construction - edinburgh printmakers · secondary steel structure to support glazing to window...

1
2 L(21) 50 3 L(21) 50 4 L(21) 50 750 1600 R_LG.02 Reception / Shop R_LG.01 Lobby Sim 1 A(31) 12 Sim 1 A(31) 13 Sim 1 A(31) 14 Sim 1 A(31) 17 First Floor 72870 Prop entrance level 66600 Member's Gallery 69518 2393 477 2477 3207 1160 5395 Clear silicone joints between DGUs Clear silicone joints between DGUs 100mm rigid insulation fixed to u/s floor structure over entrance, F30/156 Top coat of self-coloured render on reinforcing mesh on base coat render on exterior grade cementitious carrier board fixed using exterior grade stainless steel screws at centres recommended by manufacturer to exterior grade steel soffit hanging system fixed to u/s of floor slab, M21/160 - Contractor designed Ceiling type 01 to lobby, K10/200 - Air curtain over doors to be concealed in ceiling void Forbo Nuway Tuftiguard Classic entrance matting with bamboo scrapper bars recessed into screed, M40/200 New area of stone paving within recessed entrance, Q25/200. 50mm thick Caithness slabs with Riven, slip resistant finish, on subbase to str. eng. specification Brick outer leaf, F10/110 50mm cavity 100mm Kingspan Kooltherm K12 insulation, F30/155 Breather membrane, F30/190 on 22mm moisture resistant plywood Vapour control membrane, P10/310 on 22mm moisture resistant plywood to inner face of SFS SFS framing system between new steel structure Raico toggle detail along vertical silicone joints (clear silicone) to RHS behind Both lobby doors, H13/115: Double glazed, PPC aluminium frame double doors with low energy actuator, GEZE Slimdrive EMD F-IS or similar approvded. Doors to drive open upon pressing button, otherwise manually opened, automatic door closer in all situations. Wheelchair accessible low threshold, brushed stainless steel R_LG.01 Lobby Sim 1 A(31) 15 Sim 1 A(31) 11 1 A(35) 04 Sim 1 A(22) 06 R_LG.03 Gallery First Floor 72870 Prop entrance level 66600 Member's Gallery 69518 W(UG)_01 W(FF)_01 W(FF)_02 W(FF)_03 W(FF)_04 W(FF)_05 W(UG)_05 Red hatch indicates extent of existing brick wall to be removed. Cut down brickwork to form new openings. Rebuild / make good brickwork reveals / piers / heads as necessary using brick salvaged from site, F10/340 Remove existing windows W(UG)_02 - 04 Provide new PPC steel linings to reveals & heads of each of the three openings, L30/300, refer to A(21) series drawings for detail. Lining to wrap around 3 sides of pier and fully conceal strengthening steelwork to rear face Client supply gates to each of the 3no. openings - Contractor to allow for full installation including coordination with Artist making the gates and provision of foundations for gate posts as necessary Provide new galvanised steelwork on inner face of existing brick (roughly shown dotted red) to strengthen brick piers to Str. Eng. detail and specification. W(LG)_14 New PPC aluminium framed, double glazed, fixed window W(LG)_14 to replace previous boarded up door Ex_D.01, L10/330. New window to be sized to fit existing opening 3no. acid etched precast concrete L-shaped canopies, H42/110, one over each opening. Secondary galvanised steel structure to support canopies to Structural Engineer's detailed design Lightbox signage adjacent to front door, N15/250, refer to drawing L(99) 01. Push button for door actuators to be located on frame of lightbox. Lightbox to be freestanding, Contractor to provide necessary steel frame / column structure. Baseplates to be concealed below paving Illuminated poster boxes, N15/300, refer to L(99) 01 for details Balustrade, to Architect's later detailed design, fixed to edge of floor structure, to Str. Eng. spec 99 Double glazed structural glazing with concealed PPC aluminium glazing angles at head and base to subcontractor's detailed design, H13/115 Ex_D.01 Secondary steel structure to support glazing to window subcontractor's detailed design Acid etched precast concrete canopy, H42/110 Sim 1 A(31) 09 Sim 1 A(31) 10 Sim 1 A(31) 11 Sim 1 A(21) 13 5400 Sim 1 A(21) 13 Sim 1 A(31) 09 Sim 1 A(31) 11 Opaque glazing to conceal structure. Provide LED strip lighting behind glazing Steel structure to support window, to window subcontractor's specification, at vertical joint. Raico toggle detail along vertical silicone joints (clear silicone), H13/115 Double glazed, structural glazing with clear silicone joints, H13/115 Glass to glass corner joint at first floor level, no visible structure of framing. Glazing supported at head & base by concealed PPC glazing angles - final detail to window subcontractor's detailed design Concealed PPC glazing angles along based of glazing, recessed to finish flush with FFL Provide new, fixed, PPC aluminium framed window to fit existing door opening Ex_D.01, L10/330 Cut down 3no. existing window openings along line of existing brick piers to FFL within entrance. Rebuild / make good brickwork reveals / piers / heads as necessary using brick salvaged from site, F10/340. Provide new PPC steel linings to reveals, refer to A(21) series drawings for detail Provide new steelwork on inner face of brick to strengthen brick piers to Str. Eng. detail and specification. Strengthening steelwork to be fully concealed by PPC steel reveal linings Client supply, artist designed gates to each of the three new openings - Contractor to allow for full installation including coordination with Artist making the gates and provision of foundations for gate posts as necessary New area of stone paving within recessed entrance, Q25/200. 50mm thick Caithness slabs with Riven, slip resistant finish, on subbase to str. eng. specification Make good existing concrete footpath if damaged during works PPC aluminium flashing covering structure over entrance door Fixed structural glazing with concealed PPC glazing angles at head & base, H13/115 W(UG)_01 W(UG)_05 Steel structure to support window, to window subcontractor's specification, at vertical joint. Raico toggle detail along vertical silicone joints (clear silicone), H13/115 Existing metal columns to be concealed within wall Mezzanine floor structure set back from glazing, provide steel balustrade to edge to Architect's later detailed design W(LG)_14 Lightbox signage adjacent to front door, N15/250, refer to drawing L(99) 01. Push button for door actuators to be located on frame of lightbox. Lightbox to be freestanding, Contractor to provide necessary steel frame / column structure. Baseplates to be concealed below paving Illuminated poster boxes, N15/300, refer to L(99) 01 for details W(UG)_01 W(UG)_05 Existing brick wall to be treated for rot, spec C52 Wall type 6A, K10/140 - insulated drylining to all external walls Wall type 4C, K10/122 - Line insulated drylining with 1 layer 12.5mm plasterboard on 1 layer 18mm plywood on wall lining studs so that artwork can be hung in any location on the wall VOID Mezzanine floor structure set back from glazing, provide steel balustrade to edge to Architect's later detailed design Glass to glass corner joint at first floor level, no visible structure of framing. Glazing supported at head & base by concealed PPC glazing angles - final detail to window subcontractor's detailed design Fixed structural glazing with concealed PPC glazing angles at head & base, H13/115 Provide new PPC steel linings to reveals, L30/300, refer to A(21) series drawings for detail. Lining to wrap around 3 sides of pier and fully conceal strengthening steelwork to rear face Provide new steelwork on inner face of brick to strengthen brick piers to Str. Eng. detail and specification. Strengthening steelwork to be fully concealed by PPC steel reveal linings 1 A(31) 10 1 A(31) 15 Sim Sim 1 A(31) 18 Sim 1 A(31) 12 Sim 1 A(31) 13 Do not scale from drawing. Use figured dimensions only. All dimensions to be checked on site by the contractor and any discrepancies to be notified to the architect prior to works being carried out. Revisions: Title: Project: Client: Scale: Date: Drawing No: Page Park Architects 20 James Morrison Street, Glasgow G1 5PE, UK T 0141 553 5440 F 0141553 5441 [email protected] www.pagepark.co.uk @ C1 Front entrance study 07/25/16 Edinburgh Printmakers Creative Hub Edinburgh Printmakers 1:50 L(21) 50 CONSTRUCTION A1 Steel to support window, to window subcontractor's specification, concealed within wall Steel structure to support window, to window subcontractor's specification, at vertical joint. Raico toggle detail along vertical silicone joints (clear silicone), H13/115 RHS to support corner of window, to window subcontractor's detailed design. This RHS spans from the entrance level to the u/s of the timber mezzanine structure only. Glass to glass corner detail at first floor with no visible structure Provide secondary steel structure to support window head, to window subcontractor's detailed design Wall type 9A PPC aluminium flashing covering structure over entrance door Concealed glazing angles at head & base of DGU Double glazed structural glazing with concealed PPC aluminium glazing angles at head and base to subcontractor's detailed design, H13/115 Opaque glazing Opaque glazing 1500mm X 1500mm clear turning space for wheelchairs Structural, double height glazing with concealed PPC glazing angles at head & base, H13/115 New area of stone paving within recessed entrance, Q25/200. 50mm thick Caithness slabs with Riven, slip resistant finish, on subbase to str. eng. specification W(LG) 14 - Provide new, fixed, PPC aluminium framed window to fit existing door opening, L10/330. Remove existing steps within door opening. Provide new precast concrete window cill, H42/110 Both lobby doors, H13/115: Double glazed, PPC aluminium frame double doors with low energy actuator, GEZE Slimdrive EMD F-IS or similar approvded. Doors to drive open upon pressing button, otherwise manually opened, automatic door closer in all situations. Wheelchair accessible low threshold, brushed stainless steel. Min. clear width 1400mm Glazed side panel Ex_D.02 Ex_D.01 Air curtain concealed in ceiling void over doors to M&E engineer's specification & detail Client supply gates to each of the 3no. openings - Contractor to allow for full installation including coordination with Artist making the gates and provision of foundations for gate posts as necessary Provide new steelwork on inner face of brick to strengthen brick piers to Str. Eng. detail and specification. Strengthening steelwork to be fully concealed by PPC steel reveal linings Provide new PPC steel linings to reveals, L30/300, refer to A(21) series drawings for detail. Lining to wrap around 3 sides of pier and fully conceal strengthening steelwork to rear face Steel structure to support window, to window subcontractor's specification, concealed within wall Steel structure to support window, to window subcontractor's specification, at vertical joint. Raico toggle detail along vertical silicone joints (clear silicone), H13/115 Structural, double height glazing with concealed PPC glazing angles at head & base, H13/115 Lower Ground Floor - Plan of proposed recessed entrance area Upper Ground Floor - Plan of proposed recessed entrance area Fixed double glazed window with concealed PPC aluminium glazing angles at head & base, H13/115 PPC aluminium flashing covering structure over entrance door Provide new PPC steel linings to new openings, L30/300, refer to A(21) series drawings for detail Client supply gates to each of the 3no. openings - Contractor to allow for full installation including coordination with Artist making the gates and provision of foundations for gate posts as necessary New area of stone paving within recessed entrance, Q25/200. Caithness slabs with riven, slip resistant finish, on subbase to str. eng. specification White brick outer leaf to new reveal within entrance Double glazed structural glazing with concealed PPC aluminium glazing angles at head and base to subcontractor's detailed design, H13/115. Clear silicone joints Top coat of self-coloured render on reinforcing mesh on base coat render on exterior grade cementitious carrier board fixed using exterior grade stainless steel screws at centres recommended by manufacturer to exterior grade steel soffit hanging system fixed to u/s of floor slab, M21/160 - Contractor designed Provide new PPC steel linings to new openings, L30/300, refer to A(21) series drawings for detail 1 - Front elevation of new entrance 2 - Section thru new entrance 3 - Section thru new entrance 4 - Section thru new entrance 5 - 3D of new entrance with FF removed Lightbox signage adjacent to front door, N15/250, refer to drawing L(99) 01. Push button for door actuators to be located on frame of lightbox. Lightbox to be freestanding, Contractor to provide necessary steel frame / column structure. Baseplates to be concealed below paving C1 CONSTRUCTION ISSUE 01.04.2017 Illuminated poster boxes, N15/300, refer to L(99) 01 for details

Upload: others

Post on 20-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CONSTRUCTION - Edinburgh Printmakers · Secondary steel structure to support glazing to window subcontractor's detailed design Acid etched precast concrete canopy, H42/110 Sim 1 A(31)

2

L(21) 50

3

L(21) 50

4

L(21) 50

750

1600

R_LG.02Reception / Shop

R_LG.01Lobby

Sim1

A(31) 12

Sim1

A(31) 13

Sim1

A(31) 14

Sim1

A(31) 17

First Floor72870

Prop entrance level66600

Member's Gallery69518

2393

477

2477

3207 1160

5395

Clear silicone jointsbetween DGUs

Clear silicone jointsbetween DGUs

100mm rigid insulation fixed to u/s floorstructure over entrance, F30/156

Top coat of self-coloured render on reinforcingmesh on base coat render on exterior grade

cementitious carrier board fixed using exterior gradestainless steel screws at centres recommended bymanufacturer to exterior grade steel soffit hanging

system fixed to u/s of floor slab, M21/160 -Contractor designed

Ceiling type 01 to lobby, K10/200- Air curtain over doors to beconcealed in ceiling void

Forbo Nuway Tuftiguard Classicentrance matting with bambooscrapper bars recessed intoscreed, M40/200

New area of stone pavingwithin recessed entrance,Q25/200. 50mm thickCaithness slabs with Riven,slip resistant finish, onsubbase to str. eng.specification

Brick outerleaf, F10/110

50mm cavity

100mm KingspanKooltherm K12insulation, F30/155

Breather membrane,F30/190 on 22mmmoisture resistantplywood

Vapour control membrane,P10/310 on 22mm moisture

resistant plywood to innerface of SFS

SFS framing systembetween new steel

structure

Raico toggle detailalong vertical siliconejoints (clear silicone)to RHS behind

Both lobby doors, H13/115:Double glazed, PPC aluminiumframe double doors with low energyactuator, GEZE Slimdrive EMD F-ISor similar approvded. Doors todrive open upon pressing button,otherwise manually opened,automatic door closer in allsituations. Wheelchair accessiblelow threshold, brushed stainlesssteel

R_LG.01Lobby

Sim1

A(31) 15

Sim1

A(31) 11

1

A(35) 04

Sim1

A(22) 06

R_LG.03Gallery

First Floor72870

Prop entrance level66600

Member's Gallery69518

W(UG)_01

W(FF)_01W(FF)_02W(FF)_03W(FF)_04W(FF)_05

W(UG)_05

Red hatch indicates extent of existing brickwall to be removed. Cut down brickwork toform new openings. Rebuild / make goodbrickwork reveals / piers / heads asnecessary using brick salvaged from site,F10/340

Remove existing windows W(UG)_02 - 04

Provide new PPC steel linings to reveals &heads of each of the three openings,L30/300, refer to A(21) series drawings fordetail. Lining to wrap around 3 sides ofpier and fully conceal strengtheningsteelwork to rear face

Client supply gates to each of the 3no. openings -Contractor to allow for full installation includingcoordination with Artist making the gates andprovision of foundations for gate posts asnecessary

Provide new galvanised steelwork oninner face of existing brick (roughlyshown dotted red) to strengthen brickpiers to Str. Eng. detail and specification.

W(LG)_14

New PPC aluminium framed,double glazed, fixed window

W(LG)_14 to replace previousboarded up door Ex_D.01,

L10/330. New window to be sizedto fit existing opening

3no. acid etched precast concreteL-shaped canopies, H42/110, oneover each opening. Secondarygalvanised steel structure to supportcanopies to Structural Engineer'sdetailed design

Lightbox signage adjacent to front door,N15/250, refer to drawing L(99) 01. Pushbutton for door actuators to be located onframe of lightbox. Lightbox to befreestanding, Contractor to providenecessary steel frame / column structure.Baseplates to be concealed below paving

Illuminated poster boxes, N15/300, referto L(99) 01 for details

Balustrade, to Architect'slater detailed design, fixed to

edge of floor structure, toStr. Eng. spec

99

Double glazed structural glazing withconcealed PPC aluminium glazing

angles at head and base tosubcontractor's detailed design,

H13/115

Ex_D.01

Secondary steel structure to supportglazing to window subcontractor's

detailed design

Acid etched precast concretecanopy, H42/110

Sim1

A(31) 09

Sim1

A(31) 10

Sim1

A(31) 11

Sim1

A(21) 13

5400

Sim1

A(21) 13

Sim1

A(31) 09

Sim1

A(31) 11

Opaque glazing to conceal structure. ProvideLED strip lighting behind glazing

Steel structure to support window, to windowsubcontractor's specification, at vertical joint. Raico

toggle detail along vertical silicone joints (clearsilicone), H13/115

Double glazed, structural glazing withclear silicone joints, H13/115

Glass to glass corner joint at first floor level, novisible structure of framing. Glazing supported athead & base by concealed PPC glazing angles -final detail to window subcontractor's detaileddesign

Concealed PPC glazing angles alongbased of glazing, recessed to finishflush with FFL

Provide new, fixed, PPCaluminium framed window to fitexisting door opening Ex_D.01,

L10/330

Cut down 3no. existing window openings along line ofexisting brick piers to FFL within entrance. Rebuild /make good brickwork reveals / piers / heads asnecessary using brick salvaged from site, F10/340.Provide new PPC steel linings to reveals, refer toA(21) series drawings for detail

Provide new steelwork on inner face ofbrick to strengthen brick piers to Str. Eng.detail and specification. Strengtheningsteelwork to be fully concealed by PPCsteel reveal linings

Client supply, artist designed gates to each of the three newopenings - Contractor to allow for full installation includingcoordination with Artist making the gates and provision offoundations for gate posts as necessary

New area of stone paving within recessedentrance, Q25/200. 50mm thick Caithnessslabs with Riven, slip resistant finish, onsubbase to str. eng. specification

Make good existing concrete footpath if damagedduring works

PPC aluminium flashing coveringstructure over entrance door

Fixed structural glazing with concealed PPCglazing angles at head & base, H13/115

W(UG)_01

W(UG)_05

Steel structure to support window, to windowsubcontractor's specification, at vertical joint.

Raico toggle detail along vertical silicone joints(clear silicone), H13/115

Existing metal columns to be concealed within wall

Mezzanine floor structure set back from glazing, providesteel balustrade to edge to Architect's later detailed design

W(LG)_14

Lightbox signage adjacent to front door, N15/250, refer todrawing L(99) 01. Push button for door actuators to belocated on frame of lightbox. Lightbox to be freestanding,Contractor to provide necessary steel frame / columnstructure. Baseplates to be concealed below paving

Illuminated poster boxes, N15/300, refer to L(99) 01for details

W(UG)_01

W(UG)_05

Existing brick wall to betreated for rot, spec C52

Wall type 6A, K10/140 - insulated dryliningto all external walls

Wall type 4C, K10/122 - Line insulateddrylining with 1 layer 12.5mm plasterboardon 1 layer 18mm plywood on wall liningstuds so that artwork can be hung in anylocation on the wall

VOID

Mezzanine floor structure set back fromglazing, provide steel balustrade to edge toArchitect's later detailed design

Glass to glass corner joint at first floor level, novisible structure of framing. Glazing supportedat head & base by concealed PPC glazingangles - final detail to window subcontractor'sdetailed design

Fixed structural glazing with concealed PPCglazing angles at head & base, H13/115

Provide new PPC steel linings toreveals, L30/300, refer to A(21)series drawings for detail. Lining towrap around 3 sides of pier and fullyconceal strengthening steelwork torear face

Provide new steelwork on inner face of brick tostrengthen brick piers to Str. Eng. detail and

specification. Strengthening steelwork to be fullyconcealed by PPC steel reveal linings

1

A(31) 10 1

A(31) 15

Sim

Sim1

A(31) 18Sim1

A(31) 12 Sim1

A(31) 13

Do not scale from drawing. Use figured dimensions only.All dimensions to be checked on site by the contractor and anydiscrepancies to be notified to the architect prior to works being carriedout.

Revisions:

Title:

Project:

Client:

Scale:

Date:

Drawing No:

Page Park Architects

20 James Morrison Street, Glasgow G1 5PE, UK

T 0141 553 5440 F 0141553 5441

[email protected] www.pagepark.co.uk

@

C1

Front entrance study

07/25/16

Edinburgh Printmakers Creative Hub

Edinburgh Printmakers

1:50

L(21) 50

CONSTRUCTION

A1

Steel to support window,to window

subcontractor'sspecification, concealed

within wall

Steel structure to supportwindow, to window

subcontractor's specification,at vertical joint. Raico toggledetail along vertical silicone

joints (clear silicone), H13/115RHS to support corner of window,

to window subcontractor's detaileddesign. This RHS spans from the

entrance level to the u/s of thetimber mezzanine structure only.

Glass to glass corner detail at firstfloor with no visible structure

Provide secondary steelstructure to support windowhead, to windowsubcontractor's detaileddesign

Wall type 9A

PPC aluminium flashing coveringstructure over entrance door

Concealed glazingangles at head &

base of DGU

Double glazed structural glazingwith concealed PPC aluminium

glazing angles at head and base tosubcontractor's detailed design,

H13/115

Opaqueglazing

Opaqueglazing

1500mm X 1500mmclear turning spacefor wheelchairs

Structural, double heightglazing with concealed PPC

glazing angles at head &base, H13/115

New area of stone paving withinrecessed entrance, Q25/200.

50mm thick Caithness slabs withRiven, slip resistant finish, on

subbase to str. eng. specification

W(LG) 14 - Provide new, fixed, PPCaluminium framed window to fit existing

door opening, L10/330. Removeexisting steps within door opening.

Provide new precast concrete windowcill, H42/110

Both lobby doors, H13/115:Double glazed, PPC aluminium framedouble doors with low energy actuator,GEZE Slimdrive EMD F-IS or similarapprovded. Doors to drive open uponpressing button, otherwise manuallyopened, automatic door closer in allsituations. Wheelchair accessible lowthreshold, brushed stainless steel.Min. clear width 1400mm

Glazed side panel

Ex_D.02

Ex_

D.0

1

Air curtain concealed inceiling void over doors toM&E engineer'sspecification & detail

Client supply gates to each of the 3no.openings - Contractor to allow for full

installation including coordinationwith Artist making the gates andprovision of foundations for gate

posts as necessary

Provide new steelwork on inner faceof brick to strengthen brick piers to

Str. Eng. detail and specification.Strengthening steelwork to be fully

concealed by PPC steel reveallinings

Provide new PPC steel linings toreveals, L30/300, refer to A(21)

series drawings for detail. Liningto wrap around 3 sides of pier

and fully conceal strengtheningsteelwork to rear face

Steel structure to supportwindow, to window

subcontractor'sspecification, concealed

within wall

Steel structure to supportwindow, to window

subcontractor's specification,at vertical joint. Raico toggledetail along vertical silicone

joints (clear silicone), H13/115

Structural, double heightglazing with concealedPPC glazing angles athead & base, H13/115

Lower Ground Floor - Plan of proposed recessed entrance area Upper Ground Floor - Plan of proposed recessed entrance area

Fixed double glazedwindow withconcealed PPCaluminium glazingangles at head &base, H13/115

PPC aluminium flashing coveringstructure over entrance door

Provide new PPC steel liningsto new openings, L30/300, referto A(21) series drawings fordetail

Client supply gates to each ofthe 3no. openings - Contractor toallow for full installation includingcoordination with Artist makingthe gates and provision offoundations for gate posts asnecessary

New area of stone paving withinrecessed entrance, Q25/200.Caithness slabs with riven, slipresistant finish, on subbase to str.eng. specification

White brick outer leaf tonew reveal within entrance

Double glazed structuralglazing with concealed

PPC aluminium glazingangles at head and base

to subcontractor's detaileddesign, H13/115. Clear

silicone joints

Top coat of self-coloured renderon reinforcing mesh on base coat

render on exterior gradecementitious carrier board fixed

using exterior grade stainlesssteel screws at centres

recommended by manufacturer toexterior grade steel soffit hanging

system fixed to u/s of floor slab,M21/160 - Contractor designed

Provide new PPC steel liningsto new openings, L30/300,

refer to A(21) series drawingsfor detail

1 - Front elevation of new entrance

2 - Section thru new entrance 3 - Section thru new entrance 4 - Section thru new entrance

5 - 3D of new entrance with FF removed

Lightbox signage adjacent to front door, N15/250, refer todrawing L(99) 01. Push button for door actuators to belocated on frame of lightbox. Lightbox to be freestanding,Contractor to provide necessary steel frame / columnstructure. Baseplates to be concealed below paving

C1 CONSTRUCTION ISSUE 01.04.2017

Illuminated poster boxes, N15/300, refer to L(99) 01 fordetails