construction activities 090913

Upload: habeebmohammedfarooq

Post on 07-Aug-2018

222 views

Category:

Documents


2 download

TRANSCRIPT

  • 8/20/2019 Construction Activities 090913

    1/2

     

    2 Sep

    CON

    BeloProp

    Workworks

    Referrealigpede

    Loca

    tember 201

    STRUCTI

     is an overvirties directly

     will occurwill occur b

    overleaf fon Kesselstrian diver 

    ion 

    Kessels Ro(including ni

    Mains Road(including ni

    Mains Road(including ni

    Kessels Ro

    (including niKessels Ro

    Kessels Ro(including ni

    Mimosa Cr SpringfieldPark ‘n’ Rid

     

    N UPDAT

    iew of upco impacted b

    onday to Setween 8.00

     important ioad westbion on sout

    d west of thight works)

    north of theight works)

    south of thight works)

    d east of th

    ight works)d north sid

    d south sidight works)

    ek, Grout, Btreets and

    e (including

    E  – WEEK 

    ing worksthe works

    turday betpm and 5.0

    nformationund traffich side of K

    e intersecti

     intersection

     intersectio

    e intersectio

     businesse

     businesse

    enaud andessels Roa

    night works)

    STARTIN

    ver the fortnill be conta

    een 6.30amam on Sund

    about the so the northssels Road

    Schedu

    n DrainaOngoiMainsRoad

    Continunderglighting

      Ongoistorm

    n Works

    the Ke  Contin

      Earthand ligunderg

    dEstabliCreekservic

    9 SEPTE

    ight startingcted by the

    and 6.30pay to Thurs

    cheduled tr  between B between S

    led 

    construc

    ge works fog excavatioRoad bridgeoise barrier 

    uing survey,round drain. Asphalting

    g kerb andater draina

    to prepare f 

    sels Roaduing landsc

    orks and sehting alonground stor 

    shment ofBridge. Earts.

    BER TO 

    9 Septembommunity

    . For safetyay nights.

    affic switchnaud Streeringfield St

    ion 

    activities

     the westernns and conc deck. Finis.

    kerb and foge and per 

     works.

    ootpath wor e.

    or and then

    nderpassping works

    rvices investouth side o water drain

    orks compohworks and

    EEK EN

    r 2013 for thngagement

    and traffic

    on Wednest and Groutreet and Gr 

     section ofreting worksing and lan

    tpath worksanent sign

    ks. Works t

    tart excava

    long the no

    igation. Inst Kessels Roage, new ke

    nds. Workshe installati

    ING 22 S

    e Mains+K Team.

    anagement

    day 4 SepteStreet andout Street.

    essels Roa for the westscaping wo

    . Ongoingage. Works

    install und

    ions for the

    rth side of K

    llation of tead. Construrbing, and a

     to demolishn of new un

    PTEMBE

    ssels upgra

    reasons so

    mber 2013 temporary

    underpassern half of trks for the K

    orks to insto install stre

    rground

    eastern sect

    essels Road

    porary foottion ofphalting wo

     the old Miderground

    2013 

    e.

    e

    o

    .eessels

    llet

    ion of

    .

    paths

    rks.

    osa

  • 8/20/2019 Construction Activities 090913

    2/2

     

    Traffic switch to temporarily realign Kessels Road westbound traffic to the north 

    To accommodate further upgrade works on the southern side of Kessels Road, the project will implement a traffic switch

    to temporarily realign Kessels Road westbound traffic to the north between Benaud Street and Grout Street.

    The traffic switch will see westbound traffic on Kessels Road between Springfield Street and Grout Street temporarily

    moved onto the new northern half of the Mimosa Creek Bridge. Following the implementation of the switch, both east and

    westbound traffic lanes on Kessels Road will be on the new northern half of the Mimosa Creek Bridge. The old Mimosa

    Creek Bridge will then be demolished to facilitate construction of the new southern half of the bridge.

    Lane closures and traffic control will be in place on Kessels Road between MacGregor Street and Mains Road from

    8pm Wednesday 4 September 2013 to 5am Thursday 5 September 2013 to facilitate these changes (weather and

    construction conditions permitting).

    During these lane closures, Grout Street and Springfield Street will be accessible via left in/left out only, with u-turn

    facilities provided at the MacGregor Street and Mains Road intersections.

    Traffic control and signage will be in place during these works to guide road users along the newly aligned works.

    Every reasonable effort will be made to minimise disruptions to residents and businesses, however, there will be some

    traffic delays, noise, dust, flashing lights and lighting towers associated with the construction activities. Motorists are

    advised to drive carefully, follow the road signage in place and allow extra time to complete your journey.

    Temporary pedestrian diversion on Kessels Road south side 

    To facilitate the bridge construction works, pedestrian access on the southern side of Kessels Road between Grout Street

    and Springfield Street will be temporarily diverted to the northern side of Kessels Road from Thursday 5 September 2013.

    The diversion will be in place for the next few months while the second half of the Mimosa Creek Bridge is constructed.

    Safety is a project priority and pedestrians are asked to follow the signage in place.