Community Economic Development Association of Cook County LIHEAP FURNACE PROGRAM ® Construction Task Catalog Specification #: IFB01222014 February 2014

Upload: others

Post on 26-Apr-2020

15 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Construction Task Catalog · 1. The tasks in this Construction Task Catalog are organized using CSI’s MasterFormat. The Unit Prices Include: LABOR COSTS: 1. Labor costs include

Community Economic Development Association of Cook County

LIHEAP FURNACE PROGRAM

®Construction Task CatalogSpecification #: IFB01222014

February 2014

Page 2: Construction Task Catalog · 1. The tasks in this Construction Task Catalog are organized using CSI’s MasterFormat. The Unit Prices Include: LABOR COSTS: 1. Labor costs include

THIS PAGE INTENTIONALLY LEFT BLANK

Page 3: Construction Task Catalog · 1. The tasks in this Construction Task Catalog are organized using CSI’s MasterFormat. The Unit Prices Include: LABOR COSTS: 1. Labor costs include

Table of Contents

February 2014 copyright © 2014 The Gordian Group, Inc.

Community Economic Development Association of Cook County Emergency Furnace Page TOC - 1

00 Using The Construction Task Catalog® 1

01 General Requirements 1 01 20 Price And Payment Procedures ............................................................................................................................................................... 1

01 22 Unit Prices ........................................................................................................................................................................................... 1 01 97 CEDA ....................................................................................................................................................................................................... 1

01 97 00 03 Electric ....................................................................................................................................................................................... 1 01 97 00 05 Health And Safety ...................................................................................................................................................................... 1 01 97 00 06 HVAC......................................................................................................................................................................................... 1 01 97 00 07 Insulation ................................................................................................................................................................................... 4 01 97 00 14 Vent ........................................................................................................................................................................................... 4 01 97 00 16 Water Heater ............................................................................................................................................................................. 5

Page 4: Construction Task Catalog · 1. The tasks in this Construction Task Catalog are organized using CSI’s MasterFormat. The Unit Prices Include: LABOR COSTS: 1. Labor costs include

Table of Contents

copyright © 2014 The Gordian Group, Inc. February 2014 Page TOC - 2 Community Economic Development Association of Cook County Emergency Furnace

THIS PAGE INTENTIONALLY LEFT BLANK

Page 5: Construction Task Catalog · 1. The tasks in this Construction Task Catalog are organized using CSI’s MasterFormat. The Unit Prices Include: LABOR COSTS: 1. Labor costs include

Using The Construction Task Catalog®

February 2014 copyright © 2014 The Gordian Group, Inc.

Community Economic Development Association of Cook County Emergency Furnace Page 00 - 1

CTC Information:

1. This Construction Task Catalog® was developed and customized by The Gordian Group, Inc. specifically for Community Economic Development Association of Cook County, priced locally using current labor, material and equipment costs, and published in February 2014.

2. The Gordian Group, Inc. licenses the use of this CTC and other proprietary information and software for the sole purpose of providing Job Order Contracting services to Community Economic Development Association of Cook County. Use of The Gordian Group’s CTC and other proprietary information and software for any other purpose or any other entity is expressly prohibited without the express written consent of The Gordian Group, Inc.

MasterFormat™

1. The tasks in this Construction Task Catalog are organized using CSI’s MasterFormat.

The Unit Prices Include:

LABOR COSTS: 1. Labor costs include direct labor through the

working foreperson level at straight-time DOL wage rates for weatherization work including published fringe benefits and an allowance for Social Security and Medicare taxes, worker's compensation, unemployment insurance and employee benefits.

2. Labor costs are based on workers familiar with and skilled in the performance of the task following OSHA requirements.

3. Labor costs include time lost for normal work breaks, layout, measuring and cutting to fit, clean-up of regular construction debris, inspection, permit compliance, job meetings and start-up.

4. Labor costs include complying with Lead Safe Weatherization and the Environmental Protection Agency / Renovate Repair and Paint (EPA / RRP) protocols. EPA/ RRP protocols must be followed during all installations.

MATERIAL COSTS: 1. Material costs include the cost of the material

being installed and all incidentals and accessories integral to the installation.

2. Material costs include manufacturer's and/or fabricator's shop drawings.

3. Material costs include an allowance for waste for such materials that are typically provided in standard widths, lengths, weights and units such as drywall, pipe, conduit, lumber. This list is not intended to be all inclusive, but descriptive of the types of construction materials that are typically sold in standard lengths, sizes and weights.

Complete and In-Place Construction:

1. Unit prices are for complete and in-place construction and include all labor, equipment and material required to complete the task as described in the CTC.

2. Unit Prices include all deliveries, unloading and storing materials, tools and equipment on site, and moving materials, tools and equipment from storage area or truck to the Job Order site.

Page 6: Construction Task Catalog · 1. The tasks in this Construction Task Catalog are organized using CSI’s MasterFormat. The Unit Prices Include: LABOR COSTS: 1. Labor costs include

Using The Construction Task Catalog®

copyright © 2014 The Gordian Group, Inc. February 2014 Page 00 - 2 Community Economic Development Association of Cook County Emergency Furnace

3. Unit prices include all fasteners such as anchor bolts, lag bolts, screws, adhesive, wedge anchors, expansion bolts, that are required.

4. Unit prices include testing, calibration, balancing and the like required to ensure proper installation, construction and performance (balancing of heating ventilation and air conditioning, pneumatic or hydrostatic testing, soaping of joints, disinfection and flushing, others as required).

The Adjustment Factors Include:

BUSINESS COSTS: 1. Overhead costs, including, unless specifically

excluded in the Contract Documents, but not limited to;

• home office overhead

• insurance, bonds, and indemnification

• project meetings, training, management and supervision

• mobilization and close-out for the contract and each Job Order

• project office staff and equipment.

2. Profit.

3. Subcontractor's overhead and profit.

4. All taxes for which a waiver is not available including material sales tax and equipment rental.

5. Employee or Subcontractor’s wage rates that exceed the prevailing wage rates.

6. Fringe benefits, payroll taxes, worker’s compensation, insurance costs and any other payment mandated by law in connection with labor that exceeds the labor rate allowances.

7. Cost of financing the work.

8. Business risks such as the risk of a lower than expected volume of work, smaller than anticipated

Job Orders, poor Subcontractor performance, and inflation or material cost increases.

CONSTRUCTION RELATED COSTS: 1. Services required to obtain permits. The

Contractor will be compensated for the cost of the actual permit.

2. Costs incurred to investigate work sites necessary to prepare proposals and the preparation and modification of proposals, sketches, incidental drawings such as layout drawings detailing the connections and other layout drawings, submittals, digital photographs and other project records.

3. Costs incurred to define and modify scopes as required to support a Job Order.

4. Construction vehicles such as pick-up trucks, utility trucks, vans, service trucks, flat bed trucks, tractors, trailers, etc.

5. Storage devices or items such as gang boxes and storage containers for Contractor's tools, equipment and materials.

6. Personnel safety equipment (hard hats, ropes, harness, etc.) and basic safety signage, railings, tape, roping, cable, markings, cones, etc.

7. Meeting Owner security requirements.

8. Excess waste including roofing, drywall, VCT, carpet, wall covering, ceiling tile, pipe, conduit, siding, concrete, etc. This list is not intended to be all inclusive, but descriptive of the types of construction materials that are typically sold in standard lengths, sizes and weights.

9. Removing and returning Owner's furniture and furnishings.

10. Protection of all surfaces including those not in the scope of work from construction dust, debris or damage during construction up until final acceptance. The methods of protection including plastic, paper, temporary Masonite and plywood (except for temporary walls), sealing doors or windows are the Contractor’s responsibility.

Page 7: Construction Task Catalog · 1. The tasks in this Construction Task Catalog are organized using CSI’s MasterFormat. The Unit Prices Include: LABOR COSTS: 1. Labor costs include

Using The Construction Task Catalog®

February 2014 copyright © 2014 The Gordian Group, Inc.

Community Economic Development Association of Cook County Emergency Furnace Page 00 - 3

11. Daily clean-up of the project area and associated construction debris outside the project area.

12. Final professional project clean-up of the project area and all related construction debris outside the project area. Costs resulting from inadequate supply of building materials, fuel, electricity, or skilled labor.

13. Costs resulting from productivity loss.

14. Working in extreme temperatures (below or above normal) or adverse conditions such as excessive rain, wind, sleet or snow.

15. Differences in project size, complexity, and location.

16. All costs for other than discreet items of work specifically required to complete a particular Job Order.

17. All parking costs for Contractor's or Subcontractor's vehicles.

PRICE VARIATIONS: 1. Contractors may find differences in labor,

equipment and material costs due to certain economic factors. Variations in labor cost can also result from labor efficiency, labor restrictions, working conditions and local work rules. Variations in material costs can also result from the quantity of material purchased, the existing relationship with suppliers, and because the materials have been discontinued or have become obsolete.

2. While diligent effort is made to provide accurate and reliable up-to-date pricing, it is the responsibility of the Contractor to review and analyze the unit prices, and to calculate their Adjustment Factors accordingly, prior to bidding.

GENERAL COSTS: 1. This list is not exhaustive and is intended to

provide general examples of costs to be included in the Contractor's Adjustment Factor as defined in the Contract.

2. The only compensation to be paid to a Contractor for the work tasks will be:

Published Unit Price

X Installation (or Demolition)

Quantity

X Appropriate Adjustment

Factor

3. No additional payments of any kind whatsoever will be made. All costs not included in the unit prices must be part of the Adjustment Factors.

General Interpretations:

1. Assembly unit prices take precedence over individual component pricing.

2. Whenever a material, article or piece of equipment is identified in the CTC or in the specifications by reference to manufacturers’ or vendors’ names, trade names, catalogue numbers, or make, the identification is intended to establish a standard. Any material, article or equipment of another manufacturer or vendor which performs satisfactorily the duties imposed by the general design may be considered equally acceptable provided that, in the opinion of the Owner, the material, article or equipment so proposed is of equal quality, substance and function. The Contractor shall not provide, furnish or install any proposed material, article or equipment without the prior written approval of the Owner. The burden of proof and all costs related thereto concerning the "or equal" nature of the substitute item, whether approved or disapproved, shall be borne by the Contractor.

SPECIFICATIONS: 1. Specifications for tasks shall be interpreted as

follows: All labor, material, equipment, spare parts, services, and work required by a specification shall be considered part of the unit price, unless the task description or technical specifications state otherwise.

Page 8: Construction Task Catalog · 1. The tasks in this Construction Task Catalog are organized using CSI’s MasterFormat. The Unit Prices Include: LABOR COSTS: 1. Labor costs include

Using The Construction Task Catalog®

copyright © 2014 The Gordian Group, Inc. February 2014 Page 00 - 4 Community Economic Development Association of Cook County Emergency Furnace

Useful Information:

UNIT OF MEASURE DEFINITIONS: CFMR - Cubic Feet Per Minute Reduction, EA –

Each, LF - Linear Foot, MBH - One Thousand British

Thermal Units, SF - Square Foot, UI - United Inch

DEFINITION FOR TASK ABBREVIATIONS: ADJ – Adjustable, ALUM – Aluminum, APP –

Appliance, CFL – Compact Fluorescent Light, C.O –

Carbon Monoxide, DH – Double Hung, EFE –

Efficiency, ELEC – Electric, EQUIV – Equivalent, FAF

– Forced Air Furnace, FG – Fiberglass, FURN –

Furnace, GALV – Galvanized, HTR – Heater, MF –

Multi-Family, M.H. – Mobile Home, NAT – Natural,

NG – Natural Gas, PROP – Propane, REP –

Replacement, STM – Steam, SW – Single Wall,

TERM – Termination, T-STAT – Thermostat, W.H. –

Water Heater, WIND - Window

CONVERSIONS: 1 Acre = 43,560 Square Feet = 4046.8 Square

Meters

1 Board Foot = 12” x 12” x 1” = 144 Cubic Inches

1 Centimeter = 0.3937 Inches = 0.0328 Feet

1 Cubic Foot = 0.03704 Cubic Yards = 0.02832

Cubic Meters

1 Cubic Meter = 1.3080 Cubic Yards = 35.3147

Cubic Feet

1 Cubic Yard = 27 Cubic Feet = 0.7646 Cubic Meters

1 Foot = 12 Inches = 0.3048 Meters

1 Inch = 2.54 Centimeters = 0.0254 Meters

1 Kilogram = 2.2046 Pounds

1 Kilometer = 0.6214 Miles = 3280 Feet

1 Meter = 100 Centimeters = 3.2808 Feet

1 Mile = 5280 Feet = 1.6093 Kilometers

1 Pound = 0.4536 Kilograms

1 Square Foot = 144 Square Inches = .0929 Square

Meters

1 Square Meter = 1.1960 Square Yards = 10.7639

Square Feet

1 Square Yard = 9 Square Feet = 0.8361 Square

Meters

1 Ton = 2000 Pounds = 907.185 Kilograms

1 Yard = 3 Feet = 0.9144 Meters

Sheet Metal Thickness (inches)

Gage No.

Steel Sheet

Galvanized Steel Sheet

Stainless Steel Sheet

Aluminum Sheet

10 .135 .138 .141 11 .120 .123 .125 12 .105 .108 .109 13 .090 .093 .094 .072 14 .075 .079 .078 .064 15 .067 .071 .070 .057 16 .060 .064 .063 .051 17 .054 .058 .056 .045 18 .048 .052 .050 .040 19 .042 .046 .044 .036 20 .036 .040 .038 .032 21 .033 .037 .034 .028 22 .030 .034 .031 .025 23 .027 .031 .028 .023 24 .024 .028 .025 .020 25 .021 .025 .022 .018 26 .018 .022 .019 .017

Page 9: Construction Task Catalog · 1. The tasks in this Construction Task Catalog are organized using CSI’s MasterFormat. The Unit Prices Include: LABOR COSTS: 1. Labor costs include

Using The Construction Task Catalog®

February 2014 copyright © 2014 The Gordian Group, Inc.

Community Economic Development Association of Cook County Emergency Furnace Page 00 - 5

STANDARD GEOMETRY: Circle

• Circumference = 2 π radius = π diameter

• Area = π radius2 = π (diameter2 / 4)

Cylinder

• Volume = (π radius2)height

• Surface Area = 2 π radius2+(2 π radius)height

Sphere

• Volume = (4 π radius3) / 3

• Surface Area = 4 π radius2

π = 3.14159

United Inch

• The industry standard for measuring windows is the United Inch or UI. The UI is determined by adding the width and the height in inches.

TRADEMARKS Gordian JOC Solution, JOC Complete Solution, JOC Complete Solution Plus, PROGEN, eGordian, ezIQC, Construction Task Catalog, Catalog of Construction Tasks, DMAP, The Standard for Job Order Contracting and 6 Phase Development and Implementation Process are either registered trademarks or trademarks of The Gordian Group, Inc. The names of actual companies and products mentioned herein may be the trademarks of their respective owners

Page 10: Construction Task Catalog · 1. The tasks in this Construction Task Catalog are organized using CSI’s MasterFormat. The Unit Prices Include: LABOR COSTS: 1. Labor costs include

Using The Construction Task Catalog®

copyright © 2014 The Gordian Group, Inc. February 2014 Page 00 - 6 Community Economic Development Association of Cook County Emergency Furnace

THIS PAGE INTENTIONALLY LEFT BLANK

Page 11: Construction Task Catalog · 1. The tasks in this Construction Task Catalog are organized using CSI’s MasterFormat. The Unit Prices Include: LABOR COSTS: 1. Labor costs include

General Requirements 01

01

Price And Payment Procedures 01 20 Unit Prices 01 22

MINOR TOTAL DIRECT DEMOLITION CSI UOM DESCRIPTION UNIT COST UNIT COST

February 2014 copyright 2014 The Gordian Group, Inc. Community Economic Development Association of Cook County Emergency Furnace Page 01 - 1

. 01 General Requirements . . 01 20 Price And Payment Procedures (01) . . 01 22 Unit Prices (01 20) . . 01 22 16 Unit Price Payment (01 22) . . 01 22 16 00-0001 Reimbursable Fees (01 22 16)

Note: Reimbursable fees include but are not limited to permits, special inspections, special insurance, A/E stamped drawings, additional warranties, etc, which are not included in a task or an Adjustment Factor as explained in the Contract or The Construction Task Catalog®.

.

. 01 22 16 00-0002 EA Reimbursable Fees ................................................................................................................................................................. 1.00

Note: Reimbursable fees will be paid to the contractor for the actual cost, without mark-up, for which a receipt or bill is received. The Adjustment Factor applied to Reimbursable Fees will be 1.0000. The base cost of the Reimbursable Fee is $1.00. The quantity used will adjust the base cost to the actual Reimbursable Fee (e.g. quantity of 125 = $125.00 Reimbursable Fee). If there are multiple Reimbursable Fees, each one shall be listed separately with a comment in the "note" block to identify the Reimbursable Fees (e.g. sidewalk closure, road cut, various permits, extended warrantee, expedited shipping costs, etc.). A copy of each receipt shall be included with the Proposal.

XXXXXXX . 01 97 CEDA (01) . . 01 97 00 03 Electric (01 97) . .

01 97 00 03-0001 EA A/C Disconnect 10-2 4' Whip ................................................................................................................................................ 12.24 .

01 97 00 03-0002 EA Circuit Breaker - Double Pole ............................................................................................................................................... 66.37 .

01 97 00 03-0003 EA Circuit Breaker - Single Pole ................................................................................................................................................. 40.25 .

01 97 00 03-0004 LF Conduit (Metal) - 1/2" Per Foot ............................................................................................................................................... 5.47 .

01 97 00 03-0005 LF Conduit (Metal) - 3/4" Per Foot ............................................................................................................................................... 6.16 .

01 97 00 03-0006 LF Elec Wire - 10-2 With Ground Per Foot .................................................................................................................................. 3.02 .

01 97 00 03-0007 LF Elec Wire - 12-2 BX With Ground Per Foot............................................................................................................................. 3.76 .

01 97 00 03-0008 LF Elec Wire - 12-2 With Ground Per Foot .................................................................................................................................. 3.71 .

01 97 00 03-0009 LF Elec Wire - 12-3 BX With Ground Per Foot............................................................................................................................. 4.12 .

01 97 00 03-0010 LF Elec Wire - 12-3 With Ground Per Foot .................................................................................................................................. 4.09 .

01 97 00 03-0011 LF Elec Wire - 14-2 With Ground Per Foot .................................................................................................................................. 3.69 .

01 97 00 03-0012 LF Elec Wire - 14-4 BX With Ground Per Foot............................................................................................................................. 3.66 .

01 97 00 03-0013 LF Elec Wire - 6-2 With Ground Per Foot .................................................................................................................................... 4.81 .

01 97 00 03-0014 EA GFCI Receptacle .................................................................................................................................................................. 29.17 .

01 97 00 03-0015 EA GFCI Receptacle/Switch Combo .......................................................................................................................................... 59.43 .

01 97 00 03-0016 EA Junction Box ......................................................................................................................................................................... 22.90 .

01 97 00 03-0017 EA Junction Box Cover ................................................................................................................................................................. 5.00 . 01 97 00 05 Health And Safety (01 97) . .

01 97 00 05-0001 EA C.O. Detector ........................................................................................................................................................................ 39.27 .

01 97 00 05-0002 EA Dryer Vent Kit - Includes Term And Semi-Rigid Vent ........................................................................................................... 50.00 .

01 97 00 05-0003 EA Fire Extinguisher ................................................................................................................................................................... 27.79 .

01 97 00 05-0004 EA Smoke Detector .................................................................................................................................................................... 33.19 .

01 97 00 05-0005 EA Smoke Detector - Hearing Impaired ................................................................................................................................... 106.70 . 01 97 00 06 HVAC (01 97) . .

01 97 00 06-0001 LF Aluminum Flashing - Per Foot (Roof Flashing) ....................................................................................................................... 3.00 .

01 97 00 06-0002 EA 80% NG/Prop FAF - 40,000 BTU ..................................................................................................................................... 1,276.00 .

01 97 00 06-0003 EA 80% NG/Prop FAF - 60,000 BTU ..................................................................................................................................... 1,276.00 .

01 97 00 06-0004 EA 80% NG/Prop FAF - 80,000 BTU ..................................................................................................................................... 1,086.00 .

01 97 00 06-0005 EA 80% NG/Prop FAF - 100,000 BTU ................................................................................................................................... 1,086.00 .

01 97 00 06-0006 EA 80% NG/Prop FAF - 120,000 BTU ................................................................................................................................... 1,086.00 .

01 97 00 06-0007 EA 92% NG/Prop FAF - 40,000 BTU ..................................................................................................................................... 1,423.49 .

01 97 00 06-0008 EA 92% NG/Prop FAF - 60,000 BTU ..................................................................................................................................... 1,470.99 .

01 97 00 06-0009 EA 92% NG/Prop FAF - 80,000 BTU ..................................................................................................................................... 1,511.25 .

01 97 00 06-0010 EA 92% NG/Prop FAF - 100,000 BTU ................................................................................................................................... 1,594.87 .

01 97 00 06-0011 EA 92% NG/Prop FAF - 120,000 BTU ................................................................................................................................... 1,685.44 .

01 97 00 06-0012 EA 90% NG/Prop FAF - 40,000 BTU ..................................................................................................................................... 1,273.49 .

01 97 00 06-0013 EA 90% NG/Prop FAF - 60,000 BTU ..................................................................................................................................... 1,592.00 .

01 97 00 06-0014 EA 90% NG/Prop FAF - 80,000 BTU ..................................................................................................................................... 1,592.00 .

01 97 00 06-0015 EA 90% NG/Prop FAF - 100,000 BTU ................................................................................................................................... 1,665.00 .

01 97 00 06-0016 EA 90% NG/Prop FAF - 120,000 BTU ................................................................................................................................... 1,832.00 .

01 97 00 06-0017 EA 95% (Mod) NG/Prop FAF - 40,000 BTU .......................................................................................................................... 1,594.87 .

01 97 00 06-0018 EA 95% (Mod) NG/Prop FAF - 60,000 BTU .......................................................................................................................... 1,685.44 .

01 97 00 06-0019 EA 95% NG/Prop FAF - 80,000 BTU (Two Stage) ................................................................................................................ 1,874.00 .

01 97 00 06-0020 EA 95% NG/Prop FAF - 100,000 BTU (Two Stage) .............................................................................................................. 2,056.00 .

01 97 00 06-0021 EA 95% NG/Prop FAF - 120,000 BTU (Two Stage) .............................................................................................................. 2,215.00 .

01 97 00 06-0022 LF Black Pipe - 1/2" (Pipe, Fittings And Support) ........................................................................................................................ 5.20 .

01 97 00 06-0023 LF Black Pipe - 3/4" (Pipe, Fittings And Support) ........................................................................................................................ 5.34 .

01 97 00 06-0024 LF Black Pipe - 1" (Pipe, Fittings And Support) ........................................................................................................................... 5.72 .

01 97 00 06-0025 EA Black Pipe Cap - 1/2" ............................................................................................................................................................ 10.26 .

01 97 00 06-0026 EA Black Pipe Cap - 3/4" ............................................................................................................................................................ 10.43 .

01 97 00 06-0027 EA Black Pipe Cap - 1" ............................................................................................................................................................... 10.56 .

01 97 00 06-0028 EA Blower Compartment Safety Switch ..................................................................................................................................... 40.00 .

01 97 00 06-0029 EA Blower Motor....................................................................................................................................................................... 379.83 .

01 97 00 06-0030 EA Blower Wheel ...................................................................................................................................................................... 116.65 .

01 97 00 06-0031 EA Boiler FW - 80% EFE 40K BTU ....................................................................................................................................... 1,126.31

Page 12: Construction Task Catalog · 1. The tasks in this Construction Task Catalog are organized using CSI’s MasterFormat. The Unit Prices Include: LABOR COSTS: 1. Labor costs include

01 01 General Requirements

01 97 CEDA 01 97 00 06 HVAC

MINOR TOTAL DIRECT DEMOLITION CSI UOM DESCRIPTION UNIT COST UNIT COST

copyright 2014 The Gordian Group, Inc. February 2014 Page 01 - 2 Community Economic Development Association of Cook County Emergency Furnace

. 01 97 00 06-0032 EA Boiler FW - 80% EFE 60K BTU ....................................................................................................................................... 1,126.31

. 01 97 00 06-0033 EA Boiler FW - 80% EFE 70K BTU ....................................................................................................................................... 1,200.08

. 01 97 00 06-0034 EA Boiler FW - 80% EFE 85K BTU ....................................................................................................................................... 1,369.00

. 01 97 00 06-0035 EA Boiler FW - 80% EFE 100K BTU ..................................................................................................................................... 1,369.00

. 01 97 00 06-0036 EA Boiler FW - 80% EFE 130K BTU ..................................................................................................................................... 1,402.16

. 01 97 00 06-0037 EA Boiler FW - 80% EFE 150K BTU ..................................................................................................................................... 1,574.58

. 01 97 00 06-0038 EA Boiler FW - 80% EFE 165K BTU ..................................................................................................................................... 1,599.58

. 01 97 00 06-0039 EA Boiler FW - 80% EFE 200K BTU ..................................................................................................................................... 1,733.09

. 01 97 00 06-0040 EA Boiler FW - 90% EFE 100K BTU ..................................................................................................................................... 2,202.70

. 01 97 00 06-0041 EA Boiler FW - 90% EFE 130K BTU ..................................................................................................................................... 2,598.15

. 01 97 00 06-0042 EA Boiler FW - 90% EFE 150K BTU ..................................................................................................................................... 2,824.15

. 01 97 00 06-0043 EA Boiler FW - 90% EFE 165K BTU ..................................................................................................................................... 3,019.15

. 01 97 00 06-0044 EA Boiler FW - 90% EFE 200K BTU ..................................................................................................................................... 3,152.23

. 01 97 00 06-0045 EA Boiler Parts - Air Scoop ......................................................................................................................................................... 87.59

. 01 97 00 06-0046 EA Boiler Parts - Air Vent ........................................................................................................................................................... 30.36

. 01 97 00 06-0047 EA Boiler Parts - Aquastat ........................................................................................................................................................ 180.13

. 01 97 00 06-0048 EA Boiler Parts - Back Flow Preventer ..................................................................................................................................... 101.82

. 01 97 00 06-0049 EA Boiler Parts - Boiler Gauges ................................................................................................................................................. 44.97

. 01 97 00 06-0050 EA Boiler Parts - Circulator Pump............................................................................................................................................. 180.86

. 01 97 00 06-0051 LF Boiler Parts - Copper Pipe 1-1/2" Includes Fittings ............................................................................................................... 14.81

. 01 97 00 06-0052 LF Boiler Parts - Copper Pipe 1-1/4" Includes Fittings ............................................................................................................... 13.13

. 01 97 00 06-0053 LF Boiler Parts - Copper Pipe 1" Includes Fittings ..................................................................................................................... 11.73

. 01 97 00 06-0054 LF Boiler Parts - Copper Pipe 1/2" Includes Fittings .................................................................................................................... 9.85

. 01 97 00 06-0055 LF Boiler Parts - Copper Pipe 2 1/2" Includes Fittings ............................................................................................................... 22.76

. 01 97 00 06-0056 LF Boiler Parts - Copper Pipe 2" Includes Fittings ..................................................................................................................... 18.19

. 01 97 00 06-0057 LF Boiler Parts - Copper Pipe 3/4" Includes Fittings .................................................................................................................. 10.53

. 01 97 00 06-0058 EA Boiler Parts - Discharge Pipe ................................................................................................................................................ 32.97

Note: For Boiler - Under 3' in length. .

01 97 00 06-0059 EA Boiler Parts - Drain Valve ...................................................................................................................................................... 62.22 .

01 97 00 06-0060 EA Boiler Parts - 30 Gallon Expansion Tank .............................................................................................................................. 95.65 .

01 97 00 06-0061 EA Boiler Parts - Flow Control Valve ........................................................................................................................................ 102.30 .

01 97 00 06-0062 EA Boiler Parts - Isolation Valve ................................................................................................................................................. 72.26 .

01 97 00 06-0063 EA Boiler Parts - Low Water Cut Off ......................................................................................................................................... 120.82 .

01 97 00 06-0064 EA Boiler Parts - Outdoor Reset Control .................................................................................................................................. 260.55 .

01 97 00 06-0065 EA Boiler Parts - Outdoor Reset With ASBT ............................................................................................................................ 202.10 .

01 97 00 06-0066 EA Boiler Parts - Pressure Reducing Valve ................................................................................................................................ 84.63 .

01 97 00 06-0067 EA Boiler Parts - Pressure/Temperature Gauges ....................................................................................................................... 90.00 .

01 97 00 06-0068 EA Boiler Parts - Radiator (Labor Only) .................................................................................................................................... 224.37 .

01 97 00 06-0069 EA Boiler Parts - Radiator 4 Tube 14 Section ........................................................................................................................... 805.91 .

01 97 00 06-0070 EA Boiler Parts - Radiator 4 Tube 24 Section ........................................................................................................................ 1,221.29 .

01 97 00 06-0071 EA Boiler Parts - Radiator 4 Tube 6 Section ............................................................................................................................. 473.60 .

01 97 00 06-0072 EA Boiler Parts - Radiator Valve ............................................................................................................................................... 109.35 .

01 97 00 06-0073 EA Boiler Parts - Radiator Vent/Bleeder Valve ........................................................................................................................... 64.24 .

01 97 00 06-0074 EA Boiler Parts - Supply/Return Water Lines ............................................................................................................................. 22.91 .

01 97 00 06-0075 EA Boiler Parts - T And P Valve ................................................................................................................................................. 27.04 .

01 97 00 06-0076 EA Boiler Parts - Triple Aquastat .............................................................................................................................................. 180.13 .

01 97 00 06-0077 EA Boiler Part - Boiler Zone T-Stat ........................................................................................................................................... 114.96 .

01 97 00 06-0078 EA Boiler Parts - Zone Valve And Rewire ................................................................................................................................. 208.65 .

01 97 00 06-0079 EA Burner Assembly (Furnace/Boiler) ...................................................................................................................................... 246.67 .

01 97 00 06-0080 EA Chimney Cap ........................................................................................................................................................................ 76.66 .

01 97 00 06-0081 EA Chimney Storm Collar- 4" ..................................................................................................................................................... 25.22 .

01 97 00 06-0082 EA Chimney Storm Collar- 5" ..................................................................................................................................................... 26.42 .

01 97 00 06-0083 EA Chimney Storm Collar- 6" ..................................................................................................................................................... 27.62 .

01 97 00 06-0084 EA Chimney Storm Collar- 7" ..................................................................................................................................................... 29.12 .

01 97 00 06-0085 EA Circuit Board ....................................................................................................................................................................... 217.89 .

01 97 00 06-0086 EA Condensate Pump 1/30 HP ................................................................................................................................................ 101.79 .

01 97 00 06-0087 EA Draft Inducer Motor ............................................................................................................................................................. 192.79 .

01 97 00 06-0088 EA Gas Sediment Trap ............................................................................................................................................................... 32.90 .

01 97 00 06-0089 EA Drip Leg (Discharge Pipe) ..................................................................................................................................................... 11.00 Note: Sediment trap.

. 01 97 00 06-0090 EA Duct Boot Round (4" x 10") 6" ............................................................................................................................................... 24.98

. 01 97 00 06-0091 EA Duct Boot Round (4" x 10") 8" ............................................................................................................................................... 27.06

. 01 97 00 06-0092 EA Duct Boot Round (4" x 12") 6" ............................................................................................................................................... 25.35

. 01 97 00 06-0093 EA Duct Boot Round (4" x 12") 8" ............................................................................................................................................... 27.87

. 01 97 00 06-0094 EA Elec Baseboard Htr - 2 FT .................................................................................................................................................... 75.99

. 01 97 00 06-0095 EA Elec Baseboard Htr - 4 FT .................................................................................................................................................... 84.47

. 01 97 00 06-0096 EA Elec Baseboard Htr - 6 FT .................................................................................................................................................. 105.79

. 01 97 00 06-0097 EA Electric Furn - 10 KW (34,000 BTU) ................................................................................................................................ 1,447.63

. 01 97 00 06-0098 EA Electric Furn - 18 KW (60,000 BTU) ................................................................................................................................ 1,447.63

. 01 97 00 06-0099 EA Electric Furn - 20 KW (70,000 BTU) ................................................................................................................................ 1,447.63

. 01 97 00 06-0100 EA Electric Furn - 23 KW 75,000 BTU).................................................................................................................................. 1,447.55

. 01 97 00 06-0101 EA Electric Furn - 24 KW (80,000 BTU) ................................................................................................................................ 1,447.55

. 01 97 00 06-0102 EA Electric Furn - 25 KW (85,000 BTU) ................................................................................................................................ 1,593.84

. 01 97 00 06-0103 EA Filter Rack (Includes Cover) ............................................................................................................................................... 122.70

. 01 97 00 06-0104 EA Filter Rack Cover - Magnetic ................................................................................................................................................ 15.00

. 01 97 00 06-0105 EA Filter Rack Cover - Sheet Metal ............................................................................................................................................ 20.00

. 01 97 00 06-0106 EA Flame Rollout Sensor ........................................................................................................................................................... 42.68

. 01 97 00 06-0107 EA Flat Wall Return Grille - 16" x 20" ......................................................................................................................................... 40.98

. 01 97 00 06-0108 EA Flat Wall Return Grille - 20" x 20" ......................................................................................................................................... 41.20

. 01 97 00 06-0109 EA Flat Wall Return Grille - 20" x 25" ......................................................................................................................................... 41.20

. 01 97 00 06-0110 LF Flex Tubing 3/8" - Cond Drain ................................................................................................................................................. 1.08

. 01 97 00 06-0111 EA Floor Registers - 4" x 10" ...................................................................................................................................................... 16.44

. 01 97 00 06-0112 EA Floor Registers - 4" x 12" ...................................................................................................................................................... 16.44

. 01 97 00 06-0113 EA Floor Registers - 4" x 8" ........................................................................................................................................................ 16.44

Page 13: Construction Task Catalog · 1. The tasks in this Construction Task Catalog are organized using CSI’s MasterFormat. The Unit Prices Include: LABOR COSTS: 1. Labor costs include

General Requirements 01

01

CEDA 01 97 HVAC 01 97 00 06

MINOR TOTAL DIRECT DEMOLITION CSI UOM DESCRIPTION UNIT COST UNIT COST

February 2014 copyright 2014 The Gordian Group, Inc. Community Economic Development Association of Cook County Emergency Furnace Page 01 - 3

. 01 97 00 06-0114 EA Floor Registers - 6" x 10" ...................................................................................................................................................... 16.44

. 01 97 00 06-0115 EA Floor Registers - 6" x 12" ...................................................................................................................................................... 16.44

. 01 97 00 06-0116 EA Floor Return Grille - 14" x 20" ............................................................................................................................................... 24.43

. 01 97 00 06-0117 EA Floor Return Grille - 16" x 16" ............................................................................................................................................... 24.43

. 01 97 00 06-0118 EA Floor Return Grille - 20" x 20" ............................................................................................................................................... 28.63

. 01 97 00 06-0119 EA Furn Filter - 14" x 20" x 1" ....................................................................................................................................................... 4.87

. 01 97 00 06-0120 EA Furn Filter - 16" x 16" x 1" ....................................................................................................................................................... 4.81

. 01 97 00 06-0121 EA Furn Filter - 16" x 20" x 1" ....................................................................................................................................................... 4.81

. 01 97 00 06-0122 EA Furn Filter - 16" x 25" x 1" ....................................................................................................................................................... 4.89

. 01 97 00 06-0123 EA Furn Filter - 20" x 20" x 1" ....................................................................................................................................................... 4.90

. 01 97 00 06-0124 EA Furn Filter - 20" x 25" x 1" ....................................................................................................................................................... 4.97

. 01 97 00 06-0125 EA Gas App Conn 48" - 3/4"....................................................................................................................................................... 36.16

. 01 97 00 06-0126 EA Gas Shut Off Valve - 1" ......................................................................................................................................................... 22.09

. 01 97 00 06-0127 EA Gas Shut Off Valve - 1/2" ...................................................................................................................................................... 20.28

. 01 97 00 06-0128 EA Gas Shut Off Valve - 3/4" ...................................................................................................................................................... 21.17

. 01 97 00 06-0129 EA Heat Pump (AS) - 1.5 Ton (DZ) ....................................................................................................................................... 2,927.56

. 01 97 00 06-0130 EA Heat Pump (AS) - 2 Ton (DZ) .......................................................................................................................................... 2,927.56

. 01 97 00 06-0131 EA High Limit Switch .................................................................................................................................................................. 67.00

. 01 97 00 06-0132 EA Hot Surface Ignitor ................................................................................................................................................................ 58.51

. 01 97 00 06-0133 LF Insulated Flex Duct - 4" ........................................................................................................................................................... 2.84

. 01 97 00 06-0134 LF Insulated Flex Duct - 6" ........................................................................................................................................................... 3.11

. 01 97 00 06-0135 LF Insulated Flex Duct - 8" ........................................................................................................................................................... 3.51

. 01 97 00 06-0136 EA Intermittent Ignition Device (lID) .......................................................................................................................................... 119.91

. 01 97 00 06-0137 EA M.H. 80% NG/Prop FAF- 56,000 BTU ............................................................................................................................. 1,529.89

. 01 97 00 06-0138 EA M.H. 80% NG/Prop FAF- 70,000 BTU ............................................................................................................................. 1,529.89

. 01 97 00 06-0139 EA M.H. 80% NG/Prop FAF- 90,000 BTU ............................................................................................................................. 1,529.89

. 01 97 00 06-0140 EA M.H. 95% NG/Prop FAF - 40,000 BTU ............................................................................................................................ 1,891.55

. 01 97 00 06-0141 EA M.H. 95% NG/Prop FAF - 60,000 BTU ............................................................................................................................ 1,976.55

. 01 97 00 06-0142 EA M.H. 95% NG/Prop FAF - 80,000 BTU ............................................................................................................................ 2,160.15

. 01 97 00 06-0143 EA M.H. Electric Furn - 10 KW .............................................................................................................................................. 1,447.55

. 01 97 00 06-0144 EA M.H. Electric Furn - 12 KW .............................................................................................................................................. 1,447.55

. 01 97 00 06-0145 EA M.H. Electric Furn - 15 KW .............................................................................................................................................. 1,447.55

. 01 97 00 06-0146 EA M.H. Electric Furn - 20 KW .............................................................................................................................................. 1,447.55

. 01 97 00 06-0147 EA M.H. 95% Termination Roof Adapter/Seal .......................................................................................................................... 132.39

. 01 97 00 06-0148 EA M.H. Roof Jack ................................................................................................................................................................... 195.00

. 01 97 00 06-0149 EA Mini-Split (Dual Zone) - 1 Ton .......................................................................................................................................... 2,650.47

. 01 97 00 06-0150 EA Mini-Split (Dual Zone) - 1.5 Ton ....................................................................................................................................... 2,650.47

. 01 97 00 06-0151 EA Mini-Split (Dual Zone) - 2 Ton .......................................................................................................................................... 2,808.81

. 01 97 00 06-0152 EA Mini-Split (Single Zone) - 1 Ton ....................................................................................................................................... 1,688.74

. 01 97 00 06-0153 EA Mini-Split (Single Zone) - 1.5 Ton .................................................................................................................................... 2,216.81

. 01 97 00 06-0154 EA Mini-Split (Single Zone) - 2 Ton ....................................................................................................................................... 2,296.51

. 01 97 00 06-0155 EA Module For IID .................................................................................................................................................................... 170.35

. 01 97 00 06-0156 EA Mother Board (Labor Only) ................................................................................................................................................. 144.01

. 01 97 00 06-0157 EA Pilot Assembly Kit ................................................................................................................................................................. 72.19

. 01 97 00 06-0158 EA Pressure Switch .................................................................................................................................................................... 71.81

. 01 97 00 06-0159 LF PVC Pipe Ins - 2" To 3"........................................................................................................................................................... 4.16

. 01 97 00 06-0160 LF PVC Pipe Ins - 3" To 4"........................................................................................................................................................... 4.21

. 01 97 00 06-0161 LF PVC Pipe Ins - Up To 2" ......................................................................................................................................................... 4.11

. 01 97 00 06-0162 EA Return Air Filter Grille- 14" x 20" ........................................................................................................................................... 38.30

. 01 97 00 06-0163 EA Return Air Filter Grille -14" x 25" ........................................................................................................................................... 38.30

. 01 97 00 06-0164 EA Return Air Filter Grille - 16" x 16" .......................................................................................................................................... 40.98

. 01 97 00 06-0165 EA Return Air Filter Grille - 16" x 20" .......................................................................................................................................... 41.20

. 01 97 00 06-0166 EA Return Air Filter Grille - 16" x 25" .......................................................................................................................................... 41.31

. 01 97 00 06-0167 EA Return Air Filter Grille - 20" x 20" .......................................................................................................................................... 42.71

. 01 97 00 06-0168 EA Return Drop (8 Foot Drop) .................................................................................................................................................. 154.50

. 01 97 00 06-0169 EA Return Plenum .................................................................................................................................................................... 144.50

Note: For supply or return. .

01 97 00 06-0170 EA Return Transition ................................................................................................................................................................ 144.50 Note: For supply or return.

. 01 97 00 06-0171 EA Roof Adapter/Seal For 90% Vent Termination .................................................................................................................... 109.52

. 01 97 00 06-0172 EA Roof Term Kit- 95% M.H. Furn ........................................................................................................................................... 109.52

. 01 97 00 06-0173 LF Round Duct Insulation - 4" (Includes Connector And Support) ............................................................................................... 2.90

. 01 97 00 06-0174 LF Round Duct Insulation - 6" (Includes Connector And Support) ............................................................................................... 2.90

. 01 97 00 06-0175 LF Round Duct Insulation - 8" (Includes Connector And Support) ............................................................................................... 2.90

. 01 97 00 06-0176 EA Sheet Metal - Per Sheet (Includes 32 SF) ............................................................................................................................ 80.00

. 01 97 00 06-0177 EA Space Htr - Floor Mat ........................................................................................................................................................... 66.13

. 01 97 00 06-0178 EA Space Htr NG/P 80% - 20K BTU With Blower And Mat ................................................................................................... 1,252.75

. 01 97 00 06-0179 EA Space Htr NG/P 80% - 20K BTU With Blower And Mat (DV)........................................................................................... 1,768.00

. 01 97 00 06-0180 EA Space Htr NG/P 80% - 35K BTU With Blower And Mat ................................................................................................... 1,302.82

. 01 97 00 06-0181 EA Space Htr NG/P 80% - 35K BTU With Blower And Mat (DV)........................................................................................... 2,074.00

. 01 97 00 06-0182 EA Space Htr NG/P 80% - 40K BTU With Blower And Mat ................................................................................................... 1,324.00

. 01 97 00 06-0183 EA Space Htr NG/P 80% - 40K BTU With Blower And Mat (DV)........................................................................................... 2,089.00

. 01 97 00 06-0184 EA Space Htr NG/P 80% - 50K BTU With Blower And Mat ................................................................................................... 1,324.00

. 01 97 00 06-0185 EA Space Htr NG/P 80% - 50K BTU With Blower And Mat (DV)........................................................................................... 2,199.00

. 01 97 00 06-0186 EA Space Htr NG/P 80% - 65K BTU With Blower And Mat ................................................................................................... 1,439.00

. 01 97 00 06-0187 EA Space Htr NG/P 80% - 65K BTU With Blower And Mat (DV)........................................................................................... 2,299.00

. 01 97 00 06-0188 EA Space Htr Tall Wall Mount (DV) - 55K BTU With Blower ................................................................................................. 1,644.00

. 01 97 00 06-0189 EA Space Htr Tall Wall Mount (NO) - 40K BTU Dual Dir With Blower ................................................................................... 1,354.00

. 01 97 00 06-0190 EA Space Htr Tall Wall Mount- 40K BTU Nat Draft With Blower ........................................................................................... 1,289.00

. 01 97 00 06-0191 EA Space Htr Tall Wall Mount- 55K BTU Nat Draft With Blower ........................................................................................... 1,509.00

. 01 97 00 06-0192 EA Space Htr Wall Mount (DV) - 15K BTU ............................................................................................................................ 1,109.00

. 01 97 00 06-0193 EA Space Htr Wall Mount (DV) - 25K BTU ............................................................................................................................ 1,189.00

. 01 97 00 06-0194 EA Spark Ignitor ......................................................................................................................................................................... 86.30

Page 14: Construction Task Catalog · 1. The tasks in this Construction Task Catalog are organized using CSI’s MasterFormat. The Unit Prices Include: LABOR COSTS: 1. Labor costs include

01 01 General Requirements

01 97 CEDA 01 97 00 06 HVAC

MINOR TOTAL DIRECT DEMOLITION CSI UOM DESCRIPTION UNIT COST UNIT COST

copyright 2014 The Gordian Group, Inc. February 2014 Page 01 - 4 Community Economic Development Association of Cook County Emergency Furnace

. 01 97 00 06-0195 EA SSY Assembly ...................................................................................................................................................................... 23.75

Note: Electrical disconnect switch. .

01 97 00 06-0196 EA Stm Boiler- 80% EFE 60K BTU........................................................................................................................................ 1,696.01 .

01 97 00 06-0197 EA Stm Boiler- 80% EFE 70K BTU........................................................................................................................................ 1,696.01 .

01 97 00 06-0198 EA Stm Boiler- 80% EFE 80K BTU........................................................................................................................................ 1,696.01 .

01 97 00 06-0199 EA Stm Boiler- 80% EFE 100K BTU...................................................................................................................................... 1,835.01 .

01 97 00 06-0200 EA Stm Boiler- 80% EFE 125K BTU...................................................................................................................................... 1,835.01 .

01 97 00 06-0201 EA Stm Boiler - 80% EFE 150K BTU..................................................................................................................................... 1,951.01 .

01 97 00 06-0202 EA Stm Boiler - 80% EFE 175K BTU..................................................................................................................................... 2,192.00 .

01 97 00 06-0203 EA Stm Boiler - 80% EFE 200K To 225K BTU ...................................................................................................................... 2,476.29 .

01 97 00 06-0204 EA Stm Boiler - 80% EFE 225K To 276K BTU ...................................................................................................................... 2,707.02 .

01 97 00 06-0205 EA Stm Boiler Parts - Air Vent .................................................................................................................................................... 57.44 .

01 97 00 06-0206 EA Stm Boiler Parts - Blow Off Valve For Low Water Cut Off ................................................................................................... 120.82 .

01 97 00 06-0207 EA Stm Boiler Parts - Boiler Relay............................................................................................................................................ 133.27 .

01 97 00 06-0208 EA Stm Boiler Parts - Combo Feeder/Cut Off ........................................................................................................................... 489.01 .

01 97 00 06-0209 EA Stm Boiler Parts - Hartford Loop ......................................................................................................................................... 320.17 .

01 97 00 06-0210 EA Stm Boiler Parts - Internal Limit Control .............................................................................................................................. 187.36 .

01 97 00 06-0211 EA Stm Boiler Parts - Limit Control ........................................................................................................................................... 164.55 .

01 97 00 06-0212 EA Stm Boiler Parts - Low Water Cut Off ................................................................................................................................. 275.91 .

01 97 00 06-0213 EA Stm Boiler Parts - Outdoor Cut Off...................................................................................................................................... 248.58 .

01 97 00 06-0214 EA Stm Boiler Parts - Pressure Valve......................................................................................................................................... 84.63 .

01 97 00 06-0215 EA Stm Boiler Parts - Radiator Bleeder/Pressure Relief............................................................................................................. 64.24 .

01 97 00 06-0216 EA Stm Boiler Parts - Water Column Site Glass Kit.................................................................................................................... 59.11 .

01 97 00 06-0217 EA Stm Boiler Parts - Water Column Site Glass Kit With Drain .................................................................................................. 86.02 .

01 97 00 06-0218 EA Stm Boiler Parts - Water Feeder ......................................................................................................................................... 238.14 .

01 97 00 06-0219 EA Supply Plenum .................................................................................................................................................................... 144.61 .

01 97 00 06-0220 EA Supply Transition ................................................................................................................................................................ 144.61 .

01 97 00 06-0221 EA T-Stat (Digital) - Heat/Cool .................................................................................................................................................... 88.14 .

01 97 00 06-0222 EA T-Stat (Digital) Visually Imp - Heat/Cool ............................................................................................................................. 120.72 .

01 97 00 06-0223 EA T-Stat (Prog) - Heat/Cool ...................................................................................................................................................... 97.05 .

01 97 00 06-0224 EA T-Stat (Prog) Visually Imp - Heat/Cool ................................................................................................................................ 108.26 .

01 97 00 06-0225 LF T-Stat Wire 18-2 Per Foot ....................................................................................................................................................... 1.18 .

01 97 00 06-0226 LF T-Stat Wire 18-4 Per Foot ....................................................................................................................................................... 1.18 .

01 97 00 06-0227 LF T-Stat Wire 18-5 Per Foot ....................................................................................................................................................... 1.18 .

01 97 00 06-0228 LF T-Stat Wire 18-8 Per Foot ....................................................................................................................................................... 1.27 .

01 97 00 06-0229 EA Thermocouple ....................................................................................................................................................................... 33.47 .

01 97 00 06-0230 EA Transfer Grille - 20" x 20" (2 Must Be Used) ......................................................................................................................... 33.86 .

01 97 00 06-0231 EA Transfer Grille- 14" x 20" (2 Must Be Used) .......................................................................................................................... 29.66 .

01 97 00 06-0232 EA Transfer Grille - 6" x 10" (2 Must Be Used) ........................................................................................................................... 22.97 .

01 97 00 06-0233 EA Transfer Grille - 6" x 14" (2 Must Be Used) ........................................................................................................................... 23.77 .

01 97 00 06-0234 EA Transfer Grille- 16" x 16" (2 Must Be Used) .......................................................................................................................... 27.87 .

01 97 00 06-0235 EA Transformer Relay 12-Volt (12/24 Volt) ................................................................................................................................ 52.50 .

01 97 00 06-0236 EA Wall/Ceiling Registers - 4" x 10" ........................................................................................................................................... 13.58 .

01 97 00 06-0237 EA Wall/Ceiling Registers - 4" x 12" ........................................................................................................................................... 15.06 .

01 97 00 06-0238 EA Wall/Ceiling Registers - 6" x 10" ........................................................................................................................................... 13.75 .

01 97 00 06-0239 EA Wall/Ceiling Registers - 6" x 12" ........................................................................................................................................... 14.09 . 01 97 00 07 Insulation (01 97) . .

01 97 00 07-0001 SF Cellulose Dense Pack - R-11 (Includes Rmv And Rpl Siding, Wall Patches And Plugs) ........................................................ 2.13 .

01 97 00 07-0002 SF Cellulose Dense Pack - R-11 Interior Drill (Includes Wall Patches And Plugs) ....................................................................... 2.13 .

01 97 00 07-0003 SF Cellulose Dense Pack - R-19 (Includes Rmv And Rpl Siding, Wall Patches And Plugs) ........................................................ 2.92 .

01 97 00 07-0004 SF Cellulose Dense Pack - R-19 Interior Drill (Includes Rmv And Rpl Siding, Wall Patches And Plugs) ..................................... 2.92 . 01 97 00 14 Vent (01 97) . .

01 97 00 14-0001 LF B-Vent - 3" .............................................................................................................................................................................. 5.66 .

01 97 00 14-0002 LF B-Vent - 4" .............................................................................................................................................................................. 5.66 .

01 97 00 14-0003 LF B-Vent - 5" .............................................................................................................................................................................. 6.15 .

01 97 00 14-0004 LF B-Vent - 6" .............................................................................................................................................................................. 6.84 .

01 97 00 14-0005 EA B-Vent Cap - 3" ..................................................................................................................................................................... 15.45 .

01 97 00 14-0006 EA B-Vent Cap - 4" ..................................................................................................................................................................... 15.45 .

01 97 00 14-0007 EA B-Vent Cap - 5" ..................................................................................................................................................................... 16.65 .

01 97 00 14-0008 EA B-Vent Cap - 6" ..................................................................................................................................................................... 17.85 .

01 97 00 14-0009 EA B-Vent Cap - 8" ..................................................................................................................................................................... 19.35 .

01 97 00 14-0010 EA B-Vent Storm Collar - 3"........................................................................................................................................................ 25.22 .

01 97 00 14-0011 EA B-Vent Storm Collar - 4"........................................................................................................................................................ 25.22 .

01 97 00 14-0012 EA B-Vent Storm Collar - 5"........................................................................................................................................................ 26.42 .

01 97 00 14-0013 EA B-Vent Storm Collar - 6"........................................................................................................................................................ 27.62 .

01 97 00 14-0014 EA B-Vent Storm Collar - 8"........................................................................................................................................................ 29.12 .

01 97 00 14-0015 EA Chimney Liner 4" - 1 Story .................................................................................................................................................. 308.93 .

01 97 00 14-0016 EA Chimney Liner 4" - 2 Story .................................................................................................................................................. 387.26 .

01 97 00 14-0017 EA Chimney Liner 5" - 1 Story .................................................................................................................................................. 198.73 .

01 97 00 14-0018 EA Chimney Liner 5" - 2 Story .................................................................................................................................................. 288.15 .

01 97 00 14-0019 EA Chimney Liner 6" - 1 Story .................................................................................................................................................. 220.02 .

01 97 00 14-0020 EA Chimney Liner 6" - 2 Story .................................................................................................................................................. 301.35 .

01 97 00 14-0021 EA Concentric Vent 2" ................................................................................................................................................................ 79.80 .

01 97 00 14-0022 EA Concentric Vent 3" ................................................................................................................................................................ 95.20 .

01 97 00 14-0023 LF Dryer Vent Pipe - 4" ................................................................................................................................................................ 7.05 .

01 97 00 14-0024 EA Dryer Vent Termination ......................................................................................................................................................... 34.00 .

01 97 00 14-0025 LF PVC Schd 40 - 2" Per Foot (Includes Pipe, Fittings And Supports) ....................................................................................... 4.42 .

01 97 00 14-0026 LF PVC Schd 40 - 3" Per Foot (Includes Pipe, Fittings And Support) .......................................................................................... 4.63 .

01 97 00 14-0027 LF PVC Schd 40 - 3/4" Per Foot (Includes Pipe, Fittings And Support) ....................................................................................... 2.35 .

01 97 00 14-0028 LF SW Vent - 3" (Includes Pipe, Fittings And Supports) .............................................................................................................. 4.40 .

01 97 00 14-0029 LF SW Vent - 4" (Includes Pipe, Fittings And Supports) .............................................................................................................. 4.59 .

01 97 00 14-0030 LF SW Vent - 5" (Includes Pipe, Fittings And Supports) .............................................................................................................. 5.08

Page 15: Construction Task Catalog · 1. The tasks in this Construction Task Catalog are organized using CSI’s MasterFormat. The Unit Prices Include: LABOR COSTS: 1. Labor costs include

General Requirements 01

01

CEDA 01 97 Vent 01 97 00 14

MINOR TOTAL DIRECT DEMOLITION CSI UOM DESCRIPTION UNIT COST UNIT COST

February 2014 copyright 2014 The Gordian Group, Inc. Community Economic Development Association of Cook County Emergency Furnace Page 01 - 5

. 01 97 00 14-0031 LF SW Vent - 6" (Includes Pipe, Fittings And Supports) .............................................................................................................. 5.53

. 01 97 00 14-0032 LF SW Vent - 8" (Includes Pipe, Fittings And Supports) .............................................................................................................. 7.43

. 01 97 00 14-0033 EA SW Vent Cap - 4".................................................................................................................................................................. 15.40

. 01 97 00 14-0034 EA SW Vent Cap - 5".................................................................................................................................................................. 16.60

. 01 97 00 14-0035 EA SW Vent Cap - 6".................................................................................................................................................................. 17.80

. 01 97 00 14-0036 EA SW Vent Cap - 8".................................................................................................................................................................. 19.30

. 01 97 00 14-0037 EA SW Vent WYE- 3" (Single Wall) ............................................................................................................................................ 15.54

. 01 97 00 14-0038 EA SW Vent WYE- 4" (Single Wall) ............................................................................................................................................ 15.75

. 01 97 00 14-0039 EA SW Vent WYE- 5" (Single Wall) ............................................................................................................................................ 18.54

. 01 97 00 14-0040 EA SW Vent WYE- 6" (Single Wall) ............................................................................................................................................ 19.02

. 01 97 00 14-0041 EA SW Vent WYE- 8" (Single Wall) ............................................................................................................................................ 20.52

. 01 97 00 14-0042 EA Vent Damper (Barometric Damper) ...................................................................................................................................... 59.00

. 01 97 00 16 Water Heater (01 97) . .

01 97 00 16-0001 EA TPR Valve............................................................................................................................................................................. 84.50 .

01 97 00 16-0002 EA W.H. Discharge Pipe ............................................................................................................................................................ 33.00 Note: Long pipe over 5' length.

END OF SECTION 01

Page 16: Construction Task Catalog · 1. The tasks in this Construction Task Catalog are organized using CSI’s MasterFormat. The Unit Prices Include: LABOR COSTS: 1. Labor costs include

01 01 General Requirements

01 97 CEDA 01 97 00 16 Water Heater

MINOR TOTAL DIRECT DEMOLITION CSI UOM DESCRIPTION UNIT COST UNIT COST

copyright 2014 The Gordian Group, Inc. February 2014 Page 01 - 6 Community Economic Development Association of Cook County Emergency Furnace

THIS PAGE INTENTIONALLY LEFT BLANK

Page 17: Construction Task Catalog · 1. The tasks in this Construction Task Catalog are organized using CSI’s MasterFormat. The Unit Prices Include: LABOR COSTS: 1. Labor costs include

THIS PAGE INTENTIONALLY LEFT BLANK