Construction Management
Two 2014
Setting up Site
Presenter Tony BosnichFeb 2014
>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT
Out comeAccept that all sites are unique
Plan and set up site establishment accordingly
>>DEPARTMENT OF CONSTRUCTION
>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT
Every site is unique but generally it is a matter of using a check list type of approach details based on historical details
relating to similar projects.
What are some of the items you would consider on your check list.
Write down ten items.
What do we need in order to carry out this project successfully.
>>DEPARTMENT OF CONSTRUCTION
>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT >>DEPARTMENT TITLE EDIT IN HEADER & FOOTER
>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT
Public protection Survey and set out
Fences Access gates
Signage Hazard Board
Craneage Other lifting provision
Temporary works Special formwork
Site hut establishment Special false work
Loading in platform Road Load bay
Storage Set down area
Wheel wash provision Site assembly area
Silt pond Temp fire fighting provision
Temporary weather proofing Temporary services
Temporary access provision Traffic control
Scaffolding
Plant and equipment Any others to add?
Here are some,
>>DEPARTMENT TITLE EDIT IN HEADER & FOOTER
>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT
What are the site set up
Elements of this Picture?
Public protection
Traffic plan
Signage
Scaffolding
Environmental
Hoardings
Look at this site
>>DEPARTMENT TITLE EDIT IN HEADER & FOOTER
>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT >>DEPARTMENT TITLE EDIT IN HEADER & FOOTER
>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT
But as part of the site set up some items will be soft.
Safety plan PPE
Quality plan Communication system
Insurances Planning /Programming
Method statements Computer set up
Agreements, contracts Copier
Site rules and requirements Documents
Inductions
Sub contractor provision
Crane and plant booking arrangements
Plant maintenance and testing provision
Any others ?
These are all considered to be hard physical items.
>>DEPARTMENT TITLE EDIT IN HEADER & FOOTER
>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT
There maybe be an area allocated for site establishment by the consultants.
Note also most buildings actually cover the whole site now, so the trend now is to remove MC main site establishment to exterior of site.
Most of the requirements will have already been established based on your pre contract planning, and usually only one site visit.
What is the main reason for including site set up details in the pre contract planning.
Where do we do this set up.
>>DEPARTMENT OF CONSTRUCTION
>>FACULTY OF TECHNOLOGY AND BUILT ENVIRONMENT
There are no details drawn by any consultant as this is a P&G items and it is up to the Main contractor how they want to set up the site, hence it is not a detailed measured item.
Where to start?
Clear Site plan to suitable scale
Existing details
>>DEPARTMENT TITLE EDIT IN HEADER & FOOTER