GENERAL PROJECT INFORMATION New School in New Market, Maryland +/- 15 Acre Site Part of Hamptons West PUD Partial Two-Story Building Structural Steel Frame/Brick Cladding
State Rated Capacity: 725 students* Project Size: 95,085 GSF* Net-to-Gross Efficiency: 69.99%*Includes Specialized Instruction Add Alternate
Facilities Services Division© 2019
PROJECT SITE
*PLAYING
FIELD
Vehicular Circulation• 134 On-Site Parking Spaces
• 31 On-Street Parking Spaces
• 32 Car Drop-Off/Pick-Up Queuing Spaces (Stacked)
• 12 Bus Spaces (Stacked)
Three (3) Playgrounds (PG)
One (1) Paved Play Court
One (1) 240’ x 150’ Multi-Use Playing Field
Two (2) Specimen Trees Preserved
Copyright 2019GWWO Architects/MK Consulting Engineers/Harris Smariga & Assoc
PARKING
PARKING
BUS ENTRYLower Level: el. +/- 513.6’
MAIN ENTRYUpper Level: el. +/- 529.6’
SERVICE AREAUpper Level: el. +/- 529.6’*
PG
PGPG
PAVED COURT
Facilities Services Division© 2019
CAFETERIA
OPENTO
BELOW
GYMNASIUM
UPPER LEVEL FLOOR PLAN
MAIN ENTRY
SERVICEENTRY
SP INSTENTRY
Classroom
Pre-K/Kindergarten
Creative Classroom
Learning Support
Maintenance
Circulation
Media Center
Building Support
Cafeteria/Stage
Gymnasium
Administration
Health Suite
Specialty Program
COLLABSPACE
KITCHEN
STAGE
SERVICEDRIVE
BUILDING AREA BASE BID W/ ADD ALT 01LOWER LEVEL 30,585 GSF 30,585 GSFUPPER LEVEL 61,665 GSF 64,500 GSF
TOTAL AREA 92,250 GSF 95,085 GSFPROGRAM AREA 66,546 NSF 66,546 NSFEFFICIENCY 70.13% 69.99%
Facilities Services Division© 2019
UPPER LEVEL ABOVE+16.00’
MEDIACENTER
LOWER LEVEL FLOOR PLANBUS
ENTRYClassroom
Pre-K/Kindergarten
Creative Classroom
Learning Support
Maintenance
Circulation
Media Center
Building Support
Cafeteria/Stage
Gymnasium
Administration
Health Suite
Specialty Program
PLAYGROUNDS
PLAYGROUNDS
BUILDING AREA BASE BID W/ ADD ALT 01LOWER LEVEL 30,585 GSF 30,585 GSFUPPER LEVEL 61,665 GSF 64,500 GSF
TOTAL AREA 92,250 GSF 95,085 GSFPROGRAM AREA 66,546 NSF 66,546 NSFEFFICIENCY 70.13% 69.99%
Facilities Services Division© 2019
EXTERIOR RENDERING
VIEW OF MAIN ENTRY
Facilities Services Division© 2019
EXTERIOR RENDERING
VIEW OF BUS ENTRY
Facilities Services Division© 2019
PROJECT SCHEDULE
PHASE DURATION
Construction Documents July 2019 – December 2019
Issued for Bid January 2020
Contracts/Construction February 2020 – June 2021
Faculty Occupancy July 2021
Student Occupancy September 2021