![Page 1: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/1.jpg)
1
Construction Manager / General ContractorCM/GC Procurement Case Study
February 2016
Federal Transit AdministrationWendy A. Lee, Regional Counsel, Cambridge, MA
WORLD TRADE CENTER PATH TERMINAL PROJECT
MBTA GREEN LINE EXTENSION PROJECT
![Page 2: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/2.jpg)
2
Observations and Lesson Learned
The use of non-traditional contracting methods for major FTA-funded construction projects is on the rise.
• The CM/GC approach is the most innovative but difficult to manage
• Selection of the right Joint Venture, Design, and other consulting teams is critical
• Early involvement of in-house legal counsel
• Requires experienced owner to manage competing interests; significant and continuous involvement of owner
• Need to be willing to terminate agreement if Guaranteed Maximum Price (GMP) not established within the contractual time frame and execute contingency plan
![Page 3: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/3.jpg)
Green Line Extension (GLX)Light Rail Project
• MBTA
• Extend existing light rail service 4.3 miles
• Executed Full Funding Grant Agreement in January 2015
Project Budget - $2.297B
Required Completion Date –June 29, 2022
• Utilized CM/GC procurement strategy
Engaged White Skanska Kiewit, J.V. in August 2014
3
Project Background
World Trade Center (WTC) PATH Terminal Project
• Port Authority of NY & NJ
• Rebuild former WTC PATH Terminal
• Executed Construction Agreement in May 2006
Project Budget - $2.501B
Required Completion Date -April 30, 2012
• Utilized CM/GC procurement strategy
Engage Phoenix Constructors J.V. in January 2006 (Fluor, Skanska, Bovis, Granite)
![Page 4: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/4.jpg)
4
WTC PATH Terminal ProjectJustification for CM / GC Approach
A single CM/GC approach would:
• Fast-track project delivery that could save between 10-31 months
• Yield cost of between $95-$243 million
• Produce higher quality work
• Provide a single point of responsibility and control of construction activities
• Establish a guaranteed maximum price (GMP) prior to completion of final design
![Page 5: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/5.jpg)
5
WTC PATH Terminal ProjectKnown Challenges and Risks
Highly challenging conditions include:• Aggressive Schedule
• Complex Construction Coordination with 16-acres site
• Scope and Quality of Construction
![Page 6: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/6.jpg)
VSC
1 LineSubway
6
WTA PATH Terminal ProjectWTC Site
Tower 4
Tower 3Tower 2
FreedomTower
Memorial
Route 9A
Chiller Plant
DeutscheBank
PAC Dey StConnector
Oculus
![Page 7: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/7.jpg)
WTC PATH Terminal ProjectStakeholders
7
![Page 8: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/8.jpg)
In September 2008, the PA and CM/GC mutually agreed to terminate the contract
• Design process was delayed due to several factors:
Complexity of the site
Interdependence of each redevelopment project on others
Conflicting and changing demands of multiple stakeholders
Conscious effort by PA to re-examine certain aspects of design to reign in costs and accelerate schedule
• Failure to negotiate a realistic GMP
• Failure to establish comprehensive schedule to meet program milestones
• Market conditions improved thereby softening the construction market
WTC PATH Terminal ProjectProcurement Shift
8
![Page 9: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/9.jpg)
WTC PATH Terminal ProjectCost and Schedule Update
Construction Agreement April 25, 2006
Project Budget $2.201B Federal; $2.501B Total
Required Completion Date April 30, 2012
Revised and Restated Construction Agreement September 18, 2012
Project Budget $2.872B Federal; $3.995B Total
Required Completion Date December 17, 2015
Hurricane Sandy October 26‐29, 2012
Current Completion Date December 31, 20169
![Page 10: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/10.jpg)
WTC PATH Terminal Project
10
![Page 11: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/11.jpg)
WTC PATH Terminal Project
11
![Page 12: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/12.jpg)
12
WTC PATH Terminal ProjectExcavation for the Transit Hub
October 2009
![Page 13: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/13.jpg)
13
WTC PATH Terminal ProjectSteel Erection Below Grade
May 2012
![Page 14: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/14.jpg)
14
WTC PATH Terminal ProjectOculus East Arch Retail Area
August 2012
![Page 15: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/15.jpg)
15
WTC PATH Terminal ProjectTransit Hall
August 2012
![Page 16: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/16.jpg)
16
WTC PATH Terminal ProjectEast/West Connector
August 2012
![Page 17: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/17.jpg)
17
WTC PATH Terminal ProjectTower Cranes in Position to Erect Oculus Steel
May 2013
![Page 18: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/18.jpg)
18
WTC PATH Terminal ProjectErection of Oculus Portal Steel
April 2014
![Page 19: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/19.jpg)
19
WTC PATH Terminal ProjectOculus Rafter Installation
November 2014
![Page 20: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/20.jpg)
20
WTC PATH Terminal ProjectInside the Oculus
August 2015
![Page 21: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/21.jpg)
21
WTC PATH Terminal ProjectEnclosure is Almost Complete
December 2015
![Page 22: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/22.jpg)
22
WTC PATH Terminal ProjectAerial View
January 2016
![Page 23: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/23.jpg)
23
MBTA Green Line Extension ProjectProject Area
![Page 24: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/24.jpg)
24
MBTA Green Line Extension ProjectJustification for CM / GC Approach
A single CM/GC approach would:
• Allow owner to maintain ownership of the design
• Integrate contractor into design process to improve constructability, reduce changes and minimize schedule risk
• Reduce construction contingency since pricing not established by contractor until risk items are assigned
![Page 25: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/25.jpg)
25
MBTA Green Line Extension ProjectJustification for CM / GC Approach
![Page 26: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/26.jpg)
26
MBTA Green Line Extension ProjectProject Delivery Method Advantage/Disadvantage Summary
DBB CM‐GC DBProject‐Level Issues Rating1. Project Size2. Cost3. Schedule4. Schedule Flexibility5. Risk Management6. Risk Allocation7. Sustainability/LEED CertificationAgency‐Level Issues Rating8. Agency Experience9. Staffing Required10. Staff Capability11. Agency Goals and Objectives12. Agency Control of Project13. Third‐Party Agreement(s)Public Policy/Regulatory Issues Rating14. Competition15. DBE Impacts16. Labor Unions17. Federal/State/Local Laws18. FTA/EPA Regulations19. Stakeholder/Community InputLifecylel Issues Rating20. Lifecycle Costs21. MaintainabilityOther Issues Rating22. Construction Claims23. Adversarial Relationships
Most Appropriate Appropriate Least Appropriate
![Page 27: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/27.jpg)
27
MBTA Green Line Extension ProjectKnown Challenges and Risks
Massachusetts laws limited use of Construction Management delivery methods to vertical construction
• In 2012, Mass legislature authorized use of CM / GC for the Green Line Extension Project as a pilot project
• Further authorization was provided by the MBTA Board and Massachusetts Office of Inspector General Align
• MBTA had virtually no experience with use of CM /GC for large, complex, horizontal construction project
• Heavy reliance on outside consultants by MBTA project team
• CM/GC required to perform no less than 50% of overall contract value
• No incentive for sharing savings; savings benefited MBTA exclusively
![Page 28: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/28.jpg)
28
MBTA Green Line Extension ProjectProject Phasing
Phase 3
Phase 1
Phase 1 Phase 4
Phase 2A
Phase 1
Union Sq
Washington St
Phase 2
Phase 1 – Harvard Street Rail Bridge; Medford Street Rail Bridge; & 21 Water Street Demolition
Phase 2 – Lechmere to Washington Street
Phase 2A – Union Square Branch
Phase 3 – Vehicle Maintenance Facility
Phase 4 – Washington Street to College Avenue
![Page 29: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/29.jpg)
29
MBTA Green Line Extension ProjectBaseline vs. Actual/Projected Cost
$0
$500,000,000
$1,000,000,000
$1,500,000,000
$2,000,000,000
$2,500,000,000
$3,000,000,000
Dec-11 May-13 Sep-14 Jan-16 Jun-17 Oct-18 Mar-20 Jul-21 Dec-22
Baseline
Projected
CM/GC Cancelled
IGMP’s 1‐3, 4a
FFGA Executed
IGMP 4
![Page 30: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/30.jpg)
30
MBTA Green Line Extension ProjectProject Redirect
In December 2015, the MBTA terminated its contractual relationship with the CM/GC
• Not financially feasible to proceed with GMP #4 FFGA (60% Design) - $487,306,862 CM/GC - $889,081,221
Established conditions for moving forward with GLX
• Undertaking value engineering and redesign to reduce costs while maintaining functionality
• Developing a re-procurement strategy• Putting in place new project management team• Focusing on other non-federal funding sources
![Page 31: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/31.jpg)
31
MBTA Green Line Extension ProjectConceptual Design
![Page 32: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/32.jpg)
32
MBTA Green Line Extension ProjectConceptual Design
![Page 33: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/33.jpg)
33
MBTA Green Line Extension ProjectConceptual Design
![Page 34: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/34.jpg)
34
MBTA Green Line Extension Project
![Page 35: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/35.jpg)
35
MBTA Green Line Extension Project
![Page 36: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/36.jpg)
36
MBTA Green Line Extension Project
![Page 37: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/37.jpg)
37
MBTA Green Line Extension Project
![Page 38: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/38.jpg)
38
MBTA Green Line Extension Project
![Page 39: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/39.jpg)
39
MBTA Green Line Extension Project
![Page 40: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/40.jpg)
40
MBTA Green Line Extension Project
![Page 41: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/41.jpg)
41
MBTA Green Line Extension Project
![Page 42: Construction Manager / General Contractor CM/GC ... Manager / General Contractor CM/GC Procurement Case Study ... Federal/State/Local Laws 18. ... Massachusetts laws limited use of](https://reader034.vdocuments.mx/reader034/viewer/2022051508/5aa6423f7f8b9ac8748e339d/html5/thumbnails/42.jpg)
42
MBTA Green Line Extension Project