Construction Cost Handbook 

PHILIPPINES 2013 

Langdon & Seah Philippines Inc 

Page 2: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 2/139

 

Projects featured on Cover Page : 

1. Ben Thanh Towers - Ho Chi Minh City, Vietnam.

(upper left side) 

2. China Central TV Tower - Beijing, China 

(second upper left side) 

3. ION Orchard & Residences - Singapore 

(upper right side) 

4. Johor International Convention Center - Malaysia 

(middle left side) 

5. Hyderabad International Convention Center - India 

(lower side) 

Published by Langdon & Seah (Philippines) 

Page 3: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 3/139

INTRODUCTION  1 

The following handbook of information relating to theconstruction industry has been compiled by: 

Langdon & Seah Philippines Inc. 4th & 7th Floor King’s Court I Building 2129 Pasong Tamo, Makati City 1231 Philippines 

Telephone : +63 (2) 811 2971 Fax : +63 (2) 811 2071 Email : [email protected] Website : www.langdonseah.com 

© Langdon & Seah Philippines Inc. 2013 

 All rights reserved. No part of this publication may bere-produced or copied in any form without prior writtenpermission from Langdon & Seah (Philippines). 

The information contained herein should beregarded as indicative and for general guidanceonly. Whilst every effort has been made to ensureaccuracy, no responsibility can be accepted forerrors and omissions, however caused. 

If advice concerning individual projects is required, we

would be happy to assist. 

Unless otherwise stated, costs reflected in thishandbook are anticipated Manila costs in 4th Quarter  2012. 

Langdon & Seah Philippines Inc. would like toacknowledge the assistance of Jones Lang LaSalle inproviding additional data and information for thispublication. 

Page 4: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 4/139

0 TABLE OF CONTENTS 

2  TABLE OF CONTENTS 

Page No. 

Index 

Calendar 4 

Vision / Mission Statement 6 

Quality Policy Statement 10 

1. CONSTRUCTION COST DATA 

Construction Costs for Selected Asian Cities 12 

M & E Costs for Selected Asian Cities 18 

Construction Costs for Philippines 24 

M & E Services Costs for Philippines 26 

Construction Cost Specification 28 

Major Rates for Selected Asian Cities 30 

Retail Prices of Basic Construction Materials 

for Philippines 36 Unit Costs for Ancillary Facilities for Philippines 40 

M & E Major Plant Costs for Philippines 42 

Fit-out Costs for Philippines 44 

Kitchen Equipment Cost for Philippines 47 

2. GENERAL CONSTRUCTION DATA 

Trends in Construction Costs for Philippines 51 Construction Value 52 

Construction Activity 53 

Lead Time of Different Packages 54 

Utility Costs for Selected Asian Cities 56 

Estimating Rules of Thumb 58 

Progress Payments 60 

Construction Materials Wholesale Price Index 62 Minimum Wage 64 

 Average Earnings Index for Construction 65 

Page 5: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 5/139

TABLE OF CONTENTS  3 

3. PROPERTY COMMENTARY 

Page No. 

Commercial  69 

Residential  70 

Hotels and Serviced Apartments  71 

Retail  73 

Industrial  74 

4. FINANCIAL 

Philippines Key Data  78 

Economic Highlights  79 

Financial Definitions  80 

Financial Formulae  81 

Mortgage Repayment Table  83 Consumer Price Index  83 

Exchange Rates  84 

Currency Charts  86 

Prime Rates  90 

Manila Reference Rate  91 

5. OTHER INFORMATION 

Philippine Map  94 

Public Holidays  95 

IDD Codes & Time Differences  106 

Conversion Factors  107 

Langdon & Seah Professional Services  108 

Quality System  110 

Environmental Sustainability  112 

Development ManagementInternational Directory of

Langdon & Seah Offices 

114 

119 

Page 6: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 6/139

0 CALENDAR 

4  CALENDAR 

        2        0         1        2

        2        0         1        3 

JANUARY FEBRUARY MARCH 

M T W T F S S 

30 31 1 

2 3 4 5 6 7 8 

9 10 11 12 13 14 15 

16 17 18 19 20 21 22 

23 24 25 26 27 28 29 

M T W T F S S 1 2 3 4 5 

6 7 8 9 10 11 12 

13 14 15 16 17 18 19 

20 21 22 23 24 25 26 

27 28 29 

M T W T F S S 1 2 3 4 

5 6 7 8 9 10 11 

12 13 14 15 16 17 18 

19 20 21 22 23 24 25 

26 27 28 29 30 31 

 APRIL MAY JUNE 

M T W T F S S 

30 1 

2 3 4 5 6 7 8 

9 10 11 12 13 14 15 

16 17 18 19 20 21 22 

23 24 25 26 27 28 29 

M T W T F S S 

1 2 3 4 5 6 

7 8 9 10 11 12 13 

14 15 16 17 18 19 20 

21 22 23 24 25 26 27 

28 29 30 31 

M T W T F S S 

1 2 3 

4 5 6 7 8 9 10 

11 12 13 14 15 16 17 

18 19 20 21 22 23 24 

25 26 27 28 29 30 

JULY AUGUST SEPTEMBER M T W T F S S 

30 31 1 

2 3 4 5 6 7 8 

9 10 11 12 13 14 15 16 17 18 19 20 21 22 

23 24 25 26 27 28 29 

M T W T F S S 

1 2 3 4 5 

6 7 8 9 10 11 12 

13 14 15 16 17 18 19 20 21 22 23 24 25 26 

27 28 29 30 31 

M T W T F S S 

1 2 

3 4 5 6 7 8 9 

10 11 12 13 14 15 16 17 18 19 20 21 22 23 

24 25 26 27 28 29 30 

OCTOBER NOVEMBER DECEMBER 

M T W T F S S 

1 2 3 4 5 6 7 

8 9 10 11 12 13 14 

15 16 17 18 19 20 21 

22 23 24 25 26 27 28 

29 30 31 

M T W T F S S 

1 2 3 4 

5 6 7 8 9 10 11 

12 13 14 15 16 17 18 

19 20 21 22 23 24 25 

26 27 28 29 30 

M T W T F S S 

31 1 2 

3 4 5 6 7 8 9 

10 11 12 13 14 15 16 

17 18 19 20 21 22 23 

24 25 26 27 28 29 30 

JANUARY FEBRUARY MARCH M T W T F S S 

1 2 3 4 5 6 

7 8 9 10 11 12 13 

14 15 16 17 18 19 20 

21 22 23 24 25 26 27 

28 29 30 31 

M T W T F S S 

1 2 3 

4 5 6 7 8 9 10 

11 12 13 14 15 16 17 

18 19 20 21 22 23 24 

25 26 27 28 

M T W T F S S 

1 2 3 

4 5 6 7 8 9 10 

11 12 13 14 15 16 17 

18 19 20 21 22 23 24 

25 26 27 28 29 30 31 

 APRIL MAY JUNE 

M T W T F S S 

1 2 3 4 5 6 7 

8 9 10 11 12 13 14 

15 16 17 18 19 20 21 

22 23 24 25 26 27 28 

29 30 

M T W T F S S 

1 2 3 4 5 

6 7 8 9 10 11 12 

13 14 15 16 17 18 19 

20 21 22 23 24 25 26 

27 28 29 30 31 

M T W T F S S 

1 2 

3 4 5 6 7 8 9 

10 11 12 13 14 15 16 

17 18 19 20 21 22 23 

24 25 26 27 28 29 30 

JULY AUGUST SEPTEMBER M T W T F S S 

1 2 3 4 5 6 7 

8 9 10 11 12 13 14 

15 16 17 18 19 20 21 

22 23 24 25 26 27 28 

29 30 31 

M T W T F S S 

1 2 3 4 

5 6 7 8 9 10 11 

12 13 14 15 16 17 18 

19 20 21 22 23 24 25 

26 27 28 29 30 

M T W T F S S 

30 1 

2 3 4 5 6 7 8 

9 10 11 12 13 14 15 

16 17 18 19 20 21 22 

23 24 25 26 27 28 29 

OCTOBER NOVEMBER DECEMBER 

M T W T F S S 

1 2 3 4 5 6 

7 8 9 10 11 12 13 

14 15 16 17 18 19 20 

21 22 23 24 25 26 27 

28 29 30 

M T W T F S S 

1 2 3 

4 5 6 7 8 9 10 

11 12 13 14 15 16 17 

18 19 20 21 22 23 24 

25 26 27 28 29 30 

M T W T F S S 

30 31 1 

2 3 4 5 6 7 8 

9 10 11 12 13 14 15 

16 17 18 19 20 21 22 

23 24 25 26 27 28 29 

Page 7: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 7/139

CALENDAR  5 

2        0       1       4       

2       

 0       1        5       

JANUARY FEBRUARY MARCH 

M T W T F S S 1 2 3 4 5 

6 7 8 9 10 11 12 

13 14 15 16 17 18 19 

20 21 22 23 24 25 26 

27 28 29 30 31 

M T W T F S S 1 2 

3 4 5 6 7 8 9 

10 11 12 13 14 15 16 

17 18 19 20 21 22 23 

24 25 26 27 28 

M T W T F S S 31 1 2 

3 4 5 6 7 8 9 

10 11 12 13 14 15 16 

17 18 19 20 21 22 23 

24 25 26 27 28 29 30 

 APRIL MAY JUNE 

M T W T F S S 

1 2 3 4 5 6 

7 8 9 10 11 12 13 

14 15 16 17 18 19 20 

21 22 23 24 25 26 27 

28 29 30 

M T W T F S S 

1 2 3 4 

5 6 7 8 9 10 11 

12 13 14 15 16 17 18 

19 20 21 22 23 24 25 

26 27 28 29 30 31 

M T W T F S S 

30 1 

2 3 4 5 6 7 8 

9 10 11 12 13 14 15 

16 17 18 19 20 21 22 

23 24 25 26 27 28 29 

JULY AUGUST SEPTEMBER M T W T F S S 

1 2 3 4 5 6 

7 8 9 10 11 12 13 

14 15 16 17 18 19 20 

21 22 23 24 25 26 27 

28 29 30 31 

M T W T F S S 

31 1 2 

3 4 5 6 7 8 9 

10 11 12 13 14 15 16 

17 18 19 20 21 22 23 

24 25 26 27 28 29 30 

M T W T F S S 

1 2 3 4 5 6 7 

8 9 10 11 12 13 14 

15 16 17 18 19 20 21 

22 23 24 25 26 27 28 

29 30 

OCTOBER NOVEMBER DECEMBER M T W T F S S 

1 2 3 4 5 

6 7 8 9 10 11 12 

13 14 15 16 17 18 19 

20 21 22 23 24 25 26 27 28 29 30 31 

M T W T F S S 

30 1 

2 3 4 5 6 7 8 

9 10 11 12 13 14 15 

16 17 18 19 20 21 22 

23 24 25 26 27 28 29 

M T W T F S S 

1 2 3 4 5 6 7 

8 9 10 11 12 13 14 

15 16 17 18 19 20 21 

22 23 24 25 26 27 28 29 30 31 

JANUARY FEBRUARY MARCH 

M T W T F S S 

1 2 3 4 

5 6 7 8 9 10 11 

12 13 14 15 16 17 18 

19 20 21 22 23 24 25 

26 27 28 29 30 31 

M T W T F S S 

2 3 4 5 6 7 8 

9 10 11 12 13 14 15 

16 17 18 19 20 21 22 

23 24 25 26 27 28 

M T W T F S S 

30 31 1 

2 3 4 5 6 7 8 

9 10 11 12 13 14 15 

16 17 18 19 20 21 22 

23 24 25 26 27 28 29 

 APRIL MAY JUNE M T W T F S S 

1 2 3 4 5 

6 7 8 9 10 11 12 

13 14 15 16 17 18 19 

20 21 22 23 24 25 26 

27 28 29 30 

M T W T F S S 

1 2 3 

4 5 6 7 8 9 10 

11 12 13 14 15 16 17 

18 19 20 21 22 23 24 

25 26 27 28 29 30 31 

M T W T F S S 

1 2 3 4 5 6 7 

8 9 10 11 12 13 14 

15 16 17 18 19 20 21 

22 23 24 25 26 27 28 

29 30 

JULY AUGUST SEPTEMBER M T W T F S S 

1 2 3 4 5 

6 7 8 9 10 11 12 

13 14 15 16 17 18 19 

20 21 22 23 24 25 26 

27 28 29 30 31 

M T W T F S S 

31 1 2 

3 4 5 6 7 8 9 

10 11 12 13 14 15 16 

17 18 19 20 21 22 23 

24 25 26 27 28 29 30 

M T W T F S S 

1 2 3 4 5 6 

7 8 9 10 11 12 13 

14 15 16 17 18 19 20 

21 22 23 24 25 26 27 

28 29 30 

OCTOBER NOVEMBER DECEMBER 

M T W T F S S  M T W T F S S  M T W T F S S 

1 2 3 4  30 1  1 2 3 4 5 6 

5 6 7 8 9 10 11  2 3 4 5 6 7 8  7 8 9 10 11 12 13 

12 13 14 15 16 17 18  9 10 11 12 13 14 15  14 15 16 17 18 19 20 

19 20 21 22 23 24 25  16 17 18 19 20 21 22  21 22 23 24 25 26 27 

26 27 28 29 30 31  23 24 25 26 27 28 29  28 29 30 31 

Page 8: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 8/139

6  VISION MISSION STATEMENT 

0 VISION MISSION STATEMENT 

LANGDON AND SEAH PHILIPPINES INC. 

Vision 

To be the leading Cost and Quantity Surveying, Environmental

Sustainability and Development Management Consultant in the

Philippines built environment providing the highest level of

excellence in professionalism and integrity, working on modern,leading edge projects - integrating and coordinating each of our

business lines. 

COST AND QUANTITY SURVEYING 

Vision 

To be the leading Cost and Quantity Surveying Consultant in the

Philippines built environment, providing the highest level of

excellence in professionalism and integrity, working on modern,

leading edge projects  –  integrating and coordinating our Cost

and Quantity Surveying Consultancy with our other service lines

of Environmental Sustainability and Development Management. 

Mission 

Protecting the interests of our Clients, we commit to: 

• Provide our Clients with proactive, integrated service where we 

are working on the project covering more than one role. • Establish partnerships with major Clients, working together as 

an integral part of their management team. 

• Provide our Clients with service over and above their  

requirements through enhanced understanding of their needs. 

• Provide our Clients accurate and dependable services taking 

into account their needs and procurement options. Being the greatest assets of the Company, we commit to the

growth and development of our Staff by: 

• Providing training, an exciting work environment and a 

competitive remuneration package. 

•  Providing opportunities for career growth and professional 

development. • Encouraging and providing time and resource to gain external

accreditation and qualifications in the field of Cost Consultancy

and Quantity Surveying services at the earliest time. 

Page 9: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 9/139

VISION MISSION STATEMENT  7 

We commit to continuously protect the interest of our  Stockholders by: 

• Maintaining and upholding our Chartered status with the RICS. 

• Maintaining our Quality Assurance accreditation while being

committed to continual improvement. 

• Producing marketing materials and marketing strategy to

diversify and widen our client base on Cost Consultancy andQuantity Surveying services. 

We commit to our responsibility to our Society, hence; 

• We contribute to socio civic works as a conscientious

organization. 

ENVIRONMENTAL SUSTAINABILITY Vision 

To be the leading Environmental Sustainability Consultant in the

Philippines built environment, providing the highest level of

excellence in professionalism and integrity, working on modern,

leading edge projects  –  integrating and coordinating our

Environmental Sustainability Consultancy with our other service

lines of Development Management, Cost and Quantity

Surveying Consultancy. 

Mission 

Protecting the interests of our Clients, we commit to: 

• Provide LEED, BERDE and BREAM accreditation consultancy

services and expanding this to a capability in other S.E. Asian

accreditation systems such as Greenmark (Singapore). 

• Provide our Clients with a proactive, integrated service guiding

them through the accreditation process and educating key

parties where there is lack of past experience/familiarization with

the process. 

• Provide our Clients with service over and above their

requirements by achieving the project’s targeted sustainability

certification, striving to go beyond the project’s  pursued level

within a reasonable cost and time. 

Being the greatest assets of the Company, we commit to the

growth and development of our Staff by: 

• Providing training, an exciting work environment and a

remuneration package that exceeds the highest local

benchmark competitors. 

Page 10: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 10/139

0 VISION MISSION STATEMENT 

8  VISION MISSION STATEMENT 

• Providing opportunities  for career growth and professionaldevelopment. 

• Encouraging and providing time and resource to gain external

accreditation, specialization seminars and qualifications in the

field of environmental sustainability consultancy services at the

earliest time. 

We commit to continuously protect the interest of our  Stockholders by: 

• Developing the company as the foremost energy modeling

center in the region, well-versed over a range of accredited

software; that clients and other LS companies in S.E. Asia might

refer for modeling services. 

• Expanding our Consultancy Services into other related fieldssuch as carbon assessment, daylight simulation and

commissioning works. 

• Developing our Consultancy Services to increase our

involvement in the existing built environment as well as new

build developments. 

• Producing marketing materials and marketing strategy todiversify and widen our Client base on Environmental

Sustainability Consultancy. 

• Maintaining our Quality Assurance accreditation while being

committed to continual improvement. 

We commit to our responsibility to our Society, hence; 

• We contribute to socio civic works as a conscientiousorganization. 

DEVELOPMENT MANAGEMENT 

Vision 

To be the leading Development Management Consultant in the

Philippines built environment, providing the highest level of

excellence in professionalism and integrity, working on modern,

leading edge projects  –  integrating and coordinating our

Development Management Consultancy with our other service

lines of Environmental Sustainability, Cost and Quantity

Surveying Consultancy. 

Page 11: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 11/139

VISION MISSION STATEMENT  9 

Mission 

Protecting the interests of our Clients, we commit to: 

• Provide a high level Client’s Representative service

incorporating strategic procurement advice, project

management, planning, risk avoidance and programming

services. 

• Provide our Clients with a pr oactive, integrated service where

we are working on the project covering more than one role. 

• Establish partnerships with major Clients, working together as

an integral part of their management team. 

•  Guide our Clients through the development process and

educating key parties where there is lack of past

experience/familiarization with the process. 

• Provide our Clients with service over and above their

requirements through enhanced understanding of their needs. 

Being the greatest assets of the Company, we commit to the

growth and development of our Staff by: 

• Providing training, an exciting work environment and a

competitive remuneration package. 

• Providing opportunities for career growth and professional

development. 

• Encouraging and providing time and  resource to gain external

accreditation and qualifications in the field of DevelopmentManagement services at the earliest time. 

We commit to continuously protect the interest of our  

Stockholders by: 

• Producing marketing materials and marketing strategy to

diversify and widen our client base on Development

Management services. 

• Maintaining our Quality Assurance accreditation while being

committed to continual improvement. 

We commit to our responsibility to our Society, hence; 

• We contribute to socio civic works as a conscientious

organization. 

Page 12: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 12/139

0 QUALITY POLICY STATEMENT 

10  QUALITY POLICY STATEMENT 

QUALITY POLICY STATEMENT 

Our policy and goal is to fill the company’s culture

with committed, dedicated and excellent people

having in-depth knowledge in the Quantity Surveyingfield who will play a positive and creative role in

realising the needs and expectations of our clients

and to continually strive to ensure that our clients

have the best service available. 

Each process within the Company that determines the

quality of our services shall be managed and

controlled in a planned and systematic manner in

accordance with our quality system documents with

the highest integrity, impartiality and independency. 

We see our quality system as a valuable tool and

mechanism to promote, instill, further develop and

bring about opportunities for improvement to our staff

and our internal processes. 

Essential to an effective quality system is our belief in

continuous investment in professional development

and structured training of our staff at all levels in core

skills and knowledge. 

 All staff members are required to comply with this

policy statement, be responsible for the quality of their

work and for providing our clients with a consistently

high standard of service. 

LangdonSeah 

Page 13: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 13/139

 

CONSTRUCTION COST DATA

1 Construction Costs for Selected Asian Cities

M & E Costs for Selected Asian Cities

Construction Costs for Philippines 

M & E Servies Costs for Philippines 

Construction Cost Specification 

Major Rates for Selected Asian Cities 

Retail Prices of Basic Construction Materials

for Philippines 

Unit Cost for Ancillary Facilities

for Philippines 

M & E Major Plant Costs for Philippines 

Fit-out Costs for Philippines 

Kitchen Equipment Costs for Philippines 

Page 14: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 14/139

 

   (   U   S   $   /  m   2   )

 

   M   A   N   I   L   A

   H   O   N   G   K   O   N   G   *   S

   I   N   G   A   P   O   R   E   *   *

    K   U   A   L   A

   B   A   N   G   K   O   K

   #

   B   R   U   N   E   I

   L   U   M   P   U   R

 

   D   O   M   E   S   T   I   C

    D   e    t   a   c    h   e    d    h   o   u   s   e   s   a   n    d    b   u   n   g   a    l   o   w

   s

    T   e   r   r   a   c   e    d    h   o   u   s   e   s

    A   v   e   r   a   g   e   s    t   a   n    d   a   r    d   a   p   a   r    t   m   e   n    t   s ,    h

    i   g    h   r    i   s   e

    L   u   x   u   r   y   a   p   a   r    t   m   e   n    t   s ,

    h    i   g    h   r    i   s   e

 

    1 ,    3

    0    0

    6    5    0    8    9    0

    1 ,    2

    0    0

 

    4 ,    5

    5    0

    3 ,    5

    8    0

    2 ,    6

    6    5

    3 ,    2

    5    5

 

    2 ,    4

    6    0

    2 ,    0

    9    0

    1 ,    7

    2    0

    2 ,    8

    3    0

 

    1 ,    0

    2    0

    3    9    5    5    8    0

    1 ,    1

    3    5

 

    9    8    5    5    9    1    8    2    1

    1 ,    1

    4    9

 

    7    5    3    5    2    6    8    7    3

    1 ,    0

    7    4

   O   F   F   I   C   E   /   C   O   M   M   E   R   C   I   A   L

    A   v   e   r   a   g   e   s    t   a   n    d   a   r    d   o    f    f    i   c   e   s ,

    h    i   g    h   r    i   s   e

    P   r   e   s    t    i   g   e   o    f    f    i   c   e   s ,

    h    i   g    h   r    i   s   e

    S    h   o   p   p    i   n   g    C   e   n    t   r   e   s

 

    8    6    0

    1 ,    3

    5    0

    1 ,    1

    0    0

 

    2 ,    6

    3    5

    3 ,    2

    5    5

    2 ,    9

    4    5

 

    2 ,    1

    3    0

    2 ,    3

    8    0

    2 ,    3

    0    0

 

    8    0    0

    1 ,    1

    7    5

    9    7    5

 

    7    7    2

    1 ,    0

    5    1

    7    9    5

 

    8    7    3

    1 ,    1

    9    5

    1 ,    1

    0    0

   H   O   T   E   L   S

    R   e   s   o   r    t    H   o    t   e    l

    3  -   s    t   a   r    b   u    d   g   e    t    h   o    t   e    l   s    i   n   c    l   u   s    i   v   e   o    f

    F .    F .

    &    E .

    5  -   s    t   a   r    l   u   x   u   r   y    h   o    t   e    l   s    i   n   c    l   u   s    i   v   e   o    f    F

 .    F .

    &    E .

    1 ,    3

    8    0

    1 ,    3

    0    0

    1 ,    6

    4    0

 

    N    /    A

    3 ,    2

    9    0

    3 ,    9

    1    0

 

    2 ,    5

    4    0

    2 ,    6

    2    0

    3 ,    5

    2    0

 

    1 ,    4

    1    5

    1 ,    2

    8    0

    2 ,    3

    7    5

 

    2 ,    2

    3    3

    1 ,    3

    1    3

    1 ,    9

    0    4

 

    1 ,    4

    4    1

    1 ,    5

    6    3

    2 ,    1

    6    8

 

1 CONSTRUCTION COST DATA 

CONSTRUCTION COSTS FOR SELECTED

ASIAN CITIES 

12  CONSTRUCTION COST DATA 

Page 15: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 15/139

CONSTRUCTION COST DATA  13 

   I   N   D   U   S   T   R   I   A   L

    L    i   g    h    t    d   u    t   y    f    l   a    t    t   e    d    f   a   c    t   o   r    i   e   s ,

    7 .    5

    k   p

   a

    4    4    0

    1 ,    5

    6    0

    (    1    5    0    l    b .    )

    l   o   a    d    i   n   g

    H   e   a   v   y    d   u    t   y    f    l   a    t    t   e    d    f   a   c    t   o   r    i   e   s   a   n    d

    4    9    0

    1 ,    7

    2    5

   w   a   r   e    h   o   u   s   e   s ,

    1    5    k   p   a    (    3    0    0    l    b .    )

    l   o   a    d    i   n   g

    S    i   n   g    l   e   s    t   o   r   e   y   c   o   n   v   e   n    t    i   o   n   a    l    f   a   c    t   o   r   y   o    f

    4    2    0

    N    /    A

   s    t   r   u   c    t   u   r   a    l   s    t   e   e    l   w   o   r    k

    O   w   n   e   r   o   p   e   r   a    t   e    d    f   a   c    t   o   r    i   e   s ,

    l   o   w   r    i   s

   e

    4    5    0

    2 ,    3

    5    0

 

    1 ,    1

    5    0

 

    1 ,    3

    9    0

 

    9    8    0

 

    N    /    A

 

    4    6    5

 

    5    5    5

 

    4    6    5

 

    5    6    5

 

    5    9    8

 

    N    /    A

 

    5    9    8

 

    N    /    A

 

    4    8    4

 

    N    /    A

 

    4    4    2

 

    N    /    A

   O   T   H   E   R   S

    B   a   s   e   m   e   n    t   c   a   r   p   a   r    k   s    (   <    3    l   e   v   e    l   s    )

    5    1    0

    2 ,    1

    0    0

    E    l   e   v   a    t   e    d   c   a   r   p   a   r    k   s    (   <    4    l   e   v   e    l   s    )

    5    0    0

    1 ,    1

    2    0

    P   r    i   m   a   r   y   a   n    d    S   e   c   o   n    d   a   r   y    S   c    h   o   o    l   s

    6    1    0

    2 ,    2

    1    0

    S    t   u    d   e   n    t    H   o   s    t   e    l   s

    7    1    0

    1 ,    8

    0    5

    S   p   o   r    t   s    C    l   u    b   s    i   n   c    l   u   s    i   v   e   o    f    F .    F .

    &    E

 .

    1 ,    3

    3    0

    3 ,    0

    9    5

 

    1 ,    3

    4    0    7    8    0

    1 ,    0

    8    0

    1 ,    1

    9    0

    1 ,    8

    1    0

 

    5    4    0    3    0    5    3    5    0    4    4    0    9    0    5

 

    6    9    0    3    6    1

    N    /    A    N    /    A    N    /    A

 

    N    /    A    4    9    5    6    9    5    7    9    5

    N    /    A

    E   x   c    h   a   n   g   e    R   a    t   e    U   s   e    d   :    U    S    $    1   =

    P    H    P    4    2 .    0

    0

    H    K    $    7 .    8

    0

    S    $    1 .    2

    2

    R    M    3 .    0

    6

    B    A    H    T    3    0 .    4    6

    B    $    1 .    2

    4

   T   h  e  a   b  o  v  e  c  o  s   t  s  a  r  e  a   t   4   t   h   Q  u  a  r   t  e  r   2   0   1   2   l  e  v  e   l  s ,   i  n  c   l  u  s   i  v  e  o   f

  p  r  e   l   i  m   i  n  a  r   i  e  s  u  n   l  e  s  s  o   t   h  e  r  w   i  s  e  s   t  a   t  e   d .

   M  a  n   i   l  a   b  u   i   l   d   i  n  g  c  o  s   t  s  a  r  e  e  x  p  e  c

   t  e   d   t  o   i  n  c  r  e  a  s  e   b  y

  a  p  p  r  o  x   i  m  a   t  e   l  y   0 .   5   %  p  e  r  m  o  n   t   h   (  c  o  m  p  o  u  n   d  e   d   )   d  u  r   i  n  g   2   0   1   3 .

 

   M  a  n   i   l  a

  r  a   t  e  s  a  r  e   i  n  c   l  u  s   i  v  e  o   f   1   2   %   V   A   T   b  u   t  e  x   l  u  s   i  v  e  o   f  c  o  n   t   i  n  g  e  n  c   i  e  s .

   *   R  a   t  e  s

  a  r  e  e  x  c   l  u  s   i  v  e  o   f  c  o  n   t   i  n  g  e  n  c   i  e  s .

   *   *   R  a   t  e  s

  a  r  e  n  e   t   t  o   f   G   S   T  a  n   d  e  x  c   l  u  s   i  v  e  o   f  c  o  n   t   i  n  g  e

  n  c   i  e  s .

   #

   R  a   t  e  s

  a  r  e  n  e   t   t  o   f   V   A   T  a  n   d  c  o  n   t   i  g  e  n  c   i  e  s .

Page 16: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 16/139

 

   (   U   S   $   /  m   2   )

   D   A   L   I   A   N

   J   A   K   A   R   T   A   #

   I   N   D   I   A   @ 

   S   E   O   U   L   *   *

   H   O   C   H   I   M   I   N   H   ^

 

   D   O   M   E   S   T   I   C

    D   e    t   a   c    h   e    d    h   o   u   s   e   s   a   n    d    b   u   n   g   a    l   o   w   s

    T   e   r   r   a   c   e    d    h   o   u   s   e   s

    A   v   e   r   a   g   e   s    t   a   n    d   a   r    d   a   p   a   r    t   m   e   n    t   s ,

    h    i   g    h   r    i   s   e

    L   u   x   u   r   y   a   p   a   r    t   m   e   n    t   s ,

    h    i   g    h   r    i   s   e

 

    6    3    6    4    7    7    6    5    2

    1 ,    1

    9    2

 

    5    1    0

    N    /    A    6    4    0    8    7    0

 

    3    9    7    2    9    1    3    7    9    5    6    9

 

    2 ,    0

    3    0

    1 ,    6

    9    0

    1 ,    3

    7    0

    1 ,    7

    1    0

 

    5    2    0  -

    5    7    0

    4    3    0  -

    4    6    0

    6    0    0  -

    7    2    0

    7    7    0  -

    9    0    0

   O   F   F   I   C   E   /   C   O   M   M   E   R

   C   I   A   L

    A   v   e   r   a   g   e   s    t   a   n    d   a   r    d   o    f    f    i   c   e   s ,

    h    i   g    h   r    i   s   e

    P   r   e   s    t    i   g   e   o    f    f    i   c   e   s ,

    h    i   g    h   r    i   s   e

    S    h   o   p   p    i   n   g    C   e   n    t   r   e   s

 

    9    3    8

    1 ,    2

    5    6

    1 ,    0

    5    7

 

    6    2    5    9    3    0    5    4    0

 

    4    0    9    5    1    8    4    7    0

 

    1 ,    2

    4    0

    1 ,    3

    9    0

    1 ,    5

    4    5

 

    7    1    5  -

    8    3    5

    8    3    5  -    1 ,    0

    7    0

    6    6    5  -

    7    7    0

   H   O   T   E   L   S

    R   e   s   o   r    t    H   o    t   e    l

    3  -   s    t   a   r    b   u    d   g   e    t    h   o    t   e    l   s

    i   n   c    l   u   s    i   v   e   o    f    F .    F .

    &    E .

    5  -   s    t   a   r    l   u   x   u   r   y    h   o    t   e    l   s    i   n   c    l   u   s    i   v   e   o    f    F .    F .

    &    E .

 

    N    /    A

    1 ,    0

    8    1

    1 ,    7

    4    9

 

    1 ,    3

    0    0

    1 ,    0

    6    0

    1 ,    5

    1    0

 

    7    2    3    8    3    2

    1 ,    5

    5    8

 

    1 ,    6

    3    0

    1 ,    8

    2    5

    2 ,    4

    6    0

 

    1 ,    1

    3    0  -    1 ,    4

    2    0

    1 ,    3

    5    0  -    1 ,    6

    0    5

    1 ,    7

    3    0  -    1 ,    9

    6    0

 

1 CONSTRUCTION COST DATA 

CONSTRUCTION COSTS FOR SELECTED

ASIAN CITIES 

14  CONSTRUCTION COST DATA 

Page 17: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 17/139

CONSTRUCTION COST DATA  15 

   I   N   D   U   S   T   R   I   A   L

    L    i   g    h    t    d   u    t   y    f    l   a    t    t   e    d    f   a

   c    t   o   r    i   e   s ,

    7 .    5

    k   p   a

    N    /    A

    N    /    A

    (    1    5    0    l    b .    )

    l   o   a    d    i   n   g

    H   e   a   v   y    d   u    t   y    f    l   a    t    t   e    d    f   a   c    t   o   r    i   e   s   a   n    d

    N    /    A

    N    /    A

   w   a   r   e    h   o   u   s   e   s ,

    1    5    k   p   a    (    3    0    0    l    b .    )

    l   o   a    d    i   n   g

    S    i   n   g    l   e   s    t   o   r   e   y   c   o   n   v   e

   n    t    i   o   n   a    l    f   a   c    t   o   r   y   o    f

    N    /    A

    2    9    0

   s    t   r   u   c    t   u   r   a    l   s    t   e   e    l   w   o

   r    k

    O   w   n   e   r   o   p   e   r   a    t   e    d    f   a   c    t   o   r    i   e   s ,

    l   o   w   r    i   s   e

    N    /    A

    N    /    A

 

    2    5    5

 

    3    0    4

 

    2    4    5

 

    N    /    A

 

    N    /    A

    N    /    A

    7    4    5

 

    N    /    A

 

    2    2    5  -

    3    7    0

 

    3    7    5  -

    4    8    0

 

    3    7    5  -

    4    8    0

 

    3    7    5  -

    4    7    5

   O   T   H   E   R   S

    B   a   s   e   m   e   n    t   c   a   r   p   a   r    k   s

    (   <    3    l   e   v   e    l   s    )

    N    /    A

    4    2    0

    E    l   e   v   a    t   e    d   c   a   r   p   a   r    k   s    (   <    4    l   e   v   e    l   s    )

    3    9    0

    2    9    0

    P   r    i   m   a   r   y   a   n    d    S   e   c   o   n

    d   a   r   y    S   c    h   o   o    l   s

    N    /    A

    N    /    A

    S    t   u    d   e   n    t    H   o   s    t   e    l   s

    N    /    A

    N    /    A

    S   p   o   r    t   s    C    l   u    b   s    i   n   c    l   u   s

    i   v   e   o    f    F .    F .

    &    E .

    N    /    A

    N    /    A

 

    2    4    6    2    1    5    1    7    3    2    2    1    5    8    8

 

    1 ,    0

    0    5    6    1    0

    1 ,    9

    0    0

    1 ,    1

    3    5

    1 ,    5

    2    5

 

    6    0    5  -

    6    9    8

    3    4    5  -

    4    0    5

    4    5    0  -

    4    7    5

    4    7    5  -

    6    0    0

    7    1    5  -

    7    9    5

    E   x   c    h   a   n   g   e    R   a    t   e    U   s   e

    d   :    U    S    $    1   =

    R    M    B    6 .    2

    9

    I    D

    R    9 ,    6

    0    0

    I    N    R    5    4 .    0

    0

    K    R    W    1 ,    0

    9    6

    V    N    D    2    0 ,    8

    6    6

   T   h  e  a   b  o  v  e  c  o  s   t  s  a

  r  e  a   t   4   t   h   Q  u  a  r   t  e  r   2   0   1   2   l  e  v  e   l  s ,   i  n  c   l  u  s   i  v  e  o   f

  p  r  e   l   i  m   i  n  a  r   i  e  s  u  n   l  e  s

  s  o   t   h  e  r  w   i  s  e  s   t  a   t  e   d .

   *   *   R  a   t  e  s  a  r  e  n  e   t   t  o   f   G   S   T  a  n   d  e  x  c   l  u  s   i  v  e  o   f  c  o  n   t   i  n  g  e  n  c   i  e  s .

   ^   R  a   t  e  s  a  r  e  n  e   t   t  o   f   V   A   T  a  n   d  c  o  n   t   i  n  g  e

  n  c   i  e  s .

   @ 

   R  a   t  e  s  a  r  e   b  a  s  e   d  o  n  p  r  o   j  e  c   t  s   i  n   B  a  n

  g  a   l  o  r  e  a  n   d   H  y   d  e  r  a   b  a   d  a  r  e

  n  e   t   t  o   f   V   A   T ,   S  e  r  v   i  c  e   T  a  x .   M  u  m   b  a   i  c  o  s   t  s  a  r  e  g  e  n  e  r  a   l   l  y   7   %   h   i  g   h  e  r .

   #

   R  a   t  e  s  a  r  e  n  e   t   t  o   f   V   A   T .

Page 18: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 18/139

 

   (   U   S   $   /  m   2   )

 

   S   H   A   N   G   H   A   I

   B   E   I   J   I   N   G   *

   G

   U   A   N   G   Z   H   O   U   /   C   H   O   N   G   Q   I   N   G

   S   H   E   N   Y   A   N

   G

   M   A   C   A   U   ^

   S   H   E   N   Z   H   E   N   *

   /   C   H   E   N   G   D   U

 

   D   O   M   E   S   T   I   C

    D   e    t   a   c    h   e    d    h   o   u   s   e   s   a   n    d    b   u   n   g   a    l   o   w   s

    T   e   r   r   a   c   e    d    h   o   u   s   e   s

    A   v   e   r   a   g   e   s    t   a   n    d   a   r    d   a   p   a   r    t   m   e   n    t   s ,

    h    i   g

    h   r    i   s   e

    L   u   x   u   r   y   a   p   a   r    t   m   e   n    t   s ,

    h    i   g    h   r    i   s   e

 

    7    1    5

    4    7    7    7    3    9

    1 ,    7

    8    1

 

    7    6    3    4    7    7    6    6    8

    1 ,    6

    0    6

 

    5    8    8    *

    4    2    9    *

    5    7    2    9    5    4

 

    6    0    4    4    4    5    5    8    8    9    7    0

 

    5    8    8    4    4    5    5    8    8    9    5    4

 

    3 ,    6

    3    0

    3 ,    1

    7    0

    1 ,    6

    2    0

    2 ,    3

    4    0

   O   F   F   I   C   E   /   C   O   M   M   E   R   C   I   A   L

    A   v   e   r   a   g   e   s    t   a   n    d   a   r    d   o    f    f    i   c   e   s ,

    h    i   g    h   r    i   s   e

    P   r   e   s    t    i   g   e   o    f    f    i   c   e   s ,

    h    i   g    h   r    i   s   e

    S    h   o   p   p    i   n   g    C   e   n    t   r   e   s

 

    1 ,    0

    1    7

    1 ,    3

    5    1

    1 ,    2

    4    0

 

    9    5    4

    1 ,    2

    8    8

    1 ,    1

    8    4

 

    8    3    5

    1 ,    1

    4    9

    9    8    6

 

    9    2    2

    1 ,    2

    4    0

    1 ,    0

    8    1

 

    9    2    2

    1 ,    1

    9    2

    1 ,    0

    1    0

 

    2 ,    3

    1    0

    2 ,    6

    5    0

    2 ,    8

    4    5

   H   O   T   E   L   S

    R   e   s   o   r    t    H   o    t   e    l

    3  -   s    t   a   r    b   u    d   g   e    t    h   o    t   e    l   s    i   n   c    l   u   s    i   v   e   o    f    F

 .    F .

    &    E .

    5  -   s    t   a   r    l   u   x   u   r   y    h   o    t   e    l   s    i   n   c    l   u   s    i   v   e   o    f    F .    F .

    &    E .

 

    N    /    A

    1 ,    1

    4    5

    2 ,    2

    4    2

 

    N    /    A

    1 ,    1

    2    9

    1 ,    9

    8    7

 

    N    /    A

    1 ,    0

    8    1

    1 ,    7

    4    9

 

    N    /    A

    1 ,    1

    1    3

    2 ,    0

    6    7

 

    N    /    A

    1 ,    0

    8    1

    1 ,    7

    4    9

 

    N    /    A

    2 ,    6

    9    0

    3 ,    6

    5    0

 

1 CONSTRUCTION COST DATA 

CONSTRUCTION COSTS FOR SELECTED

ASIAN CITIES 

16  CONSTRUCTION COST DATA 

Page 19: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 19/139

CONSTRUCTION COST DATA  17 

   I   N   D   U   S   T   R   I   A   L

    L    i   g    h    t    d   u    t   y    f    l   a    t    t   e    d    f   a   c    t   o   r    i   e   s ,

    7 .    5

    k   p   a

    N    /    A

    N    /    A

    (    1    5    0    l    b .    )

    l   o   a    d    i   n   g

    H   e   a   v   y    d   u    t   y    f    l   a    t    t   e    d    f   a   c    t   o   r    i   e   s   a   n    d

    N    /    A

    N    /    A

   w   a   r   e    h   o   u   s   e   s ,

    1    5    k   p   a    (    3    0    0    l    b .    )    l   o

   a    d    i   n   g

    S    i   n   g    l   e   s    t   o   r   e   y   c   o   n   v   e   n    t    i   o   n   a    l    f   a   c    t   o   r   y   o    f

    5    5    6

    5    4    1

   s    t   r   u   c    t   u   r   a    l   s    t   e   e    l   w   o   r    k

    O   w   n   e   r   o   p   e   r   a    t   e    d    f   a   c    t   o   r    i   e   s ,

    l   o   w   r    i   s   e

    N    /    A

    7    4    0

 

    N    /    A

    N    /    A

    5    4    1

 

    6    6    8

 

    N    /    A

    N    /    A

    5    4    1

 

    N    /    A

 

    N    /    A

    N    /    A

    4    7    7

 

    N    /    A

 

    1 ,    3

    1    0

    N    /    A

    N    /    A

    N    /    A

   O   T   H   E   R   S

    B   a   s   e   m   e   n    t   c   a   r   p   a   r    k   s    (   <    3    l   e   v   e    l   s    )

    8    3    8

    8    0    0

    E    l   e   v   a    t   e    d   c   a   r   p   a   r    k   s    (   <    4    l   e   v   e    l   s    )

    4    0    5

    3    9    0

    P   r    i   m   a   r   y   a   n    d    S   e   c   o   n    d   a   r   y    S   c    h   o   o    l   s

    6    0    4

    6    5    0

    S    t   u    d   e   n    t    H   o   s    t   e    l   s

    3    4    6

    3    5    0

    S   p   o   r    t   s    C    l   u    b   s    i   n   c    l   u   s    i   v   e   o    f    F .    F .    &

    E .

    1 ,    0

    6    1

    1 ,    0

    0    0

 

    7    7    9    3    9    0    4    2    9    2    7    0    8    1    1

 

    7    0    0    3    9    0

    4    9    3    3    3    4    9    5    4

 

    7    1    5    3    9    0    4    7    7    4    7    7

    6    3    6

 

    1 ,    2

    9    0

    9    6    0

    1 ,    1

    3    0

    1 ,    2

    0    0

    2 ,    7

    3    0

    E   x   c    h   a   n   g   e    R   a    t   e    U   s   e    d   :    U    S    $    1   =

    R    M    B    6 .    2

    9

    R    M    B    6 .    2

    9

    R    M    B    6 .    2

    9

    R    M    B    6 .    2

    9

    R    M    B    6 .    2    9

    M    O    P    7 .    9

    8

   T   h  e  a   b  o  v  e  c  o  s   t  s  a  r  e  a   t   4   t   h   Q  u

  a  r   t  e  r   2   0   1   2   l  e  v  e   l  s ,   i  n  c   l  u  s   i  v  e  o   f

  p  r  e   l   i  m   i  n  a  r   i  e  s  u  n   l  e  s  s  o   t   h  e  r  w   i  s  e

  s   t  a   t  e   d .

   *   R  a   t  e  s

  a  r  e  e  x  c   l  u  s   i  v  e  o   f  c  o  n   t   i  n  g  e  n  c   i  e  s .

   ^   R  a   t  e  s

  a  r  e  e  x  c   l  u  s   i  v  e  o   f  c  o  n   t   i  n  g  e  n  c   i  e  s  a  n   d  a  n  y  m  a  n  a  g  e  m  e  n   t

  c  o  n   t  r  a  c   t   f  e  e

Page 20: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 20/139

 

   B   U   I   L   D   I   N   G   T   Y   P   E

   (   P   H   P   /  m   2   )

   (   H   $   /  m   2   )

   (   S   $   /  m   2   )

   (   R   M   /  m   2   )

   (   B   $   /  m   2   )

   (   B   A   H   T   /  m   2   )

   M   A   N   I   L   A   +

   H   O   N   G   K   O   N   G

   S   I   N   G

   A   P   O   R   E   *

   K   U   A   L   A

   B   R   U   N   E   I

   B   A   N   G   K   O   K   #   #

   L   U   M   P   U   R

 

   M   E   C   H   A   N   I   C   A   L   S   E   R   V   I   C   E   S

    O    f    f    i   c   e   s

    I   n    d   u   s    t   r    i   a    l    *

    H   o    t   e    l   s

    S    h   o   p   p    i   n   g    C   e   n    t   r   e   s

    A   p   a   r    t   m   e   n    t

 

    3 ,    0

    0    0

  -    4 ,    3

    0    0

    6    5    0

  -    1 ,    5

    0    0

    3 ,    0

    0    0

  -    6 ,    5

    0    0

    2 ,    5

    0    0

  -    4 ,    5

    0    0

    2 ,    1

    0    0

  -    3 ,    0

    0    0

 

    1 ,    7

    0    0  -    2 ,    5

    0    0

    4    0    0

  -

    5    5    0

    1 ,    9

    0    0  -    2 ,    3

    0    0

    2 ,    1

    0    0  -    2 ,    6

    0    0

    7    0    0

  -    1 ,    5

    0    0

    1    5    3

  -

    2    2    8

    2    9

  -

    1    3    6

    1    5    0

  -

    2    8    9

    1    5    8

  -

    2    1    4

    9    5

  -

    1    9    2

 

    3    5    5

  -

    4    6    0

    6    0

  -

    9    0

    2    8    5

  -

    4    6    0

    2    8    5

  -

    4    1    0

    2    0    5

  -

    2    9    0

 

    1    7    9  -

    2    2    3

    2    3  -

    3    9

    2    8    8  -

    3    3    2

    2    0    4  -

    2    4    3

    2    1    1  -

    2    4    3

 

    4 ,    3

    0    0  -    4 ,    9

    0    0

    1 ,    4

    5    0  -    1 ,    8

    0    0

    4 ,    5

    0    0  -    5 ,    1

    0    0

    4 ,    4

    0    0  -    4 ,    8

    0    0

    4 ,    4

    0    0  -    4 ,    5

    0    0

   E   L   E   C   T   R   I   C   A   L   S   E   R   V   I   C   E   S

    O    f    f    i   c   e   s

    I   n    d   u   s    t   r    i   a    l    *    *

    H   o    t   e    l   s

    S    h   o   p   p    i   n   g    C   e   n    t   r   e   s

    A   p   a   r    t   m   e   n    t

 

    3 ,    3

    0    0

  -    6 ,    0

    0    0

    2 ,    0

    0    0

  -    3 ,    5

    0    0

    4 ,    4

    0    0

  -    8 ,    4

    0    0

    3 ,    6

    0    0

  -    6 ,    0

    0    0

    3 ,    9

    0    0

  -    6 ,    4

    0    0

 

    1 ,    4

    0    0  -    2 ,    1

    0    0

    5    0    0

  -

    9    0    0

    1 ,    6

    0    0  -    2 ,    3

    0    0

    1 ,    5

    0    0  -    2 ,    1

    0    0

    9    0    0

  -    1 ,    4

    0    0

    2    0    3

  -

    3    0    6

    5    8

  -

    1    4    8

    2    0    2

  -

    3    4    0

    1    7    0

  -

    2    7    5

    1    0    9

  -

    2    5    2

 

    2    2    0

  -

    4    6    5

    1    4    0

  -

    1    5    7

    2    5    0

  -

    6    0    0

    2    0    0

  -

    2    7    0

    8    5

  -

    2    1    5

 

    2    3    0  -

    2    8    8

    1    9    2  -

    2    3    0

    2    8    8  -

    3    7    6

    2    1    8  -

    3    1    3

    2    4    9  -

    3    1    3

 

    2 ,    9

    5    0  -    3 ,    1

    0    0

    1 ,    8

    5    0  -    1 ,    9

    0    0

    3 ,    5

    0    0  -    3 ,    9

    0    0

    2 ,    5

    5    0  -    2 ,    9

    5    0

    2 ,    8

    5    0  -    3 ,    3

    5    0

   H   Y   D   R   A   U   L   I   C   S   E   R   V   I   C   E   S

    O    f    f    i   c   e   s

    I   n    d   u   s    t   r    i   a    l

    O    f    f    i   c   e   s

    S    h   o   p   p    i   n   g    C   e   n    t   r   e   s

    A   p   a   r    t   m   e   n    t   s

 

    9    0    0

  -    2 ,    0

    0    0

    7    0    0

  -    1 ,    2

    0    0

    1 ,    8

    0    0

  -    3 ,    8

    0    0

    7    0    0

  -    1 ,    2

    0    0

    1    4    0    0

  -    2 ,    6

    0    0

 

    3    0    0

  -

    4    0    0

    2    5    0

  -

    3    5    0

    8    5    0

  -    1 ,    1

    0    0

    3    0    0

  -

    4    0    0

    6    0    0

  -

    9    0    0

    3    1

  -

    7    1

    1    9

  -

    3    9

    9    7

  -

    1    3    6

    4    9

  -

    7    5

    7    5

  -

    1    5    9

 

    2    5

  -

    5    5

    3    6

  -

    4    5

    1    7    5

  -

    2    4    0

    2    3

  -

    3    0

    1    8

  -

    4    5

 

    1    6  -

    3    9

    1    1  -

    1    9

    6    0

  -

    8    3

    1    2  -

    4    0

    3    8  -

    5    9

 

    7    5    0

  -

    8    9    0

    7    0    0

  -

         7         8         0 

    1 ,    4

    5    0  -    1 ,    7

    1    0

    7    8    0  -

    9    5    0

    1 ,    1

    5    0  -    1 ,    3

    5    0

 

1 CONSTRUCTION COST DATA 

M & E COSTS FOR SELECTED ASIAN CITIES 

18  CONSTRUCTION COST DATA 

Page 21: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 21/139

CONSTRUCTION COST DATA  19 

   F   I   R   E   S   E   R   V   I   C   E   S

    O    f    f    i   c   e   s

    I   n    d   u   s    t   r    i   a    l

    H   o    t   e    l   s

    S    h   o   p   p    i   n   g    C   e   n    t   r   e   s

    A   p   a   r    t   m   e   n    t

 

    6    5    0  -    1 ,    2

    0    0

    6    0    0  -

    9    0    0

    6    5    0  -    1 ,    1

    0    0

    6    5    0  -

    9    0    0

    6    0    0  -    1 ,    3

    0    0

 

    4    5    0  -

    6    0    0

    2    5    0  -

    3    5    0

    4    5    0  -

    6    0    0

    4    5    0  -

    6    0    0

    8    0  -

    1    3    0

 

    3    2

  -

    6    4

    2    4

  -

    5    4

    4    9

  -

    7    8

    3    8

  -

    6    3

    1    9

  -

    5    3

 

    6    0

  -

    8    0

    4    5

  -

    6    5

    6    5

  -

    9    5

    6    5

  -

    8    5

    2    0

  -

    2    5

 

    3    2

  -    3    9

    1    2

  -    1    9

    2    6

  -    4    8

    3    2

  -    6    5

    2    6

  -    5    1

 

    7    6    0

  -

    8    5    0

    7    2    0

  -

    7    5    0

    7    5    0

  -

    8    5    0

    7    6    0

  -

    7    9    0

    7    6    0

  -

    8    5    0

   L   I   F   T   S   /   E   S   C   A   L   A   T   O   R   S

    O    f    f    i   c   e   s

    I   n    d   u   s    t   r    i   a    l

    H   o    t   e    l   s

    S    h   o   p   p    i   n   g    C   e   n    t   r   e   s

    A   p   a   r    t   m   e   n    t

 

    1 ,    6

    0    0  -    2 ,    9

    0    0

    N    /    A

    1 ,    5

    0    0  -    3 ,    0

    0    0

    7    0    0  -    2 ,    0

    0    0

    8    0    0  -    1 ,    8

    0    0

 

    6    5    0

  -

    1 ,    1

    0    0

    5    0    0

  -

    7    0    0

    5    0    0

  -

    7    5    0

    7    5    0

  -

    9    5    0

    4    0    0

  -

    7    5    0

 

    6    2

  -    1    7    7

    4    6

  -    1    1    4

    7    6

  -    1    3    8

    8    3

  -    2    0    0

    2    7  -    1    2    3

 

    8    8

  -    4    0    0

    5    4

  -    1    9    0

    8    5

  -    3    7    0

    8    5

  -    1    1    0

    6    3

  -    1    0    5

 

    9

  -    3    2

    4

  -    1    9

    1    2  -    4    4

    1    2  -    3    6

    1    1  -    2    6

 

    1 ,    0

    0    0

  -    1 ,    0

    5    0

    N    /    A

    1 ,    0

    0    0

  -    1 ,    1

    0    0

    2    1    0

  -

    4    9    0

    4    5    0

  -

    5    0    0

   C  o  s   t  s  a  r  e  a   t   4   t   h   Q  u  a  r   t  e  r   2   0   1   2

   l  e  v  e   l  s ,  e  x  c   l  u  s   i  v  e  o   f

  c  o  n   t   i  n  g  e  n  c   i  e  s  u  n   l  e  s  s  o   t   h  e  r  w   i  s

  e  s   t  a   t  e   d .

   *

   G  e  n  e  r  a   l   l  y  w   i   t   h  o  u   t   A   /   C

   *   *   E  x  c   l  u   d  e  s  s  p  e  c   i  a   l  p  o  w  e  r  s  u

  p  p   l  y .

   +

   T  r  a  n  s   f  o  r  m  e  r ,   i  n  c   l  u   d  e   d   i  n   E   l  e  c   t  r   i  c  a   l   S  e  r  v   i  c  e  s

   @ 

   R  a   t  e  s  a  r  e  n  e   t   t  o   f   G   S   T

   #   #

   B  a  s  e   d  u  p  o  n

  n  e   t   t  e  n  c   l  o  s  e   d  a  r  e  a  a  n   d  n  e   t   t  o   f   V   A   T .

Page 22: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 22/139

 

   B   U   I   L   D   I   N   G   T   Y   P   E

   (   R  s   /  m   2   )

   (   D   R   ’   0   0   0   /  m   2   )

   (   R  s   /  m   2   )

   (   K   R   W   /   ’   0   0   0  m   2   )   (   V   N   D   /

   ’   0   0   0  m   2   ) 

   D   A   L   I   A   N

   J   A   K   A   R   T   A   #

   I   N   D   I   A   @ 

   S   E   O   U   L  ~

   H   O   C   H   I   M   I   N   H

 

   M   E   C   H   A   N   I   C   A   L   S   E   R   V   I   C

   E   S

    O    f    f    i   c   e   s

    I   n    d   u   s    t   r    i   a    l    *

    H   o    t   e    l   s

    S    h   o   p   p    i   n   g    C   e   n    t   r   e   s

    A   p   a   r    t   m   e   n    t

 

    6    0    0

  -

        7        0        0

        N        /        A 

    7    0    0  -

        8        0        0

    6    0    0

  -

        9        0        0

    1    0    0

  -

        3        0        0

 

    6    7    5

  -

    8    0    0

    2    1    0

  -

    4    9    0

    6    7    5

  -

    9    0    0

    6    0    0

  -

    7    2    0

    6    0    0

  -

    7    8    0

 

    3 ,    6

    0    0  -

    4 ,    7

    0    0

    1 ,    6

    0    0  -

    2 ,    8

    0    0

    4 ,    5

    0    0  -

    4 ,    9

    0    0

    3 ,    5

    0    0  -

    4 ,    5

    0    0

    2 ,    0

    0    0  -

    2 ,    5

    0    0

    2    0    0  -    2    8    5

    8    9

  -    1    5    5

    2    1    0  -    3    4    0

    1    4    8  -    2    4    5

    9    4

  -    1    7    3

 

    1 ,    6

    2    4

  -    2 ,    3

    1    5

    N

    /    A

    N

    /    A

    N

    /    A

    1 ,    2

    9    8

  -    1 ,    7

    7    8

   E   L   E   C   T   R   I   C   A   L   S   E   R   V   I   C   E   S

    O    f    f    i   c   e   s

    I   n    d   u   s    t   r    i   a    l    *    *

    H   o    t   e    l   s

    S    h   o   p   p    i   n   g    C   e   n    t   r   e   s

    A   p   a   r    t   m   e   n    t

 

    4    5    0

  -

        6        5        0

        N        /        A 

    7    0    0

  -

        9        0        0

    5    0    0

  -

        6        0        0

    2    0    0

  -

        3        0        0

 

    5    5    0

  -

    7    3    0

    3    0    0

  -

    4    8    0

    5    5    0

  -

    7    8    0

    4    8    0

  -

    6    1    0

    5    5    0

  -

    7    3    0

 

    3 ,    2

    0    0  -

    4 ,    5

    0    0

    1 ,    8

    5    0  -

    3 ,    1

    0    0

    3 ,    5

    0    0  -

    4 ,    9

    0    0

    3 ,    0

    0    0  -

    4 ,    0

    0    0

    1 ,    2

    0    0  -

    1 ,    6

    0    0

    2    6    5  -    3    8    5

    1    2    0  -    1    6    0

    3    6    5  -    4    8    0

    2    1    0  -    2    4    0

    1    3    5  -    1    7    5

 

    1 ,    9

    9    4

  -    2 ,    3

    7    5

    N

    /    A

    N

    /    A

    N

    /    A

    1 ,    7

    5    9

  -    2 ,    2

    2    2

   H   Y   D   R   A   U   L   I   C   S   E   R   V   I   C   E   S

    O    f    f    i   c   e   s

    I   n    d   u   s    t   r    i   a    l

    O    f    f    i   c   e   s

    S    h   o   p   p    i   n   g    C   e   n    t   r   e   s

    A   p   a   r    t   m   e   n    t   s

 

    3    0

  -

        1        2        0

        N        /        A 

    2    0    0

  -

        3        0        0

    1    2    0

  -

        1        7        0

    1    0    0

  -

        2        0        0

 

    1    3    0

  -

    2    0    0

    8    0

  -

    1    4    0

    5    5    0

  -

    7    9    0

    1    3    0

  -

    2    0    0

    5    5    0

  -

    7    8    0

 

    5    7    5  -

    8    5    0

    3    7    5  -

    6    5    0

    3 ,    0

    0    0  -

    4 ,    5

    0    0

    8    2    5  -

    1 ,    5

    0    0

    1 ,    3

    0    0  -

    1 ,    8

    0    0

    3    3

  -

    5    7

    2    0

  -

    3    1

    5    9

  -

    9    2

    2    8

  -

    5    7

    4    9

  -

    6    7

 

    2    6    8

  -

    5    1    2

    N

    /    A

    N

    /    A

    N

    /    A

    5    2    4

  -    1 ,    2

    0    2

 

1 CONSTRUCTION COST DATA 

M & E COSTS FOR SELECTED ASIAN CITIES 

20  CONSTRUCTION COST DATA 

Page 23: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 23/139

CONSTRUCTION COST DATA  21 

   F   I   R   E   S   E   R   V   I   C   E   S

    O    f    f    i   c   e   s

    I   n    d   u   s    t   r    i   a    l

    H   o    t   e    l   s

    S    h   o   p   p    i   n   g    C   e   n    t   r   e   s

    A   p   a   r    t   m   e   n    t

 

   L   I   F   T   S   /   E   S   C   A   L   A   T   O   R   S

    O    f    f    i   c   e   s

    I   n    d   u   s    t   r    i   a    l

    H   o    t   e    l   s

    S    h   o   p   p    i   n   g    C   e   n    t   r   e   s

    A   p   a   r    t   m   e   n    t

 

    1    5    0

  -

    2    3    0

    N    /    A

    1    3    0

  -

    2    3    0

    5    0

  -

    1    5    0

    5    0

  -

    1    3    0

 

    3    0    0

  -

    5    5    0

    N    /    A

    2    5    0

  -

    3    5    0

    1    5    0

  -

    2    5    0

    1    2    0

  -

    2    0    0

 

    1    8    0

  -

    2    7    0

    8    0

  -

    1    4    0

    1    8    0

  -

    2    7    0

    1    8    0

  -

    2    2    0

    1    8    0

  -

    2    2    0

 

    2    9    0

  -

    7    9    0

    N    /    A

    2    9    0

  -

    7    3    0

    2    2    0

  -

    5    8    0

    2    8    0

  -

    5    8    0

 

    9    0    0  -    1 ,    2

    0    0

    4    0    0  -

    5    5    0

    1 ,    0

    0    0  -    1 ,    3

    0    0

    8    5    0  -

    9    5    0

    4    5    0  -

    5    5    0

 

    7    0    0  -

    9    0    0

    4    0    0  -

    6    0    0

    9    0    0  -    1 ,    2

    0    0

    9    0    0  -    1 ,    3

    0    0

    6    0    0  -

    8    0    0

 

    4    2

  -

    6    8

    2    8

  -

    3    1

    5    8

  -

    9    1

    4    4

  -

    7    2

    3    3

  -

    6    8

 

    4    8

  -

    6    3

    1    6

  -

    2    5

    1    1    5  -    1    7    0

    5    8

  -

    8    2

    2    8

  -

    4    0

 

    6    2    3

  -    1 ,    0

    3    4

    N    /

    A

    N    /

    A

    N    /

    A

    4    2    6

  -

    5    3    5

 

    5    6    6    6

  -    1 ,    0

    8    5

    N    /    A

    N    /    A

    1 ,    1

    6    7

  -    1 ,    6

    5    1

    6    4    5

  -

    9    3    8

   C  o  s   t  s  a  r  e  a   t   4   t   h   Q  u  a  r   t  e  r   2   0   1   2   l  e  v  e   l  s ,  e  x  c   l  u  s   i  v  e  o   f

  c  o  n   t   i  n  g  e  n  c   i  e  s  u  n   l  e  s  s  o   t   h  e  r  w   i  s  e  s   t  a   t  e   d .

   *

   G  e  n  e  r  a   l   l  y  w   i   t   h  o  u   t   A   /   C

   *   *   E  x  c   l  u   d  e  s  s  p  e  c   i  a   l  p  o  w  e  r  s  u  p  p   l  y .

   #   A   l   l  r  a   t  e  s  a  r  e   N  e   t   t  o   f   V   A   T .   R  a   t  e  s   f  o  r   E   l  e  c   t  r   i  c  a   l   S  e  r  v   i  c  e  s  a  r  e  e  x  c   l  u   d   i  n  g  g  e  n  s  e   t .

   R  a   t  e  s   f  o  r   h  y   d  r  a  u   l   i  c   S  e  r  v   i  c  e  s  a  r  e  e  x  c   l  u   d   i  n  g   S   T   P .   R  a   t  e  s   f  o  r   M  e  c   h  a  n   i  c  a   l

   S  e  r  v   i  c  e  s  r  e   f  e  r  s   t  o   A   C   M   V   R  a   t  e  s  o  n   l  y .

   @ 

   R  a   t  e  s  a  r  e

   b  a  s  e   d  o  n  p  r  o   j  e  c   t  s   i  n   B  a  n  g  a   l  o  r  e  a  n   d  a  r  e  n

  e   t   t  o   f   V   A   T  a  n   d   S  e  r  v   i  c  e

   T  a  x .   M  u  m

   b  a   i  c  o  s   t  s  a  r  e  g  e  n  e  r  a   l   l  y   8   %   h   i  g   h  e  r .

  ~

   R  a   t  e  s  a  r  e  n  e   t   t  o   f   V   A

   T

   ^

   A   l   l  c  o  s   t  a  r  e  a  v  e  r  a  g  e . 

   S  p  r   i  n   k   l  e  r  s

  y  s   t  e  m ,   f   i  r  e   h  o  s  e  r  e  e   l  a  r  e   i  n  c   l  u   d  e   d   i  n   H  y   d  r  a  u   l   i  c   S  e  r  v   i  c  e  s .   S  m  o   k  e

  p   i   l   l  e  x   h  a  u  s

   t  s  y  s   t  e  m   i  s   i  n  c   l  u   d  e   d   i  n   M  e  c   h  a  n   i  c  a   l   S  e  r  v   i  c  e  s .   F   i  r  e  a   l  a  r  m  s  y  s   t  e  m ,

  e  m  e  r  g  e  n  c  y   P   A  s  y  s   t  e  m  a  r  e   i  n  c   l  u   d  e   d   i  n   E   l  e  c   t  r   i  c  a   l   S  e  r  v   i  c  e  s

Page 24: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 24/139

 

   (   R   M   B   /  m   2   )

   (   R   M   B   /  m   2   )

   (   R   M

   B   /  m   2   )

   (   R   M   B   /  m   2   )

   (   R   M   B   /  m   2

   )

   (   M   O   P   /  m   2   )

   G   U   A   N   G   Z   H   O   U   /

   C   H   O   N   G   Q   I   N   G

   S   H   A   N   G   H   A   I

   B   E   I   J   I   N   G

   S   H   E

   N   Z   H   E   N

   /   C   H   E   N   G   D   U

   S   H   E   N   Y   A   N   G

   M   A   C   A   U

 

   M   E   C   H   A   N   I   C   A   L   S   E   R   V   I   C   E   S

    O    f    f    i   c   e   s

    I   n    d   u   s    t   r    i   a    l    *

    H   o    t   e    l   s

    S    h   o   p   p    i   n   g    C   e   n    t   r   e   s

    A   p   a   r    t   m   e   n    t

 

    7    6    1  -

    9    6    6

    1    7    3  -

    2    8    9

    9    7    1  -    1 ,    2

    6    5

    1 ,    0

    5    0  -    1 ,    1

    0    3

    3    1    0

  -

    4    1    0

 

    7    5    0

  -

    9    9    0

    1    6    0

  -

    2    7    0

    9    1    0

  -    1 ,    1

    1    0

    7    9    0

  -

    9    5    0

    1    3    0

  -

    3    7    0

 

    7    1    5

  -

    9    7    0

    1    4    0

  -

    2    5    0

    1 ,    0    0

    0  -    1 ,    2

    5    0

    6    6    0

  -

    8    9    0

    1    1    5

  -

    3    5    5

    7    0    0

  -    1 ,    0

    0    0

    1    5    0

  -

    2    5    0

    7    5    0

  -    1 ,    2

    0    0

    6    0    0

  -    1 ,    0

    0    0

    1    0    0

  -

    3    0    0

 

    6    0    0

  -

    7    0

    0

    N    /    A

    7    0    0

  -

    8    0

    0

    6    0    0

  -

    9    0

    0

    1    0    0

  -

    3    0

    0

    N    /    A    N    /    A

    1 ,    9

    1    0  -    2 ,    2

    2    0

    1 ,    6

    5    0  -    2 ,    2

    2    0

    5    7    0  -

    6    7    0

   E   L   E   C   T   R   I   C   A   L   S   E   R   V   I   C   E   S

    O    f    f    i   c   e   s

    I   n    d   u   s    t   r    i   a    l    *    *

    H   o    t   e    l   s

    S    h   o   p   p    i   n   g    C   e   n    t   r   e   s

    A   p   a   r    t   m   e   n    t

 

    5    9    3

    6    5    1

    3    0    5  -

    4    3    1

    6    5    1  -

    8    3    0

    5    2    0  -

    6    5    1

    2    5    2  -

    3    6    8

 

    4    6    0

  -

    6    7    0

    3    2    0

  -

    4    5    0

    7    0    5

  -

    8    9    8

    4    8    1

  -

    6    6    3

    2    5    3

  -

    3    8    6

 

    4    9    5

  -

    7    1    5

    2    8    5

  -

    4    1    5

    6    3    5

  -

    8    5    5

    4    5    0

  -

    6    1    0

    2    6    0

  -

    4    1    5

    4    5    0

  -

    7    0    0

    3    0    0

  -

    4    0    0

    5    5    0

  -

    8    0    0

    4    5    0

  -

    7    0    0

    2    5    0

  -

    3    5    0

    4    5    0

  -

    6    5

    0

    N    /    A

    7    0    0

  -

    9    0

    0

    5    0    0

  -

    6    0

    0

    2    0    0

  -

    3    0

    0

    N    /    A    N    /    A

    1 ,    9

    6    0  -    2 ,    3

    7    0

    1 ,    9

    6    0  -    2 ,    1

    6    0

    6    7    0

  -

    8    8    0

   H   Y   D   R   A   U   L   I   C   S   E   R   V   I   C   E   S

    O    f    f    i   c   e   s

    I   n    d   u   s    t   r    i   a    l

    O    f    f    i   c   e   s

    S    h   o   p   p    i   n   g    C   e   n    t   r   e   s

    A   p   a   r    t   m   e   n    t   s

 

    1    1    0  -

    1    6    3

    8    9  -

    1    3    1

    3    6    8  -

    4    8    8

    1    3    7  -

    1    8    4

    1    6    8  -

    2    2    6

 

    9    5

  -

    1    4    0

    9    5

  -

    1    4    0

    3    6    0

  -

    4    7    0

    1    4    0

  -

    2    0    0

    1    6    5

  -

    2    2    5

 

    1    1    5

  -

    1    5    5

    8    0

  -

    1    0    5

    3    6    5

  -

    4    6    0

    1    0    5

  -

    1    4    0

    1    3    5

  -

    2    4    0

    7    0

  -

    1    3    0

    7    0

  -

    1    2    0

    3    0    0

  -

    4    0    0

    7    0

  -

    1    3    0

    1    2    0

  -

    2    0    0

 

    3    0

  -

    1    2

    0

    N    /    A

    2    0    0

  -

    3    0

    0

    1    2    0

  -

    1    7

    0

    1    0    0

  -

    2    0

    0

    N    /    A    N    /    A

    8    8    0  -    1 ,    0

    8    0

    3    1    0  -    4    1    0

    5    7    0  -

    7    7    0

 

1 CONSTRUCTION COST DATA 

M & E COSTS FOR SELECTED ASIAN CITIES 

22  CONSTRUCTION COST DATA 

Page 25: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 25/139

CONSTRUCTION COST DATA  23 

   F   I   R   E   S   E   R   V   I   C   E   S

    O    f    f    i   c   e   s

    I   n    d   u   s    t   r    i   a    l

    H   o    t   e    l   s

    S    h   o   p   p    i   n   g    C   e   n    t   r   e   s

    A   p   a   r    t   m   e   n    t

 

    2    0    0

  -

    3    0    0

    1    5    0

  -

    2    5    0

    2    8    0

  -

    3    8    0

    2    5    0

  -

    3    8    0

    5    0

  -

    1    0    0

    1    8    0

  -

    2    6    5

    1    4    0

  -

    2    1    5

    2    1    5

  -

    3    7    0

    2    1    5

  -

    3    7    0

    6    0

  -

    1    2    5

 

    2    1    0

  -

    3    2    5

    1    3    0

  -

    2    5    0

    2    6    0

  -

    3    8    6

    2    3    0

  -

    3    4    5

    6    0

  -

    1    1    5

 

    1    8    0

  -

    2    5    0

    1    5    0

  -

    2    5    0

    2    0    0

  -

    3    3    0

    2    2    0

  -

    3    3    0

    5    0

  -

    1    0    0

 

    1    8    0

  -

    2    5    0

    N    /    A

    1    3    0

  -

    2    3    0

    5    0

  -

    1    5    0

    5    0

  -

    1    3

    0

    N    /    A    N    /    A

    5    1    0

  -    6    2    0

    4    1    0

  -    5    2    0

    1    0    0

  -    1    6    0

   L   I   F   T   S   /   E   S   C   A   L   A   T   O   R   S

    O    f    f    i   c   e   s

    I   n    d   u   s    t   r    i   a    l

    H   o    t   e    l   s

    S    h   o   p   p    i   n   g    C   e   n    t   r   e   s

    A   p   a   r    t   m   e   n    t

 

    2    7    5

  -

    5    4    0

    1    3    0

  -

    3    8    0

    2    1    5

  -

    4    8    5

    3    2    0

  -

    4    8    5

    1    6    0

  -

    3    2    0

 

    2    9    4

  -

    5    7    7

    1    4    5

  -

    4    0    0

    2    3    2

  -

    5    2    0

    3    2    7

  -

    5    2    0

    1    7    5

  -

    2    8    9

 

    2    7    5

  -

    4    5    0

    1    4    0

  -

    4    0    5

    2    2    5

  -

    4    3    5

    3    0    5

  -

    4    3    0

    1    1    4

  -

    2    5    0

 

    3    5    0

  -

    6    0    0

    1    5    0

  -

    3    5    0

    3    0    0

  -

    5    0    0

    3    0    0

  -

    4    5    0

    1    4    0

  -

    2    5    0

 

    3    0    0

  -

    5    5    0

    N    /    A

    2    1    0

  -

    3    4    0

    1    4    0

  -

    2    3    0

    1    2    0

  -

    1    2    5

 

    N    /    A    N    /    A

    5    1    0

  -    7    2    0

    4    1    0

  -    6    2    0

    4    1    0

  -    5    2    0

   C  o  s   t  s  a  r  e  a   t   4   t   h   Q  u  a  r   t  e  r   2   0   1   2

   l  e  v  e   l  s ,  e  x  c   l  u  s   i  v  e  o   f

  c  o  n   t   i  n  g  e  n  c   i  e  s  u  n   l  e  s  s  o   t   h  e  r  w   i  s  e  s   t  a   t  e   d .

   *

   G  e  n  e  r  a   l   l  y  w   i   t   h  o  u   t   A   /   C

   *   *

   E  x  c   l  u   d  e  s  s  p  e  c   i  a   l  p  o  w  e  r  s  u  p  p   l  y .

Page 26: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 26/139

   P   E   S   O   /  m   2    M

   &   E

   D   E   S   C   R   I   P   T   I   O   N

   B   U   I   L   D   I   N   G

   T   O   T   A   L   S   E   R   V   I   C   E   S

   T   O

   T   A   L

 

   D   O   M   E   S   T   I   C

    A   v   e   r   a   g   e   s    t   a   n    d   a   r    d   a   p   a   r    t   m   e   n    t   s ,

    h    i   g    h   r    i   s   e

    L   u   x   u   r   y   a   p   a   r    t   m   e   n    t   s ,

    h    i   g    h   r    i   s

   e

    T   o   w   n    h   o   u   s   e   s

    I   n    d    i   v    i    d   u   a    l   p   r   e   s    t    i   g   e    h   o   u   s   e   s

 

    2    7 ,    1

    0    0

  -

    3    0 ,    2

    0    0

    3    5 ,    1

    0    0

  -

    3    9 ,    9

    0    0

    2    1 ,    3

    0    0

  -

    2    5 ,    7

    0    0

    4    0 ,    7

    0    0

  -

    4    8 ,    3

    5    0

 

    7 ,    0

    0    0

  -

    1    0 ,    5

    0    0

    9 ,    5

    0    0

  -

    1    5 ,    0

    0    0

    2 ,    7

    0    0

  -

    4 ,    6

    0    0

    7 ,    9

    0    0

  -

    1    2 ,    1

    5    0

 

    3    4 ,    1

    0    0

  -

    4    0 ,    7

    0    0

    4    4 ,    6

    0    0

  -

    5    4 ,    9

    0    0

    2    4 ,    0

    0    0

  -

    3    0 ,    3

    0    0

    4    8 ,    6

    0    0

  -

    6    0 ,    5

    0    0

 

   O   F   F   I   C   E   /   C   O   M   M   E   R   C   I   A   L

    A   v   e   r   a   g   e   s    t   a   n    d   a   r    d   o    f    f    i   c   e   s ,    h

    i   g    h   r    i   s   e

    P   r   e   s    t    i   g   e   o    f    f    i   c   e   s ,

    h    i   g    h   r    i   s   e

    S    h   o   p   p    i   n   g    C   e   n    t   e   r   s

 

    2    2 ,    0

    5    0

  -

    2    6 ,    8

    0    0

    3    9 ,    8

    5    0

  -

    4    3 ,    7

    0    0

    3    1 ,    0

    0    0

  -

    3    8 ,    8

    0    0

 

    9 ,    4

    5    0

  -

    1    3 ,    3

    0    0

    1    3 ,    1

    5    0

  -

    1    6 ,    4

    0    0

    8 ,    1

    5    0

  -

    1    4 ,    6

    0    0

 

    3    1 ,    5

    0    0

  -

    4    0 ,    1

    0    0

    5    3 ,    0

    0    0

  -

    6    0 ,    1

    0    0

    3    9 ,    1

    5    0

  -

    5    3 ,    3

    0    0

 

1 CONSTRUCTION COST DATA 

CONSTRUCTION COSTS FOR PHILIPPINES 

24  CONSTRUCTION COST DATA 

Page 27: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 27/139

CONSTRUCTION COST DATA  25 

   H   O   T   E   L   S

    R   e   s   o   r    t    h   o    t   e    l   s ,

    i   n   c    l   u   s    i   v   e   o    f    F .    F .    &

    E

    3  -   s    t   a   r    b   u    d   g   e    t    h   o    t   e    l   s    i   n   c    l   u   s    i   v

   e   o    f    F .    F .    &

    E

    5  -   s    t   a   r    l   u   x   u   r   y    h   o    t   e    l   s    i   n   c    l   u   s    i   v   e

   o    f    F .    F .    &

    E

 

    3    7 ,    7

    5    0  -

    5    2 ,    5

    5    0

    3    8 ,    4

    5    0  -

    4    2 ,    4

    0    0

    4    8 ,    7

    5    0  -

    5    1 ,    7

    0    0

 

    1    1 ,    3

    5    0

  -

    1    3 ,    9

    5    0

    1    2 ,    4

    0    0

  -

    1    5 ,    3

    5    0

    1    4 ,    2

    5    0

  -

    2    2 ,    8

    0    0

 

    4    9 ,    1

    0    0

  -

    6    6 ,    5

    0    0

    5    0 ,    8

    5    0

  -

    5    7 ,    7

    5    0

    6    3 ,    0

    0    0

  -

    7    4 ,    5

    0    0

 

   I   N   D   U   S   T   R   I   A   L

    O   w   n   e   r   o   p   e   r   a    t   e    d    f   a   c    t   o   r    i   e   s ,    l   o

   w   r    i   s   e

 

    1    2 ,    6

    0    0  -

    1    3 ,    8

    5    0

 

    3 ,    9

    5    0

  -

    7 ,    1

    0    0

 

    1    6 ,    5

    5    0  -

    2    0 ,    9

    5    0

 

   O   T   H   E   R   S

    C   a   r   p   a   r    k   s ,   a    b   o   v   e   g   r   o   u   n    d

    G   e   n   e   r   a    l    h   o   s   p    i    t   a    l   s

 

    1    4 ,    1

    5    0  -

    1    9 ,    0

    0    0

    3    7 ,    4

    0    0  -

    4    3 ,    6

    0    0

 

    3 ,    3

    5    0

  -

    5 ,    2

    0    0

    1    2 ,    6

    0    0

  -

    2    0 ,    3

    5    0

 

    1    7 ,    5

    0    0

  -

    2    4 ,    2

    0    0

    5    0 ,    0

    0    0

  -

    6    3 ,    9

    5    0

   C  o  s   t  s  a  r  e  a   t   4   t   h   Q  u  a  r   t  e  r   2   0

   1   2   l  e  v  e   l  s .   M  a  n   i   l  a   b  u   i   l   d   i  n  g  c  o  s   t  s  a  r  e  e  x  p  e  c   t  e   d   t  o   i  n  c  r  e  a  s  e   b  y  a  p  p  r  o  x   i  m  a   t  e   l  y   0 .   5   %

  p  e  r  m  o  n   t   h   (  c  o  m  p  o  u  n   d  e   d   )   d

  u  r   i  n  g   2   0   1   3 .

Page 28: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 28/139

Page 29: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 29/139

CONSTRUCTION COST DATA  27 

   H   O   T   E   L   S

    R   e   s   o   r    t    h   o    t   e    l   s ,

    i   n   c    l   u   s    i   v   e   o    f    F .    F .    &

    E

    3  -   s    t   a   r    b   u    d   g   e    t    h   o    t   e    l   s    i   n   c    l   u   s    i   v   e   o

    f    F .    F .    &

    E

    5  -   s    t   a   r    l   u   x   u   r   y    h   o    t   e    l   s    i   n   c    l   u   s    i   v   e   o    f

    F .    F .    &

    E

 

    1    1 ,    3

    5    0  -    1    3 ,    9

    5    0

    1    2 ,    4

    0    0  -    1    5 ,    3

    5    0

    1    4 ,    2

    5    0  -    2    2 ,    8

    0    0

 

    4 ,    4

    0    0  -    5 ,    2

    0    0

    4 ,    7

    0    0  -    5 ,    5

    0    0

    5 ,    4

    0    0  -    8 ,    4

    0    0

 

    3 ,    0

    0    0  -    3 ,    3

    0    0

    3 ,    3

    0    0  -    4 ,    0

    0    0

    4 ,    0

    0    0  -    6 ,    5

    0    0

 

    6    5    0  -

    9    5    0

    6    5    0  -

    9    5    0

    6    5    0  -    1 ,    1

    0    0

 

    1 ,    5

    0    0  -    2 ,    0    0    0

    1 ,    8

    0    0  -    2 ,    3    0    0

    1 ,    8

    0    0  -    3 ,    0    0    0

 

    1 ,    8

    0    0  -    2 ,    5

    0    0

    1 ,    9

    5    0  -    2 ,    6

    0    0

    2 ,    4

    0    0  -    3 ,    8

    0    0

 

   I   N   D   U   S   T   R   I   A   L

    O   w   n   e   r   o   p   e   r   a    t   e    d    f   a   c    t   o   r    i   e   s ,

    l   o   w   r    i   s   e

 

    3 ,    9

    5    0  -    7 ,    1

    0    0 

    2 ,    0

    0    0  -    3 ,    5

    0    0

 

    6    5    0  -    1 ,    5

    0    0 

    6    0    0  -

    9    0    0

 

  -

 

    7    0    0  -    1 ,    2

    0    0

 

   O   T   H   E   R   S

 

    C   a   r   p   a   r    k   s ,   a    b   o   v   e   g   r   o   u   n    d

    G   e   n   e   r   a    l    h   o   s   p    i    t   a    l   s

 

    3 ,    3

    5    0  -

    5 ,    2

    0    0

    1    2 ,    6

    0    0  -    2    0 ,    3

    5    0

 

    1 ,    1

    0    0  -    1 ,    6

    5    0

    5 ,    0

    0    0  -    7 ,    7

    0    0

 

    1    0    0  -

    2    0    0

    4 ,    2

    0    0  -    6 ,    5

    0    0

 

    5    5    0  -

    7    5    0

    7    5    0  -    1 ,    5

    0    0

 

    1 ,    1

    0    0  -    1 ,    7    0    0

    9    0    0  -    1 ,    8    0    0

 

    5    0    0  -

    9    0    0

    1 ,    7

    5    0  -    2 ,    8

    0    0

   C  o  s   t  s  a  r  e  a   t   4   t   h   Q  u  a  r   t  e  r   2   0   1   2   l  e  v  e   l  s .

Page 30: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 30/139

 

1 CONSTRUCTION COST DATA 

CONSTRUCTION COST SPECIFICATION 

The costs for the respective categories given on theprevious pages are averages based on fixed pricecompetitive tenders. It must be understood that theactual cost of a building will depend upon the design,procurement methods and many other factors and mayvary from the figures shown. 

The costs per square metre are based on constructionfloor areas measured to the outside face of theexternal walls/external perimeter including lift shafts,stairwells, plant rooms, water tanks and the like. 

 All buildings are assumed to have no basements(except otherwise stated) and are built on flat ground,with normal soil conditions and minimal external works.The costs exclude land cost, professional fees, financeand legal expenses. 

The standards for each category of building vary from

country to country and do not necessarily follow those ofManila. 

FF&E refers to loose furniture, fixtures and equipment.FF&E is excluded from office, residential and retailproject costs, but are included in hotels and country club

project costs. 

DOMESTIC 

 Average standard apartments of 6-8 flats per floor, 50m2 - 150 m2 per flat, facade comprising texturedpaint and punch window, itnernal finishes comprising

wood parquet, plaster and paint and painted rubbedconcrete to residential units and local ceramic tiles totoilets. 

Luxury residential facade comprised of window wall,textured paint with stone accents, finished withhomogeneous tiles, wood cladding and coved timber

ceiling to lobby, combination of wood planks, plaster andpaint and gypsum board to residential units andhomogenous tiles to toilets. 

28 CONSTRUCTION COST DATA 

Page 31: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 31/139

 

 Air conditioning, gensets, automatic sprinkler system,complete plumbing and disposal system, completefire alarm and detection system, CATV system are allowed for luxury apartments and prestige houses. 

Services to standard apartment also include for

paging system and Davit type gondola. Services to luxury residential also include CCTVcameras on lobby, track mounted type gondola andhelipad provision. 

OFFICE/COMMERCIAL 

Based on building 30-40 storeys high with floor plansminimum 1,000 m2 per level. 

 Average standard offices and shopping centres havebare finish and exclude A/C ducting and light fittings totenants areas. Prestige offices have curtain wall elevations, stone

finished lobbies. 

INDUSTRIAL 

Owner operated factories exclude manufacturingequipment, air-conditioning and special servicesprovisions. 

HOTELS 

F.F. & E. includes interior decoration and loose furniture,etc. but excludes hotel operator ’s items (e.g.cutlery, crockery, linen etc.). Includes 1 level of basement. 

OTHERS 

Carparks to be multi-storey, above ground.Schools with standard government provisions.Student hostels to university standard. Hospitals include fit-out to nursing rooms, hospitalfacilities; services i.e., oxygen piping, A/C, genset,ultrapure water system, fire suppression system andspecial type plumbing fixtures; fit-out to doctors’ offices

is excluded. 

CONSTRUCTION COST DATA 29 

Page 32: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 32/139

 

   D   E   S   C   R   I   P   T   I   O   N

   U  n   i   t 

   (   P   H   P   )

   (   H   K   $   )

   (   S   $   )

   (   R   M   )

   (   B   A

   H   T   )

   (   B   $   )

   K   U   A   L   A

   M   A   N   I   L   A

   H   O   N   G   K   O   N   G

   S   I   N   G   A   P   O   R   E   *   *

   L   U   M   P   U   R

   B   A   N   G

   K   O   K   #

   B   R   U   N   E   I  

    1 .

    E   x   c   a   v   a    t    i   n   g    b   a   s   e   m   e   n    t   s   ;   n   o    t

   e   x   c   e   e    d    i   n   g    2 .    0

    0   m    d   e   e   p

 

   m    3

    3    5    0 .    0

    0

    1    4    0 .    0

    0

 

    1    6 .    5

    0

    1    5 .    0

    0

  -

    2    0 .    0

    0

    1    2    0 .    0

    0

    3 .    6

    0

    2 .

    E   x   c   a   v   a    t    i   n   g    f   o   r    f   o   o    t    i   n   g   s   ;   n   o    t

   e   x   c   e   e    d    i   n   g    1 .    5

    0   m    d   e   e   p

   m    3

    2    7    5 .    0

    0

    1    3    0 .    0

    0

    1    6 .    5

    0

    1    5 .    0

    0

  -

    2    0 .    0

    0

    1    2    0 .    0

    0

    3 .    2

    0

    3 .    R   e   m   o   v   e   e   x   c   a   v   a    t   e    d   m   a    t   e   r    i   a    l   s

   o    f    f   s    i    t   e

   m    3

    2    5    0 .    0

    0

    2    0    0 .    0

    0

    4    5 .    0

    0  -    5    0 .    0

    0

    2    0 .    0

    0

  -

    2    5 .    0

    0

    1    2    0 .    0

    0

    3 .    0

    0

    4 .

    1    5    0   m   m    t    h    i   c    k    H   a   r    d   c   o   r   e    b   e    d    b

    l    i   n    d   e    d

   w    i    t    h    f    i   n   e   m   a    t   e   r    i   a    l   s

   m    3

    3 ,    0

    0    0 .    0

    0

    7    0    0 .    0

    0

    5    0 .    0

    0

    6    0 .    0

    0

  -

    7    0 .    0

    0

    6    5    0 .    0

    0

    4    3 .    0

    0

    5 .

    M   a   s   s   c   o   n   c   r   e    t   e   g   r   a    d   e    1    5

   m    3

    3 ,    8

    0    0 .    0

    0

    9    2    0 .    0

    0

    2    0    2 .    0

    0

    2    3    0 .    0

    0

  -    2    5    0 .    0

    0

    2 ,    4    0    0 .    0

    0

    1    2    4 .    0

    0

    6 .

    R   e    i   n    f   o   r   c   e    d   c   o   n   c   r   e    t   e   g   r   a    d   e    3    0

   m    3

    5 ,    0

    0    0 .    0

    0

    1 ,    1

    5    0 .    0

    0

    1    5    5 .    0

    0  -    1    7    0 .    0

    0

    2    5    0 .    0

    0

  -    2    8    0 .    0

    0

    2 ,    8    0    0 .    0

    0

    1    4    5 .    0

    0

    7 .

    M    i    l    d   s    t   e   e    l   r   o    d   r   e    i   n    f   o   r   c   e   m   e   n    t

    k   g

    4    7 .    0

    0

    9 .    8

    0

    1 .    6

    0  -

    1 .    7

    5

    3 .    7

    0

  -

    3 .    9

    0

    2    9 .    0

    0

    1 .    2

    0

    8 .

    H    i   g    h    t   e   n   s    i    l   e   r   o    d   r   e    i   n    f   o   r   c   e   m   e   n    t

    k   g

    4    8 .    0

    0

    9 .    8

    0

    1 .    6

    0  -

    1 .    7

    5

    3 .    9

    0

  -

    3 .    9

    0

    2    8 .    0

    0

    1 .    2

    0

    9 .

    S   a   w   n    f   o   r   m   w   o   r    k    t   o   s   o    f    f    i    t   s   o    f

   s   u   s   p   e   n    d   e    d   s    l   a    b   s

   m    2

    8    5    0 .    0

    0

    2    5    0 .    0

    0

    3    0 .    0

    0  -    3    3 .    0

    0

    3    0 .    0

    0

  -

    4    0 .    0

    0

    4    5    0 .    0

    0

    1    5 .    0

    0

    1    0 .

    S   a   w   n    f   o   r   m   w   o   r    k    t   o   c   o    l   u   m   n   s   a

   n    d   w   a    l    l   s

   m    2

    8    0    0 .    0

    0

    2    5    0 .    0

    0

    3    0 .    0

    0  -    3    3 .    0

    0

    3    0 .    0

    0

  -

    4    0 .    0

    0

    4    5    0 .    0

    0

    1    5 .    0

    0

    1    1 .

    1    1    2 .    5   m   m    T    h    i   c    k    b   r    i   c    k   w   a    l    l   s

   m    2

    N    /    A

    2    3    0 .    0

    0

    3    0 .    0

    0  -    3    5 .    0

    0

    3    2 .    0

    0

  -

    4    5 .    0

    0

    7    5    0 .    0

    0

    1    7 .    5

    0

    1    2 .

       “       K       l       i      p       l      o       k       C      o       l      o      r       b      o      n       d       ”    0 .    6

    4   m   m

   p   r   o    f    i    l   e    d   s    t   e   e    l   s    h   e   e    t    i   n   g

   m    2

    9    0    0 .    0

    0

    6    3    0 .    0

    0

    4    3 .    0

    0

    5    5 .    0

    0

  -

    6    0 .    0

    0

    1 ,    2    0    0 .    0

    0

    5    8 .    0

    0

 

1 CONSTRUCTION COST DATA 

MAJOR RATES FOR SELECTED ASIAN CITIES 

30  CONSTRUCTION COST DATA 

Page 33: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 33/139

CONSTRUCTION COST DATA  31 

    1    3 .

    A    l   u   m    i   n    i   u   m   c   a   s   e   m   e   n    t   w    i   n    d   o   w   s ,

   s    i   n   g    l   e   g    l   a   z   e    d

 

   m    2

    9 ,    0

    0    0 .    0

    0

 

    1 ,    9

    0    0 .    0

    0

 

    2    9    0 .    0

    0

    3    5    0 .    0

    0

  -    5    0    0 .    0

    0

    6 ,    5    0    0 .    0

    0    1    6    0 .    0

    0  -    2    1    0 .    0

    0

    1    4 .

    S    t   r   u   c    t   u   r   a    l   s    t   e   e    l   w   o   r    k  -    b   e   a   m

   s ,

   s    t   a   n   c    h    i   o   n   s   a   n    d    t    h   e    l    i    k   e

 

    k   g

    1    1    0 .    0

    0

    2    6 .    0

    0

 

    4 .    8

    0  -

    5 .    8

    0

    6 .    0

    0

  -

    7 .    5

    0

    6    0 .    0

    0

    3 .    5

    0

    1    5 .

    S    t   e   e    l   w   o   r    k  -   a   n   g    l   e   s ,   c    h   a   n   n   e

    l   s ,

    f    l   a    t   s   a   n    d   a   n    d    t    h   e    l    i    k   e

 

    k   g

    1    0    0 .    0

    0

 

    2    8 .    0

    0

 

    4 .    8

    0  -

    5 .    8

    0

    6 .    0

    0

  -

    7 .    5

    0

    6    0 .    0

    0

    3 .    2

    0

    1    6 .

    2    5   m   m    C   e   m   e   n    t   a   n    d   s   a   n    d    (    1

   :    3    )

   p   a   v    i   n   g

 

   m    2

    3    5    0 .    0

    0

 

    9    0 .    0

    0

 

    1    1 .    0

    0

    1    5 .    0

    0

  -    2    2 .    0

    0

    2    2    0 .    0

    0

    9 .    0

    0

    1    7 .

    2    0   m   m    C   e   m   e   n    t   a   n    d   s   a   n    d    (    1

   :    4    )

   p    l   a   s    t   e   r    t   o   w   a    l    l   s

 

   m    2

    3    5    0 .    0

    0

 

    1    0    0 .    0

    0

 

    1    5 .    5

    0

    1    5 .    0

    0

  -    2    2 .    0

    0

    2    2    0 .    0

    0

    8 .    0

    0

    1    8 .

    C   e   r   a   m    i   c    t    i    l   e   s    b   e    d    d   e    d    t   o    f    l   o   o   r

   s   c   r   e   e    d    (   m    /   s    )

 

   m    2

    1 ,    2

    0    0 .    0

    0

 

    3    0    0 .    0

    0

 

    6    5 .    5

    0

    5    0 .    0

    0

  -

    7    0 .    0

    0

    1 ,    2    0    0 .    0

    0

    3    0 .    0

    0

    1    9 .

    1    2   m   m    F    i    b   r   o   u   s   p    l   a   s    t   e   r    b   o   a   r    d

   c   e    i    l    i   n   g    l    i   n    i   n   g

 

   m    2

    1 ,    3

    0    0 .    0

    0

 

    4    6    0 .    0

    0

 

    3    0 .    0

    0

    3    0 .    0

    0

  -

    4    5 .    0

    0

    8    0    0 .    0

    0

    2    6 .    0

    0

    2    0 .    T   w   o   c   o   a    t   s   o    f   e   m   u    l   s    i   o   n   p   a    i   n    t    t   o

   p    l   a   s    t   e   r   e    d   s   u   r    f   a   c   e   s

 

   m    2

    4    0    0 .    0

    0

    4    5 .    0

    0

    3 .    5

    0  -

    4 .    0

    0

    3 .    5

    0  -

    4 .    5

    0

    1    2    0 .    0

    0

    5 .    0

    0

    A   v   e   r   a   g   e   e   x   p   e   c    t   e    d   p   r   e    l    i   m    i   n   a   r    i   e   s

    %

    8  -    1    5

    1    0  -    1    5

    1    2  -    1    5

    6  -    1    2

    1    0  -    1    5

    5  -    8

   T   h  e  a   b  o  v  e  c  o  s   t  s  a  r  e   b  a  s  e   d  o  n   l  u  m  p  s  u  m   f   i  x  e   d  p  r   i  c  e  c  o  n   t  r  a  c   t  r  a   t  e

  e  x  c   l  u  s   i  v  e  o   f  o   f  p  r  e   l   i  m   i  n  a  r   i  e  s  a

  n   d  c  o  n   t   i  n  g  e  n  c   i  e  s  u  n   l  e  s  s  o   t   h  e  r  w   i  s  e

  s   t  a   t  e   d .

   *   *   R  a   t  e  s  a  r  e  n  e   t   t  o   f   G   S   T .

   #

   R  a   t  e  s  a  r  e  n  e   t   t  o   f   V   A   T .

   M  a  n   i   l  a  :   I   t  e  m   1   3  -   A   l  u  m   i  n   i  u  m  w   i   t   h  a  n  o   d   i  z  e

   d   f   i  n   i  s   h  e   d  ;   6  m  m   t   h   i  c   k .

   H  o  n  g   K  o  n  g  :   I   t  e  m   4  -   i  n  c   l  u   d   i  n  g  w  a  s   t  e  c   h  a  r  g  e  s   i  m  p   l  e  m  e  n   t  e   d  o  n

   0   1   D  e  c .   2   0   0   5 .

   S   i  n  g  a  p  o  r  e  :   I   t  e  m   5  -  r  a   t  e   f  o  r   l  e  a  n  c  o  n  c  r  e   t  e   b   l   i  n   d   i  n  g .

Page 34: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 34/139

   (   R  s   )

    (   R   P   ’   0   0   0   )

    (   I   N   R   )

 

   (   K   R   W   )

   (   V   N   D   )

   D   E   S   C   R   I   P   T   I   O   N

   U  n   i   t

   D   A   L   I   A   N

   J   A   K   A   R   T   A   #

   I   N   D   I   A   @ 

   S   E   O   U   L   *   H

   O    C

   H   I   M   I   N   H   ^

    1 .

    E   x   c   a   v   a    t    i   n   g    b   a   s   e   m   e   n

    t   s   ;   n   o    t

   e   x   c   e   e    d    i   n   g    2 .    0

    0   m    d   e   e   p

 

   m    3

    2    5 .    0

    0

 

    2    5 .    0

    0

 

    1    3    5 .    0

    0

    1 ,    8

    0    0 .    0

    0

    7    0 ,    0

    0    0 .    0

    0

    2 .

    E   x   c   a   v   a    t    i   n   g    f   o   r    f   o   o    t    i   n   g   s   ;   n   o    t

   e   x   c   e   e    d    i   n   g    1 .    5

    0   m    d   e

   e   p

   m    3

    3    0 .    0

    0

    3    5 .    0

    0

    1    5    0 .    0

    0

    1 ,    8

    0    0 .    0

    0

    6    7 ,    0

    0    0 .    0

    0

    3 .    R   e   m   o   v   e   e   x   c   a   v   a    t   e    d   m

   a    t   e   r    i   a    l   s   o    f    f   s    i    t   e

   m    3

    2    8 .    0

    0

    3    0 .    0

    0

    N    /    A

    9 ,    5

    0    0 .    0

    0

    6    9 ,    0

    0    0 .    0

    0

    4 .

    1    5    0   m   m    t    h    i   c    k    H   a   r    d   c   o

   r   e    b   e    d    b    l    i   n    d   e    d

   w    i    t    h    f    i   n   e   m   a    t   e   r    i   a    l   s

   m    3

    1    7    0 .    0

    0

    2    9    0 .    0

    0

 

    3 ,    2

    1    0 .    0

    0

    2    7 ,    8

    0    0 .    0

    0

    3    3    4 ,    9

    0    0 .    0

    0

    5 .

    M   a   s   s   c   o   n   c   r   e    t   e   g   r   a    d   e

    1    5

   m    3

    4    2    0 .    0

    0

    7    6    0 .    0

    0

    4 ,    4

    0    0 .    0

    0

    6    0 ,    6

    0    0 .    0

    0

    1 ,    4

    2    1 ,    0

    0    0 .    0

    0

    6 .

    R   e    i   n    f   o   r   c   e    d   c   o   n   c   r   e    t   e

   g   r   a    d   e    3    0

   m    3

    5    0    0 .    0

    0

    9    1    0 .    0

    0

    5 ,    3

    7    5 .    0

    0

    7    3 ,    5

    0    0 .    0

    0

    1 ,    8

    3    0 ,    0

    0    0 .    0

    0

    7 .

    M    i    l    d   s    t   e   e    l   r   o    d   r   e    i   n    f   o   r   c   e   m   e   n    t

    k   g

    5 .    8

    0

    1    0 .    7

    0

    4    5 .    0

    0

    1 ,    1

    0    0 .    0

    0

    2    1 ,    8

    7    0 .    0

    0

    8 .

    H    i   g    h    t   e   n   s    i    l   e   r   o    d   r   e    i   n    f   o   r   c   e   m   e   n    t

    k   g

    5 .    8

    0

    1    0 .    7

    0

    4    7 .    0

    0

    1 ,    1

    1    0 .    0

    0

    2    0 ,    6

    3    5 .    0

    0

    9 .

    S   a   w   n    f   o   r   m   w   o   r    k    t   o   s   o

    f    f    i    t   s   o    f

   s   u   s   p   e   n    d   e    d   s    l   a    b   s

   m    2

    8    0 .    0

    0

    1    3    0 .    0

    0

 

    4    6    0 .    0

    0

    2    4 ,    5

    0    0 .    0

    0

    1    8    1 ,    0

    0    0 .    0

    0

    1    0 .

    S   a   w   n    f   o   r   m   w   o   r    k    t   o   c   o

    l   u   m   n   s   a   n    d   w   a    l    l   s

    1    1 .

    1    1    2 .    5   m   m    T    h    i   c    k    b   r    i   c    k

   w   a    l    l   s

   m    2

   m    2

    8    0 .    0

    0

    7    0 .    0

    0

    1    3    0 .    0

    0

    1    3    0 .    0

    0

    4    9    0 .    0

    0

    7    7    5 .    0

    0

    2    4 ,    5

    0    0 .    0

    0

    4    1 ,    8

    0    0 .    0

    0

    2    2    3 ,    0

    0    0 .    0

    0

    1    6    5 ,    0

    0    0 .    0

    0

    1    2 .

       “       K       l       i      p       l      o       k       C      o       l      o      r       b      o      n       d       ”    0 .    6

    4   m   m

   p   r   o    f    i    l   e    d   s    t   e   e    l   s    h   e   e    t    i   n

   g

   m    2

    N    /    A

    1    9    0 .    0

    0

    1 ,    0

    5    0 .    0

    0

    3    6 ,    8

    0    0 .    0

    0

    5    1    6 ,    0

    0    0 .    0

    0

 

1 CONSTRUCTION COST DATA 

MAJOR RATES FOR SELECTED ASIAN CITIES 

32  CONSTRUCTION COST DATA 

Page 35: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 35/139

CONSTRUCTION COST DATA  33 

    1    3 .

    A    l   u   m    i   n    i   u   m   c   a   s   e   m   e   n    t   w    i   n    d   o   w   s ,

   s    i   n   g    l   e   g    l   a   z   e    d

 

   m    2

    6    3    0 .    0

    0

 

    9    4    0 .    0

    0

 

    4 ,    1

    0    0 .    0

    0

 

    3    0    0 ,    0

    0    0 .    0

    0

    2 ,    6

    0    8 ,    0

    0    0 .    0

    0

    1    4 .

    S    t   r   u   c    t   u   r   a    l   s    t   e   e    l   w   o   r    k

  -    b   e   a   m   s ,

   s    t   a   n   c    h    i   o   n   s   a   n    d    t    h   e

    l    i    k   e

 

    k   g

    1    2 .    0

    0

 

    2    0 .    0

    0

 

    8    2 .    0

    0

 

    1 ,    4

    0    0 .    0

    0

    3    0 ,    1

    2    0 .    0

    0

    1    5 .

    S    t   e   e    l   w   o   r    k  -   a   n   g    l   e   s ,

   c    h   a   n   n   e    l   s ,

    f    l   a    t   s   a   n    d   a   n    d    t    h   e    l    i    k

   e

 

    k   g

    1    2 .    0

    0

 

    2    0 .    0

    0

 

    8    2 .    0

    0

 

    1 ,    5

    0    0 .    0

    0

 

    3    4 ,    2

    4    0 .    0

    0

    1    6 .

    2    5   m   m    C   e   m   e   n    t   a   n    d

   s   a   n    d    (    1   :    3    )

   p   a   v    i   n   g

 

   m    2

    3    7 .    0

    0

 

    4    8 .    0

    0

    3    2    5 .    0

    0

 

    3 ,    0

    0    0 .    0

    0

    4    9 ,    2

    0    0 .    0

    0

    1    7 .

    2    0   m   m    C   e   m   e   n    t   a   n    d

   s   a   n    d    (    1   :    4    )

   p    l   a   s    t   e   r    t   o   w   a    l    l   s

 

   m    2

    5    0 .    0

    0

 

    5    3 .    0

    0

    2    5    0 .    0

    0

    8 ,    3

    0    0 .    0

    0

    6    9 ,    1

    0    0 .    0

    0

    1    8 .

    C   e   r   a   m    i   c    t    i    l   e   s    b   e    d    d   e

    d    t   o    f    l   o   o   r

   s   c   r   e   e    d    (   m    /   s    )

 

   m    2

    1    4    0 .    0

    0

 

    1    2    0 .    0

    0

    1 ,    1

    5    0 .    0

    0

    6    1 ,    2

    0    0 .    0

    0

    2    5    0 ,    4

    0    0 .    0

    0

    1    9 .

    1    2   m   m    F    i    b   r   o   u   s   p    l   a   s    t   e   r    b   o   a   r    d

   c   e    i    l    i   n   g    l    i   n    i   n   g

 

   m    2

    1    2    0 .    0

    0

 

    1    1    0 .    0

    0

    9    0    0 .    0

    0

    2    5 ,    0

    0    0 .    0

    0

    3    0    2 ,    4

    0    0 .    0

    0

    2    0 .    T   w   o   c   o   a    t   s   o    f   e   m   u    l   s    i   o   n   p   a    i   n    t    t   o

   p    l   a   s    t   e   r   e    d   s   u   r    f   a   c   e   s

 

   m    2

    3    0    0 .    0

    0

    1    9 .    0

    0

    1    4    0 .    0

    0

 

    7 ,    5

    0    0 .    0

    0

    6    4 ,    1

    5    0 .    0

    0

    A   v   e   r   a   g   e   e   x   p   e   c    t   e    d   p   r   e    l    i   m    i   n   a   r    i   e   s

    %

    5  -    1    0

    5  -    1    0

    5  -    1    0

    6  -    1    1

    8  -    1    2

   T   h  e  a   b  o  v  e  c  o  s   t  s  a  r  e   b

  a  s  e   d  o  n   l  u  m  p  s  u  m   f   i  x  e   d  p  r   i  c  e  c  o  n   t  r  a  c   t  r  a   t  e

  e  x  c   l  u  s   i  v  e  o   f  o   f  p  r  e   l   i  m   i  n

  a  r   i  e  s  a  n   d  c  o  n   t   i  n  g  e  n  c   i  e  s  u  n   l  e  s  s  o   t   h  e  r  w   i  s  e

  s   t  a   t  e   d .

   K  a  r  a  c   h   i  :   I   t  e  m   2   0  -   i  n  c   l  u   d   i  n  g  u  n   d  e  r  c  o  a   t  a  n   d  p  r   i  m  e  r .

   J  a   k  a  r   t  a  :   I   t  e  m   1   9  -   9  m  m

  g  y  p  s  u  m   b  o  a  r   d .

   #

   R  a   t  e  s  a  r  e  n  e   t   t  o   f   V   A   T .

   @ 

   R  a   t  e  s  a  r  e   b  a  s  e   d  o  n  p  r  o   j  e  c   t  s   i  n   B  a  n  g  a   l  o  r  e  a  n   d  a  r  e  n  e   t   t  o   f

   V   A   T  a  n   d   S  e  r  v   i  c  e   T  a  x .   M  u  m   b

  a   i  c  o  s   t  s  a  r  e  g  e  n  e  e  r  a   l   l  y

   8   %   h   i  g   h  e  r .

   *

   R  a   t  e  s   i  n  c   l  u   d  e   l  a   b  o  u  r  c  o  s   t  s  a  n   d  a  r  e  n  e   t   t  o   f   V   A   T

   ^

   R  a   t  e  s  a  r  e  n  e   t   t  o   f   V   A   T

Page 36: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 36/139

 

   D   E   S   C   R   I   P   T   I   O   N

   U  n   i   t 

   (   R   M   B   )

   (   R   M   B   )

   (   R   M   B   )

   (   R   M   B   )

   (   R   M   B   )

   (   M   O   P   )

 

   S   H   A   N   G   H   A   I

   B   E   I   J   I   N   G

   G   U   A   N   G   Z   H   O   U   /   C   H   O   N   G   Q   I   N   G

   S   H   E   N   Y

   A   N   G

   M   A   C   A   U

 

   /   C   H   E   N   G   D   U

    1 .

    E   x   c   a   v   a    t    i   n   g    b   a   s   e   m   e   n    t   s   ;   n   o    t

   e   x   c   e   e    d    i   n   g    2 .    0

    0   m    d   e   e   p

 

   m    3

    3    0 .    0

    0

 

    2    0 .    0

    0

 

    2    5 .    0

    0

 

    1    8 .    0

    0

 

    2    0 .    0

    0

 

    5    0 .    0

    0

    2 .

    E   x   c   a   v   a    t    i   n   g    f   o   r    f   o   o    t    i   n   g   s   ;   n   o    t

   e   x   c   e   e    d    i   n   g    1 .    5

    0   m    d   e   e   p

    3 .    R   e   m   o   v   e   e   x   c   a   v   a    t   e    d   m   a    t   e   r    i   a    l   s   o    f    f   s    i    t   e

   m    3

 

   m    3

    2    5 .    0

    0

    1    0    5 .    0

    0

 

    2    5 .    0

    0

    3    0 .    0

    0

 

    2    0 .    0

    0

    6    8 .    0

    0

 

    4    0 .    0

    0

    4    5 .    0

    0

 

    2    0 .    0

    0

    3    4 .    0

    0

 

    6    0 .    0

    0

    6    0 .    0

    0

    4 .

    1    5    0   m   m    t    h    i   c    k    H   a   r    d   c   o   r   e    b   e    d    b    l    i   n    d   e    d

   w    i    t    h    f    i   n   e   m   a    t   e   r    i   a    l   s

   m    3

    1    6    8 .    0

    0

 

    1    5    0 .    0

    0

 

    1    4    0 .    0

    0

 

    1    3    0 .    0

    0

 

    N    /    A

 

    6    0    0 .    0

    0

    5 .

    M   a   s   s   c   o   n   c   r   e    t   e   g   r   a    d   e    1    5

   m    3

    4    0    0 .    0

    0

    5    2    5 .    0

    0

    4    0    0 .    0

    0

    3    6    0 .    0

    0

    4    0    1 .    0

    0

    7    6    0 .    0

    0

    6 .

    R   e    i   n    f   o   r   c   e    d   c   o   n   c   r   e    t   e   g   r   a    d   e    3    0

   m    3

    4    7    0 .    0

    0

    5    7    1 .    0

    0

    4    5    0 .    0

    0

    4    0    0 .    0

    0

    4    9    4 .    0

    0

    8    1    5 .    0

    0

    7 .

    M    i    l    d   s    t   e   e    l   r   o    d   r   e    i   n    f   o   r   c   e   m   e   n    t

    k   g

    6 .    0

    0

    5 .    8

    0

    6 .    5

    0

    5 .    9

    4

    6 .    3    0

    9 .    0

    0

    8 .

    H    i   g    h    t   e   n   s    i    l   e   r   o    d   r   e    i   n    f   o   r   c   e   m   e   n

    t

    k   g

    6 .    0

    0

    5 .    8

    0

    6 .    5

    0

    5 .    9

    4

    6 .    3    0

    9 .    0

    0

    9 .

    S   a   w   n    f   o   r   m   w   o   r    k    t   o   s   o    f    f    i    t   s   o    f

   s   u   s   p   e   n    d   e    d   s    l   a    b   s

   m    2

    5    5 .    0

    0

    6    8 .    0

    0

    5    5 .    0

    0

    7    9 .    0

    0

    5    5 .    0    0

    2    0    0 .    0

    0

    1    0 .

    S   a   w   n    f   o   r   m   w   o   r    k    t   o   c   o    l   u   m   n   s   a   n    d   w   a    l    l   s

   m    2

    5    5 .    0

    0

    5    8 .    0

    0

    5    5 .    0

    0

    7    7 .    0

    0

    5    5 .    0    0

    2    0    0 .    0

    0

    1    1 .

    1    1    2 .    5   m   m    T    h    i   c    k    b   r    i   c    k   w   a    l    l   s

   m    2

    6    0 .    0

    0

    6    2 .    0

    0

    7    5 .    0

    0

    6    7 .    0

    0

    5    0 .    0    0

    2    5    0 .    0

    0

    1    2 .

       “       K       l       i      p       l      o       k       C      o       l      o      r       b      o      n       d       ”    0 .    6

    4   m   m

   p   r   o    f    i    l   e    d   s    t   e   e    l   s    h   e   e    t    i   n   g

   m    2

 

    N    /    A

 

    N    /    A

 

    N    /    A

 

    N    /    A

 

    N    /    A

 

    N    /    A

 

1 CONSTRUCTION COST DATA 

MAJOR RATES FOR SELECTED ASIAN CITIES 

34  CONSTRUCTION COST DATA 

Page 37: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 37/139

CONSTRUCTION COST DATA  35 

    1    3 .

    A    l   u   m    i   n    i   u   m   c   a   s   e   m   e   n    t   w    i   n    d   o   w

   s ,

   s    i   n   g    l   e   g    l   a   z   e    d

   m    2

    6    0    0 .    0

    0

 

    7    8    0 .    0

    0

 

    5    5    0 .    0

    0

 

    7    5    0 .    0

    0

 

    7    5    0

 .    0    0

    1 ,    8

    5    0 .    0

    0

    1    4 .

    S    t   r   u   c    t   u   r   a    l   s    t   e   e    l   w   o   r    k  -    b   e   a   m   s

 ,

   s    t   a   n   c    h    i   o   n   s   a   n    d    t    h   e    l    i    k   e

    k   g

    1    2 .    0

    0

 

    1    0 .    0

    0

 

    1    0 .    0

    0

 

    1    0 .    0

    0

 

    1    2

 .    0    0

    2    7 .    0

    0

    1    5 .

    S    t   e   e    l   w   o   r    k  -   a   n   g    l   e   s ,   c    h   a   n   n   e    l   s ,

    f    l   a    t   s   a   n    d   a   n    d    t    h   e    l    i    k   e

 

    k   g

    1    0 .    0

    0

 

    1    1 .    0

    0

 

    1    0 .    0

    0

 

    1    0 .    0

    0

 

    1    0

 .    0    0

 

    3    2 .    0

    0

    1    6 .

    2    5   m   m    C   e   m   e   n    t   a   n    d   s   a   n    d    (    1   :    3

    )

   p   a   v    i   n   g

 

   m

    3    5 .    0

    0

 

    2    0 .    0

    0

 

    3    0 .    0

    0

 

    2    8 .    0

    0

 

    2    5

 .    0    0

    8    0 .    0

    0

    1    7 .

    2    0   m   m    C   e   m   e   n    t   a   n    d   s   a   n    d    (    1   :    4

    )

   p    l   a   s    t   e   r    t   o   w   a    l    l   s

    2   m

    2    8 .    0

    0

 

    2    2 .    0

    0

 

    3    5 .    0

    0

 

    2    2 .    0

    0

 

    2    0

 .    0    0

    9    5 .    0

    0

    1    8 .

    C   e   r   a   m    i   c    t    i    l   e   s    b   e    d    d   e    d    t   o    f    l   o   o   r

   s   c   r   e   e    d    (   m    /   s    )

   m    2

    1    6    0 .    0

    0

 

    1    2    0 .    0

    0

 

    1    3    0 .    0

    0

 

    1    3    0 .    0

    0

 

    1    2    0

 .    0    0

    4    0    0 .    0

    0

    1    9 .

    1    2   m   m    F    i    b   r   o   u   s   p    l   a   s    t   e   r    b   o   a   r    d

   c   e    i    l    i   n   g    l    i   n    i   n   g

   m    2

    1    7    0 .    0

    0

    1    4    0 .    0

    0

    1    8    0 .    0

    0

 

    1    5    0 .    0

    0

    1    3    0

 .    0    0

    3    6    0 .    0

    0

    2    0 .    T   w   o   c   o   a    t   s   o    f   e   m   u    l   s    i   o   n   p   a    i   n    t    t

   o

   p    l   a   s    t   e   r   e    d   s   u   r    f   a   c   e   s

    2

   m

    3    2 .    0

    0

 

    3    0 .    0

    0

 

    2    8 .    0

    0

 

    3    0 .    0

    0

 

    3    0

 .    0    0

    8    0 .    0

    0

    A   v   e   r   a   g   e   e   x   p   e   c    t   e    d   p   r   e    l    i   m    i   n   a   r    i   e   s

    %

    3  -    8

    5  -    1    0

    5  -    1    0

    5  -    1    0

    5  -

    1    0

    6  -    1    2

   T   h  e  a   b  o  v  e  c  o  s   t  s  a  r  e   b  a  s  e   d  o  n

   l  u  m  p  s  u  m   f   i  x  e   d  p  r   i  c  e  c  o  n   t  r  a  c   t  r  a   t  e

  e  x  c   l  u  s   i  v  e  o   f  o   f  p  r  e   l   i  m   i  n  a  r   i  e  s  a  n

   d  c  o  n   t   i  n  g  e  n  c   i  e  s  u  n   l  e  s  s  o   t   h  e  r  w   i  s  e

  s   t  a   t  e   d .

   S   h  a  n  g   h  a   i  :   I   t  e  m   1   1  -  r  a   t  e   f  o  r   1   2   0  m  m   t   h   i  c   k

  c  o  n  c  r  e   t  e   b   l  o  c   k  w  a   l   l  s .

   B  e   i   j   i  n  g ,   C   h  o  n  g  q   i  n  g ,   C   h  e  n  g   d  u  :

   I   t  e  m   1   3  -  r  a   t  e   f  o  r   d  o  u   b   l  e  g   l  a  z  e   d  w   i  n   d  o  w

Page 38: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 38/139

1 CONSTRUCTION COST DATA 

36  CONSTRUCTION COST DATA 

RETAIL PRICES OF BASIC CONSTRUCTION 

240

220

200

180

160

140

120

100

Cement 

Php / bag (40kg) 

2008 2009 2010 2011 2012

Year

Aggregates 

1,100

1,000

900

800

700

600

500

400

Sand Gravel

300

2008 2009 2010 2011 2012Year

Page 39: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 39/139

MATERIALS FOR PHILIPPINES 

CONSTRUCTION COST DATA  37 

Ordinary Concrete Hollow Blocks 

Php / piece 15

14

13

12

11

10

9

84" thk 6" thk

7

6

5

2008 2009 2010 2011 2012

Year

Timber  

180 

160 

Php / bdft 

140 

120 

100 

80 

60 

40  Softwood 

20  Hardwood 

2008 2009 2010 2011 2012Year

Page 40: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 40/139

1 CONSTRUCTION COST DATA 

38  CONSTRUCTION COST DATA 

RETAIL PRICES OF BASIC CONSTRUCTION 

Reinforcing Bar  (Intermediate Grade - Grade 40; 275 MPa) 

Php / kg 

65

60

55

50

45 16mm

32mm 

40

35

30

25

20

2008 2009 2010 2011 2012Year

Reinforcing Bar  (High Yield Grade - Grade 60; 10 MPa) 

Php / kg 

65

60

55

50

45

40

35

30

25

20

16mm

32mm

2008 2009 2010 2011 2012

Year

Page 41: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 41/139

MATERIALS FOR PHILIPPINES 

CONSTRUCTION COST DATA  39 

Structural Steel (Angle Bar; A36) Php / kg 

1/4" x 2" x 20'

3/8" x 3" x 20'

2008 2009 2010 2011 2012

Year

Structural Steel (Wide Flange) 

Php / kg 

60

55

50 14 x 30 lbs

45

40

35

30

25

2008 2009 2010 2011 2012

Year

Page 42: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 42/139

1 CONSTRUCTION COST DATA 

40  CONSTRUCTION COST DATA 

UNIT COSTS FOR ANCILLARY FACILITIESFOR PHILIPPINES 

DESCRIPTION  UNIT  PESO 

SQUASH COURTS 

Single court with glass backwall includingassociated mechanical and electrical servicesbut including any public facilities (enclosingstructure not included) 

TENNIS COURTS 

Single court on grade with acrylic surfacingcompleted with chain link fence 

Single court on grade with artificial turfsurfacing including chain link fence 

Extra for lighting 

SWIMMING POOLS 

Half Olympic (25m x 16m) 6-lanes outdoorswimming pool built in ground, fully tiled,complete with 5m wide deck and associatedequipment 

Half Olympic (25m x 16m) 6-lanes indoorswimming pool with suspended structure

(enclosing structure not included) fully tiledand completed with 5m wide deck, includingmechanical ventilation and associatedequipment. 

Extra for heating equipment 

Extra for salt chlorine generator  BASKETBALL COURTS 

Exposed court, approximately 975m 2 includingplayer benches and excluding equipment 

Covered court approximately 975m 2 ,including metal viewing seats, built-infurnitures, provision for T&B, etc* 

per court 

per court

per court 

per court 

per pool 

per pool 

per pool

per pool 

per court 

per court 

1,400,000 

2,000,000 

2,400,000 

500,000 

8,000,000 

12,000,000 

1,500,000 

500,000 

3,900,000 

18,000,000 

Page 43: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 43/139

CONSTRUCTION COST DATA  41 

DESCRIPTION  UNIT  PESO 

PLAYGROUND EQUIPMENT 

Outdoor playground equipmentcomprising various activities andsafety mat 

SAUNAS 

Sauna room for 4-6 people complete

with all accessories (enclosingstructure not included) 

STEAM BATHS 

Steam bath for 4-6 people completewith all accessories (enclosing

structure not included) 

GOLF COURSES 

(Based on ‘ Average Cost Model’ of an 18 hole golf course in Asia)excluding fairway construction and

rough hydroseeding 

Including fairway construction andrough hydroseeding 

GOLF SIMULATOR 

Complete golf simulation systemcomplete with projector, high impactprojection screen, artificial grassputting turf, putting green cup andcontrol computer with softwareoverall size 4m x7m x 3m high

(enclosing structure not included) 

per set 

perroom 

per

room 

per hole 

per hole 

per set 

500,000to 1,500,000 

500,000 

800,000 

23,000,000 

27,000,000 

3,000,000to 

4,500,000 

* includes provision for forward/rear fold ceiling mountedbasketball goal. 

Page 44: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 44/139

42  CONSTRUCTION COST DATA 

1 CONSTRUCTION COST DATA 

M & E MAJOR PLANT COSTS FOR THEPHILIPPINES 

DESCRIPTION  UNIT COST

(Php) 

1. Water cooled electric chiller  

2. Air-cooled electric chillers 

3. Cooling Towers; induced draft 

4. Air Handling Units (AHU) 

5. Packaged water-cooled units (PWCU) 

6. Fire Pumps; electric motor driven 

7. Fire Pumps; diesel engine driven 

8. Standby generator sets 

per TR

per TR

per GPM 

per TR 

per TR 

per HP

per HP

per KW 

16,000 – 26,000 

25,000 – 35,000 

2,300 – 3,000 

13,000 – 19,000 

18,000 – 23,000 

17,000 – 22,000 

22,000 – 26,000 

5,500 – 9,500 

NOTE: 

1. Rates are based on direct supply of imported quipment andmaterials by the developer. 

2. Rates include all government imposed taxes, import duties

brokerage fees and allowances for local materials andinstallation cost. 

3. Rates exclude preliminaries and contingencies. 4. Rates are based on fixed price tenders received in 4th 

Quarter 2012. 

Page 45: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 45/139

Page 46: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 46/139

1 CONSTRUCTION COST DATA 

FIT- OUT COSTS FOR PHILIPPINES 

44  CONSTRUCTION COST DATA 

DESCRIPTION PESO/m2 

HOTELS 

Public Areas (Front of House) : 

3-star Hotel 18,000 - 22,000 4-star Hotel 24,000 - 28,000 5-star Hotel 30,000 up 

Guest rooms : 3-star Hotel 16,000 - 18,000 4-star Hotel 20,000 - 25,000 5-star Hotel 25,000 - 35,000 

Notes : 

1. Includes furniture, floor, wall and ceilingfinishes, drapery, sanitary fittings andlight fittings. 

2. Excludes partitioning, M & E works,building shell, chandelier, operational itemsand equipment (e.g. bed, cutlery, crokery,linen, television, refrigerator, etc.), openingexpenses, stage equipment and computersystems. 

COMMERCIAL 

Shopping centers 20,000 - 25,000 

Notes : 

1. Mall/Public areas only; tenant area to bebare finish 

2. See notes 1,2,& 3 below 

NOTE: 1. Costs are at December 2012 Levels. 

2. Costs include wall, floor, ceiling finishes, doors, FF&E,M&E Works service reticulation, preliminaries Forex US$1:42 

Page 47: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 47/139

CONSTRUCTION COST DATA  45 

DESCRIPTION  PESO/m 2 

OFFICES 

Standard offices *Executive offices **Banking lobby *** 

* Medium quality systems furniture ** High quality furnitures and finishes *** Imported stone finishes; double volume

spaces 

Note : See notes 1, 2 & 3 below 

RESTAURANTS 

General dining restaurant Fine dining restaurant 

Note : 

Includes furniture, floor, wall and ceilingfinishes, minor alteration to air-conditioningand fire services installation to suit layout,exhaust for kitchen but excludes exhaust flue, operational items (e.g. cutlery, crockery,linen, utensils, etc.). 

18,000 - 26,000 35,000 - 50,000 55,000 - 65,000 

18,000 - 35,000 35,000 up 

3. Costs exclude operational equipment and supplies,structure, external enclosure, major M&E plant, financing

and developers costs, professional and marketing fees. 

Page 48: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 48/139

Page 49: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 49/139

CONSTRUCTION COST DATA  47 

KITCHEN EQUIPMENT COSTS

FOR PHILIPPINES 

DESCRIPTION  COST (Php) 

BUSINESS CLUB

500 - 900 m 2 floor area 

EXECUTIVE DINING

200 - 400 m2 floor area 

4 STAR HOTEL 

50 - 150 rooms 

5 STAR HOTEL

200 - 500 rooms 

OFFICE CANTEEN

200 - 300 m2 floor area 

20M - 25M 

20M - 30M 

25M - 35M 

35M - 50M 

10M - 20M 

Page 50: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 50/139

48  CONSTRUCTION COST DATA 

1 CONSTRUCTION COST DATA 

Page 51: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 51/139

 

GENERAL CONSTRUCTION DATA

2 Trends in Construction Cost for Philippines

Construction Value

Construction Activity 

Lead Time of Different Packages

Utility Costs for Selected Asian Cities

Estimating Rules of Thumb 

Progress Payments

Construction Materials Wholesale Price Index

Minimum Wage 

Average Earnings Index for Construction 

Page 52: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 52/139

2 GENERAL CONSTRUCTION DATA 

50  GENERAL CONSTRUCTION DATA 

Page 53: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 53/139

GENERAL CONSTRUCTION DATA  51 

TRENDS IN CONSTRUCTION COSTSFOR PHILIPPINES 

80 

Office Bldgs. - Grade A 70 

Residential - Luxury Apts. 

60  Retail Stores Hotels - 5-star  

50 

40 

30 

20 

10 

0 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 

Year  

Building Construction Cost (Php/m2) 

 Year Hotels Office Residential RetailUS$ 

to Php 

2002 

2003 

2004 

2005 

2006 

2007 

2008 

2009 

2010 

2011 

2012 

57,240 31,270 36,835 

57,750 31,625 37,125 

58,800 32,200 36,680 

58,850 32,175 36,850 

60,000 34,000 37,000 

60,200 36,980 37,410 

66,960 45,120 44,160 

67,000 45,120 44,180 

69,080 46,860 45,760 

68,800 46,400 46,010 

68,800 56,700 50,400 

21,200 

20,625 

18,840 

19,800 

21,760 

26,500 

29,500 

29,800 

32,340 

41,280 

46,200 

53.00 55.00 

56.00 

55.00 

50.00 

43.00 

48.00 

47.00 

44.00 

43.00 

42.00 

Page 54: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 54/139

2 GENERAL CONSTRUCTION DATA 

52  GENERAL CONSTRUCTION DATA 

CONSTRUCTION VALUE 

Construction Value (Php Billions) 

120 

105 

90 

75 

60 

45 

30 

15 

Residential

Non-Residential

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012*

Year  

 Year  

Construction Value Php (1,000) 

Residential  Non-Residential 

2006 

2007 

2008 

2009 

2010 

2011 2012* 

51,179,051 

53,596,319 

69,043,520 

77,953,836 

97,247,194 

102,938,618 101,550,926 

50,772,217 

53,240,552 50,718,172 48,895,248 79,047,539 

94,679,492 97,042,670 

* Forecast Source : www.census.gov.ph/business/construction 

Page 55: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 55/139

GENERAL CONSTRUCTION DATA  53 

CONSTRUCTION ACTIVITY 

Usable Floor Area (Millions m²) 

14 

Residential 

12 

Non-Residential 

10 

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012*Year  

 Year  

Usable Floor Area (m²) 

Residential  Non-Residential 

2006 

2007 

2008 

2009 

2010 2011 2012* 

7,808,050 

7,740,142 

9,305,281 

9,848,587 

11,412,345 11,291,568 11,928,328 

6,024,889 

7,028,643 

6,310,071 

5,355,568 

8,820,354 8,716,240 10,006,398 

* Forecast Source : www.census.gov.ph/business/construction 

Page 56: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 56/139

2 GENERAL CONSTRUCTION DATA 

54  GENERAL CONSTRUCTION DATA 

LEAD TIME OF DIFFERENT PACKAGES 

Packages 

Process Code* (in weeks) 

A  B  C  D 

Insitu Concrete Works 

1  1  2  - 

Structural steel frames 

4  2  -  5 

Cladding-curtain walling 

10  2  -  14 

Brickwork  1  1  2  - 

Roof finishes -profiled metal 

3  1  4  4 

Windows  2  1  3  6 

Drylining, plasterand screeds  1  1  1  - 

Demountablepartitions  2  1  2  3 

General joinery  2  2  3  5 

Raised floors  2  2  -  - 

Suspended ceilings  2  2  3  3 

Decorations 

(wall coverings)  -  -  2  - 

Stone wall andfloor finishes 

3  2  4  5 

* Process Code 

Legend: 

 A - Working Drawing B - Approve working drawing

C - Procurement of materials

D - Manufacture 

Page 57: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 57/139

GENERAL CONSTRUCTION DATA  55 

Packages 

Process Code* (in weeks) 

A  B  C  D 

Passenger lifts (non-standard) 

8  3  -  27 

Escalators  4  2  -  18 

Mechanicalpipework 

4  2  1  1 

Ductwork  4  2  4  3 

Sprinklers  6  2  4  3 

 Air-conditioning

plant 2  2  3  6 

Variable air-volume unit 

1  1  3  6 

Electrical package  6  3  -  - 

Switchgear   2  2  -  10 

Generators (600 kW)  4  2  -  13 

Light fittings  1  1  6  - 

Security systems  3  3  4  - 

Controls  4  3  3  - 

Furniture  2  2  4  8 

Data and voicecabling 

3  2  - 

The lead time provided shall serve only as guide for use in

projects, this is due mainly to the variability of factors like

local customs processing/clearing, material availability,

among others. 

Lead times do not refer to any particular building/project

type and are based on average times. For examples;  Air-conditioning plant may require between six and twelve

weeks depending on the plant specified or required.

Therefore, an average of nine weeks has been used in the

table. 

Page 58: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 58/139

56  GENERAL CONSTRUCTION DATA 

2 GENERAL CONSTRUCTION DATA 

UTILITY COSTS FOR SELECTED ASIA CITIES 

COUNTRY 

ExchangeRateUsed 

ELECTRICITY 

Domestic  Commercial/ 

US$=  US$/kwh  US$/kwh 

Manila  PESO 42.00  0.21 - 0.27  0.23 

Hong Kong  HK$ 7.80  0.10  0.12 Kuala Lumpur   RM 3.06  0.071 - 0.148  0.113 - 0.141 

Singapore  S$ 1.22  0.22  0.22 

Brunei 

Jakarta 

B$ 1.24 

IDR 9,600 

0.008 - 0.12 

0.083 

0.058 - 0.162 

0.095 

Bangkok  BAHT30.46  0.061 - 0.106  0.087 - 0.089 

Shanghai  RMB 6.29  0.098 (peak) 0.048 (normal)  0.16 (peak) 0.077 (normal) 

Beijing  RMB 6.29  0.07  0.13 

Guangzhou  RMB 6.29  0.13  0.10 / 0.15 

Chongqing  RMB 6.29  0.09  0.13 / 0.107 

Macau 

Seoul 

MOP 7.98 

KRW1086.00 

0.16 

0.08 

0.16 

0.066 Bangalore  INR 54  0.072 - 0.1814  0.104 - 0.326 

New Delhi  INR 54  0.061 - 0.116  0.111 - 0.120 

Ho Chi Minh  VND20,865  0.102  0.031 - 0.157 

Cost are at 4th Quarter 2012 Levels 

Basis of Charges in Manila, Philippines Water Electricity Domestic: 60m³ - 70m³ Domestic: 98 kwh - 251 kwh Commercial/Industrial : 2,898m³ Commercial/Industrial : 218,400 kwh - Water and Electricity: Actual Billing, includes miscellaneous charges, such as Environmental Charge,

Currency Exchange Rate Adjustment (CERA), VAT, etc. Fuel as at 23 November 2012 

Basis of Charges in Hongkong, China Water: Electricity (Based on tariff scheme of CLP Holdings Ltd)Domestic Domestic (bi-monthly consumption) 

0 - 12m³ : Free of Charge 0 - 400 kWh : US$0.10/kwh 

12 - 43m³ : US$0.53/m³ 400 - 1,000 kWh : US$0.11/kwh 43 - 62m³ : US$0.83/m³ 1,000 - 1,800 kWh : US$0.13/kwh  Above 62m³ : US$1.16/m³ Above 1,800 kWh : US$0.17/kwh 

Basis of Charges in Chongqing, China Unleaded Fuel: 93# = US$1.20/litre, Unleaded Fuel 97# - US$1.27/litre 

Basis of Charges in Macau, China Water: Consumption charge (flat rate) : US$0.55/m³ 

Other Charges (Depending on meter size 15mm - 200mm)Meter Rental = US$0.34 - 58.00/month Minimum Consumption fee = US$2.22 - 383.0/month 

Electricity tariff are composition ofdemand charges, consumption charges,fuel clause adjustment and governmenttax 

Charges for ordinary users (e.g. Business, government buildings, schools, associations, hospitals and

others) only. Special users (e.g. gaming industries, hotels, saunas, golf courses, construction, publicinfrastructures and other temporary consumption) are excluded. 

Basis of Charges in Shanghai, China Unleaded 93# = US$1.19/litre; Unleaded 97# = US$1.26/litre 

Basis of Charges in Beijing, China Unleaded fuel rate is for Unleaded gasoline 97. 

Page 59: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 59/139

GENERAL CONSTRUCTION DATA  57 

WATER  FUEL 

Domestic  Commercial/  Diesel  Leaded  Unleaded 

US$/m3  US$/m3  US$/litre  US$/litre  US$/litre 

0.70 - 0.84  1.56  0.980  N/A  1.255 

0.83  0.59  1.56  N/A  2.15 0.186 - 0.654  0.677 - 0.745  0.59  N/A  0.62 

1.48  1.71  1.26  N/A  1.77 

0.088 - 0.355  0.492 - 0.532  0.306  0.411  0.427 

0.233  0.442  0.442  N/A  0.470 

0.279 - 0.474  0.312 - 0.519  0.978  N/A  1.242 

0.47  0.59  1.22  N/A  1.24 - 1.31 

0.64  0.99  1.24  N/A  1.32 

0.31  0.55  1.33  N/A  1.43 

0.56 

0.55 to 0.56 

0.295 

0.72 

0.66 

1.398 

1.17 

1.55 

1.63 

N/A

N/A

N/A 

1.20 / 1.27 

1.99 

1.79 2.855 - 5.099 

0.250 - 1.135 

0.23 - 0.53 

3.835 - 6.323 

1.792 - 3.907 

0.73/0.39 

0.952 

0.87 

1.05 

N/A

N/A

N/A 

1.37 

1.259 

1.13 - 1.16 

Basis of Charges in Kuala Lumpur, Malaysia Unleaded fuel reat is for Unleaded Petrol Ron 95 

Basis of Charges in Bangkok, Thailand Unleaded = Gasohol 95 For Normal Tariff with consumption not exceeding 150kWh per month Basis of Charges in Karachi, Pakistan Diesel = High Speed Diesel; Unleaded = Premier Petrol 

Basis of Charges in Singapore (All Rates are nett of GST)Electricity tariff is based on low tension power supply. Domestic water rate includes conservation tax and water borne fee and is an average for the 

1st 40 m³ exclude sanitary appliance fee. Non-domestic water rate includeds conservation tax and water borne fee, exc. sanitary appliance fee 

Diesel and 98 Unleaded Petrol as at 5 November 2012. 

Basis of Charges in Ho Chi Minh, Vietnam Water: (used in norm = US$0.21; used over norm = US$0.50)Electricity: Domestic rates are applied to the 301st KW above wards.D.O - 0.05% 92 & 95 Unleaded Petrol as at October 2012. 

Basis of Charges in Brunei Electricity (Domestic) Tariff effective from 01 Jan 2012. 1-10-kwh 10c, 11-60kwh 8c, 61-100kwh 12c, above 100kwh 15c. 

Basis of Charges in Seoul, Korea 

Plus Water basic rates Domestic : US$0.939/month (within 30m³ usage)Commercial : US$77.39/month (within 100m³ usage)Plus Electricity basic rates Domestic : US$5.368/month + US$0.08/Kwh (300kwh below in use)Commercial : US$4.687/month + US$0.066/Kwh (300kwh below in use) 

Page 60: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 60/139

Page 61: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 61/139

Page 62: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 62/139

60  GENERAL CONSTRUCTION DATA 

2 GENERAL CONSTRUCTION DATA 

PROGRESS PAYMENTS 

The following graph and table are an indication of therate of expenditure for construction projects. 

The rate of expenditure is an average rate and willvary from project to project when specific project

circumstances are taken into account. 

No account has been made for downpayments orretention. 

100% 

Progress Claims 

80% 

60% 

40% 

20% 

0% 

0% 20% 40% 60% 80% 100% 

Project Period 

Page 63: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 63/139

GENERAL CONSTRUCTION DATA  61 

Contract 

Period 

Cumulative Progress Claims 

5% 

10% 

15% 

20% 

25% 

30% 

35% 

40% 

45% 

50% 

55% 

60% 

65% 70% 

75% 

80% 

85% 

90% 

95% 

100% 

1% 

3% 

5% 

7% 

10% 

14% 

21% 

29% 

38% 

48% 

59% 

68% 

77% 83% 

88% 

92% 

94% 

96% 

98% 

100% 

Page 64: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 64/139

2 GENERAL CONSTRUCTION DATA 

62  GENERAL CONSTRUCTION DATA 

CONSTRUCTION MATERIALS WHOLESALEPRICE INDEX IN THE NATIONAL CAPITAL

REGION (NCR) 

Base Year (2000 = 100) 

2011  2012 

Dec  Jan  Feb  Mar  

ALL ITEMS  214 .1  214.4  215.6  217.3 

 A. Sand and gravel  190.0  190.5  192.6  195.1 

B. Concrete Products  195.9  196.4  196.4  197.6 

C. Cement  178.1  175.3  174.8  177.4 

D. Hardware  207.0  207.0  207.3  208.5 

E. Plywood  176.2  177.1  176.1  176.6 

F. Lumber   218.2  218.1  217.9  218.7 

G. G.I. Sheet  173.5  174.1  175.7  176.9 

H. Reinforcing Steel  242.6  240.4  241.4  242.1 I. Structural Steel  267.7  269.4  270.2  272.2 

J. Tile Works  171.5  171.5  171.5  171.9 

K. Glass and Glass Products  177.7  177.7  177.7  177.7 

L. Door, Jambs and Steel Casement  194.7  194.7  195.0  196.3 

M. Electrical Works  188.4  188.6  189.4  191.1 

N. Plumbing Fixtures & Accessories/Waterworks  154.3  154.7  155.2  155.4 

O. Painting Works  198.6  199.6  200.2  201.1 

P. PVC Pipes  170.2  170.2  170.4  171.2 

Q. Fuel and Lubricants  333.6  335.6  345.9  353.4 

R. Asphalt  441.3  446.7  446.7  446.7 

S. Machinery and Equipment Rental  114.6  114.6  114.6  114.6 

Page 65: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 65/139

Page 66: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 66/139

2 GENERAL CONSTRUCTION DATA 

64  GENERAL CONSTRUCTION DATA 

MINIMUM WAGE 

Peso per Day 

500.00

450.00

400.00

350.00

300.00

250.00

200.00

150.00

100.00

50.00

0.002004 2006 2008 2010 2011 2012

Y E A R  

 Year  Wage 

Order # 

Amnt. of  

Increase 

Peso per  

Day 

01 April 1994 02 February 1996 01 May 1996 06 Febuary 1997 01 May 1997 06 February 1998 

31 October 1999 01 November 2000 05 November 2001* 01 Febuary 2002* 25 June 2004* 16 June 2005 11 July 2006 

28 August 2007 14 June 2008 28 August 2008 23 June 2010 26 May 2011 03 June 2012 01 November 2012 

NCR 03 NCR 04 NCR 04 NCR 05 NCR 05 NCR 06 

NCR 07 NCR 08 NCR 09 NCR 09 NCR 10 NCR 11 NCR 12 

NCR 13 NCR 14 NCR 14 NCR 15 NCR 16 NCR 17 NCR 17 

10.00 16.00 

4.00 15.00 

5.00 13.00 

25.50 26.50 15.00 15.00 20.00 25.00 25.00 

12.00 15.00 

5.00 22.00 22.00 20.00 10.00 

145.00 161.00 165.00 180.00 185.00 198.00 

223.50 250.00 265.00 280.00 300.00 325.00 350.00 

362.00 377.00 382.00 404.00 426.00 446.00 456.00 

* ECOLA (Emergency Cost of Living Allowance)Source : National Wages & Productivity Council, 

Department of Labor and Employment 

Page 67: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 67/139

GENERAL CONSTRUCTION DATA  65 

AVERAGE EARNINGS INDEX FORCONSTRUCTION 

(1978 = 100) 

 YEAR  2012 2011 2010  2009 

 ANNUAL  1,343.1 2,519.5 2,384.7  2,253.8 

JanuaryFebruaryMarch

 April MayJune

July August SeptemberOctoberNovemberDecember  

2,701.8 2,577.3 2,386.3 2,446.6 2,366.2 2,300.6 2,680.1 2,639.6 2,521.0 2,712.1 2,664.3 2,511.4 3,012.9 2,834.4 2,601.4 2,563.9 2,636.1 2,556.8 

2,303.1 2,208.4 2,580.0 2,236.5 2,478.5 2,425.4 2,367.4 2,297.5 2,536.7 2,366.8 2,250.1 2,204.5 

2,250.1 2,211.0 2,335.0 2,413.6 2,447.9 2,317.0 

2,188.0 2,234.1 2,304.6 2,064.8 2,135.8 2,143.7 

 YEAR  2012  2011  2010  2009 

QUARTERLY  2,384.7  2,253.8 

Q1 Q2 Q3 Q4 

2,609.5 2,763.0 

2,527.7 

2,711.6 2,453.9 2,384.7 

2,402.6 2,556.6 2,290.1 2,289.6 

2,265.4 2,392.8 2,242.2 2,114.8 

Page 68: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 68/139

2 GENERAL CONSTRUCTION DATA 

66  GENERAL CONSTRUCTION DATA 

Page 69: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 69/139

Page 70: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 70/139

3 PROPERTY COMMENTARY 

68  PROPERTY COMMENTARY 

PROPERTY 

by Jones Lang LaSalle 

In General

The healthy performance of the property market in thecountry, particularly in Metro Manila, in the past couple ofyears continued in 2012. With the support of robusteconomic growth, positive investor environment,improved consumer and business confidence andcontinued growth of property demand drivers, the realestate sector (commercial office, residential, hotel, retail

and industrial) has sustained its upward momentum. 

The commercial office property sector has exhibited asolid performance in 2012 as demand continued to bedriven by the offshoring and outsourcing (O&O) industry.The stable demand from this industry has supported themoderate growth of rentals in Grade ‘A’ offices. Property

developers have remained generally optimistic as theyhave introduced more new office projects in various areasin Metro Manila. This has further increased the volume offuture supply in the next few years. The large incomingoffice supply may likely exert downward pressure,thereby limiting rental growth in 2013. 

The residential condominium market has continued togrow in 2012, supported by the sustained inflow ofremittances from overseas Filipinos, relatively lowinterest rates and flexible financing schemes. Propertydevelopers have continued to launch new residentialprojects in the past year, further adding to the massivenumber of upcoming condominium units in Metro Manila.

However, this high supply growth may possibly slow downthe rise in rentals and capital values, albeit not severelydue to sustained demand in the market. 

Growing domestic consumption and continuous inflow ofremittances have also supported further growth in theretail sub-sector. These key drivers paved way for the

entry and expansion of international retailers notably fromthe food and clothing industries. Consequently, retailrents have continued to grow at a steady pace. In 2013,new malls and expansion projects are expected tosignificantly boost the retail supply. 

Page 71: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 71/139

PROPERTY COMMENTARY  69 

The hotel sector has continued to thrive with the increasingnumber of tourists and the entry of new hotel developmentsin the market. In the next several years, the number ofhotels in Metro Manila is expected to considerably rise.Majority of the upcoming hotels will be concentrated inEntertainment City district in the Bay City area, as well as inthe established business districts of Makati, Ortigas and

Bonifacio Global City. 

The industrial sub-sector maintained its stable growth in 2012 amidst the difficult global economic conditions. Thismay be attributed to the renewed interest on the sector onthe back of the recorded robust economic growth of thecountry. Furthermore, the potential credit upgrade by rating

agencies and strong growth prospects of the country isexpected to buoy the market moving forward. 

Overall, the encouraging projections for the economy andthe various property demand drivers such as remittancesand the O&O industry are likely to support further growth inthe property market in 2013. Despite the positive outlook,

stakeholders in the real estate market are advised toexercise caution as global economic conditions remain at afragile state. Market externalities such as the slow recoveryof the US economy and the lingering Eurozone crisis arepotential threats that may weigh down on the propertymarket. 

Commercial Sector  

JJones Lang LaSalle Research, Consulting & Valuation(“JLL Research, Consulting & Valuation”) observes thecontinued rise in office supply for all grades in Metro Manila,which stood at around 6.8 million sqm in 2012. Almost 80%of this total stock is located from the established business

districts of Makati Commercial Business District (CBD),Ortigas (CBD) and Bonifacio Global City (BGC). Despite thelarge amount of office space completed in 2012, averagevacancy of office developments in Makati CBD and BGCremained stable at less than 5% by the start of 2013. Thehealthy take-up of office space is buoyed primarily due to thesustained office demand coming from the offshoring and

outsourcing (O&O) industry. In the next three years, anestimated 1.6 million sqm is projected to be added to thetotal office stock in Makati CBD, Ortigas CBD and BGC. In 2013 alone, more than 640,000 sqm of office space areexpected to be completed in the aforementioned CBDs. 

Page 72: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 72/139

3 PROPERTY COMMENTARY 

70  PROPERTY COMMENTARY 

Following the upward momentum in the past couple ofyears, office rental rates continued to rise in 2012. InMakati CBD and BGC, average rental rates of prime andGrade ‘A’  offices have reached an estimated Php9,500per sqm per annum, up by around 3.5% from last year’s

level. New supply in 2013, however, may exert pressureto slow the rate of rental growth. 

JLL Research, Consulting & Valuation forecasts that theaverage achievable gross rental levels for Grade ‘A’

facilities in Makati CBD will fall within the range of Php750to 850 per sqm per month in 2013. Average rentals inprime office developments in Makati CBD are estimatedat around Php900 to Php1,100 per sqm per month.

Meanwhile, rentals in office developments in Ortigas CBDwill likely hover around Php500 to Php650 sqm permonth. Rental rates for office developments in BGC areestimated within the range of Php650 to Php850 per sqmper month. Capital values of Grade ‘A’ offices in MakatiCBD are projected to achieve resale prices at aroundPhp75,000 to 90,000 per sqm. In Ortigas CBD, average

capital values of office spaces are estimated to fall withinthe range of Php50,000 to Php60,000 per sqm. 

Residential Condominium Sector  

The residential property sector has sustained its healthy

performance in 2012. Demand continued to be driven by thesteady inflow of remittances from overseas Filipinos, lowinterest rates, and flexible financing schemes. On the supplyside, the residential market continued to register robustgrowth as total stock in the Makati CBD, Ortigas CBD, andBGC increased to 56,500 units in 2012. 

Property developers have continued to launch and constructnew residential projects, further increasing the number ofupcoming condominium units in the market. From 2013 to 2015, roughly 42,000 residential units are estimated to boostthe total stock in Makati CBD, Ortigas CBD, and BGC. Thistranslates to an annual average of 14,000 units for the nextthree years. The large magnitude of upcoming supply

remains a concern as it may exert downward pressure on thegrowth of rental and capital values. 

Page 73: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 73/139

Page 74: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 74/139

3 PROPERTY COMMENTARY 

72  PROPERTY COMMENTARY 

70% 

60% 

50% 

40% 

30% 

20% 01  02  03  04  05  06  07  08  09  10  11  12 

Deluxe (5-star) 58.39% 62.72% 61.23% 71.03% 74.03% 73.63% 73.84% 70.11% 64.43% 70.56% 71.43% 71.04%

First Class (4-star) 54.24% 59.90% 59.94% 65.80% 70.22% 72.32% 75.89% 68.97% 60.61% 62.21% 59.56% 57.63%

Standard (3-star) 52.51% 55.88% 58.97% 64.28% 67.88% 70.29% 71.81% 70.77% 67.77% 65.58% 65.85% 63.21%

Economy (2 and 1-star) 41.13% 51.34% 54.07% 54.12% 65.90% 58.42% 61.76% 62.32% 64.63% 58.57% 57.92% 53.85%

 Average Occupancy Rates of Hotels in Metro Manila By Hotel Classification: 2001 to 2012 

80%

Deluxe (5-star) First Class (4-star) Standard (3-star) Economy (2 and 1-star)

In the next three years, an estimated 9,500 hotel rooms isexpected to open in Metro Manila. In 2013 alone, around 3,600 hotel rooms are projected to be added to the total hotelroom stock. Majority of the upcoming supply will be located inthe integrated hotel-casino developments within theEntertainment City, such as the Belle Grande Manila Bay andSolaire Manila. The other deluxe hotel developments will be

located in the Makati CBD, Ortigas CBD and BGC. 

Retail Sector  

The retail property sector in Metro Manila continued to exhibitstrong performance in 2012 despite the new additions in thetotal retail stock and modest growth in shopping mall rentals.

The country’s large domestic consumer base and thesustained inflow of overseas remittances have helped insustaining the demand for retail space. The remittances fromoverseas Filipinos still managed to grow by 5.5% in the firstnine months of 2012. With the support of overseasremittances and the rising domestic consumption, the entryand expansion of new international retailers continued in 

2012. 

Page 75: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 75/139

PROPERTY COMMENTARY  73 

GLA

(in

'000sqm)

 

On the supply side, the opening of new shopping malls and thecompletion of mall expansion projects in 2012 brought the totalretail stock of major malls in Metro Manila to around 4.3 millionsqm. For 2013, the retail stock in the metropolis is estimated togrow further as almost 500,000 sqm of additional retail space isexpected to be completed. The new retail space supply will belocated in several new mid- to large-scale shopping centers andfrom expansions of existing malls. Despite the large retail stock inMetro Manila, JLLL Research, Consulting & Valuation estimatesvacancy rates in major shopping malls to likely remain within the 4% - 5% range. 

 Apart from Metro Manila, major mall developers, SM PrimeHoldings, Robinsons Land, and Ayala Land, are also continuingto build new shopping centers in other urban growth centersacross the country. Overall, retail supply in the Philippines isexpected to sustain its upward momentum in the short- tomedium-term.expected to sustain its upward momentum in theshort- to medium-term. 

 Accumulated Total Supply of Gross Leasable Space (in sq. m.)Major Metro Manila Retail Malls 1995-2012E 

6,000 

5,000 

4,000 

3,000 

2,000 

1,000 

Page 76: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 76/139

3 PROPERTY COMMENTARY 

74  PROPERTY COMMENTARY 

Industrial Sector  

Industrial land values edged up in the 1H2012 due to therenewed interest from manufacturing firms due to theon-going structuralization of associated costs and ways ofdoing business in traditional markets, foremost of which isChina. The improvement of consumer demand for fastmoving consumer goods also contributed to the growth of

demand for industrial warehouses and spaces, enabling anupward adjustment in land values after more than a decade ofzero- to.negative growth rates. 

 As result, total foreign direct investments (FDI) for the firstsemester of 2012 were registered at Php62.6 billion, postinga modest growth of 0.4% from the level during the same

period in 2011. A large amount of these FDIs was poured intothe manufacturing industry, as investment pledges in the saidindustry amounted to Php47.5 billion or 75.8% of the totalFDI. 

 Average land values in Cavite and Laguna were estimated torange between Php3,000 and P 4,000 per sqm. Meanwhile,

rental rates of ready-built facilities (RBFs) posted nosignificant movement and remained within the Php110 toPhp185 per sqm per month range. 

JLL Research, Consulting & Valuation estimates that landvalues in the industrial property sub-sector is expectedcontinue to post modest growth in 2013, despite the fragile

global economic conditions in the backdrop and the removalof the power scheme rates from ecozones. The anticipatedupgrade in the sovereign credit rating of the Philippinescoupled with a positive medium-term economic outlook willlikely help attract global manufacturing firms to re-enter themanufacturing sector, which will help in the long-delayedrecovery of the industrial property sub-sector. 

Disclaimer: This document is prepared by Jones Lang

LaSalle, for information only. Whilst reasonable care has

been exercised in preparing this document, it is subject to

change, and Jones Lang LaSalle makes no representations

as to its truth, accuracy or completeness, and accordingly

cannot be held responsible for any liability whatsoever for anyloss howsoever arising from or in reliance upon the whole orany part of the contents of this document  

Provided by : Jones Lang Lasal le  

Page 77: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 77/139

PROPERTY COMMENTARY  75 

Jones Lang LaSalle (NYSE:JLL) is a professional servicesfirm specializing in real estate. The firm offers integratedservices delivered by expert teams worldwide to clientsseeking increased value by owning, occupying or investing inreal estate. With 2011 global revenue of USD3.6 billion, Jones

Lang LaSalle serves clients in 70 countries from more than 1,000 locations worldwide, including 200 corporate offices.The firm is an industry leader in property and corporate facilitymanagement services, with a portfolio of approximately 2.1billion square feet worldwide. LaSalle InvestmentManagement, the company’s investment managementbusiness, is one of the world’s largest and most diverse in real

estate with more than USD47 billion of assets undermanagement. 

Jones Lang LaSalle has over 50 years of experience in Asia Pacific, with over 22,200 employees operating in 79 offices in 14 countries across the region. The firm was named the ‘Best

Property Consultancy’ in nine countries in Asia Pacific,

including a Five Star Award for the Philippines, at theInternational Property Awards Asia Pacific 2012, inassociation with HSBC, and was highly commended in afurther three countries 

Jones Lang LaSalle 5/F Equitable Bank Tower  

8751 Paseo de Roxas 1226 Makati City, Philippines Telephone : +63 2 902 0888 Fax : +63 2 729 5159 Websites : www.jll.com.ph 

: www.ap.joneslanglasalle.com/researchhub 

For more information, please contact:

David T. Leechiu Country Head Telephone : +63 2 902 0888 Mobile : +63 918 910 5158 Email : [email protected] 

Claro dG. Cordero, Jr. Head - Research, Consulting & Valuation Telephone : +63 2 902 0888 Mobile : +63 918 914 3309 Email : [email protected] 

Page 78: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 78/139

76  PROPERTY COMMENTARY 

3 PROPERTY COMMENTARY 

Page 79: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 79/139

 

FINANCIAL

4 Philippines Key data

Economic Highlights

Financial Definitions

Mortgage Repayment Table

Consumer Price Index

Exchange Rates 

Currency Charts 

Prime Rates 

Manila Reference Rate 

Page 80: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 80/139

4 FINANCIAL 

78  FINANCIAL 

PHILIPPINES KEY DATA 

POPULATION 

Population (2010)  92.34M 

Population (2013)  99.71M 

Urban Population *  47.15% Population under 15  33.27% 

Population over 65  4.34% 

 Ave. annual rowth rate 2000 - 2010   1.90% 

GEOGRAPHY 

Land Area  300,000 km2 

 Agricultural Area (2010)  43.77% 

Capital City  Manila 

(population Metropolitan Manila)  11.86M 

(population Manila as of May 2010)  1.65M 

ECONOMY 2012 

Monetary Unit  Peso  Average Headline Inflation rate 

(as of October 2012)  3.60% 

Gross Domestic Product (GDP) 

(1Q to 3Q)  Php 7,602.699bn 

GDP per capita  Php 82,333.43 

CONSTRUCTION (1Q to 3Q) in 2012 

Gross value of const. output  Php 800.770bn Net value of const. output  Php 464.467bn 

Net value of const. output as a

proportion of the GDP 7.30% 

* Population of Philippines’   key cities only  # Forecast / Projected  

Page 81: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 81/139

FINANCIAL  79 

ECONOMIC HIGHLIGHTS 

3rd Quarter 2012 

Philippine Economy grows by 7.1 percent in Q3 2012 

Beating expectations, the domestic economy accelerated forthe third consecutive quarter to 7.1 percent this year from the3.2 percent last year. The beyond expectation third quarter

growth was driven by the Services sector with the robustperformances of Transport, Storage & Communication,Financial Interdemination, and Real Estate, Renting &Business Activities supported by the five consecutivequarters of sustained accelerated growth of the Industry andthe seemingly weather tolerant Agriculture sector. With theupwardly revised second quarter Gross Domestic Product

(GDP) estimate, the growth for the first nine months of 2012at 6.5 percent surpassed the upper end target of the 6.0percent for the whole year.

On the demand side, increased consumer and governmentspending, increased investments in Construction, and thethird consecutive quarter of growth in external trade

contributed to the highest quarterly growth since the thirdquarter of 2010.

Industry expands 

The Industry Sector expanded by 8.1 percent afterposting a measly growth of 0.1 percent in the past year.The top contributors to the expansion of Industry wereManufacturing, 3.9 percentage points; Construction, 3.9percentage points; and, EGWS, 0.3 percentage points.

Meanwhile, Mining and Quarrying pulled down thegrowth of Industry by negative 0.1 percentage point.

Construction rebounds 

Construction rebounded by 24.3 percent from a decline of8.8 percent with the double digit growth posted by Publicand Private Construction.

Source: The National Accounts of the Philippines

National Statistical Coordination Board (www.nscb.gov.ph)

Page 82: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 82/139

4 FINANCIAL 

80  FINANCIAL 

FINANCIAL DEFINITIONS 

Discount Rate 

The rate of return a developer expects when investingin a project. 

i.e. opportunity cost. 

Internal Rate of Return (IRR) 

The IRR may be defined as the interest rate that

equates the precent value of expected future cash flowsto the cost of the investment. 

The IRR can be compared to the Discount Rate. 

Net Present Value (NPV) 

The NPV is the present value of all future cash flows,discounted back to today’s values at the Discount Rate. 

The NPV indicates in today’s dollars the profit or loss a

developer makes above or below his required profit(based on nominated Discount Rate). 

72 RULE 

The approximate number of years required to doubleyour capital can be calculated by dividing the interestrate into 72. 

e.g. If interest rate = 10% p.a. Then 72 ÷ 10 = 7.2 years It will take approximately 7.2 years to doubleyour capital if it is invested at 10% p.a. 

Page 83: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 83/139

Page 84: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 84/139

4 FINANCIAL 

82  FINANCIAL 

MORTGAGE REPAYMENT TABLE 

Based on : 

• 1,000 units of currency 

• Interest compounded monthly 

• Equal monthly repayments 

Interest

p.a.  5 

REPAYMEN 

10 

T (years) 

15  20 

5%  18.87  10.61  7.91  6.60 6%  19.33  11.10  8.44  7.16 

7%  19.80  11.61  8.99  7.75 

8%  20.28  12.13  9.56  8.36 

9%  20.76  12.67  10.14  9.00 

10%  21.25  13.22  10.75  9.65 

11%  21.74  13.78  11.37  10.32 

12%  22.24  14.35  12.00  11.01 

13%  22.75  14.93  12.65  11.72 

14%  23.27  15.53  13.32  12.44 

15%  23.79  16.13  14.00  13.17 

16%  24.32  16.75  14.69  13.91 

17%  24.85  17.38  15.39  14.67 

18%  25.39  18.02  16.10  15.43 

19%  25.94  18.67  16.83  16.21 

20%  26.49  19.33  17.56  16.99 

21%  27.05  19.99  18.31  17.78 

22%  27.62  20.67  19.06  18.57 23%  28.19  21.35  19.82  19.37 

24%  28.77  22.05  20.58  20.17 

25%  29.35  22.75  21.36  20.98 

Example 

Borrow $1,000,000 to be repaid monthly at 10% p.a.over 10 years. 

Repayments = 1,000,000 ÷ 1,000 x $13.22 = $13,220 per month 

Page 85: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 85/139

FINANCIAL  83 

CONSUMER PRICE INDEX 

9

8

7

6

5

4

3

2

1

02007 2008 2009 2010 2011 2012

 Year  

 Year   Index  % Change 

2007 2008 

2009 

2010 

2011 

2012* 

102.9 111.4 

116.0 

120.4 

126.2 

130.0 

2.95% 8.15% 

4.22% 

3.80% 

4.80% 

3.14% 

Note : Base date 2006 = 100 

Page 86: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 86/139

4 FINANCIAL 

84  FINANCIAL 

EXCHANGE RATES 

 Approximate rates prevailing as at 02 January 2013 

COUNTRY  Currency ForeignCurrencyin PHP 

PHP inForeignCurrency 

US$ inForeignCurrency 

 Australia*

Bahrain*

Brunei*

Canada*

China*

Denmark+ 

European 

Currency Unit* 

Hong Kong*

India+

Indonesia*

Japan*

Malaysia+ 

New Zealand+

Norway 

dollar

dinar

dollar

dollar

yuan

kroner  

euro 

dollar

rupee

rupiah

yen

ringgit

dollar  

kroner  

42.88 

108.97 

33.50 

41.37 

6.59 

7.28 

54.21 

5.30 

0.75 

0.00 

0.48 

13.44 

34.00 

7.39 

0.0233 

0.0092 

0.0299 

0.0242 

0.1517 

0.1376 

0.0184 

0.1887 

1.3312 

232.558 

2.0627 

0.0744 

0.0294 

0.1353 

0.96 

0.38 

1.23 

0.99 

6.23 

5.65 

0.76 

7.75 

54.68 

9,615.38 

84.84 

3.06 

1.21 

5.56 

Page 87: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 87/139

FINANCIAL  85 

COUNTRY  Currency 

ForeignCurrencyin PHP 

PHP inForeignCurrency 

US$ inForeignCurrency 

Pakistan+

Saudi Arabia*

Singapore*

South African+

South Korea*

Sweden+

Switzerland*

Taiwan+

Thailand* 

United Arab 

Emirates (UAE)*

United Kingdom* 

United States of  

 America* 

rupee

rial

dollar

rand

won

kroner

franc 

NT dollar

baht 

dirham

pound 

dollar  

0.42 

10.95 

33.64 

4.86 

0.04 

6.33 

44.835 

1.41 

1.34 

11.19 

66.76 

41.08 

2.3657 

0.0913 

0.0297 

0.2058 

25.8398 

0.1580 

0.0223 

0.7071 

0.7447 

0.0894 

0.0150 

0.0243 

97.17 

3.75 

1.22 

8.45 

1,062.70 

6.49 

0.92 

29.05 

30.59 

3.67 

0.62 

1.00 

Notes: * Convertible currencies with BSP 

+ Non Convertible currencies with BSPBSP Bangko Sentral ng Pilipinas 

Source: Business World - BSP Reference Rate 

Page 88: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 88/139

86  FINANCIAL 

4 FINANCIAL 

CURRENCY CHARTS 

US Dollar  Php per US$ 60 

50 

40 

30 

20 

10 

2007 2008 2009 2010 2011 2012 

Year  

Japanese Yen 

60 

50 

40 

30 

20 

10 

2007 2008 2009 2010 2011 2012 

Year  

Note: Yearly Average Rate 

Page 89: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 89/139

FINANCIAL  87 

Sterling Pound Php per GBP 

120 

100 

80 

60 

40 

20 

2007 2008 2009 2010 2011 2012 

Year  

Singaporean Dollar  

Php per Singaporean Dollar  

40 

30 

20 

10 

2007 2008  2009 

Year  

2010 2011 2012 

Page 90: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 90/139

Page 91: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 91/139

Page 92: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 92/139

90  FINANCIAL 

4 FINANCIAL 

PRIME RATES 

 Approximate rates prevailing in 4th Quarter 2012 

COUNTRY  RATE (%) 

 Australia*  3.25 

Brunei  5.50 

China**  6.40 

Egypt***  10.25 

Hong Kong  5.00 

India  9.75 

Indonesia  5.75 Japan###  1.20 

Macau  5.25 

Malaysia  6.60 

New Zealand^  9.57 

Pakistan^  ̂ 11.29 

Philippines  5.32 

Singapore  5.38 

South Africa  9.00 

South Korea+  2.76 

Thailand#  7.52 

United Kingdom  0.50 

United States of America  3.25 

Vietnam##  9.00 

 Australia* = O/N Cash Rate China** = 3-year Benchmark Lending Rate Egypt*** = Overnight Lending Rate New Zealand^ = SME Overdraft Rate 

(Previously Business Base Lending Rate) 

Pakistan^^ = Weighted Average Lending Rate 

South Korea+

= Call Rate of the Bank of Korea Implementation Date is 22 November 2012 

Thailand# = Minimum Loan Rate % per annum (averaged based on local bank)

Vietnam## = Min and in VND per year  Japan ### = Long-term prime rate % annum 

(Implementation date is 10 December 2010) 

Page 93: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 93/139

FINANCIAL  91 

MANILA REFERENCE RATE 

Manila Reference Rate (%) 

10

8

6

4

2

0

2007 2008 2009 2010 2011 2012  Year  

PHILIPPINE CENTRAL BANKMANILA REFERENCE RATE 

DATE  % 

Mar 2007 Jun 2007 Sep 2007 Dec 2007 Mar 2008 Jun 2008 Sep 2008 Dec 2008 Mar 2009 Jun 2009 Sep 2009 Dec 2009 Mar 2010 

Jun 2010 Sep 2010 Dec 2010 Mar 2011 Jun 2011 Sep 2011 Dec 2011 Mar 2012 

Jun 2012 Sep 2012 Dec 2012 

6.31 6.56 5.75 6.06 5.63 5.63 5.06 5.38 5.50 5.40 5.02 4.88 4.79 

4.81 4.88 4.86 4.71 4.71 4.83 4.81 4.94 

4.88 4.06 3.91 

Note: Based on all maturities. 

Page 94: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 94/139

92  FINANCIAL 

4 FINANCIAL 

Page 95: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 95/139

 

OTHER INFORMATION

5 Philippine Map 

Public Holidays

IDD Codes & Time Differences

Conversion Factors 

LS Professional Services

Quality System

Environmental Sustainability

Development Management 

International Directory of LS Offices 

Page 96: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 96/139

Page 97: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 97/139

OTHER INFORMATION  95 

,, 

Page 98: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 98/139

Page 99: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 99/139

OTHER INFORMATION  97 

PUBLIC HOLIDAYS 

2012 2013 

BRUNEI 

New Year ’s Day**  02  Jan  01  Jan Chinese New Year   23  Jan  11  Feb Prophet Muhammad’s 

Birthday**  06  Feb  24  Jan National day  23  Feb  23  Feb Royal Brunei Armed Forces 

 Anniversary  31  May  01  Jun Israk Miraj**  18  Jun  06  Jun His Majesty’s Birthday**  16  Jul  15  Jul First day of Ramadhan*  21  Jul  10  Jul 

 Anniversary of the Revelation 

of the Holy Koran*  06   Aug  27  Jul Hari Raya Aidilfitri*  20   Aug  08   Aug 

Hari Raya Aidilfitri 

2nd day * 

21   Aug  10   Aug 

Hari Raya Aidil Adha*&**  26 

Oct  15  Oct First Day of Hijrah*&**  15  Nov  05  Nov Christmas Day**  25  Dec  25  Dec 

Note: * Subject to change 

** Replacement for Fridays and Sundays Fridays and Sundays are government off days 

Page 100: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 100/139

5 OTHER INFORMATION 

96  OTHER INFORMATION 

Page 101: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 101/139

OTHER INFORMATION  99 

INDONESIA 

2012 2013 

New Year ’s Day 

Chinese New Year (Imlek)

Prophet Muhammad’s 

Birthday 

Hindu Day of Quiet (Nyepi)

Good Friday 

Waicak Day 

 Ascension Day of Jesus Christ 

 Ascension of Prophet 

Mohammad* 

National Independence Day 

Idul Fitri* 

Idul Adha Day

Hijriyah New Year

Christmas Day 

* Subject to changes 

VIETNAM 

Solar New Year  

Lunar New Year  

Hung Vuong King Celebration

Liberation Day of Saigon

International Labour Day 

01 Jan 

23 Jan 

05 Feb 

23 Mar  

06 Apr  

06 May 

17 May 

17 Jun 

17 Aug 

19 Aug 

20 Aug 

26 Oct 

15 Nov 

25 Dec 

02 Jan# 

23-25 Jan 

26 Jan## 

02 Apr ### 

30 Apr  

01 May 

01 Jan 

10 Feb 

24 Jan 

12 Mar  

29 Mar  

25 May 

09 May 

06 Jun 

17 Aug 

08 Aug 

09 Aug 

15 Oct 

05 Nov 

25 Dec 

01 Jan 

09-12 Feb 

# 13-14 Feb 19 Apr  

30 Apr  

01 May 

National Day  03 Sep##### 02 Sep 

Christmas Day  25 Dec  25 Dec 

# Substitute for 09 and 10 Feb (Saturday and Sunday) 

Page 102: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 102/139

5 OTHER INFORMATION 

98  OTHER INFORMATION 

PUBLIC HOLIDAYS 

2012 2013 

CHINA 

New Year ’s Day@  01  Jan  01  Jan 

Chinese New Year ’s Eve  22  Jan  09  Feb Chinese New Year*  23  Jan  10  Feb 

24  Jan  11  Feb Tombs-sweeping Day&  04   Apr   04   Apr  Labour Day%  01 

Ma   01  May Dragon-boat Festival++  23  Jun  12  Jun Mid Autumn Festival  30  Sep  19  Sep National Day#  01 

Oct  01  Oct 

02  Oct  02  Oct 03  Oct  03  Oct 

@ 2 - 3 January are holidays, 35 - 6 January are working days. * 12 - 15 January 2013 are holidays, 16 and 17 January 2013

are working days & 5 and 6 April 2013 are holidays and 07 April 2013 is

working days % 29 and 30 April are holidays, 27 and 28 April are working day + 10 and 11 June are holidays, 8 & 9 June are working days. 

20 and 21 September are holidays, 22 Sept is working day. # 4-7 October are holidays and 29 September is working day 

INDIA 

New Year ’s Day

Sankaranthi

Republic Day

Good Friday

May Day 

Independence Day 

Gandhi Jayanthi 

 AP / Karnataka 

Formation DayDeepavaliChristmas 

01 Jan 

14 Jan 

26 Jan 06 Apr  

01 May 

15 Aug 

02 Oct 

01 Nov 13 Nov 25 Dec 

01 Jan 

14 Jan 

26 Jan 11 Apr  

01 May 

15 Aug 

02 Oct 

01 Nov 03 Nov 25 Dec 

Page 103: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 103/139

OTHER INFORMATION  99 

HONGKONG 

2012 2013 

The first day in January The day following the first

day of January* 

Lunar New Year ’s Day 2ndDay of Lunar New Year  

3rdDay of Lunar New Year  

4 th Day of Lunar New Year  

Good Friday 

Chi Ming FestivalThe day following

Good Friday Easter Monday

Buddha’s Birthday

Labour Day The day following Labour Day Tuen Ng Festival 

HK Returning to China,SAR Establishment DayThe day following HKSAR 

01 Jan 

02 Jan 23 Feb 

24 Jan 25 Jan 

06 Apr  

04 Apr  

07 Apr  09 Apr  

28 Apr  

01 May 

02 May 23 Jun 

01 Jul 

01 Jan 

- 10 Feb 

11 Feb 12 Feb 13 Feb 

29 Mar  

04 Apr  

30 Mar  01 Apr  

17 May 

01 May 

- 12 Jun 

01 Jul 

Establishment Day@ 02 Jul - 

The day following the Chinese 

Mid-Autumn Festival  01 Oct  20 Sep 

NationalDay 01 Oct The day following National 

Day# 02 Oct Chung Yeung Festival 23 Oct 

01 Oct 

The day following Cheun Yung Festival 

Christmas Day 

The 1st week-day after  Christmas Day 

25 Dec 

26 Dec 

14 Oct 

25 Dec 

26 Dec 

* As the Lunar New Year’s Day in 2013 falls on Sunday,

the day following the 3rd Day of Lunar New Year will bedesignated as an additional general holiday. 

Page 104: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 104/139

5 OTHER INFORMATION 

100  OTHER INFORMATION 

PUBLIC HOLIDAYS 

MACAU 

2012 2013 

New Year ’s Day The First working day after  

New Year ’s Day 

Lunar New Year ’s Day The 2nd Day of Lunar  New Year ’s Day 

The 3rd Day of Lunar  New Year ’s Day 

The 4th Day of Lunar  

01 Jan@ 

02 Jan# 

23 Jan 

24 Jan 

25 Jan 

01 Jan 

10 Feb 

11 Feb 

12 Feb 

New Year ’s Day 13 Feb 

Ching Ming Festival Good Friday 

The Day following Good Friday 

04 Apr  06 Apr  

07 Apr  

04 Apr  29 Mar  

30 Mar  Easter Monday 09 Apr #  25 Apr  The Buddha’s Birthday The First Working Day after the 

28 Apr   17 May 

Buddha’s Birthday 30 Apr  Labour Day 

Tuen Ng Festival The first working day after  

Tuen Ng Festival 

01 May 

23 Jun 

25 Jun# 

01 May 

12 Jun 

Bank’s Holiday 02 Jul  01 Jul 

National Day 

The Day following the National Day 

Chong Yeung Festival  All Soul’s Day Feast of the Immaculate 

Concepcion The first working day after Feast of  

01 Oct 

02 Oct 23 Oct 02 Nov 

08 Dec@ 

01 Oct 

02 Oct@ 

05 Oct 02 Nov 

08 Dec@ 

the Immaculate Concepcion 10 Dec#  09 Dec# 

Macau SAR Establishment Day Winter Solstice

Christmas EveChristmas Day 

20 Dec 21 Dec 24 Dec 

25 Dec 

20 Dec 22 Dec 24 Dec 25 Dec 

Bank Holiday 26 Dec 

New Year’s Eve (afternoon)  31 Dec# 

@ Not applicable to Bank. # Special Holiday granted by The Chief Executive 

26 Dec 

31 Dec#@ 

Page 105: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 105/139

OTHER INFORMATION  10

 

MALAYSIA 

2012 2013 

New Year ’s Day**Chinese New Year*** 

Prophet Muhammad’s 

Birthday 

01 Jan# 

23 Jan 24 Jan 

05 Feb# 

01 Jan 10 Feb 11 Feb 

24 Jan Labour Day  01  May  01  May Wesak Day  05  May  17  May King/Agong’s Birthday  02  Jun  01  Jun Hari Ra a Aidilfitri*  19   Au   08   Au  

20   Aug#  09   Aug 

National Day  31   Aug  31   Aug 

Malaysia Day  16  Sep#  16  Sep 

Hari Raya Qurban*  25  Oct  15  Oct 

Deepavali*  13  Nov  02  Nov  Awal Muharram  15  Nov  05  Nov Christmas Day  25  Dec  25  Dec 

* Subject to change ** Except Johor, Kelatan, Kedah, Perlis & Terengganu *** 2nd Day except Kelantan & Terengganu # The following day will be an additional public holiday 

SINGAPORE 

New Y ear ’s Day Chinese New Year  

Good Friday

Labour Day

Vesak Day

National Day 

Hari Raya Puasa 

Deepavali*

Hari Raya Haji

Christmas Day 

01 Jan# 

23 Jan 24 Jan 

06 Apr  

01 May 

05 May 09 Aug 

19 Aug# 

13 Nov 

26 Oct 

25 Dec 

01 Jan 10 Feb 11 Feb 12 Feb 

29 Mar  

01 May 

24 May 08 Aug 

09 Aug 

15 Oct 

03 Nov# 

25 Dec 

* Subject to changes # The following Monday will be a public holiday 

Page 106: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 106/139

5 OTHER INFORMATION 

102  OTHER INFORMATION 

PUBLIC HOLIDAYS 

SOUTH KOREA 

2012 2013 

New Y ear ’s Day 

Lunar New Year (Seol) 

Independent Movement 

Day 

Buddha’s Birthday

Children’s Day

Memorial Day

Liberation Day National Foundation Day 

Full Moon Day (Chuseok) 

Christmas Day 

01 Jan 

23 Jan 

24 Jan 

01 Mar  

28 May 

05 May 

06 Jun 

15 Aug 03 Oct 

29 Sep 

30 Sep 

01 Oct 

25 Dec 

01 Jan 

09 Feb 

10 Feb 

11 Feb 

01 Mar  

17 May 

05 May 

06 Jun 

15 Aug 03 Oct 

18 Sep 

19 Sep 

20 Sep 

25 Dec 

TAIWAN 

Founding Day Lunar New Year ’s Eve 

Lunar New Year ’s Day 

2nd

Day of Lunar New Year  3rdDay of Lunar New Year  

Peace Memorial Day Women Day and Children’s Day 

Ching Ming Festival 

01 Jan 22 Jan 23 Jan 

24 Jan 25 Jan 

28 Feb 04 Apr  

04 Apr  

01 Jan 09 Feb 10 Feb 

11 Feb 12 Feb 

28 Feb 

04 Apr # 

04 Apr # 

Labour Day 01 May 

Dragon Boat FestivalMid-Autumn FestivalDouble Ten Day 

23 Jun 30 Sep 10 Oct 

12 Jun 19 Sep@ 

10 Oct 

Public Holiday# 31 Dec 

* 13 & 14 February are holidays as Lunar New Year’s Eve and Lunar New Year Day fall on Saturday and Sunday; 15 Feb 2013 is also holiday as 23 February 2013 is adjusted to work.  

@  As 3-Mar is adjusted to work, this day is adjusted to holiday #  As 22-Dec is adjusted to work, this day is adjusted to holiday 

Page 107: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 107/139

OTHER INFORMATION  10

 

THAILAND 

2012 2013 

New Year ’s Day 

Chinese New Year* 

01 Jan 1 

23 Jan 

01 Jan 03 Feb 

Makha Bucha Day  07 Mar   25 Feb 

Chakri Memorial Day

Songkran Festival

National Labour Day

Coronation Day Royal Ploughing Ceremony Day#

 

Visakha Bucha Day 

Mid Year Bank Holiday #

 Asarnha Bucha DayKhao Phansa Day 

(Buddhist Lent Day)+

H.M. The Queen’s Birthday

Chulalongkorn Day 

H.M. The King’s Birthday 

Constitution Day New Year ’s Eve 

06 Apr  

13-16 2 Apr  01 May 

07 May 3 

09 May 04 Jun 

01 Jul 

02 Aug 

03 Aug 

13 Aug 4 

23 Oct 

05 Dec 

10 Dec 31 Dec 

08 Apr  

13-16 Apr  01 May 

06 May 

13 May 24 May 

01 Jul 

22 Jul 

23 Jul 

12 Aug 

23 Oct 

05 Dec 

10 Dec 31 Dec 

* Unofficial Chineses Community Only # Banks only + Government only 1 - Substitute for 31 Dec 2011 (Saturday) and 01 Jan 2012 (Sunday) 2 - Substitute for 14 Apr 2012 (Saturday) and 15 Apr 2012 (Sunday) 

3 - Substitute for 05 May 2012 (Saturday) 4 - Substitute for 12 Aug 2012 (Sunday) 

Page 108: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 108/139

5 OTHER INFORMATION 

104  OTHER INFORMATION 

IDD CODES & TIME DIFFERENCES 

DESTINATION IDD

CountryCode 

TIMEDifference 

(hours)* 

 Australia:

Perth

Sydney 

BahrainBrunei

Canada: 

Toronto 

Vancouver  China 

Czech Republic 

Finland

France

Germany

Hong Kong

India

Indonesia

Italy 

Japan 

Korea (North)

Korea (South) 

61 

61 

973 673 

1 86 

42 

358 

33 

49 

852 

91 

62 

39 

81 

850 

82 

+2 

-5 0 

-13 

-16 0 

-7 

-6 

-7 

-7 

2.5 

-1 

-7 

+1 

+1 

+1 

* Allowance should be made for seasonal time variations 

Page 109: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 109/139

OTHER INFORMATION  105 

DESTINATION 

IDDCountry

Code 

TIMEDifference(hours)* 

Macau 

Malaysia 

Myanmar (Burma)

Netherlands

Philippines 

Qatar

Singapore

Spain

Switzerland

Taiwan

Thailand 

United Arab Emirates 

United Kingdom 

United States of America:

Los Angeles 

New York 

Vietnam 

853 

60 

95 

31 

63 

974 

65 

34 

41 

886 

66 

971 

44 

84 

-1.5 

-7 

-5 

-7 to -8 

-7 

-1 

-4 

-7 to -8 

-16 

-13 

-1 

Page 110: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 110/139

5 OTHER INFORMATION 

106  OTHER INFORMATION 

CONVERSION FACTORS 

UNIT 

LENGTH 

10 mm = 1 cm

100 cm = 1 m1,000 m = 1 km

12 in = 1 ft

3 ft = 1 yd1,760 yd = 1 mile

AREA 

10,000 m 2 = 1 ha100 ha = 1 km 2 

9 ft 2 = 1 yd 2 

4,840 yd 2 = 1 acre

638 acre = 1 mile 2 

VOLUME 

1,000 ml = 1 L1,000 L = 1 m 3 

1,000 cm 3 = 1 L

0.83 gal. (UK) = 1 gal.(US)8 pt. (US) = 1 gal.(US)4 qt. (US) = 1 gal.(US)

MASS / FORCE 

9.806 N = 1 kg

1,000 g = 1 kg1,000 kg = 1 tonne16 tael = 1 catty

1,000 lbs. = 1 kip

16 oz = 1 lb2,224 lb = 1 ton

PRESSURE 

1 Pa = 1 N/m 2 

1000 Pa = 1 KPa

1 Mpa = 1 N/mm2 

0.01kg/cm 2 = 1 KPa

0.068 atm = 1psi14.5 psi = 1 bar

0.491 psi = 1 in. Hg

POWER 

1000 w = 1 kw1 w = 1VA x pf*

550 ft-lb/sec = 1 hp

TEMPERATURE 

COOLING LOAD 12,000 BTU/hr = 1 TR3,024 kcal/hr = 1 TR1.5 hp = 1 TR

Page 111: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 111/139

OTHER INFORMATION  107 

TO IMPERIAL(Approx) 

TO METRIC(Approx) 

1 in = 25.400 mm

1 ft = 30.480 cm1 yd = 0.914 m1 mile = 1.609 km

1 cm = 0.394 in

1 m = 3.281 ft1 m = 1.094 yd1 km = 0.621 mile

1 ft2 = 0.093 m2 

1 yd 2 = 0.836 m2 

1 acre = 0.405 ha1 mile2 = 2.590 km 2 

1 pt (UK) = 0.568 L1 pt (US) = 0.473 L1 gal (UK) = 4.546 L1 gal (US) = 3.785 L

1 m 2 = 10.764 ft 2 

1 m 2 = 1.196 yd2 

1 ha = 2.471 acres1 km 2 = 0.386 mile 2 

1 L (UK) = 1.760 pt1 L (US) = 2.113 pt1 L (UK) = 0.220 gal1 L (US) = 0.264 gal

1 oz = 28.350 g1 lb = 0.454 kg1 ton = 1.016 tonne1 catty = 0.605 kg

1 gram = 0.035 oz1 kg = 2.205 lb1 tonne = 0.984 ton

1 bar = 100 KPa1 psf = 47.88 Pa1 psi = 6.895 KPa1 atm. = 101.3 KPa

1 MPa = 145 psi1 kg/cm 2 = 14.22 psi1 KPa = 0.295 in.Hg1 KPa = 20.89 psf

1 hp = 0.746 kw 1 kw = 1.340 hp

(oF - 32) x 5/9 (oC x 9/5) + 32

Page 112: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 112/139

5 OTHER INFORMATION 

108  OTHER INFORMATION 

LS PROFESSIONAL SERVICES 

Normal Services : 

¤ Preliminary cost advice and cost planning

¤ Advice on the type of contractual arrangements

to be used

¤ Advice on obtaining tenders

¤ Preparation of tendering documents

¤ Negotiation with contractors

¤ Visiting site and valuation of works in progress

¤ Assessing the cost of proposed variations

¤ Attending site and other meetings

¤ Preparation of financial statements

¤ Settlement of final cost with contractors andsub-contractors

¤ Advice on contractors’ claims

Page 113: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 113/139

OTHER INFORMATION  109 

Special Services : 

¤ Construction feasibility studies

¤ Budget formulation

¤ Analysis of cost/design options

¤ Cost planning

¤ Value engineering

¤ Cash flow evaluations

¤ Cost monitoring and/or cost control of constructionworks

¤ Project management or co-ordination

¤ Reinstatement assessments for fire insurance

¤ Quantifying mechanical and electrical installationworks

¤ Quantifying civil engineering works

¤ Definition and operation of plant procurementprogrammes

¤ Cost engineering

¤ Evaluation and operation of serial (maintenance)contracts

¤ Financial evaluation of “package” bid contracts

¤ Cost and contract research

¤ Advice on litigation

¤ Tax treatment of construction expenditure

¤ Research and consultancy in all aspects ofconstruction economics

¤ Interior decoration and fitting-out works¤ Preparation of fixed asset registers

¤ Environmental certification

Page 114: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 114/139

5 OTHER INFORMATION 

110  OTHER INFORMATION 

QUALITY SYSTEMISO 9001:2008 

LS Philippines Inc. attained ISO 9001 accreditation in September 1998 then successfully converted to ISO 9001:2000 in December 2003 and to ISO 9001:2008in January 2010. 

In addition to the Quantity Surveying Services, LSPhilippines Inc. was also certified for ISO 9001: 2008for the following: 

a) Development Management ConsultancyServices for Building and EngineeringSector; and 

b) Envrionmental SustainabilityConsultancy Services for Building andEngineering Sector  

LS Philippines Inc. recognises the importance ofQuality Assurance especially in a country whereQuantity Surveying is not a well recognized profession

and quality service is of paramount importance. Theestablishment of a standard quality control system forall aspects of the services being provided, coupled withour in-house staff training programmes, ensures thatLS Philippines continues to provide the best servicesavailable to our clients. 

Page 115: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 115/139

OTHER INFORMATION  111 

QUALITY SYSTEM ISO 14001:2004 + Cor. 1:2009 

ENVIRONMENTAL HEALTH AND SAFETY 

LS Philippines Inc. has successfully achievedaccreditation for ISO 14001 in April 2011, certified byTUV Rheinland  –  a highly respected certification bodywith a worldwide network and recognition and

accreditation in every region of the world.

ISO 14001 is globally accepted as the managementsystem standard for Environmental ManagementSystem which provides companies and organisationswith a flexible framework for the voluntary developmentof environmental protection measures wherever they

may be based.

Page 116: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 116/139

Page 117: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 117/139

OTHER INFORMATION  113 

ENVIRONMENTAL SUSTAINABILITY 

Overview of Leadership in Energy & Environmental Design (LEED) 

The U.S. based Leadership in Energy & EnvironmentalDesign (LEED) Green Building System is a voluntary

third-party rating system in which credits are earned forsatisfying specified green building criteria. Projects areevaluated within six environmental categories.

• Sustainable Sites• Water Efficiency 

• Energy & Atmosphere• Materials & Resources• Indoor Environmental Quality• Innovation & Design

Certified, Silver, Gold and Platinum levels of greenbuilding certification are awarded based on the total

points earned.

Page 118: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 118/139

Page 119: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 119/139

OTHER INFORMATION  115 

ENVIRONMENTAL SUSTAINABILITY 

Professional Services 

Construction 

• Provide pre-bid conferences and contractor training

• Evaluate compliance and progress through submittalsand reports from contractor.

• Inspect site condition if according to approvedguidelines.

• Liaise with USGBC and GBCI•  Assist and compiledocumentation for Design Phase

(final) Review.

Operations 

• Perform post-occupancy project audits - lessons

Being part of LEED 

Global Linkage 

Langdon & Seah (Phils) Inc. is a member of US GreenBuild-ing Council (USGBC) and the Philippine GreenBuilding Council (PhilGBC).

Our environmental sustainability services composed ofhighly skilled architects and engineers, has the mostnumber green professional accrediatation than any othercompany - a comination of LEED AP’s, LEED GA’s and

Certified BERDE Professionals. The group is furtherstrengthened by a building energy analyst.

Building energy analysis includes:• Identification of energy reduction and cost savingmeasures for new and existing buildings• Development of final models for use in LEED NC /green building certification• Our simulation service includes: whole building

simulation, artificial light simulation, daylight simulation

Page 120: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 120/139

Page 121: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 121/139

OTHER INFORMATION  117 

DEVELOPMENT MANAGEMENT 

OUR APPROACH 

We provide advice and consulting services at strategic,policy and operational levels, concentrating on three keyareas: 

· Project Feasibility · Project Set-up · Project Delivery 

Our multidisciplinary team is skilled in change

management, process improvement, procurement,sustainability, economics, market analysis andresearch. 

In everything we do, we are committed to creating valuefor our clients by: 

· Working collaboratively with them · Developing a deep understanding of their needs

and aspirations · Providing tailor-made solutions · Being accessible and responsive 

PROJECT MANAGEMENT 

Integrated Project Management is based on fourdistinctive phases in the project life cycle: 

1. Business Needs and Project Inception 

In the early stages of a project, Langdon & Seah createsthe conditions for success by defining a set of value driversbased on an understanding of all stakeholder interestsand requirements. 

Page 122: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 122/139

5 OTHER INFORMATION 

118  OTHER INFORMATION 

We consider needs, identify risk and can assist withbusiness planning. Where appropriate, we assist withthe production of feasibility and cost estimates, thedevelopment of master plans, option appraisals,overseeing of site acquisitions, management of

planning consents and advice on funding strategies.We work with clients to manage the appointment ofsuitable consultants, including the agreement ofservices and fees. 

2. Project Strategy & Development 

 At the early development stage we compile strategicand design briefs and produce an overall projectexecution plan. We oversee the production of costs toagree budgets and provide a detailed master programmefor project delivery. 

We recommend the most appropriate procurementstrategy and manage the selection of the best valueconstruction team. We provide a single point of contactfor the client when dealing with third parties,contractors and suppliers. 

3. Project Control & Delivery 

Prior to commencing, we make sure that acommercially viable solution has been agreed, that allcontracts are administered in the correct form and thatnecessary management procedures are in place. Weset up systems and processes to enable the sharing of

information, management of change and identificationof potential risks to successful project delivery. 

We monitor quality, time and costs and provideleadership to the team, resolving issues, liaising withthird parties, and reporting on progress as agreed withthe client. 

Page 123: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 123/139

OTHER INFORMATION  119 

4. Commissioning & Asset Management 

In the final stages of the project, we monitorcommissioning, agree completion, settle final accountsand enable the smooth transition of the asset through toongoing management. 

Post-handover, we instigate project reviews and feedlessons learned to the client. 

PLANNING 

The planning and programming team is amulti-functional group of professionals who are dedicatedto the primary management requirement of planning andprogramming. Our approach is to assist in controllingprogress, not simply monitoring it. 

Benefits 

Professional planning and programming 

· Enhances management’s understanding of progressand assists trade-offs and decision making 

· Reduces uncertainty in project completion deadlines 

· Avoids costly time overruns · Provides expert advice that designers and clients

understand · Gives high quality clear outputs that make a real

contribution to project success · Enables corrective action advice to mitigate

programme slippages and variations 

Page 124: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 124/139

Page 125: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 125/139

OTHER INFORMATION  121 

CH IN A 

BEIJING LANGDON & SEAH (BEIJING)CONSTRUCTION CONSULTANTS CO. LTDSuite 1225 - 1242 South Wing, Central Tower, Junefield Plaza 10, Xuan Wu Men Wai Street Beijing 100 052, China GPS : 39.8899, 116.3683 

Tel : (00 86 10) 6310 1136 Fax : (00 86 10) 6310 1143 Email : [email protected] Contact : Chan Chi Keung, Andrew 

CHENGDU LANGDON & SEAHCONSULTANCY(CHENGDU) CO. LTD.

Room 807, Block A, Times Plaza No. 2 Zongfu Road Chengdu, Sichuan Province 610 016, China GPS : 30.6566, 104.0761 Tel : (00 86 28) 8671 8373 Fax : (00 86 28) 8671 8535 

Email : [email protected] Contact : Chan Hoi Or, Joe 

CHONGQING LANGDON & SEAH CONSULTANCY (CHENGDU)CO. LTD. CHONGQING BRANCH Room 3409 - 3410, International Trade Centre 

38, Qing Nian Road, Central District Chongqing 400010, China GPS : 49.5588, 106.5708 Tel : (00 86 23) 8655 1333 Fax : (00 86 23) 8655 1616 Email : [email protected] Contact : Lin Wai Yip, Gary 

Page 126: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 126/139

Page 127: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 127/139

Page 128: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 128/139

5 OTHER INFORMATION 

INTERNATIONAL DIRECTORY OF OFFICES 

ASIA PACIFIC (Continued) 

122  OTHER INFORMATION 

HANGZHOU LANGDON & SEAH CONSULTANCY(SHANGHAI) CO. LTD. HANZHOU BRANCHRoom 2305 WinNing International 100 Min Xin Road Hangzhou, Zhejiang Province 310016, China GPS : 30.2510, 120.2171 Tel : (00 86 571) 2829 7766 Fax : (00 86 571) 2829 7622 

Email : [email protected] Contact : Lai Pak Hung 

HONGKONG LANGDON & SEAH HONG KONG LIMITEDLANGDON & SEAH CHINA LIMITEDLANGDON & SEAH MANAGEMENT LIMITED 

38/F AIA Kowloon Tower , Landmark East, 100 How Ming Street, Kwun Tong, Kowloon Hong Kong GPS : 22.3125, 114.2223 Tel : (00 852) 2830 3500 Fax : (00 852) 2576 0416 

Email : [email protected] Contact : Poon Kan Young, Kenneth 

MACAU LANGDON & SEAH MACAU LIMITED 14 Andar B Edifacio Commercial Rodrigues 

599 Avenida da Praia Grande Macau GPS : 22.3211, 113.9019 Tel : (00 853) 2833 1710 Fax : (00 853) 2833 1532 Email : [email protected] Contact : Chan Yuk Sim, Katherine 

Page 129: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 129/139

OTHER INFORMATION  123 

SANYA LANGDON & SEAH CONSULTANCY(SHENZHEN) CO LTD SANYA BRANCH 1206, Skyline Tower, 119 Yingbin Road Sanya, Hainan Province 

572000 China GPS : 18.4214, 109.8531 Tel : (00 86 898) 3828 0878 Fax : (00 86 898) 3828 0678 Email : [email protected] Contact : Lee Kwok Chu, Kenneth 

SHANGHAI LANGDON & SEAH CONSULTANCY(SHANGHAI) CO LTD 6/F, City Point 666 Huaihai Road West Shanghai 200052 China GPS : 31.197385, 121.421757 Tel : (00 86 21) 6091 2800 Fax : (00 86 21) 6091 2999 Email : [email protected] Contact : Lai Pak Hung 

SHENYANG LANGDON & SEAH (BEIJING) CONSTRUCTIONCONSULTANTS CO LTD SHENYANG BRANCHRoom 1801, 1806-1809, E Tower of Fortune Plaza 59 Beizhan Road, Shenhe District Shenyang City, Liaoning Province 110 013 China 

GPS : 41.8145, 123.4359 Tel : (00 86 24) 3128 6678 Fax : (00 86 24) 3128 6983 Email : [email protected] Contact : Chow Hau Ming, Simon 

Page 130: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 130/139

5 OTHER INFORMATION 

INTERNATIONAL DIRECTORY OF OFFICES 

ASIA PACIFIC (Continued) 

124  OTHER INFORMATION 

SHENZHEN LANGDON & SEAH CONSULTANCY (SHENZHEN)CO. LTD Room E & F, 42/F 

World Finance Centre, Block A 4003 East Shen Nan Road Shenzhen Guangdong Province 518 001 China GPS : 22.542248, 114.114486 Tel : (00 86 755) 2598 1841 

Fax : (00 86 755) 2598 1854 Email : [email protected] Contact : Lo Kwok Chu, Kenneth 

SUZHOU LANGDON & SEAH CONSULTANCY(SHANGHAI) CO LTD SUZHOU BRANCH

Room 906 Centuray Financial Tower  1 Suhua Road, Industrial Park Suzhou, Jiangsu Province 215021 China GPS : 331.3157, 120.6751 Tel : (00 86 512) 8777 5599 

Fax : (00 86 512) 8777 5600 Email : [email protected] Contact : Lai Pak Hung / Zhang Rui 

TIANJIN LANGDON & SEAH CONSULTANCYCO LTD TIANJIN BRANCH 

4002, 40/F Tianjin World Financial Centre Office Tower  No.2 Dagubei Road, He Ping District, Tianjin 300 020, China GPS : 39.131924, 117.200947 Tel : (00 86 22) 2329 9611 Fax : (00 86 22) 2319 3186 Email : [email protected] Contact : Won Ching Ying 

Page 131: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 131/139

OTHER INFORMATION  125 

WUHAN LANGDON & SEAH CONSULTANCY(SHANGHAI) CO LTD WUHAN BRANCHRoom 1008, 10/F, Corporate Center 5,Wuhan Tiandi, 1628 Zhongshan Road,Wuhan, Hubei Province 430 010 China GPS : 31.2366, 114.6386 Tel : (00 86 27) 5920 9299 Fax : (00 86 27) 5920 9298 Email : [email protected] Contact : Lee Kwok Wing, Dickey 

INDIABANGALORE LANGDON & SEAH CONSULTING INDIAPRIVATE LIMITED 3rd Floor, Raheja Chancery 133 Brigade Road 

Bangalore 560 025 India GPS : 12.975, 77.605 Tel : (00 91 80) 4123 9141 Fax : (00 91 80) 4123 8922 Email : [email protected] 

Contact : Jim Pollock / Lorimer Doig Velan Murali / Biju AK / Gary Miles 

CHENNAI LANGDON & SEAH CONSULTING INDIAPRIVATE LIMITED New No. 125 (Old No. 63), Jammi

Building, 1st Floor RoyapettahHigh Road, Mylapore Chennai600 004 India GPS : 13.055, 80.265 Tel : (00 91 44) 2498 8141 

Fax : (00 91 44) 2498 8137 Email : [email protected] Contact : Jim Pollock / Lorimer Doig 

Sankar Ramkrishnan / Gary Miles 

Page 132: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 132/139

5 OTHER INFORMATION 

INTERNATIONAL DIRECTORY OF OFFICES 

ASIA PACIFIC (Continued) 

126  OTHER INFORMATION 

DELHI LANGDON & SEAH CONSULTING INDIAPRIVATE LIMITED The Elements, 2nd Floor, Unit No. 465 

Udyog Vihar, Phase-VGurgaon, Haryana 122 016 India GPS : 28.5012, 77.085 Tel : (00 91 124) 430 8790 Fax : (00 91 124) 430 8793 

Email : [email protected] Contact : Jim Pollock / Lorimer Doig  Arun Basu / Gary Miles 

HYDERABAD LANGDON & SEAH CONSULTING INDIAPRIVATE LIMITED 

2nd Floor Trade Fair Office,Hitex Exhibition Center  Izzat Nagar, Hyderabad 500 084 India GPS : 17.475, 78.375 Tel : (00 91 40) 2311 4942 Fax : (00 91 40) 2311 2942 Email : [email protected] Contact : Jim Pollock / Lorimer Doig 

Ramamurthi Karthikeyan / Gary Miles 

PUNE LANGDON & SEAH CONSULTING INDIA

PVT LTD 164/A 3A Modi Baug 4th Floor,Sham Shakuntal Heights, Shivaji Nagar, Pune -411 005, India GPS : 18.535, 73.845 Tel : (00 91 20) 2551 4980 Fax : N/A Email : [email protected] Contact : Jim Pollock / Lorimer Doig / Darshan Joshi 

Gary Miles 

Page 133: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 133/139

OTHER INFORMATION  127 

MUMBAI LANGDON & SEAH CONSULTING INDIAPRIVATE LIMITED Unit No. 103 First Floor, Akruti SMC,Khopat Junction, Near Khopat Bus DepotThane (West) 400601m, Maharashtra India GPS : 19.1988, 72.9756 Tel : (00 91 22) 3933 5555 Fax : (00 91 22) 3933 3956 Email : [email protected] Contact : Jim Pollock / Lorimer Doig / Darshan Joshi 

Gary Miles 

I ND O NE SI ABALI PT LANGDON & SEAH INDONESIAJalan Sunset Road No 8C

Lingkungan Abian Base Bali 80361, Indonesia GPS : 8.7046, 115.1520 Tel : (00 62 361) 894 7517 Fax : (00 62 361) 894 7392 Email : [email protected] 

Contact : Ir. Putu Arya Canti 

JAKARTA PT LANGDON & SEAH INDONESIAJalan Jenderal Sudirman 9 Level 18 Datu Plaza Office Tower  Jakarta 10270 

Indonesia GPS : 6.2271, 106.8008 Tel : (00 62 21) 739 7550 Fax : (00 62 21) 739 7846 Email : [email protected] Contact : Peter Robinson / Stephen Osborne 

Page 134: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 134/139

5 OTHER INFORMATION 

INTERNATIONAL DIRECTORY OF OFFICES 

ASIA PACIFIC (Continued) 

128  OTHER INFORMATION 

KOREASEOUL LANGDON & SEAH KOREA CO LTD 

#429 G-Five Central Plaza 1685-8 Seocho 4-DongSeocho-Gu, SeoulKorea 137-882 GPS : 37.4953, 127.0164 Tel : (00 82 2) 543 3888 Fax : (00 82 2) 543 3898 

Email : [email protected] Contact : Goh Chok Sin / Victor Stanger  

MALAYSIAJOHOR LANGDON & SEAH (MALAYSIA) SDN BHDJURU UKUR BAHAN MALAYSIA JUBM SDN BHD DLSM PROJEKS SDN BHD 47, Jalan Setia Tropika 1/30 Taman Setia Tropika, 81200 Johor Bahru Johor Darul Takzim, Malaysia GPS : 1.5423, 103.7112 

Tel : (00 60 7) 232 8300 Fax : (00 60 7) 232 8232 Email : [email protected] Contact : Syed Mahadzir Syed Ahmad 

PENANG LANGDON & SEAH (MALAYSIA) SDN BHD

JURU UKUR BAHAN MALAYSIA JUBM SDN BHD DLSM PROJEKS SDN BHD Suite 3A-3, Level 3A, Wisma Great Eastern No. 25, Lebu Light 10200 Penang, Malaysia 

GPS : 5.4201, 100.3408 Tel : (00 60 4) 264 2071 / 2072 / 2073 Fax : (00 60 4) 264 2068 Email : [email protected] Contact : Mohd Faiz Awang 

Page 135: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 135/139

OTHER INFORMATION  129 

SABAH LANGDON & SEAH (MALAYSIA) SDN BHDJURU UKUR BAHAN MALAYSIA JUBM SDN BHD DLSM PROJEKS SDN BHD Suite 8A, 8th Floor, Wisma Pendidikan Jalan Padang, P O Box 11598 88817 Kota Kinabalu Sabah, Malaysia GPS : 5.9783, 116.0761 Tel : (00 60 88) 223 369 Fax : (00 60 88) 216 537 

Email : [email protected] Contact : Ang Kun Eng 

SARAWAK JUBM SDN BHD No. 2, (3rd Floor) Jalan Song Thian Cheok 93100 Kuching 

Sarawak, Malaysia GPS : 1.5532, 110.3532 Tel : (00 60 82) 232 212 Fax : (00 60 82) 232 198 Email : [email protected] Contact : Nor Azman Bin Baharum 

SELANGOR LANGDON & SEAH SDN BHDJURU UKUR BAHAN MALAYSIAJUBM SDN BHD DLSM PROJEKS SDN BHD 2, Jalan PJU 5/15, Kota Damansara 

47810 Petaling Jaya Selangor Darul Ehsan, Malaysia GPS : 3.1527, 101.5918 Tel : (00 60 3) 6156 9000 Fax : (00 60 3) 6157 8660 Email : [email protected] Contact : Loo Ming Chee / Mohd Ali Abd Karim /

Justin Teoh / Mohd Faiz Awang / Nur Aziz Abu Bakar  

Page 136: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 136/139

130  OTHER INFORMATION 

5 OTHER INFORMATION 

INTERNATIONAL DIRECTORY OF OFFICES 

SINGAPORE 

LANGDON & SEAH SINGAPORE PTE LTDLANGDON & SEAH PROJECT

MANAGEMENT PTE LTD DLS CONTRACT ADVISORY & DISPUTE

MANAGEMENT SERVICES 1 Magazine Road, #05-01 Central Mall Singapore 059567 GPS : 1.288526, 103.842085 Tel : (65) 6222 3888 Fax : (65) 6224 7089 Email  : [email protected] 

Contact : Jim Pollock / Goh Chok Sin /Eugene Seah / Ho Kong Mo 

THAILAND LANGDON & SEAH (THAILAND) LTD

LECE (THAILAND) CO LTD 10th Floor, Kian Gwan Building II 

140/1 Wireless Road, Lumpini, Pratumwan Bangkok 10330, Thailand GPS : 13.734969, 100.545448 Tel : (00 66 2) 253 1438 - 9 Fax : (00 66 2) 253 4977 Email  :  [email protected] Contact : Ang Yen Kooi / Wong Soon Bin 

Page 137: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 137/139

OTHER INFORMATION  131 

INTERNATIONAL DIRECTORY OF OFFICES 

VIE TN AMHANOI LANGDON & SEAH VIETNAM CO LTD 4th Level Thanh Dong Building 132-138 Kim Ma Street, Ba Dinh District, Hanoi, Vietnam GPS : 21.0320, 105.8263 Tel : (00 844) 3942 7525 Fax : (00 844) 3942 7526 Email : [email protected] Contact : Mark Olive 

HO CHI MINH CITY LANGDON & SEAH VIETNAM CO LTD 9th Level Unit E-VTP Building 08 Nguyen Hue, District 1 Ho Chi Minh City, Vietnam GPS : 10.7727, 106.7051 Tel : (00 848) 3823 8297 Fax : (00 848) 3823 8197 Email : [email protected] Contact : Mark Olive 

Page 138: Construction Cost Handbook Phillipines 2013

8/12/2019 Construction Cost Handbook Phillipines 2013

http://slidepdf.com/reader/full/construction-cost-handbook-phillipines-2013 138/139

132  OTHER INFORMATION 

5 OTHER INFORMATION 