BLUE HERON ELEMENTARY SCHOOLCONSTRUCTION DOCUMENT PRESENTATION

Presenters:Mr. Bradley Ahalt – FCPS Senior Project Manager

Mr. Scott Moir, AIA – GWWO Architects Project Manager

Facilities Services DivisionDecember 11, 2019

© 2019 FCPS/GWWO Architects

Page 2: CONSTRUCTION DOCUMENT PRESENTATION · 2019. 12. 17. · Media Center. Building Support. Cafeteria/Stage. Gymnasium. Administration. Health Suite. Specialty Program. COLLAB SPACE KITCHEN

Facilities Services Division© 2019

GENERAL PROJECT INFORMATION New School in New Market, Maryland +/- 15 Acre Site Part of Hamptons West PUD Partial Two-Story Building Structural Steel Frame/Brick Cladding

State Rated Capacity: 725 students* Project Size: 95,085 GSF* Net-to-Gross Efficiency: 69.99%*Includes Specialized Instruction Add Alternate

Page 3: CONSTRUCTION DOCUMENT PRESENTATION · 2019. 12. 17. · Media Center. Building Support. Cafeteria/Stage. Gymnasium. Administration. Health Suite. Specialty Program. COLLAB SPACE KITCHEN

Facilities Services Division© 2019

PROJECT SITE

*PLAYING

FIELD

Vehicular Circulation• 134 On-Site Parking Spaces

• 31 On-Street Parking Spaces

• 32 Car Drop-Off/Pick-Up Queuing Spaces (Stacked)

• 12 Bus Spaces (Stacked)

Three (3) Playgrounds (PG)

One (1) Paved Play Court

One (1) 240’ x 150’ Multi-Use Playing Field

Two (2) Specimen Trees Preserved

Copyright 2019GWWO Architects/MK Consulting Engineers/Harris Smariga & Assoc

PARKING

PARKING

BUS ENTRYLower Level: el. +/- 513.6’

MAIN ENTRYUpper Level: el. +/- 529.6’

SERVICE AREAUpper Level: el. +/- 529.6’*

PG

PGPG

PAVED COURT

Page 4: CONSTRUCTION DOCUMENT PRESENTATION · 2019. 12. 17. · Media Center. Building Support. Cafeteria/Stage. Gymnasium. Administration. Health Suite. Specialty Program. COLLAB SPACE KITCHEN

Facilities Services Division© 2019

CAFETERIA

OPENTO

BELOW

GYMNASIUM

UPPER LEVEL FLOOR PLAN

MAIN ENTRY

SERVICEENTRY

SP INSTENTRY

Classroom

Pre-K/Kindergarten

Creative Classroom

Learning Support

Maintenance

Circulation

Media Center

Building Support

Cafeteria/Stage

Gymnasium

Administration

Health Suite

Specialty Program

COLLABSPACE

KITCHEN

STAGE

SERVICEDRIVE

BUILDING AREA BASE BID W/ ADD ALT 01LOWER LEVEL 30,585 GSF 30,585 GSFUPPER LEVEL 61,665 GSF 64,500 GSF

TOTAL AREA 92,250 GSF 95,085 GSFPROGRAM AREA 66,546 NSF 66,546 NSFEFFICIENCY 70.13% 69.99%

Page 5: CONSTRUCTION DOCUMENT PRESENTATION · 2019. 12. 17. · Media Center. Building Support. Cafeteria/Stage. Gymnasium. Administration. Health Suite. Specialty Program. COLLAB SPACE KITCHEN

Facilities Services Division© 2019

UPPER LEVEL ABOVE+16.00’

MEDIACENTER

LOWER LEVEL FLOOR PLANBUS

ENTRYClassroom

Pre-K/Kindergarten

Creative Classroom

Learning Support

Maintenance

Circulation

Media Center

Building Support

Cafeteria/Stage

Gymnasium

Administration

Health Suite

Specialty Program

PLAYGROUNDS

PLAYGROUNDS

BUILDING AREA BASE BID W/ ADD ALT 01LOWER LEVEL 30,585 GSF 30,585 GSFUPPER LEVEL 61,665 GSF 64,500 GSF

TOTAL AREA 92,250 GSF 95,085 GSFPROGRAM AREA 66,546 NSF 66,546 NSFEFFICIENCY 70.13% 69.99%

Page 6: CONSTRUCTION DOCUMENT PRESENTATION · 2019. 12. 17. · Media Center. Building Support. Cafeteria/Stage. Gymnasium. Administration. Health Suite. Specialty Program. COLLAB SPACE KITCHEN

Facilities Services Division© 2019

EXTERIOR RENDERING

VIEW OF MAIN ENTRY

Page 7: CONSTRUCTION DOCUMENT PRESENTATION · 2019. 12. 17. · Media Center. Building Support. Cafeteria/Stage. Gymnasium. Administration. Health Suite. Specialty Program. COLLAB SPACE KITCHEN

Facilities Services Division© 2019

EXTERIOR RENDERING

VIEW OF BUS ENTRY

Page 8: CONSTRUCTION DOCUMENT PRESENTATION · 2019. 12. 17. · Media Center. Building Support. Cafeteria/Stage. Gymnasium. Administration. Health Suite. Specialty Program. COLLAB SPACE KITCHEN

Facilities Services Division© 2019

PROJECT SCHEDULE

PHASE DURATION

Construction Documents July 2019 – December 2019

Issued for Bid January 2020

Contracts/Construction February 2020 – June 2021

Faculty Occupancy July 2021

Student Occupancy September 2021