connections build q4-08

21
1-09-09 1 CONNECTIONS Build Q4-08 New York State Office of Children and Family Services

Upload: helene

Post on 05-Feb-2016

26 views

Category:

Documents


0 download

DESCRIPTION

CONNECTIONS Build Q4-08. New York State Office of Children and Family Services. Investigation Actions. Districts can choose to make completion of the Investigation Actions Task optional for their workers: - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: CONNECTIONS Build Q4-08

1-09-09 1

CONNECTIONSBuild Q4-08

New York StateOffice of Children and Family Services

Page 2: CONNECTIONS Build Q4-08

1-09-09 2

Investigation Actions

• Districts can choose to make completion of the Investigation Actions Task optional for their workers:

– If a district opts out, Investigation Actions will remain on the Task List, but its completion is no longer required for the Investigation to be approved

– Supervisors can still require Investigation Actions for individual workers or specific cases

– Whether optional or not, the Investigation Actions Event will still appear on the Event List as “PEND” or “APRV”, depending on status of the Investigation Conclusion

– Districts must contact their regional Connections Field Staff in order to request that the Investigation Actions Task be made optional.

Page 3: CONNECTIONS Build Q4-08

1-09-09 3

Progress Notes

• A New Using Button has replaced the Sort button on the Progress Notes Search Window

– New Using enables worker to copy data fields from an existing note into a new one.

Page 4: CONNECTIONS Build Q4-08

1-09-09 4

Progress Notes

• The Sort Function has been added to column headings so that users can sort directly on the Progress Notes Grid

– Pre-Q4-08 sort options are still available through the Options menu

– Arrow will show ascending or descending order

– Can change sort order by clicking on column heading

Page 5: CONNECTIONS Build Q4-08

1-09-09 5

Progress Notes

• Progress Notes entered in FSS Stages can now be entered with an event date on or after the CID or the FSI (Intake Date), whichever is earlier– Intake Date=Date of initial FSI save

• Will allow Progress Notes to be entered with an event date prior to FSI if the CID predates the FSI date.

Page 6: CONNECTIONS Build Q4-08

1-09-09 6

Family Services Stage Improvements

• Check FASP Detail —Incomplete components will appear in same order as in FASP Tree

Page 7: CONNECTIONS Build Q4-08

1-09-09 7

Family Services Stage Improvements

• FASP Tree — For an In Process FASP, the Tree will fully expand upon window entry, displaying all nodes

Page 8: CONNECTIONS Build Q4-08

1-09-09 8

Family Services Stage Improvements

• Consolidated Error Messages —Upon launch of a FASP or a Plan Amendment, all error messages will present in one Message List

Page 9: CONNECTIONS Build Q4-08

1-09-09 9

Family Services Stage Improvements

• FASP Due Dates—the “Next FASP Due Date” Field on the Family Assessment and Service Plan Window will display the date of earliest future “In process” or “Not Launched” FASP.– Prior to Build Q4-08, the

field only displayed the due date of the next “Not Launched” FASP

Page 10: CONNECTIONS Build Q4-08

1-09-09 10

Family Services Stage Improvements

• Tree will display due dates for FASPs in statuses:– Not Launched– In Process– Pending

Page 11: CONNECTIONS Build Q4-08

1-09-09 11

Family Services Stage Improvements

• FASP Overdue Message—will display when earlier of “Not Launched” or “In Process” FASP is overdue

Page 12: CONNECTIONS Build Q4-08

1-09-09 12

Family Services Stage ImprovementsCase Planner Summary

• FASP Case Planner Summary Navigation has been streamlined when only a Case Manager or Case Manager and Case Planner are assigned to the case and there is no need to summarize information recorded by multiple workers.

• Navigation will now be directly to the Case Planner Summary windows in the four instances described in the next three slides:– Note: Pre Q4-08 navigation supporting the Case Planner

compiling information recorded by multiple workers will remain available when CPS monitor and/or Caseworker is assigned to the Stage.

Page 13: CONNECTIONS Build Q4-08

1-09-09 13

Family Services Stage Improvements Case Planner Summary

1. Navigation to the Case Update Tab will display the Case Planner Summary window, bypassing the Case Update tab where draft entries are recorded by staff in the “Caseworker” role.

2. Navigation from the Assessment node will display the Case Planner Summary window for the Family View tab, bypassing the Family Assessment Analysis window

Page 14: CONNECTIONS Build Q4-08

1-09-09 14

Family Services Stage Improvements Case Planner Summary

3. Choosing the Behaviors/Contributing Factors tab, the Strengths tab, or the Needed Improvements/Changes tab will also display the Case Planner Summary window for each of these tabs.

Page 15: CONNECTIONS Build Q4-08

1-09-09 15

Family Services Stage Improvements Case Planner Summary

4. While in the Service Plan window, clicking on the Family Involvement Button will lead directly to the Case Planner Summary window.

Page 16: CONNECTIONS Build Q4-08

1-09-09 16

Family Services Stage Improvements

• Education Tab academic year dates — Instead of only the current or previous academic year, workers will be able to enter and view information related to prior, current, or the next academic year.

Page 17: CONNECTIONS Build Q4-08

1-09-09 17

Approvals

• Approval To Do’s not ready for approval by Case Manager will appear grayed out on the Manager’s To Do List

– Once the initial approval(s) is done, the To Do will no longer appear grayed out

– Will help Managers know when the initial approval(s) has been completed

– Applies to FASP, Plan Amendment, and Stage Closing approvals

Page 18: CONNECTIONS Build Q4-08

1-09-09 18

Permanency Hearing Report• Permanency Hearing Date

Certain– The Hearing Date Certain

column on Child List grid changed to “Hearing Date Certain from CCRS”

– “Amended Date Certain” check box added to Summary grid

– If the “Hearing Date Certain” is changed on the Court Information window in Connections, the Check box will prefill and the date will update on the Permanency Hearing Report

– Checkbox clarifies why hearing date in top grid may differ from the hearing date in the bottom grid.

– Q4-08 does not impact Hearing Date Certain entered in CCRS; CCRS, as the system of record, should be corrected, as necessary.

Page 19: CONNECTIONS Build Q4-08

1-09-09 19

FAD Homes

• A check box has been added to the Resource Detail Window to indicate if a resource is an adoption subsidy home, as recorded in the F/A Home License window.

Page 20: CONNECTIONS Build Q4-08

1-09-09 20

FAD Homes

• Adam Walsh Child Protection Act requires mandatory revocation of foster/adoptive parents certification/approval or disqualification of foster/adoptive applicants convicted of certain categories of felonies

• New code (mandatory disqualifier) added to drop down closure reasons on FAD Close Home window.

• Screen print to be added shortly

Page 21: CONNECTIONS Build Q4-08

1-09-09 21

Save Messages• New message added

when “Save as Final” is selected for Progress Notes

• Enables a worker to cancel the FINAL save of a Progress Note and save the note in DRAFT status instead.

• The pop up window “Changes have been saved” has been eliminated - found to be of little value because the only option was to check “OK”.

• Pop up formerly appeared when saving Progress Notes and when saving Safety or Risk Assessment in INV Stage