construction - edinburgh printmakers · secondary steel structure to support glazing to window...
TRANSCRIPT
2
L(21) 50
3
L(21) 50
4
L(21) 50
750
1600
R_LG.02Reception / Shop
R_LG.01Lobby
Sim1
A(31) 12
Sim1
A(31) 13
Sim1
A(31) 14
Sim1
A(31) 17
First Floor72870
Prop entrance level66600
Member's Gallery69518
2393
477
2477
3207 1160
5395
Clear silicone jointsbetween DGUs
Clear silicone jointsbetween DGUs
100mm rigid insulation fixed to u/s floorstructure over entrance, F30/156
Top coat of self-coloured render on reinforcingmesh on base coat render on exterior grade
cementitious carrier board fixed using exterior gradestainless steel screws at centres recommended bymanufacturer to exterior grade steel soffit hanging
system fixed to u/s of floor slab, M21/160 -Contractor designed
Ceiling type 01 to lobby, K10/200- Air curtain over doors to beconcealed in ceiling void
Forbo Nuway Tuftiguard Classicentrance matting with bambooscrapper bars recessed intoscreed, M40/200
New area of stone pavingwithin recessed entrance,Q25/200. 50mm thickCaithness slabs with Riven,slip resistant finish, onsubbase to str. eng.specification
Brick outerleaf, F10/110
50mm cavity
100mm KingspanKooltherm K12insulation, F30/155
Breather membrane,F30/190 on 22mmmoisture resistantplywood
Vapour control membrane,P10/310 on 22mm moisture
resistant plywood to innerface of SFS
SFS framing systembetween new steel
structure
Raico toggle detailalong vertical siliconejoints (clear silicone)to RHS behind
Both lobby doors, H13/115:Double glazed, PPC aluminiumframe double doors with low energyactuator, GEZE Slimdrive EMD F-ISor similar approvded. Doors todrive open upon pressing button,otherwise manually opened,automatic door closer in allsituations. Wheelchair accessiblelow threshold, brushed stainlesssteel
R_LG.01Lobby
Sim1
A(31) 15
Sim1
A(31) 11
1
A(35) 04
Sim1
A(22) 06
R_LG.03Gallery
First Floor72870
Prop entrance level66600
Member's Gallery69518
W(UG)_01
W(FF)_01W(FF)_02W(FF)_03W(FF)_04W(FF)_05
W(UG)_05
Red hatch indicates extent of existing brickwall to be removed. Cut down brickwork toform new openings. Rebuild / make goodbrickwork reveals / piers / heads asnecessary using brick salvaged from site,F10/340
Remove existing windows W(UG)_02 - 04
Provide new PPC steel linings to reveals &heads of each of the three openings,L30/300, refer to A(21) series drawings fordetail. Lining to wrap around 3 sides ofpier and fully conceal strengtheningsteelwork to rear face
Client supply gates to each of the 3no. openings -Contractor to allow for full installation includingcoordination with Artist making the gates andprovision of foundations for gate posts asnecessary
Provide new galvanised steelwork oninner face of existing brick (roughlyshown dotted red) to strengthen brickpiers to Str. Eng. detail and specification.
W(LG)_14
New PPC aluminium framed,double glazed, fixed window
W(LG)_14 to replace previousboarded up door Ex_D.01,
L10/330. New window to be sizedto fit existing opening
3no. acid etched precast concreteL-shaped canopies, H42/110, oneover each opening. Secondarygalvanised steel structure to supportcanopies to Structural Engineer'sdetailed design
Lightbox signage adjacent to front door,N15/250, refer to drawing L(99) 01. Pushbutton for door actuators to be located onframe of lightbox. Lightbox to befreestanding, Contractor to providenecessary steel frame / column structure.Baseplates to be concealed below paving
Illuminated poster boxes, N15/300, referto L(99) 01 for details
Balustrade, to Architect'slater detailed design, fixed to
edge of floor structure, toStr. Eng. spec
99
Double glazed structural glazing withconcealed PPC aluminium glazing
angles at head and base tosubcontractor's detailed design,
H13/115
Ex_D.01
Secondary steel structure to supportglazing to window subcontractor's
detailed design
Acid etched precast concretecanopy, H42/110
Sim1
A(31) 09
Sim1
A(31) 10
Sim1
A(31) 11
Sim1
A(21) 13
5400
Sim1
A(21) 13
Sim1
A(31) 09
Sim1
A(31) 11
Opaque glazing to conceal structure. ProvideLED strip lighting behind glazing
Steel structure to support window, to windowsubcontractor's specification, at vertical joint. Raico
toggle detail along vertical silicone joints (clearsilicone), H13/115
Double glazed, structural glazing withclear silicone joints, H13/115
Glass to glass corner joint at first floor level, novisible structure of framing. Glazing supported athead & base by concealed PPC glazing angles -final detail to window subcontractor's detaileddesign
Concealed PPC glazing angles alongbased of glazing, recessed to finishflush with FFL
Provide new, fixed, PPCaluminium framed window to fitexisting door opening Ex_D.01,
L10/330
Cut down 3no. existing window openings along line ofexisting brick piers to FFL within entrance. Rebuild /make good brickwork reveals / piers / heads asnecessary using brick salvaged from site, F10/340.Provide new PPC steel linings to reveals, refer toA(21) series drawings for detail
Provide new steelwork on inner face ofbrick to strengthen brick piers to Str. Eng.detail and specification. Strengtheningsteelwork to be fully concealed by PPCsteel reveal linings
Client supply, artist designed gates to each of the three newopenings - Contractor to allow for full installation includingcoordination with Artist making the gates and provision offoundations for gate posts as necessary
New area of stone paving within recessedentrance, Q25/200. 50mm thick Caithnessslabs with Riven, slip resistant finish, onsubbase to str. eng. specification
Make good existing concrete footpath if damagedduring works
PPC aluminium flashing coveringstructure over entrance door
Fixed structural glazing with concealed PPCglazing angles at head & base, H13/115
W(UG)_01
W(UG)_05
Steel structure to support window, to windowsubcontractor's specification, at vertical joint.
Raico toggle detail along vertical silicone joints(clear silicone), H13/115
Existing metal columns to be concealed within wall
Mezzanine floor structure set back from glazing, providesteel balustrade to edge to Architect's later detailed design
W(LG)_14
Lightbox signage adjacent to front door, N15/250, refer todrawing L(99) 01. Push button for door actuators to belocated on frame of lightbox. Lightbox to be freestanding,Contractor to provide necessary steel frame / columnstructure. Baseplates to be concealed below paving
Illuminated poster boxes, N15/300, refer to L(99) 01for details
W(UG)_01
W(UG)_05
Existing brick wall to betreated for rot, spec C52
Wall type 6A, K10/140 - insulated dryliningto all external walls
Wall type 4C, K10/122 - Line insulateddrylining with 1 layer 12.5mm plasterboardon 1 layer 18mm plywood on wall liningstuds so that artwork can be hung in anylocation on the wall
VOID
Mezzanine floor structure set back fromglazing, provide steel balustrade to edge toArchitect's later detailed design
Glass to glass corner joint at first floor level, novisible structure of framing. Glazing supportedat head & base by concealed PPC glazingangles - final detail to window subcontractor'sdetailed design
Fixed structural glazing with concealed PPCglazing angles at head & base, H13/115
Provide new PPC steel linings toreveals, L30/300, refer to A(21)series drawings for detail. Lining towrap around 3 sides of pier and fullyconceal strengthening steelwork torear face
Provide new steelwork on inner face of brick tostrengthen brick piers to Str. Eng. detail and
specification. Strengthening steelwork to be fullyconcealed by PPC steel reveal linings
1
A(31) 10 1
A(31) 15
Sim
Sim1
A(31) 18Sim1
A(31) 12 Sim1
A(31) 13
Do not scale from drawing. Use figured dimensions only.All dimensions to be checked on site by the contractor and anydiscrepancies to be notified to the architect prior to works being carriedout.
Revisions:
Title:
Project:
Client:
Scale:
Date:
Drawing No:
Page Park Architects
20 James Morrison Street, Glasgow G1 5PE, UK
T 0141 553 5440 F 0141553 5441
[email protected] www.pagepark.co.uk
@
C1
Front entrance study
07/25/16
Edinburgh Printmakers Creative Hub
Edinburgh Printmakers
1:50
L(21) 50
CONSTRUCTION
A1
Steel to support window,to window
subcontractor'sspecification, concealed
within wall
Steel structure to supportwindow, to window
subcontractor's specification,at vertical joint. Raico toggledetail along vertical silicone
joints (clear silicone), H13/115RHS to support corner of window,
to window subcontractor's detaileddesign. This RHS spans from the
entrance level to the u/s of thetimber mezzanine structure only.
Glass to glass corner detail at firstfloor with no visible structure
Provide secondary steelstructure to support windowhead, to windowsubcontractor's detaileddesign
Wall type 9A
PPC aluminium flashing coveringstructure over entrance door
Concealed glazingangles at head &
base of DGU
Double glazed structural glazingwith concealed PPC aluminium
glazing angles at head and base tosubcontractor's detailed design,
H13/115
Opaqueglazing
Opaqueglazing
1500mm X 1500mmclear turning spacefor wheelchairs
Structural, double heightglazing with concealed PPC
glazing angles at head &base, H13/115
New area of stone paving withinrecessed entrance, Q25/200.
50mm thick Caithness slabs withRiven, slip resistant finish, on
subbase to str. eng. specification
W(LG) 14 - Provide new, fixed, PPCaluminium framed window to fit existing
door opening, L10/330. Removeexisting steps within door opening.
Provide new precast concrete windowcill, H42/110
Both lobby doors, H13/115:Double glazed, PPC aluminium framedouble doors with low energy actuator,GEZE Slimdrive EMD F-IS or similarapprovded. Doors to drive open uponpressing button, otherwise manuallyopened, automatic door closer in allsituations. Wheelchair accessible lowthreshold, brushed stainless steel.Min. clear width 1400mm
Glazed side panel
Ex_D.02
Ex_
D.0
1
Air curtain concealed inceiling void over doors toM&E engineer'sspecification & detail
Client supply gates to each of the 3no.openings - Contractor to allow for full
installation including coordinationwith Artist making the gates andprovision of foundations for gate
posts as necessary
Provide new steelwork on inner faceof brick to strengthen brick piers to
Str. Eng. detail and specification.Strengthening steelwork to be fully
concealed by PPC steel reveallinings
Provide new PPC steel linings toreveals, L30/300, refer to A(21)
series drawings for detail. Liningto wrap around 3 sides of pier
and fully conceal strengtheningsteelwork to rear face
Steel structure to supportwindow, to window
subcontractor'sspecification, concealed
within wall
Steel structure to supportwindow, to window
subcontractor's specification,at vertical joint. Raico toggledetail along vertical silicone
joints (clear silicone), H13/115
Structural, double heightglazing with concealedPPC glazing angles athead & base, H13/115
Lower Ground Floor - Plan of proposed recessed entrance area Upper Ground Floor - Plan of proposed recessed entrance area
Fixed double glazedwindow withconcealed PPCaluminium glazingangles at head &base, H13/115
PPC aluminium flashing coveringstructure over entrance door
Provide new PPC steel liningsto new openings, L30/300, referto A(21) series drawings fordetail
Client supply gates to each ofthe 3no. openings - Contractor toallow for full installation includingcoordination with Artist makingthe gates and provision offoundations for gate posts asnecessary
New area of stone paving withinrecessed entrance, Q25/200.Caithness slabs with riven, slipresistant finish, on subbase to str.eng. specification
White brick outer leaf tonew reveal within entrance
Double glazed structuralglazing with concealed
PPC aluminium glazingangles at head and base
to subcontractor's detaileddesign, H13/115. Clear
silicone joints
Top coat of self-coloured renderon reinforcing mesh on base coat
render on exterior gradecementitious carrier board fixed
using exterior grade stainlesssteel screws at centres
recommended by manufacturer toexterior grade steel soffit hanging
system fixed to u/s of floor slab,M21/160 - Contractor designed
Provide new PPC steel liningsto new openings, L30/300,
refer to A(21) series drawingsfor detail
1 - Front elevation of new entrance
2 - Section thru new entrance 3 - Section thru new entrance 4 - Section thru new entrance
5 - 3D of new entrance with FF removed
Lightbox signage adjacent to front door, N15/250, refer todrawing L(99) 01. Push button for door actuators to belocated on frame of lightbox. Lightbox to be freestanding,Contractor to provide necessary steel frame / columnstructure. Baseplates to be concealed below paving
C1 CONSTRUCTION ISSUE 01.04.2017
Illuminated poster boxes, N15/300, refer to L(99) 01 fordetails