01 Steve Womble, P.E.; phone number (813) 975-7592 Schedule Date-Prop.DS Zach Adams, P.E.; phone number (727) 725-7950 Actual Date

N/A Erich McCartney, E.I.; phone number (727) 725-7950 Shortlisted Name: Comments: DISTRICT 7SUNSHINE SKYWAY BRIDGE-REPAIR/REHABILITATION Consultant Address: Project Info:

NORTH FISHING PIER Funds Encumbered: November 12, 2014 Contact: Funds Encumb. Date:

$3,504,500 ( 1.24% ) Phone: Contractor Award Date: $354,520 ( 10.12% ) Fax: CEI Contract #: NEW

C/S 431750-3-62-01 Steve Womble, P.E.; phone number (813) 975-7592 Schedule Date-Prop.DSB1 Zach Adams, P.E.; phone number (727) 725-7950 Actual Date

N/A Erich McCartney, E.I.; phone number (727) 725-7950 Shortlisted Name: Comments: DISTRICT 7SUNSHINE SKYWAY BRIDGE-REPAIR/REHABILITATION Consultant Address: Project Info:

SOUTH FISHING PIER Funds Encumbered: November 12, 2014 Contact: Funds Encumb. Date:

$3,026,378 ( 1.07% ) Phone: Contractor Award Date: $191,532 ( 6.33% ) Fax: CEI Contract #: D7

C/S 1 431210-1-62-01 Vanessa G. Clayton (863) 519-2554 Schedule Date-Prop. 01/03/15SA Eunice Usher (239) 656-7852 Actual Date 10/31/14

N/A Ivan Sokolic (239) 656-7854 Shortlisted Name: Comments: JacobsSR 776 RESURFACING Consultant Address: Project Info: TWO 29

FROM WILLOW BEND DR Funds Encumbered ($): $328,275.00TO COLLINGSWOOD BLVD December 3, 2014 (145) Contact: Funds Encumb. Date: 10/23/14

3.837 $3,770,622 ( 1.33% ) Phone: Contractor Award Date: N/ACES-MMG-VGC CHARLOTTE $328,275 ( 8.71% ) Fax: CEI Contract No.: C9A69

C/S 4 428254-1-62-01 Justin R. Reck (863) 519-2502 Schedule Date-Prop. 08/29/14TALU Eunice Usher (239) 656-7852 Actual Date 07/14/14

N/A Ivan Sokolic (239) 656-7854 Shortlisted Name: Comments: JacobsSHADOWLAWN SIDEWALK Consultant Address: Project Info: TWO 22

ELEMENTARY - SIDEWALK Funds Encumbered ($): $42,810.00SAFE ROUTES TO SCHOOL July 30, 2014 (70) Contact: Funds Encumb. Date: 07/14/14

0.001 $93,337 ( 0.03% ) Phone: Contractor Award Date: 07/30/14CES-AEB-JRR COLLIER $42,810 ( 45.87% ) Fax: CEI Contract No.: C9A69

GW 431750-2 (Managed by

District 7)

GW 431750-3

PROJECT WILL BE PROCURED AND MANAGED BY DISTRICT 7

PROJECT WILL BE PROCURED AND MANAGED BY DISTRICT 7

FMOC - CONTINUING SERVICES (CS) CONTRACT #C9A69

FMOC - CONTINUING SERVICES (CS) CONTRACT #C9A69

S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2014-2015 CEI CAP 4.3.15 7 of 21 4/7/2015 - 1:15 PM

Seq. Financial Project ID/(Fund) Design Project Manager/Phone No./Fax No.No. WPI No.(Old)/SPN(Old) Resident Construction Office/Resident Engineer 1 2 3 4 5 6 7 8 9 10 11

Federal Project (WP21) Construction Project Manager/Phone No./Fax No. (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Project Name Type Project/English-Metric

Limit-From Number of Bridges/Alt. ContractLimit -To Letting Date (Mo-Year)/Construction Time (Days) Oral/ Scope

Dist.(Mi.)/Prop. X- Sect. Ph 52 Budget $ (% of CEI FY Total Ph 52) Scope Long Short Scope Written Consult. Proposal Clarif. Negot. Agree,County Work Type Ph 62 Budget $ (% of Ph 52) Due Advert List List Meeting Present. Select. Review Meeting Meeting Execution

Event

C/S 5 429120-1-62-01 Janet W. Middleton (863) 519-2309 Schedule Date-Prop. 01/17/15DDR Eunice Usher (239) 656-7852 Actual Date 91/19/14

N/A Ivan Sokolic (239) 656-7854 Shortlisted Name: Comments: JacobsSR 84 (DAVIS BLVD) RESURFACING Consultant Address: Project Info: TWO 30

FROM AIRPORT - PULLING RD Funds Encumbered ($): $305,692.00TO HERITAGE TRAIL December 18, 2014 (185) Contact: Funds Encumb. Date: 09/18/14

3.997 $3,226,291 ( 1.14% ) Phone: Contractor Award Date: N/ACES-RLM-JWM COLLIER $432,593 ( 13.41% ) Fax: CEI Contract No.: C9A69

C/S 7 430869-1-62-01 Walter H. Breuggeman (863) 519-2451 Schedule Date-Prop. 04/25/15ACSU Eunice Usher (239) 656-7852 Actual Date 02/06/15

N/A Ivan Sokolic (239) 656-7854 Shortlisted Name: Comments: JacobsUS 41 (SR 90) PEDESTRIAN SAFETY IMPROVEMENT Consultant Address: Project Info: TWO 33

AT GORDON RIVER Funds Encumbered ($): $51,372.00BRIDGE #030300 March 25, 2015 (90) Contact: Funds Encumb. Date: 02/05/15

0.221 $631,354 ( 0.22% ) Phone: Contractor Award Date: N/ACES-AEB-WHB COLLIER $51,372 ( 8.14% ) Fax: CEI Contract No.: C9A69

C/S 8 430873-1-62-01 Walter H. Breuggeman (863) 519-2451 Schedule Date-Prop. 06/30/15SU Eunice Usher (239) 656-7852 Actual Date

N/A Ivan Sokolic (239) 656-7854 Shortlisted Name: Comments: JacobsUS 41 (SR 45) FROM SIDEWALK Consultant Address: Project Info: TWO 38

CR 862 (VANDERBILT BCH RD Funds Encumbered ($): $143,298.00TO S OF PELICAN BAY BLVD June 17, 2015 (145) Contact: Funds Encumb. Date:

0.458 $458,033 ( 0.16% ) Phone: Contractor Award Date: N/ACES-AEB-WHB COLLIER $143,298 ( 31.29% ) Fax: CEI Contract No.: C9A69

C/S 9 430877-1-62-01 Mario Dipola 63) 519-2396 Schedule Date-Prop. 06/30/15SU Eunice Usher (239) 656-7852 Actual Date

N/A Ivan Sokolic (239) 656-7854 Shortlisted Name: Comments: JacobsCITY OF NAPLES SIDEWALK Consultant Address: Project Info: TWO 37

SIDEWALKS AT VARIOUS Funds Encumbered ($): $51,372.00LOCATIONS June 17, 2015 (145) Contact: Funds Encumb. Date:

0.055 $309,538 ( 0.11% ) Phone: Contractor Award Date: N/ACES-AEB-MAD COLLIER $74,865 ( 24.19% ) Fax: CEI Contract No.: C9A69

FMOC - CONTINUING SERVICES (CS) CONTRACT #C9A69

FMOC - CONTINUING SERVICES (CS) CONTRACT #C9A69

FMOC - CONTINUING SERVICES (CS) CONTRACT #C9A69

FMOC - CONTINUING SERVICES (CS) CONTRACT #C9A69

S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2014-2015 CEI CAP 4.3.15 8 of 21 4/7/2015 - 1:15 PM

Seq. Financial Project ID/(Fund) Design Project Manager/Phone No./Fax No.No. WPI No.(Old)/SPN(Old) Resident Construction Office/Resident Engineer 1 2 3 4 5 6 7 8 9 10 11

Federal Project (WP21) Construction Project Manager/Phone No./Fax No. (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Project Name Type Project/English-Metric

Limit-From Number of Bridges/Alt. ContractLimit -To Letting Date (Mo-Year)/Construction Time (Days) Oral/ Scope

Dist.(Mi.)/Prop. X- Sect. Ph 52 Budget $ (% of CEI FY Total Ph 52) Scope Long Short Scope Written Consult. Proposal Clarif. Negot. Agree,County Work Type Ph 62 Budget $ (% of Ph 52) Due Advert List List Meeting Present. Select. Review Meeting Meeting Execution

Event

C/S 11 435393-1-62-01 Amy E. Blair (863) 519-2272 Schedule Date-Prop. 06/30/15EB Eunice Usher (239) 656-7852 Actual Date

N/A Ivan Sokolic (239) 656-7854 Shortlisted Name: Comments: JacobsPINE RIDGE RD INTERSECTION IMPROVEMENT Consultant Address: Project Info: TWO 36

AT US 41 Funds Encumbered ($): $141,308.00May 20, 2015 (120) Contact: Funds Encumb. Date:

0.2 $1,006,842 ( 0.36% ) Phone: Contractor Award Date: N/ACES-NEM-AEB COLLIER $141,308 ( 14.03% ) Fax: CEI Contract No.: C9A69

C/S 12 430893-1-62-01 Ryan Weeks (863) 519-2379 Schedule Date-Prop. 10/23/14ACTN Eunice Usher (239) 656-7852 Actual Date 08/11/14

N/A Ivan Sokolic (239) 656-7854 Shortlisted Name: Comments: JacobsFRASER AVE SIDEWALK Consultant Address: Project Info: TWO 24

FROM HARDEE ST Funds Encumbered ($): $55,689.00TO MAIN ST September 24, 2014 (100) Contact: Funds Encumb. Date: 08/08/14

0.458 $116,591 ( 0.04% ) Phone: Contractor Award Date: N/ACES-NEM-RTW HENDRY $55,689 ( 47.76% ) Fax: CEI Contract No.: C9A69

C/S 13 430894-1-62-01 Ryan Weeks (863) 519-2379 Schedule Date-Prop. 10/23/14TALL Eunice Usher (239) 656-7852 Actual Date 08/11/14

N/A Ivan Sokolic (239) 656-7854 Shortlisted Name: Comments: JacobsE BASILIAN CRESCENT SIDEWALK Consultant Address: Project Info: TWO 25

FROM SW WC OWENS AVE Funds Encumbered ($): $55,689.00TO DEAN DUFF September 24, 2014 (100) Contact: Funds Encumb. Date: 08/08/14

0 $122,623 ( 0.04% ) Phone: Contractor Award Date: N/ACES-NEM-RTW HENDRY $55,689 ( 45.41% ) Fax: CEI Contract No.: C9A69

C/S 14 431211-1-62-01 Kellie F. Spurgeon (863) 519-2654 Schedule Date-Prop. 03/19/15DDR Eunice Usher (239) 656-7852 Actual Date 12/16/14

N/A Ivan Sokolic (239) 656-7854 Shortlisted Name: Comments: JacobsUS 27/SR 25/ SR 80 RESURFACING Consultant Address: Project Info: TWO 32

FROM INDUSTRIAL CANAL Funds Encumbered ($): $346,130.00TO MERCHANT STREET February 20, 2015 (150) Contact: Funds Encumb. Date: 12/12/14

1.895 $3,069,379 ( 1.09% ) Phone: Contractor Award Date: N/ACES-MMG-KFS HENDRY $423,816 ( 13.81% ) Fax: CEI Contract No.: C9A69

G/W 430894-1

FMOC - CONTINUING SERVICES (CS) CONTRACT #C9A69

FMOC - CONTINUING SERVICES (CS) CONTRACT #C9A69

FMOC - CONTINUING SERVICES (CS) CONTRACT #C9A69

FMOC - CONTINUING SERVICES (CS) CONTRACT #C9A69

G/W 430893-1

S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2014-2015 CEI CAP 4.3.15 9 of 21 4/7/2015 - 1:15 PM

Seq. Financial Project ID/(Fund) Design Project Manager/Phone No./Fax No.No. WPI No.(Old)/SPN(Old) Resident Construction Office/Resident Engineer 1 2 3 4 5 6 7 8 9 10 11

Federal Project (WP21) Construction Project Manager/Phone No./Fax No. (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Project Name Type Project/English-Metric

Limit-From Number of Bridges/Alt. ContractLimit -To Letting Date (Mo-Year)/Construction Time (Days) Oral/ Scope

Dist.(Mi.)/Prop. X- Sect. Ph 52 Budget $ (% of CEI FY Total Ph 52) Scope Long Short Scope Written Consult. Proposal Clarif. Negot. Agree,County Work Type Ph 62 Budget $ (% of Ph 52) Due Advert List List Meeting Present. Select. Review Meeting Meeting Execution

Event

C/S 16 429895-1-62-01 Ryan Weeks (863) 519-2379 Schedule Date-Prop. 08/29/14SU Eunice Usher (239) 656-7852 Actual Date 06/23/14

N/A Ivan Sokolic (239) 656-7854 Shortlisted Name: Comments: JacobsUS 41 (SR 45) BIKE LANE/SIDEWALK Consultant Address: Project Info: TWO 19

FROM SR 78 (PINE ISLAND) Funds Encumbered ($): $38,565.00TO STOCKTON STREET July 30, 2014 (60) Contact: Funds Encumb. Date: 06/16/14

0.349 $211,558 ( 0.07% ) Phone: Contractor Award Date: 08/29/14CES-NEM-RTW LEE $54,091 ( 25.57% ) Fax: CEI Contract No.: C9A69

C/S 18 433370-1-62-01 Mario Dipola 63) 519-2396 Schedule Date-Prop. 05/29/15HSP Eunice Usher (239) 656-7852 Actual Date

N/A Ivan Sokolic (239) 656-7854 Shortlisted Name: Comments: JacobsSR 82 INTERSECTION IMPROVEMENT Consultant Address: Project Info: TWO 35

AT FOWLER STREET Funds Encumbered ($): $57,811.00June 17, 2015 (100) Contact: Funds Encumb. Date:

0.188 $383,633 ( 0.14% ) Phone: Contractor Award Date: N/ACES-AEB-MAD LEE $57,811 ( 15.07% ) Fax: CEI Contract No.: C9A69

C/S 19 433407-1-62-01 Justin R. Reck (863) 519-2502 Schedule Date-Prop. 05/29/15HSP Eunice Usher (239) 656-7852 Actual Date

N/A Ivan Sokolic (239) 656-7854 Shortlisted Name: Comments: JacobsSR 867 INTERSECTION IMPROVEMENT Consultant Address: Project Info: TWO 34

AT A & W BULB ROAD Funds Encumbered ($): $86,413.00June 17, 2015 (100) Contact: Funds Encumb. Date:

0.292 $716,805 ( 0.25% ) Phone: Contractor Award Date: N/ACES-AEB-JRR LEE $86,413 ( 12.06% ) Fax: CEI Contract No.: C9A69

C/S 23 429499-2-62-01 Justin R. Reck (863) 519-2502 Schedule Date-Prop. 11/16/14DS Albert Rosenstein (941) 359-7315 Actual Date 09/29/14

N/A Carl Harman (941) (941) 359-7366 Shortlisted Name: Comments: AlliedSR 70 SIDEWALK Consultant Address: Project Info: TWO 37

FROM 26TH AVE EAST TO 24TH AVE EAST Funds Encumbered ($): $69,726.86October 16, 2014 (90) Contact: Funds Encumb. Date: N/A

$229,418 ( 0.08% ) Phone: Contractor Award Date: N/ACES-AEB-JRR MANATEE $82,289 ( 35.87% ) Fax: CEI Contract No.: C9B65

GW 433370-1

FMOC - CONTINUING SERVICES (CS) CONTRACT #C9A69

GW 433407-1FMOC - CONTINUING SERVICES (CS) CONTRACT #C9A69

FMOC - CONTINUING SERVICES (CS) CONTRACT #C9A69

SOC - CONTINUING SERVICES (CS) CONTRACT #C9B65

S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2014-2015 CEI CAP 4.3.15 10 of 21 4/7/2015 - 1:15 PM

Seq. Financial Project ID/(Fund) Design Project Manager/Phone No./Fax No.No. WPI No.(Old)/SPN(Old) Resident Construction Office/Resident Engineer 1 2 3 4 5 6 7 8 9 10 11

Federal Project (WP21) Construction Project Manager/Phone No./Fax No. (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Project Name Type Project/English-Metric

Limit-From Number of Bridges/Alt. ContractLimit -To Letting Date (Mo-Year)/Construction Time (Days) Oral/ Scope

Dist.(Mi.)/Prop. X- Sect. Ph 52 Budget $ (% of CEI FY Total Ph 52) Scope Long Short Scope Written Consult. Proposal Clarif. Negot. Agree,County Work Type Ph 62 Budget $ (% of Ph 52) Due Advert List List Meeting Present. Select. Review Meeting Meeting Execution

Event

C/S 24 429504-1-62-01 Amy E. Blair (863) 519-2272 Schedule Date-Prop. 06/30/15HSP Albert Rosenstein (941) 359-7315 Actual Date

N/A Carl Harman (941) (941) 359-7366 Shortlisted Name: Comments: AlliedUS 41 / SR 45 TRAFFIC SIGNAL UPDATE Consultant Address: Project Info: TWO 45

AT BAYSHORE PKWY Funds Encumbered ($): $92,455.00June 17, 2015 (150) Contact: Funds Encumb. Date:

0.026 $332,892 ( 0.12% ) Phone: Contractor Award Date: N/ACES-NEM-AEB MANATEE $92,455 ( 27.77% ) Fax: CEI Contract No.: C9B65

C/S 25 429506-1-62-01 Amy E. Blair (863) 519-2272 Schedule Date-Prop. 06/30/15HSP Albert Rosenstein (941) 359-7315 Actual Date

N/A Carl Harman (941) (941) 359-7366 Shortlisted Name: Comments: AlliedUS 41 / SR 45 LIGHTING Consultant Address: Project Info: TWO 46

FROM 63RD AVE W Funds Encumbered ($): $92,455.00TO 53RD AVE W June 17, 2015 (150) Contact: Funds Encumb. Date:

1.247 $1,108,744 ( 0.39% ) Phone: Contractor Award Date: N/ACES-NEM-AEB MANATEE $92,455 ( 8.34% ) Fax: CEI Contract No.: C9B65

C/S 26 430861-1-62-01 Walter H. Breuggeman (863) 519-2451 Schedule Date-Prop. 02/28/15HSP Albert Rosenstein (941) 359-7315 Actual Date 12/18/14

N/A Carl Harman (941) (941) 359-7366 Shortlisted Name: Comments: AlliedSR 64 INTERSECTION IMPROVEMENT Consultant Address: Project Info: TWO 39

AT 66TH STREET COURT E Funds Encumbered ($): $69,727.00January 28, 2015 (90) Contact: Funds Encumb. Date: 12/16/14

0.086 $336,490 ( 0.12% ) Phone: Contractor Award Date: N/ACES-AEB-WHB MANATEE $69,727 ( 20.72% ) Fax: CEI Contract No.: C9B65

C/S 28 433369-1-62-01 Justin R. Reck (863) 519-2502 Schedule Date-Prop. 06/20/15HSP Albert Rosenstein (941) 359-7315 Actual Date 04/01/15

N/A Carl Harman (941) (941) 359-7366 Shortlisted Name: Comments: AlliedUS 301 INTERSECTION IMPROVEMENT Consultant Address: Project Info: TWO 41

AT 25TH DRIVE EAST Funds Encumbered ($): $92,336.00May 20, 2015 (100) Contact: Funds Encumb. Date: 04/01/15

0.149 $233,237 ( 0.08% ) Phone: Contractor Award Date: N/ACES-AEB-JRR MANATEE $92,336 ( 39.59% ) Fax: CEI Contract No.: C9B65

SOC - CONTINUING SERVICES (CS) CONTRACT #C9B65

SOC - CONTINUING SERVICES (CS) CONTRACT #C9B65

SOC - CONTINUING SERVICES (CS) CONTRACT #C9B65

GW 429506-1SOC - CONTINUING SERVICES (CS) CONTRACT #C9B65

GW 433372-1

GW 429504-1

S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2014-2015 CEI CAP 4.3.15 11 of 21 4/7/2015 - 1:15 PM

Seq. Financial Project ID/(Fund) Design Project Manager/Phone No./Fax No.No. WPI No.(Old)/SPN(Old) Resident Construction Office/Resident Engineer 1 2 3 4 5 6 7 8 9 10 11

Federal Project (WP21) Construction Project Manager/Phone No./Fax No. (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Project Name Type Project/English-Metric

Limit-From Number of Bridges/Alt. ContractLimit -To Letting Date (Mo-Year)/Construction Time (Days) Oral/ Scope

Dist.(Mi.)/Prop. X- Sect. Ph 52 Budget $ (% of CEI FY Total Ph 52) Scope Long Short Scope Written Consult. Proposal Clarif. Negot. Agree,County Work Type Ph 62 Budget $ (% of Ph 52) Due Advert List List Meeting Present. Select. Review Meeting Meeting Execution

Event

C/S 29 433372-1-62-01 Mario Dipola 63) 519-2396 Schedule Date-Prop. 06/20/15HSP Albert Rosenstein (941) 359-7315 Actual Date 04/01/15

N/A Carl Harman (941) (941) 359-7366 Shortlisted Name: Comments: AlliedSR 70 INTERSECTION IMPROVEMENT Consultant Address: Project Info: TWO 43

FROM 6TH STREET EAST Funds Encumbered ($): $92,336.00TO 9TH STREET EAST May 20, 2015 (100) Contact: Funds Encumb. Date: 03/23/15

0.217 $340,302 ( 0.12% ) Phone: Contractor Award Date: N/ACES-AEB-MAD MANATEE $92,336 ( 27.13% ) Fax: CEI Contract No.: C9B65

C/S 31 434809-1-62-01 Walter H. Breuggeman (863) 519-2451 Schedule Date-Prop. 04/25/15HSP Albert Rosenstein (941) 359-7315 Actual Date 02/19/15

N/A Carl Harman (941) (941) 359-7366 Shortlisted Name: Comments: AlliedSR 64 LIGHTING Consultant Address: Project Info: TWO 40

FROM 75TH STREET WEST Funds Encumbered: $130,228.00TO 59TH STREET WEST March 25, 2015 (100) Contact: Funds Encumb. Date: 02/13/15

1.134 $672,073 ( 0.24% ) Phone: Contractor Award Date: N/ACES-AEB-WHB MANATEE $151,182 ( 22.49% ) Fax: CEI Contract #: C9B65

C/S 33 435106-1-62-01 Benjamin B. Loeser (813) 975-7574 Schedule Date-Prop. 12/19/14BRRP Albert Rosenstein (941) 359-7315 Actual Date 10/03/14

SR 55 (US 41) Carl Harman (941) (941) 359-7366 Shortlisted Name: Comments: AlliedOVER SR 43 (US 301) BRIDGE REPAIR/REHABILITATION Consultant Address: Project Info: TWO 38

AT BRIDGE 130002 Funds Encumbered: $256,566.00SARASOTA OPERATIONS CENTER November 20, 2014 (200) Contact: Funds Encumb. Date: 10/01/14

190550 $3,493,285 ( 1.24% ) Phone: Contractor Award Date: N/ACES-MTH-BBL MANATEE $256,566 ( 7.34% ) Fax: CEI Contract #: C9B65

C/S 34 432754-1-62-01 Nicolas A. Leon (863) 519-2376 Schedule Date-Prop. 06/20/15DDR Albert Rosenstein (941) 359-7315 Actual Date 04/06/15

N/A Carl Harman (941) (941) 359-7366 Shortlisted Name: Comments: AlliedUS 41 FROM SIDEWALK Consultant Address: Project Info: TWO 44

VENETIAN DRIVE Funds Encumbered ($): $58,423.00TO PALM DRIVE May 20, 2015 (80) Contact: Funds Encumb. Date: 04/03/15

0.264 $293,346 ( 0.10% ) Phone: Contractor Award Date: N/ACES-RLM-NAL SARASOTA $58,423 ( 19.92% ) Fax: CEI Contract No.: C9B65

SOC - CONTINUING SERVICES (CS) CONTRACT #C9B65

SOC - CONTINUING SERVICES (CS) CONTRACT #C9B65

SOC - CONTINUING SERVICES (CS) CONTRACT #C9B65

SOC - CONTINUING SERVICES (CS) CONTRACT #C9B65GW 433369-1

S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2014-2015 CEI CAP 4.3.15 12 of 21 4/7/2015 - 1:15 PM

Seq. Financial Project ID/(Fund) Design Project Manager/Phone No./Fax No.No. WPI No.(Old)/SPN(Old) Resident Construction Office/Resident Engineer 1 2 3 4 5 6 7 8 9 10 11

Federal Project (WP21) Construction Project Manager/Phone No./Fax No. (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Project Name Type Project/English-Metric

Limit-From Number of Bridges/Alt. ContractLimit -To Letting Date (Mo-Year)/Construction Time (Days) Oral/ Scope

Dist.(Mi.)/Prop. X- Sect. Ph 52 Budget $ (% of CEI FY Total Ph 52) Scope Long Short Scope Written Consult. Proposal Clarif. Negot. Agree,County Work Type Ph 62 Budget $ (% of Ph 52) Due Advert List List Meeting Present. Select. Review Meeting Meeting Execution

Event

C/S 35 433373-1-62-01 Mario Dipola 63) 519-2396 Schedule Date-Prop. 06/20/15HSP Albert Rosenstein (941) 359-7315 Actual Date 04/01/15

N/A Carl Harman (941) (941) 359-7366 Shortlisted Name: Comments: AlliedSR 72 INTERSECTION IMPROVEMENT Consultant Address: Project Info: TWO 42

AT MYAKKA VALLEY TRAIL Funds Encumbered ($): $69,727.00May 20, 2015 (100) Contact: Funds Encumb. Date: 03/23/15

1 $403,567 ( 0.14% ) Phone: Contractor Award Date: N/ACES-AEB-MAD SARASOTA $69,727 ( 17.28% ) Fax: CEI Contract No.: C9B65

C/S 38 429843-1-62-01 Justin R. Reck (863) 519-2502 Schedule Date-Prop. 11/16/14CIGP Albert Rosenstein (941) 359-7315 Actual Date 09/30/14

N/A Carl Harman (941) (941) 359-7366 Shortlisted Name: Comments: ALLIEDSR 70 ADD LEFT TURN LANE(S) Consultant Address: Project Info: TWO 36

AT CR 760 Funds Encumbered ($): $62,425.00October 16, 2014 (90) Contact: Funds Encumb. Date: 09/30/14

0.348 $538,139 ( 0.19% ) Phone: Contractor Award Date: N/ACES-AEB-JRR DESOTO $62,425 ( 11.60% ) Fax: CEI Contract No.: C9B65

C/S 42 428117-1-62-01 Ryan Weeks (863) 519-2379 Schedule Date-Prop. 06/20/15SU Jennifer Perry (863) 519-4101 Actual Date 03/23/15

N/A Doug McClintock (863) 519-4326 Shortlisted Name: Comments: RK&KUPPER PEACE LEGACY BIKE PATH/TRAIL Consultant Address: Project Info: TWO 22

TRAIL FROM FORT FRASER Funds Encumbered ($): $152,197.00TRAIL TO SR 540 May 20, 2015 (150) Contact: Funds Encumb. Date: 03/23/15

0 $2,276,842 ( 0.81% ) Phone: Contractor Award Date: N/ACES-AEB-RTW POLK $152,197 ( 6.68% ) Fax: CEI Contract No.: C9E98

C/S 43 428252-1-62-01 Mario Dipola 63) 519-2396 Schedule Date-Prop. 09/26/14ACTU Jennifer Perry (863) 519-4101 Actual Date 07/23/14

N/A Doug McClintock (863) 519-4326 Shortlisted Name: Comments: RK&KLK ALFRED ELEMENTARY SIDEWALK Consultant Address: Project Info: TWO 6

SIDEWALK Funds Encumbered ($): $37,421.00SAFE ROUTES TO SCHOOL August 27, 2014 (100) Contact: Funds Encumb. Date: 07/22/14

0.276 $106,260 ( 0.04% ) Phone: Contractor Award Date: 09/26/14CES-AEB-MAD POLK $37,421 ( 35.22% ) Fax: CEI Contract No.: C9E98

BOC - CONTINUING SERVICES (CS) CONTRACT #C9E98

SOC - CONTINUING SERVICES (CS) CONTRACT #C9B65

SOC - CONTINUING SERVICES (CS) CONTRACT #C9B65

BOC - CONTINUING SERVICES (CS) CONTRACT #C9E98

S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2014-2015 CEI CAP 4.3.15 13 of 21 4/7/2015 - 1:15 PM

Seq. Financial Project ID/(Fund) Design Project Manager/Phone No./Fax No.No. WPI No.(Old)/SPN(Old) Resident Construction Office/Resident Engineer 1 2 3 4 5 6 7 8 9 10 11

Federal Project (WP21) Construction Project Manager/Phone No./Fax No. (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Project Name Type Project/English-Metric

Limit-From Number of Bridges/Alt. ContractLimit -To Letting Date (Mo-Year)/Construction Time (Days) Oral/ Scope

Dist.(Mi.)/Prop. X- Sect. Ph 52 Budget $ (% of CEI FY Total Ph 52) Scope Long Short Scope Written Consult. Proposal Clarif. Negot. Agree,County Work Type Ph 62 Budget $ (% of Ph 52) Due Advert List List Meeting Present. Select. Review Meeting Meeting Execution

Event

C/S 44 429106-1-62-01 Kellie F. Spurgeon (863) 519-2654 Schedule Date-Prop. 04/25/15SA Jennifer Perry (863) 519-4101 Actual Date 02/09/15

N/A Doug McClintock (863) 519-4326 Shortlisted Name: Comments: RK&KSR 539 RESURFACING Consultant Address: Project Info: TWO 19

FROM PEAR STREET Funds Encumbered ($): $222,304.00TO ELLIOT STREET March 25, 2015 (150) Contact: Funds Encumb. Date: 02/05/15

1.756 $2,560,715 ( 0.91% ) Phone: Contractor Award Date: N/ACES-MMG-KFS POLK $222,304 ( 8.68% ) Fax: CEI Contract No.: C9E98

C/S 47 429834-1-62-01 Janet Middleton (863) 519-2309 Schedule Date-Prop. 09/26/14TALT Jennifer Perry (863) 519-4101 Actual Date 07/24/14

N/A Doug McClintock (863) 519-4326 Shortlisted Name: Comments: RK&KSIXTH STREET S SIDEWALK Consultant Address: Project Info: TWO 8

FROM HINSON AVE Funds Encumbered ($): $142,915.00TO WOOD AVE August 27, 2014 (185) Contact: Funds Encumb. Date: 07/22/14

0.001 $1,499,987 ( 0.53% ) Phone: Contractor Award Date: 09/26/14CES-AEB-JWM POLK $142,915 ( 9.53% ) Fax: CEI Contract No.: C9E98

C/S 49 430915-1-62-01 Walter H. Breuggeman (863) 519-2451 Schedule Date-Prop. 04/25/15TALU Jennifer Perry (863) 519-4101 Actual Date 02/09/15

N/A Doug McClintock (863) 519-4326 Shortlisted Name: Comments: RK&KPOLK AVENUE SIDEWALK Consultant Address: Project Info: TWO 21

ELEMENTARY SRTS SAFETY Funds Encumbered ($): $28,007.00SIDEWALKS March 25, 2015 (60) Contact: Funds Encumb. Date: 02/05/15

0.173 $146,792 ( 0.05% ) Phone: Contractor Award Date: N/ACES-AEB-WHB POLK $28,007 ( 19.08% ) Fax: CEI Contract No.: C9E98

C/S 50 430925-1-62-01 Mario Dipola 63) 519-2396 Schedule Date-Prop. 09/26/14ACTU Jennifer Perry (863) 519-4101 Actual Date 07/24/14

N/A Doug McClintock (863) 519-4326 Shortlisted Name: Comments: RK&KLAKE ALFRED SIDEWALK Consultant Address: Project Info: TWO 9

ELEMENTARY SRTS SAFETY Funds Encumbered ($): $32,507.00SIDEWALKS August 27, 2014 (100) Contact: Funds Encumb. Date: 07/22/14

0.604 $61,082 ( 0.02% ) Phone: Contractor Award Date: 09/26/14CES-AEB-MAD POLK $32,507 ( 53.22% ) Fax: CEI Contract No.: C9E98

BOC - CONTINUING SERVICES (CS) CONTRACT #C9E98

GW 428252-1

GW 433562-1BOC - CONTINUING SERVICES (CS) CONTRACT #C9E98

BOC - CONTINUING SERVICES (CS) CONTRACT #C9E98

BOC - CONTINUING SERVICES (CS) CONTRACT #C9E98

S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2014-2015 CEI CAP 4.3.15 14 of 21 4/7/2015 - 1:15 PM

Seq. Financial Project ID/(Fund) Design Project Manager/Phone No./Fax No.No. WPI No.(Old)/SPN(Old) Resident Construction Office/Resident Engineer 1 2 3 4 5 6 7 8 9 10 11

Federal Project (WP21) Construction Project Manager/Phone No./Fax No. (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Project Name Type Project/English-Metric

Limit-From Number of Bridges/Alt. ContractLimit -To Letting Date (Mo-Year)/Construction Time (Days) Oral/ Scope

Dist.(Mi.)/Prop. X- Sect. Ph 52 Budget $ (% of CEI FY Total Ph 52) Scope Long Short Scope Written Consult. Proposal Clarif. Negot. Agree,County Work Type Ph 62 Budget $ (% of Ph 52) Due Advert List List Meeting Present. Select. Review Meeting Meeting Execution

Event

C/S 54 433374-1-62-01 Justin R. Reck (863) 519-2502 Schedule Date-Prop. 6/20/215HSP Jennifer Perry (863) 519-4101 Actual Date 04/06/15

N/A Doug McClintock (863) 519-4326 Shortlisted Name: Comments: RK&KSR 37 LIGHTING Consultant Address: Project Info: TWO 23

AT CR 640 Funds Encumbered ($): $62,912.00May 20, 2015 (140) Contact: Funds Encumb. Date: 04/06/15

0.3 $258,709 ( 0.09% ) Phone: Contractor Award Date: N/ACES-AEB-JRR POLK $62,912 ( 24.32% ) Fax: CEI Contract No.: C9E98

C/S 55 433375-1-62-01 Mario Dipola 63) 519-2396 Schedule Date-Prop. 06/30/15HSP Jennifer Perry (863) 519-4101 Actual Date

N/A Doug McClintock (863) 519-4326 Shortlisted Name: Comments: RK&KUS 17 (SR 35) LIGHTING Consultant Address: Project Info: TWO 28

FROM S OF 9TH ST SE Funds Encumbered ($):TO N OF 9TH ST NE June 17, 2015 (150) Contact: Funds Encumb. Date:

1.6 $740,015 ( 0.26% ) Phone: Contractor Award Date: N/ACES-AEB-MAD POLK $97,651 ( 13.20% ) Fax: CEI Contract No.: C9E98

C/S 56 433376-1-62-01 Amy E. Blair (863) 519-2272 Schedule Date-Prop. 06/20/15HSP Jennifer Perry (863) 519-4101 Actual Date

N/A Doug McClintock (863) 519-4326 Shortlisted Name: Comments: RK&KUS 98 LIGHTING Consultant Address: Project Info: TWO 24

FROM US 17 Funds Encumbered ($): $65,894.00TO PEACE RIVER BRIDGE May 20, 2015 (140) Contact: Funds Encumb. Date:

1.476 $555,902 ( 0.20% ) Phone: Contractor Award Date: N/ACES-NEM-AEB POLK $65,894 ( 11.85% ) Fax: CEI Contract No.: C9E98

C/S 57 433379-1-62-01 Walter H. Breuggeman (863) 519-2451 Schedule Date-Prop. 04/25/15HSP Jennifer Perry (863) 519-4101 Actual Date 02/09/15

N/A Doug McClintock (863) 519-4326 Shortlisted Name: Comments: RK&KSR 17 ROUNDABOUT Consultant Address: Project Info: TWO 20

AT HUNT BROTHERS ROAD Funds Encumbered ($): $145,571.00March 25, 2015 (150) Contact: Funds Encumb. Date: 02/06/15

0.189 $1,311,918 ( 0.46% ) Phone: Contractor Award Date: N/ACES-AEB-WHB POLK $145,571 ( 11.10% ) Fax: CEI Contract No.: C9E98

GW 433376-1BOC - CONTINUING SERVICES (CS) CONTRACT #C9E98

GW 433374-1

BOC - CONTINUING SERVICES (CS) CONTRACT #C9E98

BOC - CONTINUING SERVICES (CS) CONTRACT #C9E98

BOC - CONTINUING SERVICES (CS) CONTRACT #C9E98

S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2014-2015 CEI CAP 4.3.15 15 of 21 4/7/2015 - 1:15 PM

Seq. Financial Project ID/(Fund) Design Project Manager/Phone No./Fax No.No. WPI No.(Old)/SPN(Old) Resident Construction Office/Resident Engineer 1 2 3 4 5 6 7 8 9 10 11

Federal Project (WP21) Construction Project Manager/Phone No./Fax No. (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Project Name Type Project/English-Metric

Limit-From Number of Bridges/Alt. ContractLimit -To Letting Date (Mo-Year)/Construction Time (Days) Oral/ Scope

Dist.(Mi.)/Prop. X- Sect. Ph 52 Budget $ (% of CEI FY Total Ph 52) Scope Long Short Scope Written Consult. Proposal Clarif. Negot. Agree,County Work Type Ph 62 Budget $ (% of Ph 52) Due Advert List List Meeting Present. Select. Review Meeting Meeting Execution

Event

C/S 58 433396-1-62-01 Amy E. Blair (863) 519-2272 Schedule Date-Prop. 05/29/15HSP Jennifer Perry (863) 519-4101 Actual Date

N/A Doug McClintock (863) 519-4326 Shortlisted Name: Comments: RK&KSR 33 ROUNDABOUT Consultant Address: Project Info: TWO 25

AT DEEN STILL ROAD Funds Encumbered ($): $240,294.00April 29, 2015 (250) Contact: Funds Encumb. Date:

0.285 $3,082,015 ( 1.09% ) Phone: Contractor Award Date: N/ACES-NEM-AEB POLK $240,294 ( 7.80% ) Fax: CEI Contract No.: C9E98

C/S 59 433408-1-62-01 Amy E. Blair (863) 519-2272 Schedule Date-Prop. 06/30/15HSP Jennifer Perry (863) 519-4101 Actual Date

N/A Doug McClintock (863) 519-4326 Shortlisted Name: Comments: RK&KSR 659 INTERSECTION IMPROVEMENT Consultant Address: Project Info: TWO 26

FROM E MAIN STREET Funds Encumbered ($): $180,046.00TO NORTH OF US 92 June 17, 2015 (150) Contact: Funds Encumb. Date:

0.609 $1,312,918 ( 0.46% ) Phone: Contractor Award Date: N/ACES-NEM-AEB POLK $180,046 ( 13.71% ) Fax: CEI Contract No.: C9E98

C/S 60 433411-1-62-01 Walter H. Breuggeman (863) 519-2451 Schedule Date-Prop. 01/03/15HSP Jennifer Perry (863) 519-4101 Actual Date 10/27/14

N/A Doug McClintock (863) 519-4326 Shortlisted Name: Comments: RK&KSR 540 PEDESTRIAN SAFETY IMPROVEMENT Consultant Address: Project Info: TWO 12

FROM 2ND ST SW Funds Encumbered ($): $107,266.00TO 10TH ST SE December 3, 2014 (110) Contact: Funds Encumb. Date: 10/23/14

1.091 $249,223 ( 0.09% ) Phone: Contractor Award Date: N/ACES-AEB-WHB POLK $107,266 ( 43.04% ) Fax: CEI Contract No.: C9E98

C/S 61 433561-1-62-01 Ryan Weeks (863) 519-2379 Schedule Date-Prop. 03/24/15ACSU Jennifer Perry (863) 519-4101 Actual Date 01/13/15

N/A Doug McClintock (863) 519-4326 Shortlisted Name: Comments: RK&KPEACE RIVER TRAIL BIKE PATH/TRAIL Consultant Address: Project Info: TWO 18

FROM MOUNT PISGAH ROAD Funds Encumbered ($): $125,967.00TO US 98 February 25, 2015 (115) Contact: Funds Encumb. Date: 01/12/15

0 $737,000 ( 0.26% ) Phone: Contractor Award Date: N/ACES-NEM-RTW POLK $125,967 ( 17.09% ) Fax: CEI Contract No.: C9E98

GW 434958-1

BOC - CONTINUING SERVICES (CS) CONTRACT #C9E98

BOC - CONTINUING SERVICES (CS) CONTRACT #C9E98

BOC - CONTINUING SERVICES (CS) CONTRACT #C9E98

BOC - CONTINUING SERVICES (CS) CONTRACT #C9E98

S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2014-2015 CEI CAP 4.3.15 16 of 21 4/7/2015 - 1:15 PM

Seq. Financial Project ID/(Fund) Design Project Manager/Phone No./Fax No.No. WPI No.(Old)/SPN(Old) Resident Construction Office/Resident Engineer 1 2 3 4 5 6 7 8 9 10 11

Federal Project (WP21) Construction Project Manager/Phone No./Fax No. (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Project Name Type Project/English-Metric

Limit-From Number of Bridges/Alt. ContractLimit -To Letting Date (Mo-Year)/Construction Time (Days) Oral/ Scope

Dist.(Mi.)/Prop. X- Sect. Ph 52 Budget $ (% of CEI FY Total Ph 52) Scope Long Short Scope Written Consult. Proposal Clarif. Negot. Agree,County Work Type Ph 62 Budget $ (% of Ph 52) Due Advert List List Meeting Present. Select. Review Meeting Meeting Execution

Event

C/S 62 433658-1-62-01 Ryan Weeks (863) 519-2379 Schedule Date-Prop. 06/30/15ACSU Jennifer Perry (863) 519-4101 Actual Date

Doug McClintock (863) 519-4326 Shortlisted Name: Comments: RK&KFORT FRASER TRAIL WIDEN BIKE/PEDESTRIAN BRIDGE Consultant Address: Project Info: TWO 27

AT BANANA CREEK BRIDGE Funds Encumbered: June 17, 2015 (145) Contact: Funds Encumb. Date:

.013 $477,179 ( 0.17% ) Phone: Contractor Award Date: N/ACES-NEM-RTW POLK $162,674 ( 34.09% ) Fax: CEI Contract #: C9E98

C/S 65 428145-1-62-01 Ryan Weeks (863) 519-2379 Schedule Date-Prop. 06/30/15TALL Erik Padron (863) 386-6112 Actual Date

N/A Susan Hindman (863) 386-6112 Shortlisted Name: Comments: RK&KVANCE WHIDDEN PARK BIKE PATH/TRAIL Consultant Address: Project Info: TWO 57

Funds Encumbered ($): $55,202.00June 16, 2015 (80) Contact: Funds Encumb. Date:

0 $598,319 ( 0.21% ) Phone: Contractor Award Date: N/ACES-AEB-RTW GLADES $55,202 ( 9.23% ) Fax: CEI Contract No.: C9970

C/S 67 435769-1-62-01 Chris M. Zeigler (863) 519-2253 Schedule Date-Prop. 05/29/15DS Erik Padron (863) 386-6112 Actual Date 03/26/15

N/A Susan Hindman (863) 386-6112 Shortlisted Name: Comments: RK&KSR 25 (US 27) AT BRONSON ROAD INTERSECTION IMPROVEMENT Consultant Address: Project Info: TWO 56

Funds Encumbered ($): $55,513.00April 29, 2015 (80) Contact: Funds Encumb. Date: 03/09/15

0 $721,911 ( 0.26% ) Phone: Contractor Award Date: N/ACES-AEB-CMZ GLADES $69,471 ( 9.62% ) Fax: CEI Contract No.: C9970

C/S 69 430917-1-62-01 Mario Dipola 63) 519-2396 Schedule Date-Prop. 10/23/14ACTN Erik Padron (863) 386-6112 Actual Date 08/20/14

N/A Susan Hindman (863) 386-6112 Shortlisted Name: Comments: RK&KLAKE PLACID SIDEWALK Consultant Address: Project Info: TWO 53

ELEMENTARY SRTS SAFETY Funds Encumbered ($): $36,119.00SIDEWALKS September 24, 2014 (60) Contact: Funds Encumb. Date: 08/18/14

0.2 $52,640 ( 0.02% ) Phone: Contractor Award Date: N/ACES-AEB-MAD HIGHLANDS $38,432 ( 73.01% ) Fax: CEI Contract No.: C9970

BOC - CONTINUING SERVICES (CS) CONTRACT #C9970

BOC - CONTINUING SERVICES (CS) CONTRACT #C9970

BOC - CONTINUING SERVICES (CS) CONTRACT #C9970

BOC - CONTINUING SERVICES (CS) CONTRACT #C9E98

S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2014-2015 CEI CAP 4.3.15 17 of 21 4/7/2015 - 1:15 PM

Seq. Financial Project ID/(Fund) Design Project Manager/Phone No./Fax No.No. WPI No.(Old)/SPN(Old) Resident Construction Office/Resident Engineer 1 2 3 4 5 6 7 8 9 10 11

Federal Project (WP21) Construction Project Manager/Phone No./Fax No. (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Project Name Type Project/English-Metric

Limit-From Number of Bridges/Alt. ContractLimit -To Letting Date (Mo-Year)/Construction Time (Days) Oral/ Scope

Dist.(Mi.)/Prop. X- Sect. Ph 52 Budget $ (% of CEI FY Total Ph 52) Scope Long Short Scope Written Consult. Proposal Clarif. Negot. Agree,County Work Type Ph 62 Budget $ (% of Ph 52) Due Advert List List Meeting Present. Select. Review Meeting Meeting Execution

Event

C/S 70 435269-1-62-01 Benjamin B. Loeser (813) 975-7574 Schedule Date-Prop. 05/16/15DS Erik Padron (863) 386-6112 Actual Date 03/26/15

N/A Susan Hindman (863) 386-6112 Shortlisted Name: Comments: RK&KCHANNEL IMPROVEMENTS Channel Improvements- Dredging Consultant Address: Project Info: TWO 55

SR 25 (US 27) Funds Encumbered: $94,412.00OVER LAKE JACKSON April 16, 2015 (70) Contact: Funds Encumb. Date: 03/17/15

0.016 $306,551 ( 0.11% ) Phone: Contractor Award Date: N/ACES-MTH-BBL HIGHLANDS $94,412 ( 30.80% ) Fax: CEI Contract #: C9970

C/S 71 431605-1-62-01 Chris M. Zeigler (863) 519-2253 Schedule Date-Prop. 09/20/14GRSC Erik Padron (863) 386-6112 Actual Date 07/28/14

N/A Susan Hindman (863) 386-6112 Shortlisted Name: Comments: RK&KCR 68 EAST -NE 224TH RESURFACING Consultant Address: Project Info: TWO 10

ST FROM US 441 Funds Encumbered ($): $180,327.00TO ST LUCIE C/L August 29, 2014 (150) Contact: Funds Encumb. Date: 07/24/14

8.068 $3,444,754 ( 1.22% ) Phone: Contractor Award Date: 09/20/14CES-AEB-CMZ OKEECHOBEE $237,046 ( 6.88% ) Fax: CEI Contract No.: C9E98

LOA 198285-1-62-05 Jon M. Sands (863) 519-2223 Schedule Date-Prop. 01/21/14 02/10/14 03/14/14 04/03/14 N/A N/A 05/28/14 N/A N/A N/A 07/31/14DS E. Jan Thompson (863) 519-2256 Actual Date 01/24/14 02/10/14 03/14/14 04/03/14 N/A N/A 05/28/14 N/A N/A N/A 07/28/14

N/A Kelly Kautz (863) 519-2232 Shortlisted Name: AIM Engineering & SurveyingCivilSurv, Inc. DRMP, Inc. McKim & Creed, Inc. Comments: ELOR KC-SH-WJCONSTRUCTION CEI INSPECT CONSTRUCTION PROJS. Consultant Address: 195 South Orange Ave, Suite2525 Drane Field Road, Su1125 Bartow Road, Suite 15701 Division Drive, Auit Project Info: McKim and Creed

SURVEY SUPPORT Bartow, FL 33830 Lakeland, FL 33811 Lakeland, FL 33801 Fort Myers, FL 33905 Funds Encumbered ($): $350,000.00Contact: Wayne Carter, PSM Kristi H. Breed Allen L. Quickel Thomas Halstead, PSM Funds Encumb. Date: 07/21/14

$ 350,000 ( 0.00% ) Phone: 239-872-2633 863-646-4771 863-686-7100 239-275-8875 Contractor Award Date: N/AREP DIST/ST-WIDE $350,000 ( ) Email: [email protected] [email protected] [email protected] thalstead@mckimcreeCEI Contract No.: C9G12

LOA 409988-1-62-03 Jon Sands (863) 519-2223 Schedule Date-Prop. 07/01/14DS Brian Penny (863) 519-2228 Actual Date 07/15/14

N/A Paul Harkins (863) 519-2226 Shortlisted Name: Comments: JacobsCEI GENERAL CONSULT INSPECT CONSTRUCTION PROJS. Consultant Address: Project Info: LOA #8

FOR CONSTRUCTION CEI Funds Encumbered ($): $2,000,000.00SUPPORT Contact: Funds Encumb. Date: 07/01/14

$ 2,916,574 ( 0.00% ) Phone: Contractor Award Date: N/AREP-JMS DIST/ST-WIDE ( ) Fax: CEI Contract No.: C9242

BOC - CONTINUING SERVICES (CS) CONTRACT #C9970GW 435028-1,

435028-2

- CONTINUING SERVICES (CS) CONTRACT #C9242(Paul)

BOC - CONTINUING SERVICES (CS) CONTRACT #C9E98

S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2014-2015 CEI CAP 4.3.15 18 of 21 4/7/2015 - 1:15 PM

Seq. Financial Project ID/(Fund) Design Project Manager/Phone No./Fax No.No. WPI No.(Old)/SPN(Old) Resident Construction Office/Resident Engineer 1 2 3 4 5 6 7 8 9 10 11

Federal Project (WP21) Construction Project Manager/Phone No./Fax No. (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Project Name Type Project/English-Metric

Limit-From Number of Bridges/Alt. ContractLimit -To Letting Date (Mo-Year)/Construction Time (Days) Oral/ Scope

Dist.(Mi.)/Prop. X- Sect. Ph 52 Budget $ (% of CEI FY Total Ph 52) Scope Long Short Scope Written Consult. Proposal Clarif. Negot. Agree,County Work Type Ph 62 Budget $ (% of Ph 52) Due Advert List List Meeting Present. Select. Review Meeting Meeting Execution

Event

LOA 409988-3-62-03 Jon Sands (863) 519-2223 Schedule Date-Prop. 07/01/14DS Brian Penny (863) 519-2228 Actual Date

N/A Paul Harkins (863) 519-2226 Shortlisted Name: Comments: JacobsCEI GENERAL CONSUL INSPECT CONSTRUCTION PROJS. Consultant Address: Project Info:

CONSTRUCTION OPERATING Funds Encumbered ($): $150,000.00BUDGET Contact: Funds Encumb. Date:

$ 150,000 ( 0.00% ) Phone: Contractor Award Date: EJG-JMS DIST/ST-WIDE ( ) Fax: CEI Contract No.: C9242

LOA 410028-1-62-03 Jon Sands (863) 519-2223 Schedule Date-Prop. 07/01/14DS Brian Penny (863) 519-2228 Actual Date 07/15/14

N/A Paul Harkins (863) 519-2226 Shortlisted Name: Comments: MetricCONSTRUCTION CEI INSPECT CONSTRUCTION PROJS. Consultant Address: Project Info: LOA #3

SUPPORT FOR PLAN AND Funds Encumbered ($): $300,000.00CLAIM REVIEW #2 Contact: Funds Encumb. Date: 07/01/14

$ 300,000 ( 0.00% ) Phone: Contractor Award Date: N/AREP-JMS- DIST/ST-WIDE ( ) Fax: CEI Contract No.: C9316

LOA 433183-1-62-02 E. Jan Thompson (863) 519-2256 Schedule Date-Prop. 07/01/14DS Jennifer Perry (863) 519-4101 Actual Date 07/24/14

N/A Doug McClintock (863) 519-4326 Shortlisted Name: Comments: RK&KCEI CONTINUING INSPECT CONSTRUCTION PROJS. Consultant Address: Project Info: LOA #1

SERVICES (INSPECTION) Funds Encumbered: $1,001,492.00BARTOW OPERATIONS CENTER Contact: Funds Encumb. Date: 7/1/2014

$ 1,499,492 ( 0.00% ) Phone: Contractor Award Date: N/AREP-TMM-EJT DIST/ST-WIDE ( ) Fax: CEI Contract #: C9E98

LOA 433183-2-62-01 E. Jan Thompson (863) 519-2256 Schedule Date-Prop. 07/01/14DS Albert Rosenstein (941) 359-7315 Actual Date 07/15/14

N/A Carl Harman (941) 359-7366 Shortlisted Name: Comments: AlliedCEI CONTINUNING INSPECT CONSTRUCTION PROJS. Consultant Address: Project Info: LOA #2

SERVICES (INSPECTION) Funds Encumbered ($): $1,235,977.00SARASOTA OPERATIONS CTR Contact: Funds Encumb. Date: 07/01/14

$ 1,235,977 ( 0.00% ) Phone: Contractor Award Date: N/AREP-TMM-EJT DIST/ST-WIDE ( ) Fax: CEI Contract No.: C9B65

SOC - CONTINUING SERVICES (CS) CONTRACT #C9B65

- CONTINUING SERVICES (CS) CONTRACT #C9316

BOC - CONTINUING SERVICES (CS) CONTRACT BOC C/S #C9E98

- CONTINUING SERVICES (CS) CONTRACT #C9242(Paul)

(Paul)

S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2014-2015 CEI CAP 4.3.15 19 of 21 4/7/2015 - 1:15 PM

Seq. Financial Project ID/(Fund) Design Project Manager/Phone No./Fax No.No. WPI No.(Old)/SPN(Old) Resident Construction Office/Resident Engineer 1 2 3 4 5 6 7 8 9 10 11

Federal Project (WP21) Construction Project Manager/Phone No./Fax No. (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Project Name Type Project/English-Metric

Limit-From Number of Bridges/Alt. ContractLimit -To Letting Date (Mo-Year)/Construction Time (Days) Oral/ Scope

Dist.(Mi.)/Prop. X- Sect. Ph 52 Budget $ (% of CEI FY Total Ph 52) Scope Long Short Scope Written Consult. Proposal Clarif. Negot. Agree,County Work Type Ph 62 Budget $ (% of Ph 52) Due Advert List List Meeting Present. Select. Review Meeting Meeting Execution

Event

LOA 433183-3-62-01 E. Jan Thompson (863) 519-2256 Schedule Date-Prop. 07/01/14DS Eunice Usher (239) 656-7852 Actual Date 07/16/14

N/A Leighton Elliott (239) 656-7800 Shortlisted Name: Comments: JacobsCEI CONTINUING INSPECT CONSTRUCTION PROJS. Consultant Address: Project Info: LOA #2

SERVICES (INSPECTION) Funds Encumbered ($): $833,589.00FORT MYERS OP CTR Contact: Funds Encumb. Date: 07/01/14

$ 971,995 ( 0.00% ) Phone: Contractor Award Date: N/AREP-TMM-EJT DIST/ST-WIDE ( ) Fax: CEI Contract No.: C9A69

LOA 434442-1-62-01 Jon Sands (863) 519-2223 Schedule Date-Prop. 07/01/14DS Brian Penny (863) 519-2228 Actual Date 07/29/14

N/A Jackie Brown (863) 519-2757 Shortlisted Name: Comments: Genesis CE&ICONTINUING SERVICES INSPECT CONSTRUCTION PROJS. Consultant Address: Project Info: LOA #3

RESIDENT COMPLIANCE Funds Encumbered: $806,281.00SPECIALIST (RCS) Contact: Funds Encumb. Date: 07/25/14

$ 786,655 ( 0.00% ) Phone: Contractor Award Date: N/ACN106JB DIST/ST-WIDE ( ) Fax: CEI Contract #: C9B43

DW 433412-1-62-01 Kati Sherrard (863) 519-2990 Schedule Date-Prop. 12/31/14HSP Nikesh Patel (941) 465-0411 Actual Date 12/12/14

John "Joe" Freeman (863) 519-2345 Shortlisted Name: Comments: TWO / TWO Safety Design Build Push Button Contract District Wide Consultant Address: Project Info: CSS/Inspector

Funds Encumbered: $257,500.00May 26, 2015 Contact: Funds Encumb. Date: 12/12/14

$657,925 ( 0.23% ) Phone: Contractor Award Date: Pending FEB 2015REP-WRJ-KCS DIST/ST-WIDE $257,500 ( 39.14% ) Fax: CEI Contract #: C9045/C9116

DW 433416-1-62-01 David Gilley (863) 519-2384 Schedule Date-Prop. 12/31/14HSP Nik Patel (941) 359-7367 Actual Date 23/12/2014

John "Joe" Freeman (863) 519-2345 Shortlisted Name: Comments: TWO / TWOSafety Design Build Push Button Contract District Wide Consultant Address: Project Info: CSS/Inspector

Funds Encumbered: $154,500.00May 26, 2015 Contact: Funds Encumb. Date: 12/12/14

$386,250 ( 0.14% ) Phone: Contractor Award Date: Pending FEB 2015REP-GPA-DDG DIST/ST-WIDE $154,500 ( 40.00% ) Fax: CEI Contract #: C9045/C9116

DISTRICT CONSTRUCTION - CONTINUING SERVICES (RCS, CS) CONTRACT #C9B43

FMOC - CONTINUING SERVICES (CS) CONTRACT #C9A69

GW 433412-1, 433415-1, 427321-7, 427399-7

GW 433415-1, 433416-1, 427321-7, 427399-7

District Wide (DW) CONTRACT #C9045/C9116

District Wide (DW) CONTRACT #C9045/C9116

S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2014-2015 CEI CAP 4.3.15 20 of 21 4/7/2015 - 1:15 PM

Seq. Financial Project ID/(Fund) Design Project Manager/Phone No./Fax No.No. WPI No.(Old)/SPN(Old) Resident Construction Office/Resident Engineer 1 2 3 4 5 6 7 8 9 10 11

Federal Project (WP21) Construction Project Manager/Phone No./Fax No. (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Project Name Type Project/English-Metric

Limit-From Number of Bridges/Alt. ContractLimit -To Letting Date (Mo-Year)/Construction Time (Days) Oral/ Scope

Dist.(Mi.)/Prop. X- Sect. Ph 52 Budget $ (% of CEI FY Total Ph 52) Scope Long Short Scope Written Consult. Proposal Clarif. Negot. Agree,County Work Type Ph 62 Budget $ (% of Ph 52) Due Advert List List Meeting Present. Select. Review Meeting Meeting Execution

Event

CEI FY 14/15 Total Phase 52 $282,607,409.00 ( 100.00% )CEI FY 14/15 Total Phase 62 $31,124,734.00 ( 11.01% )

S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2014-2015 CEI CAP 4.3.15 21 of 21 4/7/2015 - 1:15 PM