consortium meeting feb 2, 2012

28
Consortium Meeting Feb 2, 2012

Upload: loe

Post on 21-Jan-2016

37 views

Category:

Documents


0 download

DESCRIPTION

Consortium Meeting Feb 2, 2012. Hit Rates. Big Snowstorm Hi: 3-4x normal demand. Slowed down web server-new fixes for this. Second is Canadian (Toronto): Should I block. Data Rates: Will Stop Google. Hardware. New, more powerful data server New internal web server - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Consortium Meeting Feb 2, 2012

Consortium MeetingFeb 2, 2012

Page 2: Consortium Meeting Feb 2, 2012

Hit Rates

Big Snowstorm Hi: 3-4x normal demand. Slowed down web server-new fixes for this

Page 3: Consortium Meeting Feb 2, 2012

Second is Canadian (Toronto): Should I block

Page 4: Consortium Meeting Feb 2, 2012

Data Rates: Will Stop Google

Page 5: Consortium Meeting Feb 2, 2012

Hardware

• New, more powerful data server• New internal web server• Major internal improvements last week to

improve responsiveness on the web• Let me know if there are any problems with

access.

Page 6: Consortium Meeting Feb 2, 2012

Major Changes

• On October 17th, moved to the new domain structure, with major expansion of 4/3 km domain, and modest expansions on 12 and 4 km domains.

Page 7: Consortium Meeting Feb 2, 2012

Before

Page 8: Consortium Meeting Feb 2, 2012

After

Page 9: Consortium Meeting Feb 2, 2012
Page 10: Consortium Meeting Feb 2, 2012
Page 11: Consortium Meeting Feb 2, 2012
Page 12: Consortium Meeting Feb 2, 2012

Hardening the New System

• The new domains are now solid, and several tweaks to the control scripts and model, and the experimental language has been taken off of them on the web.

• Also “experimental” was taken off the extended run.• New data storage array for SAGE.• New department data server.• New internal web server to reduce load• Major improvements and fixes since snowstorm to

improve robustness under major loads.

Page 13: Consortium Meeting Feb 2, 2012

Timing

• MM5-NAM to hour 72 by 7:05 am/pm PST• WRF 36/12 to hour 84 by 9 am/pm PST 36/12

to hour 180 by 10 am/pm PST (runtime 2.25 hours)

• WRF 4-km to hour 84 by 9:10 am/pm PST (runtime 1.5 hours)

• WRF 4/3 km to hour 48 by 2:30 pm/am PST runtime 5.1 hours it can be done as early as 2:02 if there is no precip

Page 14: Consortium Meeting Feb 2, 2012

Major Enhancements to Web Page and New Products

• Consolidated 1 1/3 km domain Web page with the rest of the domains .

Page 15: Consortium Meeting Feb 2, 2012

Random Point Selection for All Products Now Working for All Domains

Page 16: Consortium Meeting Feb 2, 2012

New Products• Added all air quality graphics for the 1 1/3 km

domain and fixed up labeling locations

Page 17: Consortium Meeting Feb 2, 2012

Major Changes to Web Pages and Products

• Added subdomains (zoomed in) for the 1 1/3 km domain for wind speed.

• Added high-resolution roads, islands, coastlines, and counties to our version of RIP. Using these on the most zoomed-in domains.

• Added more snow graphics for the 1 1/3 km domain • Added model snow for western Washington views of all

domains . • Added pre-generated soundings, time-heights, and

meteograms for the 1 1/3 km domain. • Nearly done fixing the meteograms for the MM5-NAM

(they're plotting locations based on the WRF-GFS domain which is quite different).

Page 18: Consortium Meeting Feb 2, 2012
Page 19: Consortium Meeting Feb 2, 2012

What Else?

• What further changes and additions are needed to graphics/products?

• Anything you think we can drop?

Page 20: Consortium Meeting Feb 2, 2012

Verification Stats

Page 21: Consortium Meeting Feb 2, 2012

No Drag Parameterization in 4/3 km

Page 22: Consortium Meeting Feb 2, 2012
Page 23: Consortium Meeting Feb 2, 2012
Page 24: Consortium Meeting Feb 2, 2012
Page 25: Consortium Meeting Feb 2, 2012
Page 26: Consortium Meeting Feb 2, 2012

Maintain and Improve Ensemble Systems

• UWME based on WRF• EnKF based on WRF.• More on these at next consortium meeting.

Page 27: Consortium Meeting Feb 2, 2012

Next Steps• Evaluate adding additional levels in PBL..especially for 4/3 km• Addition changes/improvements to subgrid drag parameterization.• Test new PBL schemes• Test new WRF version 3.4 coming out next month.• Test new NOAA Land Surface Model (LSM) to see if surface

temperature biases are improved.• Using LSM, allow snow to change during runs (not now).• Improve products for EnKF system and complete rewrite of Phil’s

code.• Consider driving the high-res system by the best ensemble member

of the ensemble mean.

Page 28: Consortium Meeting Feb 2, 2012

The END