construction activities 090913
TRANSCRIPT
-
8/20/2019 Construction Activities 090913
1/2
2 Sep
CON
BeloProp
Workworks
Referrealigpede
Loca
1
2
3
4
5
6
7
tember 201
STRUCTI
is an overvirties directly
will occurwill occur b
overleaf fon Kesselstrian diver
ion
Kessels Ro(including ni
Mains Road(including ni
Mains Road(including ni
Kessels Ro
(including niKessels Ro
Kessels Ro(including ni
Mimosa Cr SpringfieldPark ‘n’ Rid
N UPDAT
iew of upco impacted b
onday to Setween 8.00
important ioad westbion on sout
d west of thight works)
north of theight works)
south of thight works)
d east of th
ight works)d north sid
d south sidight works)
ek, Grout, Btreets and
e (including
E – WEEK
ing worksthe works
turday betpm and 5.0
nformationund traffich side of K
e intersecti
intersection
intersectio
e intersectio
businesse
businesse
enaud andessels Roa
night works)
1
STARTIN
ver the fortnill be conta
een 6.30amam on Sund
about the so the northssels Road
Schedu
n DrainaOngoiMainsRoad
Continunderglighting
Ongoistorm
n Works
the Ke Contin
Earthand ligunderg
dEstabliCreekservic
3
2
9 SEPTE
ight startingcted by the
and 6.30pay to Thurs
cheduled tr between B between S
led
construc
ge works fog excavatioRoad bridgeoise barrier
uing survey,round drain. Asphalting
g kerb andater draina
to prepare f
sels Roaduing landsc
orks and sehting alonground stor
shment ofBridge. Earts.
BER TO
9 Septembommunity
. For safetyay nights.
affic switchnaud Streeringfield St
ion
activities
the westernns and conc deck. Finis.
kerb and foge and per
works.
ootpath wor e.
or and then
nderpassping works
rvices investouth side o water drain
orks compohworks and
5
EEK EN
r 2013 for thngagement
and traffic
on Wednest and Groutreet and Gr
section ofreting worksing and lan
tpath worksanent sign
ks. Works t
tart excava
long the no
igation. Inst Kessels Roage, new ke
nds. Workshe installati
6
ING 22 S
e Mains+K Team.
anagement
day 4 SepteStreet andout Street.
essels Roa for the westscaping wo
. Ongoingage. Works
install und
ions for the
rth side of K
llation of tead. Construrbing, and a
to demolishn of new un
7
PTEMBE
ssels upgra
reasons so
mber 2013 temporary
underpassern half of trks for the K
orks to insto install stre
rground
eastern sect
essels Road
porary foottion ofphalting wo
the old Miderground
2013
e.
e
o
.eessels
llet
ion of
.
paths
rks.
osa
-
8/20/2019 Construction Activities 090913
2/2
Traffic switch to temporarily realign Kessels Road westbound traffic to the north
To accommodate further upgrade works on the southern side of Kessels Road, the project will implement a traffic switch
to temporarily realign Kessels Road westbound traffic to the north between Benaud Street and Grout Street.
The traffic switch will see westbound traffic on Kessels Road between Springfield Street and Grout Street temporarily
moved onto the new northern half of the Mimosa Creek Bridge. Following the implementation of the switch, both east and
westbound traffic lanes on Kessels Road will be on the new northern half of the Mimosa Creek Bridge. The old Mimosa
Creek Bridge will then be demolished to facilitate construction of the new southern half of the bridge.
Lane closures and traffic control will be in place on Kessels Road between MacGregor Street and Mains Road from
8pm Wednesday 4 September 2013 to 5am Thursday 5 September 2013 to facilitate these changes (weather and
construction conditions permitting).
During these lane closures, Grout Street and Springfield Street will be accessible via left in/left out only, with u-turn
facilities provided at the MacGregor Street and Mains Road intersections.
Traffic control and signage will be in place during these works to guide road users along the newly aligned works.
Every reasonable effort will be made to minimise disruptions to residents and businesses, however, there will be some
traffic delays, noise, dust, flashing lights and lighting towers associated with the construction activities. Motorists are
advised to drive carefully, follow the road signage in place and allow extra time to complete your journey.
Temporary pedestrian diversion on Kessels Road south side
To facilitate the bridge construction works, pedestrian access on the southern side of Kessels Road between Grout Street
and Springfield Street will be temporarily diverted to the northern side of Kessels Road from Thursday 5 September 2013.
The diversion will be in place for the next few months while the second half of the Mimosa Creek Bridge is constructed.
Safety is a project priority and pedestrians are asked to follow the signage in place.