100 Climate Solutions Project Campaign ~ 2016 Renewable Energies REGIONS OF CLIMATE ACTION Summary Mandating Authority : Expected project CAPEX : Main stakeholders Social and environmental impact Location and population Project Type : The implementation of this project will bring electricity to a population that still lacks access to energy. The living conditions of these populations will be improved and the project will generate direct and indirect jobs. In addition, the project is located outside Abidjan, thus it will help to slow the rural exodus. The project will not rely on fossil fuels, and will therefore reduce GHGs, thus contributing to the resolutions of COP21. Construction of a solar power plant The Cavally region is in the western part of the Ivory Coast, and has a very good solar irradiation (2.5 kWh / m2 / day). The country has a goal to achieve an energy mix con- sisting of 11% renewables by 2020. This includes the construction of solar power stations in cities with good irradiation. This project is therefore part of the overall energy vision of the country. Conseil Regional du Cavally 31’335’000 € Cavally Region / NGO IMPACTUM / CAPDEL / GIWA Guiglo city, Cavally Region, Côte d’Ivoire Solar

Upload: others

Post on 15-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016

Renewable Energies

REGIONS OFCLIMATE ACTION

Summary

Mandating Authority :

Expected project CAPEX :

Main stakeholders

Social and environmental impact

Location and population

Project Type :

The implementation of this project will bring electricity to a population that still lacks access to energy. The living conditions of these populations will be improved and the project will generate direct and indirect jobs. In addition, the project is located outside Abidjan, thus it will help to slow the rural exodus. The project will not rely on fossil fuels, and will therefore reduce GHGs, thus contributing to the resolutions of COP21.

Construction of a solar power plant

The Cavally region is in the western part of the Ivory Coast, and has a very good solar irradiation (2.5 kWh / m2 / day). The country has a goal to achieve an energy mix con-sisting of 11% renewables by 2020. This includes the construction of solar power stations in cities with good irradiation. This project is therefore part of the overall energy vision of the country.

Conseil Regional du Cavally

31’335’000 €

Cavally Region / NGO IMPACTUM / CAPDEL / GIWA

Guiglo city, Cavally Region, Côte d’Ivoire

Solar

100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016

Project maturity ( IFC / World Bank Categories )

STAGE 1 : Concept Development, Site identification

Building permits signed :

STAGE 4 : Permitting / Financing / Contracts

Land concession signed :

Environmental impact study :

Grid Connection :

Power Purchase Agreement

Off-Taker :

Tenor : Price of electricity :

Identified sources of fundings

Site identified :

Site access :

STAGE 3 : Feasibility Studies

STAGE 2 : Pre-Feasibility Studies

Pre-feasibility study :

Feasibility study :

Technology :

Expected installed capacity :

Energy resource data

Expected type of contract :

Comments

Engineering, Procurement and Construction Contractor :

Operation and Maintenance Contractor :

Adequate road Rail access Port facilities

STAGE 5 : Engineering / Construction / Commercial Operation

STAGE 1 : Concept Development, Site identification

STAGE 2 : Pre-Feasibility Studies

STAGE 3 : Feasibility Studies

STAGE 4 : Permit t ing / Financing / Contracts

STAGE 5 : Engineering/Construction/Commercial Operation

No

This project is part of the government’s vision to diversify the energy mix in order to provide more stable, abundant and cheaper energy.

solar photovoltaic power plant (ongoing discussion with the supplier)

No

Ongoing discussion

Ongoing discussion

Ongoing discussion

Ongoing discussion

No

Ongoing discussion

Yes

No

No TBD

No

15 MW

3,5 kWh/m2 /j

Ingénierie Approvisionnement Construction

Yes