Ash Dump Site
Manager: EHS&RM
Coal ash dump from Power Plant to
Taku Parking Lot area and Eco Dump.
Scheduled 2013 - 2018
Sewerline Replacement on Yukon Dr,
Chandalar Dr, near Wood Center and the
Fire Station (UTWH)
Manager: Mike Schuetz
Sewer line reconstruction.
Construction scheduled May - October 1 2014
Roof Drain Modifications at Constitution Hall
and Wickersham Hall (UTWBD)
Manager: Mike Schuetz
Removing roof drains from sanitary sewer.
Construction scheduled May - October 1 2014
Gruening Building Roof Replacement (CWGRR)
Manager: Reed Morisky
This project will replace the existing 40 year old
roof system with a new built-up roof system.
Construction scheduled May - August 2014
Utilities Wood Center Vault
Manager: Jenny Campbell
Completion of UTWCV. Summer work includes
realigning the South Chandalar Fire Lane west
of Wood Center.
Construction Scheduled April 2013 - Aug 2014
Campus Wide Housing and Dining, Phase 1A
Manager: Jenny Campbell
Construct 585 seat dining facility adjacent to
existing Wood Center.
Construction scheduled April 2013 - August 2014
Sewer Line Relining West
Ridge Arctic Health (UTWBR)
Manager: Mike Schuetz
Relining through selected
manholes on West Ridge.
Construction scheduled
May - October 1, 2014
Butrovich Exterior Civil
Engineering Project (BUECE)
Manager: Mary Pagel
Demolition of the widened sidewalk
and failing retaining wall on the
South side of Yukon Drive.
Construction scheduled
Summer 2014
Prepare and repaint Butrovich
Building Canopy
Manager: Mary Pagel
Prepare and repaint the building
canopy.
Construction scheduled
Summer 2014
Elvey Deferred Maintenance (ELDM)
Manager: Reed Morisky
This project will establish critical utilities
connections between the Elvey Annex (ASF)
and the WRRB server room.
Construction scheduled Summer & Fall 2014
Arctic Health East Passenger Elevator
Modernization
Manager: Mike Schuetz
Modernize elevator 36 and include
seismic improvements.
Construction scheduled Apr - Sept 2014
West Ridge Deferred Renewal
Temporary Labs
Manager: Cameron Wohlford
Relocate two donated lab modules
from Geist Road to Arctic Health.
Construction scheduled Summer 2014
Yankovich/Miller Hill Multi-Use Path
Manager: Mary Pagel
Construct a multi-use pedestrian path
adjacent to West Tanana Dr, Sheep Creek,
Miller Hill and Yankovich Roads.
Construction scheduled mid-September 2014
Campus Wide Gruening Switchgear
Replacement (CWGSR)
Manager: Milton Ludington
This project will replace the switchgear in the
basement. Major power outages in between
summer sessions.
Construction scheduled May - September 2014
BUTROVICH
MURIE
MUSEUM
REICHARDT
MBS
SRC
LOLA
TILLY
Campus Wide ADA Restrooms (GR5RR)
Manager: Milton Ludington
This project will construct two new ADA
restrooms on the sixth floor of Gruening.
Construction scheduled May - August 2014
Akasofu Restoration (AKR)
Manager: Bob Crenshaw
Restore and renovate office spaces
on the fourth floor and restorations
throughout entire building.
Construction scheduled
May 2014 - February 2015
2
2
3
4
3
4
5
5
7
8
9
10
15
16
17
20
25
26
7
8
9
10
20
17
16
15
27
19
21
29
25
26
27
19
21
29
22
22
1
1
13 14
13
Patty Center Bleacher Installation (PCBI)
Manager: Mary Pagel
Install new bleachers.
Construction scheduled May - September 2014
14
Patty Ice ADA Restroom and
Seating (PIARS)
Manager: Mary Pagel
Construct ADA restrooms and new seating.
Construction scheduled September 2014
Temporary Access Route
SEE PAGE 2
24
18
28
11
12
6
Irving I Rm 210 & 211 Renovation
Manager: Bob Crenshaw
Remove walls between rooms 210 & 211.
Construction scheduled July 2014
6
West Ridge Animal Resources Facility
Relocation (WRARF)
Manager: Cameron Wohlford
This project will complete approximately
6000 SF of previously shelled space to
support animal care and housing.
Construction scheduled Summer 2014
11
12
Eielson ADA Restroom Renovation
Manager: Jonathan Shambare
Renovate ADA restroom.
Construction scheduled June - September 2014
18
Eielson Entry Door Renovation
Manager: Milton Ludington
Replace north and south entry vestibule doors.
Construction scheduled June - August 2014
24
28
UAF Engineering Building
Manager: Cameron Wohlford
Laydown area for ENNF Contractor.
Construction scheduled
April 2013 - June 2015
Taku Stairs (PLTMS)
Manager: Cameron Wohlford
Replace the sidewalk along Taku
Drive with metal stairs.
Construction scheduled
May - August 2014
UAF Engineering Building
Manager: Cameron Wohlford
Construct new engineering
facility to meet the needs of the
College of Engineering and Mines.
Construction scheduled
April 2013-June 2015
Museum Renovate Rm 101
Manager: Bob Crenshaw
Remove walls enclosing office
area to expand gift shop.
Construction scheduled May 2014
MBS Drinking Fountains
Manager: Bob Crenshaw
Replace drinking fountains in
Bartlett Hall on 1st to 4th floor.
Construction scheduled July 2014
Brooks Building Flood Repairs
Manager: Bob Crenshaw
Repair damage caused by water
on 3rd and 4th floor.
Construction scheduled
July - September 2014
23
Gruening 8th Floor Ceiling Replacement
Manager: Milton Ludington
Remove and replace existing ceiling and lights.
Construction scheduled June - July 2014
23
FOR FURTHER INFORMATION:
Division of Design and Construction
P.O. Box 758160
Fairbanks, Ak 99775-8160
(907) 474-5299
1" = 500' @ 11x17
University of Alaska Fairbanks
CONSTRUCTION PROJECTS 2014
April 02, 2014
www.uaf.edu/fs/departments/design-construction/
AERIAL DATED: JUNE 2013
TM
Community & Technical College Barnette Parking Rehabilitation
Manager: Mike Schuetz
Improve parking and landscape for CTC Barnette building.
Construction scheduled May - 1 October 2014
Community & Technical College Aviation Entry Canopy
Manager: Mike Schuetz
Design and install canopies over building entrances.
Construction scheduled July - August 2014
Antenna Base Construction (AIAS2)
Manager: Cameron Wohlford
Install antenna base on Richardson Hwy.
Construction scheduled May - July 2014
Northwest Campus Science Building Remodel (NWSBR)
Manager: Milton Ludington
Exterior and interior improvements to the existing campus facilities
located in Nome, Alaska.
Construction scheduled May-August 2014
Sewerline Demolition AFES Farm
Manager: Mike Schuetz
Close abandoned sewerline South of farm including eleven manholes.
Construction scheduled June - July 2014
Road Improvements FMATS Street Light Conversion Stage III (RISLC)
Manager: Mary Pagel
Street light conversion and select pole replacement, trenching and
associated electrical work will occur all over campus.
Construction scheduled August 2014
Utilities Campus Wide (UTER)
Manager: Mike Ruckhaus
Convert buildings to new system - multiple power outages.
Construction scheduled Summer 2014
Utilities
Construction / Renovation
Staging Areas / Parking Impacts
Critical Electrical Distribution Renewal
Construction Scheduled Summer 2014
Grading, Topsoil and Seeding
Temporary Fire Lane
1
Dining Facility related Staging Areas
Street Lights Affected by Street Light
Conversion Project (RISLC)